Loading...
HomeMy WebLinkAboutSW5140801_As-Built - Certification_20240206 Post-Construction Stormwater Management Permit No. SW5140801 AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due..care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the "AS-BUILT" drawings, such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM #?Pond A - Check here if this is a part of a Fast-Track As-Built Package Submittal per .1044(3). Check here if the designer did not observe the construction, but is certifying the project. _ Check here if pictures of the SCM are provided. Printed 1iYV) '1"Frank Slinsky Signaturei' !/ NC Registration Z Number ° 336 Zs" 2/ 2. Date / Y SEAL: Consultant's Mailing Address: \0,0.;�CARo,//� 5410 Trinity Road, Suite 102 l � .:-.„ • City/State/ZIP Raleigh, NC 27607 ;ate SEAL 9r: = • 033612 ; (919) 866-4505 Phone Number /i,4i/C•• 4..k ` Consultant's Email address: •///Il111\0 frank.slinsky@timmons.com O Circle N if the as-built value differs from the Plan. If N is circled, provide an explanation on Page 2. OO N/E = not evaluated (provide explanation on page 2) OO N/A = not applicable to this SCM or project. Consultant's Certification NCAC .1003((3) & General MDC OAs-built ON/E ON/A .1050 A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N 2. The SCM achieves runoff volume match. Y or N 3. Runoff from offsite areas and/or existing BUA is Y or N bypassed. _. 4. Runoff from offsite areas and/or existing BUA is directed Y or N into the permitted SCM and is accounted for at the full N/A build-out potential. 5. The project controls runoff through an offsite permitted Y or N N/A SCM that meets the requirements of the MDC. 6. The net area of new BUA increase for an existing project �jY or N has been accounted for at the appropriate design storm level. 7. The SCM(s) meets all the specific minimum design ® or N criteria. B. VEGETATED SETBACKS/ BUA 1. The width of the vegetated setback has been measured Y or N from the normal pool of impounded waters, the MHW N/A line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other Y or N N/A vegetation. 3. BUA that meets the requirements of NCGS 143-214.7 Y or N N/A (b2)(2) is located in the setback. Page 3 of 6 Post-Construction Stormwater Management Permit No. SW5140801 4. BUA that does not meet the requirements of NCGS 143- Y or N 214.7 (b2)(2) is located within the setback and is limited to: a. Publicly funded linear projects (road, greenway sidewalk) N/A b. Water-dependent structures c. Minimal footprint uses (utility poles, signs, security lighting and appurtenances) 5. Stormwater that is not treated in an SCM is released at Y or N the edge of the setback and allowed to flow through the N/A setback as dispersed flow. OAs-built OO N/E ©N/A C. STORMWATER OUTLETS —the outlet handles the peak 0 or N flow from the 10 year storm with no downslope erosion. D. VARIATIONS 1. A variation (alternative) from the stormwater rule Y or N N/A provisions has been implemented. 2. The variation provides equal or better stormwater control Y or N N/A and equal or better protection of surface waters. E. COMPLIANCE WITH OTHER REGULATORY PROGRAMS Qu or N has been met. F. SIZING -the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required DY or N storm depth. G. CONTAMINATED SOILS— infiltrating SCM's are not QY or N located in or on areas with contaminated soils. H. SIDE SLOPES 1. Vegetated side slopes are no steeper than 3H:1V. QY or N 2. Side slopes include retaining walls, gabion walls, or Y or N N/A other surfaces that are steeper than 3H:1V. 3. Vegetated side slopes are steeper than 3H:1V (provide Y or N N/A supporting documents for soils and vegetation). I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. 0 or N 2. The outlet does not cause erosion downslope of the 0 or N discharge point during the peak flow from the 10 year storm. J. EXCESS FLOWS—An overflow/ bypass has been or N provided. K. DEWATERING — A method to drawdown standing water has DY or N been provided to facilitate maintenance and inspection. L. CLEANOUT AFTER CONSTRUCTION —the SCM has been 0 or N cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. QY or N 2. The access does not include lateral or incline slopes DY or N >3:1. N. DESIGNER QUALIFICATIONS (FAST-TRACK PERMIT) — The designer is licensed under Chapters 89A, 89C, 89E, or QY or N 89F of the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked "N/A" or "N/E", below. Attach additional pages as needed: Items A.4, A.5: There is no offsite BUA or SCM. Items B.1-B.5: There are no vegetated setbacks. Items D.1, D.2: There were no variations from stormwater rules. Items H.2, H.3: There are no slopes steeper than 3:1. Page 4 of 6