Loading...
HomeMy WebLinkAboutTable of ContentsVolume II Figures 1-1 General Vicinity Map 2-1 Photographic Examples of Road Types 2-2 Principal Park Road Typical Section 2-3 Special Purpose Park Road Typical Section 2-4 Primitive Park Road/Administrative Access Road Typical Section 2-5 Initial Concepts Considered 2-6 Preliminary Study Alternatives 2-7 Alternatives Initially Suggested for Detailed Study in the DEIS 2-8 Detailed Study Alternatives 2-9 Laurel Branch Picnic Area Conceptual Plan 2-10 Laurel Branch Picnic Area Example Structures 2-11 Bushnell Area Conceptual Plan 2-12 Bushnell Area Example Structures 3-1 Census Boundaries 3-2 GMP Proposed Management Zoning 3-3 Floodplains 3-4 Ambient Sound levels 3-5 Streams and Wetlands 3-6 Vegetation Communities 3-7 Viewpoints for Detailed Analysis 4-1 Traffic Data and Capacity Analysis Intersection, Peak Hour Volumes A.M./P.M. Year 2025 (No- Action) 4-2 Traffic Data and Capacity Analysis Intersection, Peak Hour Volumes A.M./P.M. Year 2025 (Laurel Branch) 4-3 Traffic Data and Capaciry Analysis Intersection, Peak Hour Volumes A.M./P.M. Year 2025 (Bushnell — Primitive) 4-4 Traffic Data and Capacity Analysis Intersection, Peak Hour Volumes A.M./P.M. Year 2025 (Bushnell — Principal) Table of Contents — i North Shore Road Final Environmental Impact Statement 4-5 Traffic Data and Capacity Analysis Intersection, Peak Hour Volumes A.M./P.M. Year 2025 (Northern Shore Corridor — Primitive) 4-6 Traffic Data and Capacity Analysis Intersection, Peak Hour Volumes A.M./P.M. Year 2025 (Northern Shore Corridor — Principal) 4-7 Traffic Data and Capacity Analysis Intersection, Level of Service Year 2025 (No-Action) 4-8 Traffic Data and Capacity Analysis Intersection, Level of Service Year 2025 (Laurel Branch) 4-9 Traffic Data and Capacity Analysis Intersection, Level of Service Year 2025 (Bushnell — Primitive) 4-10 Traffic Data and Capacity Analysis Intersection, Level of Service Year 2025 (Bushnell — Principal) 4-11 Traffic Data and Capacity Analysis Intersection, Level of Service Year 2025 (Northern Shore Corridor — Primitive) 4-12 Traffic Data and Capacity Analysis Intersection, Level of Service Year 2025 (Northern Shore Corridor — Principal) 4-13 Backcountry Campsite and Trail Elimination 4-14 Private In-Holdings Errata and Addenda to Appendices There are no revisions to Appendices B, C, E, F, G, K, and O. A 1943 Agreement D Local Government Resolutions and Correspondence H Programmatic Agreement Among the National Park Service, Federal Highway Administration, and the North Carolina State Historic Preservation Officer for the North Shore Road Project I Topography, Geology, and Soils Technical Report J Public Involvement Comment Summary L Cherohala Skyway: An Evaluation of Construction Techniques, Water Quality, and Similarities with the North Shore Road Project M Water Resources Technical Report N Terrestrial Resources Technical Report P Agency Consultation and Coordination Letters Q Great Smoky Mountains National Park Enabling Legislation R Independent Review of Cost Estimate for the North Shore Road Project Table of Contents — i North Shore Road Final Environmental Impact Statement