Loading...
HomeMy WebLinkAbout20001195 Ver 15_Staff Comments_20150914From: Johnson, Alan Sent: Monday, September 14, 2015 11:17 AM To: 8urdette, Jennifer a Subject: FVV: Traffic Control Tower Attachments: AE[OK4 Letter to N[DVVR [LTAT[T 0 ll l5.pdf Went tothe site. Attached are the comments | requested. Streams are upper headwater area. Channel may be more an issue of SW runoff. Definitely intermittent. 6o ahead and issue. Securityconcernsandsite|inesareamajorissueindesign(avoidance|imitations) Alan From: Benton, Charles [maiKo:charlesbenton@aecom.onm] Sent: Friday, September 11, 2015 4:01 PM To: ]ohnson,Alan Cm: Burdette,]ennifera; Crysta|.CAmsch|er@usace.army.mi| Subject: RE: Traffic Control Tower Alan, Please find attached a letter and supporting figure with the information you requested. Essentially, we've presented several security constraints that prevent further reconfiguration of the site layout. We've also noted some additional site constraints that were considered during the design of this facility. I will send a hard copy as well. I have an electronic copy of the Airport Layout Plan, but the most I can reduce the size to is 17MB. Please let me know if you are able to receive a file this size via email. Please let me know if you have any questions regarding this information. 9MM Charlie Benton.PWG Natural Environment Lead I Senior Project Manager D 1-919-461-1435 C 1-919-946-3122 AECOM 16-0-0- Perimeter Park Drive Suite 400 www.a000m.00m AECOM and URS have joined together as one company. Learn more. From:]ohnson Alan [nlai Ito: kan.iohnson(d)ncdencoovl Sent: Tuesday, September O8, 2015 11:08 AM To: Benton, Charles Subject: Traffic Control Tower