Loading...
HomeMy WebLinkAbout20151049 Ver 1_Stormwater Management Plan_20151006WOODALL SUBDIVISION Town of Apex, North Carolina Stormwater Management Plan : 7.1' 0 WITHERS RAVENEL 115 MACKENAN DRIVE CARY, NC 27511 October, 2015 t�11111a111�/!�! r SEAL 4 .. 26385 t.f+ YARD 'i ro, TABLE OF CONTENTS A. Wake County Soil Map ................................................................... ............................... B. NOAA Atlas Precipitation Depth Data ............................................ ............................... C. NOAA Atlas Rainfall Intensity Data ................................................. ............................... D. Stormwater Management Plan Summary ....................................... ............................... E. Pre and Post - Drainage Area Maps ................................................. ............................... F. Wet Detention Pond 1 Design ........................................................ ............................... G. Wet Detention Pond 2 Design ........................................................ ............................... H. Overall Site Watershed Model Schematic ..................................... ............................... I. Curve Number & TC Calcs ............................................................. ............................... J. 1 -Year Hydrographs ...................................................................... ............................... K. 10 -Year Hydrographs .................................................................... ............................... L. loo -Year Hydrographs .................................................................. ............................... M. Culvert Calculations ...................................................................... ............................... N. Seasonal High Water Table Determination (By Others) ................. ............................... 0. NCDENR Wet Detention Basin and Level Spreader Supplements ................................. Wake County Soil Map 35° 43'26'N 35° 09'N Soil Map` —Wake County, North Carolina a (Woodall Subdivision Soils) in � 35° 43 26' N 0 35° 43 9' N 691640 691700 691760 691820 691880 691940 692000 3 3 bt h Map Scale: 1:2,5901f ported on A putrat ( &5" x 11") sheet lx Um � k N 0 35 70 140 210 0 100 200 400 600 A Map pro)e�on: Web Mercq u Comeraoordrales: WG584 Edge tics: UTM Zone 17N WGS84 USG4 Natural Resources Web Soil Survey 6/17/2015 Conservation Service National Cooperative Soil Survey Page 1 of 3 MAP LEGEND Ares of Interest tA011 0 Area of Interest (AOI) Sells E3 Soll Map Unit Polygons N Soil Map Unk Lines Other Soil Map Link Polnle Special Polni Features IV Blowout ® Borrow Pit 444 Clay spa 0 Closed Depression Y. Gravel Pit Gravely Spot O Landfill A, Lava Flow 46 Marsh or swamp * Mine or Quarry O Mbceseneous Water O Perennial Water V Rock Outcrop + Saline Spot ... Sandy Spot Severely Eroded Spot Sinkhole Slide or Sep df SWIG Spot Soil Map —Wake County, North Caroline (Woodall Subdivision Soils) 1@ Spoll Area c Slony Spot Very Stony Spot Wet Spot Other •� Speclal Line Features Water Features ._ Stresms and Canals Transportsaon 444 Rails w Interstate Highways •v US Routes Major Roads Local Roads Background . Aerial Pholography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,600. Warning: Soil Map may not be valid at this scale. Enlargamoril of maps beyond the scale of mapping can couss miaundafstanding of the detail of mopping and accuiacy of soli line placement The maps do not Shwa the small areas or contrasling sci la "I could have boon spawn at a more dolsiiled scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: hllp :ltwebsoilsurvey.nres,usda,gov Coordinate System: Web Mercator (EPSG:3857) Maps from ilia Wob soil Survey are based on the Web Mercator projection, wh "ch preserves direction and shape but distorts dlslance and area A pro)aotlon that preserves area, such as the Albers equal -area conic projection, should be used 6 more accurate calculations of distance or area are required. This product is generated from the USDA -NRCS certified data as of the version date(s) listed below. Soil Survey Area: Wake County, North Carolina Survey Area Data: Version 12, Sep 10, 2014 Soil map units are labeled (as apace allows) for map scales 1:50,000 or larger- Dale(s) aerial images were photographed: Apr 27, 2014 —May 6, 2014 The orthophoto or other Gass map on which the soil lines were compiled and digitized probably did(orc from Iho background Imagery displayed a7 these moos As a rosull, some minor shifting of map unit boundaries may be evident. �i gm Natural Resources Web Soil Survey 6!1712015 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Wake County, North Carolina Woodall Subdivision Soils Map Unit Legend Wake County, North Carolina (NC783) Map Unit Symbol Map Unit Name Acres In AOI ' Percent of AOI MfD2 Mayodan sandy loam, 10 to 15 0.5 1.9% percent slopes, moderately eroded Mg132 Mayodan gravelly sandy loam, 1A 5.7%1 2 to 6 percent slopes, moderately eroded MgC2 Mayodan gravelly sandy loam, 16.4 67.2% 6 to 10 percent slopes, moderately eroded WyA Worsham sandy loam, 0 to 3 6.2 25.2% percent slopes Totals for Area of Interest 24.5 100.011/4 USDA Natural Resources Web Soil Survey 6/17/2015 Conservation Service National Cooperative Soil Survey Page 3 of 3 NOAAAttas Precipitation Depth Data Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 �. -.. Location name: Apex, North Carolina, US* Latitude: 35.7305 °, Longitude: - 78.8516° Elevation: 503 ft* 'source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnln, D. Martin, B. Lin, T Parzybok, M.Yekla, and D Riley NOAH, National Weather Service, Silver Spring, Maryland PF tabular I PF araohical I Mans & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)' 1 4.88 5.80 6.98 7.90 .1 12.1 9.14 .1 II I1 13.4 14.5 1 10 -day . (4.58 -520) (5.44 -6.19 6.54 -7. 11 39 - 8. I 53 -9.75) �+ (9.42 -10.8) (103 -1 11.2 -12.9 I 1 Average recurrence interval (years) (13.3 -15.5) 6.52 7.69 9.10 10.2 �[ 11.7 12.9 1 14.1 15.3 I f 11 1L(14.2, 16.9 11 10urationilI L20 -day (9.57 -10.9) I{ (10.9 -12.5) II (12.0 -13.7) (13.1 -15.0) 16.3) 41 �J (6.12 -6.95) (7.23 -6.20) II (6.54 -9.69) (15.6 -18.1) (16.7 - 19.5) 8.10 9.52 11.1 12.3 I 13.9 15.1 16.3 17.5 19.1 11 20.4 (7.53 -8.61) (8.96 -10.1) (10.4 -11.8) {11.5 -13.1) I (13.0 -14.8) (14.1 -161) (15.2 - 17.4) (16.3 -16.7) I (17.7 -20.4) (16.13-21.8) 10.3 12.1 13.9 15.2 17.0 18.4 19.7 l 20.9 i E4daaj� f9.B2 -1D.9) (11.5 -1281 (13.2 -14.7 L(14.4 -16.1) I1 (16.1 -18.0) I (17.3_19,4) L(1819.7.81 JI (19.7 -22.2) ! 22.6 (21.2 -24.0) IL(22.3 1 1[ 2 i1 5 11 10 11 25 11 50 II 100 11 200 11 500 11 1000 j Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates 0.407 J 0.476 _ 0.546 0.606 0.669 0.715 0.756 0.791 0.830 0.862 5 -min I (0.373 -$,444 14(0.436- 0,520501- 0.596) (0.554 �I II - 0.6II 09- 0.729) II (0.648 - 0.779).(0.682- 1f 0.823)Jn 0.710 - 0.863) 11 110.738 -0.906 1 110.760- 0.9 41) I 10-min f 0.650 0.761 0.875 0.970 1.07 I II 1.14 1.20 1.25 11 1.31 �I 1.36 1 I(0. 595 - 0.70911(0.697- 0.832)'(0:802 - 0.955)11 (0.887 -1.06) (0.971 -1.16) (1.03 -1.24) (1.08 -1.31) (1.13 -1.37) (1.17 -1.43) (1.20 -1.48) 0.812 0.95fi 1.11 1.23 I 1.35 1.44 1.52 f 1.58 IE I� 1.65 1.70 15 -mrn l(0.744- 0.8871 (0.676 -1.05) {1.01 -1.21) I (1.12 -1.34) p (1.23 - 1.47)1 1.31 -1.57 (1.37 -1.65) (1.42 -1.73) - 1.80) (1.50 -1.86) 1.11 1.32 1.57 1.78 2.00 2.17 I 2.33 f 2.46 :2.1.47 2.63 I 2.76 �I30 -mtn (1.02 -1.22) II (1.21 -1.44) (1.44 -1.72) �1 (1.63 -1.94) (1.82 -2.18) II (1.97 -2.37) (2.10 -2.53) Il' (2.21-269) 34 -2.87) (2.43 -3.01) I 1.39 1.66 2.02 23 67 67 2.94 3.46 3.77 4.03 60 -min 1 II (1,27 -1.52) I (1,52 -1,81) 1I (1,85 -220) (2.12 -2.53) (2.43 -2. I3.20 67 - 3 21) (2. 4) -3, I1 (3.1 I 36 -4. I1 (3. -4, 40 1.62 1 1.94 2.38 2.76 3.22 3.60 II 3.97 4.33 4.81 I 5.19 2 -hr L(1,47-1-78) L(1,77 -2.13) L(2.17 -2.62) L(2.50 1 -3.04 (2.90 -3.54) (3.23 -3.95) (3.54 -4.35) (3.84 -4,75) 4.22 -5.27 (4.52 -5.70) 1.72 2.05 2.54 2.96 3.49 3.94 4.38 4.84 5.45 5.97 �I3 -hr (1.57 -1,891 II (1.BB -2.27) 16. 31-2. 11 (2.69 -3.26) IL(3.15 -3.83) 11 (3.54 -4.32) (3.90 -4,81) (4.28- 5,30111 (4.76 - 5.97)][ (5.16 -6.55) 6 -hr 2.06 2.47 3.05 3.56 4.22 4.78 5.34 5.93 6.72 7.39 1 (1.89 -2.26) (2.27 -2.71) (2.79 -3.35) (3.25 -3.90) (3.83 -4.61) (4.31 -5.22) (4.77 -5.82) (5.24 -6,45) (5.86 -7,31) 1 (6.37 -8.05) 12 -hr 2.44 2.92 3.62 4.25 5.07 5.79 6.51 7.27 8.32 9.24 (2.24-2671 (2.68 -3.201 23.31 -3 96) (3.87 -4.65) (4.59 - 5.532 (5.19 -6.28) (5,79 -7.06) (6,39 -7,68) (7.20 -9.02) (7,87 -10.0) 2.87 3.46 I 4.35 1 5.04 5.99 6.74 7.51 11 8.30 �I 9,39 10.2 24 -hr 1 (2.67 -3.09) (3.23 -3.73) (4,05 -4,68) (4.69 -5,43) _(5.55 -6.45) (6.23 -7.25) II (6.92 -8.09) {7.63 -8.95) �i (8.58 -10.1) I (9.32 -11.1) 3.32 4.bb + 4.98 5.75 6.79 7.61 8.45 9.31 10.5 11.4 2 -day 1 II (3.09 -3.57) I (3.72 -4.31) I (4.63 -5.37) I� (5.33 -6.19) (6.28 -7.31) II (7,02 -8.20) II (7.77 -9.11) �I (8.54 -10,0) �I (9.57 -11.3) h (10.4 -12.3) 3.51 4.22 5.23 6.02 w 7.10 7.95 8.82 9.72 10.9 I L(9.99 Il 11.9 �I3 -day (3.27- 3.7711L(3.93 -4.53) ILf4.67 -5.61) I� (5.59 -6.4611 _(6.57 -7.62) (7.34 -8.54) (6.12 -9.49) (8.92 -10,5) -11.8) (10.8 -12.6) 3.70 4.44 5.48 6.29 l 7.41 8.29 9.20 10.1 II 11.4 12.4 U14 -day (3.45 -3.97) 1L(4.14 -4.76) U5,10-5.86) (5.85-674) II (6,87 -7.94) II (7.67 -8.89) 1I (8.47, 9.86) Jl (930-10. (10.4 -12.2) �I (11.3 -13.3) 4.27 I 5.10 6.21 7.09 l 8.30 9.25 10.2 11.2 12.6 13.6 I7 -day - II (4.00 -4,56) 11 (4,77 -5.44) II (5.81 -6.63) (6.62 -7.571 II (7.73 -8.85) I1 (8.59 -9.88) II (9.47 -10.9) II (10.4 -12.0) 11 (11.6 -13.5) 1.(12,5-14 . 1 1 4.88 5.80 6.98 7.90 .1 12.1 9.14 .1 II I1 13.4 14.5 1 10 -day . (4.58 -520) (5.44 -6.19 6.54 -7. 11 39 - 8. I 53 -9.75) �+ (9.42 -10.8) (103 -1 11.2 -12.9 I 1 (12.4 -14.4) (13.3 -15.5) 6.52 7.69 9.10 10.2 �[ 11.7 12.9 1 14.1 15.3 I f 11 1L(14.2, 16.9 11 18.2 L20 -day (9.57 -10.9) I{ (10.9 -12.5) II (12.0 -13.7) (13.1 -15.0) 16.3) 41 �J (6.12 -6.95) (7.23 -6.20) II (6.54 -9.69) (15.6 -18.1) (16.7 - 19.5) 8.10 9.52 11.1 12.3 I 13.9 15.1 16.3 17.5 19.1 11 20.4 (7.53 -8.61) (8.96 -10.1) (10.4 -11.8) {11.5 -13.1) I (13.0 -14.8) (14.1 -161) (15.2 - 17.4) (16.3 -16.7) I (17.7 -20.4) (16.13-21.8) 10.3 12.1 13.9 15.2 17.0 18.4 19.7 l 20.9 i E4daaj� f9.B2 -1D.9) (11.5 -1281 (13.2 -14.7 L(14.4 -16.1) I1 (16.1 -18.0) I (17.3_19,4) L(1819.7.81 JI (19.7 -22.2) ! 22.6 (21.2 -24.0) IL(22.3 23.9 -25,4) 211.2 1 22.5 II 4 641I ? 25.6. II 60 -day I j11 B? 13. II (13.715.2) (15 51.2) 16 918. .70 20.0- 22.3)1 (21.2 -23.8) (22.4 -2 5.2 1I 6} II (169 .8) 1I (24,0-2 70) (2.1 -2 8.4) 51) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS) Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5 %. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. (please refer to NOAA Atlas 14 document for more information. Rack to Too PF graphical http:// hdsc. nws. noaa. gov/ hdsc /pfds /pfds _printpage.html ?lat= 35.7305 &lon= - 78.8516 &data = depth... 6/17/2015 Precipitation Frequency Data Server Page 2 of 4 Average recurrence intery -8l 25 (years) 20 2 L15 1 — 25 ro .CL 10 - r 100 ai CL 200 600 5 — 1000 0 , i u i i 1 i CC C C_ C C_ L L T T T T T T T T T C kb rV - -'0 "a -9 U F -? * 14 u1 O LA p ,"I N r, O O O V Duration pp lb 30 , Duration jr 5-min — 2-day 25 ...... ..... t 0-Run — 3-day _ 15 -min — 4Aay c 20 — 30-min — 7Aay - 60-min — 10-day aai — 2-W — 20-day v ' c 15 — 3-hr — 30-day — 6-hr — 45 day ' r — 12-hr — 60-day V 10 24-hr CL 0. 2 5 10 25 50 100 200 500 1000 Back to Too Average recurrence interval lVears) aerials NOAA Atlas 14, Volume 2. Version 3 Maps Created (GMT): Wed Jun 17 13:02:25 2015 Small scale terrain ,r,,/ R"varrnke r V I R G I N I A Wirnm,'i�ui" E` $la cksUuw di t� r 4s" j y oNew,Mrt Newk Norfolk r' `a Olrginl Greensboro 'Winton - Salerno j` S b Durham Hocky Mount e ' 1 <' krapOrY t, h R fl ORTH L I N" l aleigh Greeonville R Charlotte - O ` Mow ttCrn J Fayetteville'.eit.: o o pitrlhntilrrg oRock Hltl Ja.:ksnrrville ' 0.6rthi ,Id City Florence Wilmington a N v Mid- AURMIC Stvak Alen f. s �; C) U T H MBA tlB iCepOOple 5II kn, http: / /hdsc.nws.noaa. gov /hdsc /pfds /pfds _printpage.html ?lat =3 5.7305 &Ion=-7 8.8 5 1 6&data=depth... 6/17/2015 Precipitation Frequency Data Server Page 3 of 4 Large scale terrain 16,z II� 1613 0 1617 •'.`;1 i.:;� )cP C } 1 64 �} z A_x �pMNe 11J 'r n� 42 Friendship r �° . t,P' 2 km Map fthp#2@7FrfajSfaogle Large scale map 1612 • 1611 1613 �a C '4,, ""Y 1011 \C ILK 1hiCf1 ^ \� � P 5. 1011 A'W�C� O F1 M-61 *,lv+ A�I x oM • oKc 4` 4 4 x 11 {T Y Friendship s .Map 004 #0ri ao-gle Back to Too US Department of Commerce National O A��vic and Almosohefic Administralion National Weather Service Office of Hvdroloaic Develooment 1325 East West Highway http: //hdsc.nws.noaa.gov /hdse /pfds /pfds —printpage.html ?lat =3 5.7305 &lon =- 78.8516 &data = depth... 6/17/2015 NOAH Atlas Rainfall Intensity Data Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 '!' Location name: Apex, North Carolina, US' ,,r Latitude: 35.7319 °, Longitude: - 78.8434° i Elevation: 501 W 1' d ' source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES G.M Bonnin, D Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAH, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Mans & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inchesfhour)l lDurii for 1 Average recurrence_ interval I earall I 11 1 11 2 11 6 11 10 26 50 100 11 200 11 500 R. 1000 6 6I 7 - 41 5 -min (4,465.32), (b. 2 -69 [5.997.14) (6.640-- 8, 5 (6,50 10.33 3-11 i (a.08 -1,3) 5.80 ...83lS ..,. 6.8142] (6.4617.82) [6.7358, 16] [89888.56} [71 10 -min 1 3.89 4.55 5.23 I 8.11 (3.56.4,25) (4.17 -4.97) (4,815 -572) ! (5.37 -6.39} (581 995] [6.18 -7, 15 -min 3.24 3.81 4.41 4.90 5.39 5.75 6105 6.31 6.58 6,79 (2.97 -3.54) (3.50 -4.17) [4.06 -4.82) �� (4.46 -5.34! I� (4.61 -6.88] (5.22 -6.26) I (SAS -6.60) [5.66 -6.86) [6:86 -7.18] (5.99 -7.42] 5.24 5.60 30 -min 1 (2.0432.43! „� (2.41-2M ) �I [288 142) (3.245387) II 13.84�#351II (3.833b.72) III (41.18 4.64 4 -5,05) 1 (4.41'-536 11 1 14.66 -5.72) � (4.85 800 1 2.93 3,19 3.44 3.76 4.01 1 60 -min 1.38 1 1.115 2 01 2.-2 2,66 (1.27 - 1.511( {1.57 - 1.81) {1.84w 2.2{11 (2.11 -2.52) [2.42 -2.915) (2.66 -3.20) (2.98 -3.441) (3.09 -3.78) (334- 4.10) (3.54 -438) 2 -hr �( #734 0.888 (0480- L06) (1.08111.31) 1.38 1.61 1.79 1.97 216 2.39 2.68 {1.25 -1,51} (LA5 -1.76) (1.61 -1.97) (1.76 -2.17) (1.91 -2.36) 1 (2.10 -2.62) (2,25 -2,84) 1 3 -hr �[0. 52050. 627)I(0.62460752i1,I1I(0.76 11.108 0.694 -f 092711 (0.892x108)11[ (1.05 0.703 - 116.27) 1IlI 7 -1A3) ft.294551 (1.4261,76 ) II (1.5661.98) (1,7192.17) 1 6 -hr [0.31530376)11(0.377 - 0.462111[0. 485 - 0.55711(0.547 0.949]18 (0.637- 0.767j) 0.717- 0.868)11 {0.794 - 0968)1 {0,87141607)11(0,974 -12j (1.0e�34) a 12 -hr ,0,185- D7�1k1��0 .222- 0.28511(0.274?0328) (0,32130.986 �i0.360 0157 10.430 0519 (0.479- 0.584 ([0.526- 0,65110.593 0,7451(0650-0,827 0.144 # 166 0185) {0.495 6226 ![ #231 -0.286 _., .158 0.193 24 -hr 0'120 0.181 0.210 0.249 0.281 0.312 0345 0.390 0.425 (0.111 -0.129 (o.13S- 0.1551I1 f -- - 259 .0.902) (0.286 - 0.936 (0.317 -0.372 [0.35?-A421)'(0-3a8-0A69) 0.218 0.23i 2 day (0.064 -0074) [0.077- 03oeoll (0.098- -01121 (D.11l -D.i29 lt#.13110.152110.146- 6.170)1 [0.162 b 1891 0.177- 0.209 [0.199-0.235) (0.215 -0256 3-day l( 0.045 - 0.052) (0,655- 0.06311:0. 067 - 0.078111(15. 078- 0. p91ifo .0al-- O806]�10.102- 0.115)Il(D.7 3- 6231j��1 0135 I� #,138 0.1'53J(0.1 507057"7>� 0.124-0.145]1 4 -day (0. 038 - 9.04111(0.043-0.049 0.053 -64 061 (0.061 050701 _0_ 77 �DAG 0:092} 10� }((). 811 .108 0.12r {#.111- 20�1391I [ #.071 -0039 (0.068 -0.1153 7 -day 0.025 0.030 0.037 0,042 0.049 11.055 0.061 - -- !I _ 0.067 0.075 - 0.081 [0,024 - 0.027) 0.028 - 0.032 1(0,035- 0.039) (0.0'" ( #.048 - 0.055, (0.051 - 0.1559} (0,058- O.D�_111t0_im0.0711 0.068 - 0.066 }.(0.0.78 -0.08 10 -day 0.020 0.024 II 0.029 0.033 0.038 0.042 0.046 II� 0,050 0.066 f 0.060 (0,016- 0,022) (0. 028- 0.029PN0.027- 0,031) (0.031 -0. 51 10.(=8- 0.041l� (0.034 - 0,046) 11 (4.049 -0.04 kO.047 »0.054).HiC.032-0.03B)6.035-0,04 0.052- 0.050)I(MO56 -ftM 20 -day 1(0.013 -0014) O.0t5 0D1751i9.0118 9 }11[p•61v- 0423]11 {0.023 o.D26)1�(31.026 -6. 029 }l�(0 -02 - 0.031j11(0.028- 011! 300ay 0 .411 0.013 0A9' II 0.017 0.019 11 D.021 11 0.023' 11 0.024 1 4.027 1 0,028 11 11(0.011 - 0.012)(0.012 -0.014 t( #.014- 0.016kOp.016- 0.018 1 (0.018 -0.0 45-day 0.010 1 0.011 0.013 0.1514 I 0,016 l 0.409-0.010) (0,011 -0.012 0.012 -0.014 (0.013 -9.015 #.0150,6 60�ay 0.008 0.010 0.011 D.012 0814 (0.008- 0.009) {0.010 -0.011 0.011-0.012) (O.o12- 0.413 ,013 -0.Q 0.017 0.1579 0.019 0.1121 0.022 )16- 9,078,11 r0.D17-0.016 0.016- 0.020 #020- 0.032 0;!' 'o 0.615 C- 0.016 0.017 11 0.018 0.018 I Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers In parenthesis are PF estimates a( lower and upper bounds of the 9D°l Confidence interval, The probability that precipitation frequency estimates (for a given duration arxl average recurrence Interval) will be greater [haft the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not :heCW against probable maximum precipitation (PN)P) estimates and may be higher then currently valid PIMP vaiues. Please refer to NDAA Atlas 14 document for more information. _ Back IO Top PF graphical http:// hdse. nws. noaa. gov/ hdsc /pfds /pfds _printpage.html ?lat= 35.7319 &lon =- 78.8434 &data... 1/13/2015 Precipitation Frequency Data Server I d r r r .c 10 000 .el 1.000 _ c .+2, 0100 A m y a d 0.010 -. 0.001 T TT ?+ T A T TT C C C C L L L L L f9 r0 r9 M M r0 M r0 (9 E E E E E N rA rb ry a v v o v v v a v �' � � rFi � '••� N N � � r O rQi rTi d Duration 100.000 - - „i , Page 2 of 4 Average recurrence interval (years) — 1 2 -- 6 -� to — 26 50 100 200 600 1000 Duration 5-mh — 2-day 10 000 — I0-min — 3 -day . _... I6min — 4 -day c -- 30-min — 7 -day 1.000 — 60-min — 10-day c 2-hr — 20-day v e — — 3 -hr — 30-day C — 6-hr — 45-day Z 0.100 /w...... � i i — 12-hr — eo-day " 24-hr EL 0.010 0.001 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval � -rlalC NOAH Atlas 14, Volume 2, Version 3 MapsAated {GFi7): Tue Jan 13 23:45:312015 Small scale terrain v I R G I N I is � ,'• tilrrck +�trrrre�• � Frt!VY rtrf+1L14a t � ..... - Hsi stall Danville - . Suflolko Norfolk Greensboro' ' Winston- SalemQ o Durha j rr1 +1 pr�r'gr °High Point °R Aockyo Dams ` a. Hrckery N Q I T H i' „B,I0 Wilson CAROLIN I a Greenville r3oldolroro � ��^� Charlotte _ 0 - Matthews Fayetteville ' Rock Hill ° o ( Jeeksonville r r Florence ` Wilrniriclton SOUTH 50 km Map cb4AODiWeogle http: //hdsc.nws.noaa.gov /hdsc /pfds /pfds _printpage.html ?lat =3 5.7319 &lon =- 78.8434 &data... 1/13/2015 Precipitation Frequency Data Server Page 3 of 4 Large scale terrain � l:Ary Towne % T QD t Ap"I, II e qb 2km• Map Fp®PAkwe691e Large scale map � t:ary Towne 1612 . • J4c, 1 taoo ii 16 01 F1q�, Y "k° • 54P - Q 196A ae ,; 1147 � � 4 fi �a2lutt � Map �di3P���0 �l na1 Umornmeto O A iniaim n Netlonel JAMIher Sgtyll e Qlllce ad Hvcla o -IC (3avetoomenl 1375 East Weal Highway Silver Spring, MD 20910 http:llhdsc.nws.noaa. gov/ hdsc /pfds /pfds _printpage.html ?lat =3 5.7319 &lon =- 78.8434 &data... 1/13/2015 Stormwater Management Plan Summary STORMWATER MANAGEMENT PLAN SUMMARY BACKGROUND Woodall Subdivision is a proposed 51 lot, single - family master subdivision. The property is bounded by a newly constructed school to the west, residential agriculture to the east and south, and Medium /High- Density Residential across Apex- Barbecue Road to the north. The total acreage is 27.67 acres, 22.24 acres of which will be subdivided at this time leaving a remaining tract of 5.44 acres. SITE ANALYSIS Withers and Ravenel's analysis consisted of analyzing the hydrology of the existing and proposed site conditions at the point where stormwater runoff would exit the site. This analysis was also extended to the point where the site area is less than 10% of the total watershed per the Town of Apex's UDO. Existina Conditions The parcel to be developed is located within the Cape Fear River Basin, within the Beaver Creek Basin, and in the Primary Watershed Protection Overlay District. It is not located in a FEMA 100 - year floodplain and /or floodway. The soil types present on site according to Wake County soil records are the following: MgC2 (Mayodan Gravelly Sandy Loam, 6 -10% slope), MfD2 (Mayodan Sandy Loam 10 -15% slope), MgB2 (Mayodan Gravelly Sandy Loam, 2 -6% slope) and WyA (Worsham Sandy Loam, 0 -3% slope). The prevalent soil type is MgC2, with Worsham Sandy Loam following the stream and drainage pattern through the middle of the site and along the southern property line. The Mayodan soil is classified as Hydrologic Soil Group (HSG) B, while the Worsham soil is HSG D. The existing topography consists of an average slope of 6% across the site, with an upper elevation of 412' at the northeast corner of the site and a lower elevation of 345' at the southwest corner of the site. The drainage pattern consists of a ridgeline running northwest to southwest shedding water to a drained pond and existing intermittent stream. This stream flows in a southwesterly direction to its confluence point with an east -to -west flowing perennial stream and exits at the southwest corner of the site. The site is primarily wooded with approximately 20% being open field. Proposed Conditions The Woodall Subdivision property will be mass graded. The proposed development will disturb 18.40 acres and have an allowable built upon area of 65 %. A hydrologic analysis of pre - development and post - development conditions indicates that there would be greater than a 10% increase in the runoff rates for the 1- and 10 -year recurrence interval storms after the proposed development is completed. Therefore, BMPs will be required to reduce post - development discharge rates to pre - development levels. The majority of the site will be drained to 2 Wet Detention Ponds. Wet Detention Pond 1 is designed to provide 90% TSS removal and discharge into a bypass swale to the downstream channel. Wet Detention Pond 2 is designed to provide 85% TSS removal, will utilize a Level Spreader for up to 5 cfs of discharge flow per SW Rule, and then bypass remaining flows directly to the downstream stream channel. Both BMPs will capture and hold the 1" site runoff of their corresponding drainage areas. Lots adjoining riparian buffers will be allowed to sheet flow through the buffer. EROSION CONTROL AND PHASING The development will follow the Town of Apex approved erosion and sediment control plans. These plans are to be approved during the construction plan submittal, and will contain approved erosion control practices and devices commonly used throughout the State of North Carolina and the Town of Apex. The construction sequence will follow the Town of Apex's regulations for sedimentation and erosion control. OPERATION & MAINTENANCE OF BMPS The owner is responsible to provide annual inspections to the Town of Apex for each BMP serving their property. OFF SITE IMPACT The proposed BMPS serve to prevent impacts downstream from the increase in built -upon area and subsequent higher runoff rates. BMPs will be designed to limit the 1 -year, 24 -hour and 10 -year, 24 -hour peak flow discharges to pre - development conditions. This will ensure discharges are less than or equal to pre - development conditions during these regulated precipitation events and minimize the potential for increased flooding and erosion. CONCLUSION AND IMPROVEMENTS On -site detention facilities will limit discharges from the proposed development. An existing culvert downstream of the site and upstream from the 10% point crosses under Interstate 540. Withers and Ravenel's hydraulic analysis determines an overall increase of approximately 2 cfs (a 1% total increase) in the 100 -Year storm. As such, the existing downstream culvert will not require improvements. Pre and Post - Drainage Area Maps I WOODALL SUBDIVISION MASTER SUBDIVISION PLAN asi.oar�,< V OAK i}rti Sf' WAKE COUNTY PRE -DRAT NAG AREAS 7 O P E Y i WTON KNOW WHATS BELOW. CALL eEFORE YOU o:c. WITHERS RAVENEL RHOINERR3 ! DLANNRRA i SURV2YOR9 — 1 WOODALL SUBDIVISION MASTER SUBDIVISION PLAN a n mlwzr�. WHITE OAK TWSP WAKE COUNTY NC POST - DRAINAGE AREAS I WITHERS &- RAVENEL EN45101149 I PLANNI!! 1 SURVIVORS z 0 z a x IQ I KNOW WHATS BELOW, CALL BEFORE YOU DIG. Wet Detention Pond 1 Design A. Average Pond Depth Calculation ................................................... ............................... B. Watershed Data ............................................................................. ............................... C. Hydrograph Formulation ................................................................ ............................... D. Stage - Storage Function ................................................................. ............................... E. Pond Volume Calculations ............................................................. ............................... F. Chainsaw Routing for 1 -Year Storm ................................................ ............................... G. Chainsaw Routing for io -Year Storm .............................................. ............................... H. Chainsaw Routing for loo -Year Storm ............................................ ............................... I. Orifice Drawdown Calculations ...................................................... ............................... J. Anti - Flotation Calcs ....................................................................... ............................... BMP 1 AVERAGE POND DEPTH CALCULATION OPTION 1. Volume (Permanent Pool) j Depth (Average) = Surface Area (of Permanent Pool) 0 OPTION 2 Average Depth Rounded Down to the nearest 0.5' per NCDWQ BMP Manual Surface Area Permanent Pool (sf) _ Surface Area Bottom Shelf (sf) = Surface Area Bottom Pond (Sediment Cleanout Top Elevation (sf) = Pond Depth from Bottom of Pond (Sediment Cleanout Top Elevation) to Bottom of Shelf (ft) = Volume Permanent Pool (cf) _ [0.25X(1 +(Surface Area Bottom Shelf /Surface Area Permanent Depth (Average) = Pool))] +[((Surface Area Bottom Shelf +Surface Area Bottom Pond) /2)X(Depth /Surface Area Bottom Shelf)] 3.224684378 3 9882 7905 3062 4 0 WATERSHED DATA Woodall Subdivision IMPERVIOUSNESS, RATIONAL -C', AND SCS CN 11 PRE VI POST lWatershed Area 3.95 ac. 3.95 ac. IPavement/Building Area 0.00 ac. 2.75 ac. Natural Area 3.95 ac. 1.20 ac. Percent Impervious 0.00% lRational C 0.30 SCS Curve Number 50 NOTES: 69.62% 0.77 89 Rational Runoff Coefficient -'C' 'C' for Pavement/Building Area = 0.98 'C' for Natural Area = 0.30 SCS Curve Number for Soil Group C - CN CN for Pavement/Building Area = 98 CN for Natural Area = 50 HYDROGRAPH FORMULATION Woodall Subdivision BACKGROUND: Use the Rational Method REFERENCES: ( Malcom, 1991; Wanielista, 1990 ) SOLUTION - Qp: Use the Kirpich Equation & the Rational Method INPUT OUTPUT POST OUTPUT PRE Tc -pre = 16.8 minutes Tc -post = 5.0 minutes Apre = 3.95 acres Apost = 3.95 acres Cpre = 0.30 _ Cpost = 0.77 g = 112 (1 year I = 4.48 in /hr 3.04 in /hr h = 20 storm/ 24 hour) Qp1 = 13.7 cfs 3.6 cfs g = 195 (10 year I = 7.22 in /hr I 5.03 in /hr h = 22 storm/ 24 hour) Qp10 = 22.1 cfs 6.0 cfs g = 232 (25 year I = 8.29 in/hr II 5.83 in /hr h = 23 storm/ 24 hour) Qp25 = 25.3 cfs 6.9 cfs g = 261 (50 year I = 9.00 in /hr 6.40 in /hr h = 24 storm/ 24 hour) QP50 = 27.5 cfs 7.6 cfs g = 290 (100 year I = 9.67 in /hr 6.94 in /hr [ h = 25 storm/ 24 hour) QP100 = 29.5 cfs 8.2 cfs SOLUTION - Tp: INPUT OUTPUT S= 1.17 in Pn6 = 2.03 in (1 Year Storm) Q* = 1.09 in CN = 89 TP1 = 13.6 minutes Pn6 = 3.50 in (10 Year Storm) Q* = 2.40 in CN = 89 TP10 = 18.7 minutes Pn6 = 4.14 in (25 Year Storm) Q* = 3.00 in If CN = 89 Tp25 = 20.4 minutes - Pn6 = 4.67 in (50 Year Storm) Q* = 3.51 in CN = 89 TP50 = 21.9 minutes Pn6 = 5.21 in (100 Year Storm) Q* = 4.03 in CN = 89 TP100 = 23.4 minutes TERMINOLOGY: L= Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in /hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) STAGE - STORAGE FUNCTION: 12 11 U) c 10 S =Ks *Zb where: b = 1.66 and KS = 2197 Storage at Top of Embankment = 76,286 cf Storage at Normal Pool = 26,593 cf Stage- Storage Function 8 Z est ft 4.01 4.48 5.02 8.50 9 . I I 0.0 0.5 1.0 1.5 2.0 2.5 In Z STAGE - STORAGE FUNCTION Woodall Subdivision 1 2 3 4 5 6 7 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft 371 3062 0 0 375 7905 21934 21934 4 9.9958 1.3863 375.5 9882 4447 26380.75 4.5 10.1804 1.5041 376 12016 5475 31855.25 5 10.3690 1.6094 379.5 13373 44431 76286 8.5 11.2422 2.1401 STAGE - STORAGE FUNCTION: 12 11 U) c 10 S =Ks *Zb where: b = 1.66 and KS = 2197 Storage at Top of Embankment = 76,286 cf Storage at Normal Pool = 26,593 cf Stage- Storage Function 8 Z est ft 4.01 4.48 5.02 8.50 9 . I I 0.0 0.5 1.0 1.5 2.0 2.5 In Z POND VOLUME CALCULATIONS Woodall Subdivision CALCULATE IMPERVIOUS AREA: Drainage area = 3.95 ac. Impervious area = 2.75 ac. Percent Impervious = 69.62% FIND SA/DA FOR PERMANENT POOL SIZING: Assume 90% Pollutant Removal Efficiency average pool depth of 3.0 foot. Use Table 10 -3 in Stormwater Management Guidance Manual and interpolate. Interpolated SA/DA = 4.00% Depth of Pool= 4.5 ft *AVG DEPTH = 3.0' FIND REQUIRED SURFACE AREA: Surface Area = SA/DA x Drainage Area Surface Area Required = 0.16 ac or 6,882 sf Surface Area Provided = 0.23 ac or 9,882 sf OK FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.68 DA = 3.95 ac Volume = Rv x 0.0833 x Drainage Area = 0.22 ac. -ft. or 9697 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q' = Runoff Depth, (in) CHAINSAW ROUTING FOR 1 -YEAR STORM (REF: Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.23 ac 3 Peak Stage = 376.87 ft Maximum Surface Area = 0.27 ac 8 Rise = 1.37 ft Freeboard = 2.63 ft Storage Peak Outflow = 0.4 cfs Riser Riser INPUT Notch Orifice Hydrograph Results: Riser: Nr = 1 Top of Dam: 379.50 ft Qp = 13.7 cfs Riser Width = 4.0 ft Barrel: Tp = 13.6 min Riser Length = 4.0 ft Nb = 1 dT = 2 min Cwr = 3.33 Db = 18 in Stage- Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 2197 Zcr = 378.00 ft Zinv = 370.00 ft b = 1.66 Notch Weir. Nr = 1 Orifice: N = 1 Zo = 371.0 ft (inv) Weir Length = 0.5 ft Cdr = 0.60 Initial Water Level: Cwr = 3.33 D = 1.5 in Z, = 375.50 ft Zcr = 376.50 ft Zcr = 375.50 ft OUTPUT 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs I cfs cfs cfs cfs cfs 0 _ 0 26593.34 375.50 0.0 0.0 0.0 0.0 0.0 0.0 2 1 26593.34 375.50 0.0 00 0.0 0.0 0.0 0.0 4 3 26679.00 375.51 0.0 0.0 0.0 0.0 0.0 0.0 6 6 27003.11 375.54 0.0 0.0 0.0 0.0 0.0 0.0 8 9 27669.12 375.61 0.0 0.0 0.0 0.0 0.0 0.0 10 11 28709.00 375.71 0.0 0.0 0.0 0.0 0.0 0.0 12 13 30076.58 375.85 0.0 0.0 0.0 0.0 0.0 0.0 14 14 31657.22 376.00 0.0 0.0 0.0 0.0 0.0 0.0 16 13 33291.67 376.15 0.0 0.0 0.0 0.0 0.0 0.0 18 11 34809.32 376.29 0.1 0.0 0.0 0.1 0.0 0.1 20 9 36084.18 37641 0.1 0.0 0.0 0.1 0.0 0.1 22 7 37136.17 376.50 0.1 0.0 0.0 0.1 0.0 0.1 24 6 38003.95 376.58 0.1 0.0 0.0 0.1 0.0 0.1 26 5 38714.96 376.64 0.2 0.0 0.0 0.2 0.1 0.1 28 4 39293.94 376.69 0.2 0.0 0.0 0.2 0.1 0.1 30 3 39762.74 376.74 0.3 0.0 0.0 0.3 0.2 0.1 32 3 40140.00 376.77 0.3 0.0 0.0 0.3 0.2 0.1 34 2 40441.37 376.79 0.3 0.0 0.0 0.3 0.3 0.1 36 2 40679.97 376.82 0.4 00 0.0 0.4 0.3 0.1 38 2 40866.71 376.83 0.4 0.0 0.0 04 0.3 01 40 1 41010.67 376.84 0.4 0.0 0.0 0.4 0.3 0.1 42 1 41119.40 376.85 0.4 0.0 0.0 0.4 0.3 0.1 44 1 41199.15 376.86 0.4 0.0 0.0 0.4 0.4 0.1 46 1 41255.08 376.86 0.4 0.0 0.0 0.4 0.4 0.1 48 1 41291.49 376.87 0.4 0.0 0.0 0.4 0.4 0.1 50 1 41311.91 376.87 0.4 00 0.0 0.4 0.4 0.1 52 0 41319.28 376.87 0.4 0.0 0.0 0.4 0.4 0.1 54 0 41316.00 376.87 0.4 0.0 0.0 0.4 0.4 0.1 56 0 41304.09 376.87 0.4 0.0 0.0 0.4 0.4 0.1 58 0 4128517 376.87 0.4 0.0 0.0 0.4 0.4 0.1 60 0 41260.62 376.87 0.4 0.0 0.0 0.4 0.4 0.1 62 0 41231.55 376.86 0.4 0.0 0.0 0.4 0.4 0.1 64 0 41198.88 376.86 0.4 0.0 0.0 0.4 0.4 0.1 66 0 41163.37 376.86 0.4 0.0 0.0 0.4 0.4 0.1 68 0 41125.65 376.85 0.4 0.0 0.0 0.4 0.4 0.1 70 0 41086.23 376.85 0.4 0.0 0.0 0.4 0.3 0.1 1 2 3 4 5 6 7 8 1 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 72 0 41045.53 376.85 0.4 0.0 0.0 0.4 0.3 0.1 74 0 41003.90 376.84 0.4 0.0 0.0 0.4 0.3 0.1 76 0 40961.62 376.84 0.4 0.0 0.0 0.4 0.3 01 78 0 40918.92 376.84 0.4 0.0 0.0 0.4 0.3 0.1 80 0 40875.99 376.83 0.4 0.0 0.0 0.4 0.3 0.1 82 0 40832.98 376.83 0.4 0.0 0.0 0.4 0.3 0.1 84 0 40790.02 376.82 0.4 0.0 0.0 0.4 0.3 0.1 86 0 40747.21 376.82 0.4 0.0 0.0 0.4 0.3 0.1 88 0 40704.63 376.82 0.4 0.0 0.0 0.4 0.3 0.1 90 0 40662.34 376.81 0.4 0.0 0.0 0.4 0.3 0.1 92 0 40620.39 376.81 0.4 0.0 0.0 0.4 0.3 0.1 94 0 40578.83 376.81 0.4 0.0 0.0 0.4 0.3 0.1 96 0 40537.69 376.80 0.3 0.0 0.0 0.3 0.3 0.1 98 0 40496.99 376.80 0.3 0.0 0.0 0.3 0.3 0.1 100 0 40456.75 376.80 0.3 0.0 0.0 0.3 0.3 0.1 102 0 40416.97 376.79 0.3 0.0 0.0 0.3 0.3 0.1 104 0 40377.68 376.79 0.3 0.0 0.0 0.3 0.3 0.1 106 0 40338.88 376.79 0.3 0.0 0.0 0.3 0.3 0.1 108 0 40300.56 376.78 0.3 0.0 0.0 0.3 0.3 0.1 110 0 40262.74 376.78 0.3 0.0 0.0 0.3 0.2 0.1 112 0 40225.40 376.78 0.3 0.0 0.0 0.3 0.2 0.1 114 0 40188.55 376.77 0.3 0.0 0.0 0.3 0.2 0.1 116 0 40152.19 376.77 0.3 0.0 0.0 0.3 0.2 0.1 118 0 40116.30 376.77 0.3 0.0 0.0 0.3 0.2 0.1 120 0 4008089 376.76 0.3 0.0 0.0 0.3 0.2 0.1 122 0 40045.94 376.76 0.3 0.0 0.0 0.3 0.2 0.1 124 0 40011.46 376.76 0.3 0.0 0.0 0.3 0.2 0.1 126 0 39977.43 376.75 0.3 0.0 0.0 0.3 0.2 0.1 128 0 39943.85 376.75 0.3 0.0 0.0 0.3 0.2 0.1 130 0 39910.71 376.75 0.3 0.0 0.0 0.3 0.2 0.1 132 0 39878.01 376.75 0.3 0.0 0.0 0.3 0.2 0.1 134 0 39845.74 376.74 0.3 0.0 0.0 0.3 0.2 0.1 136 0 39813.88 376.74 0.3 0.0 0.0 0.3 0.2 0.1 138 0 39782.44 376.74 0.3 0.0 0.0 0.3 0.2 0.1 140 0 39751.41 376.73 0.3 0.0 0.0 0.3 0.2 0.1 142 0 39720.77 376.73 0.3 0.0 0.0 0.3 0.2 0.1 144 0 39690.53 376.73 0.2 0.0 0.0 0.2 0.2 0.1 146 0 39660.68 376.73 0.2 0.0 0.0 0.2 0.2 0.1 148 0 39631.21 376.72 0.2 0.0 0.0 0.2 0.2 0.1 150 0 39602.10 376.72 0.2 0.0 0.0 0.2 0.2 0.1 152 0 39573.37 376.72 0.2 0.0 0.0 0.2 0.2 0.1 154 0 39545.00 376.72 0.2 0.0 0.0 0.2 0.2 0.1 156 0 39516.97 376.71 0.2 0.0 0.0 0.2 0.2 0.1 158 0 39489.30 376.71 0.2 0.0 0.0 0.2 0.2 0.1 160 0 39461.97 376.71 0.2 0.0 0.0 0.2 0.2 0.1 162 0 39434.98 376.71 0.2 0.0 0.0 0.2 0.2 0.1 164 0 39408.31 376.70 0.2 0.0 0.0 0.2 0.2 0.1 166 0 39381.97 376.70 0.2 0.0 0.0 0.2 0.2 0.1 168 0 39355.95 376.70 0.2 0.0 0.0 0.2 0.1 0.1 170 0 39330.24 376.70 0.2 0.0 0.0 0.2 0.1 0.1 172 0 39304.84 376.70 0.2 0.0 0.0 0.2 0.1 0.1 174 0 39279.74 376.69 0.2 0.0 0.0 0.2 0.1 0.1 176 0 39254.94 376.69 0.2 0.0 0.0 0.2 0.1 0.1 178 0 39230.43 376.69 0.2 0.0 0.0 0.2 0.1 0.1 180 0 39206.21 376.69 0.2 0.0 0.0 0.2 0.1 0.1 182 0 39182.28 376.69 0.2 0.0 0.0 0.2 01 0.1 184 0 39158.62 376.68 0.2 0.0 0.0 0.2 0.1 0.1 186 0 39135.23 376.68 0.2 0.0 0.0 0.2 0.1 0.1 188 0 39112.11 376.68 0.2 0.0 0.0 0.2 0.1 0.1 190 0 39089.26 376.68 0.2 0.0 0.0 0.2 0.1 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 192 0 39066.67 376.68 02 0.0 0.0 0.2 0.1 0.1 194 0 39044.33 376.67 0.2 0.0 0.0 0.2 0.1 0.1 196 0 39022.24 376.67 0.2 0.0 0.0 0.2 0.1 0.1 198 0 39000.41 376.67 0.2 0.0 0.0 0.2 0.1 0.1 200 0 38978.81 376.67 0.2 0.0 00 0.2 0.1 0.1 202 0 38957.45 376.67 0.2 0.0 0.0 0.2 0.1 0.1 204 0 38936.33 376.66 0.2 0.0 0.0 0.2 0.1 0.1 206 0 38915.44 376.66 0.2 0.0 0.0 0.2 0.1 0.1 208 0 38894.78 376.66 0.2 0.0 0.0 0.2 0.1 0.1 210 0 38874.35 376.66 0.2 0.0 0.0 0.2 0.1 0.1 212 0 38854.13 376.66 0.2 0.0 0.0 0.2 0.1 0.1 214 0 38834.13 376.65 0.2 0.0 0.0 0.2 0.1 0.1 216 0 38814.34 376.65 0.2 0.0 0.0 0.2 0.1 0.1 218 0 38794.77 376.65 0.2 0.0 0.0 0.2 0.1 0.1 220 0 38775.40 376.65 0.2 0.0 0.0 0.2 0.1 0.1 222 0 3875624 376.65 0.2 0.0 0.0 0.2 0.1 0.1 224 0 38737.27 376.65 0.2 0.0 0.0 0.2 0.1 0.1 226 0 38718.50 376.64 0.2 0.0 0.0 0.2 0.1 0.1 228 0 38699.93 376.64 0.2 0.0 0.0 0.2 0.1 0.1 230 0 38681.55 376.64 0.2 0.0 0.0 0.2 0.1 0.1 232 0 38663.36 376.64 0.2 0.0 0.0 0.2 0.1 0.1 234 0 38645.35 376.64 0.1 0.0 0.0 0.1 0.1 0.1 236 0 38627.52 376.64 0.1 0.0 0.0 0.1 0.1 0.1 238 0 38609.87 376.63 0.1 0.0 0.0 0.1 0.1 0.1 240 0 38592.41 376.63 0.1 0.0 0.0 0.1 0.1 0.1 242 0 38575.11 376.63 0.1 0.0 0.0 0.1 0.1 0.1 244 0 38557.99 376.63 0.1 0.0 0.0 0.1 0.1 0.1 246 0 38541.03 376.63 0.1 0.0 0.0 0.1 0.1 0.1 248 0 38524.24 376.63 0.1 0.0 0.0 0.1 0.1 0.1 250 0 38507.62 376.63 0.1 0.0 0.0 0.1 0.1 0.1 252 0 38491.15 376.62 0.1 0.0 0.0 0.1 0.1 0.1 254 0 38474.85 376.62 0.1 0.0 0.0 0.1 0.1 0.1 256 0 38458.70 376.62 0.1 0.0 0.0 0.1 0.1 0.1 258 0 38442.71 376.62 0.1 0.0 0.0 0.1 0.1 0.1 260 0 38426.86 376.62 0.1 0.0 0.0 0.1 0.1 0.1 262 0 38411.17 376.62 0.1 0.0 0.0 0.1 0.1 0.1 264 0 38395.63 376.62 0.1 0.0 0.0 0.1 0.1 0.1 266 0 38380.23 376.61 0.1 0.0 0.0 0.1 0.1 0.1 268 0 38364.97 376.61 0.1 0.0 0.0 0.1 0.1 0.1 270 0 38349.85 376.61 0.1 0.0 0.0 0.1 0.1 0.1 272 0 38334.88 376.61 0.1 0.0 0.0 0.1 0.1 0.1 274 0 38320.04 376.61 01 0.0 0.0 0.1 0.1 0.1 276 0 38305.33 376.61 0.1 0.0 0.0 0.1 0.1 0.1 278 0 38290.76 376.61 0.1 0.0 0.0 0.1 0.1 0.1 280 0 38276.32 376.61 0.1 0.0 0.0 0.1 0.1 0.1 282 0 38262.00 376.60 0.1 0.0 0.0 0.1 0.1 0.1 284 0 38247.82 376.60 0.1 0.0 0.0 0.1 0.1 0.1 286 0 38233.76 376.60 0.1 0.0 0.0 0.1 0.1 0.1 288 0 38219.82 376.60 0.1 0.0 0.0 0.1 0.1 0.1 290 0 38206.01 376.60 0.1 0.0 0.0 0.1 0.1 0.1 292 0 38192.31 376.60 0.1 0.0 0.0 0.1 0.1 0.1 294 0 38178.73 376.60 0.1 0.0 0.0 0.1 0.1 0.1 296 0 38165.27 376.60 0.1 0.0 0.0 0.1 00 0.1 298 0 38151.93 376.59 0.1 0.0 0.0 0.1 0.0 0.1 300 0 38138.70 376.59 0.1 0.0 0.0 0.1 0.0 0.1 302 0 38125.57 376.59 0.1 0.0 0.0 0.1 0.0 0.1 304 0 38112.56 376.59 0.1 0.0 0.0 0.1 0.0 0.1 306 0 38099.66 376.59 0.1 0.0 0.0 0.1 0.0 0.1 308 0 38086.87 376.59 0.1 0.0 0.0 0.1 0.0 0.1 310 0 38074.18 376.59 0.1 0.0 0.0 0.1 0.0 0.1 312 0 38061.59 376.59 0.1 0.0 0.0 0.1 0.0 0.1 314 0 38049.11 376.59 0.1 0.0 0.0 0.1 0.0 0.1 316 0 38036.72 376.58 0.1 0.0 0.0 0.1 0.0 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 318 0 38024.44 376.58 0.1 0.0 0.0 0.1 0.0 0.1 320 0 38012.26 376.58 0.1 0.0 0.0 0.1 0.0 0.1 322 0 38000.17 376.58 0.1 0.0 0.0 0.1 0.0 01 324 0 37988.18 376.58 0.1 0.0 0.0 0.1 0.0 0.1 326 0 37976.28 376.58 0.1 0.0 0.0 0.1 0.0 0.1 328 0 37964.47 376.58 0.1 0.0 0.0 0.1 0.0 0.1 330 0 37952.76 376.58 0.1 0.0 0.0 0.1 0.0 0.1 332 0 37941.13 376.58 0.1 0.0 0.0 0.1 0.0 0.1 334 0 37929.60 376.57 0.1 0.0 0.0 0.1 0.0 0.1 336 0 37918.15 376.57 0.1 0.0 0.0 0.1 0.0 0.1 338 0 37906.79 376.57 0.1 0.0 0.0 0.1 0.0 0.1 340 0 37895.51 376.57 0.1 0.0 0.0 0.1 0.0 0.1 342 0 37884.32 376.57 0.1 0.0 0.0 0.1 0.0 0.1 344 0 37873.21 376.57 0.1 0.0 0.0 0.1 0.0 0.1 346 0 37862.19 376.57 0.1 0.0 0.0 0.1 0.0 0.1 348 0 37851.24 376.57 0.1 0.0 0.0 0.1 0.0 0.1 350 0 37840.37 376.57 0.1 0.0 0.0 0.1 0.0 0.1 352 0 37629.59 376.57 0.1 0.0 0.0 0.1 0.0 0.1 354 0 37818.88 376.57 0.1 0.0 0.0 0.1 0.0 0.1 356 0 37808.24 376.56 0.1 0.0 0.0 0.1 0.0 0.1 358 0 37797.68 376.56 0.1 0.0 0.0 0.1 0.0 0.1 360 0 37787.20 376.56 0.1 0.0 0.0 0.1 0.0 0.1 362 0 37776.78 376.56 0.1 0.0 0.0 0.1 0.0 0.1 364 0 37766.44 376.56 0.1 0.0 0.0 0.1 0.0 0.1 366 0 37756.18 376.56 0.1 0.0 0.0 0.1 0.0 0.1 368 0 37745.98 376.56 0.1 0.0 0.0 0.1 0.0 0.1 370 0 37735.85 376.56 0.1 0.0 0.0 0.1 0.0 0.1 372 0 37725.79 376.56 0.1 0.0 0.0 0.1 0.0 0.1 374 0 37715.79 376.56 0.1 0.0 0.0 0.1 0.0 01 376 0 37705.86 376.55 0.1 0.0 0.0 0.1 0.0 0.1 378 0 37696.00 376.55 0.1 0.0 0.0 0.1 0.0 0.1 380 0 37686.20 376.55 0.1 0.0 0.0 0.1 0.0 0.1 382 0 37676.47 376.55 0.1 0.0 0.0 0.1 0.0 0.1 384 0 37666.80 376.55 0.1 0.0 0.0 0.1 0.0 0.1 386 0 37657.19 376.55 0.1 0.0 0.0 0.1 0.0 0.1 388 0 37647.64 376.55 0.1 0.0 0.0 0.1 0.0 0.1 390 0 37638.15 376.55 0.1 0.0 0.0 0.1 0.0 0.1 392 0 37628.72 376.55 0.1 0.0 0.0 0.1 0.0 0.1 394 0 37619.35 376.55 0.1 0.0 0.0 0.1 0.0 0.1 396 0 37610.03 376.55 0.1 0.0 0.0 0.1 0.0 0.1 398 0 37600.77 376.55 0.1 0.0 0.0 0.1 0.0 0.1 400 0 37591.57 376.54 0.1 0.0 0.0 0.1 0.0 0.1 402 0 37582.43 376.54 0.1 0.0 0.0 0.1 0.0 0.1 404 0 37573.33 376.54 0.1 0.0 0.0 0.1 0.0 0.1 406 0 37564.29 376.54 0.1 0.0 0.0 0.1 0.0 0.1 408 0 37555.31 376.54 0.1 0.0 0.0 0.1 0.0 0.1 410 0 37546.37 376.54 0.1 0.0 0.0 0.1 0.0 0.1 412 0 37537.49 376.54 0.1 0.0 0.0 0.1 0.0 0.1 414 0 37528.66 376.54 0.1 0.0 0.0 0.1 0.0 0.1 416 0 37519.88 376.54 01 0.0 0.0 0.1 0.0 0.1 418 0 37511.14 376.54 0.1 0.0 0.0 0.1 0.0 0.1 420 0 37502.46 376.54 0.1 0.0 0.0 0.1 0.0 0.1 422 0 37493.82 376.54 0.1 0.0 0.0 0.1 0.0 0.1 424 0 37485.23 376.54 0.1 0.0 0.0 01 0.0 0.1 426 0 37476.68 376.53 0.1 0.0 0.0 0.1 0.0 0.1 428 0 37468.18 376.53 0.1 0.0 0.0 0.1 0.0 0.1 430 0 37459.73 376.53 0.1 0.0 0.0 0.1 0.0 0.1 432 0 37451.32 376.53 0.1 0.0 0.0 0.1 0.0 0.1 434 0 37442.95 376.53 0.1 0.0 0.0 0.1 0.0 0.1 436 0 37434.62 376.53 0.1 0.0 0.0 0.1 0.0 0.1 438 0 37426.34 376.53 0.1 0.0 0.0 0.1 0.0 0.1 440 0 37418.10 376.53 0.1 0.0 0.0 0.1 0.0 0.1 442 0 37409.89 376.53 0.1 0.0 0.0 0.1 0.0 0.1 444 0 37401.73 376.53 0.1 0.0 0.0 0.1 0.0 0.1 1 2 3 4 5 6 7 8 9 ' 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T ! S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 446 0 37393.61 376.53 0.1 0.0 0.0 0.1 00 0.1 448 0 37385.53 376.53 0.1 0.0 0.0 0.1 0.0 0.1 450 0 37377.48 376.53 0.1 0.0 0.0 0.1 0.0 0.1 16 14 12 w 10 w v d rn 8 M N G 6 4 2 0 0 GRAPHED DATA FOR 1 YEAR STORM Hydrographs 376.80 376.60 376.40 uj 376.20 a 376.00 375.80 375.60 375.40 0 50 100 150 200 250 300 350 400 450 500 Time (min) STAGE - DISCHARGE FUNCTION 1 2 3 4 5 6 DISCHARGE (cfs) CHAINSAW ROUTING FOR 10 -YEAR STORM (REF: ,Malcom, 1991 ) COMPUTED RESULTS Normal Surface Area = 0.23 ac Peak Stage = 377.95 ft Maximum Surface Area = 0.30 ac Rise = 2.45 ft Freeboard = 1.55 ft Peak Outflow = 3.0 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 379.50 ft Qp = 22.1 cfs Riser Width = 4.0 ft Barrel: Tp = 18.7 min Riser Length = 4.0 ft Nb = 1 dT = 2 min Cwr = 3.33 Db = 18 in Stage- Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 2197 Zcr = 378.00 ft Zinv = 370.00 ft b = 1.66 Notch Weir: Nw = 1 Orifice: No = 1 Za = 371.0 ft (inv) Riser Length = 0.5 ft Cdr = 0.60 Initial Water Level: Cwr = 3.33 D = 1.5 in Z, = 375.50 ft Zcr = 376.50 ft Zcr = 375.50 ft OUTPUT 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 0 0 26593.34 375.50 0.0 0.0 0.0 0.0 0.0 0.0 2 1 26593.34 375.50 0.0 0.0 0.0 0.0 00 0.0 4 2 26667.25 375.51 0.0 0.0 0.0 0.0 0.0 0.0 6 5 26954.04 375.54 0.0 0.0 0.0 0.0 0.0 0.0 8 9 27569.31 375.60 0.0 0.0 0.0 0.0 0.0 0.0 10 12 28591.91 375.70 0.0 0.0 0.0 0.0 0.0 0.0 12 16 30055.15 375.84 0.0 0.0 0.0 0.0 0.0 0.0 14 19 31943.07 376.03 0.0 0.0 0.0 0.0 0.0 0.0 16 21 34192.22 376.24 0.1 0.0 0.0 0.1 0.0 0.1 18 22 36698.73 376.47 0.1 0.0 0.0 0.1 0.0 0.1 20 22 39329.93 376.70 0.2 0.0 0.0 0.2 0.1 0.1 22 20 41921.48 376.92 0.5 0.0 0.0 0.5 0.5 0.1 24 18 44309.60 377.12 0.9 0.0 0.0 0.9 0.8 01 26 16 46371.47 377.29 1.3 0.0 0.0 1.3 1.2 0.1 28 14 48108.53 377.43 1.6 0.0 0.0 1.6 1.5 0.1 30 12 49560.99 377.55 1.9 0.0 0.0 1.9 1.8 0.1 32 10 50765.23 377.65 2.1 0.0 0,0 2.1 2.0 0.1 34 9 51753.72 377.72 2.3 0.0 0.0 2.3 2.3 0.1 36 8 52555.20 377.79 2.5 0.0 0.0 2.5 2.4 0.1 38 7 53195.01 377.84 2.7 0.0 0.0 27 2.6 0.1 40 6 53695.36 377.88 2.8 0.0 0.0 2.8 2.7 0.1 42 5 54075.70 377.90 2.9 0.0 0.0 2.9 2.8 0.1 44 5 54353.00 377.93 2.9 0.0 0.0 2.9 2.8 0.1 46 4 54542.05 377.94 3.0 0.0 0.0 3.0 2.9 0.1 48 3 54655.72 377.95 3.0 0.0 0.0 3.0 2.9 0.1 50 3 54705.19 377.95 3.0 0.0 0.0 3.0 2.9 0.1 52 3 54700.17 377.95 3.0 0.0 0.0 3.0 2.9 0.1 54 2 54649.05 377.95 3.0 0.0 0.0 3.0 2.9 0.1 56 2 54559.13 377.94 3.0 0.0 0.0 3.0 2.9 0.1 58 2 54436.70 377.93 2.9 0.0 0.0 2.9 2.9 0.1 60 1 54287.20 377.92 2.9 0.0 0.0 2.9 2.8 0.1 62 1 54115.32 377.91 2.9 0.0 0.0 2.9 2.8 0.1 64 1 53925.11 377.89 2.8 0.0 0.0 2.8 2.7 0.1 66 1 53720.06 377.88 2.8 0.0 0.0 2.8 2.7 0.1 68 1 53503.14 377.86 2.7 0.0 0.0 2.7 2.6 0.1 70 1 53276.94 377.84 2.7 0.0 0.0 2.7 2.6 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 72 1 53043.65 377.82 2.6 0.0 0.0 2.6 2.5 0.1 74 1 52805.14 377.81 2.6 0.0 0.0 2.6 2.5 0.1 76 0 52563.03 377.79 2.5 0.0 0.0 2.5 2.4 0.1 78 0 52318.67 377.77 2.5 0.0 0.0 2.5 2.4 0.1 80 0 52073.22 377.75 2.4 0.0 0.0 2.4 2.3 0.1 82 0 51827.66 377.73 2.4 0.0 0.0 2.4 2.3 0.1 84 0 51582.81 377.71 2.3 0.0 0.0 2.3 2.2 0.1 86 0 51339.36 377.69 2.3 0.0 0.0 2.3 2.2 0.1 88 0 51097.89 377.67 2.2 0.0 0.0 2.2 2.1 0.1 90 0 50858.88 377.65 2.2 0.0 0.0 2.2 2.1 0.1 92 0 50622.70 377.64 2.1 0.0 0.0 2.1 2.0 0.1 94 0 50389.69 377.62 2.1 0.0 0.0 2.1 2.0 0.1 96 0 50160.10 377.60 2.0 0.0 0.0 2.0 1.9 0.1 98 0 49934.12 377.58 2.0 0.0 0.0 2.0 1.9 0.1 100 0 49711.91 377.56 1.9 0.0 0.0 1.9 1.8 0.1 102 0 49493.59 377.55 1.9 0.0 0.0 1.9 1.8 0.1 104 0 49279.24 377.53 1.8 0.0 0.0 1.8 1.7 01 106 0 49068.91 377.51 1.8 0.0 0.0 1.8 1.7 0.1 108 0 48862.63 377.50 1.7 0.0 0.0 1.7 1.7 0.1 110 0 48660.42 377.48 1.7 0.0 0.0 1.7 1.6 01 112 0 48462.27 377.46 1.7 0.0 0.0 1.7 1.6 0.1 114 0 48268.14 377.45 1.6 0.0 0.0 1.6 1.5 0.1 116 0 48078.02 377.43 1.6 0.0 0.0 1.6 1.5 0.1 118 0 47891.85 377.42 1.5 0.0 0.0 1.5 1.5 0.1 120 0 47709.58 377.40 1.5 0.0 0.0 1.5 1.4 0.1 122 0 47531.16 377.39 1.5 0.0 0.0 1.5 1.4 0.1 124 0 47356.52 377.37 1.4 0.0 0.0 1.4 1.4 0.1 126 0 47185.60 377.36 1.4 0.0 0.0 1.4 1.3 0.1 128 0 47018.31 377.35 1.4 0.0 0.0 1.4 1.3 0.1 130 0 46854.60 377.33 1.3 0.0 0.0 1.3 1.3 0.1 132 0 46694.39 377.32 1.3 0.0 0.0 1.3 1.2 0.1 134 0 46537.60 377.31 1.3 0.0 0.0 1.3 1.2 0.1 136 0 46384.15 377.29 1.3 0.0 0.0 1.3 1.2 0.1 138 0 46233.96 377.28 1.2 0.0 0.0 1.2 1.2 0.1 140 0 46086.97 377.27 1.2 0.0 0.0 1.2 1.1 0.1 142 0 45943.10 377.26 1.2 0.0 0.0 1.2 1.1 0.1 144 0 45802.26 377.25 1.2 0.0 0.0 1.2 1.1 0.1 146 0 45664.39 377.24 1.1 0.0 0.0 1.1 1.1 0.1 148 0 45529.42 377.22 1.1 0.0 0.0 1.1 1.0 0.1 150 0 45397.27 377.21 1.1 0.0 0.0 1.1 1.0 0.1 152 0 45267.87 377.20 1.1 0.0 0.0 1.1 1.0 0.1 154 0 45141.15 377.19 1.0 0.0 0.0 1.0 1.0 0.1 156 0 45017.04 377.18 1.0 0.0 0.0 1.0 0.9 0.1 158 0 44895.49 377.17 1.0 0.0 0.0 1.0 0.9 0.1 160 0 44776.42 377.16 1.0 0.0 0.0 1.0 0.9 0.1 162 0 44659.77 377.15 1.0 0.0 0.0 1.0 0.9 0.1 164 0 44545.48 377.14 0.9 0.0 0.0 0.9 0.9 0.1 166 0 44433.50 377.13 0.9 0.0 0.0 0.9 0.8 01 168 0 44323.75 377.12 0.9 0.0 0.0 0.9 0.8 0.1 170 0 44216.19 377.12 0.9 0.0 0.0 0.9 0.8 0.1 172 0 44110.76 377.11 0.9 0.0 0.0 0.9 0.8 0.1 174 0 44007.41 377.10 0.8 0.0 0.0 0.8 0.8 0.1 176 0 43906.08 377.09 0.8 0.0 0.0 0.8 0.8 0.1 178 0 43806.73 377.08 0.8 0.0 0.0 0.8 0.7 0.1 180 0 43709.30 377.07 0.8 0.0 0.0 0.8 0.7 0.1 182 0 43613.74 377.06 0.8 0.0 0.0 0.8 0.7 01 184 0 43520.02 377.06 0.8 0.0 0.0 0.8 0.7 0.1 186 0 43428.08 377.05 0.8 0.0 0.0 0.8 0.7 0.1 188 0 43337.88 377.04 0.7 0.0 0.0 0.7 0.7 0.1 190 0 43249.38 377.03 0.7 0.0 0.0 0.7 0.7 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T i S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 192 0 43162.53 377.03 0.7 00 0.0 0.7 0.6 0.1 194 0 43077.31 377.02 0.7 0.0 0.0 0.7 0.6 0.1 196 0 42993.65 377.01 0.7 0.0 0.0 0.7 0.6 0.1 198 0 42911.54 377.01 07 0.0 0.0 0.7 0.6 0.1 200 0 42830.93 377.00 0.7 0.0 0.0 0.7 0.6 0.1 202 0 42751.78 376.99 0.6 0.0 0.0 0.6 0.6 0.1 204 0 4267407 376.99 0.6 0.0 0.0 0.6 0.6 0.1 206 0 42597.75 376.98 0.6 0.0 0.0 0.6 0.6 0.1 208 0 42522.79 376.97 0.6 0.0 0.0 0.6 0.5 0.1 210 0 42449.17 376.97 0.6 0.0 0.0 0.6 0.5 0.1 212 0 42376.85 376.96 0.6 0.0 0.0 0.6 0.5 0.1 214 0 42305.79 376.95 0.6 0.0 0.0 0.6 0.5 0.1 216 0 42235.98 376.95 0.6 0.0 0.0 0.6 0.5 0.1 218 0 42167.38 376.94 0.6 0.0 0.0 0.6 0.5 0.1 220 0 42099.97 376.94 0.6 0.0 0.0 0.6 0.5 0.1 222 0 42033.71 376.93 0.5 0.0 0.0 0.5 0.5 0.1 224 0 41968.58 376.93 0.5 0.0 0.0 0.5 0.5 0.1 226 0 41904.56 376.92 0.5 0.0 0.0 0.5 0.5 0.1 228 0 41841.62 376.91 0.5 0.0 0.0 0.5 0.4 0.1 230 0 41779.73 376.91 0.5 0.0 0.0 0.5 0.4 0.1 232 0 41718.87 376.90 0.5 0.0 0.0 0.5 0.4 0.1 234 0 41659.03 376.90 0.5 0.0 0.0 0.5 0.4 0.1 236 0 41600.17 376.89 0.5 0.0 0.0 0.5 0.4 0.1 238 0 41542.28 376.89 0.5 0.0 0.0 0.5 0.4 0.1 240 0 41485.33 376.88 0.5 0.0 0.0 0.5 0.4 0.1 242 0 41429.31 376.88 0.5 0.0 0.0 0.5 0.4 0.1 244 0 41374.19 376.87 0.5 0.0 0.0 0.5 0.4 0.1 246 0 41319.95 376.87 0.4 0.0 0.0 0.4 0.4 0.1 248 0 41266.58 376.87 0.4 0.0 0.0 0.4 0.4 0.1 250 0 41214.05 376.86 0.4 0.0 0.0 0.4 0.4 0.1 252 0 41162.36 376.86 0.4 0.0 0.0 0.4 0.4 0.1 254 0 41111.47 376.85 0.4 0.0 0.0 0.4 0.3 0.1 256 0 41061.38 376.85 0.4 0.0 0.0 0.4 0.3 0.1 258 0 41012.06 376.84 0.4 0.0 0.0 0.4 0.3 0.1 260 0 40963.51 376.84 0.4 0.0 0.0 0.4 0.3 0.1 262 0 40915.70 376.84 0.4 0.0 0.0 0.4 0.3 0.1 264 0 40868.62 376.83 0.4 0.0 0.0 0.4 0.3 0.1 266 0 40822.25 376.83 0.4 0.0 0.0 0.4 0.3 0.1 268 0 40776.59 376.82 0.4 0.0 0.0 0.4 0.3 0.1 270 0 40731.61 376.82 0.4 0.0 0.0 0.4 0.3 0.1 272 0 40687.30 376.82 0.4 0.0 0.0 0.4 0.3 0.1 274 0 40643.65 376.81 0.4 0.0 0.0 0.4 0.3 0.1 276 0 40600.64 376.81 0.4 0.0 0.0 0.4 0.3 0.1 278 0 40558.27 376.80 0.3 0.0 0.0 0.3 0.3 0.1 280 0 40516.51 376.80 0.3 0.0 0.0 0.3 0.3 0.1 282 0 40475.36 376.80 0.3 0.0 0.0 0.3 0.3 0.1 284 0 40434.81 376.79 0.3 0.0 0.0 0.3 0.3 0.1 286 0 40394.83 376.79 0.3 0.0 0.0 0.3 0.3 0.1 288 0 40355.43 376.79 0.3 0.0 0.0 0.3 0.3 0.1 290 0 40316.59 376.78 0.3 0.0 0.0 0.3 0.3 0.1 292 0 40278.30 376.78 0.3 0.0 0.0 0.3 0.2 0.1 294 0 40240.55 376.78 0.3 0.0 0.0 0.3 0.2 01 296 0 40203.32 376.77 0.3 0.0 0.0 0.3 0.2 0.1 298 0 40166.62 376.77 0.3 0.0 0.0 0.3 0.2 0.1 300 0 40130.42 376.77 0.3 0.0 0.0 0.3 0.2 0.1 302 0 40094.72 376.76 0.3 0.0 0.0 0.3 0.2 0.1 304 0 40059.51 376.76 0.3 0.0 0.0 0.3 0.2 0.1 306 0 40024.78 376.76 0.3 0.0 0.0 0.3 0.2 0.1 308 0 39990.52 376.76 0.3 0.0 0.0 0.3 0.2 0.1 310 0 39956.72 376.75 0.3 0.0 0.0 0.3 0.2 0.1 312 0 39923.37 376.75 0.3 0.0 0.0 0.3 0.2 0.1 314 0 39890.47 376.75 0.3 0.0 0.0 0.3 0.2 0.1 316 0 39858.01 376.74 0.3 0.0 0.0 0.3 0.2 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T 1 S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 318 0 39825.97 376.74 0.3 0.0 0.0 0.3 0.2 0.1 320 0 39794.36 376.74 0.3 0.0 0.0 0.3 0.2 0.1 322 0 39763.16 376.74 0.3 0.0 0.0 0.3 0.2 0.1 324 0 39732.36 376.73 0.3 0.0 0.0 0.3 0.2 0.1 326 0 39701.96 376.73 0.3 0.0 0.0 0.3 0.2 0.1 328 0 39671.95 376.73 0.2 0.0 0.0 0.2 0.2 0.1 330 0 39642.33 376.73 0.2 0.0 0.0 0.2 0.2 0.1 332 0 39613.08 376.72 0.2 0.0 0.0 0.2 0.2 0.1 334 0 39584.20 376.72 0.2 0.0 0.0 0.2 0.2 0.1 336 0 39555.69 376.72 0.2 0.0 0.0 0.2 0.2 0.1 338 0 39527.53 376.72 0.2 0.0 0.0 0.2 0.2 0.1 340 0 39499.73 376.71 0.2 0.0 0.0 0.2 0.2 0.1 342 0 39472.26 376.71 0.2 0.0 0.0 0.2 0.2 0.1 344 0 39445.14 376.71 0.2 0.0 0.0 0.2 0.2 0.1 346 0 39418.35 376.71 0.2 0.0 0.0 0.2 0.2 0.1 348 0 39391.89 376.70 0.2 0.0 0.0 0.2 0.2 0.1 350 0 39365.74 376.70 0.2 0.0 0.0 0.2 0.2 0.1 352 0 39339.92 376.70 0.2 0.0 0.0 0.2 0.1 0.1 354 0 39314.40 376.70 0.2 0.0 0.0 0.2 0.1 0.1 356 0 39289.19 376.69 0.2 0.0 0.0 0.2 0.1 0.1 358 0 39264.28 376.69 0.2 0.0 0.0 0.2 0.1 0.1 360 0 39239.66 376.69 0.2 0.0 0.0 0.2 0.1 0.1 362 0 39215.33 376.69 0.2 0.0 0.0 0.2 0.1 0.1 364 0 39191.29 376.69 0.2 0.0 0.0 0.2 0.1 0.1 366 0 39167.52 376.68 0.2 0.0 0.0 0.2 0.1 0.1 368 0 39144.03 376.68 0.2 0.0 0.0 0.2 0.1 0.1 370 0 39120.81 376.68 0.2 0.0 0.0 0.2 0.1 0.1 372 0 39097.86 376.68 0.2 0.0 0.0 0.2 0.1 0.1 374 0 39075.17 376.68 0.2 0.0 0.0 0.2 0.1 0.1 376 0 39052.74 376.67 0.2 0.0 0.0 0.2 0.1 0.1 378 0 39030.56 376.67 0.2 0.0 0.0 0.2 0.1 0.1 380 0 39008.63 376.67 0.2 0.0 0.0 0.2 0.1 0.1 382 0 38986.94 376.67 0.2 0.0 0.0 0.2 0.1 0.1 384 0 38965.49 376.67 0.2 0.0 0.0 0.2 0.1 0.1 386 0 38944.28 376.66 0.2 0.0 0.0 0.2 0.1 0.1 388 0 38923.31 376.66 0.2 0.0 0.0 0.2 0.1 0.1 390 0 38902.56 376.66 0.2 0.0 0.0 0.2 0.1 0.1 392 0 38882.04 376.66 0.2 0.0 0.0 0.2 0.1 0.1 394 0 38861.74 376.66 0.2 0.0 0.0 0.2 0.1 0.1 396 0 38841.66 376.66 0.2 0.0 0.0 0.2 0.1 0.1 398 0 38821.79 376.65 0.2 0.0 0.0 0.2 0.1 0.1 400 0 38802.14 376.65 0.2 0.0 0.0 0.2 0.1 0.1 402 0 38782.69 376.65 0.2 0.0 0.0 0.2 0.1 0.1 404 0 38763.45 376.65 0.2 0.0 0.0 0.2 0.1 0.1 406 0 38744.41 376.65 0.2 0.0 0.0 0.2 0.1 0.1 408 0 38725.57 376.65 0.2 0.0 0.0 0.2 0.1 0.1 410 0 38706.92 376.64 0.2 0.0 0.0 0.2 0.1 0.1 412 0 38688.47 376.64 0.2 0.0 0.0 0.2 0.1 0.1 414 0 38670.20 376.64 0.2 0.0 0.0 0.2 0.1 0.1 416 0 38652.13 376.64 0.1 0.0 0.0 0.1 0.1 0.1 418 0 38634.23 376.64 0.1 0.0 0.0 0.1 0.1 0.1 420 0 38616.52 376.64 0.1 0.0 0.0 0.1 0.1 0.1 422 0 38598.98 376.63 0.1 0.0 0.0 0.1 0.1 0.1 424 0 38581.62 376.63 0.1 0.0 0.0 0.1 0.1 0.1 426 0 38564.43 376.63 0.1 0.0 0.0 0.1 0.1 0.1 428 0 38547.41 376.63 0.1 0.0 0.0 0.1 0.1 01 430 0 38530.56 376.63 0.1 0.0 0.0 0.1 0.1 0.1 432 0 38513.88 376.63 0.1 0.0 0.0 0.1 0.1 0.1 434 0 38497.35 376.63 0.1 0.0 0.0 0.1 0.1 0.1 436 0 38480.99 376.62 0.1 0.0 0.0 0.1 0.1 0.1 438 0 38464.78 376.62 0.1 0.0 0.0 0.1 0.1 0.1 440 0 38448.73 376.62 0.1 0.0 0.0 0.1 0.1 0.1 442 0 38432.83 376.62 0.1 0.0 0.0 0.1 0.1 0.1 444 0 38417.08 376.62 0.1 0.0 0.0 0.1 0.1 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 446 0 38401.48 376.62 0.1 0.0 0.0 0.1 0.i 0.1 448 0 38386.03 376.62 0.1 0.0 0.0 0.1 0.1 0.1 450 0 38370.72 376.61 0.1 0.0 0.0 0.1 0.1 0.1 25 20 15 a� rn s 10 0 GRAPHED DATA FOR 10 YEAR STORM Hydrographs 0 0 50 100 150 200 250 300 350 400 450 500 Time (min) 378.50 378.00 377.50 377.00 w c� Q 376.50 376.00 375.50 375.00 0 STAGE - DISCHARGE FUNCTION 1 1 2 2 3 3 4 DISCHARGE (cfs) j CHAINSAW ROUTING FOR 100 -YEAR STORM cfs cu -ft (REF: Malcom, 1991 ) cfs cfs cfs cfs COMPUTED RESULTS cfs 0 Normal Surface Area = 0.23 ac Peak Stage = 378.38 ft Maximum Surface Area = 0.31 ac Rise = 2.88 ft Freeboard = 1.12 ft Peak Outflow = 17.1 cfs 0.0 0.0 INPUT 0.0 0.0 Hydrograph Results: Riser: Nr = 1 Top of Dam: 379.50 ft Qp = 29.5 cfs Riser Width = 4.0 ft Barrel: 0.0 Tp = 23.4 min Riser Length = 4.0 ft Nb = 1 dT = 2 min Cwr = 3.33 Db = 18 in Stage- Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 2197 Zcr = 378.00 ft Zinv = 370.00 ft b = 1.66 Notch Weir: Nr = 1 Orifice: N = 1 Za = 371.0 ft (inv) Riser Length = 0.5 ft Cdr = 0.60 Initial Water Level: Cwr = 3.33 D = 1.5 in Z, = 375.50 ft Zcr = 376.50 ft Zcr = 375.50 ft OUTPUT 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T i S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 0 0 26593.34 375.50 0:0 0.0 0.0 0.0 0.0 0.0 2 1 26593.34 375.50 0.0 0.0 0.0 0.0 0.0 0.0 4 2 26656.64 375.51 0.0 0.0 0.0 0.0 0.0 0.0 6 5 26904.78 375.53 0.0 0.0 0.0 0.0 0.0 0.0 8 8 27446.47 375.59 0.0 0.0 0.0 0.0 0.0 0.0 10 11 28369.39 375.68 0.0 0.0 0.0 0.0 0.0 0.0 12 15 29733.98 375.81 0.0 0.0 0.0 0.0 0.0 0.0 14 19 31569.06 375.99 0.0 0.0 0.0 0.0 0.0 0.0 16 23 33869.82 376.21 0.0 0.0 0.0 0.0 0.0 0.0 18 26 36598.11 376.46 0.1 0.0 0.0 0.1 0.0 0.1 20 28 39685.18 376.73 0.2 0.0 0.0 0.2 0.2 0.1 22 29 43014.68 377.01 0.7 0.0 0.0 07 0.6 0.1 24 29 46443.30 377.30 1.3 0.0 0.0 1.3 1.2 0.1 26 29 49829.61 377.57 1.9 0.0 0.0 1.9 1.9 0.1 28 27 53037.34 377.82 2.6 0.0 0.0 2.6 2.5 01 30 24 55943.84 378.05 3.9 0.6 16.8 22.9 3.2 0.1 32 22 58393.04 378.23 9.9 6.0 37.1 23.2 3.8 0.1 34 19 59815.79 378.34 14.7 10.5 44.8 23.4 4.2 0.1 36 17 60380.81 378.38 16.9 12.5 47.5 23.5 4.3 0.1 38 16 60443.78 378.38 17.1 12.7 47.8 23.5 4.3 0.1 40 14 60258.05 378.37 16.4 12.0 46.9 23.5 4.3 0.1 42 12 59962.56 378.35 15.3 11.0 45.5 23.4 4.2 0.1 44 11 59626.09 378.32 14.0 9.8 43.8 23.4 4.1 0.1 46 10 59281.27 378.30 12.8 8.7 42.1 23.3 4.0 0.1 48 9 58943.12 378.27 11.6 7.6 40.3 23.3 19 0.1 50 8 58618.22 378.25 10.6 6.6 38.4 23.3 3.9 0.1 52 7 58309.09 378.23 9.6 5.7 36.6 23.2 3.8 0.1 54 6 58016.27 378.20 8.7 4.9 34.8 23.2 3.7 0.1 56 6 57739.36 378.18 7.9 4.2 33.0 23.2 3.6 0.1 58 5 57477.51 37816 7.2 3.5 31.2 23.1 3.6 0.1 60 5 57229.66 378.14 6.6 2.9 29.3 23.1 3.5 0.1 62 4 56994.65 378.13 6.0 2.4 27.5 23.1 3.5 0.1 64 4 56771.27 378.11 5.5 2.0 25.6 23.0 3.4 0.1 66 3 56558.32 378.09 5.0 1.5 236 23.0 3.4 0.1 68 3 56354.55 378.08 4.6 1.2 21.6 23.0 3.3 01 70 3 56158.68 378.06 4.2 0.9 19.5 23.0 3.3 0.1 1 2 3 4 5 6 7 8 9 . ... 10 . ...... ....... Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 72 2 55969.34 378.05 3.9 0.6 17.1 23.0 3.2 0.1 74 2 55785.02 378.04 3.6 0.4 14.5 22.9 3.2 0.1 76 2 55603.91 378.02 3.4 0.2 11.4 22.9 3.1 0.1 78 2 55423.66 378.01 3.2 0.0 6.9 22.9 3.1 0.1 80 2 55240.61 377.99 3.1 0.0 0.0 3.1 3.0 0.1 82 1 55045.98 377.98 3.1 0.0 0.0 3.1 3.0 0.1 84 1 54837.73 377.96 3.0 0.0 0.0 3.0 2.9 0.1 86 1 54618.23 377.95 3.0 0.0 0.0 3.0 2.9 0.1 88 1 54389.57 377.93 2.9 0.0 0.0 2.9 2.8 0.1 90 1 54153.57 377.91 2.9 0.0 0.0 2.9 2.8 0.1 92 1 53911.86 377.89 2.8 0.0 0.0 2.8 27 0.1 94 1 53665.83 377.87 2.8 0.0 0.0 2.8 2.7 0.1 96 1 53416.74 377.85 2.7 0.0 0.0 2.7 2.6 0.1 98 1 53165.66 377.83 2.7 0.0 0.0 2.7 2.6 0.1 100 0 52913.53 377.81 2.6 0.0 0.0 2.6 2.5 0.1 102 0 52661.17 377.80 2.5 0.0 0.0 2.5 2.5 0.1 104 0 52409.28 377.78 2.5 0.0 0.0 2.5 2.4 0.1 106 0 52158.49 377.76 2.4 0.0 0.0 2.4 2.3 0.1 108 0 51909.30 377.74 2.4 0.0 0.0 2.4 2.3 0.1 110 0 51662.17 377.72 2.3 0.0 0.0 2.3 2.2 0.1 112 0 51417.48 377.70 2.3 0.0 0.0 2.3 2.2 0.1 114 0 51175.56 377.68 2.2 0.0 0.0 2.2 2.1 0.1 116 0 50936.67 377.66 2.2 0.0 0.0 2.2 2.1 0.1 118 0 50701.04 377.64 2.1 0.0 0.0 2.1 2.0 0.1 120 0 50468.85 377.62 2.1 0.0 0.0 2.1 2.0 0.1 122 0 50240.24 377.60 2.0 0.0 0.0 2.0 1.9 0.1 124 0 50015.34 377.59 2.0 0.0 0.0 2.0 1.9 0.1 126 0 49794.23 377.57 1.9 0.0 0.0 1.9 1.8 0.1 128 0 49576.98 377.55 1.9 0.0 0.0 1.9 1.8 0.1 130 0 49363.63 377.54 1.8 0.0 0.0 1.8 1.8 0.1 132 0 49154.21 377.52 1.8 0.0 0.0 1.8 1.7 0.1 134 0 48948.73 377.50 1.8 0.0 0.0 1.8 1.7 0.1 136 0 48747.18 377.49 1.7 0.0 0.0 1.7 1.6 0.1 138 0 48549.55 377.47 1.7 0.0 0.0 1.7 1.6 0.1 140 0 48355.82 377.45 1.6 0.0 0.0 1.6 1.6 0.1 142 0 48165.95 377.44 1.6 0.0 0.0 1.6 1.5 0.1 144 0 47979.90 377.42 1.6 0.0 0.0 1.6 1.5 0.1 146 0 47797.62 377.41 1.5 0.0 0.0 1.5 1.4 0.1 148 0 47619.07 377.39 1.5 0.0 0.0 1.5 1.4 0.1 150 0 47444.17 377.38 1.5 0.0 0.0 1.5 1.4 0.1 152 0 47272.89 377.37 1.4 0.0 0.0 1.4 1.3 0.1 154 0 47105.14 377.35 1.4 0.0 0.0 1.4 1.3 0.1 156 0 46940.88 377.34 1.4 0.0 0.0 1.4 1.3 0.1 158 0 46780.03 377.33 1.3 0.0 0.0 1.3 1.3 0.1 160 0 46622.51 377.31 1.3 0.0 0.0 1.3 1.2 0.1 162 0 46468.28 377.30 1.3 0.0 0.0 1.3 1.2 0.1 164 0 46317.25 377.29 1.2 0.0 0.0 1.2 1.2 0.1 166 0 46169.36 377.28 1.2 0.0 0.0 1.2 1.1 0.1 168 0 46024.54 377.26 1.2 0.0 0.0 1.2 1.1 0.1 170 0 45882.71 377.25 1.2 0.0 0.0 1.2 1.1 0.1 172 0 45743.82 377.24 1.1 0.0 0.0 1.1 1.1 0.1 174 0 45607.80 377.23 1.1 0.0 0.0 1.1 1.0 0.1 176 0 45474.57 377.22 1.1 0.0 0.0 1.1 1.0 0.1 178 0 45344.07 377.21 1.1 0.0 0.0 1.1 1.0 0.1 180 0 45216.24 377.20 1.0 0.0 0.0 1.0 1.0 0.1 182 0 45091.02 377.19 1.0 0.0 0.0 1.0 1.0 0.1 184 0 44968.33 377.18 1.0 0.0 0.0 1.0 0.9 0.1 186 0 44848.13 377.17 1.0 0.0 0.0 1.0 0.9 0.1 188 0 44730.35 377.16 1.0 0.0 0.0 1.0 0.9 0.1 190 0 44614.93 377.15 0.9 0.0 0.0 0.9 0.9 0.1 1 2 3 4 5 6 7 8 9 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs 192 0 44501.81 377,14 0.9 0.0 0.0 0.9 0.9 194 0 44390.94 377.13 0.9 0.0 0.0 0.9 0.8 196 0 44282.26 377.12 0.9 0.0 0.0 0.9 0.8 198 0 44175.72 377.11 0.9 0.0 0.0 0.9 0.8 200 0 44071.27 377.10 0.9 0.0 0.0 0.9 0.8 202 0 43968.86 377.09 0.8 0.0 0.0 0.8 0.8 204 0 43868.43 377.09 0.8 0.0 0.0 0.8 0.7 206 0 43769.94 377.08 0.8 0.0 0.0 0.8 0.7 208 0 43673.34 377.07 0.8 0.0 0.0 0.8 0.7 210 0 43578.58 377.06 0.8 0.0 0.0 0.8 0.7 212 0 43485.63 377.05 0.8 0.0 0.0 0.8 0.7 214 0 43394.43 377.05 0.7 0.0 0.0 0.7 0.7 216 0 43304.95 377.04 0.7 0.0 0.0 0.7 0.7 218 0 43217.14 377.03 0.7 0.0 0.0 0.7 0.6 220 0 43130.96 377.02 0.7 0.0 0.0 0.7 0.6 222 0 43046.38 377.02 0.7 0.0 0.0 0.7 0.6 224 0 42963.35 377.01 0.7 0.0 0.0 0.7 0.6 226 0 42881.84 377.00 0.7 0.0 0.0 0.7 0.6 228 0 42801.81 377.00 0.7 0.0 0.0 0.7 0.6 230 0 42723.23 376.99 0.6 0.0 0.0 0.6 0.6 232 0 42646.06 376.98 0.6 0.0 0.0 0.6 0.6 234 0 42570.28 376.98 0.6 0.0 0.0 0.6 0.5 236 0 42495.84 376.97 0.6 0.0 0.0 0.6 0.5 238 0 42422.72 376.96 0.6 0.0 0.0 0.6 0.5 240 0 42350.89 376.96 0.6 0.0 0.0 0.6 0.5 242 0 42280.31 376.95 0.6 0.0 0.0 0.6 0.5 244 0 42210.96 376.95 0.6 0.0 0.0 0.6 0.5 246 0 42142.81 376.94 06 0.0 0.0 0.6 0.5 248 0 42075.83 376.93 0.5 0.0 0.0 0.5 0.5 250 0 42010.00 376.93 0.5 0.0 0.0 0.5 0.5 252 0 41945.29 376.92 0.5 0.0 0.0 0.5 0.5 254 0 41881.67 376.92 0.5 0.0 0.0 0.5 0.5 256 0 41819.12 376.91 0.5 0.0 0.0 0.5 0.4 258 0 41757.62 376.91 0.5 0.0 0.0 0.5 0.4 260 0 41697.14 376.90 0.5 0.0 0.0 0.5 0.4 262 0 41637.66 376.90 0.5 0.0 0.0 0.5 0.4 264 0 41579.16 376.89 0.5 0.0 0.0 0.5 0.4 266 0 41521.62 376.89 0.5 0.0 0.0 0.5 0.4 268 0 41465.01 376.88 0.5 0.0 0.0 0.5 0.4 270 0 41409.32 376.88 0.5 0.0 0.0 0.5 0.4 272 0 41354.53 376.87 0.4 0.0 0.0 0.4 0.4 274 0 41300.61 376.87 0.4 0.0 0.0 0.4 0.4 276 0 41247.55 376.86 0.4 0.0 0.0 0.4 0.4 278 0 4119533 376.86 0.4 0.0 0.0 0.4 0.4 280 0 41143.93 376.86 0.4 0.0 0.0 0.4 0.4 282 0 41093.33 376.85 0.4 0.0 0.0 0.4 0.3 284 0 41043.52 376.85 0.4 0.0 0.0 0.4 0.3 286 0 40994.48 376.84 0.4 0.0 0.0 0.4 0.3 288 0 40946.20 376.84 0.4 0.0 0.0 0.4 0.3 290 0 40898.66 376.83 0.4 0.0 0.0 0.4 0.3 292 0 40851.84 376.83 0.4 0.0 0.0 0.4 0.3 294 0 40805.73 376.83 0.4 0.0 0.0 0.4 0.3 296 0 40760.31 376.82 0.4 0.0 0.0 0.4 0.3 298 0 40715.58 376.82 0.4 0.0 0.0 0.4 0.3 300 0 40671.51 376.81 0.4 0.0 0.0 0.4 0.3 302 0 40628.09 376.81 0.4 0.0 0.0 0.4 0.3 304 0 40585.31 376.81 0.4 0.0 0.0 0.4 0.3 306 0 40543.16 376.80 0.3 0.0 0.0 0.3 0.3 308 0 40501.63 376.80 0.3 0.0 0.0 0.3 0.3 310 0 40460.69 376.80 0.3 0.0 0.0 0.3 0.3 312 0 40420.35 376.79 0.3 0.0 0.0 0.3 0.3 314 0 40380.59 376.79 0.3 0.0 0.0 0.3 0.3 316 0 40341.39 376.79 0.3 0.0 0.0 0.3 0.3 10 Orifice cfs 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 318 0 40302.75 376.78 0.3 0.0 0.0 o-. s 0.3 01 320 0 40264.65 376.78 0.3 0.0 0.0 0.3 0.2 0.1 322 0 40227.09 376.78 0.3 0.0 0.0 0.3 0.2 0.1 324 0 40190.05 376.77 0.3 0.0 0.0 0.3 0.2 0.1 326 0 40153.53 376.77 0.3 0.0 0.0 0.3 0, 2 0.1 328 0 40117.52 376.77 0.3 0.0 0.0 0.3 0.2 0.1 330 0 40081.99 376.76 0.3 0.0 0.0 0.3 0.2 01 332 0 40046.96 376.76 0.3 0.0 0.0 0.3 0.2 0.1 334 0 40012.40 376.76 0.3 0.0 0.0 0.3 0.2 0.1 336 0 39978.30 376.75 0.3 0.0 0.0 0.3 0.2 0.1 338 0 39944.67 376.75 0.3 0.0 0.0 0.3 0.2 0.1 340 0 39911.48 376.75 0.3 0.0 0.0 0.3 0.2 0.1 342 0 39878.74 376.75 0.3 0.0 0.0 0.3 0.2 0.1 344 0 39846.43 376.74 0.3 0.0 0.0 0.3 0.2 0.1 346 0 39814.55 376.74 0.3 0.0 0.0 0.3 0.2 0.1 348 0 39783.08 376.74 0.3 0.0 0.0 0.3 0.2 0.1 350 0 39752.03 376.73 0.3 0.0 0.0 0.3 0.2 0.1 352 0 39721.38 376.73 0.3 0.0 0.0 0.3 0.2 0.1 354 0 39691.12 376.73 0.2 0.0 0.0 0.2 0.2 0.1 356 0 39661.25 376.73 0.2 0.0 0.0 0.2 0.2 0.1 358 0 39631.76 376.72 0.2 0.0 0.0 0.2 0.2 0.1 360 0 39602.65 376.72 0.2 0.0 0.0 0.2 0.2 0.1 362 0 39573.90 376.72 0.2 0.0 0.0 0.2 0.2 0.1 364 0 39545.52 376.72 0.2 0.0 0.0 0.2 0.2 0.1 366 0 39517.49 376.71 0.2 0.0 0.0 0.2 0.2 0.1 368 0 39489.81 376.71 0.2 0.0 0.0 0.2 0.2 0.1 370 0 39462.47 376.71 0.2 0.0 0.0 0.2 02 0.1 372 0 39435.46 376.71 0.2 0.0 0.0 0.2 0.2 0.1 374 0 39408.79 376.70 0.2 0.0 0.0 0.2 0.2 0.1 376 0 39382.44 376.70 0.2 0.0 0.0 0.2 0.2 0.1 378 0 39356.41 376.70 0.2 0.0 0.0 0.2 0.1 0.1 380 0 39330.70 376.70 0.2 0.0 0.0 0.2 01 0.1 382 0 39305.29 376.70 0.2 0.0 0.0 0.2 0.1 0.1 384 0 39280.19 376.69 0.2 0.0 0.0 0.2 0.1 0.1 386 0 39255.38 376.69 0.2 0.0 0.0 0.2 0.1 0.1 388 0 39230.87 376.69 0.2 0.0 0.0 0.2 0.1 0.1 390 0 39206.64 376.69 0.2 0.0 0.0 0.2 0.1 0.1 392 0 39182.70 376.69 0.2 0.0 0.0 0.2 0.1 0.1 394 0 39159.04 376.68 0.2 0.0 0.0 0.2 0.1 0.1 396 0 39135.65 376.68 0.2 0.0 0.0 0.2 0.1 0.1 398 0 39112.52 376.68 0.2 0.0 0.0 0.2 0.1 0.1 400 0 39089.67 376.68 0.2 0.0 0.0 0.2 0.1 0.1 402 0 39067.07 376.68 0.2 0.0 0.0 0.2 0.1 0.1 404 0 39044.73 376.67 0.2 0.0 0.0 0.2 0.1 0.1 406 0 39022.64 376.67 0.2 0.0 0.0 0.2 0.1 0.1 408 0 39000.79 376.67 0.2 0.0 0.0 0.2 0.1 0.1 410 0 38979.19 376.67 0.2 0.0 0.0 0.2 0.1 0.1 412 0 38957.83 376.67 0.2 0.0 0.0 0.2 0.1 0.1 414 0 38936.71 376.66 0.2 0.0 0.0 0.2 0.1 0.1 416 0 38915.82 376.66 0.2 0.0 0.0 0.2 0.1 0.1 418 0 38895.15 376.66 0.2 0.0 0.0 0.2 0.1 0.1 420 0 38874.71 376.66 0.2 0.0 0.0 0.2 0.1 0.1 422 0 38854.49 376.66 0.2 0.0 0.0 0.2 0.1 0.1 424 0 38834.49 376.65 0.2 0.0 0.0 0.2 0.1 0.1 426 0 38814.70 376.65 0.2 0.0 0.0 0.2 0.1 0.1 428 0 38795.12 376.65 0.2 0.0 0.0 0.2 0.1 0.1 430 0 38775.74 376.65 0.2 0.0 0.0 0.2 0.1 0.1 432 0 38756.58 376.65 0.2 0.0 0.0 0.2 0.1 0.1 434 0 38737.61 376.65 0.2 0.0 0.0 0.2 0.1 0.1 436 0 38718.84 376.64 0.2 0.0 0.0 0.2 0.1 0.1 438 0 38700.26 376.64 0.2 0.0 0.0 0.2 0.1 0.1 440 0 38681.88 376.64 0.2 0.0 0.0 0.2 0.1 0.1 442 0 38663.68 376.64 0.2 0.0 0.0 0.2 0.1 0.1 444 0 38645.67 376.64 0.1 0.0 0.0 0.1 0.1 0.1 1 2 3 4 5 6 7.... 8 9 10 Time inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 446 0 38627.84 376.64 0.1 0.0 U 0.1 0.1 0.1 448 0 38610.19 376.63 0.1 0.0 0.0 0.1 0.1 0.1 450 0 38592.72 376.63 0.1 0.0 0.0 0.1 0.1 0.1 35 - 30 25 i a w 3" 20 m rn L v 15 y 10 5 0 0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 379.00 378.50 378.00 377.50 x Lu 377.00 Q 376.50 376.00 375.50 375.00 0 50 100 150 200 250 300 350 400 450 500 Time (min) STAGE - DISCHARGE FUNCTION 2 4 6 8 10 12 14 16 18 DISCHARGE (cfs) F Number of Drains = Diameter of Drains = Orifice Coefficient = Elevation of Drains = DRAWDOWN CALCULATIONS Woodall Subdivision Storage Pool Drawdown 'ond must detain the first 1" of runoff and release it in 2 to 5 days INPUT 1 Starting Water Elevation = 376.50 ft 1.5 in Ending Water Elevation = 375.50 ft 0.60 Driving Head = 0.33 ft 375.50 ft OUTPUT By the Orifice Equation: Permanent Pool Drawdown Flow = 0.03 cfs Vol of Storage Required = 9697 cf Vol of Storage Provided = 10496 cf Length of Drawdown = 307631 sec or OK 3.56 days OK By the Orifice Equation: Average Flow = Volume of Storage = Length of Drawdown = OUTPUT 2.79 cfs 26593 cf 9540 sec or 2.65 hours OK Permanent Pool Drawdown Bottom drain must completely drain pond in less than 24 hours INPUT Number of Drains = 1 Starting Water Elevation = 375.50 ft Diameter of Drains = 8.0 in Ending Water Elevation = 370.00 ft Orifice Coefficient = 0.60 Average Head = 2.75 ft Elevation of Drains = 370.00 ft By the Orifice Equation: Average Flow = Volume of Storage = Length of Drawdown = OUTPUT 2.79 cfs 26593 cf 9540 sec or 2.65 hours OK OBJECTIVE: ASSUMPTIONS: SOLUTION - Qp: ANTI- FLOTATION CALCULATIONS Woodall Subdivision Determine Anti - Flotation Block Density of Water = 62.4 Ibs/ cf Density of Concrete = 150.0 Ibs/ cf - Calculate the bouyant force as if the top of the riser were to become plugged. - Bouyant force is the Volume X Density of Water X 1.1 Use Section 8.07.08 to determine the Determine the weight of water displaced by the empty riser, and desing a block with bouyant weight 1.1 times the weight of displaced water. Riser Width = Riser Length = Riser Height = Base Width Base Length = Base Depth = Barrel Opening = Riser Walls Riser Interior Barrel Opening Base Net Force 4.0 ft Wall Thickness = 8 in 4.0 ft ( "See sheet C3.5 for dimensions) 8.0 ft 6.8 ft 82 in 5.3 ft 64 in 1.00 ft 12 in 1.5 ft 18 in Volume Dry Weight cf Ibs 138.67 20,800.00 128.00 1.18 - 176.71 36.44 5,466.67 26,089.95 5,203.54lbs DOWNWARD Bouyant Force Ibs 9,518.08 8,785.92 80.86 2,501.55 20,886.41 CONCLUSION: OK: The riser structure has enough weight to overcome bouyant forces. Wet Detention Pond 2 Design A. Average Pond Depth Calculation ................................................... ............................... B. Watershed Data ............................................................................. ............................... C. Hydrograph Formulation ................................................................ ............................... D. Stage- Storage Function ................................................................. ............................... E. Pond Volume Calculations ............................................................. ............................... F. Chainsaw Routing for 1 -Year Storm ................................................ ............................... G. Chainsaw Routing for so -Year Storm .............................................. ............................... H. Chainsaw Routing for loo -Year Storm ............................................ ............................... I. Orifice Drawdown Calculations ...................................................... ............................... J. Anti - Flotation Calcs ....................................................................... ............................... K. Flow- Splitter Calculations .............................................................. ............................... BMP2 OPTION 1 OPTION 2 Average Depth Rounded Down to the nearest 0.5' per NCDWQ BMP Manual Surface Area Permanent Pool (sf) _ Surface Area Bottom Shelf (sf) _ Surface Area Bottom Pond (Sediment Cleanout Top Elevation (sf) _ Pond Depth from Bottom of Pond (Sediment Cleanout Top Elevation) to Bottom of Shelf (ft) _ Volume Permanent Pool (cf) _ (AVERAGE POND DEPTH CALCULATION Depth (Average) _ ! Volume (Permanent Pool) II Surface Area (of Permanent Pool) I 0 [0.25X(1 +(Surface Area Bottom Shelf /Surface Area Permanent Depth (Average) = Pool))] +[((Surface Area Bottom Shelf +Surface Area Bottom Pond) /2)X(Depth /Surface Area Bottom Shelf)] 3.054534164 _ 10757 8270 2532 4 0 WATERSHED DATA Woodall Subdivision IMPERVIOUSNESS, RATIONAL -C', AND SCS CN I� PRE POST Watershed Area 8.27 ac. 8.27 ac. Pavement/Building Area 0.00 ac. 5.83 ac. Natural Area 8.27 ac. 2.44 ac. Percent Impervious Rational C SCS Curve Number NOTES: 0.00% 70.50% 0.30 0.78 50 90 Rational Runoff Coefficient -'C' 'C' for Pavement/Building Area = 0.98 'C' for Natural Area = 0.30 SCS Curve Number for Soil Group C - CN CN for Pavement/Building Area = 98 CN for Natural Area = 50 HYDROGRAPH FORMULATION Woodall Subdivision BACKGROUND: Use the Rational Method REFERENCES: ( Malcom, 1991; Wanielista, 1990 ) SOLUTION - Qp: Use the Kirpich Equation & the Rational Method SOLUTION - Tp: INPUT OUTPUT POST OUTPUT PRE Tc -pre = 16.6 minutes Tc -post = _.._ minutes 1.14 in Pn6 = Apre = 8.27 acres Apost = 8.27 acres CN = 90 Cpre = 0.30 Cpost = 0.78 3.50 in (10 Year Storm) Q* = 2.42 g = 112 (1 year I = 4.48 in /hr 3.06 in /hr h = 20 storm/ 24 hour) Qp1 = 28.9 cfs 7.6 cfs g = 195 (10 year I = 7.22 in /hr 5.05 in /hr h = 22 storm/ 24 hour) Qp10 = 46.6 cfs VI 12.5 cfs g = 232 (25 year I = 8.29 in /hr 5.86 in /hr h = 23 storm/ 24 hour) Qp25 = 53.4 cfs 14.5 cfs g = 261 (50 year I = 9.00 in /hr 6.43 II in /hr h = 24 storm/ 24 hour) QP50 = 58.0 cfs 15.9 cfs g = 290 (100 year I = 9.67 in /hr 6.97 �I in /hr h = 25 storm/ 24 hour) QP100 = 62.3 cfs 17.3 cfs SOLUTION - Tp: TERMINOLOGY: L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in /hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) INPUT OUTPUT S= 1.14 in Pn6 = 2.03 in (1 Year Storm) Q* = 1.10 in CN = 90 Tp1 = 13.7 minutes P,6 = 3.50 in (10 Year Storm) Q* = 2.42 in CN = 90 TP10 = 18.7 minutes Pn6 = 4.14 in (25 Year Storm) Q* = 3.03 in CN = 90 _ Tp25 = 20.4 minutes Pr6 = 4.67 in (50 Year Storm) Q* = 3.53 in CN = 90 Tp50 = 21.9 minutes Pr6 = 5.21 in (100 Year Storm) Q* = 4.05 in CN = 90 TP100 = 23.4 minutes TERMINOLOGY: L = Hydraulic Length, (ft) H = Vertical Relief, (ft) g = Statistical Variable h = Statistical Variable A = Watershed Area, (acres) C = Composite Runoff Coefficient Pn6 = Precipitation from 6 hr storm (in) CN = Curve Number Tc = Time of Concentration, (minutes) I = Rainfall Intensity, (in /hr) Qp = Peak Discharge, (cfs) S = Ultimate Soil Storage, (in) Q* = Runoff Depth, (in) Tp = Time to Peak, (minutes) STAGE - STORAGE FUNCTION Woodall Subdivision 1 2 3 4 5 6 7 8 Y X CONTOUR CONTOUR INCR ACCUM Z In S In Z Z est 'AREA VOLUME VOLUME STAGE sq ft cu ft cu ft ft ft 356 2532 0 0 360 8270 21604 21604 4 9.9806 1.3863 3.99 360.5 10757 4757 26360.75 4.5 10.1796 1.5041 4.48 361 13408 6041 32402 5 10.3860 1.6094 5.05 366.5 16506 82264 114665.5 10.5 11.6498 2.3514 10.48 STAGE - STORAGE FUNCTION: 12 11 c 10 S =KS"Z" where: b = 1.73 and KS = 1978 Storage at Top of Embankment = 114,666 cf Storage at Normal Pool = 26,593 cf Stage- Storage Function 9 1 1 , 0.0 0.5 1.0 1.5 2.0 2.5 In Z POND VOLUME CALCULATIONS Woodall Subdivision CALCULATE IMPERVIOUS AREA: Drainage area = 8.27 ac. Impervious area = 5.83 ac. Percent Impervious = 70.50% FIND SA/DA FOR PERMANENT POOL SIZING: Assume 85% Pollutant Removal Efficiency average pool depth of 3 foot. Use Table 10 -3 in Stormwater Management Guidance Manual and interpolate. Interpolated SA/DA = 2.88% Depth of Pool= 4.5 ft *AVG DEPTH = 3' FIND REQUIRED SURFACE AREA: Surface Area = SA/DA x Drainage Area Surface Area Required = 0.24 ac or 10,375 sf Surface Area Provided = 0.25 ac or 10,757 sf OK FIND VOLUME TO BE CONTROLLED FROM 1" STORM Rv = 0.68 DA = 8.27 ac Volume = Rv x 0.0833 x Drainage Area = 0.47 ac. -ft. or 20539 cf. TERMINOLOGY: P = Precipitation Depth, (in) S = Ultimate Soil Storage, (in) CN = Curve Number Q" = Runoff Depth, (in) CHAINSAW ROUTING FOR 1 -YEAR STORM (REF. Malcom, 1991) COMPUTED RESULTS Normal Surface Area = 0.25 ac Peak Stage = 363.03 ft Maximum Surface Area = 0.32 ac Rise = 2.53 ft Freeboard .= 3.47 ft Peak Outflow = 1.2 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 366.50 ft Qp = 28.9 cfs Riser Width = 4.0 ft Barrel: Tp = 13.7 min Riser Length = 4.0 ft Nb = 1 dT = 2 min Cwr = 3.33 Db = 24 in 51age•Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1978 Zcr = 364.85 ft Zinv = 357.00 ft b = 1.73 Notch Weir: Nr = 1 Orifice: N = 1 Zo = 356.0 ft (inv) Weir Length = 0.5 ft Cdr = 0.60 Initial Water Level: Cwr = 3.33 D = 2.0 in Z, = 360.50 ft Zcr = 362.30 ft Zcr = 360.50 ft 1 2 3 4 _OUTPUT 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel I Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 0 0 26592.72 350.50 0.0 0.0 0.0 0.0 0.0 0.0 2 1 26592.72 360.50 0.0 0.0 0.0 0.0 0.0 0.0 4 6 26770.84 360.52 0.0 0.0 0.0 0.0 0.0 0.0 6 12 27445.06 360.58 0.0 0.0 0.0 0.0 0.0 0.0 8 18 28832.35 360.72 0.0 0.0 0.0 0.0 0.0 0.0 10 24 31002.68 360.92 0.1 0.0 0.0 0.1 0.0 0.1 12 28 33864.77 361.18 0.1 0.0 0.0 0.1 0.0 0.1 14 29 37184.74 361.46 0.1 0.0 00 0.1 0.0 0.1 16 27 40634.24 361.75 0.1 0.0 0.0 0.1 0.0 0.1 18 23 43857.96 362.01 0.1 0.0 0.0 0.1 0.0 0.1 20 19 46579.80 362.22 0.1 0.0 0.0 0.1 0.0 0.1 22 16 48828.53 362.40 0.2 0.0 0.0 0.2 0.1 0.1 24 13 50679.65 362.54 0.3 0.0 0.0 0.3 0.2 0.1 26 11 52189.60 362.65 0.5 0.0 0.0 0.5 0.3 0.2 28 9 53413.04 362.74 0.6 0.0 0.0 0.6 0.5 0.2 30 7 54397.49 362.81 0.8 0.0 0.0 0.8 0.6 0.2 32 6 55183.35 362.87 0.9 0.0 0.0 0.9 0.7 0.2 34 5 55804.62 362.91 1.0 0.0 0.0 1.0 0.8 0.2 36 4 56289.75 362.95 1.0 0.0 0.0 1.0 0.9 0.2 38 3 56662.50 362.97 1.1 0.0 0.0 1.1 0.9 0.2 40 3 56942.60 362.99 1.1 0.0 0.0 1.1 1.0 0.2 42 2 57146.49 363.01 1.2 0.0 0.0 1.2 1.0 0.2 44 2 57287.76 363.02 12 0.0 0.0 1.2 1.0 0.2 46 2 57377.71 363.02 1.2 0.0 0.0 1.2 1.0 0.2 48 1 57425.68 363.03 1.2 0.0 0.0 1.2 1.1 0.2 50 1 57439.40 363.03 1.2 0.0 0.0 1.2 1.1 0.2 52 1 57425.26 363.03 1.2 0.0 0.0 1.2 1.1 0.2 54 1 57388.56 363.02 1.2 0.0 0.0 1.2 1.0 0.2 56 1 57333.63 363.02 1.2 0.0 0.0 1.2 1.0 0.2 58 1 57264.10 363.01 1.2 0.0 0.0 1.2 1.0 0.2 60 0 57182.92 363.01 1.2 0.0 0.0 1.2 1.0 0.2 62 0 57092.53 363.00 1.2 0.0 0.0 1.2 1.0 0.2 64 0 56994.96 363.00 1.2 0.0 0.0 1.2 1.0 0.2 66 0 56891.85 362.99 1.1 0.0 0.0 1.1 1.0 0.2 68 0 56784.57 362.98 1.1 0.0 0.0 1.1 1.0 0.2 70 0 56674.22 362.97 1.1 0.0 0.0 1.1 0.9 0.2 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 72 0 56561.73 362.96 1.1 0.0 0.0 11 0.9 0.2 74 0 56447.83 362.96 1.1 0.0 0.0 1.1 0.9 0.2 76 0 56333.14 362.95 1.1 0.0 00 1.1 0.9 0.2 78 0 56218.15 362.94 1.0 0.0 0.0 1.0 0.9 0.2 80 0 56103.26 362.93 1.0 0.0 0.0 1.0 0.9 0.2 82 0 55988.80 362.92 1.0 0.0 0.0 1.0 0.8 0.2 84 0 55875.02 362.92 1.0 0.0 0.0 1.0 0.8 0.2 86 0 55762.13 362.91 1.0 0.0 0.0 1.0 0.8 0.2 88 0 55650.29 362.90 1.0 0.0 0.0 1.0 0.8 02 90 0 55539.64 362.89 0.9 0.0 0.0 0.9 0.8 0.2 92 0 55430.27 362.88 0.9 0.0 0.0 0.9 0.8 0.2 94 0 55322.26 362.88 0.9 0.0 0.0 0.9 0.7 0.2 96 0 55215.66 362.87 0.9 0.0 0.0 0.9 0.7 0.2 98 0 55110.52 362.86 0.9 0.0 0.0 0.9 0.7 0.2 100 0 55006.85 362.85 0.9 0.0 0.0 0.9 0.7 0.2 102 0 54904.68 362.85 0.8 0.0 0.0 0.8 0.7 0.2 104 0 54804.01 362.84 0.8 0.0 0.0 0.8 0.7 0.2 106 0 54704.84 362.83 0.8 0.0 0.0 0.8 0.7 0.2 108 0 54607.16 362.82 0.8 0.0 0.0 0.8 0.6 0.2 110 0 54510.98 362.82 0.8 0.0 0.0 0.8 0.6 0.2 112 0 54416.26 362.81 0.8 0.0 0.0 0.8 0.6 0.2 114 0 54323.00 362.80 0.8 0.0 0.0 0.8 0.6 0.2 116 0 54231.18 362.80 0.8 0.0 0.0 0.8 0.6 0.2 118 0 54140.77 362.79 0.7 0.0 0.0 0.7 0.6 0.2 120 0 54051.76 362.78 0.7 0.0 0.0 0.7 0.6 0.2 122 0 53964.11 362.78 0.7 0.0 0.0 0.7 0.6 0.2 124 0 53877.82 362.77 0.7 0.0 0.0 0.7 0.6 0.2 126 0 53792.85 362.77 0.7 0.0 0.0 0.7 0.5 0.2 128 0 53709.18 362.76 0.7 0.0 0.0 0.7 0.5 0.2 130 0 53626.79 362.75 0.7 0.0 0.0 0.7 0.5 0.2 132 0 53545.65 362.75 0.7 0.0 0.0 0.7 0.5 0.2 134 0 53465.74 362.74 0.7 0.0 0.0 0.7 0.5 0.2 136 0 53387.03 362.74 0.6 0.0 0.0 0.6 0.5 0.2 138 0 53309.50 362.73 0.6 0.0 0.0 0.6 0.5 0.2 140 0 53233.13 362.72 0.6 0.0 0.0 0.6 0.5 0.2 142 0 53157.90 362.72 0.6 0.0 0.0 0.6 0.5 0.2 144 0 53083.78 362.71 0.6 0.0 0.0 0.6 0.5 0.2 146 0 53010.74 362.71 0.6 0.0 0.0 0.6 0.4 0.2 148 0 52938.78 362.70 0.6 0.0 0.0 0.6 0.4 0.2 150 0 52867.86 362.70 0.6 0.0 0.0 0.6 0.4 0.2 152 0 52797.98 362.69 0.6 0.0 0.0 0.6 0.4 0.2 154 0 52729.09 362.69 0.6 0.0 0.0 0.6 0.4 0.2 156 0 52661.20 362.68 0.6 0.0 0.0 0.6 0.4 02 158 0 52594.27 362.68 0.5 0.0 0.0 0.5 0.4 0.2 160 0 52528.29 362.67 0.5 0.0 0.0 0.5 0.4 0.2 162 0 52463.23 362.67 0.5 0.0 0.0 0.5 0.4 0.2 164 0 52399.09 362.66 0.5 0.0 0.0 0.5 0.4 0.2 166 0 52335.85 362.66 0.5 0.0 0.0 0.5 0.4 0.2 168 0 52273.47 362.65 0.5 0.0 0.0 0.5 0.4 0.2 170 0 52211.96 362.65 0.5 0.0 0.0 0.5 0.4 0.2 172 0 52151.29 362.65 0.5 0.0 0.0 0.5 0.3 0.2 174 0 52091.45 362.64 0.5 0.0 0.0 0.5 0.3 0.2 176 0 52032.41 362.64 0.5 0.0 0.0 0.5 0.3 0.2 178 0 51974.17 362.63 0.5 0.0 0.0 0.5 0.3 0.2 180 0 51916.71 362.63 0.5 0.0 0.0 0.5 0.3 0.2 182 0 51860.01 362.62 0.5 0.0 0.0 0.5 0.3 0.2 184 0 51804.06 362.62 0.5 0.0 0.0 0.5 0.3 0.2 186 0 51748.85 362.62 0.5 0.0 0.0 0.5 0.3 0.2 188 0 51694.36 362.61 0.4 0.0 0.0 0.4 0.3 0.2 190 0 51640.58 362.61 0.4 0.0 0.0 0.4 0.3 0.2 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs i 92 0 51587.50 362.60 0.4 0.0 0.0 0.4 0.3 0.2 194 0 51535.09 362.60 0.4 0.0 0.0 0.4 0.3 0.2 196 0 51483.36 362.60 0.4 0.0 0.0 0.4 0.3 0.2 198 0 51432.28 362.59 0.4 0.0 0.0 0.4 0.3 0.2 200 0 51381.85 362.59 0.4 0.0 0.0 0.4 0.3 0.2 202 0 51332.05 362.58 0.4 0.0 0.0 0.4 0.3 0.2 204 0 51282.87 362.58 0.4 0.0 0.0 0.4 0.3 0.2 206 0 51234.31 362.58 0.4 0.0 0.0 0.4 0.2 0.2 208 0 51186.34 362.57 0.4 0.0 0.0 0.4 0.2 0.2 210 0 51138.96 362.57 0.4 0.0 0.0 0.4 0.2 0.2 212 0 51092.15 362.57 0.4 0.0 0.0 0.4 0.2 0.2 214 0 51045.92 362.56 0.4 0.0 0.0 0.4 0.2 0.2 216 0 51000.24 362.56 0.4 0.0 0.0 0.4 0.2 0.2 218 0 50955.11 362.56 0.4 00 0.0 0.4 0.2 0.2 220 0 50910.52 362.55 0.4 0.0 0.0 0.4 0.2 0.2 222 0 50866.45 362.55 0.4 0.0 0.0 0.4 0.2 0.2 224 0 50822.90 362.55 0.4 0.0 0.0 0.4 0.2 0.2 226 0 50779.87 362.54 0.4 0.0 0.0 0.4 0.2 0.2 228 0 50737.33 362.54 0.4 0.0 0.0 0.4 0.2 0.2 230 0 50695.28 362.54 0.3 0.0 0.0 0.3 0.2 0.1 232 0 50653,72 362.53 0.3 0.0 0.0 0.3 0.2 0.1 234 0 50612.63 362.53 0.3 0.0 0.0 0.3 0.2 0.1 236 0 50572.01 362.53 0.3 0.0 0.0 0.3 0.2 0.1 238 0 50531.84 362.53 0.3 0.0 0.0 0.3 0.2 0.1 240 0 50492.13 362.52 0.3 0.0 0.0 0.3 0.2 0.1 242 0 50452.86 362.52 0.3 0.0 0.0 0.3 0.2 01 244 0 50414.02 362.52 0.3 0.0 0.0 0.3 0.2 0.1 246 0 50375.62 362.51 0.3 0.0 0.0 0.3 0.2 0.1 248 0 50337.63 362.51 0.3 0.0 0.0 0.3 0.2 0.1 250 0 50300.05 362.51 0.3 0.0 0.0 0.3 0.2 01 252 0 50262.88 362.50 0.3 0.0 0.0 0.3 0.2 0.1 254 0 50226.11 362.50 0.3 0.0 0.0 0.3 0.2 0.1 256 0 50189.74 362.50 0.3 0.0 0.0 0.3 0.2 0.1 258 0 50153.75 362.50 0.3 0.0 0.0 0.3 0.1 0.1 260 0 50118.14 362.49 0.3 0.0 0.0 0.3 0.1 0.1 262 0 50082.90 362.49 0.3 0.0 0.0 0.3 0.1 0.1 264 0 50048.03 362.49 0.3 0.0 0.0 0.3 0.1 0.1 266 0 50013.51 362.49 0.3 0.0 0.0 0.3 0.1 0.1 268 0 49979.36 362.48 0.3 0.0 0.0 0.3 0.1 0.1 270 0 49945.55 362.48 0.3 0.0 0.0 0.3 0.1 0.1 272 0 49912.09 362.48 0.3 0.0 0.0 0.3 0.1 0.1 274 0 49878.96 362.48 0.3 0.0 0.0 0.3 0.1 0.1 276 0 49846.17 362.47 0.3 0.0 0.0 0.3 0.1 0.1 278 0 49813.70 362.47 0.3 0.0 0.0 0.3 0.1 0.1 280 0 49781.55 362.47 0.3 0.0 0.0 0.3 0.1 0.1 282 0 49749.72 362.47 0.3 0.0 0.0 0.3 0.1 0.1 284 0 49718.20 362.46 0.3 0.0 0.0 0.3 0.1 0.1 286 0 49686.98 362.46 0.3 0.0 0.0 0.3 0.1 0.1 288 0 49656.07 362.46 0.3 0.0 0.0 0.3 0.1 0.1 290 0 49625.45 362.46 0.3 0.0 0.0 0.3 0.1 0.1 292 0 49595.12 362.45 0.3 0.0 0.0 0.3 0.1 0.1 294 0 49565.08 362.45 0.2 0.0 0.0 0.2 0.1 0.1 296 0 49535.32 362.45 0.2 0.0 0.0 0.2 0.1 0.1 298 0 49505.84 362.45 0.2 0.0 0.0 0.2 0.1 0.1 300 0 49476.63 362.45 0.2 0.0 0.0 0.2 0.1 0.1 302 0 49447.69 362.44 0.2 0.0 0.0 0.2 0.1 0.1 304 0 49419.01 362.44 0.2 0.0 0.0 0.2 0.1 0.1 306 0 49390.59 362.44 0.2 0.0 0.0 0.2 0.1 0.1 308 0 49362.43 362.44 0.2 0.0 0.0 0.2 01 0.1 310 0 49334.52 362.44 0.2 0.0 0.0 0.2 0.1 0.1 312 0 49306.85 362.43 0.2 0.0 0.0 0.2 0.1 0.1 314 0 49279.43 362.43 0.2 0.0 0.0 0.2 0.1 0.1 316 0 49252.25 362.43 0.2 0.0 0.0 0.2 0.1 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs f as 318 6 49225.31 362.43 0.2 0.[a 0.0 0.2 0.1 0.1 320 0 49198.59 362.42 0.2 0.0 0.0 0.2 0.1 0.1 322 0 49172.11 362.42 0.2 0.0 0.0 0.2 0.1 0.1 324 0 49145.85 362.42 0.2 0.0 0.0 0.2 0.1 0.1 326 0 49119.81 362.42 0.2 0.0 0.0 0.2 0.1 0.1 328 0 49093.99 362.42 0.2 0.0 0.0 0.2 0.1 0.1 330 0 49068.38 362.41 0.2 0.0 0.0 0.2 0.1 0.1 332 0 49042.98 362.41 0.2 0.0 0.0 0.2 0.1 0.1 334 0 49017.79 362.41 0.2 0.0 0.0 0.2 0.1 0.1 336 0 48992.81 362.41 0.2 0.0 0.0 0.2 0.1 0.1 338 0 48968.02 362.41 0.2 0.0 0.0 0.2 0.1 0.1 340 0 48943.44 362.41 0.2 0.0 0.0 0.2 0.1 0.1 342 0 48919.04 362.40 0.2 0.0 0.0 0.2 0.1 0.1 344 0 48894.84 362.40 0.2 0.0 0.0 0.2 0.1 0.1 346 0 48870.83 362.40 0.2 0.0 0.0 0.2 0.1 0.1 348 0 48847.00 362.40 0.2 0.0 0.0 0.2 0.1 0.1 350 0 48823.35 362.40 0.2 0.0 0.0 0.2 0.1 0.1 352 0 48799.89 362.39 0.2 0.0 0.0 0.2 0.0 0.1 354 0 48776.60 362.39 0.2 0.0 0.0 0.2 0.0 0.1 356 0 48753.48 362.39 0.2 0.0 0.0 0.2 0.0 0.1 358 0 48730.54 362.39 0.2 0.0 0.0 0.2 0.0 0.1 360 0 48707.76 362.39 0.2 0.0 0.0 0.2 0.0 0.1 362 0 48685.15 362.39 0.2 0.0 0.0 0.2 0.0 0.1 364 0 48662.70 362.38 0.2 0.0 0.0 0.2 0.0 0.1 366 0 48640.41 362.38 0.2 0.0 0.0 0.2 0.0 0.1 368 0 48618.28 362.38 0.2 0.0 0.0 0.2 0.0 0.1 370 0 48596.30 362.38 0.2 0.0 0.0 0.2 0.0 0.1 372 0 48574.47 362.38 0.2 0.0 0.0 0.2 0.0 0.1 374 0 48552.80 362.38 0.2 0.0 0.0 0.2 0.0 0.1 376 0 48531.27 362.37 0.2 0.0 0.0 0.2 0.0 0.1 378 0 48509.88 362.37 0.2 0.0 0.0 0.2 0.0 0.1 380 0 48488.64 362.37 0.2 0.0 0.0 0.2 0.0 0.1 382 0 48467.54 362.37 0.2 0.0 0.0 0.2 0.0 0.1 384 0 48446.58 362.37 0.2 0.0 0.0 0.2 0.0 0.1 386 0 48425.75 362.37 0.2 0.0 0.0 0.2 0.0 0.1 388 0 48405.05 362.36 0.2 0.0 0.0 0.2 0.0 0.1 390 0 48384.48 362.36 0.2 0.0 0.0 0.2 0.0 0.1 392 0 48364.05 362.36 0.2 0.0 0.0 0.2 0.0 0.1 394 0 48343.74 362.36 0.2 0.0 0.0 0.2 0.0 0.1 396 0 48323.55 362.36 0.2 0.0 0.0 0.2 0.0 0.1 398 0 48303.48 362.36 0.2 0.0 0.0 0.2 0.0 0.1 400 0 48283.53 362.36 0.2 0.0 0.0 0.2 0.0 0.1 402 0 48263.70 362.35 0.2 0.0 0.0 0.2 0.0 0.1 404 0 48243.99 362.35 0.2 0.0 0.0 0.2 0.0 0.1 406 0 48224.39 362.35 0.2 0.0 0.0 0.2 0.0 0.1 408 0 48204.90 362.35 0.2 0.0 0.0 0.2 0.0 0.1 410 0 48185.52 362.35 0.2 0.0 0.0 0.2 0.0 0.1 412 0 48166.24 362.35 0.2 0.0 0.0 0.2 0.0 0.1 414 0 48147.07 362.34 0.2 0.0 0.0 0.2 0.0 0.1 416 0 48128.00 362.34 0.2 0.0 0.0 0.2 0.0 0.1 418 0 48109.03 362.34 0.2 0.0 0.0 0.2 0.0 0.1 420 0 48090.16 362.34 0.2 0.0 0.0 0.2 0.0 0.1 422 0 48071.39 362.34 0.2 0.0 0.0 0.2 0.0 0.1 424 0 48052.71 362.34 0.2 0.0 0.0 0.2 0.0 0.1 426 0 48034.12 362.34 0.2 0.0 0.0 0.2 0.0 0.1 428 0 48015.62 362.33 0.2 0.0 0.0 0.2 0.0 0.1 430 0 47997.21 362.33 0.2 0.0 0.0 0.2 0.0 0.1 432 0 47978.89 362.33 0.2 0.0 0.0 0.2 0.0 0.1 434 0 47960.65 362.33 0.2 0.0 0.0 0.2 0.0 0.1 436 0 47942.49 362.33 0.2 0.0 0.0 0.2 0.0 0.1 438 0 47924.42 362.33 0.1 0.0 0.0 0.1 0.0 0.1 440 0 47906.42 362.33 0.1 0.0 0.0 0.1 0.0 0.1 442 0 47888.50 362.33 0.1 0.0 0.0 0.1 0.0 0.1 444 0 47870.65 362.32 0.1 0.0 0.0 0.1 0.0 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 446 0 47852.87 362.32 0.1 0.0 0,0 0.1 0.0 0.1 448 0 47835.16 362.32 0.1 0.0 0.0 0.1 0.0 0.1 450 0 47817.52 362.32 0.1 0.0 0.0 0.1 0.0 0.1 35 30 25 w 20 m m v 15 w 0 10 5 0 0 GRAPHED DATA FOR 1 YEAR STORM Hydrographs 363.50 363.00 362.50 362.00 w a 361.50 361.00 360.50 360.00 0 50 100 150 200 250 300 350 400 450 500 Time (min) STAGE - DISCHARGE FUNCTION 1 2 3 4 5 6 DISCHARGE (cfs) CHAINSAW ROUTING FOR 10 -YEAR STORM Inflow (REF.- Malcom, 1991) Outflow Riser Riser COMPUTED RESULTS Notch Orifice Normal Surface Area = 0.25 ac S Peak Stage = 364.81 ft Maximum Surface Area = 0.38 ac Rise = 4.31 ft Freeboard = 1.69 ft cu -ft Peak Outflow = 7.0 cfs cfs cfs INPUT cfs cfs Hydrograph Results: Riser: Nr = 1 Top of Dam: 366.50 ft Qp = 46.6 cfs Riser Width = 4.0 ft Barrel: 0.0 Tp = 18.7 min Riser Length = 4.0 ft Nb = 1 dT = 2 min Cwr = 3.33 Db = 24 in Stage- Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1978 Zcr = 364.85 ft Zinv = 357.00 ft b = 1.73 Notch Weir. Nw = 1 Orifice: No = 1 Zo = 356.0 ft (inv) Riser Length = 0.5 ft Cdr = 0.60 Initial Water Level: Cwr = 3.33 D = 2.0 in Z, = 360.50 ft Zcr = 362.30 ft Zcr = 360.50 ft OUTPUT 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice I T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 0 0 26592.72 360.50 0.0 0.0 0.0 0.0 0.0 0.0 2 1 26592.72 360.50 0.0 0.0 0.0 0.0 0.0 0.0 4 5 26748.17 360.52 0.0 0.0 0.0 0.0 0.0 0.0 6 11 27351.14 360.57 0.0 0.0 0.0 0.0 0.0 0.0 8 18 28644.91 360.70 0.0 0.0 0.0 0.0 0.0 0.0 10 26 30795.70 360.90 0.1 0.0 0.0 0.1 0.0 0.1 12 33 33874.19 361.18 0.1 0.0 0.0 0.1 0.0 0.1 14 40 37847.66 361.52 0.1 0.0 0.0 0.1 0.0 0.1 16 44 42583.61 361.91 0.1 0.0 0.0 0.1 0.0 0.1 18 46 47864.44 362.32 0.1 0.0 0.0 0.1 0.0 0.1 20 46 53411.02 362.74 0.6 0.0 0.0 0.6 0.5 0.2 22 43 58857.44 363.13 1.4 0.0 0.0 1.4 1.3 0.2 24 38 63863.86 363.47 2.3 0.0 0.0 2.3 2.2 0.2 26 33 68172.02 363.76 3.2 0.0 0.0 12 3.0 0.2 28 29 71783.88 364.00 3.9 0.0 0.0 3.9 3.8 0.2 30 25 74787.13 364.19 4.6 0.0 0.0 4.6 4.4 0.2 32 22 77260.80 364.34 5.2 0.0 0.0 5.2 5.0 0.2 34 19 79275.19 364.47 5.6 0.0 0.0 5.6 5.4 0.2 36 17 80892.33 364.57 6.0 0.0 00 6.0 5.8 0.2 38 14 82166.76 364.65 6.3 0.0 0.0 6.3 6.1 0.2 40 13 83146.18 364.70 6.6 0.0 0.0 6.6 6.3 0.2 42 11 83872.28 364.75 6.7 0.0 0.0 6.7 6.5 0.2 44 10 84381.38 364.78 6.9 0.0 0.0 6.9 6.6 0.2 46 8 84705.09 364.80 6.9 0.0 0.0 6.9 6.7 0.2 48 7 84870.87 364.81 7.0 0.0 0.0 7.0 6.8 0.2 50 6 84902.56 364.81 7.0 0.0 0.0 7.0 6.8 0.2 52 5 84820.83 364.81 7.0 0.0 0.0 7.0 6.7 0.2 54 5 84643.57 364.80 6.9 0.0 0.0 6.9 6.7 0.2 56 4 84386.26 364.78 6.9 0.0 0.0 6.9 6.6 0.2 58 4 84062.27 364.76 6.8 0.0 0.0 6.8 6.6 0.2 60 3 83683.13 364.74 6.7 0.0 0.0 6.7 6.5 0.2 62 3 83258.80 364.71 6.6 0.0 0.0 6.6 6.4 0.2 64 2 82797.84 364.68 6.5 0.0 0.0 6.5 6.3 0.2 66 2 82307.61 364.65 6.4 0.0 0.0 6.4 6.1 0.2 68 2 81794.41 364.62 6.2 0.0 0.0 6.2 6.0 0.2 70 2 81263.67 364.59 6.1 0.0 0.0 6.1 5.9 0.2 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 72 1 80719.99 364.56 6.0 0.0 0.0 6.0 5.8 0.2 74 1 80167.32 364.52 5.8 0.0 0.0 5.8 5.6 0.2 76 1 79609.02 364.49 5.7 0.0 0.0 5.7 5.5 0.2 78 1 79047.93 364.45 5.6 0.0 0.0 5.6 5.4 0.2 80 1 78486.45 364.42 5.5 0.0 0.0 5.5 5.2 0.2 82 1 77926.61 364.38 5.3 0.0 0.0 5.3 5.1 0.2 84 1 77370.09 364.35 5.2 0.0 0.0 5.2 5.0 0.2 86 1 76818.31 364.32 5.1 0.0 0.0 5.1 4.9 0.2 88 0 76272.44 364.28 4.9 0.0 0.0 4.9 4.7 0.2 90 0 75733.42 364.25 4.8 0.0 0.0 4.8 4.6 0.2 92 0 75202.05 364.21 4.7 0.0 0.0 4.7 4.5 0.2 94 0 74678.93 364.18 4.6 0.0 0.0 4.6 4.4 0.2 96 0 74164.56 364.15 4.5 0.0 0.0 4.5 4.3 0.2 98 0 73659.30 364.12 4.4 0.0 0.0 4.4 4.2 0.2 100 0 73163.45 364.08 4.2 0.0 0.0 4.2 4.0 0.2 102 0 72677.19 364.05 4.1 0.0 0.0 4.1 3.9 0.2 104 0 72200.66 364.02 4.0 0.0 0.0 4.0 3.8 0.2 106 0 71733.91 363.99 3.9 0.0 0.0 3.9 3.7 0.2 108 0 71276.96 363.96 3.8 0.0 0.0 3.8 3.6 0.2 110 0 70829.79 363.93 3.7 0.0 0.0 3.7 3.5 0.2 112 0 70392.34 363.91 3.7 0.0 0.0 3.7 3.5 0.2 114 0 69964.51 363.88 3.6 0.0 0.0 3.6 3.4 0.2 116 0 69546.20 363.85 3.5 0.0 0.0 3.5 3.3 0.2 118 0 69137.27 363.82 3.4 0.0 0.0 3.4 3.2 0.2 120 0 68737.57 363.80 3.3 0.0 0.0 3.3 3.1 0.2 122 0 68346.94 363.77 3.2 0.0 0.0 3.2 3.0 0.2 124 0 67965.21 363.75 3.1 0.0 0.0 3.1 3.0 0.2 126 0 67592.20 363.72 3.1 0.0 0.0 3.1 2.9 0.2 128 0 67227.72 363.70 3.0 0.0 0.0 3.0 2.8 0.2 130 0 66871.59 363.67 2.9 0.0 0.0 2.9 2.7 0.2 132 0 66523.62 363.65 2.9 0.0 0.0 2.9 2.7 0.2 134 0 66183.61 363.63 2.8 0.0 0.0 2.8 2.6 0.2 136 0 65851.37 363.61 27 0.0 0.0 27 2.5 0.2 138 0 65526.71 363.58 2.7 0.0 0.0 2.7 2.5 0.2 140 0 65209.44 363.56 2.6 0.0 0.0 2.6 2.4 0.2 142 0 64899.38 363.54 2.5 0.0 0.0 2.5 2.4 0.2 144 0 64596.34 363.52 2.5 0.0 0.0 2.5 2.3 0.2 146 0 64300.13 363.50 2.4 0.0 0.0 2.4 2.2 0.2 148 0 64010.58 363.48 2.4 0.0 0.0 2.4 2.2 0.2 150 0 63727.51 363.46 2.3 0.0 0.0 2.3 2.1 0.2 152 0 63450.76 363.44 2.3 0.0 0.0 2.3 2.1 0.2 154 0 63180.15 363.43 2.2 0.0 0.0 2.2 2.0 0.2 156 0 62915.52 363.41 2.2 0.0 0.0 2.2 2.0 0.2 158 0 6265671 363.39 2.1 0.0 0.0 2.1 1.9 0.2 160 0 62403.57 363.37 2.1 0.0 0.0 2.1 1.9 0.2 162 0 62155.93 363.36 2.0 0.0 0.0 2.0 1.8 0.2 164 0 61913.67 363.34 2.0 0.0 0.0 2.0 1.8 0.2 166 0 61676.62 363.32 1.9 0.0 0.0 1.9 1.8 0.2 168 0 61444.66 363.31 1.9 0.0 0.0 1.9 1.7 0.2 170 0 61217.64 363.29 1.9 0.0 0.0 1.9 1.7 0.2 172 0 60995.44 363.28 1.8 0.0 0.0 1.8 1.6 0.2 174 0 60777.92 363.26 1.8 0.0 0.0 1.8 1.6 0.2 176 0 60564.97 363.25 1.7 0.0 0.0 1.7 1.6 0.2 178 0 60356.46 363.23 1.7 0.0 0.0 1.7 1.5 0.2 180 0 60152.27 363.22 1.7 0.0 0.0 1.7 1.5 0.2 182 0 59952.29 363.20 1.6 0.0 0.0 1.6 1.5 0.2 184 0 59756.41 363.19 1.6 0.0 0.0 1.6 1.4 0.2 186 0 59564.52 363.18 1.6 0.0 0.0 1.6 1.4 0.2 188 0 59376.52 363.16 1.5 0.0 0.0 1.5 1.4 0.2 190 0 59192.31 363.15 1.5 0.0 0.0 1.5 1.3 0.2 1 2 3 4 5 6 7 8 9 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs 192 0 59011.78 363.14 1.5 0.0 0.0 1.5 1.3 194 0 58834.85 363.13 1.4 0.0 0.0 1.4 1,3 196 0 58661.43 363.11 1.4 0.0 0.0 1.4 1.2 198 0 58491.41 36310 1.4 0.0 0.0 1.4 1.2 200 0 58324.72 363.09 1.4 0.0 0.0 1.4 1.2 202 0 58161.28 363.08 1.3 0.0 0.0 1.3 1.2 204 0 58000.99 363.07 13 0.0 0.0 1.3 1.1 206 0 57843.78 363.06 1.3 0.0 0.0 1.3 1.1 208 0 57689.58 363.04 1.3 0.0 0.0 1.3 1.1 210 0 57538.31 363.03 1.2 0.0 0.0 1.2 1.1 212 0 57389.89 363.02 1.2 0.0 0.0 1.2 1.0 214 0 57244.25 363.01 1.2 0.0 0.0 1.2 1.0 216 0 57101.34 363.00 1.2 0.0 0.0 1.2 1.0 218 0 56961.07 362.99 1.1 0.0 0.0 1.1 1.0 220 0 56823.39 362.98 1.1 0.0 0.0 1.1 1.0 222 0 56688.24 362.97 1.1 0.0 0.0 1.1 0.9 224 0 56555.55 362.96 1.1 0.0 0.0 1.1 0.9 226 0 56425.26 362.96 1.1 0.0 0.0 1.1 0.9 228 0 56297.31 362.95 1.0 0.0 0.0 1.0 0.9 230 0 56171.66 362.94 1.0 0.0 0.0 1.0 0.9 232 0 56048.25 362.93 1.0 0.0 0.0 1.0 0.8 234 0 55927.01 362.92 1.0 0.0 0.0 1.0 0.8 236 0 55807.91 362.91 1.0 0.0 0.0 1.0 0.8 238 0 55690.89 362.90 1.0 0.0 0.0 1.0 0.8 240 0 55575.91 362.89 0.9 0.0 0.0 0.9 0.8 242 0 55462.91 362.89 0.9 0.0 0.0 0.9 0.8 244 0 55351.86 362.88 0.9 0.0 0.0 0.9 0.7 246 0 55242.70 362.87 0.9 0.0 0.0 0.9 0.7 248 0 55135.39 362.86 0.9 0.0 0.0 0.9 0.7 250 0 55029.90 362.86 0.9 0.0 0.0 0.9 0.7 252 0 54926.18 362.85 0.8 0.0 0.0 0.8 0.7 254 0 54824.18 362.84 0.8 0.0 0.0 0.8 0.7 256 0 54723.88 362.83 0.8 0.0 0.0 0.8 0.7 258 0 54625.23 362.83 0.8 0.0 0.0 0.8 0.6 260 0 54528.20 362.82 0.8 0.0 0.0 0.8 0.6 262 0 54432.76 362.81 0.8 0.0 0.0 0.8 0.6 264 0 54338.86 362.81 0.8 0.0 0.0 0.8 0.6 266 0 54246.47 362.80 0.8 0.0 0.0 0.8 0.6 268 0 54155.56 362.79 0.7 0.0 0.0 0.7 0.6 270 0 54066.10 362.79 0.7 0.0 0.0 0.7 0.6 272 0 53978.06 362.78 0.7 0.0 0.0 0.7 0.6 274 0 53891.40 362.77 0.7 0.0 0.0 0.7 0.6 276 0 53806.10 362.77 0.7 0.0 0.0 0.7 0.5 278 0 53722.12 362.76 0.7 0.0 0.0 0.7 0.5 280 0 53639.45 362.75 0.7 0.0 0.0 0.7 0.5 282 0 53558.05 362.75 0.7 0.0 0.0 0.7 0.5 284 0 53477.89 362.74 0.7 0.0 0.0 0.7 0.5 286 0 53398.95 362.74 0.6 0.0 0.0 0.6 0.5 288 0 53321.20 362.73 0.6 0.0 0.0 0.6 0.5 290 0 53244.63 362.73 0.6 0.0 0.0 0.6 0.5 292 0 53169.20 362.72 0.6 0.0 0.0 0.6 0.5 294 0 53094.88 362.71 0.6 0.0 0.0 0.6 0.5 296 0 53021.67 362.71 0.6 0.0 0.0 0.6 0.4 298 0 52949.53 362.70 0.6 0.0 0.0 0.6 0.4 300 0 52878.45 362.70 0.6 0.0 0.0 0.6 0.4 302 0 52808.40 362.69 0.6 0.0 0.0 0.6 0.4 304 0 52739.35 362.69 0.6 0.0 0.0 0.6 0.4 306 0 52671.30 362.68 0.6 0.0 0.0 0.6 0.4 308 0 52604.23 362.68 0.6 0.0 0.0 0.6 0.4 310 0 52538.10 362.67 0.5 0.0 0.0 0.5 0.4 312 0 52472.91 362.67 0.5 0.0 0.0 0.5 0.4 314 0 52408.63 362.66 0.5 0.0 0.0 0.5 0.4 316 0 52345.24 362.66 0.5 0.0 0.0 0.5 0.4 10 Orifice cfs 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 1 2 3 4 5 6 7 _ 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cis 318 0 52282.74 362.65 0.5 0,0 0.0 0.5 0.4 0.2 320 0 52221.10 362.65 0.5 0.0 0.0 0.5 0.4 0.2 322 0 52160.30 362.65 0,5 0.0 0.0 0.5 0.3 0.2 324 0 52100.33 362.64 0.5 0.0 0.0 0.5 0.3 0.2 326 0 52041.17 362.64 0.5 0.0 0.0 0.5 0.3 0.2 328 0 51982.82 362.63 0.5 0.0 0.0 0.5 0.3 0.2 330 0 51925.24 362.63 0.5 0.0 0.0 0.5 0.3 0.2 332 0 51868.43 362.62 0.5 0.0 0.0 0.5 0.3 0.2 334 0 51812.37 362.62 0.5 0.0 0.0 0.5 0.3 0.2 336 0 51757.05 362.62 0.5 '0.0 0.0 0.5 0.3 0.2 338 0 51702.45 362.61 0.4 0.0 0.0 0.4 0.3 0.2 340 0 51648.57 362.61 0.4 0.0 0.0 0.4 0.3 0.2 342 0 51595.38 362.60 0.4 0.0 0.0 0.4 0.3 0.2 344 0 51542.87 362.60 0.4 0.0 0.0 0.4 0.3 0.2 346 0 51491.04 362.60 0.4 0.0 0.0 0.4 0.3 0.2 348 0 51439.86 362.59 0.4 0.0 0.0 0.4 0.3 0.2 350 0 51389.34 362.59 0.4 0.0 0.0 0.4 0.3 0.2 352 0 51339.44 362.59 0.4 0.0 0.0 0.4 0.3 0.2 354 0 51290.17 362.58 0.4 0.0 0.0 0.4 0.3 0.2 356 0 51241.51 362.58 0.4 0.0 0.0 0.4 0.2 0.2 358 0 51193.46 362.57 0.4 0.0 0.0 0.4 0.2 0.2 360 0 51145.99 362.57 0.4 0.0 0.0 0.4 0.2 0.2 362 0 51099.10 362.57 0.4 0.0 0.0 0.4 0.2 0.2 364 0 51052.78 362.56 0.4 0.0 0.0 0.4 0.2 0.2 366 0 51007.02 362.56 0.4 0.0 0.0 0.4 0.2 0.2 368 0 50961.81 362.56 0.4 0.0 0.0 0.4 0.2 0.2 370 0 50917,14 362,55 0.4 0.0 0.0 0.4 0.2 0.2 372 0 50872.99 362.55 0.4 0.0 0.0 0.4 0.2 0.2 374 0 50829.37 362.55 0.4 0.0 0.0 0.4 0.2 0.2 376 0 50786.26 362.54 0.4 0.0 0.0 0.4 0.2 0.2 378 0 50743.64 362.54 0.4 0.0 0.0 0.4 0.2 0.2 380 0 50701.52 362.54 0.3 0.0 0.0 0.3 0.2 0.1 382 0 50659.89 362.53 0.3 0.0 0.0 0.3 0.2 0.1 384 0 50618.73 362.53 0.3 0.0 0.0 0.3 0.2 0.1 386 0 50578.04 362.53 0.3 0.0 0.0 0.3 0.2 0.1 388 0 50537.81 362.53 0.3 0.0 0.0 0.3 0.2 0.1 390 0 50498.03 362.52 0.3 0.0 0.0 0.3 0.2 0.1 392 0 50458.69 362.52 0.3 0.0 0.0 0.3 0.2 0.1 394 0 50419.79 362.52 0.3 0.0 0.0 0.3 0.2 0.1 396 0 50381.32 362.51 0.3 0.0 0.0 0.3 0.2 0.1 398 0 50343.27 362.51 0.3 0.0 0.0 0.3 0.2 0.1 400 0 50305.63 362.51 0.3 0.0 0.0 0.3 0.2 0.1 402 0 50268.41 362.51 0.3 0.0 0.0 0.3 0.2 0.1 404 0 50231.58 362.50 0.3 0.0 0.0 0.3 0.2 0.1 406 0 50195.14 362.50 0.3 0.0 0.0 0.3 0.2 0.1 408 0 50159.09 362.50 0.3 0.0 0.0 0.3 0.1 0.1 410 0 50123.43 362.49 0.3 0.0 0.0 0.3 0.1 01 412 0 50088.13 362.49 0.3 0.0 0.0 0.3 0.1 0.1 414 0 50053.21 362.49 0.3 0.0 0.0 0.3 0.1 0.1 416 0 50018.64 362.49 0.3 0.0 0.0 0.3 0.1 0.1 418 0 49984.43 362.48 0.3 0.0 0.0 0.3 0.1 0.1 420 0 49950.57 362.48 0.3 0.0 0.0 0.3 0.1 0.1 422 0 49917.06 362.48 0.3 0.0 0.0 0.3 0.1 0.1 424 0 49883.88 362.48 0.3 0.0 0.0 0.3 0.1 0.1 426 0 49851.04 362.47 0.3 0.0 0.0 0.3 0.1 0.1 428 0 49818.52 362.47 0.3 0.0 0.0 0.3 0.1 0.1 430 0 49786.33 362.47 0.3 0.0 0.0 0.3 0.1 0.1 432 0 49754.45 362.47 0.3 0.0 0.0 0.3 0.1 0.1 434 0 49722.88 362.46 0.3 0.0 0.0 0.3 0.1 0.1 436 0 49691.62 362.46 0.3 0.0 0.0 0.3 0.1 0.1 438 0 49660.66 362.46 0.3 0.0 0.0 0.3 0.1 0.1 440 0 49630.00 362.46 0.3 0.0 0.0 0.3 0.1 0.1 442 0 49599.63 362.46 0.3 0.0 0.0 0.3 0.1 0.1 444 0 49569.55 362.45 0.2 0.0 0.0 0.2 0.1 0.1 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs -- cu -ft ft cfs cfs cfs cfs cfs cfs fAfi 0 49539.74 362.45 U 0.0 0.0 0.2 0.1 0.1 448 0 49510.22 362.45 02 0.0 0.0 0.2 0.1 0.1 450 0 49480.97 362.45 0.2 0.0 0.0 0.2 0.1 0.1 50 45 40 35 30 m 25 co s w 20 0 15 10 5 0 0 GRAPHED DATA FOR 10 YEAR STORM Hydrographs 365.50 365.00 364.50 364.00 363.50 363.00 w c� F 362.50 362.00 361.50 361.00 360.50 360.00 0 50 100 150 200 250 300 350 400 450 500 Time (min) STAGE - DISCHARGE FUNCTION 1 2 3 4 5 6 7 8 DISCHARGE (cfs) CHAINSAW ROUTING FOR 100 -YEAR STORM (REF: Malcom, 199 1) COMPUTED RESULTS Normal Surface Area = 0.25 ac Peak Stage = 365.49 ft Maximum Surface Area = 0.40 ac Rise = 4.99 ft Freeboard = 1.01 ft Peak Outflow = 36.9 cfs INPUT Hydrograph Results: Riser: Nr = 1 Top of Dam: 366.50 ft Qp = 62.3 cfs Riser Width = 4.0 ft Barrel: Tp = 23.4 min Riser Length = 4.0 ft Nb = 1 dT = 2 min Cwr = 3.33 Db = 24 in Stage- Storage Results: Cdr = 0.60 Cdb = 0.60 Ks = 1978 Zcr = 364.85 ft Zinv = 357.00 ft b = 1.73 Notch Weir. Nr = 1 Orifice: N = 1 Za = 356.0 ft (inv) Riser Length = 0.5 ft Cdr = 0.60 Initial Water Level: Cwr = 3.33 D = 2.0 in Z, = 360.50 ft Zcr = 362.30 ft Zcr = 360.50 ft OUTPUT 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 0 0 26592.72 360.50 13.0 0.0 0.0 0.0 0.0 0.0 2 1 26592.72 360.50 0.0 0.0 0.0 0.0 0.0 0.0 4 4 26726.61 360.51 0.0 0.0 0.0 0.0 0.0 0.0 6 10 27251.15 360.56 0.0 0.0 0.0 0.0 0.0 0.0 8 16 28396.15 360.67 0.0 0.0 0.0 0.0 0.0 0.0 10 24 30346.82 360.86 0.1 0.0 0.0 0.1 0.0 0.1 12 32 33230.64 361.12 0.1 0.0 0.0 0.1 0.0 0.1 14 41 37108.17 361.46 01 0.0 0.0 0.1 0.0 0.1 16 48 41968.70 361.86 0.1 0.0 0.0 0.1 0.0 0.1 18 54 47731.00 362.31 0.1 0.0 0.0 0.1 0.0 0.1 20 59 54248.83 362.80 0.8 0.0 U 0.8 0.6 0.2 22 62 61250.76 363.29 1.9 0.0 0.0 1.9 1.7 0.2 24 62 68438.01 363.78 3.2 0.0 0.0 3.2 3.1 0.2 26 60 75513.67 364.23 4.8 0.0 0.0 4.8 4.6 0.2 28 57 82193.33 364.65 6.3 0.0 0.0 6.3 6.1 0.2 30 51 88222.21 365.01 11.2 3.4 30.7 40.0 7.6 0,2 32 46 93013.09 365.29 24.5 15.5 51.0 40.8 8.8 0.2 34 41 95559.27 365.43 33.5 23.9 58.9 41.2 9.4 0.2 36 37 96445.79 365.49 36.9 27.0 61.4 41.3 9.7 0.2 38 33 96409.32 365.48 36.8 26.9 61.3 41.3 9.7 0.2 40 29 95927.95 365.46 34.9 25.2 60.0 41.2 9.5 0.2 42 26 95255.56 365.42 32.4 22.8 58.0 41.1 9.4 0.2 44 23 94516.71 365.38 29.7 20.3 55.8 41.0 92 0.2 46 21 93770.26 365.33 27.1 17.9 53.5 40.9 9.0 0.2 48 19 93043.13 365.29 24.6 15.6 51.1 40.8 8.8 0.2 50 17 92346.85 365.25 22.3 13.5 48.7 40.7 8.6 0.2 52 15 91685.51 365.21 20.3 11.6 46.3 40.6 8.4 0.2 54 13 91059.60 365.18 18.4 9.9 43.9 40.5 8.3 0.2 56 12 90467.84 365.14 16.7 8.4 41.5 40.4 8.1 0.2 58 11 89908.15 365.11 15.2 7.0 39.1 40.3 8.0 0.2 60 10 89378.04 365.08 13.8 5.8 36.7 40.2 7.9 0.2 62 9 88874.84 365.05 12.6 4.7 34.2 40.1 7.7 0.2 64 8 88395.82 365.02 11.5 3.7 31.7 40.0 7.6 0.2 66 7 87938.18 364.99 10.6 2.8 29.0 39.9 7.5 0.2 68 6 87499.03 364.97 9.7 2.1 26.2 39.9 7.4 0.2 70 6 87075.29 364.94 9.0 1.5 23.2 39.8 7.3 0.2 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 72 5 86663.59 364.92 8.3 0.9 19.8 39.7 7.2 0.2 74 4 86259.97 364.89 7.8 0.5 15.8 39.6 7.1 0.2 76 4 85859.35 364.87 7.3 0.1 10.4 39.6 7.0 0.2 78 4 85454.18 364.84 7.1 0.0 0.0 7.1 6.9 0.2 80 3 85026.48 364.82 7.0 0.0 0.0 7.0 6.8 0.2 82 3 84566.52 364.79 6.9 0.0 0.0 6.9 6.7 0.2 84 3 84079.93 364.76 6.8 0.0 0.0 6 -8 6.6 0.2 86 2 83571.65 364.73 6.7 0.0 0.0 6.7 6.4 0.2 88 2 83046.04 364.70 6.5 0.0 0.0 6.5 6.3 0.2 90 2 82506.92 364.67 6.4 0.0 0.0 6.4 6.2 0.2 92 2 81957.64 364.63 6.3 0.0 0.0 6.3 6.1 0.2 94 1 81401.13 364.60 61 0.0 0.0 6.1 5.9 0.2 96 1 80839.96 364.56 6.0 0.0 0.0 6.0 5.8 0.2 98 1 80276.34 364.53 5.9 0.0 0.0 5.9 5.7 0.2 100 1 79712.22 364.49 5.7 0.0 0.0 5.7 5.5 0.2 102 1 79149.26 364.46 5.6 0.0 0.0 5.6 5.4 0.2 104 1 78588.91 364.43 5.5 0.0 0.0 5.5 5.3 0.2 106 1 78032.40 364.39 5.3 0.0 0.0 5.3 5.1 0.2 108 1 77480.80 364.36 5.2 0.0 0.0 5.2 5.0 0.2 110 1 76934.99 364.32 5.1 0.0 0.0 5.1 4.9 0.2 112 1 76395.73 364.29 5.0 0.0 0.0 5.0 4.8 0.2 114 0 75863.66 364.26 4.9 0.0 0.0 4.9 4.6 0.2 116 0 75339.29 364.22 4.7 0.0 0.0 4.7 4.5 0.2 118 0 74823.05 364.19 4.6 0.0 0.0 4.6 4.4 0.2 120 0 74315.28 364.16 4.5 0.0 0.0 4.5 4.3 0.2 122 0 73816.25 364.13 4.4 0.0 0.0 4.4 4.2 0.2 124 0 73326.16 364.09 4.3 0.0 0.0 4.3 4.1 0.2 126 0 72845.15 364.06 4.2 0.0 0.0 4.2 4.0 0.2 128 0 72373.32 364.03 4.1 0.0 0.0 41 3.9 0.2 130 0 71910.73 364.00 4.0 0.0 0.0 4.0 3.8 0.2 132 0 71457.38 363.97 3.9 0.0 0.0 3.9 3.7 0.2 134 0 71013.26 363.95 3.8 0.0 0.0 3.8 3.6 0.2 136 0 70578.33 363.92 3.7 0.0 0.0 3.7 3.5 0.2 138 0 70152.52 363.89 3.6 0.0 0.0 3.6 3.4 0.2 140 0 69735.75 363.86 3.5 0.0 0.0 3.5 3.3 0.2 142 0 69327.89 363.84 3.4 0.0 0.0 3.4 3.2 0.2 144 0 68928.85 363.81 3.3 0.0 0.0 3.3 3.2 0.2 146 0 68538.49 363.78 3.3 0.0 0.0 3.3 3.1 0.2 148 0 68156.66 363.76 3.2 0.0 0.0 3.2 3.0 0.2 150 0 67783.22 363.73 3.1 0.0 0.0 3.1 2.9 0.2 152 0 67418.01 363.71 3.0 0.0 0.0 3.0 2.8 0.2 154 0 67060.88 363.69 3.0 0.0 0.0 3.0 2.8 0.2 156 0 66711.66 363.66 2.9 0.0 0.0 2.9 2.7 0.2 158 0 66370.18 363.64 2.8 0.0 0.0 2.8 2.6 0.2 160 0 66036.28 363.62 2.8 0.0 0.0 2.8 2.6 0.2 162 0 65709.79 363.60 2.7 0.0 0.0 2.7 2.5 0.2 164 0 65390.54 363.57 2.6 0.0 0.0 2.6 2.4 0.2 166 0 65078.37 363.55 2.6 0.0 0.0 2.6 2.4 0.2 168 0 64773.10 363.53 2.5 0.0 0.0 2.5 2.3 0.2 170 0 64474.58 363.51 2.5 0.0 0.0 2.5 2.3 0.2 172 0 64182.63 36149 2.4 0.0 0.0 2.4 2.2 0.2 174 0 63897.10 363.47 2.3 0.0 0.0 2.3 2.2 0.2 176 0 63617.83 363.46 2.3 0.0 0.0 2.3 2.1 0.2 178 0 63344.66 363.44 2.2 0.0 0.0 2.2 2.1 0.2 180 0 63077.44 363.42 2.2 0.0 0.0 2.2 2.0 0.2 182 0 62816.02 363.40 2.1 0.0 0.0 2.1 2.0 0.2 184 0 62560.26 363.38 2.1 0.0 0.0 2.1 1.9 0.2 186 0 62310.00 363.37 2.0 0.0 0.0 2.0 1.9 0.2 188 0 62065.10 363.35 2.0 0.0 0.0 2.0 1.8 0.2 190 0 61825.44 363.33 2.0 0.0 0.0 2.0 1.8 0.2 1 2 3 4 5 6 7 8 9 10 Time I Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 192 0 61590.87 363.32 1.9 0.0 0.0 1.9 1.7 0.2 194 0 61361.27 363.30 1.9 0.0 0.0 1.9 1.7 0.2 196 0 61136.50 363.29 1.8 0.0 0.0 1.8 1.7 0.2 198 0 60916.45 363.27 1.8 0.0 0.0 1.8 1.6 0.2 200 0 60700.98 363.26 1.8 0.0 0.0 1.8 1.6 0.2 202 0 60489.99 363.24 1.7 0.0 0.0 1.7 1.6 0.2 204 0 60283.35 363.23 1.7 0.0 0.0 1.7 1.5 0.2 206 0 60080.96 363.21 1.7 0.0 0.0 1.7 1.5 0.2 208 0 59882.71 363.20 1.6 0.0 0.0 1.6 1.4 0.2 210 0 59688.48 363.19 1.6 0.0 0.0 1.6 1.4 0.2 212 0 59498.19 363.17 1.6 0.0 0.0 1.6 1.4 0.2 214 0 59311.72 363.16 1.5 0.0 00 1.5 1.4 0.2 216 0 59128.98 363.15 1.5 0.0 0.0 1.5 1.3 0.2 218 0 58949.88 363.13 1.5 0.0 0.0 1.5 1.3 0.2 220 0 58774.32 363.12 1.4 0.0 0.0 1.4 1.3 0.2 222 0 58602.21 363.11 1.4 0.0 0.0 1.4 1.2 0.2 224 0 58433.47 363.10 1.4 0.0 0.0 1.4 1.2 0.2 226 0 58268.01 363.09 1.4 0.0 0.0 1.4 1.2 0.2 228 0 58105.76 363.07 1.3 0.0 0.0 1.3 1.2 0.2 230 0 57946.62 363.06 1.3 0.0 0.0 1.3 1.1 0.2 232 0 57790.53 363.05 1.3 0.0 0.0 1.3 1.1 0.2 234 0 57637.41 363.04 1.3 0.0 0 -0 1.3 1.1 0.2 236 0 57487.18 363.03 1.2 0.0 0.0 1.2 1.1 0.2 238 0 57339.78 363.02 1.2 0.0 0.0 1.2 1.0 0.2 240 0 57195.14 363.01 1.2 0.0 0.0 1.2 1.0 0.2 242 0 57053.18 363.00 1.2 0.0 0.0 1.2 1.0 0.2 244 0 56913.84 362.99 1.1 0.0 0.0 1.1 1.0 0.2 246 0 56777.07 362.98 1.1 0.0 0.0 1.1 1.0 0.2 248 0 56642.79 362.97 1.1 0.0 0.0 1.1 0.9 0.2 250 0 56510.95 362.96 1.1 0.0 0.0 1.1 0.9 0.2 252 0 56381.49 362.95 1.1 0.0 0.0 1.1 0.9 0.2 254 0 56254.36 362.94 1.0 0.0 0.0 1.0 0.9 0.2 256 0 56129.49 362.93 1.0 0.0 0.0 1.0 0.9 0.2 258 0 56006.84 362.93 1.0 0.0 0.0 1.0 0.8 0.2 260 0 55886.35 362.92 1.0 0.0 0.0 1.0 0.8 0.2 262 0 55767.98 362.91 1.0 0.0 0.0 1.0 0.8 0.2 264 0 55651.67 362.90 1.0 0.0 0.0 1.0 0.8 0.2 266 0 55537.38 362.89 0.9 0.0 0.0 0.9 0.8 0.2 268 0 55425.06 362.88 0.9 0.0 0.0 0.9 0.8 0.2 270 0 55314.66 362.88 0.9 0.0 0.0 0.9 0.7 0.2 272 0 55206.14 362.87 0.9 0.0 0.0 0.9 0.7 0.2 274 0 55099.46 362.86 09 0.0 0.0 0.9 0.7 0.2 276 0 54994.58 362.85 0.9 0.0 0.0 0.9 0.7 0.2 278 0 54891.45 362.85 0.8 0.0 0.0 0.8 0.7 0.2 280 0 54790.04 362.84 0.8 0.0 0.0 0.8 0.7 0.2 282 0 54690.31 362.83 0.8 0.0 0.0 0.8 0.7 0.2 284 0 54592.22 362.82 0.8 0.0 0.0 0.8 0.6 0.2 286 0 54495.74 362.82 0.8 0.0 0.0 0.8 0.6 0.2 288 0 54400.82 362.81 0.8 0.0 0.0 0.8 0.6 0.2 290 0 54307.44 362.80 0.8 0.0 0.0 0.8 0.6 0.2 292 0 54215.56 362.80 0.8 0.0 0.0 0.8 0.6 0.2 294 0 54125.14 362.79 0.7 0.0 0.0 0.7 0.6 0.2 296 0 54036.17 362.78 0.7 0.0 0.0 0.7 0.6 0.2 298 0 53948.60 362.78 0.7 0.0 0.0 0.7 0.6 0.2 300 0 53862.41 362.77 0.7 0.0 0.0 0.7 0.5 0.2 302 0 53777.56 362.76 0.7 0.0 0.0 0.7 0.5 0.2 304 0 5369403 362.76 0.7 0.0 0.0 0.7 0.5 0.2 306 0 53611.79 362.75 0.7 0.0 0.0 0.7 0.5 0.2 308 0 53530.81 362.75 0.7 0.0 0.0 0.7 0.5 0.2 310 0 53451.07 362.74 0.7 0.0 0.0 0.7 0.5 0.2 312 0 53372.54 362.73 0.6 0.0 0.0 0.6 0.5 0.2 314 0 53295.19 362.73 0.6 0.0 0.0 0.6 0.5 0.2 316 0 53219.00 362.72 0.6 0.0 0.0 0.6 0.5 0.2 1 2 3 4 5 6 7 8 9 10 Time Inflow Storage Stage Outflow Riser Riser Barrel Notch Orifice T I S Z O_ (weir) (orifice) Weir min cfs cu -ft ft cfs cfs cfs cfs cfs cfs 318 0 53143.95 362.72 0.6 0.0 0.0 0.6 0.3 0.2 320 0 53070.02 362.71 0.6 0.0 0.0 0.6 0.5 0.2 322 0 52997.17 362.71 0.6 0.0 0.0 06 0.4 0.2 324 0 52925.39 362.70 0.6 0.0 0.0 0.6 0.4 02 326 0 52854.66 362.70 0.6 0.0 0.0 0.6 0.4 0.2 328 0 52764.95 362.69 0.6 0.0 0.0 0.6 0.4 0.2 330 0 52716.25 362.69 0.6 0.0 0.0 0.6 0.4 0.2 332 0 52648.53 362.68 0.6 0.0 0.0 0.6 0.4 0.2 334 0 52581.77 362.68 0.5 0.0 0.0 0.5 0.4 0.2 336 0 52515.96 362.67 0.5 0.0 0.0 0.5 0.4 0.2 338 0 52451.08 362.67 0.5 0.0 0.0 0.5 0.4 0.2 340 0 52387.11 362.66 0.5 OA 0.0 05 0.4 0.2 342 0 52324.02 362.66 0.5 0.0 0.0 0.5 0.4 0.2 344 0 52261.81 362.65 0.5 0.0 0.0 0.5 0.4 0.2 346 0 52200.46 362.65 0.5 0.0 0.0 0.5 0.4 0.2 348 0 52139.94 362.64 0.5 0.0 0.0 0.5 0.3 0.2 350 0 52080.25 362.64 0.5 0.0 0.0 0.5 0.3 0.2 352 0 52021.37 362.64 0.5 0.0 0.0 0.5 0.3 0.2 354 0 51963.27 362.63 0.5 0.0 0.0 0.5 0.3 0.2 356 0 51905.96 362.63 0.5 0.0 0.0 0.5 0.3 0.2 358 0 51849.40 362.62 0.5 0.0 0.0 0.5 0.3 0.2 360 0 51793.59 362.62 0.5 0.0 0.0 0.5 0.3 0.2 362 0 51738.52 362.61 0.5 0.0 0.0 0.5 0.3 0.2 364 0 51684.16 362.61 0.4 0.0 0.0 0.4 0.3 0.2 366 0 51630.51 362.61 0.4 0.0 0.0 0.4 0.3 0.2 368 0 51577.56 362.60 0.4 0.0 0.0 0.4 0.3 0.2 370 0 51525.28 362.60 0.4 0.0 0.0 0.4 0.3 0.2 372 0 51473.67 362.60 0.4 0.0 0.0 0.4 0.3 0.2 374 4 51422.72 362.59 0.4 0.0 0.0 0.4 0.3 0.2 376 0 51372.41 362.59 0.4 0.0 0.0 0.4 0.3 0.2 378 0 51322.72 362.58 0.4 0.0 0.0 0.4 0.3 0.2 380 0 51273.66 362.58 0.4 0.0 0.0 0.4 0.3 0.2 382 0 51225.21 362.58 0.4 0.0 0.0 0.4 0.2 0.2 384 0 51177.35 362.57 0.4 0.0 0.0 0.4 0.2 0.2 386 0 51130.08 362.57 0.4 0.0 0.0 0.4 0.2 0.2 388 0 51083.39 362.57 0.4 0.0 0.0 0.4 0.2 0.2 390 01 51037.26 362.56 0.4 0.0 0.0 0.4 0.2 0.2 392 0 50991.68 362.56 0.4 0.0 0.0 0.4 0.2 0.2 394 0 50946.66 362.56 0.4 0.0 0.0 0.4 0.2 0.2 396 0 50902.16 362.55 0.4 0.0 0.0 0.4 0.2 0.2 398 0 50858.20 362.55 0.4 0.0 0.0 0.4 0.2 0.2 400 0 50814.74 362.55 0.4 0.0 0.0 0.4 0.2 0.2 402 0 50771.80 362.54 0.4 0.0 0.0 0.4 0.2 0.2 404 0 50729.36 362.54 0.3 0.0 0.0 0.3 0.2 0.2 406 0 50687.40 362.54 0.3 0.0 0.0 0.3 0.2 0.1 408 0 50645.93 362.53 0.3 0.0 0.0 0.3 0.2 0.1 410 0 50604.93 362.53 0.3 0.0 0.0 0.3 0.2 0.1 412 0 50564.40 362.53 0.3 0.0 0.0 0.3 0.2 0.1 414 0 50524.32 362.52 0.3 0.0 0.0 0.3 0.2 0.1 416 0 50484.69 362.52 0.3 0.0 0.0 0.3 0.2 0.1 418 0 50445.50 362.52 0.3 0.0 0.0 0.3 0.2 0.1 420 0 50406.74 362.52 0.3 0.0 0.0 0.3 0.2 0.1 422 0 50368.42 362.51 0.3 0.0 0.0 0.3 0.2 0.1 424 0 50330.51 362.51 0.3 0.0 0.0 0.3 0.2 0.1 426 0 50293.01 362.51 0.3 0.0 0.0 0.3 0.2 0.1 428 0 50255.92 362.50 0.3 0.0 0.0 0.3 0.2 0.1 430 0 50219.22 362.50 0.3 0.0 0.0 0.3 0.2 0.1 432 0 50182.92 362.50 0.3 0.0 0.0 0.3 0.2 0.1 434 0 50147.00 362.50 0.3 0.0 0.0 0.3 0.1 0.1 436 0 50111.46 362.49 0.3 0.0 0.0 0.3 0.1 0.1 438 0 50076.29 362.49 0.3 0.0 0.0 0.3 0.1 0.1 440 0 50041.49 362.49 0.3 0.0 0.0 0.3 0.1 0.1 442 0 50007.04 362.49 0.3 0.0 0.0 0.3 0.1 0.1 444 0 49972.95 362.48 0.3 0.0 0.0 0.3 0.1 0.1 70 60 50 N �r. 40 d rn �v v 30 _N D 20 10 0 0 GRAPHED DATA FOR 100 YEAR STORM Hydrographs 366.00 365.00 364.00 w 363.00 Q U) 362.00 361.00 360.00 -L 0 50 100 150 200 250 300 350 400 450 500 Time (min) 5 10 STAGE - DISCHARGE FUNCTION 15 20 25 30 35 40 DISCHARGE (cfs) Pc Number of Drains = Diameter of Drains = Orifice Coefficient = Elevation of Drains = DRAWDOWN CALCULATIONS Woodall Subdivision Storage Pool Drawdown nd must detain the first 1" of runoff and release it in 2 to 5 days INPUT 1 Starting Water Elevation = 362.30 ft 2.0 in Ending Water Elevation = 360.50 ft 0.60 Driving Head = 0.60 ft 360.50 ft OUTPUT By the Orifice Equation: Flow = 0.08 cfs Vol of Storage Required = 20539 cf Vol of Storage Provided = 20966 cf OK Length of Drawdown = 257646 sec or 2.98 days OK Permanent Pool Drawdown Bottom drain must completely drain pond in less than 24 hours INPUT Number of Drains = 1 Starting Water Elevation = 360.50 ft Diameter of Drains = 8.0 in Ending Water Elevation = 357.00 ft Orifice Coefficient = 0.60 Average Head = 1.75 ft Elevation of Drains = 357.00 ft OUTPUT By the Orifice Equation- Average Flow = 2.22 cfs Volume of Storage = 26593 cf Length of Drawdown = 11959 sec or 3.32 hours OK OBJECTIVE ASSUMPTIONS: SOLUTION - Qp: ANTI- FLOTATION CALCULATIONS Woodall Subdivision Determine Anti - Flotation Block Density of Water = 62.4 Ibs/ cf Density of Concrete = 150.0 Ibs/ cf - Calculate the bouyant force as if the top of the riser were to become plugged. - Bouyant force is the Volume X Density of Water X 1.1 Use Section 8.07.08 to determine the Determine the weight of water displaced by the empty riser, and desing a block with bouyant weight 1.1 times the weight of displaced water. Riser Width = Riser Length = Riser Height = Base Width = Base Length Base Depth = Barrel Opening = Riser Walls Riser Interior Barrel Opening Base Net Force 4.0 ft Wall Thickness = 8 in 4.0 ft ( *See sheet C3.5 for dimensions) 7.9 ft 6.8 ft 82 in 5.3 ft 64 in 1.00 ft 12 in 2.0 ft 24 in Volume Dry Weight cf Ibs 136.07 20,410.00 125.60 2.09 - 314.16 36.44 5,466.67 25,562.51 4,956.40lbs DOWNWARD Bouyant Force A Ibs 9,339.62 8,621.18 143.76 2,501.55 20,606.11 CONCLUSION: OK: The riser structure has enough weight to overcome bouyant forces. Project Name: Project BMP 2 Proiect #: # Citv /State: Town Date: 6- Oct -15 SPUTTER BOX DESIGN Q = Cd *A *(2gh)'(1/2) WQ Volume Drawdown Variables Constants Q from WQ storm: 0.10 cfS g = Diameter of Pipe to Level Spreader: 0.17 ft Cd= A of pipe to level spreader: 0.02 sf Solve for h to head on level spreader pipe required for WQ flow. h = (Q /(Cd *A))"2 2g h = 0.837213425 Head on centroid of level spreader pipe should be 0.84 ft Set invert of bypass pipe to 0.92 feet above invert of level spreader pipe K: \14 \14- 0270 \140274 - Woodall Tract\H -H \BMP \Splitter Box - Woodall.xlsx 32.2 WS2 0.6 Overall Site Watershed Model Schematic I Watershed Model Schemat�IcdraflowHydrographs Extension for AutoCAD® Civil 3D ®2014byAutodesk, Inc. v10.3 RE -AREA 1 4-POST-AREA 1 PRE-DRAINAGE 2 v RE- DRAINAGE! 3 V OST -AREA 2 AST -AREA 3 POST -AREA 4 f POST -AREA 5 POST-AREA 6 POST -AREA 7 If D 15 - POST -AREA 8 - OFFSITE CV 8 -BMP2 V b -BMP1 V6 PRE �14 -ADD POST V16 - OVERALL POST Project: WOODALL- 9- 30- 15.gpw I Tuesday, 10 / 6 / 2015 Curve Number& TC Calculations POND 1 Curve Number and Time of Concentration Calcs WOODALL - PRE AREA 1 . PRE - DEVELOPMENT CONDITIONS hydrologic Sail Group (HSGJ HSG A HSG 6 HSG C HSG D SUM of Cover Type Area I CN Area CN Area CN Area CN CN (acre) k (acre) ` (acre) ` (acre) Impervious Areas (excludinq ROW) JJJ Paved parkinq lots. roofs. driveways °: I 98 0.500 I 98 I 98 49.0 Streels and Roads Paved. curbs and storm sewers jeKcludinq ROW) 98 98 98 98 00 Paved, open ditch" (including OW) - 83 89 92 93 010 Gravel 0acludinp ROW 76 1 � 85 89 91 00 Dirt (including ROW) 72 82 87 89 0 -0 QQpa Soaee {lidwn& parks golf courses, Mc) �PPoor Cprrdr -on (grass cover < 50% se 79 66 89 IJ _a_ Fair Condition (press cover 50 to 7b %} - I 49 69 4..480 79 84 35'J -9 Gaud Condition (gr35s cover> 76%,l 39 _ _ 61 74 { 80 0 -0 Urban Aistrids Commercial and businesss (A vo 65% Impervious) 89 I 92 44 � 95 0.00.0 'TL-3 rf8f Avq r2 %imoerviou5 I 81 88 � 91 93 0.5 . IRcaid n1ift istricts by Avg Lot Size - 1/8 Acre or Less, townhomes (Avg 65% Impervious) 77 85 90 92 0 -0 - - 114 Acre r1(Avo 3856 fmpervidusll 61 75 83 87 0.0 1 1/3 Acre (Ava 309l Impervious) 57 72 $1 86 00 I 112ACre (Avg 25% Impervious) 54 70 80 85 0 -0 I 1 Acre (Avq 20% Impervious+ 51 68 79 84 010 2 Acre (Avq 12% Impervious 46 65 I 77 82 0.0 Newiv Graded Areas PefoDus areas Only, no vegetation i' 77 I 86 I I k 91 I I 94 0.0 Pasture, range (continuous forage for grazing} j Poor Cooddion (grass cover <WY 68 79 86 IR 89 0.0 Fair Condition (q>;rws cover 50 to 755%)_ I 49 I 69 I 79 { 84 0.0 _ - Good Condition (grass cover> 75_ %) 39 61 74 j 80 0,0 Meadow Conti uduss& np arazin q. mowed for ha ( I 30 1 58 1 71 I 78 0.0 Hrush rush /weedlarass mix, mo5lhr brusbi - Poor ndition (press cover < 50ya 48 67 77 _ 83 0.0 Fair Condition e" cover 50 to 7L 35 I 56 I 70 I 77 0.0 Good Condition (gqrass cover> 75 %) 30 48 - 65 73 0.4 W oods/Grass Combination I Poor CarrVftn (Grass cover < X% 57 73 - 82 86 0.0 Fair Condiitian (grass cover 50 to 7 } 43 65 - 26 -970 76 82 _2049 -7 Good Condition (Grass cover > 75 %) I 32 58 72 79 0.0 . Woods Poor CGWJUon 45 I!I 66 77 83 00 Fair Condition I I Goad Condition 36 ! 55 70 77 0.0 Farmsteads - $U+tdlnos. Lanes, driveways. and surroundinq lots 1 59 1 74 1 82 I 86 00 Agicultural Land _ Fallow, Sere Soll 77 86 91 I 94 I 0.0 Fallow, Crop Residue Cover p>ar} 76 85 90 93 0.0 Fallow, Crop Residue Cover ( 1 74 83 - 88 90 0.0 _ Row Crops. Straiaht Row (Poor) 72 81 88 91 0.0 Row Croo, $freight Row (19000 67 - 78 - 85 89 O.D Row Crops. Straight Row & Crop Residue (Poor) 71 80 87 90 OA Row Crops, Straight Row & Crop Residue (Good) 64 75 82 85 0.0 - r Total = 24526 TOTAL AREA = 31.95 COMPOSITE CN = %6./(i� POND 1 Curve Number and Time of Concentration Calcs TIME OF CONCENTRATION I AREA 1 Manninq's Overland Flow Coefficient SHEET FLOW TRAVEL TIME Bermuda Grass 0.410 P2 Depth Manning's Land Travel Culvtivated, Residue < 20% 0.060 Land Cover I I O erlandw I en th Culvtivated, Residue > 20 / 0.170 ( 2- y r, 24 - Coefficient Slope c =15w oft) Time Dense Grass 0.240 (inihr) (In l (ftlft) (ft) (min) Fallow (no residue) 0.050 Woods (light underbrush) - 3.9 OA 0.0500 150 18.65 Range 0.130 - - #N /A - - - Short Grass 0.150 Smooth Surfaces 0.011 Woods (dense underbrush) 0.800 Woods (light underbrush) 0.400 SHALLOW CONCENTRATE DF O �WTIME FLOW � Shallow Concentrated Flow Coefficient Land Cover Velocity Factor Land Slope Velocity Flow l Land Cover Velocitv Factor Length Time Paved 20.3282 (ftlft) MIS) (ft) (min)_ Unpaved 16.1345 IUnpaved 16.1345 0.0710 4.30 200 0.78 OPEN CHANNEL OR PIPE FLOW TIME Diameter (in) or Side Long. Flow Channel Shape Manning's n Depth Velocity Travel Time Base Width (ft) Slope Slope Length (Hrv) (ft/ft) (ft/s) (ft) jmin) Triangular 0.035 1 1 3 0.060 6.97 1861 4.45 Trapezoidal 0.035 1 2 2 0.020 4.37 0 0.00 Circular 0.010 1 1 0 0.010 1.13 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Triangular 0.010 1 1 0 0.010 7.16 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Total Time of Concentraiton 23.88 min POND 1 Curve Number and Time of Concentration Calcs t WOOPALL - PRE AREA 2 - PRE - DEVELOPMENT CONDMONS Hydrologic Soil Group (HSG) MSG A "5 H SG HSG C HSG D SUM of Cover Type Area (acre) I CN Area (acre) I CN Area (acre) CN Area (acre) I CN CN *Area Impervious Areas (exclutlinq ROW) Paved parkino lots, roofs, ddveways 1 98 _ 98 2.000 1 96 I 98 1960 Streets and Roads - Paved, curbs and storm sewers (excluding ROW) 98 98 98 98 0 -0 Paved. open ditches (inoludkm OW) 83 89 j 92 93 0.0 Gravel fincludinq ROW) 76 85 I 89 91 0.0 Dirt (includino ROW) I 72 82 87 89 0.0 0 Spaec�lnwns, Q�rks, Golf courses. eWI 79 86 88 0 0 Poor Condrlian fyysass cover < W%t 68 I Fair Condition (grass cover 50 to 75 %) I 49 I 69 2.890 79 I 84 22$,3 Good Coit;&ion brass cover> 75%) 39 61 f f 74 80 0 =0 Urban DJSWcts _ CornmerG01 and business lAvy 65% ImpeNfpus) } 89 92 - I 94 I 95 '0.0 lndustrisl (Avq r`2% impervious) ` 81 88 ` 91 93 00 Residential Oistricls by Avq Lot Size 1/8 Acre or Less, townhomes (Avq 851% Impervious) 77 85 1.000 90 92 90.0 - 114 Acre (Avq 36% Info Moust 61 75 83 87 0.0 1/3 Acre Avq 30% Impervious) 57 72 81 66 0.0 112 Acre (Avo 25% Im us) 64 70 80 85 00 I Acre (Aral 20% bete) 51 68 79 84 0.0 2 Acre tAvo 12% Impervious) _ 46 65 _ 77 1 82 0.0 Newly Graded Areas Pervious areas oniv. no vegetation 1 77 I 66 1 91 1 94 0 -0 Pasture. range [Continuous f to' grazing) Poor Condition (crass coyer < rv0°io# 68 79 &6 89 010 Fair Condition (crass cover 50 to 7'ry %) 6 49 69 79 84 0.21 Goad Conddw (crass curer > 75 %) I 39 61 74 _ 80 0.0 Meadow -.. Conbmmus grass. no gnniry, mowed for har blush) I 30 I 58 I. 71 78 0.0 Brush (brushtw dlgrass mix, mostly Poor Condition (grass cover < 50%1 48 67 _ 77 83 0.0 Fair Condition (grass Lover 50 to 7bS6) 35 56 I 70 I 77 0.0 Good CondWon (vrass cover> 75%) 30 48 65 73 0.0 Woods(Grass Combination Poor C*WWon (crass cover < WW 57 73 Ip 82 86 0.0 Fair Cond uon (crass Cover 50 to 75%) __.. - 43 65 76 82 0.0 Good Condition (crass cover > 75 %) 32 58 72 79 0.0 Woods 1] Poor Condition 45 fib I 77 83 0.0 - FairCoadrdion 0.100 I 6 I I 2_680 73 79 10 .2 - Good Condlivn 3 I 55 j Farmsteads Buildincs, Lanes. driveways. and sumoundinplots - I 59 I 74 I 82 I 86 0.0 A aricultural Lana - _ Fallew; Bere Sole 77 86 f 91 1 94 0.0 Falhsvt, Crop Residue Cover (Poor) 76 85 90 1 93 0.0 Fallow. CrqkResidue Corer (Good) 74 83 68 1 90 0.0 Row Crops. 5lraiaht Row fPoorj 72 81 88 91 0.0 Row Crops, Straight Row Goo 67 78 85 89 0 -0 Row Crops, Straight Row & Crop Residue fPoorj 71 so 87 90 0.0 Row Crops, Straiaht Row & Croo Resk4ue (Good) 64 75 82 85 OA Total= 713.6 TOTAL AREA ^ Composst TE CN = 1 82.301 POND 1 Curve Number and Time of Concentration Calcs WOODALL - PRE AREA 3 - PRE - DEVELOPMENT CONDITIONS Hydrologic Soil Group (HSG) RSG A HSG 8 HSG C H$G D Cover Type Area I CN I Area I CN Area CN Area CN SUM of CN'Area (acre) ` (acre) (acre) (acre) impervious Areas (excluding ROW) Paved parking lots, roofs, driveways I 98 I _ 98 I 98 98 0_.0 Streets and Roads Paved, curbs and storm sewers (excluding ROW) 98 98 98 98 0 -0 Paved, open ditches (including ROW) 83 I 89 I 92 93 0.0 Gravel flnclud+ng ROVA - -- 76 85 89 91 0.0 LUrI. {includ+r( ROW) 72 82 87 89 0.0 itpyn $pace �Iawns, Parks. golf courses. etc) - _ I Poor Cor4&'an grass cover, T j 68 79 86 I+ 89 0.0 I Fair ConcRion twass cover 50 to 75%) 49 � 69 I 3,200 79 84 252 -8 1 Good Condition term cover> 75%) 39 61 I 74 8 0 -0 [Urban Oistricts I Commercial and buainesss FAvV 85 impervious? 89 92 94 95 0.0 I (ndus1rW (Ava 72% Impervious) 81 I 88 _ 91 - I 93 6.0 esidential Districts by Avg Lot Size - 1/6 Acre or Less. townhomes (Avo 65% Impervious) r 77 I1[ 85 90 92 00 1/4 Acre (Ava 38% Impervious) 61 I 75 83 87 00 113 Acre (Avg 30% Impervious) 57 72 81 86 00 1I2Acre fAvQ 25% Inlpery m a) 54 70 80 85 00 I Acre (Avg 20% impervious) 51 68 79 84 0.0 2ACre (Ave 12% Impervious) 46 65 77 82 0.0 - Newly Graded Areas - - Pervious areas only. no veoetation I 77 I 86 I 41 94 00 Pasture. range (continuous forage for grazing) - - Poor Condilton (Grass cover < 50%L 68 79 86 89 0 -0 Fair Condition fvrass cover 50 to 75 %) 49 I 69 I 79 84 0.0 Good Condition (grass cover> 75%1 39 61 74 80 0,0 Meadow Continuous giess, no gmv.npp,, mowed for hay Brush (brush1weedfgrass mtx, mosSY brush) I 30 I 58 I 71 I 78 0.0 Poor Condition fgrass cover < 50%) 48 ! 67 77 IiI 83 0 -0 Fair Condition tgaass cover 50 to 75 %) 35 56 70 77 I 0:0 Good Con0bn larass cover > 75 %) 30 48 l 65 73 0 -0 -Woo tGrassCombination - Poor Condition (grass cover < 50 %) 57 73 82 86 0.0 Fair CGrni)Gon (grass cover 5O to 75 %) I 43 65 76 82 0.0 - Good Condition ( orass cover > 75 %) 32 58 f 72 79 00 Wanda Poor Condition 45 66 77 83 0 -0 Fair Condition 36 60 0.270 73 - 79 19.7 Good CGndiYion I 30 1 55 70 77 0-0 Farmsteads BuiIdirm. tangs, driveways. andsumrunarrno lots I 59 I 74 I 82 i 86 010 Agricultural Land Fallow, Bare Soil 77 86 91 94 0.0 Fallow, Crop Residue Cover (Poor 76 85 90 93 0.0 Fallow. Crop Residue Cover (Good) 74 83 88 90 0.0 Row crops, straight Row (Poor) 72 81 88 91 0.0 Row Craps, Stlalaht Row fGoodl 67 78 85 s9 0 -0 { Row Crops. Straight Row & Crop Residue (Poor) 71 80 87 90 0.0 I flow Crops. Straight Row & Crop Residue (Good) 6A 75 82 85 00 Total = 272.5 ' TOTAL AREA = + 147 I COMPOSITE CN = I 78.533 !1 POND 1 Curve Number and Time of Concentration Calcs TIME OF CONCENTRATION PRE AREA 3 Mannino`s Overland Flow Coefficient SHEET FLOW TRAVEL TIME Bermuda Grass 0.410 Depth z p Manniing's Land Flow I TTime Culvtivated, Residue -20% 0.060 Land Cover Intensity I ( 2 ) � Overland Flow Sloe P Len th L g � a Culvtivated, Residue > =20% 0.170 Y Coefficient„ (-150 ft) Dense Grass 0.240 _ (in /hr) (in) (ft /ft) (ft) (min) Fallow (no residue) 0.050 dense grass 3.9 0.24 0.0330 150 14.63 Range 0.130 - #NIA - - - Short Grass 0.150 Smooth Surfaces 0.011 Woods (dense underbrush) 0.800 Woods (light underbrush) 0.400 SHALLOW CONCENTRATED FLOW TIME Shallow Concentrated Flow Coefficient Land Cover Velocity Factor Land Slope Velocity Flow Length Travel Time Land Cover Velocity Factor Paved 20.3282 (fuft) (fl +';j (fEj (mint Unpaved 16.1345 Unpaved 16.1345 0.0600 4.56 327 1.19 OPEN CHANNEL OR PIPE FLOW TIME ^ Channel Shape Manning's n Depth Diameter (in) or Side Long. Velocity Flow Travel Time Base Width (ft) Slope Slope Length (ft) (HN) (ft /ft) (ft/s) (ft) (min) Triangular 0.035 1 1 3 0.040 5.69 0 0.00 Trapezoidal 0.035 1 2 2 0.020 4.37 0 0.00 Circular 0.010 1 1 0 0.010 1.13 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Triangular 0.010 1 1 0 0.010 7.16 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0v00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Total Tame of Concentraiton 15.83 min POND 1 Curve Number and Time of Concentration Calcs Land Cover Unpaved OPEN CHANNEL OR PIPE FLOW TIME Channel Shape Triangular Trapezoidal Circular Trapezoidal Triangular Trapezoidal Trapezoidal Trapezoidal Total Time of Concentraiton TIME OF CONCENTRATION Diameter (in) or PRE BMP 1 0.410 _ SHEET FLOW TRAVEL TIME _ 0.060 P De th z p Manning's Land Flow Land Cover I ntensit y I (2 -yr, 24 -hr) Overland Flow Slope Length (min) Coefficient ( -150 T (in /hr) (in) fft/ft) (ft) Dense Grass 3.9 0.241 0.0330 150 - #N /A - - Land Cover Unpaved OPEN CHANNEL OR PIPE FLOW TIME Channel Shape Triangular Trapezoidal Circular Trapezoidal Triangular Trapezoidal Trapezoidal Trapezoidal Total Time of Concentraiton SHALLOW CONCENTRATED F[15* TIME Manning's Overland Flow Coefficient Diameter (in) or Bermuda Grass 0.410 Travel Culvtivated, Residue -20% 0.060 Travel Culvtivated, Residue -20% 0.170 Time Dense Grass 0.240 (min) Fallow (no residue) 0 050 14.63 Range 0.130 - Short Grass 0.150 2 Smooth Surfaces 0.011 1 Woods (dense underbrush) 0.800 0.010 Woods (light underbrush) 0.400 SHALLOW CONCENTRATED F[15* TIME Flow Diameter (in) or Side Flow Travel Velocity Factor Land Slope Velocity Length Time - (ft/ft) – (ft/s) (fQ (min) 16.1345 0.0800 4.56 250 0.91 16.78 min Shallow Concentrated Flow Coefficient Land Cover Velocitv Factor Paved 20.3282 Unpaved 16.1345 Velocity Flow Diameter (in) or Side Long. Manning's n Depth Base Width (ft) Slope Slope 420 (ft) 4.37 (Hid) (ft /ft) 0.035 1 1 3 0.040 0.035 1 2 2 0.020 0.010 1 1 0 0.010 0.010 1 1 0 0.010 0.010 1 1 0 0.010 0.010 1 1 0 0.010 0.010 1 1 0 0.010 0.010 1 1 0 0.010 16.78 min Shallow Concentrated Flow Coefficient Land Cover Velocitv Factor Paved 20.3282 Unpaved 16.1345 Velocity Flow Travel Time Length (ft)s) (ft) (min) 5.69 420 1.23 4.37 0 0.00 1.13 0 0.00 7.16 0 0.00 7.16 0 0.00 7.16 0 0.00 7.16 0 0.00 7.16 0 0.00 POND 1 Curve Number and Time of Concentration Calcs ( WOODALL - BMP 7 - POST- DEVELOPMINT CONDi T IONS I Hydrologic Sall Group (HSG1 HSG A HSG B I rtSG C I HSG 0 SUM of Cover Type Area (acre) CN Area CN (acre) Area (acre) CN Area CN (acre) ! CN -Area ImoervfousAreas (excludirm ROW) Pavedgarlunq lots, roofs. driveways I 98 I 98 0.830. f 98 98 813 Streets and Roads Paysd, curbs and storm sewers jaxdudin4 ROM j 98 98 98 98 0.0 Paved, ditches Rndudino ROW} 83 89 I 92 93 � 0.0 Gravel including ROW) I 76 85 I 89 91 0.0 Dirt (including ROW) 72 82 - 87 89 0.0 Open Spacaf f awns, pm*s, pall courses, etc) - Poor C.ondNon (rssS cover 5 68 79 86 89 0.0 ;< Farr ConViMn (4(rrass cover 50 to ) 49 69 79 84 0.0 Good CAnditn(vrass cover >7 ) 39 6i 74 80 4 -0 Urban Districts Commercial and Lusinesss A 85% Impervious) 89 42 94 95 0.0 Industrial (Avq 72% firpen�us) 81 88 91 I 93 0-0 Residential Districts Lot Size - "Avq 118Acre or Less, to times (Avq 65% Impervious) 77 85 2.820 90 92 253,8_ 114Acr a (Avq 38% IMPM10us 61 75 83 87 0.0 113 Acre (Ava 30% Imoervious� 57 72 81 86 D.0 112 Acre (Avg 25% Impervious) 54 70 80 85 0.0 1 Acre (Aver 20% Impervious) 51 _ 68 79 84 0.0 2 Acre (Avq 12% Impervious) - 46 - 65 - 77 82 0.0 lowly Graded Areas Pervious areas only. no vegeteWn 1 77 1 86 1 91 1 94 0.0 Pasture, range (continuous forage for cirazingl Poor Condition (grass cover < 50f} 68 - 79 86 89 010 Fair Condition (cress cover 50 to 75%) 49 69 I 79 84 M Good Condition (grass cover, 75 %) 39 61 74_ 80 0.0 Meadow Continuous grass, no grazinq, mowed for ha /yV 130 1 58 I 71 1 78 0.0 Brush (brushtweedfgrass mix. mostly brush) j Pour Conddiun (grass cover < 50°/,� 4B 67 4 77 83 0 0 Fair Condition (grass cover 50 to 7 %) I 35 56 70 77 I 0.0 [ Good Condition (grass cover , 75%) 30 48 III 65 73 00 kWoodslGrass Combination I Poor Conditn (grass cover < 503E 57 73 82 86 0-0 Fair ConMon (af�ss cover 50 to 75 %i 43 65 0.300 76 I 82 22,8 Condition grass cover, 75 %) 32 58 72 79 - 0?9___ _Good Woods Poor Coro fon 45 66 77 83 0.0 Fair Gondifiort I 36 I 80 I 73 79 016 Good Condition 30 55 70 77 0,0 Farmsteads Lanes, dnveways end sonoundinq lots I 59 I 74 I 82 I 86 0,0 A =r1lcuMural Land Fallow. - - Bare Soil 77 86 91 94 0;0 Fallow, Crop Residue Cover Toor) I 76 85 _ 90 93 0..0 Fallow, Crov Residue Cover fGaod) 74 83 88 _ 9D 0.0 Row Crops. Straiipht Row (PM4 - 72 81 88 91 0.0 Row Crops, Straight Row (Good) - 67 78 85 89 0..0 Row Crops, Straiatrl Row & Crop Resloiue (Poorl 71 _ 80 87 90 0.0 Row Crops, StramN Row & Crop Residua (Good) 64 75 82 85 0.0 Total TOTAL AREA COMPOSITE CN = 90.618 POND 1 Curve Number and Time of Concentration Calcs TIME OF CONCENTRATION PRE BMP 2 Mannina's Overland Flow Coefficient _ SHEET FLOW TRAVEL TIME Bermuda Grass 0.410 PZ Depth Manning' s Land Flow Travel Culvtivated, Residue -20% 0.060 Land Cover Intensity Overland Flow Length o Culvtivated, Residue-20% 0.170 (2 -yr, 24 -hr) Coefficient Slope (< =150 ft) Time Dense Grass 0.240 _ (in /hr) ilnj (ft/ft) (ft) (mn) Fallow (no residue) 0.050 " Dense Grass 3.9 0.24 0.0330 150 14.63 Range 0.130 - #N /A - - - Short Grass 0.150 Smooth Surfaces 0.011 Woods (dense underbrush) 0.800 Woods (light underbrush) 0 400 SHALWw'CONCENTRAATED FLOW TIME Shallow Concentrated Flow Coefficient Land Cover Velocity Factor Land Slope Velocity Flow Length Time l Land Cover Velocity Factor Paved 20.3282 (ft/ft) ...... _ _(ft /s) (ft) (mm) Unpaved 16.1345 Unpaved 16.1345 0.0500 3.61 250 1.15 OPEN CHANNEL OR PIPE FLOW TIME Channel Shape Manning's n Depth Diameter (in) or Side Long. Velocity Flow Travel Time Base Width ft to pe Slope Length (ft) .__ H,-v) � (ft /ft) (ft/s) (ft) (min) Triangular 0.035 1 1 3 0.050 6.36 300 0.79 Trapezoidal 0.035 1 2 2 0.020 4.37 0 0.00 Circular 0.010 1 1 0 0.010 1.13 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Triangular 0.010 1 1 0 0.010 7.16 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Trapezoidal 0.010 1 0 0.010 7.16 0 0.00 Trapezoidal 0.010 1 1 0 0.010 7.16 0 0.00 Total Time of Co .... 16.57 .. min POND 1 Curve Number and Time of Concentration Calcs W 6bALL -BMP 2 - POST - DEVELOPMENT CONDITIONS Hydrologic Soil Group (MSG) - HSG A I MSG Ei HSG C - HSG O SUM of Cover Type - Area CN Area CN Area CN Area CN CN-Area (acre) (acre) (acre) (acre) Impervious Areas (excluding Rf VY) Paved parking lots, roofs, driveways 98 I 98 2,260 1 98 I 98 2215 Streets and Roads Paved, curbs and slorm sewers (excluding ROM 98 98 98 98 0,0 Paved, open ddGhes (rnctuddnq ROW) 83 89 92 ` 93 0.0 Gravel (includina ROW) 76 85 I 89 I 91 0-0 Dirt (includino ROW) 72 82 87 89_ 0.0 cef awns, paa, troll courses, etc) or okk_,,(gss rover c 5f 68 79 Sl sy 0.0 Fall CC cover 50 ro J 49 69 I 79 84 0.0 ,Oyn Good Candilia 5 ravaP > 7$q/v) 39 lit 74 BQ Q•Q [Urban Districts Commercialandbusinesss(A 95 %Imoerylqus) 89 92 94 95 0.0 lndmIrW {Avq 72-lo Imperviours 81 88 91 - 93 0.0 Rieakkm6al. Districts b,� Ava Lo1Kte or Less. town)rpmas (Avg 65% ImpervkruS) 77 85 5.530 90 92 - 497.7 _}A)Acre 114 Acre (Avq 38% ImpervHi ql - - 61 75 88 _. 87 _ 0 -0 113 Acre (Ava 30% InMeMmis) 57 72 81 86 00 112 Acre (Ava 25% Impervious) 54 70 _ 80 B5 0.0 _ 1 Acre (Avg 20% Impervious) 51 68 79 84 - 0.0 2 AGie (Avq 12% Impervious) 46 65 77 82 00 Newsy Graded Areas Pervious areas only. no veaelabbn 1 77 I 86 - I 91 I 94 0.0 r Pasture, ran !p (continuous forge 4razingS Poor Condition (grass cover < %J 68 j 79 - 86 - I 89 0.0 Fair Condition (grass cover 50 to 75 %) 49 69 79 8d 0.0 Good Condition (crass cover > 75%) 39 61 74 III 8o 0.0 Meadow _ _ _ Continuous grass, no grazing, mgwed for ha 1 30 I 58 71 1 78 0.0 rush (4rushWoedWass mix, mostly brush, Poor 1 Oon d lwz (grass cover < 3p9yI1 48 I 67 77 83 0.0 Fair Condition (grass cover 50 to 75%) p 35 ! 56 70 77 0.10 Good Condition - (grass coven 75 %) € 30 I 48 65 73 04 WoodslGrass CombinaBcn Poor Canditrorr Wass cover < �y 57 I 73 82 86 0.0 Fah Condition forass cover 50 to 7 %) I 43 I 65 76 82 0.0 _ Good Condition (grass cover> 75 %) 32 1 58 0.480 72 79 $4.8 _ Woods Poor Conditon 45 66 77 83 00 Fair Cohdkion 36 60 I 73 79 I 0.0 Good Condition 30 55 f 70 77 0.0 rarmsteads - Buildings, Lanes, drivewav8, apd surmundina lots -_ I 59 74 82 I 88 0.0 Agrlculturai Land Fallow Bare So# 77 86 91 94 010 Fallow. Crop Residue Cover (Poor) 76 85 90 93 0.0 Fallow, Crop Residue Cover (Goad) 74 83 88 .90 0.0 Row Crops. Straight Row (Poor _ 72 81 88 91 0.0 Row Crops. Straight Row ( ) 67 78 as as 00 Row Crops, 5tranht Row ii Crop Residue (PO9 i 71 80 87 90 0.0 Row Crops, Sbaight Row 6 Crop Residua food) - - QA 75_ 82 85 0,0 Total = I 753.7 I TOTAL AREA !4 COMPOSITE CN = 91.141 POND 1 Curve Number and Time of Concentration Calcs WOODALL - AREA 3 - POSTS 3EVELOPMENT CONDITIONS Hydrologic Soil Group (HSGI HSG A HSG 6 1 HSG C Cover Type Area i CN (acre) ! Area CN (acre) Area CN (acre) IrrAervious Areas f excludini ROW) 35 1 56 70 30 Paver) lots. roofs. driveways I 98 98 9e Streets and Roads - 58 72 45 Paved, curbs and storm sewerslexctudlnq ROW) I 98 60 73 { 98 '� 98 Paved open ditches `inrWrr9 OW) 83 86 91 89 85 90 92 - Gravel (rndu Rp4�7 76 81 88 85 I 78 85 89 17Iri finciudr V4 l` 72 75 82 82 87 _ Open Spc e awns, parks, golf courses, etc) Poor 9p pgrass I _ (9 I Fair Conn (grass cover 50 to cover 0to I 49 I 49 69 I -- Ie79 -° Good Co n (press cover > 75 %J 39 61 0.5Q0 74 Urban OtstrFria GDormerciaf and businesss lAvQ 85% impervious) I 89 92 94 Industrial (Ava 72% Impervious) 1 81 a6 91 Residential stricts bV Ava Lot Size 1/8 Acre or Less, townhomes (Ava 65% Impervious) 77 85 90 114 Acre (Ava 36% Impervloust 61 75 0.450 83 - 113 Acre Am 30% Impervious) 57 72 81 V2AGm Ova 25% Impervious) 54 70 80 1 Acre (Avq 20*14 impervious) 51 68 79 2 Acre (Avq 12% Impervious) - 46 65 77 Newly Graded Areas _ Pervious areas onl no veqetation 1 77 1 86 1 91 Pasture, range (continuous forage for grazing) Poor, Condition (grass cover < 50%) Fair Condition (Cress cover 50 to 75 %) GOO Gandhian (grass cover > 75 %) Meadow Continuous grass. no Crazing, mowed for hav Brush- tbrushlweedlgrass mix, mostly brush) - Poor Condition f0rass cover <W%) Fair Condition (grass cover 50 to 75 %) Good Condition (grass cover> 75 %) Woods /Grass Combination Poor Condition (crass cover < 50 %) Fair Condition (grass cover 50 to 75 %) od Go CondNon (grass cover > 751%) Woods Poor Condition _ 1 Fair Condition I Goad CoAfton Farmsteads 6u3d+hos. Lines. dnvoways, and surroundinglots Agricultural Land - Fallow. Bare Soil _ Fallow. Crop Residue Cover (Poor) Fallow. Croo Residue Cover (Good) Row Crops. Straight Row (Poor Row Crops, Slrl,%rt Row f2.4 Row Crops, Stra ht Row Rft4fdue i1'odr1 Row Crops, Straight Raw & Crop Residue lGoodl j TOTAL AREA -... 11 C47MPOS"E Cm tJ a6 78.263 68 79 I 86 I 39 ! 51 30 58 1 71 48 67 77 35 1 56 70 30 11` 48 65 57 73 8 43 65 76 I I 32 58 72 45 66 77 36 60 73 30 55 70 1 59 1 74 j 62 77 86 91 76 85 90 74 83 88 72 81 88 67 78 85 71 80 87 64 75 82 HSG D I SUM of Area I CN CN Area (acre) I 96 0.0 98 1201-11002) 93 91 0 89 0.0 89 0 -0 84 0 u 80 370 95 _ 00 a3 0,0 92 0.0 87 37,4 86 0 -0 85 D -0 84 00 82 0.0 94 0.0 89 0.0 84 0.0 80 0,0 78 0.0 83 0.0 77 _ 0.0 73 0.0 86 - 0.0 82 0.0 79 0.0 83 0.0 79 0.0 77 0.0 86 00 94 00 93 00 90 0.0 91 0.0 89 0.0 90 f!404 I 85 Te1al = POND 1 Curve Number and Time of Concentration Calcs W©ODALL . AREA 4 - POST - DEVELOPMENT CONDMONS Hvdroloqic Sail Group {HSG) HSG A I HSG a HSG C HSG 0 SUM of Cover Type Area CN Area CN Area CN Area CN CN•Area - (acre) (acre) (acre) (acre) lmoervious Areas fexcludirm ROW! Paved partcinq IM, roofs, drfvewaYs 98 1 98 _ 98 ?8 Streets and Roads -.. -. Paved, c1✓t t and storm sawersj(excle &no ROM 98 98 98 98 - 00 Paved, open ditches (Including ROM � 83 I 89 I 92 j 93 00 _ (including ROW) 76 85 89 91 _Gravel _ Dirt pncludinq ROW) 72 82 87 Ij 89 0.0 peen Sgace`ilawns, pparks, golf oour844i. etc) _ Poor Condition grass cover c W% 50 to AN) 88 799 l 8fi 79 89 84 X0.0 0.0 Fair cons t ri f/Qrnss cover Good condition jgrass cover> 75361 49 I 39 69 6i 74 80 0.4 Urban Districts Commercial and business lA"�7 M lmoerviousl -j � 89 I 92 } 94 95 _ 0.0 7ndustria! 72% Imaerviou -. -- l 81 j 88 f 91 _ 93 0.4 If RendduAntial Districts by Avq Lot ixe 1/8 Acre or Less. lownhomes (Ava 65% Impervious) 77 85 _ I 90 _ 92 0 0 114 Acre ((Ava 38% Impervious) 61 75 1,040 83 87 86 3 113 Acre fAvo 30% Impervious) 57 72 81 86 0.0 112 Acre (Avg 25% Impervious) 54 70 80 85 0.0 1 Acre fAvo 20% Impervious) 51 68 79 84 010 _ Acre (Avg 12% Impervious) 46 _ 65 77 62 0.0 _2 -Newly Graded Areas i - Aqr ious area onl+{, no vega!etipn _ I 77 f 86 91 I 94 0.0 Pastureu raliRe fCVnl2ngaus io qa r grazing( -- poor C tlon Grass cover < f 68 79 f 86 89 - 0.0 Fair Condition (grass cover 50 to 75 %) ` 49 69 79 84 0.0 Good Condition (grass cover> 75 %) ` 39 I 61 I 74 80 -0.0 Meadow Continuous rass. no grazing. Mowed for hav l 30 I 58 I 71 I 78 0.0 Brush (bruU w=rass mix. mostly brush) Poor Conawn/prass cover <.50%) 48 67 77 83 0.0 Fair Condition crass cover 50 to 75 %) 35 I 56 � I 70 77 I 0.0 Good Condition (9rase Cover >75%1 30 48 65 73 0.0 Woods/Grass Combination Poor condition fords$ covet , 60% � 57 73 82 i 86 0,0 _ Fair Conditkn fgaass cover 50 to 951 43 65 I 76 _ I 82 4.0 Good Condition (grass cover> 75 %) 32 58 72 79 010 Woods I Poor Condition 45 66 77 83 - 0.0 Fair Cowen 60 Good Condition 36 1 I 70 77 0.0 Farmsteads Buldings, Lanes, dmreewaYS, and surrounding lots 1 59 1 _ 74 1 82 I 86 0 -0 Agricultural Land Aft-w, Bare Sort 77 86 91 94 U Fallow, Crop Residue Cover (Poor) 76 85 - 90 93 0.0 p Fallow, CResidue Cover (Good) 74 83 88 90 0.0 Row Crops, Straiaht Row (Po _ 72 81 88 91 0.0 Row Crops, St-wght Row �G 67 78 85 89 0.0 Row Crops, StraiPht Row & G'rOp Residue (Poor, 71 _ 80 87 90 85 0.0 0.0 Raw Crops. Stra!ght Row & Cmp Residue (Good) 64 75 82 Total a 86.3 t TOTAL AREA = I 1.04 COMPOSITE CN 83.000 POND 1 Curve Number and Time of Concentration Calcs WOODALL - AREA 5 - POST - DEVELOPMENT CONDITIONS Hydrologic Soil Group (HSG1 NSG A NSG a NSG C Area Area I Area Cover Type (acre) � CN (acre) 1 CN (acre) � CN Impervious Areas {excluding ROW1 Paved parking lots, roofs, dnveways I 98 - f 98 98 Streets and Roads 73 Paved, curbs and storm sewers jexeludino ROW) 98 Paved. Open ditches (including OW) 83 Gravel (i>rclu&nQ ROM 76 Dirt (including ROW) 72 Open parB f4wris, parks, golf Courses, etc) 72 Poor Condftn forass cover < 505 68 Fair Condiion 1krasscover 50 to 75%) _ 49 I Goad Condition forass cover , 75 %) 39. Urban Districts -. 73 Commercial and huainesss lAv�7 85% Impervious) 89 I lnduslrial Ar 72%IrnaervWsu 81 RBSidenpal 0 sUicts by Avg Lot Size 1/8 Acre or Less, lownhomes (Avo 65% Impervious) 77 114 Acre (Avg 38 Imoervious) 61 113 Acre ((Avq 30% Impervious + 57 112 Acre�JAvR 25% Impanioual 1 Acre (((Avg 20% Impervious) 51 2 Acre (Ava 12% Impervious) - 46 Newly Graded Areas _- i Pervious areas only, no veoetatlarr I I 77 ; Pasture, rangeteontinuousfo eforgrazingi 87 Poor Condition (grass cover < /Z) f 68 Fair Condition (grass cover 50Io 75 %) I 49 Good Condition (grass cover> 75%.) 39 Meadow Continuous 9/a55, no graziao. mowed for hav I 30 Brush Ilhrushtweedlgrass mix. mostly brushy Poor [:ondflian (grass cover < 50%) 48 Fair Condition (grass cover 50 to 75 %) 35 Good Condition (orass cover, 755Q 30 WoodslGrass Combination - Poor Conditkm forass cover < 50 %J { 57 Fair Contrition grass Cover 50 to 75 %) E 43 Good Conddion1wass Cover > 75%) 32 Woods -_ Poor Cdn NOP 45 Fair Comwon I 36 Good Condition f 30 Farmsteads Buildings. Lanes, dnveways, and surroundino lots I 59 A ftut'tural Land Fellow, Bare Soil 77 Fallow. crop Residue Cover (Poor) 76 Fallow. Cro Residue Cover (Good) 74 ROW CXV`aig8t Flaw (Poor) 72 Row Crops, St'0oht Row (Good] 67 Row Crops, Straight Row & CroD ResWuo t`(qP_,-o,00 - 71 - _ Row Crops. Strsiohl Row & Crop Residue (Good) - 64 TOTAL AREA = 0 93 1 COMPOSITE CN = 1 1 80 516 98 I1689 85 82 I . 79 69 61 92 88 e5 75 72 70 68 65 - I 86 { 79 li 69 61 I 58 67 56 48 98 92 89 87 86 79 (4 94 91 90 0,600 83 81 80 79 77 1 91 86 79 74 NSG 1) - SUM of Area I CN CN -Area (acre) ` 73 77 l 70 0 330 65 NSG 1) - SUM of Area I CN CN -Area (acre) ` 98 98 93 91 89 89 _ I 84 80 I95 93 92 87 86 85 84 82 94 89 84 80 1 - 78 83 77 73 86 82 79 1 83 79 77 I 86 94 93 90 91 89 90 85 Total = 0000 00 00 0 -0 00 0.0 0.0 0.0 0.0 49.8 0,0 0.0 0,0 0.0 0.0 0A 0.0 0.0 0.0 0 -00 0,a 0.0 0.0 25 -1 0.0 0.0 0.0 0.0 0,0 00 0.0 0.0 oA 0.0 0 -0 0-0 74.8 73 82. 6. 0 330 76 58 72 66 77 60 73 55 70 1 74 I 82 88 91 85 90 83 88 81 88 78 85 $o - 87 75 - 82 98 98 93 91 89 89 _ I 84 80 I95 93 92 87 86 85 84 82 94 89 84 80 1 - 78 83 77 73 86 82 79 1 83 79 77 I 86 94 93 90 91 89 90 85 Total = 0000 00 00 0 -0 00 0.0 0.0 0.0 0.0 49.8 0,0 0.0 0,0 0.0 0.0 0A 0.0 0.0 0.0 0 -00 0,a 0.0 0.0 25 -1 0.0 0.0 0.0 0.0 0,0 00 0.0 0.0 oA 0.0 0 -0 0-0 74.8 POND 1 Curve Number and Time of Concentration Calcs WOODALL - AREA 6 - POST - DEVELOPMENT CONDITIONS Hydrologic Soii Group fN5G1 HSG A - MSG B HSG C HS &'D SUM of Cover Type Area CN Area CN - Area CN Area I CN CN -Area (acre) (acre) (acre) (acre) ! , tmprr *us Areas (excluding ROW) , Paved parking lots. roofs. dnveways 99 98 I 98 - 98 _ - 0-0 and Reads Paved curbs and storm sewerslekcludino ROW) 98 98 98 98 0,0 EStreets Paved. auen dlolches fincludino ROM 83 89 92 93 0.0 Gravel (inavdi� ROM 76 85 89 91 0.0 Dirt rndufling fiUV97 72 82 87 89 0.0 a�et1 dawns, partoS, golf GourseS. etC) �C8 poor d.-=n 1grass cover < 5wal 88 79 Ij9 86 89 0.0 Fair Condilion (grass cover 50 to ;�5!) I 49 69 79 I 84 0.0 Good Cgnditign (crass cover > 75%) 39 61 74 80 0.0 Urban Districts Commerciai Bnd businesss /Avp 85i% impervicusJ_ 89 92 88 { 94 91 P 95 93 0.0 `u.0 Industrial jAT 729% imperwous,ff 8'1 den- D stricts by Avq Lot Size 1 /6Acre or less, townhomes (Avg 6590lmm vious) I 77 - 85 90 _ 92 0.0 _ 114 Acre (Avq 36% Impervious) - 1 61 75 83 87 0.4 _ in Acre fAvq 30% Irnpenfts) 57 72 81 86 0.0 1)2 Acre /Aq 25% Impervious) 54 70 80 85 0.0 i Acre (Avg 0% Impervioml 51 68 79 84 00 2 Acre (Avq 12% rmperviatrsl 46 65 77 82 0.0 Newly Graded Areas Pervious areas only, no vegelatian 1 77 I 86 1 91 1 94 010 Pasture, range (continuous tom for crazing) Poor Condition (,grass cover < gyp/! 68 79 86 89 0.0 Fair Condition (crass cover 50 to 7�1b/) 49 69 79 84 0.0 Good Condition (crass cover > 75 %) j 39 61 74 80 00 Meadow I ContinvouS'B58, no gr&zing mowed for hav 30 58 71 78 00 Brush (Meed /grass mix, mosv brush) - Poor `Ofzdihon (grass over <„X 48 67 77 83 0.0 Fair Corxrftn (crass cover 50 to ) 35 56 70 77 0.0 Good Condition (crass cover , 75 %) 30 48 65 73 - 0.0 WoadsfGrass Combination Poor Condition ff�rats cover < 50% _ Fair Condition (press cover 50 to 73Y1 I 57 43 73 65 I 82 6.800 74� 86 82 I 0.0 501.6 Good Condilr`on (grass cover, 75%) _ _ 32 58 _ 72 79 0.0 Woods Poor Condition 45 66 77 Fair C;ondilion I 36 60 73 79 1 0,0 Condiion - 30 - 55 & 70 787 00 _G Farmsteads Buildinos. Lanes, drveways, and surroundinq lots - - 59 1 74 82 I 86 0.0 AAriculturat Land Fallow, Bare Soil 77 86 91 94 00 Fallow. Croo Residue Cover (poor) - - - 76 85 90 93 0.0 Fallow. Crop Residue Cover (GogdJ 74 83 88 90 0.0 Row Crops. Straight Row (Poor( 72 81 68 91 OA Row Crops. Straight Row Good) 67 78 85 89 _ - 010 Row Crops. Straight Row 8 Croo Residue (Poor) 71 _ _ 80 I 87 90 - 0.0 _ Row Crops. Straight Row 8 Crop Residue !Good) 64 11 I 75 82 85 0.0 jl Total = 501.E TOTAL AREA a 6.6—u I j COMPVSrm CN = I rb.UU0 J Land Cover Woods (light underbrush) Land Cover Unpaved OPEN CHANNEL OR PIPE FLOW TIME Channel Shape Triangular Trapezoidal Circular Trapezoidal Triangular Trapezoidal Trapezoidal Trapezoidal Total Time of Concentraiton POND 1 Curve Number and Time of Concentration Calcs TIME OF CONCENTRATIO N POST AREA 6 Manning's Overland Flow Coefficient SHEET FLOW TRAVEL TIME E _ Bermuda Grass 0.410 Depth P2 p Mannin and Flow Travel Culvtivated, Residue -20% 0.060 Intensity yDe F ow O erla,C'gl Length Culvtivated, Residue > =20% 0.170 ( 2- r 24-hr) lent Slo pe ( -150 ft) III Time Dense Grass 0.240 jin nr) (in) (fuft) (ft) (min) Fallow (no residue) 0.050 - 3.9 0.4 o.63®tl 150 22.88 Range 0.130 - MIA - - - Short Grass 0.150 Smooth Surfaces 0.011 Woods (dense underbrush) 0.800 Woods (light underbrush) 0.400 SHALLOW CONCENTRATED FLOW TIME Shallow Concentrated Flow Coefficient Velocity Factor Land Slope Velocity Flow l Land Cover Velocity Factor Length Time Paved 20.3282 (ft /ft) (ft/s) (ft) `mini Unpaved 16.1345 16 134E. 0.0500 3.61 '50 0.69 Manning's n Depth Diameter (in) or Side Long. Velocity Flow Travel Time Base Width (ft) Slope Slope Length (ft) (HrJ) (ft /ft) (ftls) .1ft) Jmin) 0.035 1 3 0.050 6.36 700 1.83 0.035 ! 2 2 0.020 4.37 0 0.00 0.010 1 1 0 0.010 1.13 0 0.00 0.010 1 1 0 0.010 7.16 0 0.00 0.010 1 1 0 0.010 7.16 0 0.00 0.010 1 1 0 0.010 7.16 0 0.00 0.010 1 1 0 0.010 7.16 0 0.00 0.010 1 1 0 0.010 7.16 0 0.00 25;40 min I POND 1 Curve Number and Time of Concentration Calcs WOODA'LL -AREA 7 - POST-DEVELOPMENT + CONDITIONS Hydrologic Soil Group {MSG) HSG A HSG a HSG C H5G D SUM of Cover Type Area CN Area CN Area CN Area + CN CN Area (acre) acre) (acre) (acre) Imparvlous Areas iexcludina RDWI Paved parkfna lots, roofs. driveways 98 dd ! I 98 98 98 Streets and Roads I - Paved. curbs and storm sewers (excluding ROW) 98 1 98 98 98 OA Paved, open ditches rnncluding ROM ` 83 89 92 93 0 -0 Gravel (including ROW) I 76 85 89 91 OA - Dirt (including ROW) Open Spare lawns peeks. golf courses, etc) 72 82 87 89 0.0 Poor Con n /grass cover < 50% 68 I 79 86 Sy 0.0 Far Conc (grass cover 50 to 75 %) I 49 I 69 79 I 84 0.0 I Good Condlion (grass cover, 75%) 39 j 61 74 80 0•0 [Urban Districts 11 I C4mmelciat and busrneSSSIfAv 85% Impervous) I 89 -_. -.- 92 _ j 94 _ 95 I 0.0 Indus €fiat vq 72% lmoervwus W 88 91 93 0.4 Residential Districts by Avq Lot ixe I _ . 1/8Acfe or I,ess. towrthomes (Avg 65 %Impervious) 77 85 90 92 - 0 -0 _ 114 Acre (AMC 38% Imparviouej 61 75 83 87 0.0 113 Acre Avg 30% Impervious) 57 72 _ 81 86 _ 0.0 112 Acre (Avg 25% Impervious) 54 70 80 85 0.0 - 1 Acre (Avg 20% Impervious) 51 fib 79 84 0.0 _ 2 Acre (Avg 12% Impervious) 46 65 77 82 - 0.0 Newly,,Graded Areas Pervious areas only, no veoslation 1 77 1 86 1 91 I 94 0.0 Pasture, range fcontlnuous forage for gra4mq) Poor Condition (grass cover < 50 %{ 68 79 I 86 89 0.0 Fair Condition (grass cover 50 to 7 1 49 69 79 I 84 0.0 Good Cond�1ton (crass cover 1 75%) _ 39 61_ 4 74 80 0.0 Meadow ConRnuous gyrass. no grazing, mowed for had�(( Brush (hn+shlweedfs7rass mix; mosi)v Drushl 1 30 58 71 1 78 0 -0 _— Poor Condition (grass cover < 50 %) 48 67 77 83 0.0 Fair Condition (crass cover 50 to 75 %) 35 _ 56 j 70 77 0.0 Good Condition (grass cover , 75 %) 30 48 k 65 73 010 WoodsMrass Combination - - Poor Condition (grass cover < 50 %� ! 57 73 82 ` 86 0.0 Fair Condition (grass.cover 50 to T ) 43 65 I 76 I 82 0.0 Good Condition (grass cover, 75 %) I 32 58 72 79 _ 0.0 Woods I JI 6 77 93 U . Fairy ondti ( 3.180 I 20 Good Cond�or? ition 36 f i 55 70 79 01 Farmsteads Buildings, Lanes, driveways- and surround+nq lots 1 59 1 74 l 82 1 86 0.0 ngryoullurat Land �J- allow, bare SON -- ) 77 - SB 91 94 0.0 Falow. Crop Residue Cover `root] 76 _ 85 90 93 _ 0.0 _ Fallow, Crop_ Residue Cover(Good) 74 83 88 90 0.0 Row Crops, Straiohl Row (Poore 72 _ 81 88 99 010 Row Crops, Straight Row (Good) 67 78 85 89 - 0.0 Row Crops, Straight Row & Crop Residue (Poor) 71 80 87 90 0 -0 Row Crops. Strwoht Row & Crop Residua (Good) 64 75 82 85 0 -0 Total = 232.1 TOTAL AREA = 3.18 COMPOSITE CN = 73.000 Land Cover woods (liqht underbrush) Land Cover Unpaved OPEN CHANNEL OR PIPE FLOW TIME Channel Shape Triangular Trapezoidal Circular Trapezoidal Triangular Trapezoidal Trapezoidal Trapezoidal Total Time of Concentraiton POND 1 Curve Number and Time of Concentration Calcs TIME OF CONCENTRATION POST AREA 7 _ Manning's Overland Flow Coefficient _ SHEET FLOW TRAVEL TIME Bermuda Grass 0.410 Manning's Flow Culvtivated, Residue -20% 0.060 Intensity PZ Depth Overland Flow `Slope Land Length Travel o Culvtivated, Residue-20% 0.170 (2 -yr, 24 -hr) fficient ( -150 ft) Time Dense Grass 0.240 (in /hr) (in) (ft/ft) (ft) (min) Fallow (no residue) 0.050 - 3.9 0.4 0.0300 150 22.88 Range 0.130 _ #N `A _ - - Short Grass 0.150 Smooth Surfaces 0.011 Woods (dense underbrush) 0.800 Woods (light underbrush) 0.400 SHALLOW CONCENTRATED FLOW TIME - Shallow Concentrated Flow Coefficient Velocity Factor Land Slope Velocity Flow Travel Land Cover Velocitv Factor Length Paved 20.3282 (ft/ft) .t. "s) [`tY fmin) Unpaved 16.1345 1 E 12A 0.0600 1 5 150 0.83 Manning's n Depth Diameter (in) or Side Long. Velocity Flow Travel Time Base Width (ft) Slope Slope Length (tt] (HN) (futt) (ft/s) (ft) (min) 0.035 1 1 3 0.080 8.04 800 1.66 0.035 1 2 2 0.020 4.37 0 0.00 0.010 1 1 0 0.010 1.13 0 0.00 0.010 1 1 0 0.010 7.16 0 0.00 0.010 1 1 0 0.010 7.16 0 0.00 0.010 1 1 0 0.010 7.16 0 0.00 0.010 t 1 0 0.010 7.16 0 0.00 0.010 1 0 0.010 7.16 0 0.00 25.17 Mir] 1 -Year Hydrographs Hydrograph Summary Re p9yld aflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 31.07 2 730 120,331 - - -- - PRE -AREA 1 2 SCS Runoff 19.02 2 718 38,262 - - - - -- -- - ---- PRE- DRAINAGE 2 3 SCS Runoff 4.543 2 722 13,086 - - - - -- - - ---- -- PRE - DRAINAGE 3 4 SCS Runoff 12.44 2 716 25,754 - - - - -- -•- - POST -AREA 1 5 Reservoir 0.446 2 814 23,723 4 376.87 41,361 BMP 1 6 Combine 40.31 2 720 171,679 1, 2, 3, - - - - -- TOTAL PRE 7 SCS Runoff 26.43 2 716 54,890 - - - - -- - - - - -- POST -AREA 2 8 Reservoir 1.027 2 804 52,411 7 362.92 60,983 BMP 2 9 SCS Runoff 1.219 2 724 3,524 - - - - -- - - - - -- POST -AREA 3 10 SCS Runoff 1.756 2 722 4,942 - - - - -- POST -AREA 4 11 SCS Runoff 1.370 2 722 3,896 - - - - -- POST -AREA 5 12 SCS Runoff 16.95 2 730 66,157 - -- - - - - -- - - - - -- POST -AREA 6 13 SCS Runoff 5.912 2 730 24,120 - - - - -- -• - - -- - - - - -- POST -AREA 7 14 Combine 20.99 2 728 154,654 5, 8, 9, - - - - -- - -• -- ADD POST 10, 11, 12, 15 SCS Runoff 6.386 2 734 29,587 -• -• -- - - - - -- POST -AREA 8 - OFFSITE 16 Combine 26.79 2 728 178,774 13, 14, - - - - -- - - - - -- OVERALL POST WOODALL- 9- 30- 15.gpw Return Period: 1 Year Tuesday, 10 / 6 / 2015 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31362014 by Autodesk, Inc. 00.3 Hyd. No. 1 PRE -AREA 1 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 34.870 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.87 in Distribution Storm duration = 24 hrs Shape factor Tuesday, 10 /6/2015 31.07 cfs = 730 min = 120,331 cuft 76.7 = Oft = 23.80 min Type II = 484 PRE -AREA 1 Q (cfs) Q (cfs) Hyd. No. 1 -- 1 Year 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 f 10.00 5.00b 5.00 0.00 -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) PRE - DRAINAGE 2 Q (cfs) Q (cfs) Hyd. No. 2 -- 1 Year 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 I 9.00 9.00 6.00 6.00 3.00 3.00 t 0.00 ,c = _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 10 16 / 2015 Hyd. No. 2 PRE - DRAINAGE 2 Hydrograph type = SCS Runoff Peak discharge = 19.02 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 38,262 cuft Drainage area = 8.670 ac Curve number a 82.3 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - DRAINAGE 2 Q (cfs) Q (cfs) Hyd. No. 2 -- 1 Year 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 I 9.00 9.00 6.00 6.00 3.00 3.00 t 0.00 ,c = _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 31D@2014 by Autodesk, Inc. 00.3 Tuesday, 10 / 6 / 2015 Hyd. No. 3 PRE - DRAINAGE 3 Hydrograph type = SCS Runoff Peak discharge = 4.543 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 13,086 cuft Drainage area = 3.470 ac Curve number = 78.5 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.00 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 PRE - DRAINAGE 3 Hyd. No. 3 -- 1 Year Q (cfs) 5.00 4.00 We I] 2.00 MR, 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 3 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 4 POST -AREA 1 Hydrograph type = SCS Runoff Peak discharge = 12.44 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 25,754 cuft Drainage area = 3.950 ac Curve number = 90.6 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST -AREA 1 Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 14.00 14.00 12.00 12.00 10.00 - 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - — - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) — Hyd No. 4 Storage Indication method used. Wet pond routing start elevation = 375.50 ft Q (cfs) 14.00 12.00 10.00 8.00 ,. UIR 4.00 2.00 I I BMP 1 Hyd. No. 5 -- 1 Year Q (cfs) 14.00 12.00 10.00 e MN 4.00 0 �� 0.00 - _ 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 5 Hyd No. 4 Total storage used = 41,361 cult 6 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD@ Civil 31382014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 5 BMP 1 Hydrograph type = Reservoir Peak discharge = 0.446 cfs Storm frequency = 1 yrs Time to peak = 814 min Time interval = 2 min Hyd. volume = 23,723 cuft Inflow hyd. No. = 4 - POST -AREA 1 Max. Elevation = 376.87 ft Reservoir name = BMP 1 Max. Storage = 41,361 cuft Storage Indication method used. Wet pond routing start elevation = 375.50 ft Q (cfs) 14.00 12.00 10.00 8.00 ,. UIR 4.00 2.00 I I BMP 1 Hyd. No. 5 -- 1 Year Q (cfs) 14.00 12.00 10.00 e MN 4.00 0 �� 0.00 - _ 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 5 Hyd No. 4 Total storage used = 41,361 cult Q (cfs) 50.00 40.00 30.00 20.00 10.00 TOTAL PRE Hyd. No. 6 -- 1 Year Q (cfs) 50.00 40.00 t M NMI] Iii lIf �1J l 0.00 - 1. . I '� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 6 Hyd No. 1 - Hyd No. 2 - Hyd No. 3 7 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 6 TOTAL PRE Hydrograph type = Combine Peak discharge = 40.31 cfs Storm frequency = 1 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 171,679 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 47.010 ac Q (cfs) 50.00 40.00 30.00 20.00 10.00 TOTAL PRE Hyd. No. 6 -- 1 Year Q (cfs) 50.00 40.00 t M NMI] Iii lIf �1J l 0.00 - 1. . I '� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 6 Hyd No. 1 - Hyd No. 2 - Hyd No. 3 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc 00.3 Tuesday, 10 / 6 / 2015 Hyd. No. 7 POST -AREA 2 Hydrograph type = SCS Runoff Peak discharge = 26.43 cfs Storm frequency = 1 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 54,890 cuft Drainage area = 8.270 ac Curve number = 91 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.87 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST -AREA 2 Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 28.00 28.00 v 24.00 24.00 20.00 - 20.00 16.00 16.00 12.00 12.00 8.00 - 8.00 4.00 4.00 0.00 _., „ - ---�, 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 7 Time (min) Storage Indication method used. Wet pond routing start elevation = 360.50 ft Q (cfs) 28.00 24.00 20.00 16.00 12.00 N. 11 4.00 BMP 2 Hyd. No. 8 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 0.00 ° -- . 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 8 � Hyd No. 7 i11T1 1 11 Total storage used = 60,983 cult 9 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD@ Civil 3[M2014 by Autodesk, Inc. v10 3 Tuesday, 10 / 6 / 2015 Hyd. No. 8 BMP 2 Hydrograph type = Reservoir Peak discharge = 1.027 cfs Storm frequency = 1 yrs Time to peak = 804 min Time interval = 2 min Hyd. volume = 52,411 cuft Inflow hyd. No. = 7 - POST -AREA 2 Max. Elevation = 362.92 ft Reservoir name = BMP 2 Max. Storage = 60,983 cuft Storage Indication method used. Wet pond routing start elevation = 360.50 ft Q (cfs) 28.00 24.00 20.00 16.00 12.00 N. 11 4.00 BMP 2 Hyd. No. 8 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 0.00 ° -- . 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 8 � Hyd No. 7 i11T1 1 11 Total storage used = 60,983 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2014 by Autodesk, Inc. v10.3 Hyd. No. 9 POST -AREA 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.960 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.87 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 I 0.00 0 120 240 360 480 600 - Hyd No. 9 POST -AREA 3 Hyd. No. 9 -- 1 Year 10 Tuesday, 10 /6/2015 = 1.219 cfs = 724 min = 3,524 cuft = 78 = Oft = 15.00 min = Type II = 484 720 840 960 1080 1200 1320 Q (cfs) 2.00 1.00 - -- 0.00 1440 1560 Time (min) Hydrograph Report Hydraf low Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. 00.3 Hyd. No. 10 POST -AREA 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.040 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.87 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 POST -AREA 4 Hyd. No. 10 -- 1 Year 0.00 - 0 120 240 360 480 600 Hyd No. 10 11 Tuesday, 10 / 6 / 2015 1.756 cfs = 722 min = 4,942 cuft = 83 = Oft = 15.00 min = Type II = 484 Q (cfs) 2.00 1.00 ' 0.00 720 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc v10.3 Hyd. No. 11 POST -AREA 5 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. _ 2.87 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 2.00 1.00 w POST -AREA 5 Hyd. No. 11 -- 1 Year 120 240 360 480 600 Hyd No. 11 12 Tuesday, 10 / 6 / 2015 1.370 cfs = 722 min = 3,896 cult = 80.5 = Oft = 15.00 min = Type II = 484 720 840 960 1080 1200 1320 Q (cfs) 2.00 1.00 0.00 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Hyd. No. 12 POST -AREA 6 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 19.940 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.87 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 18.00 15.00 12.00 M we POST -AREA 6 Hyd. No. 12 -- 1 Year 13 Tuesday, 10/6 /2015 = 16.95 cfs = 730 min = 66,157 cuft = 76 = Oft = 25.00 min = Type II = 484 Q (cfs) 18.00 15.00 12.00 M we] 3.00 3.00 0.00 =_ - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10 3 Hyd. No. 13 POST -AREA 7 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.670 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.87 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 POST -AREA 7 Hyd. No. 13 -- 1 Year 14 Tuesday, 10 /6/2015 = 5.912 cfs = 730 min = 24,120 cuft = 73 = Oft = 25.20 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Q (cfs) 21.00 18.00 15.00 12.00 • M I1 3.00 0.00 0 240 Hyd No. 14 ADD POST Hyd. No. 14 -- 1 Year 480 720 960 1200 - Hyd No. 5 Hyd No. 8 Hyd No. 10 Hyd No. 11 Q (cfs) 21.00 18.00 15.00 12.00 M WE 3.00 N' ' ' - 0.00 1440 1680 1920 Hyd No. 9 Time (min) Hyd No. 12 15 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc v10 3 Tuesday, 10 / 6 / 2015 Hyd. No. 14 ADD POST Hydrograph type = Combine Peak discharge = 20.99 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 154,654 cuft Inflow hyds. = 5, 8, 9, 10, 11, 12 Contrib. drain. area = 22.870 ac Q (cfs) 21.00 18.00 15.00 12.00 • M I1 3.00 0.00 0 240 Hyd No. 14 ADD POST Hyd. No. 14 -- 1 Year 480 720 960 1200 - Hyd No. 5 Hyd No. 8 Hyd No. 10 Hyd No. 11 Q (cfs) 21.00 18.00 15.00 12.00 M WE 3.00 N' ' ' - 0.00 1440 1680 1920 Hyd No. 9 Time (min) Hyd No. 12 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc v10.3 Hyd. No. 15 POST -AREA 8 - OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.670 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 2.87 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 7.00 Me] 5.00 H UX 3.00 POST -AREA 8 - OFFSITE Hyd. No. 15 -- 1 Year 16 Tuesday, 10 / 6 / 2015 = 6.386 cfs = 734 min = 29,587 cuft = 76 = Oft = 31.00 min - Type II = 484 Q (cfs) 7.00 M . 0M 4.00 3.00 2.00 — —• -- - - - -- - - - -�— 2.00 1.00 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 OVERALL POST Q (cfs) Hyd. No. 16 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 - 16.00 12.00 12.00 8.00 8.00 4.00 -I _ `� 4.00 _r 0.00 0 .00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 Time (min) - - Hyd No. 16 Hyd No. 13 - Hyd No. 14 17 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD(D Civil 3D@)2014 by Autodesk, Inc. 00.3 Tuesday, 10 / 6 / 2015 Hyd. No. 16 OVERALL POST Hydrograph type = Combine Peak discharge = 26.79 cfs Storm frequency = 1 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 178,774 cuft Inflow hyds. = 13, 14 Contrib. drain. area = 8.670 ac OVERALL POST Q (cfs) Hyd. No. 16 -- 1 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 - 16.00 12.00 12.00 8.00 8.00 4.00 -I _ `� 4.00 _r 0.00 0 .00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 1680 1800 Time (min) - - Hyd No. 16 Hyd No. 13 - Hyd No. 14 so -Year Hydrographs Hydrograph Summary Re p'?yld aflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc v10.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 89.05 2 728 327,695 - - - - -- ...... - - - - -- PRE -AREA 1 2 SCS Runoff 45.25 2 716 92,745 .... •- - - - - -- ...... PRE - DRAINAGE 2 3 SCS Runoff 12.23 2 722 34,274 ....- - - - - -- - - - - -- PRE - DRAINAGE 3 4 SCS Runoff 2478 2 716 53,478 - - - - -- - - - - -- POST -AREA 1 5 Reservoir 2.949 2 732 51,309 4 377.93 54,888 BMP 1 6 Combine 112.41 2 720 454,714 1, 2, 3, - - - - -- TOTAL PRE 7 SCS Runoff 52.23 2 716 113,164 - - - - -- - - ---- ...... POST -AREA 2 8 Reservoir 6.854 2 728 110,403 7 364.81 89,280 BMP 2 9 SCS Runoff 3.328 2 722 9,329 - - - - -- - - -- - -- POST -AREA 3 10 SCS Runoff 4.188 2 722 11,817 — — POST -AREA 4 11 SCS Runoff 3.486 2 722 9,789 - - - - -- - - - - -- - - -- POST -AREA 5 12 SCS Runoff 49.67 2 728 183,010 - - - -- POST -AREA 6 13 SCS Runoff 19.27 2 728 71,622 ..... - - - - - -- - - - - -- POST -AREA 7 14 Combine 68.01 2 728 375,656 5, 8, 9, - - - - -- - - - - -- ADD POST 10, 11, 12, 15 SCS Runoff 18.83 2 734 81,847 - - - - -- - - - - -- - - - - -- POST -AREA 8 - OFFSITE 16 Combine 87.29 2 728 447,279 13, 14, - - - - -- - - - - -- OVERALL POST WOODALL- 9- 30- 15.9pw Return Period: 10 Year Tuesday, 10 / 6 / 2015 Hydrograph Report Hydraf low Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. 00.3 Hyd. No. 1 : _ VWX Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 34.870 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.04 in Distribution Storm duration = 24 hrs Shape factor PRE -AREA 1 Q (cfs) Hyd. No. 1 -- 10 Year 90.00 80.00 - 70.00 - - - - -- — — - — - 60.00 -- 50.00 4U.UU 30.00 20.00 10.00 i, - 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 18 Tuesday, 10 /6/2015 = 89.05 cfs = 728 min = 327,695 cuft = 76.7 = Oft = 23.80 min = Type II = 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. 00.3 Hyd. No. 2 PRE - DRAINAGE 2 19 Tuesday, 10 / 6 / 2015 Hydrograph type = SCS Runoff Peak discharge = 45.25 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 92,745 cuft Drainage area = 8.670 ac Curve number = 82.3 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - DRAINAGE 2 Q (cfs) Hyd. No. 2 -- 10 Year 50.00 40.00 30.00 20.00 10.00 0.00 - -- - 0 120 240 360 480 600 720 840 Hyd No. 2 Q (cfs) 50.00 Hollis] i1 11 41111 LO 10.00 0.00 960 1080 1200 1320 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 3 PRE - DRAINAGE 3 Hydrograph type = SCS Runoff Peak discharge = 12.23 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 34,274 cuft Drainage area = 3.470 ac Curve number = 78.5 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.00 min Total precip. = 5.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - DRAINAGE 3 Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 14.00 14.00 12.00 12.00 L' 10.00 10.00 8.00 8.00 6.00 - 6.00 4.00 4.00 2.00 2.00 1 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 21 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 4 POST -AREA 1 Hydrograph type = SCS Runoff Peak discharge = 24.78 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 53,478 cuft Drainage area = 3.950 ac Curve number = 90.6 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 POST -AREA 1 Hyd. No. 4 -- 10 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 :11111 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 4 Time (min) Storage Indication method used. Wet pond routing start elevation = 375.50 ft BMP 1 Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 28.00 - - 28.00 24.00 24.00 20.00 1 20.00 16.00 16.00 i 12.00 12.00 8.00 - 8.00 4.00 4.00 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 5 Hyd No. 4 Q 1 Tl I 1 : Total storage used = 54,888 cult 22 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc v10 3 Tuesday, 10 / 6 / 2015 Hyd. No. 5 BMP 1 Hydrograph type = Reservoir Peak discharge = 2.949 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 51,309 cuft Inflow hyd. No. = 4 - POST -AREA 1 Max. Elevation = 377.93 ft Reservoir name = BMP 1 Max. Storage = 54,888 cuft Storage Indication method used. Wet pond routing start elevation = 375.50 ft BMP 1 Q (cfs) Hyd. No. 5 -- 10 Year Q (cfs) 28.00 - - 28.00 24.00 24.00 20.00 1 20.00 16.00 16.00 i 12.00 12.00 8.00 - 8.00 4.00 4.00 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 5 Hyd No. 4 Q 1 Tl I 1 : Total storage used = 54,888 cult Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 TOTAL PRE Hyd. No. 6 -- 10 Year Q (cfs) 120.00 100.00 !�1I1I1] 20.00 .�� ■ �� � _ 0.00 ••— 0.00 '�'� 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 � Hyd No. 1 — Hyd No. 2 — Hyd No. 3 23 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. v10.3 Tuesday, 10 16 / 2015 Hyd. No. 6 TOTALPRE Hydrograph type = Combine Peak discharge = 112.41 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 454,714 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 47.010 ac Q (cfs) 120.00 100.00 80.00 60.00 40.00 20.00 TOTAL PRE Hyd. No. 6 -- 10 Year Q (cfs) 120.00 100.00 !�1I1I1] 20.00 .�� ■ �� � _ 0.00 ••— 0.00 '�'� 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 � Hyd No. 1 — Hyd No. 2 — Hyd No. 3 24 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc 00.3 Tuesday, 10 / 6 / 2015 Hyd. No. 7 POST -AREA 2 Hydrograph type = SCS Runoff Peak discharge = 52.23 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 113,164 cuft Drainage area = 8.270 ac Curve number = 91 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 POST -AREA 2 Hyd. No. 7 -- 10 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 10.00 0.00 p— - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) Hyd No. 7 25 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 8 BMP 2 Hydrograph type = Reservoir Peak discharge = 6.854 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 110,403 cuft Inflow hyd. No. = 7 - POST -AREA 2 Max. Elevation = 364.81 ft Reservoir name = BMP 2 Max. Storage = 89,280 cuft Storage Indication method used. Wet pond routing start elevation = 360 50 ft Q (cfs) 60.00 50.00 40.00 30.00 20.00 ■ 10.00 BMP 2 Hyd. No. 8 -- 10 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 - - – — — 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) Hyd No. 8 Hyd No. 7 TUJ I I 1 Total storage used = 89,280 cult Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D0 2014 by Autodesk, Inc. v10 3 Hyd. No. 9 POST -AREA 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.960 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.04 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 4.00 3.00 2.00 1.00 0.00 = 0 120 240 Hyd No. 9 POST -AREA 3 Hyd. No. 9 -- 10 Year 360 480 600 72 26 Tuesday, 10 / 6 / 2015 = 3.328 cfs = 722 min = 9,329 tuft = 78 = Oft = 15.00 min = Type II = 484 Q (cfs) 4.00 i 11, 2.00 1.00 I . - 0.00 0 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Hyd. No. 10 POST -AREA 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.040 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.04 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 5.00 4.00 3.00 E, w 1.00 POST -AREA 4 Hyd. No. 10 -- 10 Year 27 Tuesday, 10 / 6 / 2015 = 4.188 cfs = 722 min = 11,817 tuft = 83 = Oft = 15.00 min = Type II = 484 Q (cfs) 5.00 4.00 3.00 2.00 1.00 0.00 - -- • - - - � - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc v10.3 Hyd. No. 11 POST -AREA 5 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.930 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.04 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 4.00 3.00 W IM 1.00 0.00 _ 0 120 240 Hyd No. 11 POST -AREA 5 Hyd. No. 11 -- 10 Year 360 480 600 72 28 Tuesday, 10 / 6 / 2015 = 3.486 cfs 722 min = 9,789 cuft = 80.5 Oft 15.00 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 tl� 0.00 0 840 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. 00.3 Hyd. No. 12 POST -AREA 6 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 19.940 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.04 in Storm duration = 24 hrs Q (cfs) 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST -AREA 6 Hyd. No. 12 -- 10 Year 29 Tuesday, 10 / 6 / 2015 = 49.67 cfs = 728 min = 183,010 cuft = 76 = Oft = 25.00 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 - - -- -' -- - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3130 2014 by Autodesk, Inc. v10 3 Hyd. No. 13 POST -AREA 7 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.670 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.04 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 21.00 18.00 15.00 12.00 MM ,. e s 3.00 POST -AREA 7 Hyd. No. 13 -- 10 Year W Tuesday, 10 / 6 / 2015 19.27 cfs = 728 min = 71,622 cult = 73 = Oft = 25.20 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 • of M 3.00 0.00 . _- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc v10 3 Hyd. No. 14 ADD POST 31 Tuesday, 10 /6/2015 Hydrograph type = Combine Peak discharge = 68.01 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 375,656 cuft Inflow hyds. = 5, 8, 9, 10, 11, 12 Contrib. drain. area = 22.870 ac ADD POST Q (cfs) Hyd. No. 14 -- 10 Year 70.00 .I M1 50.00 40.00 - 30.00 10.00 Q (cfs) 70.00 .ace 50.00 40.00 - - -- -- - – - - —� --- - _ 30.00 20.00 10.00 0.00 -- — - . - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Hyd No. 5 Hyd No. 8 Hyd No. 9 Time (min) Hyd No. 10 Hyd No. 11 Hyd No. 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civi131302014 by Autodesk, Inc v10.3 Hyd. No. 15 POST -AREA 8 - OFFSITE Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 2 min Drainage area = 8.670 ac Basin Slope = 0.0% Tc method = User Total precip. = 5.04 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 00 . W 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST -AREA 8 - OFFSITE Hyd. No. 15 -- 10 Year 32 Tuesday, 10 / 6 / 2015 = 18.83 cfs = 734 min = 81,847 cuft = 76 = Oft = 31.00 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 MN . es, i 1 3.00 1 0.00 - I - -.- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 33 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 16 OVERALL POST Hydrograph type = Combine Peak discharge = 87.29 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 447,279 cuft Inflow hyds. = 13, 14 Contrib. drain. area = 8.670 ac OVERALL POST Q (cfs) Hyd. No. 16 -- 10 Year Q (cfs) 90.00 90.00 80.00 - 80.00 70.00 - 70.00 60.00 - 60.00 50.00 50.00 40.00 - 40.00 30.00 30.00 ■ 20.00 t 20.00 10.00 10.00 0.00 = - �'�- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 16 - Hyd No. 13 Hyd No. 14 soo -Year Hydrographs Hydrograph Summary Re p9rdraf low Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. v10.3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 162.45 2 728 597,210 - - - - -- - - - - -- -• -••- PRE -AREA 1 2 SCS Runoff 76.14 2 716 160,221 - - - - -- ... -.• - - - - -- PRE - DRAINAGE 2 3 SCS Runoff 21.65 2 722 61,365 - - - - -- ...... - - - - -- PRE - DRAINAGE 3 4 SCS Runoff 38.61 2 716 85,951 - - - - -- - - - --- ---- -- POST -AREA 1 5 Reservoir 21.95 2 722 83,703 4 378.65 64,225 BMP 1 6 Combine 202.69 2 720 818,796 1, 2, 3, - - - - -- • - - - -• TOTAL PRE 7 SCS Runoff 81.15 2 716 181,275 - - - - -- POST -AREA 2 8 Reservoir 42.71 2 722 178,392 7 366.16 109,150 BMP 2 9 SCS Runoff 5.930 2 722 16,784 - - - - -- - - - - -- - - - - -- POST -AREA 3 10 SCS Runoff 7.049 2 722 20,284 - - - - -- - - - - -- - -• - -- POST -AREA 4 11 SCS Runoff 6.032 2 722 17,196 - - - --- - - - - -- POST -AREA 5 12 SCS Runoff 91.43 2 728 335,889 - - - -- •• -• -• - - - - -- POST -AREA 6 13 SCS Runoff 36.97 2 728 135,643 - - - - -- ...... POST -AREA 7 14 Combine 167.07 2 724 652,248 5, 8, 9, - - -- ...... ADD POST 10, 11, 12, 15 SCS Runoff 34.76 2 732 150,219 - - - -•- - - - - - -- POST -AREA 8 - OFFSITE 16 Combine 201.66 2 726 787,890 13, 14, - - - - -- OVERALL POST WOODALL- 9- 30- 15.gpw Return Period: 100 Year Tuesday, 10 / 6 / 2015 34 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 1 PRE -AREA 1 Hydrograph type = SCS Runoff Peak discharge = 162.45 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 597,210 cuft Drainage area = 34.870 ac Curve number = 76.7 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 23.80 min Total precip. = 7.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE -AREA 1 Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 180.00 - 180.00 160.00 - 160.00 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 =_� - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 35 Hydrograph Report Hydraf low Hydrographs Extension for AutoCADO Civil 3D@2014 by Autodesk, Inc. 00.3 Tuesday, 10 / 6 / 2015 Hyd. No. 2 PRE - DRAINAGE 2 Hydrograph type = SCS Runoff Peak discharge = 76.14 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 160,221 cuft Drainage area = 8.670 ac Curve number = 82.3 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - DRAINAGE 2 Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 36 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2014 by Autodesk, Inc v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 3 PRE - DRAINAGE 3 Hydrograph type = SCS Runoff Peak discharge = 21.65 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 61,365 cuft Drainage area = 3.470 ac Curve number = 78.5 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 16.00 min Total precip. = 7.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE - DRAINAGE 3 Q (cfs) Hyd. No. 3 -- 100 Year 24.00 20.00 16.00 12.00 Q (cfs) 24.00 20.00 16.00 12.00 8.00 8.00 4.00 4.00 0.00 = _ -- - '- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) - Hyd No. 3 37 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 4 POST -AREA 1 Hydrograph type = SCS Runoff Peak discharge = 38.61 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 85,951 cuft Drainage area = 3.950 ac Curve number = 90.6 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST -AREA 1 Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 40.00 40.00 30.00 1 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Time (min) - Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc v10.3 Hyd. No. 5 :3►VAIM Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 4 - POST -AREA 1 Max. Elevation Reservoir name = BMP 1 Max. Storage Storage Indication method used Wet pond routing start elevation = 375.50 ft. BMP 1 Q (cfs) Hyd. No. 5 -- 100 Year 40.00 - 30.00 20.00 10.00 38 Tuesday, 10 /6/2015 = 21.95 cfs = 722 min = 83,703 cult = 378.65 ft = 64,225 cuft Q (cfs) 40.00 20.00 10.00 0.00 -. oli 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 5 Hyd No. 4 fl f J 11D Total storage used = 64,225 cult 39 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc 00.3 Tuesday, 10 / 6 / 2015 Hyd. No. 6 TOTAL PRE Hydrograph type = Combine Peak discharge = 202.69 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 818,796 cuft Inflow hyds. = 1, 2, 3 Contrib. drain. area = 47.010 ac TOTAL PRE Q (cfs) Hyd. No. 6 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 - 120.00 90.00 - 90.00 60.00 - 60.00 30.00 =" 30.00 0.00 - � 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 6 - Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. 00.3 Hyd. No. 7 POST -AREA 2 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.270 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.51 in Distribution Storm duration = 24 hrs Shape factor POST -AREA 2 Q (cfs) Hyd. No. 7 -- 100 Year 90.00 80.00 - ri r e 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 360 480 600 720 840 960 Hyd No. 7 40 Tuesday, 10 / 6 / 2015 = 81.15 cfs = 716 min = 181,275 cuft = 91 = Oft = 5.00 min = Type II = 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1080 1200 Time (min) Storage Indication method used. Wet pond routing start elevation = 360.50 ft BMP 2 Q (cfs) Hyd. No. 8 -- 100 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 - 60.00 50.00 50.00 40.00 40.00 30.00 I 30.00 20.00 - 20.00 w 10.00 f l 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 7 Total storage used = 109,150 CA 41 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@)2014 by Autodesk, Inc v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 8 BMP 2 Hydrograph type = Reservoir Peak discharge = 42.71 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 178,392 cuft Inflow hyd. No. = 7 - POST -AREA 2 Max. Elevation = 366.16 ft Reservoir name = BMP 2 Max. Storage = 109,150 cuft Storage Indication method used. Wet pond routing start elevation = 360.50 ft BMP 2 Q (cfs) Hyd. No. 8 -- 100 Year Q (cfs) 90.00 90.00 80.00 80.00 70.00 70.00 60.00 - 60.00 50.00 50.00 40.00 40.00 30.00 I 30.00 20.00 - 20.00 w 10.00 f l 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 8 Hyd No. 7 Total storage used = 109,150 CA Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10 3 Hyd. No. 9 POST -AREA 3 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 0.960 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.51 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 POST -AREA 3 Hyd. No. 9 -- 100 Year 42 Tuesday, 10 /6/2015 = 5.930 cfs = 722 min = 16,784 cult = 78 = Oft = 15.00 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 % - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 - Hyd No. 9 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc. v10.3 Hyd. No. 10 POST -AREA 4 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 1.040 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.51 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 8.00 More, 4.00 2.00 r �� w POST -AREA 4 Hyd. No. 10 -- 100 Year 43 Tuesday, 10 / 6 / 2015 = 7.049 cfs = 722 min = 20,284 cult = 83 = Oft = 15.00 min = Type II = 484 Q (cfs) 8.00 -1Q, 4.00 2.00 I 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 10 44 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2014 by Autodesk, Inc v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 11 POST -AREA 5 Hydrograph type = SCS Runoff Peak discharge = 6.032 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 17,196 cuft Drainage area = 0.930 ac Curve number = 80.5 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.00 min Total precip. = 7.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 7.00 11 5.00 4.00 C 11 2.00 POST -AREA 5 Hyd. No. 11 -- 100 Year Q (cfs) 7.00 11 5.00 4.00 MIN 2.00 1.00 - 1 1.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) y 45 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3 D 2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 12 POST -AREA 6 Hydrograph type = SCS Runoff Peak discharge = 91.43 cfs Storm frequency = 100 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 335,889 cuft Drainage area = 19.940 ac Curve number = 76 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 25.00 min Total precip. = 7.51 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST -AREA 6 Q (cfs) Hyd. No. 12 -- 100 Year Q (cfs) 100.00 _ _ - 100.00 90.00 ! I — -. 90.00 80.00 80.00 70.00 70.00 60.00 60.00 50.00 - 50.00 G 40.00 40.00 30.00 30.00 20.00 20.00 10.00 ,� �? 10.00 0.00 - -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD@ Civil 3D@)2014 by Autodesk, Inc. 00.3 Hyd. No. 13 POST -AREA 7 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.670 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.51 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 40.00 30.00 20.00 10.00 w POST -AREA 7 Hyd. No. 13 -- 100 Year 46 Tuesday, 10 / 6 / 2015 = 36.97 cfs 728 min 135,643 cuft = 73 Oft = 25.20 min Type II = 484 Q (cfs) - 40.00 30.00 20.00 10.00 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 13 47 Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civil 3D® 2014 by Autodesk, Inc. v10 3 Tuesday, 10 / 6 / 2015 Hyd. No. 14 ADD POST Hydrograph type = Combine Peak discharge = 167.07 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 652,248 cuft Inflow hyds. = 5, 8, 9, 10, 11, 12 Contrib. drain. area = 22.870 ac ADD POST Q (cfs) Hyd. No. 14 -- 100 Year Q (cfs) 180.00 180.00 160.00 160.00 i 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 - - - - -�— __ -�r 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Hyd No. 5 Hyd No. 8 Hyd No. 9 Time (min) Hyd No. 10 Hyd No. 11 Hyd No. 12 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Hyd. No. 15 POST -AREA 8 - OFFSITE Hydrograph type = SCS Runoff Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.670 ac Curve number Basin Slope = 0.0% Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 7.51 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 POST -AREA 8 - OFFSITE Hyd. No. 15 -- 100 Year 48 Tuesday, 10 / 6 / 2015 = 34.76 cfs = 732 min 150,219 cuft 76 Oft 31.00 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 15.00 10.00 � =oo 0.00 - - - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 15 OVERALL POST Q (cfs) Hyd. No. 16 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 m 120.00 90.00 - 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 16 Hyd No. 13 Hyd No. 14 49 Hydrograph Report Hydraf low Hydrographs Extension for AutoCAD® Civil 3D@2014 by Autodesk, Inc. v10.3 Tuesday, 10 / 6 / 2015 Hyd. No. 16 OVERALL POST Hydrograph type = Combine Peak discharge = 201.66 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 787,890 cuft Inflow hyds. = 13, 14 Contrib. drain. area = 8.670 ac OVERALL POST Q (cfs) Hyd. No. 16 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 m 120.00 90.00 - 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 16 Hyd No. 13 Hyd No. 14 Culvert Calculations CULVERT ANALYSIS Proposed as part of the Woodall Subdivision are two culverts known as North and South for the purposes of this study. The north culvert will replace an existing 18" at the project entrance. The south culvert will serve to drain the site along the western property boundary. A drainage area map is provided for reference. The peak flows were determined using the SCS Method, in conjunction with NOAA Atlas 14 rainfall data for Apex, was used to develop runoff hydrographs for the storm events. This method requires three basic parameters: a curve number (CN), time of concentration (tc), and drainage area. Composite curve numbers were developed based on soil type and land use. Soil types were delineated from the Soil Survey of Wake County, North Carolina (November 1970). Land use was assumed to be % acre lot residential for the drainage area. Times of concentration were calculated using the Kirpich method and based on Wake County topographic maps and field survey data. Due to the short flow path lengths, a 5 minute time of concentration was assigned to these drainage areas. Pondpack was used to generate the flows for the drainage area. Flowmaster was used to analyze the flows for the different storm events. Culvert sizes were determined based on the calculated flow to the culvert. Summary North Culvert 24" RCP Return Period Flow (Q) (CFS) 25 -year 34.4 100 -year 42.4 The theoretical capacity of the culvert flowing full is 44.3CFS. The culvert is sized using the 100 -year return period (Qloo = 42.4 CFS). The culvert is adequate for the estimated peak flow. South Culvert 48" RCP Return Period Flow (Q) (CFS) 25 -year 89.1 100 -year 112.1 The theoretical capacity of the culvert flowing full is 132.4 CFS. The culvert is sized using the 100 -year return period (Qloo = 112.1 CFS). The culvert is adequate for the estimated peak flow. Therefore, the culverts are designed to meets the requirements of the Town of Apex Standard Specifications. S { i Y'1 x•44 J� a .• 'y �, •f� i _J"'"• -4 i ;ITA7 r'! 11 lo ' . 1 I r tr 4 M3 1 F' � I r V � i ;r•• � r 1 1 I• i• � \ Y e �'r Job File: K: \14 \14- 0270 \140274- Woodall Tract \H -H \CULVERT FLOW.PPW Rain Dir: K: \14 \14- 0270 \140274- Woodall Tract \H -H\ JOB TITLE Project Date: 7/31/2015 Project Engineer: bmiller Project Title: Watershed Project Comments: SIN; Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:52 PM 8/3/2015 Table of Contents i Table of Contents NETWORK SUMMARIES (DETAILED) * * * * * * * * * * * * * ** Watershed....... 25 Executive Summary (Nodes) .......... 1.01 * * * * * * * * * * * * * * * * ** DESIGN STORMS SUMMARY * * * * * * * * * * * * * * * * * ** RDU 24 Hour Desi Design Storms ...................... 2.01 * * * * * * * * * * * * * * * * * * * * ** TC CALCULATIONS * * * * * * * * * * * * * * * * * * * ** NORTH CULVERT... Tc Calcs ........................... 3.01 SOUTHCULVERT... Tc Calcs ... ........................ 3.03 * * * * * * * * * * * * * * * * * * * * ** CN CALCULATIONS * * * * * * * * * * * * * * * * * * * ** NORTH CULVERT... Runoff CN -Area ..................... 4.01 SOUTH CULVERT... Runoff CN- Area ..................... 4.02 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:52 PM 6/3/2015 Type..., Executive Summary (Nodes) Page 1.01 Name.... Watershed Event: 25 yr File.... K: \14 \14- 0270 \140274 - Woodall Tract \H -H \Culvert flow.ppw Storm.,. RDU NOAA 25yr Tag: 25 NETWORK SUMMARY -- NODES (Trun.= HYG Truncation: Blank =None; L =Left; R =Rt; LR =Left 6 Rt) DEFAULT Design Storm File,ID = RDU 24 Hour Desi Storm Tag Name = 25 Data Type, File, ID = Time -Depth Curve RDU NOAA 25yr Storm Frequency = 25 yr Total Rainfall Depth= 5.9000 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs HYG Vol Qpeak Qpeak Max WSEL Node ID Type ac -ft Trun. -- hrs --------- cfs ft -------- --------- ----------------- NORTH CULVERT ____ ---------- AREA 1.934 12.1000 34.37 Outfall NORTH FLOW JCT 1.934 12.1000 34.37 SOUTH CULVERT AREA 7.598 12.2500 89.10 Outfall SOUTH FLOW JCT 7.598 12.2500 89.10 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:52 PM 8/3/2015 Type.... Design Storms Name.... RDU 24 Hour Desi Page 2.01 File.... K: \14 \14- 02'10\ 140274 - Woodall Tract \H -H \Culvert flow.ppw Title... Project Date: 7/31/2015 Project Engineer: bmiller Project Title: Watershed Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = Storm Tag Name = 25 RDU 24 Hour Desi Data Type, File, ID = Time -Depth Curve RDU NOAA 25yr Storm Frequency = 25 yr Total Rainfall Depth= 5.9000 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 100 Data Type, File, ID = Time -Depth Curve RDU NOAA 100yr Storm Frequency = 100 yr Total Rainfall Depth= 7.3700 in Duration Multiplier = 1 Resulting Duration = 23.9990 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9990 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.021.00) 1:52 PM 8/3/2015 Type.... Tc Calcs Name.... NORTH CULVERT Page 3.01 File.... K.\14\14-0270\140274-Woodall Tract\H-11\Culvert flow.ppw TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: User Defined Segment #1 Time; .0833 hrs — ---------- ------------------------- --------------------------------- S/N: Bentley PondPack (10.00.027.00) Total Tc: .0833 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs 1:52 PM Bentley systems, Inc. 8/3/2015 Type.... Tc Calcs Name.... NORTH CULVERT Page 3.02 File.... K: \14 \14- 02V0 \1402V4- Woodall Tract \H -H \Culvert flow.ppw Tc Equations used... User Defined Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:52 PM 8/3/2015 Type.... Tc Calcs Name.... SOUTH CULVERT Page 3.03 File.... K:\14\14-0270\140274-Woodall Tract\H-H\Culvert flow.ppw TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: User Defined Segment #1 Time: .2823 hrs --------- -------------------------- Total Tc: .2823 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:52 PM 8/3/2015 Type.... Tc Calcs Name.... SOUTH CULVERT Page 3.04 File.... K: \14 \14 -0270 \140274- Woodall Tract \H -H \Culvert flow.ppw __--- _r_.____ -_- - __ - -_ -- Tc Equations used... ___= User Defined Tc = Value entered by user Where: Tc = Time of concentration SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:52 PM 8/3/2015 Type.... Runoff CN -Area Name.... NORTH CULVERT Page 4.01 File.... K: \14 \14- 0270 \140274- Woodall Tract \H -H \Culvert flow.ppw RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil /Surface Description CN acres %C RUC CN - - Residential Districts - 1/4 acre 75 7.260 75.00 COMPOSITE AREA & WEIGHTED CN - - -> 7.260 75.00 (75) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1:52 PM 8/3/2015 Type.... Runoff CN -Area Name.... SOUTH CULVERT Page 4.02 File.... K: \14 \14- 0270 \140274- Woodall Tract \H -H \Culvert flow.ppw RUNOFF CURVE NUMBER DATA Impervious Area Adjustment Adjusted Soil /Surface Description CN acres %C %UC CN 4 Residential Districts - 1/4 acre 75 28.520 75.00 COMPOSITE AREA & WEIGHTED CN - - -> 28.520 75.00 (75) SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1 :52 PM 8/3/2015 Appendix A Index of Starting Page Numbers for ID Names - - - -- N - - - -- NORTH CULVERT... 3.01, 4.01 RDU 24 Hour Desi... 2.01 S SOUTH CULVERT... 3.03, 4.02, 1.01 A -1 SIN, Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 1 :52 PM 8/3/2015 Worksheet for Circular Pipe - South Pipe 25 year Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Diameter Discharge ftesult8 Normal Depth Flow Area Wetted Perimeter Hydraulic Radius Top Width Critical Depth Percent Full Critical Slope Velocity Velocity Head Specific Energy Froude Number Maximum Discharge Discharge Full Slope Full Flow Type GVF Input Data Downstream Depth Length Number Of Steps ow--01 0 too Upstream Depth Profile Description Profile Headloss Average End Depth Over Rise Normal Depth Over Rise Downstream Velocity Manning Formula Normal Depth SuperCritical 0.013 0.00850 ft/ft 4.00 ft 89.10 ft' /s 2.40 ft 7.88 ft' 7.09 ft 1.11 ft 3.92 ft 2.86 ft 60.1 % 0.00519 ft/ft 11.30 ft/s 1.99 ft 4.39 ft 1.41 142.45 ft /s 132.43 ft/s 0.00365 ft/ft 0.00 ft 0.00 ft 0 0.00 ft 0.00 ft 0.00 % 60.06 % Infinity ft/s Bentley Systems, Inc. Haestad Methods SolBiintldJAlllwMaster Val (SELECTserles 1) [08.11.01.031 7/31/2015 3:20:49 PM 27 Slemons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 2 Seasonal High Water Table Determination (By Others) SEASONAL HIGH WATER TABLE DETERMINATION Woodall Tract Wake County, North Carolina Catena Job # 7656 Prepared For: Ralph E. Sanders, P.E. Froehling & Robertson, Inc. 310 Hubert Street Raleigh, NC 27603 Prepared By: &%%LGThe roup 3l�1`�' 1000 Corporate Drive, Suite 101 Hillsborough, NC 27278 Tel (919) 732 -1300 July 30, 2015 i�'G John C. Ro INTRODUCTION FroehIing & Robertson, Inc. (F &R) is investigating the construction of two stormwater best management practice (BMP) devices within the Woodall Tract project site located on the south side of Apex Barbeque Road, Apex, Wake County, North Carolina. The stormwater BMPs are being considered to collect and treat runoff from adjacent impervious surfaces. As part of the application process, a soils investigation detailing soil type and depth to the seasonal high water table (SHWT) is required. Three Oaks Engineering I The Catena Group (Catena) has been retained to perform the soils investigation. INVESTIGATION METHODOLOGY The Wake County Soil Survey was referenced to get an overview of the possible soil series located within the study area. The Mayodan soil series is mapped at the BMP locations. Information for this soil series is listed in Table 1. The Natural Resource Conservation Service (MRCS) soil map is shown on Figure 1. Table 1. Map Unit Symbol, Soil Series, and Taxonomic Classification Map Unit Symbol Soil Series Taxonomic Class MgC2 Mayodan Fine, mixed, semiactive, thermic Typic Hapludults The field investigation was performed on July 27, 2015. Two (2) soil borings were advanced via a hand auger and their locations shown on the attached figure. Observations of the landscape (slope, drainage patterns, etc.) as well as soil properties (depth, texture, seasonal wetness, restrictive horizons, etc.) were recorded. Soil color was determined with a Munsell Soil Color Chart. RESULTS Soil Type and Depth to SHWT A soil series determination was made by comparing the soil boring descriptions to the NRCS Official Series Description and the results are listed in Table 2. Soil boring B1 and B2 are best described by the Mayodan soil series. Soil boring B 1 was positioned along a shoulder slope and the surface elevation estimated at 380 -ft based on the provided site plan. Soil boring 132 was positioned along a linear slope and the surface elevation estimated at 365 -ft. Soil characteristics indicative of a SHWT were not observed at either boring location. Full soil profile descriptions are attached. Table 2. Soil Series Determination and Depth to SHWT Soil Boring Soil Series # Determination B1 Mayodan B2 Mayodan SHWT (in. below existing surface) >84 >40 Estimated Surface Elevation at Boring Location (ft) 380 365 Woodall Tract SHWT July 30, 2015 Catena Job #7656 CONCLUSIONS The findings presented herein represent Catena's professional opinion based on our soil evaluation. Evidence of a SHWT was not observed at either boring location. This report is provided to assist in the application for stormwater wetland BMP's by providing the soil information. The Town of Apex, or equivalent permitting agency, must issue the final permit. Any concurrence with the findings in this report would be made at that time. Woodall Tract SHWT July 30, 2015 Catena Job #7656 Ell 6G 0 Alt -3- 7 70 TOW--M7.1' OW�30 Bap + r` f AC SHWT Test Location 1 7owE37s.tr er tow =388A' eow�e2a' 01 377.0 �t A� BOW - 382.4' _ 1 BMP 1 — POOLa375.60' --,S ' � 1 { / I a to I t SF 7 W= 300.0 *,m 11:4sA BOW - 3770 401, / Q / tEY WALL 2 �' 4 y�, °° /♦'""� GFE: ,3N.3' RET WALL, / �.�` RCA 1 4 M 366.0' WALL=M 4' „Q r. arc 37&0, CIO 5 '4 4 f k v r1p► 77 JII V IF W 1. � � � jr � CAE: 363.3 � rrE- 3570 / RFE 371.' RET WALL 6 ! Bow - 358.3' WALL 84,4• t RET WALL 7 4A FWE. 3 WE me �4 ` u I i 300.6 � , i `� ' • fiE: 375.' � GiIE. 378A' l I �� �' C8 3 T01N�38B.0• .- -.FFEi 576,5 FFU 371LG7' i E: 362.17' `! BOW= 363.1' 6FL• 366.5' I TOW-Mr I I , ! ^^ CB tB � TOW= 370.5 FICA 2 Bow�71.a Born -s66 a ca t C9 3 „ TOW�60.0 r 1 1 " 1 TOw- 384.0 TOW= 976.3' _ BOWz374.0' `` WALL ■3557. f t I BOW- 359.0' BOW--371.01 CB •t 7 V K _ RET WAIL 8 BMP 2 R SHWT Test Location 2 y is !4 i t TOW -370.5 011: 2 PO f BOw=36B.0 f� OL. =38d 60 </ 1 ,/� J Tts 363J) R15E ' • SHWT Test Location - 3 { } 3136 USDA -NRCS Mapped Soils `'�- ! ? MgC2 — Mayodan RET WALL 9 as wnl l = �= Wy - Worsham . TOW -wff 1130w MIX Dale: July Figure SHWT Determination July 2015 Woodall Tract sale �! Cotena o Z<.s 50 Feat Gsswp � � 33 Wake County, North Carolina J111 "°-: 7656 yf�tl�� SOIL EVALUATION FORM The Catena Group, Inc Catena Job: 76"--6, 1000 Corporate Drive, Suite 101 County: (0,/"C Hillsborough, NC 27278 Date: 7-,? 7- 919.732.1300 Sheet: / of i n _ _ Structure / Consistence / Matrix Mottle Colors Texture Mineralogy Color (Quantity, Size, Contrast, Color) JZ S k 5 VFR / Ns,NA DY�I 6 � _ 0 M / Sq. SS. S P VA Air I'm G G A _ 0 rUP_ k1 YL y/t b�l Yo rr L l�k f j s- SI" 0 Y 7 r i� o S H i./T f O" io9,011A fG 01 6,4 ?e-4?� -I- Evaluated 'by: G Q Permit No. �A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. [I, PROJECT INFORMATION Project name Woodall Subdivision Contact person Alicia Albini Phone number 919 -238 -0354 Date 9/30/2015 Drainage area number BMP 1 111. DESIGN INFORMATION Site Characteristics Drainage area 172,062 ft2 Impervious area, post - development 119,790 ft2 % impervious 69.62 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters 0.77 (unitless) Minimum volume required 9,697 ft3 Volume provided 10,496 ft3 Storage Volume: SA Waters 1.5" runoff volume ft3 Pre - development 1 -yr, 24 -hr runoff ft3 Post - development 1 -yr, 24 -hr runoff ft3 Minimum volume required ft3 Volume provided ft3 (to be provided by DWQ) o¢ W A TO9 3G gob OK, volume provided is equal to or in excess of volume required. Peak Flow Calculations Is the pre /post control of the 1 yr 24hr storm peak flow required? Y (Y or N) 1 -yr, 24 -hr rainfall depth 2.9 in Rational C, pre - development 0.30 (unitless) Rational C, post - development 0.77 (unitless) Rainfall intensity: 1 -yr, 24 -hr storm 0.12 in /hr OK Pre - development 1 -yr, 24 -hr peak flow 3.60 ft3 /sec Post - development 1 -yr, 24 -hr peak flow 0.40 ft3 /sec Pre /Post 1 -yr, 24 -hr peak flow control -3.20 ft3 /sec Elevations Temporary pool elevation 376.50 fmsl Permanent pool elevation 375.50 fmsl SHWT elevation (approx. at the perm. pool elevation) fmsl Top of 1 Oft vegetated shelf elevation 376.00 fmsl Bottom of 1 Oft vegetated shelf elevation 375.00 fmsl Sediment cleanout, top elevation (bottom of pond) 371.00 fmsl Sediment cleanout, bottom elevation 370.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state- required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Form SW401 -Wet Detention Basin -Rev 9- 4/18112 Parts I & 11 Design Summary, Page 1 of 2 Permit No. 111. DESIGN INFORMATION Surface Areas (to be provided by DWQ) Area, temporary pool 12,016 ft2 Area REQUIRED, permanent pool 6,882 ft2 SAIDA ratio 4.00 (unitless) Area PROVIDED, permanent pool, Ape" pool 9,882 ft2 OK Area, bottom of 1 Oft vegetated shelf, Abo, shell 7,905 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abol_ pond 3,062 ft2 Volumes Volume, temporary pool 10,496 ft3 OK Volume, permanent pool, Vperm pool 26,381 ft' Volume, forebay (sum of forebays if more than one forebay) 5,276 ft' Forebay % of permanent pool volume 20.0% % OK SA/DA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain /Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 4.00 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10 -2b) N (Y or N) Volume, permanent pool, Vperm-pool 26,381 ft' Area provided, permanent pool, Apem,_pool 9,882 ft2 Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, deV, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10 -2b) Y (Y or N) Area provided, permanent pool, Apem, -pool 9,882 ft2 Area, bottom of 1 Oft vegetated shelf, Abot shelf 7,905 ft2 Area, sediment cleanout, top elevation (bottom of pond). Abol -pond 3,062 ft2 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 4.00 ft Average depth calculated 3.00 ft OK Average depth used in SAIDA, de,, (Round to down to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1.50 in Area of orifice (if- non - circular) in Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 0.33 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) ( unitless) Length of weir (L) ft Driving head (H) ft Pre - development 1 -yr, 24 -hr peak flow 3.60 ft3 /sec Post - development 1 -yr, 24 -hr peak flow 0.40 ft'/sec Storage volume discharge rate (through discharge orifice or weir) 0.03 ft3 /sec Storage volume drawdown time 3.56 days OK, draws down in 2 -5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: DRAIN VALVE Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Parts I, & II. Design Summary, Page 2 of 2 Permit No. 1111, REQUIRED ITEMS CHECKLIST (to be provided by D WQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Part III. Required Items Checklist, Page 1 of 1 Page/ Plan Initials Sheet No. 1. Plans (1" 50' or larger) of the entire site showing: 3.0 ' 3, Design at ultimate build -out, Off -site drainage (if applicable), CW Ca�.lS Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, Maintenance access, �C Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross - section, * f Vegetation specification for planting shelf, and Filter strip. 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, &(0 Pretreatment and treatment areas, and .�' - Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified It.0 — 44. S on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. +cl —4.5 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 7 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement, l� 9. A copy of the deed restrictions (if required). �c,�•` 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Part III. Required Items Checklist, Page 1 of 1 Permit No. (to be provided by DWQ) O� VNAr R MGM o °� NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. L PROTECT INFORMATION Project name Woodall Subdivision Contact person Alicia Albini Phone number 919 - 238 -0354 Date 9/3/2015 Drainage area number BMP 2 II. DESIGN INFORMATION Site Characteristics Drainage area 360,241 ft' Impervious area, post - development 253,955 ft2 % impervious 70.50 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre - development 1 -yr, 24 -hr runoff Post- development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre /post control of the 1 yr 24hr storm peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre - development Rational C, post - development Rainfall intensity: 1 -yr, 24 -hr storm Pre - development 1 -yr, 24 -hr peak flow Post - development 1 -yr, 24 -hr peak flow Pre /Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state - required temp. pool? Elevation of the top of the additional volume 20,539 ft3 20.966 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.9 in 0.30 (unitless) 0.77 (unitless) 0.12 in /hr OK 7.60 ft3 /sec 1.20 ft3 /sec -6.40 ft3 /sec 362.30 fmsl 360.50 fmsl fmsl 361.00 fmsl 360.00 fmsl 356.00 fmsl 355.00 fmsl 1.00 ft (Y or N) fmsl Form SW401 -Wet Detention Basin -Rev 9- 4/18/12 Parts I. & 11 Design Summary, Page 1 of 2 Permit No. III. DESIGN INFORMATION Surface Areas Area, temporary pool 15,941 ft' Area REQUIRED, permanent pool 10,375 ft' SAIDA ratio 2.88 (unitless) Area PROVIDED, permanent pool, Apes pool 10,757 ft2 OK Area, bottom of 1 Oft vegetated shelf, Ab l shell 8,270 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abut�ond 2,532 ft' Volumes Volume, temporary pool 20,966 ft' OK Volume, permanent pool, Vpenpool 26,361 ft3 Volume, forebay (sum of forebays if more than one forebay) 5,272 ft3 Forebay % of permanent pool volume 20.0% % OK SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? N (Y or N) Mountain /Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.88 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10 -2b) N (Y or N) Volume, permanent pool, Vpenroo, 26,361 ft' Area provided, permanent pool, Apermyoo, 10,757 ft' Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, deV, (Round is nearest 0.5ft) ft Calculation option 2 used? (See Figure 10 -2b) Y (Y or N) Area provided, permanent pool, Apemi_ pool 10,757 ft' Area, bottom of loft vegetated shelf, Abot Shell 8,270 ft2 Area, sediment cleanout, top elevation (bottom of pond). Abo, -pond 2,532 fie "Depth" (distance b/w bottom of loft shelf and top of sediment) 4.00 ft Average depth calculated 3.00 ft OK Average depth used in SAIDA, deV, (Round to down to nearest 0 5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if- non - circular) in' Coefficient of discharge (Co) 0.60 (unitless) Driving head (He) 0.60 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C,) (unitless) Length of weir (L) ft Driving head (H) ft Pre - development 1 -yr, 24 -hr peak flow 7.60 ft'/sec Post - development 1 -yr, 24 -hr peak flow 1.20 ft'/sec Storage volume discharge rate (through discharge orifice or weir) 0.08 ft'/sec Storage volume drawdown time 2.98 days OK, draws down in 2 -5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 1D A OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: DRAIN VALVE (to be provided by DWQ) Form SW401 -Wet Detention Basin -Rev 9- 4116/12 Parts I & 11 Design Summary, Page 2 of 2 Permit No. Jill. REQUIRED ITEMS CHECKLIST (to be provided by D WQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. �., 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. —TO 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. if 4 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Part III. Required Items Checklist, Page 1 of 1 Nagel Plan Initials Sheet No. ` 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build -out, 5.9 Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1 " = 30' or larger) and details for the wet detention basin showing: 3 • _ Outlet structure with trash rack or similar, 4A 3.�� Maintenance access, - Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, 1--� Basin cross - section, •� Vegetation specification for planting shelf, and Filter strip. . �.D 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. �., 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. —TO 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. if 4 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401 -Wet Detention Basin- Rev.9- 4/18/12 Part III. Required Items Checklist, Page 1 of 1 AC? AA ?' C NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS -VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. 1. PROJECT INFORMATION Project name Woodall Subdivision Contact name Alicia Albini Phone number 919 - 238 -0354 Date September 11, 2015 Drainage area number BMP 2 11. DESIGN INFORMATION The purpose of the LS -VFS Buffer Rule: Diffuse Flow Stormwater enters LS -VFS from A BMP Type of VFS Protected riparian buffer (slope < 5 %) Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from the Drainage Area Drainage area ff Do not complete this section of the form. Impervious surface area ft Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 in/hr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10 -yr storm in/hr Do not complete this section of the form. Peak flow from the 10 -yr storm cfs Do not complete this section of the form. Design storm Pick one: Maximum amount of flow directed to the LS -VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other" responses above If Stormwater Enters the LS -VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 0.08 cfs Peak discharge from the BMP during the 10 -year storm 0.1 cfs Maximum capacity of a 100 -foot long LS -VFS 2 cfs Peak flow directed to the LS -VFS 0.1 cfs Is a flow bypass system going to be used? Y (Y or N) Explanation of any "Other" responses above Form SW401 - LS -VFS - 29June2012 - Rev. 10 page 1 of 3 LS -VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level lip provided Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10 -year storm) freeboard (during the 10 -year storm) Peak velocity in the channel during the 10 -yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above I I nt 150 sq It No forebay is required. OTHER in OTHER in 50 fUcfs 5 ft Ten feet is the minimum level spreader length. 12 It 50 ft 353.50 fmsl 351.00 fmsl 5.00 % N (Y or N) OK N (Y or N) Y (Y or N) Y (Y or N) Please provide plan details of flow splitter & supporting calcs. OTHER ft OTHER It OTHER ft OTHER It OTHER ft/sec Rip -rap N (Y or N) Y (Y or N) FLOW BYPASS IS VIA STORM PIPE AND OUTLET PROTECTION W 7 y (dining the 10-yr storm) ; I n1 I 4 � Iyt .inrT Form SW401 - LS -VFS - 29June2012 - Rev. 10 page 2 of 3 NI. REQUIRED ITEMS CHECKLIST EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. 2. Plan details (1 " = 30' or larger) for the level spreader showing: - Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downslope filter fabric. 4. Plan details of the flow splitting device and supporting calculations (if applicable). Initials EJ Page or plan sheet number and any notes: 'I 4P • Lao 5. A construction sequence that shows how the level spreader will be protected from - D <; sediment until the entire drainage area is stabilized. 6. If a non - engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0 &M) agreement. 3.i� -3.9 Form SW401 - LS -VFS - 29June2012 - Rev. 10 page 3 of 3 �a Ic F- W J_ LL W Q H W Q W GG W LL LL m Z Q oc a a W m H 0 Z J Q Q Z Y Z a m Y W W V C Q W F- (A Z O in a W LL cc LL. m cc Z W Q LL Q C) a W ~ J W Q W H � Q Z CC W Q W w a a cn � J W N W � J W 6L t; O L NJ W W Z W > O 0 W :7 Tir to ��Dq & W a cc `^ W W J > W J 0 � W Q Q � W Q W > ~ W J