Loading...
HomeMy WebLinkAbout20240672 Ver1_R-5777 C Craven February 7 2024_20240207ST�7E�. 05 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR February 6, 2024 US Army Corps of Engineers Washington Regulatory Field Office 2407 West 5th Street Washington, NC 27889-1000 J.R. "JOEY" HOPKINS SECRETARY NC Division of Water Resources 943 Washington Square Mall Washington, NC 27889 ATTN: Mr. Tom Steffens, NCDOT Coordinator ATTN: Mr. Garcy Ward, NCDOT Coordinator Subject: Application for Section 404 Individual Permit, Section 401 Water Quality Certification, and Neuse Riparian Buffer Authorization for the proposed Upgrade to US 70 from Thurman Road to the Havelock Bypass in Craven County. STIP No. R- 5777C. Debit $570 from WBS 44648.1.4 Dear Sirs: The North Carolina Department of Transportation (NCDOT) proposes to upgrade the existing US 70 through Craven County. The Preferred Alternative originates at the northern terminus to the Havelock Bypass (STIP No. R-1015) and continues to east of Thurman Road (SR 1116) at the southern terminus to the US 70 Improvements in James City (U-5713/R5777A&B) in Craven County, North Carolina. The purpose of this letter is to request approval for a Section 404 Individual Permit, Section 401 Water Quality Certification, and Neuse Riparian Buffer Authorization. In addition to this cover letter, this application package includes the following: ENG Form 4345, stormwater management plan, permit drawings, roadway plans, State Historic Preservation Office (SHPO) concurrence letter, North Carolina Division of Mitigation Services (NCDMS) Acceptance Letter, and 4B/4C meeting minutes. Purpose and Need This project is one of several that NCDOT is working on to improve the US 70 corridor, with the intent to improve regional mobility and provide better connectivity between Raleigh and the seaport at Morehead City, as well as to the military bases in Havelock and Goldsboro and to the Global Transpark in Kinston. 2015 Fixing America's Surface Transportation Act designated US 70 from I-40 in Garner to the port at Morehead City as a high -priority corridor and future interstate (1-42). The intent of the 1-42 designation is to benefit military interconnectivity, aid in economic development, create jobs and stimulate growth in travel and tourism. In addition, US 70 is a designated hurricane evacuation route between the coast and the 1-95 interchange in Johnston County. The purpose of this project is to add additional capacity and access management improvements to the US 70 corridor through Craven County, with the goal of providing local and regional benefits in traffic operations and economic development. In addition, the project will address local community concerns related to connectivity, access, and modal choice, including walking and biking. Mailing Address: Telephone: (919) 707-6000 Location: NC DEPARTMENT OF TRANSPORTATION Fax: (919) 212-5785 1000 BIRCH RIDGE DRIVE ENVIRONMENTAL ANALYSIS UNIT Customer Service: 1-877-368-4968 RALEIGH NC 27610 1598 MAIL SERVICE CENTER Website: www.ncdot.gov RALEIGH NC 27699-1598 Project Description The NCDOT proposes to upgrade US 70 to interstate standards from the Havelock Bypass (STIP No. R- 1015) to the east of Thurman Road (S.R. 1116) in Craven County, North Carolina. Improvements include upgrading US 70 to interstate standards and constructing service roads as needed within the project study area. The project is located within the planning jurisdictions of the City of Havelock, the City of New Bern, and Craven County. The project would upgrade US 70 to interstate standards for a distance of approximately 7 miles with grade - separated interchanges at three locations: Stately Pines Road (S.R. 1106), West Fisher Road/East Fisher Avenue (S.R. 1104), and West Camp Kiro Road/East Camp Kiro Road (S.R. 1112). Existing driveway connections, intersections, and median crossovers will be removed, and service roads will be extended along portions of the project to provide access for property owners and to ensure mobility for local traffic. At the interchanges, roundabouts will be constructed where the US 70 on/off ramps connect to the intersecting cross streets. Detailed descriptions of the proposed improvements are described below in the Proposed Improvements section. Project Schedule R-5777C Construction Let was January 2023. The project is anticipated to be completed by June 7, 2028. Right-of-way acquisition began in June of 2023 and construction is scheduled to begin in the second quarter of 2025. NEPA Document Status The Type III Categorical Exclusion (CE) was certified on June 1, 2021, for the R-5777C project. An update to the CE was provided through a Right -of -Way Consultation, on August 18, 2022. It was determined that the proposed project is essentially the same as the proposed action described in the original CE. While this project was not in the merger process, 4B and 4C interagency meetings were completed during the design process. These documents are available at hiips:Hxfer.services.ncdot.gov/pdea/EnvironmentalDocs. Independent Utility The project has the following characteristics of independent utility: 1) The project connects logical termini and is of sufficient length to address environmental matters on a broad scope. 2) The project is a useable and reasonable expenditure, even if no additional transportation improvements are made in the area. 3) The project does not restrict consideration of alternatives for other reasonably foreseeable transportation improvements. Summary of Impacts The CE anticipated that the Preferred Alternative would result in 1,579 linear feet of permanent impact to jurisdictional streams and 1.73 acres of permanent impact to jurisdictional wetlands. The current design prepared by the NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent practicable. Proposed permanent impacts to jurisdictional areas total 1.555 acres of permanent wetland impacts. Additionally, there is one wetland feature (WP) that is not being directly impacted in its entirety but is being counted as a total take for the portion west of service road SRY4D, for a total of 0.039 acre. Including the total take, proposed permanent impacts to jurisdictional wetlands total 1.594 acres of permanent wetland impacts. There will be 1,558 linear feet of permanent stream impacts (including 436 feet of intermittent streams, 926 feet of perennial streams and 196 feet of bank stabilization). There will be 355 linear feet of temporary stream impacts (including 177 feet of intermittent streams and 178 feet of perennial streams) and 0.409 acre of temporary hand clearing impacts in wetlands. There are 162,336 sq. ft. of riparian buffer impacts (including 102,956 sq. ft. in Zone 1 and 59,380 sq. ft. in Zone 2). Table 1. R-5777C Jurisdictional Resources Impacts Impact Wetlands (ac) Streams (If) Riparian Buffer (sq. ft.) Zones 1/2 Type Perm Temp Perm Temp Zone 1 Zone 2 Neuse River Basin 1.594 0.409 1,558 355 102,956 59,380 (HUC 03020204 Summary of Mitigation The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent possible. The proposed construction of R-5777C will result in unavoidable impacts to jurisdictional streams, riparian wetlands, non -riparian wetlands, and Neuse River riparian buffers. The impact totals for R-5777C are shown in Tables 3-6 below. NCDOT is utilizing NCDMS for compensatory mitigation for R-5777C. North Carolina Division of Water Resources (NCDWR) mitigation requirements for permanent stream and wetland impacts at the 1:1 ratio will be met under the United States Army Corps of Engineers (USAGE) mitigation requirement ratio of 2: 1. Mitigation for the total take of Wetland WP, west of SRY41) at Site 20, will be mitigated at the 1:1 ratio. Mitigation for Neuse River riparian buffers in Zone 2 will be mitigated at the 1.5:1 ratio and Neuse River riparian buffers in Zone 1 will be mitigated at the 3:1 ratio. Mitigation is not proposed for bank stabilization. Resource Status Water Resources Classification The study area is located in the Piedmont Physiographic region of North Carolina. Jurisdictional features within the project footprint are located in the Neuse River Basin {USGS Hydrologic Unit Code (HUC) 030202041 in Craven County. Table 2. R-5777C Impacted Jurisdictional Streams Stream Name Number of Impacted Unnamed Tributaries (UT) NCDWR Index Number NCDWR Classification Goodwin Creek N/A 27-112-6-2 SC; Sw; NSW Otter Creek N/A 27-108 SC; Sw; NSW UT to Otter Creek 6 27-108 SC; Sw; NSW UT to Great Branch 1 27-101-40-3 C; Sw; NSW UT to Brice Creek 2 27-101-40-(1) C; Sw; NSW UT to Neuse River 1 27- 104 SB; Sw; NSW There are no Outstanding Resource Waters (ORW), High Quality Waters (HQW), WS-I waters, or WS-II waters within 8 miles upstream or downstream of the study area. There are no streams within or 1.0 mile downstream of the project area listed on the North Carolina 2022 Final 303(d) list of impaired waters for sedimentation and turbidity. Detailed information about the type and quality of the streams can be found in the Natural Resources Technical Report (NRTR, 2020). No stream that flows through the study area is designated as a National Wild and Scenic River or a State Natural and Scenic River. Jurisdictional Determination Wetland delineations for the R-5777C project followed the 1987 Corps of Engineers Wetland Delineation Manual (Environmental Laboratory, 1987) and the Regional Supplement to the Corps of Engineers Delineation: Atlantic and Gulf Coastal Plain Region. Stream identification and classification followed the NCDWR publication Identification Methods for the Origins of Intermittent and Perennial Streams. Wetland and stream delineations were conducted for TIP R-5777C between June 2019 and November 2021. Wetland and stream delineations were verified by the USACE and NCDWR in December 2019 and March of 2020. At this time, the USACE and NCDWR have not provided written verification of the resources within the R-5777C project. Impacts to Jurisdictional Resources Utility Impacts Project construction will entail the relocation of various utilities. A separate set of Utility Permit Impact Drawings and Utility Buffer Impact Drawings are attached, and the totals are included in Tables 3 through 5 below. Underground utilities that cross features and are not accounted for at an impact site will be installed through trenchless installation methods to avoid impacts to these features. Jurisdictional Impacts Tables 3 through 5 provide individual site impact amounts for wetlands, surface waters, and Neuse River riparian buffers. The detailed permit drawings for R-5777C provide the station number, structure size/type, and type of impact associated with each site. All impacts associated with R-5777C are located within the Neuse River Basin. Table 3. Wetland Impacts Permit Drawing Site Number NRTR Label Impact Type Wetland Type Permanent Impacts (ac.) Temporary Impacts (ac.) 1 WA Fill Riparian 0.005 1 WA Mechanized Clearing Riparian 0.006 2 WB Mechanized Clearing Riparian 0.010 2 WB Mechanized Clearing Riparian 0.001 3 WC Fill Riparian 0.007 4 WD Mechanized Clearing Riparian 0.001 5 WE Fill Riparian 0.494 5 WE Mechanized Clearing Riparian 0.080 5 WE Hand Clearing Riparian 0.001 6 WE Fill Riparian 0.121 6 WE Mechanized Clearing Riparian 0.030 Permit Drawing Site Number NRTR Label Impact Type Wetland Type Permanent Impacts (ac.) Temporary Impacts (ac.) 6 WE Hand Clearing Riparian 0.032 7 WE Fill Riparian 0.126 7 WE Mechanized Clearing Riparian 0.050 7 WE Hand Clearing Riparian 0.043 8 WF Mechanized Clearing Riparian 0.007 9 WG Fill Riparian 0.062 9 WG Mechanized Clearing Riparian 0.014 9 WG Hand Clearing Riparian 0.004 10 WRR Mechanized Clearing Riparian 0.002 10 WRR Hand Clearing Riparian 0.002 10 WRR Fill Riparian 0.013 10 WRR Excavation Riparian 0.010 10 WRR Hand Clearing Riparian 0.029 15 WJ Fill Riparian 0.099 15 WJ Excavation Riparian 0.043 15 WJ Mechanized Clearing Riparian 0.033 15 WJ Hand Clearing Riparian 0.089 17 WL Fill Riparian 0.004 17 WL Excavation Riparian 0.019 17 WL Mechanized Clearing Riparian 0.016 19 WN Fill Riparian 0.022 19 WN Mechanized Clearing Riparian 0.025 19 WN Fill Riparian 0.010 19 WN Mechanized Clearing Riparian 0.012 20 WP Fill Non -riparian 0.069 20 WP Mechanized Clearing Non -riparian 0.008 20 WP Hand Clearing Non -riparian 0.005 22 WY Fill Riparian 0.138 22 WY Mechanized Clearing Riparian 0.018 22 WY Hand Clearing Riparian 0.019 Utility Site 4 WD Hand Clearing Riparian 0.037 Utility Site 6 WE Hand Clearing Riparian 0.065 Utility Site 9 WG Hand Clearing Riparian 0.018 Utility Site 10 WRR Hand Clearing Riparian 0.029 Utility Site 20 WP Hand Clearing Non -riparian 0.032 Utility Site 24 WAA Hand Clearing Riparian 0.001 Utility Site 25 WQQ Hand Clearing Riparian 0.003 20 WP Total Take I Non -riparian 0.039 HUC 03020204 Impact Total 1.594 0.409 Hand Clearing 0.409 Total Requiring Mitigation 1.594 Table 4. Surface Water Impacts Permit Drawing Site Number NRTR Label Impact Type Stream Flow Permanent Surface Water Impacts (If) Temporary Surface Water Impacts (If) 1 Goodwin Creek RCBC Perennial 40 1 Goodwin Creek Fill Perennial 19 19 1 Goodwin Creek Fill Perennial 54 11 7 SA RCP Perennial 6 15 7 SA RCP Perennial 91 7 SA Dewatering Perennial 15 7 SA Bank Stabilization Perennial 20 7 SA Dewatering Perennial 13 7 SA Bank Stabilization Perennial 25 7 SA RCP Perennial 156 7 SA Dewatering Perennial 9 7 SA Bank Stabilization Perennial 20 7 SA Fill Perennial 34 17 8 SB RCBC Intermittent 23 15 8 SB RCBC Intennittent 67 8 SB Dewatering Intennittent 22 8 SB Bank Stabilization Intermittent 30 8 SB Dewatering Intermittent 28 8 SB Bank Stabilization Intermittent 30 11 SC* RCP Intermittent 14 11 SC* Fill Intermittent 12 15 12 SD RCP Perennial 105 12 SD Dewatering Perennial 20 12 SD Bank Stabilization Perennial 16 13 SP* RCP Intermittent 18 13 SP* Fill Intermittent 20 11 14 SF RCBC Intermittent 7 14 SF Dewatering Intennittent 18 14 SF Bank Stabilization Intennittent 25 14 SF Dewatering Intermittent 10 14 SF Bank Stabilization Intermittent 30 14 SF RCBC Intermittent 11 14 SF Fill Intennittent 31 21 16 SG* RCP Intenmittent 33 16 SG* Fill Intermittent 20 7 18 SE* RCP Perennial 223 18 SE* Fill Perennial 26 10 18 SE* Fill Perennial 16 21 21 Si* RCP Intermittent 64 21 Si* Fill Intermittent 23 12 23 SO RCP Intermittent 93 18 24 Otter Creek RCP Perennial 126 18 24 Otter Creek Fill Perennial 30 10 HUC 03020204 Intermittent Stream Bank Stabilization 115 Perennial Stream Bank Stabilization 81 �4& Intermittent Streams** 436 177 Perennial Streams** 926 178 Intermittent Stream Mitigation 232 Perennial Stream Mitigation 661 Total Requiring Mitigation 893 * Mitigation not required based on agency field review. ** Stream impacts without bank stabilization. Table 5. Riparian Buffer Impacts Allowable Mitigable Wetlands in Buffer Buffer Drawing Site NRTR Label Zone 1 (sq. .) Zone 2 (sq. .) Zone 1 sq• f.) Zone 2 sq• f.) Zone 1 (sq. .) Zone 2 (sq. . )Number 1 Goodwin Creek 4,341 1,002 7 SA 14,348 9,430 1 23 7 SA 15,634 7,634 8,046 74 8 SB 4,861 3,266 8 SB 9,174 5,173 258 11 SC 4,005 2,651 12 SD 8,412 5,612 12 SD 3,451 2,307 13 SP 3,072 1,628 14 SF 5,968 3,782 14 SF 4,729 3,323 16 SG 3,802 1,503 23 SO 5,493 3,518 24 Otter Creek 10,307 3,839 Utility Site 7 SA 257 695 Utility Site 8 SB 1,289 1,471 Utility Site 23 SO 2,117 1,423 Utility Site 24 1 Otter Creek 1,696 1,123 HUC 03020204 Totals 36,379 18,853 66,577 40,527 8,305 97 Total Buffer Impacts Requiring Mitigation 58,272 40,430 Mitigation Options The NCDOT is committed to incorporating all reasonable and practicable design features to avoid and minimize jurisdictional impacts, and to provide full compensatory mitigation of all remaining, unavoidable jurisdictional impacts. Avoidance measures were taken during planning and NEPA compliance stages; minimization measures were incorporated as part of the project design. Avoidance and Minimization: All jurisdictional features were delineated, field verified, and surveyed within the corridor for R-5777C. Using these features, preliminary designs were adjusted to avoid and/or minimize impacts to jurisdictional areas. NCDOT employs many strategies to avoid and minimize impacts to jurisdictional areas in all of its designs. Avoidance and minimization measures for R-5777C were further discussed during the 4B and 4C meetings and are being implemented to the maximum extent practicable. Additional avoidance and minimization measures are listed below. • A Stormwater Management Plan (SWMP) has been created for the project and is included in this package with the permit drawings. • All major structures have been designed to minimize environmental and surface water impacts as much as practicable. • Key elements of the SWMP included the construction of permanent basins and the use of grassed swales for stormwater treatment. Six detention basins were used throughout the project and primarily designed to provide stormwater treatment and minimize pre/post impacts. 0 Grassed swales were used for treatment when BMP design standards in sensitive watersheds could be met. 0 Grassed swales were used to reduce flow velocity, promote sedimentation infiltration and runoff attenuation; discharge velocities at jurisdictional features are non -erosive. Utilities will be installed through trenchless installation methods where practicable. 0 Where possible, utilities were placed within the proposed roadway fill limits to avoid additional impacts. • Box culverts will be buried 1 foot below the existing streambed and backfilled with native streambed material. • Borrow and waste activities will occur outside of jurisdictional features. • No staging of construction equipment or storage of construction supplies in jurisdictional wetlands or streams. • 3:1 slopes are used in wetland areas where possible. • Hand clearing proposed at wetland locations where feasible. • Rip rap pads are used at all storm drain system outlets to dissipate energy and reduce velocities. Combensatory Mitigation: The NCDOT has avoided and minimized impacts to jurisdictional resources to the greatest extent practicable. The proposed construction of R-5777C will result in unavoidable permanent impacts to 1.594 acres of riparian/non-riparian wetlands, 893 linear feet of jurisdictional streams, and 98,702 sq. ft. of riparian buffers that will require mitigation. The wetland, stream, and buffer impacts are in the 8 digit hydrologic unit 03020204 of the Neuse River Basin. The NCDMS will provide compensatory mitigation for the unavoidable impacts to wetlands, streams, and riparian buffers (see attached NCDMS letter of acceptance). Table 6. R-5777C Proposed Compensatory Mitigation Riparian Non -Riparian Riparian Buffer (sq. ft.) Mitigation Type Wetlands (ac) Wetlands (ac) Streams (If) Zones 1/2 Zone 1 Zone 2 Neuse River Basin 1.478 0.116 893 58,272 40,430 HUC 03020204 Federally Protected Species The United States Fish and Wildlife Service (USFWS) Information for Planning and Consultation (IPaC) Environmental Conservation Online System (ECOS) identified federally protected species protected by the Endangered Species Act (ESA) within the study area. For each species, the presence or absence of habitat is included below along with the Biological Conclusion rendered based on survey results. Table 7. ESA federally protected species potentially occurring within the Study Area' Scientific Name Common Name Federal Status Habitat Present Biological Conclusion Alligator mississippiensis American alligator T S/A Yes Not Required Calidris canutus rufa rufa red knot T Yes No Effect Chelonia m das green sea turtle T No No Effect Dermochel s coriacea leatherback sea turtle E No No Effect Laterallus jamaicensis jamaicensis eastern black rail T No No Effect L simachia as erulae olia rough -leaved loosestrife E Yes No Effect M otis se tentrionalis northern long-eared bat E Yes MA-LAA Necturus lewisi Neuse River waterdog T No MA-NLAA Perim otis sub avus tricolored bat PE Yes MA-LAA Picoides borealis red -cockaded woodpecker E Yes No Effect Trichechus manatus West Indian manatee T No No Effect 1 IPaC data checked on January 12, 2024 E — Endangered, T — Threatened, T(S/A) — Threatened due to Similarity of Appearance, PE — Proposed endangered, MA-LAA — May Affect, Likely to Adversely Affect, MA-NLAA — May Affect, Not Likely to Adversely Affect. Biological Conclusions for ESA Listed Species The CE addressed the analysis of potential effects on federally protected species. Since the CE was approved there have been changes in status of several species that were listed or proposed for listing in the study area. The Neuse River waterdog was proposed for listing when the CE was approved and has now been officially listed as Threatened. The status of northern long-eared bat (NLEB) was changed from Threatened to Endangered. Tricolored bat has been proposed for listing as Endangered within the study area. Several species have been removed as potentially occurring within the study area including Atlantic sturgeon, Carolina madtom, shortnose sturgeon, and sensitive joint -vetch. It was determined that the project will have No Effect on all the officially listed species except for the northern long-eared bat and tricolored bat which both had a biological conclusion of May Affect, Likely to Adversely Affect (MA-LAA) and Neuse River waterdog which had a biological conclusion of May Affect, Not Likely to Adversely Affect (MA-NLAA); see Table 7. Rufa red knot Suitable intertidal marine and estuarine shoreline habitat for the rufa red knot is present within the study area. This area is located where USFS property abuts the Neuse River at Fisher's Landing Campground. Sandy, intertidal beaches occur throughout this section of shoreline, making it a suitable migration stopover location. However, due to the location of the shoreline distance from the project construction boundary, the project will not affect the rufa red knot. Rufa red knot surveys were conducted on April 8 and April 16 of 2020. No rufa red knots were observed during these two spring migration surveys. A review of the October 2, 2023 NCNHP dataset indicates no known rufa red knot occurrences within 1.0 mile of the study area. Rough -leaved loosestrife Suitable habitat for rough -leaved loosestrife does exist in the study area along roadside rights -of -way, within utility corridors, and along sufficiently sunlit upland/wetland interfaces. Three Oaks staff conducted plant -by -plant surveys for rough -leaved loosestrife June 5-6, 2019. No plants were observed. An additional survey is planned for mid -May 2024 to update the 2019 survey and confirm biological conclusion. A review of the October 2, 2023 NCNHP dataset indicates no known rough -leaved loosestrife occurrences within 1.0 mile of the study area. Northern long-eared bat The USFWS has issued a programmatic biological opinion (PBO) in conjunction with the Federal Highway Administration (FHWA), the US Army Corps of Engineers (USAGE), and NCDOT for the northern long- eared bat (NLEB) (Myotis septentrionalis) in eastern North Carolina. The PBO covers the entire NCDOT program in Divisions 1-8, including all NCDOT projects and activities. Although this programmatic covers Divisions 1-8, The USFWS only considers NLEBs to be known or potentially found in 30 counties within Divisions 1-8. NCDOT, FHWA, and USACE have agreed to two conservation measures which will avoid/minimize mortality of NLEBs. These conservation measures only apply to the 30 current known/potential counties shown on Figure 2 of the PBO at this time. The programmatic determination for NLEB for the NCDOT program is May Affect, Likely to Adversely Affect. The PBO will ensure compliance with Section 7 of the Endangered Species Act for ten years (effective through December 31, 2030) for all NCDOT projects with a federal nexus in Divisions 1-8, which includes Craven County, where R-5777C is located. Neuse River waterdog The Neuse River waterdog (NRWD) is listed as a Threatened Species. A NRWD Survey Report was completed for this project in which a biological conclusion of May Affect, Not Likely to Adversely Affect (MA-NLAA) was reached on March 6, 2020. A Neuse River Waterdog Habitat Assessment Memo was completed to update the 2020 report for the R-5777C. A biological conclusion of May Affect not Likely to Adversely Affect remains valid for this species. In a letter dated January 17, 2024 the USFWS concurred that the project would not likely adversely affect the Neuse River Waterdog. Tricolored bat The USFWS has issued a programmatic conference opinion (PCO) in conjunction with the Federal Highway Administration (FHWA), the US Army Corps of Engineers (USACE), and NCDOT for the tricolored bat (TCB) (Perimyotis subflavus) in eastern North Carolina. The PCO covers the entire NCDOT program in Divisions 1-8, including all NCDOT projects and activities. NCDOT, FHWA, and USACE have agreed to three conservation measures (listed in the PCO) which will avoid/minimize take to TCBs. These conservation measures apply to all counties in Divisions 1-8. The programmatic determination for TCB for the NCDOT program is May Affect, Likely to Adversely Affect. Once the TCB is officially listed, the PCO will become the programmatic biological opinion (PBO) by formal request from FHWA and USACE. The PBO will ensure compliance with Section 7 of the ESA for approximately five years (effective through December 31, 2028) for all NCDOT projects with a federal nexus in Divisions 1-8, which includes Craven County, where R-5777C is located. Red -cockaded woodpecker Suitable nesting (open to semi -open pine stands > 60 years of age) and foraging (open to semi -open pine stands > 30 years of age) habitat for the red -cockaded woodpecker (RCW) does exist in the study area. These forests receive prescribed fire treatments every 3-6 years and possess the necessary mid -story and groundcover vegetative structure required by the red -cockaded woodpecker. Due to the presence of suitable habitat within the study area, Three Oaks staff conducted RCW surveys within a half -mile radius of suitable habitat located within the study area. RCW surveys were conducted November 20-21, 2019 and January 29-30 and February 17, 2020. A report documenting the results of these surveys is provided in Appendix C. No RCW's or RCW cavities were found within the study area. One potential RCW start -cavity was found within a half -mile of the study area on USFS property but was later determined by USFS staff to be the product of pileated woodpecker activity as opposed to that of an RCW; however, USFS staff indicated they would monitor the start -cavity to ensure this was indeed pileated woodpecker activity. A review of the October 2, 2023 NCNHP dataset indicates no known RCW occurrences within 1.0 mile of the study area. Bald and Golden Eagle Protection Act (BGPA In the July 9, 2007, Federal Register (72:37346-37372), the bald eagle was declared recovered and removed (de -listed) from the federal list of threatened and endangered wildlife. This delisting took effect on August 8, 2007. After delisting, the Bald and Golden Eagle Protection Act (16 U.S.C. 668-668d) became the primary law protecting bald eagles. Surveys of the study area and the area within 660 feet of the project limits took place on November 20-21, 2019 and April 8 and April 16 of 2020. Surveys concluded that the proposed project has potential foraging areas within 1.0 mile from the study area but will have no impact on the bald eagle due to the absence of nest sites. A review of the October 2, 2023 NCNHP dataset identified a historic record from 1971 within one mile of the study area. Although this occurrence occurs within the study area, the lack of nests or observed eagles and the minimal impact anticipated, it has been determined that this project will not affect this species. Moratoria No streams are subject to the anadromous fish construction moratorium within the proposed project construction limits. Essential Fish Habitat The project will not impact any Essential Fish Habitat (EFH) identified by the National Marine Fisheries Service (NMFS), and NMFS has not requested further consultation regarding EFH. Cultural Resources In March 2020, NCDOT architectural historians conducted an intensive -level survey of the two properties identified (Tom Haywood Store (CV1044) and Croatan Presbyterian Church (CV 1385) in which they were both determined not eligible for NRHP listing. The SHPO concurred with this finding on May 6, 2020. Site 31CV241 is recommended eligible for the National Register of Historic Places (NRHP). The archaeological site will not be impacted by the proposed design. Final Plans will identify the location of High -Visibility Fencing (HVF) along the Proposed Right of Way/Control of Access (ROW/CA) or Easement, whichever extends farthest into Parcel# 6-011-019 (U.S. Government Property, Deed Book 0336, Deed Page 0061), beyond which will be labeled as: "PROTECTED AREA." High -Visibility Fencing will be installed prior to any clearing and grubbing operations, will be maintained for the construction duration, and will not be removed until final project inspection. Indirect and Cumulative Effects Potential indirect and cumulative effects (ICE) attributable to the upgrade to US 70 from Thurman Road to the Havelock Bypass project were analyzed in the CE. The project is anticipated to lead to a reduction in travel time along the mainline, US 70. Population and employment within the project area are expected to grow, but at modest rates, and local planners anticipate that available land will be developed over time, whether the project is constructed or not. The City of New Bern, the City of Havelock, and Craven County have plans and ordinances in place to effectively manage growth and development while protecting natural resources within the project area. It is anticipated that the project will not notably contribute to cumulative impacts to environmental resources in the project area. The potential for the degradation of water quality does exist through erosion and stream sedimentation. The stormwater management plan details measures taken to avoid and minimize these potential project related impacts. The notable natural environmental features found within the project area are provided multiple protections under state and federal laws and local permitting ordinances. The cumulative effect of this project when considered in the context of other past, present, and future actions, and the resulting impact on the notable human and natural features, will not notably contribute to cumulative impacts to environmental resources in the project area. Direct natural environmental impacts by NCDOT are minimized to the maximum extent practicable while still serving the purpose of the project. All future development will be required to follow local, state, and federal guidelines and permitting regulations. No significant indirect or cumulative impacts to water quality are anticipated due to the construction of the R-5777C project. FEMA Compliance The project has been coordinated with appropriate state and local officials and the Federal Emergency Management Agency (FEMA) to assure compliance with FEMA, state, and local floodway regulations. Regulatory Approvals Section 404: Application is hereby made for a USACE Individual 404 Permit as required for the above described activities. Section 401: We are requesting a Section 401 Water Quality Certification from NCDWR. We are providing this application to NCDEQ, for their approval. Authorization to debit the $570 Permit Application Fee from WBS Element WBS 44648.1.4 is hereby given. CAMA: Under separate cover, NCDOT is submitting a request for a CAMA Federal Consistency Review from the N. C. Division of Coastal Management for R-5777C. A copy of this permit application and its distribution list will be posted on the NCDOT website at: https:Hconnect.ncdot.gov/resources/Environmental Thank you for your assistance with this project. If you have any questions or need additional information, please contact Deanna Riffey at driffey@ncdot.gov (919) 707-6151. Sincerely, Michael Turchy !' Environmental Coordinating and Permitting Group Leader cc: NCDOT Permit Application Standard Distribution List U.S. Army Corps of Engineers (USACE) Form Approved - APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB No. 0710-0003 33 CFR 325. The proponent agency is CECW-CO-R. Expires: 01-08-2018 The public reporting burden for this collection of information, OMB Control Number 0710-0003, is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections(a)mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR APPLICATION TO THE ABOVE EMAIL. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. System of Record Notice (SORN). The information received is entered into our permit tracking database and a SORN has been completed (SORN #A1145b) and may be accessed at the following website: http://dpcld.defense.gov/Privacy/SORNslndex/DOD-wide-SORN-Article-View/Article/570115/al l45b-ce.aspx (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) First - Michael Middle - Last - Turchy First - Middle - Last - Company - NCDOT - Environmental Coordination and Permitting Company - E-mail Address - E-mail Address - 6. APPLICANT'S ADDRESS: 9. AGENT'S ADDRESS: Address- 1598 Mail Service Center Address - City -Raleigh State -NC Zip -27699 Country -USA City - State - Zip - Country - 7. APPLICANT'S PHONE NOs. w/AREA CODE 10. AGENTS PHONE NOs. w/AREA CODE a. Residence b. Business c. Fax a. Residence b. Business c. Fax (919) 707-6157 STATEMENT OF AUTHORIZATION 11. 1 hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. SIGNATURE OF APPLICANT DATE NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) R-5777C (Upgrade to U.S. 70 from Thurman Road to Havelock Bypass, Craven County) 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRESS (if applicable) UT to Neuse River, UT to Brice Creek, Goodwin Creek, Otter Creek Address 15. LOCATION OF PROJECT Latitude: -N 34.988740 Longitude: -W-76.981956 City - State- Zip- 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) State Tax Parcel ID Municipality Section - Township - Range - ENG FORM 4345, MAY 2018 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 3 17. DIRECTIONS TO THE SITE Please see attached vicinity map. 18. Nature of Activity (Description of project, include all features) Construction of US 70 Improvements in Craven County, North Carolina. The preferred alternative begins at the Havelock Bypass (STIP No. R-1015) and ends east of Thurman Road (S.R. 1116), in Craven County. Interchanges will be constructed at Stately Pines Road (S.R. 1106), West Fisher Road/East Fisher Avenue (S.R. 1104), and West Camp Kiro Road/East Camp Kiro Road (S.R. 1112). Full control of access is proposed. 19. Project Purpose (Describe the reason or purpose of the project, see instructions) The purpose of the project is to improve the traffic operations along the US 70 corridor and enhance regional connectivity in eastern North Carolina USE BLOCKS 20-23 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge Wetlands and streams will be impacted by construction activities, i.e., widening of road, interchanges, new locations, utility relocations, and installation of drainage structures 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Type Type Amount in Cubic Yards Amount in Cubic Yards Amount in Cubic Yards See attached cover letter. 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres See attached cover letter. or Linear Feet See attached cover letter. 23. Description of Avoidance, Minimization, and Compensation (see instructions) See attached cover letter. ENG FORM 4345, MAY 2018 Page 2 of 3 24. Is Any Portion of the Work Already Complete? ❑ Yes �X No IF YES, DESCRIBE THE COMPLETED WORK 25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- See attached list City - State - Zip - b. Address - City - State - Zip - c. Address - City - State - Zip - d. Address - City - State - Zip - e. Address - City - State - Zip - 26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL' IDENTIFICATION DATE APPLIED DATE APPROVED DATE DENIED NUMBER " Would include but is not restricted to zoning, building, and flood plain permits 27. Application is hereby made for permit or permits to authorize the work described in this application. I certify that this information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. -February-2024 SIGNATURE OF APPLIC T DATE SIGNATURE OF AGENT DATE The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, MAY 2018 Page 3 of 3 Minutes from the Interagency 413 Hydraulic Design and Permit Review Meeting R-5777C - Craven County NCDOT CCA Technical Services Conference Room Col. C11 (Teams Hybrid) July 12, 2023 Team Members: Tom Steffens, USACE Garcy Ward, NCDWR Susan Locklear, NCDWR Stephen Lane, NCDCM Cathy Brittingham, NCDCM Travis Wilson, NC WRC James Harrison, NCDEQ Amanetta Somerville, EPA John Mintz, NCDCR Lindsay Ferrante, NCDCR Renee Gledhill -Earley, NCDRC Minutes (present) (present) (present) (present) (present) (present) (present) (not present) (not present) (not present) (not present) Participants: Cadmus Capehart, NCDOT Division 2 DCE Jordan Scott, NCDOT Division 2 Assist. DCE Casey Whitley, NCDOT Division 2 PDU David Kramer, NCDOT Division 2 Utilities Byron Kyle, NCDOT DBU Mike Sanderson, NCDOT EPU Ray Lovinggood, NCDOT HU Wes Chandler, NCDOT REU Kristy Alford, NCDOT SMU Philip Harris, NCDOT George Hoops, FHWA Chris Rivenbark, RK&K Paul Cameron, HNTB Pete Distefano, Balfour Beatty Adam Freeman, STV Joshua Kotheimer, STV Brian Elam, Sungate Design Group Jake Stanovich, Sungate Design Group Tom Steffens opened the meeting and introductions were made by all in conference room attendance. Adam Freeman provided a brief overview of the project's purpose and roadway design elements. Brian Elam provided an overview of water bodies for which the project drains and stated that treatment would be obtained mostly through grassed swales in the median and outside ditches. He proceeded through the project plan sheets 4 through 33, reviewing 30% drainage design and site photos. General • Garcy Ward stated that the Stormwater Management plan would be required with the grassed swale section completed for buffered areas requiring treatment. • Garcy Ward noted that some proposed ditch notes referenced the wrong ditch details throughout the plans. • Tom Steffens noted throughout the plans that directional flow arrows of waterways appeared to be incorrect in the FS file. o The design build team will put together an FS file revision request for flow arrows that need to be corrected. • Rip rap dissipator pads in wetlands should be shown to scale throughout the project. • Tom Steffens noted plan sheet matchlines that needed to be added to clarify plan sheet orientations around interchange sheet 7. o Adam Freeman to have matchlines added or text corrected as noted. • Brian Elam stated that rip rap toe protection was used throughout the project in wetland and buffer areas, where natural ground slopes toward the proposed roadway fill. It was concurred that rip rap toe protection should be shown only on the fill slopes in wetland areas. • Tom Steffens inquired about the use of end walls at the outlet ends of large pipe crossings. The topic was discussed. Ray Lovinggood confirmed that the NCDOT Hydraulics Unit does not have a guideline or policy requiring the use of end walls at pipe outlets. Brian Elam mentioned that they were used in several areas throughout the project to shorten pipe lengths only where ROW or other nearby features were a concern. o Cadmus Capehart to get back with the design build team regarding Division 2 preference on use of end walls for large pipe outlets. • Brian Elam asked if the use of geotextile fabric would be acceptable under rip rap in the stream bed where channel stabilization is proposed. The topic was discussed. Tom Steffens and Garcy Ward agreed that it was acceptable to use geotextile under rip rap stabilization in jurisdictional streams. • Proposed drainage from the adjoining R-5777A&B project to be shown where applicable on plan sheets 25-28. Plan Sheet 4: • No comments. Plan Sheet 5: • Garcy Ward noted that proposed ditches were shown through wetlands along the west side of-SRY1B-. Garcy and Tom stated that the proposed ditch depths should be minimized to avoid adverse impacts to wetlands. o Brian Elam stated that the proposed ditch was necessary to replace an existing ditch and convey offsite drainage. Ditch depths to be minimized to match existing. • Brian Elam stated that an existing scour hole was present in Goodwin Creek, just downstream of the existing 3'x4' RCBC under SR 1162. Rip rap scour hole and bank stabilization will be used in Goodwin Creek at the proposed RCBC outlet. o Garcy Ward stated that rip rap in outlet scour hole should be set at natural stream bed elevation. • Discussed alignment of culvert and phasing for RCBC at 15+12 -L-. Brian Elam stated that the existing 48" RCP would be temporarily extended upstream so the proposed RCBC could be constructed without having to convey flow through the RCBC during construction. • Jordan Scott asked if drainage area to Goodwin Creek was increasing. o Brian Elam answered that drainage area to the Goodwin Creek outfall would match pre/post and that preliminary pre/post peak flow was within the acceptable NCDOT tolerance. ■ Drainage design to this outfall is still progressing and an outfall analysis will be provided with the 100% drainage submittal. • Tom Steffens noted that access to the existing cemetery in the quadrant between - L- and -SRYC- may be compromised by removal of an existing drive pipe. Tom also asked to be sure to keep CA fence outside of cemetery boundary. o Brian Elam asked if the existing pipe could be retained to avoid potential impacts to the cemetery. ■ Cadmus stated that Division 2 would need to investigate condition. • Brian Elam — Pipe will be shown as replacement in drainage plans. o Adam Freeman stated that the fence was drawn along the boundary during the pursuit and will be revised to be outside the boundary of the cemetery. • Established existing ditches along SRY1C and replacing cross pipes. • Susan Locklear asked about the 24" pipe size to the left of the RCBC outlet. Brian Elam mentioned that it may be reduced to an 18" in final design. • Established that swale over proposed RCBC would be ok for design. Plan Sheet 6: • Reviewed and discussed proposed 42" RCP under-SRY1C- and impacts to wetland WC. o Brian Elam stated that the proposed pipe will be set at the same inlet and outlet elevation as the existing and rip rap placed in wetland WC at outlet. o Tom Steffens stated that the pipe should not be set below wetland substrate elevation. Rip rap to be shown to scale at outlet. • Reviewed and verified the drainage area for the existing 24" RCP under US 70 goes to same Goodwin Creek outfall. Plan Sheet 7: • Garcy Ward asked about the pipe system discharging to Stream SA at Ramp D, just downstream of the proposed cross pipe. o Brian Elam stated that piping was used in lieu of new ditches to avoid ditching through the buffer and asked if a ditch would be a better option than piping. Garcy responded that ditching would be acceptable as long as treatment was attained prior to entering the buffer and erosive velocities were not a concern. If drainage can be ditched try to ditch on one side of - Y1RPD-, as opposed to both. • Brian Elam brought to attention that Stream SA gets steep and goes underground just downstream of the-SRYIDY3C- cross pipe. Although not currently shown with rip rap in the bed, Brian recommended stream channel stabilization be considered at the outlet due to potential for high velocities. o Garcy Ward, Travis Wilson — Verified that rip rap in the bed at this outfall would be acceptable. • Tom Steffens — Acceptable to use toe protection from approximate station 14+40 to 16+15-SRYIDY3C- RT, at pipe outlet, where proposed ditch daylights just above the wetland boundary. Plan Sheet 8: • Brian Elam stated that toe protection in wetland WG along-SRYIDY3C- will be adjusted to fill slope only. o Ray Lovinggood asked that applicable details also be corrected to show the rip rap only on the fill slope in wetland areas. Plan Sheet 9: • Verified treatment will be provided for swales flowing towards proposed 2GI's in the grassed median. • Brian Elam mentioned that wetland WRR was shown to be encroaching into the edge of pavement along Manners Beach Road. A request was made to review limits of this wetland. Plan Sheet 10: • Cross pipe at station 94+57 -L-, conveying Stream SD, discussed. Brian Elam stated that there was not enough room between the proposed outlet and an existing 48" HDPE, conveying flow offsite, to provide an open channel. An OTCB will be used to connect the new cross pipe to the existing 48" HDPE. Brian asked if there was any benefit to burying the inlet side of the proposed cross pipe if the outlet end could not be buried. Are there concerns with potential head cut? o Garcy Ward and Travis Wilson agreed that it would be acceptable not to bury the inlet end of the proposed cross pipe. o Ray Lovinggood concurred with Garcy and Travis regarding non -burial. o Travis Wilson asked if the proposed pipe would be perched inside the OTCB. Brian Elam answered that it would not be perched, and inverts would be matched. • Garcy questioned the gap in Stream SD just upstream of US 70. o Brian Elam to add this site to existing list of corrections need in FS and WET files. Plan Sheet 11 - 16: • No comments. Plan Sheet 17: • Proposed RCBC crossings under -L- and-SRY4B- discussed. o Tom Steffens questioned the purpose of the additional wildlife crossing barrel under -L-. Travis Wilson stated that the wildlife crossing barrel was a request from the Forest Service. Plan Sheet 18: • Garcy Ward stated that basins are allowable in zone 2 with prior authorization given that treatment requirements are being met. However, if zone 1 vegetation is impacted by the presence of the basin in zone 2, then the basin is not allowable. Preferred to keep basins completely out of buffer zones. Plan Sheet 19: • Discussed wetland WL and ditching. Tom asked about existing drainage patterns. Brian responded that existing roadway ditch spills to wetland and ultimately drains to cross pipe under River Bluffs Drive. Existing ditch and cross pipe elevations to be maintained to the maximum extent practical. Plan Sheet 20: • Brian Elam stated that Stream SE was highly degraded just upstream of the existing US 70 cross pipe and rip rap would be used in the proposed inlet channel to stabilize. Photos reviewed and discussed. Cadmus and Division 2 staff was not aware of previous maintenance issues here. • Tom Steffens questioned bank stabilization detail 20-5 and the statement "press riprap into the Channel Bottom Until Refusal". o Verbiage to be refined to remove "Until Refusal" requirement. Plan Sheet 24: • Ray Lovinggood agreed with use of end walls where proposed pipes were close to existing railroad ROW. • Wetland WP and impacts created by the-SRY4D- alignment and proposed 36" cross pipe discussed. o Tom Steffens asked if an equalizer pipe was necessary or if it would be better to move the proposed 36" cross pipe down to the wetland. ■ Brian Elam responded that moving the proposed 36" cross pipe would result in need for ditching through the wetland. • Tom Steffens requested that the 36" cross pipe be realigned with the existing ditch and wetland be left as is to spill to new cross pipe. Wetland WP, west of-SRY4-, should be considered a total take. • Susan Locklear inquired if the Fred Scott Smith parcel cornered by-SRY4B- and -Y4- would be a total take by right-of-way to be used as an infiltration site. o Brian Elam stated that it appears there may be an existing septic system on the property and that Dry Detention Basins #7 (between SRY413 and Y4RPB) and #8 (between SRY4A and Y4RPA) would be used in lieu of the parcel to treat stormwater and promote infiltration. • Tom Steffens — Inquired about property access being removed in the Camp Kiro interchange quadrants C & D. o Brian Elam responded that those parcels losing access due to the new location of the ramps would be receiving access on the opposite end of the parcel via service roads. o Adam Freeman responded that it was NCDOT policy not to provide driveways to existing parcels that did not currently have access. Plan Sheet 22 - 25: • No comments. Plan Sheet 26: • Tom Steffens questioned existing drainage patterns around wetland WY. Specifically, if an existing ditch drained towards the RR and if the project was redirecting that drainage. o Design Build Team to investigate drainage patterns as flow arrows could be incorrect. Brian Elam responded that the proposed design does not divert and water draining towards the rail eventually gets back to the US 70 cross pipe via Stream SJ. • Garcy asked that drainage to be installed under the previously permitted R- 5777A/B project should be shown for clarity. Plan Sheet 27 - 31: • No comments. Plan Sheet 32: • Stream SO and Otter Creek crossing under -Y1- reviewed and existing topography challenges discussed. o Request to extend Stream SO location upstream of the project already sent. Garcy asked that Otter Creek, downstream of the -Y1- alignment, location be revised to connect gap. • Pete Distefano mentioned that the 2 cross pipes conveying Otter Creek and Stream SO under -Y1- may be lengthened for traffic and construction phasing purposes. Plan Sheet 33: • No comments. -Meeting Adjourned. Minutes from the Interagency 4C Hydraulic Design and Permit Review Meeting R-5777C - Craven County NCDOT CCA Structures Conference Room Col. C4 (Teams Hybrid) December 13, 2023 Team Members: Tom Steffens, USACE (present) Garcy Ward, NCDWR (present) Susan Locklear, NCDWR (present) Stephen Lane, NCDCM (present) Cathy Brittingham, NCDCM (present) Travis Wilson, NC WRC (present) James Harrison, NCDEQ (not present) Amanetta Somerville, EPA (not present) Renee Gledhill -Earley, NCDNCR (not present) Minutes Participants: Cadmus Capehart, NCDOT Division 2 DCE Jordan Scott, NCDOT Division 2 Assist. DCE Brad McMannen, NCDOT Division 2 RE Byron Kyle, NCDOT DBU Malcolm Watson, NCDOT DBU Todd Lapham, NCDOT DBU Paul Mohler, NCDOT EAU Deanna Riffey, NCDOT ECAP Mike Sanderson, NCDOT EPU Ray Lovinggood, NCDOT HU Kristy Alford, NCDOT SMU Dylan Clark, NC OSA Mandy Posgai, NC OSA Luan Cao, NC SHPO Allyson Conner, USFS Chris Rivenbark, RK&K Paul Cameron, HNTB Jon Nance, Mott MacDonald Pete Distefano, Balfour Beatty Keith Nixon, Balfour Beatty Kevin Bailey, STV Adam Freeman, STV Joshua Kotheimer, STV Chris Sheldon, STV Brian Elam, Sungate Design Group Jake Stanovich, Sungate Design Group Mike Sanderson opened the meeting and introductions were made by all in conference room attendance and on Microsoft Teams. Kevin Bailey provided a brief overview of the project's purpose and roadway design elements. Brian Elam proceeded through the wetland and surface water and buffer drawings for both project roadway and utility impacts. General • Ray Lovinggood asked who the lead agency was for the project. o It was discussed and ultimately Tom Steffens replied that it was the FHWA. • Susan Locklear asked if the NC-SELDM Catalog had been used for the project. o Brian Elam replied that a preliminary run had been set up but not completed project wide. He identified that treatment for the project would be provided via grass swales and 6 dry detention basins. o Susan asked if at a minimum that the largest, most critical crossings could be evaluated using the NC-SELDM Catalog. o Brian Elam replied that Sungate Design Group would use the tool and review output on several of the larger jurisdictional crossings. o It was mentioned that the project may pre -date NC-SELDM. • Dylan Clark remarked the Office of State Archaeology would work with the NCDOT Environmental Analysis Unit regarding historic cemeteries within impact areas and buffers. • Chris Rivenbark requested that all quantities shown in the impact summary tables be shown to the thousandth, which differs from guidance found in the current version of NCDOT's Permit Drawing Guidelines. • Deanna Riffey mentioned that someone from REU needed to review the permit drawings and recommend any additional quantities that may be needed for hand clearing. o Chris Rivenbark remarked that a token increase would be around 10%. o Kevin Bailey mentioned that he already had REU listed to receive the revised permit drawings incorporating the comments made during the 4C meeting. • Brian Elam asked about showing buffer zone lines in the Wetland and Stream Permit Drawings. o Tom Steffens and Garcy Ward said to leave the lines in the plan set. ■ Decision is consistent with statement in the current NCDOT Permit Drawing Guidelines, "Riparian Buffer Zones should be reflected on the wetland / stream permit plan view". Wetland and Stream Permit Drawings Stormater Management Plan: • Garcy Ward asked if rock checks could be added to the swale ending at 25+70 - SRY4B- RT on PSH 17, which showed up orange in the SMP. o Brian Elam confirmed that Sungate Design Group would add water quality rock checks at this site. Site 1 (Sheet 3 of 87): • Garcy Ward asked if the median ditch goes over top of the culvert. o Brian Elam responded that the median ditches on both sides of the culvert (Upstream: Between -L- and-SRY1B-; Downstream: Between -L- and - SRY1C-) flow over top of the RCBC and reviewed on permit drawings sheet 9. • Deanna Riffey asked if the inlet channel could be identified as bank stabilization. o Discussed that the channel is being relocated and could not be described as only bank stabilization. Inlet channel detail to remain as shown. • Tom Steffens asked if the ditch, right of the culvert inlet channel, was lined with rip rap. o Brian Elam responded that the last 180ft of the ditch was rip rapped due to the steeper grade. • Deanna Riffey asked if the portion of the existing channel upstream of the inlet channel needed bank stabilization. o The area was reviewed and discussed. Ultimately it was decided that the inlet channel and rip rap would remain as currently shown. • Tom Steffens asked if the boundary to the cemetery on roadway sheet 5 would be marked. If so, notation should be added to the plans. o Cadmus Capehart expanded the question by asking the confidence of the current cemetery boundary. o Paul Mohler said that he had placed the boundary based on gps points. o Byron Kyle said that L&S would check and verify the location of the boundary. ■ A follow up virtual Teams meeting was held on 12115 with Byron Kyle, Kevin Bailey, Paul Mohler, Joshua Kotheimer, Brian Elam, Jon Nance and Adam Freeman. Byron mentioned that that a shapefile was available delineating the GPSpoints. The shapefile will be compared to the Final Survey to verify consistency. Site 2 (Sheet 3 of 87): • Garcy Ward mentioned the wetland boundary polygon had changed since the 4B meeting. o Brian Elam mentioned there were 2 wetland files for the project. One used gps points to delineate the wetland boundaries (R-5777C_WET.dgn), whereas the other used survey shots to establish the boundaries (r5777c_nat wet s.dgn). o Byron Kyle confirmed that the "wet s" file used survey shots to establish the wetland boundaries. o Tom Steffens noted that the permits should show the surveyed wetlands. Site 3 (Sheet 10 of 87): • Brian Elam mentioned that the provided set of permit drawings did not include a representative cross section sheet for the site 3 wetland impacts. A cross section sheet will be added in the final permit drawing for site 3. • No additional comments. Site 4 (Sheet 10 of 87) • No comments. Site 5 (Sheet 13 of 87): • Brian Elam stated that during preliminary permit drawing reviews a potential for reducing wetland impacts was identified inside the -Y1- Loop D alignment, where 4:1 fill slopes were currently being used. o Cadmus Capehart stated that 4:1's were preferred by NCDOT for maintenance and slope stability. o Tom Steffens asked which quantity was being reported in the summary. ■ Brian Elam replied that the 4:1 quantity was being reported. o Garcy Ward noted that DWR does not typically allow slopes shallower than 3:1 within wetland areas. o Deanna Riffey asked if this was the only area on the project where a 4:1 slope was being used in a wetland. Brian Elam responded that it was. o Cadmus Capehart confirmed that using 3:1 slopes in the -Y1- Loop D area, with toe protection, would be acceptable. • In preliminary permit drawing reviews, Chris Rivenbark identified a potential wetland restoration site where existing Stately Pines Road splits wetland WE. o Tom Steffens asked if there were any other similar situations on the project. Brian Elam stated that there were not. The limited potential acreage of restoration was discussed. o Cadmus Capehart said that he would prefer not to have a permanent easement in the area requiring maintenance. o All concurred to leave the 3ft base ditch as shown. Site 6 (Sheet 13 of 87): • No comments. Site 7 (Sheet 13 of 87): • In regard to the-SRYIDY3C- pipe crossing, Tom Steffens asked how the contractor could pump from the mechanized clearing area to the hand clearing area for excavation. o Pete Distefano replied that since it is a low flow area, a machine would not be needed. o Deanna Riffey asked if excavation is expected in the area and what was happening with the small portion of wetland outside of the easement. ■ Brian Elam replied that no excavation is expected in the hand clearing area and that the small portion outside of the easement would not be impacted during construction and is outside of right of way and construction easement. o Tom Steffens stated to leave the area as hand clearing but would need to be reviewed during construction if methods of dewatering change. Site 8 (Sheet 29 of 87): • Deanna Riffey asked if the outlet channel for the most upstream box culvert under -L- could be described as bank stabilization. o Garcy Ward expanded on the question by asking if the rip -rap would be placed below the ordinary highwater mark, and if so, then it should be shown as a stream impact and not described as bank stabilization. o Brian Elam explained the proposed culvert outlet channel detail shows rip - rap to be embedded below the channel bottom, therefore it would be below the ordinary highwater mark. o The decision to leave the detail as shown was agreed upon by everyone and the stream impact, for the outlet channel of the -L- box culvert, would not be described as bank stabilization. • Brian Elam mentioned that the provided set of permit drawings did not include a representative cross section sheet for the site 8 wetland impacts. A cross section sheet will be added in the final permit drawing for site 8. Site 9 (Sheet 29 of 87): • No comments. Site 10 (Sheet 29 of 87): • No comments. Site 11 (Sheet 36 of 87): • No comments. Site 12 (Sheet 40 of 87): • Garcy Ward wanted to verify that the unburied 60" pipe would be at bed elevation and not perched. o Brian Elam confirmed the pipe would be at bed elevation and not perched. • Garcy Ward asked about what was happening with the special grading median ditch ending —50' short of the inlet side of the 60" pipe. o Brian Elam confirmed that the ditch was above the pipe and ties to the typical median ditch between -L- and the service road. • Meeting attendees were informed that the inlet side PUE would be going away since PNG would be responsible for obtaining PUE for their gas line relocation. o Chris Rivenbark remarked that it was typical to account for any utility relocation impacts that are required for construction of the project. ■ Stephen Lane agreed and said any impacts caused by the project need to be shown and accounted for despite the responsible party. • Stream / wetland and buffer impacts associated with utility relocations will be shown and separate Utility Permit Drawings. o Paul Mohler said the area to the plan view right side of the inlet needed to be cleared with the NC Forest Service, regarding Section 106 properties. ■ A follow up virtual Teams meeting was held on 12115 with Byron Kyle, Kevin Bailey, Paul Mohler, Joshua Kotheimer, Brian Elam, Jon Nance and Adam Freeman. Potential encroachment into Archaeological Site 31 CV241 at permit Site 12 was discussed. Paul Mohler stated no additional investigation of the archeological site would be necessary if the limits of construction remained within 65ft of the existing right of way. There will need to be high visibility fencing installed along the easement line to protect the archeological site from additional impacts. Site 13 (Sheet 40 of 87): • No comments. Site 14 (Sheet 45 of 87): • No comments. Site 15 (Sheet 45 of 87): • No comments. Site 16 (Sheet 54 of 87): • No comments. Site 17 (Sheet 58 of 87): • No comments. Site 18 (Sheet 62 of 87): • Deanna Riffey asked if the outlet channel should be noted as bank stabilization. o Brian Elam confirmed that since the channel was being relocated, the proper detail and notation was used. Site 19 (Sheet 62 of 87): • No comments. Site 20 (Sheet 66 of 87): • Tom Steffens asked that the quantities be divided between what is permanent wetland fill and what will be total take due to loss of function (2:1 vs. 1:1 mitigation). o Deanna Riffey had the same request. o Both expressed a desire to add notes to plans or summary to indicate what portion applied to what ratio. o Garcy asked if we should shade the area that will be a total take. Chris Rivenbark recommended not shading or hatching the total take area, stating that on past projects if a wetland area has been hatched in the plans, it indicates to the contractor that it is ok to impact. o Everyone agreed that the note in the summary table should be amended to state that the total take acreage is not accounted for in the impact summary table and add "Fill MIT=2:1" and "Total Take MIT=1:1". Site 21 (Sheet 73 of 87): • No comments. Site 22 (Sheet 77 of 87): • No comments. Site 23 (Sheet 82 of 87): • No comments. Site 24 (Sheet 82 of 87): • No comments. Impact Summary (Sheets 84 — 87) • No additional comments. Buffer Permit Drawings Site 1 (Sheet 2 of 13): • Garcy Ward asked what the ditch clean out notes included. o Brian Elam said it included lowering the ditch bottom to provide positive slope for filled in ditches and that the side slopes in the existing ditch were flat. o Everyone agreed that a note be added to indicate that slopes "3:1 or flatter" should be used. • Deanna Riffey asked if the inlet side of the culvert was included. o Brian Elam stated that Goodwin Creek, upstream of US 70, was not subject to the Neuse River Buffers. o Deanna Riffey inquired about the reason it was not buffered upstream of US 70. o Brian Elam commented that it either did not show up as a blue line in the USGS map or a brown line on the soils map. Josh confirmed this was consistent with the PJD and NRTR. Site 7 (Sheet 3 of 13): Garcy Ward asked if the top portion of the impacts could be reduced. o Chris Rivenbark asked if a gap should be shown around the existing utilities. ■ Deanna Riffey had the same concerns. o Everyone agreed that the impacts would remain as shown. • Garcy Ward asked that transition stone be shown for the roadway drainage system entering the buffer on the right side of the outlet. o Brian Elam replied that transition stone would be added. Site 8 (Sheet 6 of 13): • Deanna Riffey asked if impacts within the buffers to the wood line was needed. o Susan Locklear asked if there would be disturbance in the area. ■ Garcy Ward commented that if it would be disturbed, then the impact must be shown. ■ Chris Rivenbark remarked that despite the area being maintained as it is now, the use of the buffer would change from utility to roadway. Therefore, it should be shown. o Everyone agreed that the area discussed would remain hatched as buffer impacts. Site 11 (Sheet 7 of 13): • No comments. Site 12 (Sheet 8 of 13): • Brian Elam stated that the PUE and construction easements at the site would be reduced in the final permit drawing set, thus reducing the buffer impacts. Site 13 (Sheet 8 of 13): • Garcy Ward remarked that the existing gravel to proposed gravel driveways did not need to be shown. He added that existing soil driveways to proposed gravel did need be shown. o Brian Elam confirmed that these changes would be made throughout the project. ■ Adjustments to buffer impacts for existing driveways applied to Site 1, Site 13 and Site 16. Site 14 (Sheet 9 of 13): • No comments. Site 16 (Sheet 10 of 13): • See Site 13 comments above. Site 23 and 24 (Sheet 11 of 13): • Garcy Ward and Chris Rivenbark requested the mitigable quantities be moved to the allowable quantities for site 24. o Garcy Ward remarked that moving the PUE clearing required for utilities should not cause the quantities to be pushed over due to different use. Utility Wetland and Stream Permit Drawings Site 4 (Sheet 2 of 14): • No comments. Site 6 (Sheet 4 of 14): 0 No comments. Site 10 (Sheet 7 of 14): • Chris Rivenbark asked for all of the utility pole impacts to be shown as fill in the wetland and to report the area based on the size of the proposed utility pole symbol. o Stephen Lane agrees. o Brian Elam said Sungate Design Group would change the quantities as requested. Site 25 (Sheet 9 of 14): • No comments. Site 20 (Sheet 10 of 14): • No comments. Site 24 (Sheet 13 of 14): • No comments. Impact Summary (Sheet 14 of 14): • Chris Rivenbark said to keep the utility pole impacts as a note due to power pole structures being accounted for differently. Utility Buffer Permit Drawings General • Garcy Ward asked if there were any areas where the PUE buffer impacts were strictly underground or aerial. o Each PUE area within a buffer was looked at and determined that both underground and aerial impacts were present at each site. Site 7 (Sheet 2 of 7): 9 No comments. Site 8 (Sheet 4 of 7): • No comments. Site 12 (Sheet 5 of 7): • This site will be going away. See "Site 12 (Sheet 40 of 87)" comments under the "Wetland and Stream Permit Drawings" section above. Site 23 (Sheet 6 of 7): • No comments. Impact Summary (Sheet 7 of 7): • Chris Rivenbark asked for all the checks under the "type" column be removed. At the conclusion of the meeting, Kevin Bailey mentioned that the USACOE 404 permit application needed to be submitted by mid -January to maintain the schedule. Meeting Adjourned. DocuSign Envelope ID: A4879A5F-F593-4FB5-8E36-49F92ECF75D7 North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Secretary Susi H. Hamilton May 6, 2020 MEMORANDUM TO: Mary Pope Furr, Senior Architectural Historian NCDOT/EAU/Historic Architecture Group FROM: Renee Gledhill -Earley Environmental Review Coordinator Office of Archives and History Deputy Secretary Kevin Cherry mfurrkncdot.gov SUBJECT: Historic Structures Survey Report, R-5777C, US 70 Improvements from SR 1116 (Thurman Road) to the Havelock Bypass, Craven County, ER 20-0790 Thank you for your March 30, 2020, memorandum transmitting the above -referenced report. We have reviewed the submittal and offer the following comments. We concur that the following properties are not eligible for listing in the National Register of Historic Places due to the loss of historic integrity and not possessing the level of significance necessary to meet the National Register Criteria for Evaluation. ■ Tom Haywood Store, 6241 East US 70 Highway (CV1044) ■ Croatan Presbyterian Church, 6375 East US 70 Highway (CV1385) All other identified resources, listed in the Appendix, do not warrant further evaluation due to lack of historic significance and/or integrity. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill -Earley, environmental review coordinator, at 919-814-6579 or environmental. reviewng,ncdcr.gov. In all future communication concerning this project, please cite the above referenced tracking number. Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 DocuSign Envelope ID: A4879A5F-F593-4FB5-8E36-49F92ECF75D7 Project Tracking No.: 19-03-0022 o4 ARCHAEOLOGICAL SURVEY REQUIRED FORM ' This form only pertains to ARCHAEOLOGICAL RESOURCES for this project. It is not _ , valid for Historic Architecture and Landscapes. You must consult separately with the Historic Architecture and Landscapes Group. 'Cl PROJECT INFORMATION Project No: R-5777C County: Craven WBSNo: 44648.1.4 Document: Federal CE F.A. No: N/A Funding: ® State ❑ Federal Federal Permit Required? ® Yes ❑ No Permit Type: USACE (anticipated) Project Description: NCDOT's Division 2 proposes to improve US 70 from east of East Thurman Road to the proposed Havelock Bypass in Craven County. Upgrading the roadway to a freeway and constructing service roads will help facilitate better traffic flow, decrease congestion, and accommodate future interstate standards. Since Preliminary Design Plans have not been developed yet, a large Study Area has been generated in order to facilitate environmental planning purposes at this stage. The Study Area varies greatly in width along the corridor, encompassing about 1,105 acres, inclusive of the existing roadway and any modern development. SUMMARY OF ARCHAEOLOGICAL RESOURCES REVIEW: SURVEYREQUIRED Brief description of review activities, results of review, and conclusions: This project was accepted for review on Wednesday, April 3, 2019. Background information for the Study Area has been compiled from various sources beginning on Thursday, April 4, to Monday, April 15, 2019. Portions of the Study Area have been previously surveyed as part of NCDOT's Havelock Bypass Project (TIP# R-1015), previous US 70 improvements (TIP# R-5777 [PAs 17-09-0015 and 17-09- 0016]), and USFS Timber Sales (Flanner Beach Compartment [OSA Biblio# 2962]). As a result of those surveys as well as others conducted in the area, over 50 archaeological sites have been recorded within a half -mile buffer of the Study Area, several of which have been deemed eligible for the National Register of Historic Places (NRHP). Digital copies of HPO's maps (Havelock, New Bern, Upper Broad Creek, and Catfish Lake Quadrangles) as well as the HPOWEB GIS Service (http://gis.ncdcr.gov/hpoweb/) were reviewed on Thursday, April 18, 2019. There are at least four (4) known historic architectural resources located within or adjacent to the Study Area; however, intact archaeological deposits associated with these resources are not anticipated within the footprint of the proposed project. In addition, topographic maps, historic maps (NCMaps website), USDA soil survey maps, and aerial photographs were utilized and inspected to gauge environmental factors that may have contributed to historic or prehistoric settlement within the project limits, and to assess the level of modern, slope, agricultural, hydrological, and other erosive -type disturbances within and surrounding the Study Area. This is a state -funded project for which a Federal permit is anticipated. In addition, there is the potential for future federal funding to be received for this project. Permanent/temporary easements will be necessary, although the need for additional ROW was not conveyed as part of the request. The size and shape of the Study Area, however, have been drawn in a way to capture any possible ground -disturbing activities associated with this project beyond NCDOT's existing ROW. At this time, we are in compliance with NC GS 121-12a, since there are no eligible (i.e. National Register -listed) archaeological resources located within the project's Study Area that would require our attention. From an `ARCHAEOLOGICAL SURVEY REQUIRED "form for Minor Transportation Projects as Qualified in the 200712015 Programmatic Agreement. 1 of3 DocuSign Envelope ID: A4879A5F-F593-4FB5-8E36-49F92ECF75D7 Project Tracking No.: 19-03-0022 environmental perspective, the Study Area falls along a sparsely developed corridor between the cities of New Bern and Havelock within the Coastal Plain physiographic region of North Carolina. The Study Area consist of numerous soil types, most of which are categorized as somewhat poorly drained (La, Le, and Ly soils), poorly drained (Gr, Me, and Ra soils), and very poorly drained (Ba, Min, and Pa soils). Such soil types would be considered to have a low probability for intact archaeological resources to be present. However, pockets of relatively level terrain with well -drained soil conditions are present within the Study Area and warrant some form of archaeological investigation. Such areas consist of: 1) Goldsboro loamy fine sand, 0-2% slopes (GoA), 2) Onslow loamy sand (On), 3) Norfolk loamy fine sand, 2-6% slopes (NoB), and Suffolk loamy sand, 10-30% slopes (SuD) and would be considered to have a moderate probability for archaeological deposits to be found. The Office of State Archaeology (OSA) has reviewed numerous projects within the vicinity of the Study Area for environmental compliance, including timber sales, commercial and residential development, transportation improvements, FEMA concerns, solar farms, and wetland mitigation work. Several archaeological surveys have been conducted in the vicinity based on recommendations put forth by OSA based on the presence of known archaeological and historic sites as well as favorable topographic settings within large swaths of undeveloped (and undisturbed) property. As mentioned before, over 50 archaeological sites have been documented in the vicinity of the Study Area as a result of those surveys. Within five (5) miles of the Study Area, NCDOT's Archaeology Group has reviewed at least five (5) transportation -related projects for environmental compliance under the Programmatic Agreement (PA) with the State Historic Preservation Office (NC-HPO), one of which can be considered an extension of the currently proposed project (i.e. TIP# R-5777 [PAs 17-09-0015 and 17-09-0016]). An archaeological survey was recommended and conducted for only the TIP# R-5777 project, because it traversed a portion of the New Bern Battlefield as well as sections of well -drained upland -like setting overlooking a perennial water source. Results from that survey are pending. In addition, there are at least five (5) cemeteries located within or adjacent to the Study Area. Additional documentation regarding these resources will be necessary. Based on the information presented here, an archaeological survey is recommended. Therefore, a visual inspection of the Study Area should be conducted, followed then by systematic archaeological excavations within areas of moderate to high archaeological probability. All cemeteries (if any) should also be properly recorded and delineated if any occur within or adjacent to the Study Area. None of the property within the Study Area that would requires further investigation is owned by the State of North Carolina so a State Archaeological Resources Protection Act (ARPA) permit should not be necessary. Should the description of this project change or design plans be made available prior to construction, additional consultation regarding archaeology will be required. *We can complete these investigations by using one of the Archaeology Team's on -call firms or if Division would like to manage and complete the survey, they can use an NCDOT prequalified archaeologist under contract with one of the Division's on -call firms. We can provide a scope of work for the Division to use, but we do need to know within seven days which path the Division plans to follow. All products produced by the Division's consultant will need to be submitted to the Archaeology Team for review, acceptance, and submittal to the Office of State Archaeology as per the Programmatic Agreement. We would be happy to discuss this approach with you. **This project falls within a North Carolina County in which the following federally recognized Tribe(s) has expressed an interest: Catawba Indian Nation. It is recommended that you contact each federal agency involved with your project to determine their Section 106 Tribal consultation requirements. Please know that no State -recognized tribes have expressed interest in activities within this county. SUPPORT DOCUMENTATION See attached: ® Map(s) ® Previous Survey Info ❑ Photos ❑Correspondence ❑ Photocopy of County Survey Notes Other: `ARCHAEOLOGICAL SURVEY REQUIRED "form for Minor Transportation Projects as Qualified in the 200712015 Programmatic Agreement. 2 of3 DocuSign Envelope ID: A4879A5F-F593-4FB5-8E36-49F92ECF75D7 Project Tracking No.: 19-03-0022 FINDING BY NCDOT ARCHAEOLOGIST —SURVEY REQUIRED i�Cu.R� 7Md�G� NCDOT ARCHAEOL PROPOSED FIELDWORK COMPLETION DATE April 18, 2019 Date October 18, 2019 1. �r r i i jq i X Z' �4 '45 %4' Figure 1: New Bern, NC (USGS 1950 [PR74]), Upper Broad Creek, NC (USGS 1951 [PR74]), Catfish Lake, NC (USGS 1984), and Havelock, NC (USGS 1949 [PI71]). `ARCHAEOLOGICAL SURVEYREQUIRED "form for Minor Transportation Projects as Qualified in the 200712015 Programmatic Agreement. 3 of3 ROY COOPER Governor ELIZABETH S. BISER Secretary MARC RECKTENWALD Director Mr. Jamie Lancaster, P.E. Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Lancaster: Subject: Mitigation Acceptance Letter: NORTH CAROLINA Environmental Quality February 5, 2024 TIP R-5777C, US 70 Upgrade from Thurman Road to Havelock Bypass, Craven County The purpose of this letter is to notify you that the North Carolina Department of Environmental Quality — Division of Mitigation Services (NCDEQ-DMS) will provide the mitigation for the subject project. Based on the information received from you on January 30, 2024, the impacts are located in CU 03020204 of the Neuse River basin in the Southern Outer Coastal Plain (SOCP) Eco-Region, and are as follows: Neuse Stream Wetlands Buffer (Sq. Ft.) 03020204 SOCP Cold Cool Warm Riparian Non -Riparian Coastal Marsh Zone 1 Zone 2 Impacts 0 0 893.000 1.478 0.116 0 58,272.000 40,430.000 feet/acres NCDEQ — DMS commits to implementing sufficient compensatory mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies in accordance with the In -Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from NCDEQ-DMS. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707-8420. Sincerely, Elizabeth A. Harmon DMS NCDOT ILF Coordinator cc: Mr. Monte Matthews, USACE Ms. Amy Chapman, NCDWR Mr. Brad Chilton, NCDOT — EAU File: R-5777C D Q �, - North Carolina Department of Environmental Quality I Division of Mitigation Services ®Jl� 217 West Jones Street 1 1652 Mail Service Center I Raleigh, North Carolina 27699-1652 NA NOP 1 H liAFOU 0"p "m&Emirtomental�uaiHy\ r 919.707,8976 Submittal February 6, 2024 HlghWay tP,Y North Carolina Department of Transportation �4't Highway Stormwater Program STORMWATER MANAGEMENT PLAN (version 3.00; Released August 2021) FOR NCDOT PROJECTS WBS Element: 44648.3.4 TIP/Proj No: R-5777C County(ies): Craven Page 1 of 5 General Project Information WBS Element: 44648.3.4 ITIP Number: R-5777C Project Type: Roadway Widening Date: 12/19/2023 NCDOT Contact: Byron Kyle Contractor / Designer: Sun ate Desi n Group, PA Address: 1020 Birch Ridge Dr Address: 905 Janes Franklin Rd Room #16 Raleigh, NC 27606 Raleigh, NC 27610 Phone: 919-707-6621 Phone: 919-710-8459 Email: btk le ncdot. ov Email: belam sun atedesi n.com City/Town: Havelock Coun ies : Craven River Basins : Neuse CAMACounty? Yes Wetlands within Project Limits? Yes Project Des cri tion Project Length lin. miles or feet): 6.54 SurroundingLand Use: Residential, Commercial, Agricultural, National Forest Proposed Project Existing Site Project Built -Upon Area ac. 116.3 1 ac. 84.0 lac. Typical Cross Section Description: US 70 (-L-): Grassed Swale median with 4:1 max side slopes (6:1 max on Guiderail Side). Existing US 70: Grassed Swale median. 2-12' paved lanes with 4' paved shoulders in 2-12' paved lanes with 12' outside shoulders (10' Paved, 2' Grassed) and 6' inside each direction. Varying fill and cut slopes. shoulders (4' Paved, 2' Grassed) in each direction. Varying fill and cut slopes. See project XSC's for detailed information. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 41,800 1 Year: 2045 Existing-.T 31,800 Year: 2019 General Project Narrative: The North Carolina Department of Transportation (NCDOT) has proposed improvements of existing US 70 in Craven County to interstate standards from the Havelock Bypass to (Description of Minimization of Water east of S.R. 1116 (Thurman Road). The project, R-5777C, has 6 proposed major structures, 4 along US 70 and 2 on adjacent service roads. All major drainage structures on this Quality Impacts) project are reinforced concrete box culverts, 5 of which replace existing drainage structures and 1 is new location. Each of the 6 box culverts will be buried 1' below the existing stream bed and be backfilled with native bed material. Sills will be used at the inlet and outlet ends of each culvert to retain backfilled material within the box. The first proposed structure is a 1@7'x7' RCBC that carries Goodwin Creek under US 70 and two adjacent service roads, -SRY1 B- and -SRY1 C-. The second structure a 1@6'x7' RCBC that carries an unnamed tributary to Otter Creek under US 70 and two ramps servicing the proposed Stately Pines Interchange. The third, approximately 380' downstream of the second culvert, is a 1@7'x7' RCBC that carries an unnamed tributary to Otter Creek under new location service road -SRY1 DY3C-. The fourth is a 1 @7'x7' RCBC that carries an unnamed tributary to Great Branch under US 70 and adjacent service road -SRY1 DY3C-. The fifth culvert is a 2@7'x7' RCBC (1 hydraulic barrel, 1 wildlife crossing barrel) that carries an unnamed tributary to Brice Creek under US 70 and adjacent service road-SRY3DY4C-. The sixth, approximately 170' downstream of the fifth Culvert, is a 1 @7'x7' RCBC that carries an unnamed tributary to Brice Creek under service road-SRY4B-. Dry detention basins are utilized throughout the project to attenuate increases in peak flow and provide stormwater treatment. Along the entire length of the project grassed swales in the median and outside shoulder areas are used for treatment when BMP design standards can be met. The primary function of these grassed swales is to reduce flow velocity, promote sedimentation infiltration and runoff attenuation. Rip rap pads are used at all storm drain system outlets to dissipate energy and reduce velocities to non-errosive at jurisdictional and wetland features. Lastly, 3:1 fill slopes are used in all wetland areas, to reduce the project footprint and minimize permanent impacts. Submittal February 6, 2024 Hi hwa North Carolina Department of Transportation Stormwater ..,.,.,, Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 3.00; Released August 2021) FOR NCDOT PROJECTS WBS Element: 44648.3.4 TIP/Prof No.: R-5777C County(ies): Craven Page 2 of 5 General Project Information Waterbody Information Surface Water Body 1 : Neuse River NCDWR Stream Index No.: 27- 104 NCDWR Surface Water Classification for Water Body Primary Classification: Class SB Supplemental Classification: Swamp Waters (Sw) (NSW Other Stream Classification: None Impairments: copper(Cu) Aquatic T&E Species? I Comments: NRTR Stream ID: Neuse River Buffer Rules in Effect: Neuse Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Body 2 : 1 Goodwin Creek NCDWR Stream Index No.: 27-112-6-2 NCDWR Surface Water Classification for Water Body Primary Classification: Class SC Supplemental Classification: Swamp Waters (Sw) (NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? F Comments: NRTR Stream ID: Goodwin Creek Buffer Rules in Effect: Neuse Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I Surface Water Body 3 : 1 Otter Creek NCDWR Stream Index No.: 27-108 NCDWR Surface Water Classification for Water Body Primary Classification: Class SC Supplemental Classification: Swamp Waters (Sw) (NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? T Comments: NRTR Stream ID: Otter Creek Buffer Rules in Effect: Neuse Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Submittal February 6, 2024 Highway Stormwater \= (Version 3.00; Released August 2021) \ WBS Element: 44648.3.4 TIP No.: R-5777C Count ies : Craven Page 3 of 5 Additional Waterbody Information Surface Water Bod 4 : Great Branch NCDWR Stream Index No.: 27-101-40-3 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) (NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? F Comments: NRTR Stream ID: N/A, im acted streams identified in the NRTR drain to Great Branch Buffer Rules in Effect: Neuse Project Includes Bridge SpanningWater Bodno ? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Bod ? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Bod 5 : 1 Crooked Run NCDWR Stream Index No.: 27-108-1 NCDWR Surface Water Classification for Water Body Primary Classification: Class SC Supplemental Classification: Swamp Waters (Sw) (NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? F Comments: NRTR Stream ID: N/A, no impacted streams identified in the NRTR drain to Crooked Run Buffer Rules in Effect: Neuse Includes Bridge Spanning Water Body?—. N/AProject D Dissipator Pads Provided in Buffer? INA Deck Drains Discharge Over Water Bod ? INA (If yes, provide justification in the General Project Narrative) I (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Bod 6 : 1 Brice Creek NCDWR Stream Index No.: 27-101-40- 1 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: Swamp Waters (Sw) (NSW Other Stream Classification: None Impairments: None Aquatic T&E Species? Comments: NRTR Stream ID: Stream SF, SG & SE Buffer Rules in Effect: Neuse Project Includes Bridge Spanning Water Body? JNo I Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? I N/A Deck Drains Discharge Over Water Body? INA (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Surface Water Bod 7 : 1 NCDWR Stream Index No.: NCDWR Surface Water Classification for Water Body Primary Classification: Supplemental Classification: Other Stream Classification: Impairments: A uatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? Deck Drains Discharge Over Water Body? (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) I Submittal February 6, 2024 I-Ijghway North Carolina Department of Transportation Stor 'ter ,.,., Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 3.00; Released August 2021) FOR NCDOT PROJECTS WBS Element: 44648.3.4 TIP/Proj No.: R-5777C County(ies): Craven Page 4 of 5 Swale Sheet No. Line Station Location (LT,RT,CL) Latitude Longitude Surface Water Body Base Width (ft) Front Slope (H:1) Back Slope (H:1) Drainage Area (ac) Recommended Treatm't Length (ft) Actual Length (ft) Longitudinal Slope N 02 (cfs) V2 (fps) Q10 (cfs) V10 (fps) Rock Checks Used BMP Associated w/ Buffer Rules? 7 Y1RPD 20+00 RT (3)Otter Creek 0.0 4.0 3.0 1.4 140 450 0.30% 3.1 1.3 3.9 1.3 No Yes 7 L 55+30 RT (3)Otter Creek 3.0 3.0 3.0 6.0 600 961 0.40% 10.8 1.9 13.8 2.1 No Yes 8 L 63+50 RT (3)Otter Creek 2.0 4.0 3.0 5.8 580 1500 0.30% 13.0 1.8 16.2 1.9 No Yes 8 SRYIDY3c 29+05 LT (3)Otter Creek 0.0 4.0 3.0 1.8 180 255 1.88% 4.2 2.7 5.2 2.9 Yes Yes $ ISRYIDY3C, 29+10 LT I (3)Otter Creek 0.0 1 4.0 3.0 1.4 1 140 240 2.21 % 1 3.1 2.7 3.9 2.8 1 Yes Yes 8 SRYIDY3c 30+50 RT (3)Otter Creek 0.0 4.0 3.0 0.2 20 110 2.73% 0.7 2.0 0.9 2.1 No Yes 9 8RYIDY3c 49+28 RT (3)Otter Creek 0.0 4.0 3.0 0.5 50 178 1.12% 1.4 1.7 1.7 1.8 No Yes 9 SRYIDY3c 49+32 RT (3)Otter Creek 0.0 4.0 3.0 0.8 80 458 0.72% 2.5 1.7 3.1 1.8 No Yes 10 SRY1A 60+03 LT (3)Otter Creek 2.0 4.0 3.0 3.1 310 659 0.30% 7.0 1.6 8.7 1.6 No Yes 10 SRY1A 60+13 LT (3)Otter Creek 2.0 4.0 3.0 1.5 150 446 0.45% 4.4 1.6 5.5 1.7 No Yes 10 8RYIDY3c 69+75 RT (3)Otter Creek 2.0 4.0 3.0 2.7 270 645 0.40% 11.0 1.9 13.6 2.0 No Yes 10 SRYIDY3c 70+30 RT (3)Otter Creek 3.0 4.0 3.0 9.4 940 1523 0.31% 21.5 2.0 28.9 2.2 No Yes 17 L 202+94 LT (6)Brice Creek 2.0 1 4.0 3.0 10.7 1 1070 2260 0.30% 1 18.0 2.0 23.1 2.1 1 No Yes 17 L 203+50 LT (6)Brice Creek 2.0 4.0 3.0 1.3 130 400 0.40% 4.0 1.5 5.0 1.6 No Yes 17 SRY413 25+70 RT (6)Brice Creek 0.0 4.0 3.0 3.4 340 670 1.18% 6.1 2.5 7.8 2.7 No Yes 17 SRY4B 25+80 LT (6)Brice Creek 0.0 4.0 3.0 1.5 150 570 0.43% 3.7 1.5 4.6 1.6 No Yes 17 SRY413 25+85 RT (6)Brice Creek 0.0 4.0 3.0 0.5 50 315 0.31 % 1.2 1.0 1.5 1.1 No Yes 18 SRY4B 42+62 LT (6)Brice Creek 2.0 4.0 3.0 5.3 530 807 0.43% 11.9 2.0 14.8 2.1 No Yes 18 SRY413 42+75 LT (6)Brice Creek 2.0 4.0 3.0 5.6 560 1220 0.35% 13.1 1.9 16.3 2.0 No Yes Additional Comments Water Quality rock check dams used as alternative design where required design storm velocities cannot be met due to site constraints. Submittal February 6, 2024 Hi tlwayNorth Carolina Department of Transportation �StOrrYl t�r4 Highway Stormwater Program 111�11 STORMWATER MANAGEMENT PLAN (Version 3.00; Released August 2021) FOR NCDOT PROJECTS WBS Element: 44648.3.4 TIP/Prof No.: R-5777C County(ies): Craven Page 5 of 5 Other Toolbox Best Management Practices Sheet No. Line Station Location (LT,RT,CL) Latitude Longitude Surface Water Body BMP Type Drainage Area (ac) New Built -Upon Area (ac) Volume Treated (ac-ft) Precipitation Depth Treated over NBUA (in) BMP Associated w/ Buffer Rules? 13 SRYIDY3C 92+40 RT 34.97521 -76.97397 (4)Great Branch Dry Detention Basin 3.2 1.3 0.266 2.58 No 16 Y3RPC 25+67 LT 34.98728 -76.98007 (1)Neuse River Dry Detention Basin 5.2 2.2 1.92 11.02 No 16 Y3RPD 14+14 LT 34.99118 -76.98163 (6)Brice Creek Dry Detention Basin 3.4 1.5 0.251 2.11 No 18 SRY4B 44+44 LT 34.99982 -76.98705 (6)Brice Creek Dry Detention Basin 2.0 0.8 0.228 3.43 No 20 SRY4B 66+76 RT 35.00517 -76.98991 (6)Brice Creek Dry Detention Basin 6.7 3.3 2.22 8.55 No 21 1 SRY4A 22+62 RT 35.012056 -76.99369 (6)Brice Creek Dry Detention Basin 5.0 2.7 1.68 7.97 No Additional Comments Primary function of dry detention basins for the R-5777C project is to detain runoff from impervious roadway surface and attenuate peak 100-yr flow to meet or reduce pre -construction conditions. See Sheet to For Index of Sheets See Sheet t B For Standard Symbology Sheet 1 N R E OI 4 10 EGIX ��ii OJECT l✓ VICINITY MAP N.T.S. D179'-TAT Trn VDnT17j-T n_c777f' END RESURFACING ONLY Submittal February 6, 2024 STATIC OF NORTH CAROLI NA DIVISION OF HIGHWAYS CRAVEN COUNTY PERMIT DRAWING SHEET I OF 89 �`"'� bTATR PRQtF(:T RRPRRRNCR NQ 6HRBT NO. TOTAL 9N8819 °` . R-5777C ]� STATE PROD. NO. F.APROl.N0. DE6CRIPTION DATE: 1 /15/2024 44648.3.4 WA DESIGN -BUILD - LOCATION. U.S. 70 FROM THE HAVELOCK BYPASS TO EAST OF S.R.1116 (THURMAN ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNING, ITS AND STRUCTURES WETLAND AND SURFACE WATER IMPACTS PERMIT THIS PROJECT IS WITHIN THE MUNICPAL BOUNDARY OF THE CITY OF NEW BERN CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. NAOOsiNq zo17 END TIP PROJECT R-5777C GRAPHIC SCALES DESIGN DATA PROJECT LENGTH PLANS PREPARED FOR THE NCDOT BY: HYDRAULICS ENGINEER 50 25 0 50 100 ADT 2019 = 31,800 ADT 2045 = 41,800 LENGTH ROADWAY TIP PROJECT R-5777C = 6.486 MILES StN Balfour Beatty NC LICENSE NUMBER F-0991 ®f NOR? � 0 ° K = 9 /O LENGTH STRUCTURE TIP PRO ECT R-5777C = 0.058 MILES J 900 W TRADE ST STE 715, CHARLOTTE, NC 28202 PLANS TOTAL LENGTH OF TIP PROJECT R-5777C = 6.544 MILES 2018 STANDARD SPECIFICATIONS D = 55% P.E. SIGNATURE: N RIGHT OF WAY DATE. JANUARY 17, 2023 ROADWAY DESIGN ENGINEER 50 25 0 50 100 0 T = 8 /o V = 75 MPH * o o (TTST=3/o+DUAL 5/0) J. ADAM FREEMAN, PE � � <, � p �® Ohl PROFILE HORIZONTAL (HORIZONTAL) PROJECT ENGINEER 10 5 0 10 20 FUNC. CLASSIFICATION = INTERSTATE STATEWIDE TIER NCDOT CONTACT: BYRON KYLE NCDOT - DESIGN -BUILD UNIT LETTING DATE: JANUARY 17, 2023 NARONG PHAL, PE Pl Tw%g PROJECT DESIGN ENGINEER PROFILE (VERTICAL) SIGNATURE: Submittal February 6, 2024 DETAIL 5-1 SPECIAL 'V' DITCH (Norio S-16) Front Ditch N.W.1 Slope QGround `''.'1 D F\o et \ °Ae ROBERT B. \ O Min. D=ts Fr. w s HARDISON, ET AL N X FROM STA. 15+50 TO STA. 18+50 -L- RT WETLAND WA GOODWIN DETAIL 5-3 50' 25' 0 50' 100, SPECIAL BASE DITCH ( Nor ro Smle) o SCALE: 1"=100' ,, D F e` Sop N WETLAND WB „. Min. D=2.5 Fr. B =3.0 Ft. FROM STA. 18+00 TO STA. 24+50 -SRYI B- LT r C� 8a� W �m FROM STA. 21+30 TO STA. 23+00 A RT 5 077 SON FAMILY, LLC PROJECT REFERENCE NO. SHEET NO. R-5777C 5 IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION INCOMPLE E PLANS 00 NOT USB POR �W ACQUISITION °°SEE ERMIT" WINGC ERT INLET a k CREEK SEE PERMIT URA ING SITE 2 SPEC 3'BASE DITCH (BEET 6 89 PE 3 BA E DITCH Woo 5 / .� AL W 8 g"1l19 ¢ W/CL 'I' P RAP (BANKS i4jJL \ W/CL'B'RIP RAP Id 1 �IlW HEET F SEE DETAIL 5-9F J� / EST 128 TONS, EST 335 SY GF / SEE DETAIL 5-3 -01M- _ -elM F EN Weao� SEE DETAIL 5-8 / PORE GEM M- M C) 0 Balfour Beatty �� R EN R��7�pty�� ��C� BASE DITCH Z — SPEC 2' B E LITCH W/CL 'B' RIPRAPI t� / € / x I - I U, SEE DETAIL 5-4 E T TONS, EST 131 SY GF >N� CL 'B' RIP RAP I R CD + I \NOJ SEE DETAIL 5-2 �E E _E—EiF-?-TANS YG i �� X d' w DOCUMENT NOT CONSIDERED FINAL E E Yeb- x = UNLESS ALL SIGNATURES COMPLETED E� _ - I C 24„ \ — �= V I PERMIT DRAWING Ln � ; _`•.: c oo ° �0 qa � � 42„ w M/M 'JNI151X3 l _- � _ __ N SHEET 2 OF 89 T- s' M W dJd .s (of w At %� Q = R M 163 18' PAVED ROADWAY - - - - - - _- _nITCt G DING ----- PLOWABLE FILL - --- - ----- �`r DATE: 1 /15/2024 - - - - - - - - - - 2GI - - - - - - 1. S EEL - - - DITCH W O - -- --- - ---- _ F5- M I— O REMOV i DITCH GRA --- - -0d - �d ni- - _-- _ J IN W zi — -- = SITE 1--F�BSE FILL YE __=� _ __---- _ _____�; V IQ-= o cRa s — / Q fn ( J REMOVE /IO 7��--------- __ 1 J cV � — — 7-- — -- — — — � was—LF --_ -- _ _ — _ _ J 2 LLI GRASs3T� _ --- __ ---- C W 2GI G ----_ i aif^ ----- ---=-- m _ CJ SPEC DITCH GRADING --US-7 -1V - ---------'_ -- __-- 1 N 4 -- ----o�ni------ O� F dn,-- �-- y-f WOODS I`iW y Z \Q [- W EMOvI< .D W - ��_ _ i _ - 24„ J SPEC . 'DITCH I,.N 13W30 SEE AIL 5-1 \\a 3d i -% eszl `� C V 3' BASE DIT r (n - -o i- - -may, I M _ RADE _ _ ee'e rec-13- SEE DETAIL E IN _ _ _ N M/a � la1 M/a DNUSrka RETAI / C { _ _ ^ � P \ _ db R O EST 5 TO \ \ SR -�i� - NC DEPT. OF TRANSPORTATION ® VEGETATION f,AP Z \ y VEGETATION \o \ ED ROAgyAY - REMO JAd .BI - _ - - - - - 3s NCB OdSI E / 3a / S _ -� / - - Jnd .bZ - - - - -d - -�--i U + /6J 33 tj REM VE m i- - - -�„-=r--,-- - - - (9 Uj JSONV I u R� 24 b b0 �NNNl7A' ��' r N W JNOj LE ILIZATIO JNoa / I I EMOVE 6 �� - ���� o REMOVE REMOVE W/ L AF RIP / - MH JNOJ ti I CLEAN OUT M sNlisrxa - - I I / b g J21.81 M NMONNNA.9 L EE DETAIL 5 / / �` p EXISTING DITCH N 4„ / - - M _ - - - - - - _ - s U) /LOPES OR FLATTER REMOVE CLEAN OUY� / w YID A. / / O EXISTING DITCH / e - SANBORN, ,�-� / SE PERMIT DRAWI / REMOVE ,\\ ET UX /� 3:1 SLOPFg OR / \ SHEET 5 OF 89 1 / � / y ) Ili � OR ENLARGEMENT la I\ \ A\bJ diV GOODWIN S / c' / /� ° IT N\\� ,IN / 1 p I EST SY GF \ 7\ \ CREEK r MICHAEL A. MILLER, ET UX l5e I �P JEREMY R. RODAMAKER DAVID A. SANBORN, ET UXj�ae / CROATAN FREE WILL wJ3 tlX r / / BAPTIST CHURCH 10 X I \ \ iH� ,e� a I CROATAN FREE I \ \\ \ / ��- _ - 9'y ).�. i a .L//c.,/� • WILL BAPTIST CHURCH I 15 1 \\ \ \ \ 1 \ \ S SURFACE WATER IMPACTS L 9e51 T­� DETAIL 5-4 SPECIAL BASE DITCH (Nat r" Smlel N"rur"I Ground 3., p Ditch sl.pe � DI� L.-"°�-.J Min. D=1.5 Ff. B=2 Ft. FROM STA. 13+50 TO STA. 16+00-SRY1B- LT TEMPORARY SURFACE WATER IMPACTS 0 I \ N I I I x CROATAN FREE WILL BAPTIST CHURCH (DII III FILL IN WETLAND • I I F CROATAN FREE WILL MECHANIZED CLEARING BAPTIST CHURCH A \� STA. 16+78 -SRY1 B- LT uWsl \ \\\ \ \�\\ O DETAIL 5-6 DETAIL 5-7 DETAIL 5-8 CULVERT OUTLET SCOUR HOLE STABILIZATION SPECIAL DITCH GRADING SPECIAL 3' BASE DITCH \ (NO b ScO.) ( Nor I. Scolel 4 ( Not to Smle) �2 \ sled 4 X _�� N"lu Fle'O °A N"rur"I I I Front / Na u", _ Gro""°� "aM"m�BO'0i1M" `sP� W,q'P(ge2 D P�pOS� sp G,e."d 3 D F� e< DkI, WOODS FOR -LLTI- PROFILE SEE SHEET 34 a0 \ o s.D' za"r InTI F J ./ Tu,kGe"rexrlle" / FOR -LRTI- PROFILE SEE SHEET 34 - mow\ \ WW c OPo d 1" FI m TIP' 'SEE CROSS SECTIONS Min. D=1.0 Fr. —. I. B MI"I. of 1M l,rPl / FOR -LLT- PROFILE SEE SHEET 35 \ \ GemeMile' 6ini H.I. 'Nnce GeoWAI. Und.r nI FROM STA. 12+00 TO STA. 23+00 -L- LT Min. D=2'OFt. FOR -LRT- PROFILE SEE SHEET 35 ". L,Nm= sp N. I -Ow. Di— by Enel"..r FROM STA. 13+00 TO STA. 15+50 -L- RT d=2.OFr. FOR-SRYIB- PROFILE SEE SHEET 8/ Tyye eluner-a'm 1 -1, m Ten B"nk - I<-w Orn Type of Liner= ODss 'B' Rip -Rap, Keyed -In B=3.OFt. FOR-SRYIC- PROFILE SEE SHEET 83 � : to To":, �r�u sr Gemexfile FROM STA. 16+80 TO STA. 18+00 -SRYI B- LT STA.17+08-SRY1C- RT WOODS ,,, \ Submittal February 6, 2024 DETAIL 5-1 SPECIAL 'V' DITCH (Neffo Scole) Front Difch N.W.1 Slope Q Ground D F\o Bc w s ROBERT B. \ O Min. D=1.5 Ft. = HARDISON, ET AL oFROM STA. 15+50 TO STA. 18+50 -L- RT WETLAND WA N - GOODWIN ISEE�1ERMIf �� \ CREEK 1 HEET F BAN °N`� F EN_ _ RGEMEN WIR arnal=- �e d � j DETAIL 5-2 SPECIAL 2' BASE DITCH I Not to Scale) N.—I o< Slope Ground p' on°t Dikh d ',.j D P Tuck Geefeslil. a Geofe.file B Minimum of 1N (1YP) Min. D=2.OFt. d=1.OF1. Type of Liner= Class 'B' Rip -Rap, Keyed -In B=2.OR FROM STA. 1A+00 TO STA. 16+70 -SRY1 R- LT DETAIL 5-3 50' 25' 0 50' 100, SPECIAL BASE DITCH ( Not fo Smle) o SCALE: 1"=100' Gmo d 3., D A\ Ks1 Fi N WETLAND WEI i I e I F\o Slop / _. Min. D=2.5 Ft. 13=3.0 Ft. FROM STA. 18+00 TO STA. 24+50-SRY1B- LT FROM STA. 21+30 TO STA. 23+00 A- RT RA I SA 5 SPEC 3' BASE DITCH � - RMIT U/ ITE2 W00 W/CL'B'RIP RAP � EET 6 � � _SEg,�ETAIL 5-3 IT -. EST 128 To EST 335 5Y F / SEE DETAIL 5-8 0/ /OR o—Iv Rod-� 4 /— ���s F WAN MEN j I rtD7 / CLEAN OUT R 5rylisrx EXISTING DITCH N OPES OR FLATTER REMOVE 32 —\C2� WOODS OF TRANSPORTATIONS \\ 4" RCP, '�NN�ALL a� C L ST 5 TO I SY F r4rr., \.BI 7 0 -- -- _- REMO `' DV 77 O m NW PERMIT DRAWI / LEXISTING ITCH /�/�� REMOVE / 3:1 SLOPE4 OR SHEET 5 OF 89 / )R ENUARC DENT i 11 / / / L 1 / c �? / / // // //// / / / b �I I IP RAP \ \ / Ada""' CREEK T I -f / / ' TONS uw - MICHAEL A. MILLER, ET UX / � /� / / � � I I I � I ESr SY GF � JEREMY R. N' ONa I RODAMAKER DAVID A. SANBORN, ET UX �x W� S DETAIL 5-4 SPECIAL BASE DITCH IN.— Smle) Nofurol \ oc Front Ground 3., p' Difch Siepe � DI� F\ref L.-"°�-.J Min. D=1.5 Ff. B=2 Ft. FROM STA. 13+50 TO STA. 16+00-SRY1B- LT DETAIL 5-6 CULVERT OUTLET SCOUR HOLE STABILIZATION INMM S—) m Bed Gmun�� El—li- IJefu�oa Tuck Geofeaiile a Mnimum of 1N z.o• 2:1 or ITYFf GeMeMile' F 1 H.I.PI i n u C Ohl d �s'�N.,e G WAI. Under Rip— Ierg1M1= 56 Ff, in L«.fiom Di— by Engineer Tyye of Liner- CL'll' D>R.p 1. T p B..k - KeyedJn (IYn E,1 210 Tons, &f SY GeMex k so (Li CROATAN FREE WILL BAPTIST CHURCH lod a ROATAN FREE \� \ 0 WILL BAPTIST HURCH 1 \ SURFACE WATER IMPACTS BdSI \ �1\\\q\ r /J TEMPORARY SURFACE WATER IMPACTS —CROATAN FREE RHURCI @A PTIST II II X IO FILL IN WETLAND f —303 —� II ao \ Y MECHANIZED CLEARING �\/ CROAT BAPTASTFREE CHURCHL v\ m PROJECT REFERENCE NO. SHEET NO. R-5777C 5 IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INC®MPLE�W E PLANS DO NOT USB POR ACOU ISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 3 OF 89 DATE: 1 /15/2024 STA. 16+78 -SRY1 B- LT DETAIL 5-7 DETAIL 5-8 SPECIAL DITCH GRADING SPECIAL 3' BASE DITCH 4 (Npf fo Scolel 4 (Not fo Scole) �a 7 / i0 / X Npturol Frain ` spy �Hgp,He( D P�O�¢ Sp Ground a, D F� e< Dkh W000s FOR -LLTI- PROFILE SEE SHEET 34 � -7 Turk Geofeaile o FOR -LRTI- PROFILE SEE SHEET 34 -� 'SEE CRO55 SECTIONS MIn.D=1.0 Ft. --I. B Minimum of 1N lrYlry / FOR -LLT- PROFILE SEE SHEET 35 FROM STA. 12+00 TO STA. 23+00 -L- LT Min. D=2'OFt. FOR -LRT- PROFILE SEE SHEET 35 - e� FROM STA. 13+00 TO STA. 15+50 -L- RT d=2.OFt. FOR-SRYIB- PROFILE SEE SHEET 8/ ef� Type of Liner= Cl...'B' Rip -Rap, Keyed -In B=3.OFt. FOR-SRYIC- PROFILE SEE SHEET B3 FROM STA.16+80 TO STA.18+00-SRY7B- LT - STA.17+08-SRY1C- RT WOODS Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-2 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2 0 2 0 2110 300 PERMIT WIN SHEE 7 OF 89 D E: 1 / 5/ 02 .683:1 �2 6111 .73 9:1 6.— 23. 0 1 .76 WETLAND W a SITE 1 SURFACE IMPACTS WATER --FILL IN P WETLAND :1 41 24. 17 '1 25 6.342: 94 — 61 61 2. — — / *E 0.0 49 3 0 3, 4.. 4:1 �2 141 .20 80: 2909 6:1 \ :i 23. 7 6:1 0.0 40 3:1 :1 - 4.748:1 6:1 204 7:1 \ :1 6: - 0.0o \ O 2 3 W 3 23.1 70 q 4 1 26 6 .8925:1 39 5:1 25.14 3: 23. 4 :1 2 5.1 .23 2:1 2675 26.0 4:1 15 +E 0.0 3 0 2 0 2 0 2 0 2 0 2 0 110 1 0 1 0 1 0 40 2 1 20 0 1 0 140 11.0 1 0 1 0 24 220 1 210 2 0 2 0 300 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-4 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2 0 2 0 21 0 300 PERMIT WIN SHEE 8 OF 89 D E: 1 / 5/ 02 49 a o s 49 W 0.050 1 4.7 4.25 2603 2 +0.0 20. o s a s 0.050 .030"•0.030 $ .7 244. '0- A:\ :l 2616 6. .5:1 \ f 0.0 O O W 3 W 3 0.050 0.030v 0.030 4:1 �'4-Z .176:1 :1 26 6. 23 - f 0.0 SITE 2 ET ND B 40 jr) 3 3 M CH NIZE CL ARI G 0.os0 - IL 0.030 0.030 4:1 5. .1 0 / :l 26 6. 26 - 0 f 0. 0 0.010 7 0.0301. Oa0 4:7 A 2 2 20 f 0.00 o.m0.,01 0.050 3•2< 0.020 4:1 •1 0 / :7 6. +E 0.0 300 2 0 2 0 2 0 2 0 2 0 180 1 0 1 0 1 0 1 0 2 2 1 0 140 1 0 160 180 200 220 2,10 260 2 0 300 Submittal February 6, 2024 o, G �_ ZGQPROJECT REFERENCE NO. R-5777C SHEET NO. C S A 1 + 12 — — ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 6 + 0 SEW =1 1° 0 '-0 " llr%;l SR 1 C- IINCOMPLE DO NOT USE FOR PLANS I ACQUISITION ZTA 11,";�IA 4 -I�ITJ I cTA 19;1-4-n�O R-1- I I I I 30 1 SKEWED G EL--2 .32 GP EL 2812 I I DOCUMENT NOT CONSIDERED FINAL PROP 1 DO Y R —� UNLESS ALL SIGNATURES COMPLETED B R = — - - - - - - - 18" PIPE -- — — — - - — --- _ 'RCP 4 "RCP I 3 "X4 AT R UR C PR FIL PR P B D N S A D SE L BED LEV =1 .03 EST U ER T 1 FT SIL B REMOVED AN F O F LLE AN A D SCOUR NOT TC SCALE) NOTE : 1 NATIVE CULVERT LOW MA SH FLOW ERIAL L PR CHA ETWE VIDE NEL. N SIL CO ATIVE S IN TINU MATE HE US IAL 0' FROM DURI THE G C THE NSTR BED CTION AT T NATI E PRO E MA ECT S ERIAL TE AND YI UB E SST ECT T PE ITC NDITI NS. SEPAR ( DO kTELY NOT S ND ELE ATTACHED ATIO B OF SILL DOWELS. 7.0, �NUM IER O SILLS DETERMINED BY THE 1.01 NLET UL AT A D OUTLET SILL p B T HAIWEG� �• ___ Ihgl G TB TB 1 � SIR TB --- -_ R6kN VIEW DETAIL ( Not o Scal ( Gmund Gro ind D� Tuck Geotextil Geof xtile B (TYP) Min. =2 .8 6.01 B=5. Ft. ffiSid. ss I' Rip- op to80 Y Ge textil I■■■■RDEM■■■■N ■iiiii�liiili���... ��ii�ilr■1 I■■E1�■��■■_ ■■■1 ■i■■■■■■■■1 I■■®■■■■■■■■11 Submittal February 6, 2024 1 50' 25' 0 50' 100, PROJECT REFERENCE NO. SHEET NO. DETAIL 6-1 DETAIL 6-2 DETAIL 6-3 DETAIL 6-4 PERMIT DRAWING R-5777C 6 SPECIAL 'V'DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING M CALE: 1"=100' SHEET 10 OF 89 ROADWAY DESIGN HYDRAULICS A ENGINEER ENGINEER (Notro Scplel INotro SwIeI 'l I Nof to Smle) 4 (Nol fo SwIe) 4 D*h "°'" F`°" ",.prod "�' DAZE- 1 /15/2024 N°fuml A' Slopa 1 of 1 °f -- -- '— -" �� Ground 3�7 �`�0< Ground 3�7 p A'\,\et Di1cn Ground J.7 p A\o°< Difcn '�,Q p �q\E F p I o I F Slope ��� F Slope SP 'PG4e<P JPp\P8 SP F Min. D=1.5 F1. " Min. D=1.5 Ff. LBJ Min. D=2.5 Fl. 8=2.0 Ft. B=3.0 Ff. 'SEE CROSS SEC KDNS Min. D=1.0 Ff. `�7 Y O FROM STA. 30+75 TO STA. 37+50-SRY1C- RT FROM STA. 23+00 TO STA. 25+50 -L- LT FROM STA. 26+00 TO STA. 35+50 -SRY1 B- LT FROM STA. 23+00 TO STA. 36+00 -L- RT FROM STA. 33+50 TO STA. 36+00 -L- MED FROM STA. 24+50 TO 26+00-SRY1B- LT q DETAIL 6-5 ��77 SPECIAL 'V' DITCH 11141`1 INm fp srolel ProM COMPANY E WEYERHAEUSER Balfour Beatty Daze CANDICE CANDICE LEE Y LEE PLISKO PLISKO StN Gsc Grpund q -1 D F\c \ \ \\ \ DOCUMENT NOT CONSIDERED FINAL o Pis Min. D=1.0 Ft. JACKSON FAMILY, LLC UNLESS ALL SIGNATURES COMPLETED ��>e N 2-2J, LLC FROM STA. 30+50 TO STA. 36+00-SRY1C- LT C) ,,\ \\\ \ SP 1sp \ "9 SP C ET BASE DI H SLATEE 2' BASE DITCH ED F C V y� 061 N ONO EE DET.R1156-3 �\ SEE DETAIL 6-2 w� CL 'B' RIP RAP b O T X3NOJ 'ow / XOG a0 I ES GF x I � \ \ 1 \\ 1 OA851 WOODS �rJ \ oHXsl I I \ \ \I \ • \ J sne Isno)) al } \ s \ 1\1 \ 1 — 3NOD E 1 G / WOODS I I JSI 31V0 _ \ \ 0 .. \s" ^ 1 C (f1 -D tc I D' gL'B'RIP RAP RD O E �E a0 ,lw EST 3 TONS p �E �l F E T 10 SY GF 1r� E E C E_ E E- 4 R c N W za^ Q = M uw 4" \ ?yD vl - -5 N_oNSNn.n - °°s3e _z ise _ �x — �-' --_— -i-- - - -- OH.SI - - ----- -- --- - --- d _ MO I .. 3315 - - - - - - - - - - - - - - - - - VOa 03nvd.8l £911 a5,21— __ REMOVE --- - - - - - - - G _ - O __ - - 9 n>l Lu Q i^ --o-+i- -- - ----- ,SEE-0EIAIL SH-------- — - - - - - -- - _ -- --- --- . __ _��� + N --od ni-- °-----------=---------3D=4 GETAiL-A,- ------ ----- _ RP -od t-- -- ----------- -- GRA55 MOUE I — W p J oe ni_ w Z + SPEC DITTC-GR7cDING —1—=_ -- - _ - �j ni- _ \ -Oi a1PAVED SHWIDER j --- = Q w REMOVE ------- — -- -- US 14 70 EBL 24'PAVED ROFDIM1' U Q LLU 2GI ls„ 2Gi -- ------ US 70 EB ---- — ------ q.pAVnsH�De� _ _ — �_�� Q ~ _ _ --- N N -- -- — — — — — — -- --- — -- ---- -- I -�---- FES a - LL _ FS, SEE DETAIL SHEET FES I IB' RCP l 2D-4 DETAIL 12 US 70 WB GRASS GRASS 7 Mo E PAVE SHOULD R $PE �DETAIL 6- -��REMOVE— _--- �C INCH G DING--�— L --�- 2Y-RIP RAP.�� ---- —_--_ _—� 70 EBL 35'PAVED ROPLri4AY \ /—� �1 Z _ ------ --- ------US FhYY ---- O - - SHOULDER f� i F� CL '2 RIP RAP WOODS PEC 3' S DITCH EST -moo'------------ EST75Y0GSF EDET � � WETLAND WC --pjFE — --I�t-- � �cn NC DEPT. OF TRANSPORTATION I Q10 =2.9 CFS SEE DETALLI6-5 TCH-- V10 =1.4 FPS SITES \\ E G DIT- .- " � a AY � Ln ------ - < —/WOOD ------ U + _ o,n._ -M- - -- �nd.oz — --- -- a.ez < -- �F2YIC� 3aDH^S < CC ------ ---- - - - --- --- - -to----- --P W °' o W - - - - i- - - - N REMOV ��PUE PUE --- — — — M/ - I _ - - - -=i _ _ and .z —_ M PUE —PUE NMONN — ��� — —L _ — — - - — — — g ana.z -s-- — sY� - o�nd,.z �= —PUE— Ig \ 4f .. �� .. A I ©fl Kl -� -e x-• PUE —PUE _ E )-= W xia Dwusl� T PUE P .. SS8 PUE _ .. SIR, ETAIL . J I III a,Hsl jOV \ HT DITCH WOODS I �E \ EE PERMIT om wsi \ x \ e'" SHEET 12 F 89- o I OR ENLA E e"\*�_—F KERN COMPANY, INC. N� WETLAND WD\ woods � KENNETH McGOWAN \y BFFG LLC CRAVEN FILL IN WETLAND COUNTY MECHANIZED CLEARING FOR -LLT- PROFILE SEE SHEETS 35 & 36 FOR -LRT- PROFILE SEE SHEET 35 & 36 Ha.o9 FOR-YIRPB- PROFILE SEE SHEET 63 FOR-SRYIB- PROFILE SEE SHEETS 8I & 82 FOR-SRYIC- PROFILE SEE SHEET 83 PRELIMIN RY PLANS DO NOT USB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USE MR �W ACQUISITION Submittal February 6, 2024 50' 25' 0 50' 100, PROJECT REFERENCE NO. SHEET NO. DETAIL 6-1 DETAIL 6-2 DETAIL 6-3 DETAIL 6-4 PERMIT DRAWING R-5777C 6 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING M CALE: 1"=100' SHEET 1 1 O F 89 ROADWAY DESIGN HYDRAULICS A ENGINEER ENGINEER (Nptro Scplel INotro Swlel 'l (Nof to Smle) 4 (Nol fo Swle) 4 D*h N°fp F`°" N,.prod Dikh DAZE: 1 /15/2024 G—nd A' Slopa 1 of 1 °f •— -- '— -" �� Ground 3�7 F� �0f Ground 3�� p A'\ het Difcn Ground J.7 p A\o °< Dncn '�,Q p �q\E F p F Slope F Slope SP 'PG4e<P JPp\P8 SP F Min. D=1.5 F1. Min. D=1.5 Ff. Min. D=2.5 H. T 'jn A.� 8=2.0 Ft. B=3.0 Ff. 'SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 30+75 TO STA. 37+50-SRY1C- RT FROM STA. 23+00 TO STA. 25+50 -L- LT FROM STA. 26+00 TO STA. 35+50 -SRY1 B- LT FROM STA. 23+00 TO STA. 36+00 -L- RT FROM STA. 33+50 TO STA. 36+00 -L- MED FROM STA. 24+50 TO 26+00-SRY1B- LT q DETAIL 6-5 ��77 • SPECIAL 'V' DITCH INm fp srolel ProM COMPANY < E WEYERHAEUSER Balfour Beatty oe" N A'� °f o�� LEE PDLISKO CAPLISKLEE \ Gsc Grpund qr p F\c '1 \\ StN DOCUMENT NOT CONSIDERED FINAL o P�� Min. D=1.0 Ft. JACKSON FAMILY, LLC UNLESS ALL SIGNATURES COMPLETED >e N 2-2J, LLC FROM STA. 30+50 TO STA. 36+00-SRY1C- LT a � V /,(� A.�� '^ SP C 3' BASE DI H LAT 2' BASE DITCH \ �` / C v" y J ONO EE DETARS6-3 SEE DETAIL b-2 31 �61 N I CL 'B' RIP RAP �09\ /� , X N j ( T ��"� _ `^ O ES GF ✓ h l \ \ \\111� 11 OABsI LNOODS �� 31 V' aHX x\\� , \ oh x l \\\ 1 s N zs} I sn _IX a1 } 1 - (g \ \ 1 11 — oNoo E G /' i� 'L woods I jsl 31v9 ` \ \�3 ` 1 ^C (f1 P RAP O E q --E I a0 ,1 EST 31 TONS QD ` 31-�� �l Ln E T 10 SLLJY -- N W A\ ,iw x 36vo \ 24 ---- --/off N Q= V9 v s oa�iw — - - ---- I F-- (q — <-- ---- - - -- aesl - - ----- --- - --- _ _ — - --voa oaadd,ar teu as ` -J` and Uzi - -133is REMOVE _ — --- _ — —'2; ,sEE-0ETAIL — — — --- — _ — — --� - w C I` — — — — — — — — L 1� — — — — — — — — — — — — — — = �— Y _ — —od t— raAS MOVE _ --of n1— _� 8Z 1=— --_ — — ----zs — - _ — a -- _ — __- 55 J c� 111 O — --44 ni - 92 —LZ �8Z �62—+� tea] PAVE W Z + Ln SPEC DIT� GRADING —_ _ 4Z- _ _ - �i ni— — 1 W J M �- --— I — —----__—= us r+wr'z4PAveD ROAuv U Q W 2GI 75, 2Gi 9Z— US 70 <B f °° — —g pAV — — Q N —25 2�� vJ �__ z�4 —25 �c— _ �-' �25� 26� = � 28 � SEE�ETA4L-SHEET 29 28 —30 — —30— —I — IB• RCP — I ETAIti2— 27— 9Z —SZ— —25= LZ 4— 25 TONS �� --- 1£� �— US HWY 70 EBL 35'PAVED ROAL7WAY \ / �3� HOLM DER = — 30 = / �= m _ — (..� + �z7 28— 29�—30.a i_ ��i� ^m - - /M - M Lll LU CL '2 RIP RAP -"WOAI S, - --0.. EST 2 TONS PECDET 3 ITC 4 — EST 7 SY GF m WETLAND WC _ _ _ _ 32- NC DEPT. OF TRANSP TATION I \ Q1O =2.9 CFS SPEC V' DIT-F \ � E DETAIL Lz V10 =1.4 FPS SITE 3 E G m'1' RIP P .� - - _ �/i A ----------------- Lo _ _ _EST 3 5 - - _ _ - ��'' i _ lisp - 1 1 �•o (i + 28�rd24��—_LZ���W00 N W PUE %- _ LL1 d - R — _ _ � _ < � � /9ICje`— d✓ PUE 1 � o�-------- --- I --A --- - -- __ "_'8% M _.PUE _ •° C N NMONN — �F,6� — —L — _ — — — — i 2 n. .. 3 .. g 3Aa .z - -s- - = s = - - �\d.. z ���. ,r '��',�/�� h�a, ` Ig _ Pi-m£� SPbC 'V' DITCH ��C \7 PLI UE m S6E ETAIL is I III a,asl �29 as�l� N Tiwsl ei x EE ' ERMIT SE F: 89 Z SITE 4 25- 28 _tea O EN E �J s2 ;- ; 28�- zs \� \ KERN COMPANY, INC. WETLAND WD 2 '�� w / KENNETH McGOWAN oo / BFFG L COUNTY FILL IN WETLAND MECHANIZED CLEARING FOR -LLT- PROFILE SEE SHEETS 35 & 36 FOR -LRT- PROFILE SEE SHEET 35 & 36 bz zee_ FOR-YIRPB- PROFILE SEE SHEET 63 FOR-SRYIB- PROFILE SEE SHEETS 8/ & 82 °£ x FOR-SRYIC- PROFILE SEE SHEET 83 ti PRELIMIN RY PLANS DO NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR �W ACQUISITION VA L WETLAND WC Submittal February 6, 2024 FILL IN WETLAND MECHANIZED CLEARING WOODS 10' 5' 0 10, 20' SCALE: 1"= 20' PROJECT REFERENCE NO. SHEET NO. R-5777C PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM PLE E FLANS DO NOT USE FOR 6W ACOUBITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 12 OF 89 DATE: 1 /15/2024 SITE 3 IE TO d 0 1 EXTM DID — — M I0I -- OAd- - — 10�- — 11 N ------------- _ REMOVE1= \ HW J O SITE 4 WETLAND WD -SRYIB- - 6 0 0 V110= SPEC 'V' DITCH M \ V10=1.4 CFS FPS OM1S1 PUE PUED IG DITCH Submittal February 6, 2024 0 5 10 PROJ. REFERENCE NO. SHEET NO. R-5777C SRY1C-8 150 1 0 130 120 To 100 90 80 70 60 50 40 30 20 1 1 2 D 3 D 4 D 5 D 60 70 80 90 100 1 0 120 1 0 1,0 1 0 P I WIN H ET 1 F 851 D E: 1 / 5/ 02 0.042 0. 42 4' 2958 31 + 0. 0 ILL RE O URF LY IN 29 38 - 3 + 0.00 --- ILL RE URF IN / 2907 \ 3 + 0.00 ET N W SITE FILL IN WET ND 3 ti MILL RE ONLY URF CIN �n 2887 2 + 0.00 Lo 1 0 110 1 10 1 0 1 90 0 0 0 0 40 20 1 13 23 60 0 0 0 1 0 110 130 1 0 1 0 Submittal February 6, 2024 PERMIT DRAWING 3� SHEET 14 OF 89'^�' F `a �v 07y DATE: 1/15/2024 FIT ELM�N RY�xP-NB T � p � \ zer%iru 'ia r d,Z INGtlMP E PLANB MATCHLINE 9�0� (SHEET31) BallowBeatty st' t� 0}, oxcum vo, / F a MATCHLINE-Y7-STA 23+0011HEET 301 \ Pxo, ro rseL4°on°ai"i 9 N N W / / rc, —IL x.LSrxLNT&K. c x � R, somor zsr, sr rF 1 —i — K s cs.°nr n.. w ,° mw Nr U5 70 NB _ � o --- -- —— --- ----_---_ WEo —_—_ 3 _ _ _ 3^ 2 izims�ximxz'o-�°iin39 i — u + - _ _ - ,r N _ __ - >.a,� _ SITE 7" xra —tea - O :ior Txr x,8xxn.e _ y u g:�r > P, W �= .. ,., � -� �+ .,_ ____ tl0 _ - - .I I SEE PERMIT IN/ y ti . . -- - 6 I ICI i SHEET tiJ. y y „= rn" o WE. N WE I Iel II' F LARGE T / �NE/ STREAM SAS I Inl � d �g\\ I � Mdd�J© � �'°'' A.I.e � �-a��� ��_� I I I li �I �I I h� II / / �� .•�«.. ` „. 30 hT Q10-1.0 CFS III FO% .I xpzuu= i dwnoo. „w cxuPex,.xc .. �� r "�� x' "„�• , m"-�' ,.o., ma.,M10 m..,<.,: .xo-u \ +u DFiAIL ] 1 DFiAIL sxcw,u[ xrcx m su °ncx fff e r e II UNTZ „p .ro-gym � 45+30 o x m m I �`:._ moo, s-z �` �or— — — Ra m.,..00 11 s,n`K, LLT I .. ...,,ryyy... Ic. $EE PERMIT DRAWING x.E a,Dz",°x SHEET 19 OF 89 FOR ENLARGEMENT SURFACE WATER IMPACTS ,„ FOR YIRPB PROFIIE SEE SHEET 63 Wv FOR RAB2 PRJFI(E SEE SHEET fil �"c OR PRBF,t£ S £SHEET 62 FFOORR BRlYIp/P3G PROSEE sHiEreET TEMPORARY SURFACE WATER IMPACTS —11Ft� 3n r E 8a fEE85 DeruL ?� c/ -3�- SITE 6 F71/;� FILL IN WETLAND �� Z VS /.P ^>ry, MATCHLIN Ny Y OZ r * * MECHANIZED CLEARING 0 -Y1-ST 00 IS SEE PERMIT DRAWING �'O �m°xorem�°nox i► A36+ ( I� ET 32) HE 16 OF 89 mF� �Zm N—O— °F I GRAPHIC SCALE Ao HAND CLEARING �° 3�P0 WETLAND WE Wll111-1-1-1° PLA\NS-I� Submittal February 6, 2024 PERMIT DRAWINGFR`snc ° 7 3w SHEET 15 OF 89 S OQ 2 PRBL�M�N RY�mPLANB DATE: 1/15/2024 IN T �- p ��' � s oiru°�i iaO1r s d,Z INGtlMP E PLANB MATCHLINE 9�0� e��� •� (SHEET31) Ballow Beatty StIL ' Y' tea:ii vo, r 1 /b MATCHLINE-Y7-STA 23+00(SHEET 30) r �a p � ` _� -:"4"°�"" 35 � �_ � i � I4$s a' �.� � e9 � Ci &9w�` •: oNsn a ��/ ��._ 6 N N Ll �� m,. .uEk,r�a � � � �� 6 � •}-J � f�/p � ,��1 '° ^-.s��' � 4I II � a I� ���ry � �,'i�"or / �` �a�r �'�' __ -_- P j�� � � ��-.,.. u i✓�j"_ E.;s° ( v, w ssmr`] .E — �_�%�." i tip' ]- Cry :m omm, •� or -- _�_� �_�.��_� � � an•�` _= a _ - — � N�� �(" 4 °v � r I � smu �E c Q `.-- �o EEC / a -tt7 T ' L 7 �p L� f� r r � x� oa�'b ,q� s. ..m �i� ..O �.. -I r �` � -fir �,• E �I � 1/ � s mai,. ry � / �,/ -�� o.,. '�'��,�.� .wo•, mA.Ml°mm.. ° .—a` .rt'AY°"'cn ...- F 6 a .. `.� 1 � .� '� � � Ind .•' ':— �'_ I � :or �- �o—zv- .ew«�°i_ 1 DfiNL ] 1 DFTAIL ,z I ffi q I #' a j p 3 �z r �'• m c. soft c, s c r rr� mn.x,w ro sraows a. .. m°m ma ss,n ro ma 19. u rrou n..v,m ro na ss.ee moss n. �z,so ,o n• zz.so i,r'rrn mom ma �s.eo ra sra ia.ss 11—a, IEEE r (v l rxom z.w smonc n w n •O-�/ EMp nF '• I I`��� �� e SEE PERMIT DRAWING �F°Rn -uurrr i°r�ae scc sHc�rs'�G.n.a .ie � SHEET 19LA89 FOR ENRGEE MENT S SURFACE WATER IMPACTS 'R"� PROF,rE EE sncEr u a..... �.. / ° . ,w "'"'"^ •^ \ % %�� Gk' RPR PROFI/E SEE SHED 63 Y ormo,. _ . so o n �.,..a+POvm� L SEEE 1 EEr E TEMPORARY SURFACE WATER IMPACTS roR sArimic va°F,.I see sRVl'' ea a as F71/;� FILL IN WETLAND NNP 9� MATCHLIN N Y OZ �\ * * MECHANIZED CLEARING a...;t,.. �;,'�,"•„; w, '. �V y14� -Y1-STA 36+00 S EET 32 SEE PERMIT DRAWING Sm 'O < iF ( ) SHEET 16 OF 89 GRAPHIC SCALE JT— i osrys,-�aN lll\ HAND CLEARING 3 1 0 LLIa= WETLAND 1�, d� 111LL1L1-1-1.1°PLA\NS _I� Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C Y1-11 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 120 1 0 1,0 150 PERMIT WIN SHEET 20 OF 8 D E: 1 / 1 5/ 02 SITE 5 v v FILL N D Li o ME HA IZED CL RIN w FILL N WETLAND - 2948 - 31 + 0. 0 60 0.0 O 0.020 a :1 4• ti w 3 2993 3 + 0.00 M 0.020 0.020 SITE 5 )VET LAN E 41) g;1 :1 EC ANI ED LEAR NG w 3 ILL I WE - 3000 3 + 0.00 1 0 1 0 10 10 1 0 10 0 0 0 0 0 1 1 2 0 0 0 0 1 0 1 0 1 0 1 0 1 0 1 0 Submittal February 6, 2024 0 5 10 PROJ. REFERENCE NO. SHEET NO. R-5777C Y1-12 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 120 130 1,0 1 0 ro PERMIT WIN 40 0.0 0 01020 SHEET 2 F 8 FJ4,, D E:j 1 / 5/ 02 2980 .02 0.0 0 - 2924 SITE 5 M 40 ILL IN WETLAND o ME HAN ZED CLEA ZING w 3•. 4: 2927 SITE 5 0.020 0 020 41) FILL IN WETLkND a z ECH NIZE CL ARI G 29.21 31 + 50. DO 1 0 1 0 1 L 1 0 1 0 1 0 0 0 O 0 0 1 20 13 01 13 30 0 0 0 O 1 10 1 0 120 1 0 11.0 l 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C Y1LPD-4 1150 11.0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 1 0 110 1120 1 0 1,0 150 PERMIT WIN SHEET 2T OF 8 D E: 1 / 1 5/ 02 WETLAND WE SITE 5 ILL I W TLAN 080 0 co MEC ANI ED ZLEARING 2882 - WETLkND WE FILL IN WE LAN SITE 5 w 4;� 080 0 O80 M - 2809 - 1 0 1 0 130 1 0 110 1 100 1 0 80 70 0 0 1 3p 20 1 ti- 2 0 70 80 90 1 0 110 1 0 1 0 1 0 1 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C Y1RPD-6 1150 11.0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 1 0 110 1120 1 0 1,0 150 PERMIT WIN SHEET 21 OF 8 D E: 1 / 1 5/ 02 SITE 5 FILL ETLA D ET N E 40 � 5 w g•. 4. 3 ECH NIZ D C EARI G - 2759 90 ET ND VVE SITE 5 40 a FILL IN WETIAND 40 3• 0 .080 �i 3 4; , 2780 0.0 0 .080 4;) - 2829 - 25 + 0.00 1 0 1 0 1 0 140 1 110 100 1 0 0 0 0 0 13 1 2p 3p 4p 50 jo 0 80 90 1 0 110 120 1130 1 0 150 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C RY1DY3C-2 1 0 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 150 PERMIT WIN SHEET 24 0 F 8 JDATE: 1 / 5/ 02 25.80 17+ 0. 0 a s W o 3.7 4:1 4:7 3 25.60 2567 0 s a WULAI,113 WE ILL IN W TLA D ~ FILL IN ET ND 3 SITE 6 MECHANIZED AN CL CL ARIN ARIN 4: ;J ME HA -HA IZED D-A.LEARING CLE RIN 2333 16 + 0. 0 a g W WE LA D E SITE b 0.05 L I WETLAND ME HA IZED L RIN 24. 0 MIA AN CL R + WE LA D E W 0.0 :7 ME A IZED CLEARING 25.10 ID YV. WETLAND E SITE b W 3 ILL I W TiD 3 0.0 3:7 -MECHANIZED CLi 5.40 2533 00 —17 q; :1 FT 5.70 2568 25.20 1 0 1 0 1 0 120 10 1 140 1 0 I 0 70 60 5 201 1 2 0 0 80 90 40 10 1 oil, 0 1 0 1 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C RY1DY3C-4 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 150 PERMIT WIN SHEET Ili OF 8 D E: 1 / 5/ 02 • 0.)60 4 1 2E iz 23 + 0.00 0.0 2 0. 42 30 72 27 23 + 0.00 0.022 0. 22 43 27 22 + 0.00 O o. of 0.1620 22 + 0.00 01 WE LA D WE SITE 7 o 0.0 0 0. 20 110 FILL INETLA D Ulir IMP CTS 3 W 3 :1 EC ANIZ D C LEAR NG ILL I TLAN 22 32 0.0 0 0. 20 10 WE LA D E SITE 7 t 3� FILL IN ETLA D li I I 21 + 00. DO 1 0 140 1 0 110 1 110 100 0 80 70 60 0 40 30 1)1 210 40 50 60 0 0 0 1 100 1 110 1 0 1 140 110 1 1 0 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CI. STk 5 5 + 0 - P EXrG NG AT PIPE C1. — — PR P OUTLET 13ED PROP INLET B D W E= 5.7 1@ 6" 0 RCP NV 24 2 ERE" 01 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED L STA 19 04 -Yl PD E G Nq AlPIE C N SE=21.1 IN =19.2 BURIED .0' 1@ 6" RCP — O Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED C ST 2 + 0 - RYl Y3 - EX G G AT PIPE CL l — J N SE 18. J URI D .0' IN B LE 1. ' 1@ " RCP Q SLLJ \ a ;J LLI � — LU p LU MH 7N0 U Q w n. IQ�U J NMON I~ EMOV LLI ~ F LIJ (n MMIgNOJ, + - Lr�_ 0 Q. r- U LLI Io c Submittal February 6, 2024 DETAIL 8-1 DETAIL 8-2 DETAIL 8-3 DETAIL 8-4 DETAIL 8-5 / SPECIAL BASE DITCH SPECIAL 'V' DITCH CULVERT INLET BANK STABILIZATION CULVERT OUTLET CHANNEL CULVERT INLET /OUTLET BANK STABILIZATION ( NM ro Sc°le) (Not I° Smle) (Not to Smle) (NO to Scala) IN— to S.IB) Frain ft �.IN°Nnl NONrpI hno�nd Dirch o N°Nrol \ of Fronl N°Nml A'"� occ Slope Ground J, D ,�.1 Ground "° d^\ Ground 3., D A"" Dirch a OMe Tuck Georedile F\mat Slop Groond 3., D �\ uck Ge°tenlile' d Tuck Ge°tetitila Key Ripr°p into mimum of 1N mu Key Riprop inb °Minimum °f 1N Channel -p1u B Min, D=1.5 Ft. -3:1 BEHIND Min. D=1.5 F. °mini m of IN Chpnnel BonomFIT) GeotexXle g DYPI Nyp) lace Geotertile Under GUARDRAIL RYE) CHANNEL BED CHANNEL BED B=2 Ft. Length=41 R. r°d°ble) Length= 47 H. Rii in Location - Min. D=2.SF1. Each SNe (voriobla) Dna<red by Engineer FROM STA. 63+45 TO STA. 66+00-L-LT Est. 60 Tons of CIPss'I'Rip-RPp, Keyed -In Typa of Liner=CL'I'Rip-R°p-Keyed-In d=2.5FL La^gth=30 Ft. FROM STA. 63+50 TO STA. 77+00 -L- RT FROM STA. 28+70 TO STA. 29+05-SRYIDY3C- LT t° Top of Bank, Est 24 CY DDE •Place Gewenile Under Rip,ap Ezt 50 Tonz, Ezt 85 SY Geotextile d=2.0 - 3.0 Ft. o o Rn sio e.5,�� a� ya �n oa� op FROM STA. 29+00 TO STA. 42+50 -SRYIA- LT FROM STA. 29+10 TO STA. 31+50 -$RYl DY3C- LT Eat 105 SY Georedile in Lomtam D.,!1d by Engineer 2170 CY DDE B=4.OF. E-30 Ton-OCln--TRipp Rnp,keyed-In, ht. 68 SY Ganteahle FROM STA. 30+50 TO STA. 31+60-SRYIDY3C- RT STA.13+30-Y1RPA-' RT STA. 11+78-Y1RPD- LT STA. 29+10-SRYIDY3C- LT L(T FROM STA. 32+10 TO STA. 34+60-SRYIDY3C- LT M O STA. 29+25-SRYIDY3C- RT PE r,0 FROM STA. 34+60 TO STA. 40+50-SRYIDY3C- LT ti FROM STA. 41+50 TO STA. 42+70-SRYIDY3C- LT FROM STA. 10+75 TO STA. 12+00 -DR2- LT S H E FROM STA. 10+75 TO STA. 12+00 -DR2- RT -_ DATE i SPEC 2' BASE DITCH i DETAIL 8-1 _ E— SPEC 'V' DITCH E— CL 'B' RIP RAP SEE DETAIL 8-2—E--E EST 2 TON$= SY GF CL 'B' RIP RAP � — — EST 2 TONS EST 7 SY GF BANK STABILIZATIO W/CL 'I' RIP RAP SEE DETAIL B-3 — WOODS SPEC 2' BASE DITCH SEE DETAIL 8-9 SPEC DITCH GRADING SEE DETAIL 8-6 SPEC 2' BASE I SEE DETAIL 8-1 CL 'B' RIP RAP EST 2 TONS EST 7 SY GF E t5E SPEC DITCH GRADING SEE DETAIL 8-6 SODOM —�.n1— d nL d 4' PAVED SHOULD _ _ _i_ _ ^ ----- ----------n--- ----------------- US HWY 70 EBL 24'PAVED ROALWAY_______��/ REMOVE -- --------------- f°a.el 4'PAVEO svoumER ?B --` ��---- -- --- --—4'PAVEO SHOULDER -------- ------ ------ --— — — — — — — — — — -- US MNY 70 WBL 24'PAVED R0"—AY ----- — — — MM D OJ,b j 4'PAVED SHOULDER �— �M— _ — — — — — — — —j1 — — — — — — — — -- — — — _ _ — — — — — �v, F-----d--------------d—GRADE*o 9RAIN------ _-SPEC 2`B Ml -- --- --- ___________------_--__-"-----SEEDETAI �13�1— — �3••f._ -- — SITE 8 ----- -- -- `-- —=--Gin,=-- — AdV- -- — — ----sd —-----/—i ----- -- ————--——————— — —ssl— --- ---- —�S,— --- EVERT CUTLET CHANNEL I I I SPEC DITCH GRADING DETAIL 8-6 SPECIAL DITCH GRADING ( NOII. Smle) IPA «y'�R/� "\POCK SP *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 66+00 TO STA. 69+00 -L- LT A FROM STA. 70+50 TO STA. 77+00 -L- LT Ji RMIT DRAWING ET 29 OF 89 �, Balfour Beatty : 1 /15/2024 �� StN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 50' 25' 0 50' 100, SCALE:1"=100' _ LU LLJ E E PROJECT REFERENCE NO. SHEET NO. R-5777C 8 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USE MR 7W ACQUISITION SPEC DITCH GRADING SEE DETAIL 8-6 Q O U) + N V Q U7 LL.I c:) z_+rn 1-- ULU Q W — — Q U7 U) J ------------------------------- r— __�M— F— — I— M �--—1--_---Mr —r ----od nL--------------od nL------------------ ---- TCPr M----------------_GRAM To-156TR----- M- - - - - --------- ------- ———————————————— — — — — —— x-----M------ ------- ,--------------ss,--------------3-- — — _ — — — 27 gd — — — — — - AL M �--, — W/ C A m W/CL'I'RIP RAP (BANKS ONLY) WOODS SURFACE WATER IMPACTS SLOPE=0.8% I SEE DETAIL 8-4 I III WOODS .. .. .. .. .. .. .. I '. WOODS I I_ %i lilim TEMPORARY SURFACE WATER IMPACTS 31Y`J 14ia � N-,. a n X�� FILL IN WETLAND DETAIL 8-7 DETAIL 8-8 DETAIL 8-9 STREAM SB 3 X / Xo SPECIAL BASE DITCH TOE PROTECTION TOE PROTECTION IN WETLAND AREAS a I JNOJ Y', ( NO. to Scolel ( Not to ScOl) (Nol Io Swle) 2,J KERN COMPANY, INC. I 1� c_Na' 3',0** F— C {� N 0 g ��C aoPE Sod Dnm SPEC V' DIT 3 � s —®09 MECHANIZED CLEARING "A'°� d F N°IurolGroend 3., Gmend J, P`� GRou"D WeNand A ea F D P°6eI slo $EE DETAIL 8 BANK STABILIZATION E SYWM GEOTEKFILE �d u Min. D=1.5 Ft. d=1.0 Ft. d=1.0 Ft. B=2 H. /CL TRIP RAP EE DErnu e s $EE�LIPERM Tel D WpI°TOO lva' Geplemle ROCK CHECK DSHEET 2 8 - EC'V'DITCH HAND CLEARING Type of Liner= Class'B'Ripatop Type of Liner= CL'B'Rip-Rap FROM STA. 13+31 TO STA. 13+50 -Y1RPA-RT / SEE DETAIL 8_2 FROM STA. 35+20 TO STA. 36+00-SRYIDY3C- RT FROM STA. 34+00 TO STA. 35+20-SRYIDY3C- RT SEE DETAIL SH I / 1• DETAILTA] k EN RG E SPEC 'V' ITCH I N I RAVEN COUNTY PE 'V' DITCH SPEC DITCH LTD I S-2 O v SE :DETAIL 8-2 SEE D' AIL 8_2 GRAD / I - CL'B'RIP P - PD E EST 2 TONa EST 7 SY GI -o R P o s < c R — — — — 2 ELBOWS Q10=16 CFS V10 =1.6 FPS 4 —SRYIDY3C- 1 R P-V 2GI TX RCBC� /CL 'B' RIP RAP F 1FT \ EST 2 TONS -i-- - EST 7 SY GF F DAYLIGHT m DITCH I / M SITE 9 ** SITE 8 F' PUE RiPg.4P PUE qg To �_ PUE E ON PUE CL 'B' RIP N STABILIZATI0 EE DET S- RAPyS RIL f1 / 5 SY / EIP CL 'B' RIP RAP SEE DETAIL 8-7 EE 8-5 I EST 8 TONS TOE PROTECFION SLOPE ONLY) — — TA7CT1 A AII'l TAT!'M 7� '� EST 21 SY GF (FILL 'B'RIP RAP WETLAND WF °� I L J11YD °°�' SEE DETAILCL IN J1 o � � e�E SITE 10 R — P�E WETLAND WRR 1V — PUE 'C m FOR -LET- PROFILE SEE SHEETS 38 & 39 — PUE m ✓ FOR -LRT- PROFILE SEE SHEETS 38 & 39 PUE — r PUE FOR-YIRPA- PROFILE SEE SHEET 62 v v m m FOR-YIRPD- PROFILE SEE SHEET 65 FOR -DR2- PROFILE SEE SHEET 77 FOR -SRYIA- PROFILE SEE SHEET 79 FOR-SRYIDY3C- PROFILE SEE SHEET 85 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. DETAIL 8-1 DETAIL 8-2 DETAIL K ST DETAIL 8-4 DETAIL 8-5 DETAIL 8-b R-5777C 8 SPECIAL BASE DITCH CULVERT INLET BANK STASILIZATION CULVERT OUTLET CHANNEL CULVERT INLET /OUTLET BANK STABILIZATION SPECIAL 'V' DITCH SPECIAL DITCH GRADING Na ro smlel INat to Scalel (Not to Scale, INot to scale, (Not to Scale, IN&to scale, p� ROADWAY DESIGN HYDRAULICS 2.1 ��d N°Nnl N—I ��// ENGINEER ENGINEER Dirch o PI —I \ of Front NaNml Ao`c Slope Ground Ground 3.y D A Dirch a p�° Tuck Ge°tedile `� `F' F\°( Slop Groend 3� D F` uck Ge°texlile' d Tuck Ge°texlila Key Ripr°p into nimum M1N SP '4'P/D \F� SP u Min.D=1.5 F. a Minimum gI1N CM1anneI BOHOm Geotextile g ° Minimum °f1N Channel N EL pY➢, �� Min. D=1.5 Ft. *3:1 BEHIND ITypI ITm) IrvPI (Typ) lace Geotextile Under GUARDRAIL CHANNEL BED N Riprop in Locations , Z"� B=2 Ft. Length-1 k. radablel Length= 47 H. �> Min. D=2.SF1. Each SNe � jvariabrejED D�recred by Engineer 'SEE CROSS SECTIONS Min. D=1.0 Ff. a, b FROM STA. 63+45 TO STA. 66+00 -L- LT Est. 60 Tons of Closs 'I'Rip-Rap, Keyee-In Typa of Liner=CL 'I' Rip-Rop -Keyed-In d=2.5F. Le^eth=ao Fl. FROM STA.66+00 TO STA. 69+00 -L- LT FROM STA. 63+50 TO STA. 77+00 -L- RT FROM STA. 28+70 TO STA. 29+OS-SRYIDY3C- LT b Top of Bank, Es1.24 CY DOE •Place Gewenile Under Riprap Ezt 50 Tonz, Ezt 85 SY Geotextile d=zo - a.o Ft. oo Rn sioe.,���.a e� �a �n o °° A FROM STA.29+00 TO STA.42+50-SRYIA- LT FROM STA. 29+10 TO STA. 31+50 -$RYl DY3C- LT Ebt. 1o5 sY Geotextile m Location: Dir«ted by engineer Est 170 CY DDE B=4.OF. Es1=30 Tons of Class'I'Ripe Rap, keyed -In, 168 SY Geotextile FROM STA.70+50 TO STA. 77+00 -L- LT Y FROM STA. 30+50 TO STA. 31+60-SRYIDY3C- RT STA.13+30 -YIRPA- RT STA. 11+78-Y1RPD- LT STA. 29+10-SRYIDY3C- LT / \ o✓ FROM STA. 32+10 TO STA. 34+60-SRYIDY3C- LT 1 / V TA. 29+ 5-SRYIDY3C- RT 9 FROM STA. 34+60 TO STA. 40+50-$RYIDY3C- LT C \ IV (bz\ '� PERMIT D RAW I N G J FROM STA. 41+50 TO STA. 42+70-SRYIDY3C- LT tb bZ v FROM STA. 10+75 TO STA. 12+00 -DR2- LT l /� FROM STA. 10+75 TO STA. 12+00 -DR2- RT 4� b SHEET 30 OF 89 17 Balfour Beatty' \ 29 C6�v DATE: 1/15/2024 \\ /1� SPEC 2' BA DOCUMENT NOT CONSIDERED FINAL �zy "� ��y� �b2 /lnti) v" �5€1: 6E7AI 8- 29 UNLESS ALL SIGNATURES COMPLETED Q M G \ SPEC 1 co � � � �� � � 50' 25' 0 50' 100' T � _-� SPE 'V' DITCH CL 'B' 62 �� i —J E$T 2 TIONS Q r S DETAIL 8-2 F--E ESP RA T TO `/ ST 7 SY GF O / CL'B'RIP RAP 7 G E C �E E SCALE: 1"=100' � EST 2 TONS M \ LU �l \� 7 $Y GF ./ \ j 62 C Lf.f BANK STABILIZATIO �, 62 ��6z W/C "RIP RAP b2 S DIItH G DI E DET 6-3 2 - s ti 62 ,V SEE E L 8-6 Lo Q _ WOODS w N. 62 m 9 } f— — 6Z N Ty l� Lf .0 ` 29 �) b6N rv6 M/il I P 29 —YIRPA— 2GI s o (n r^ E: 12' BASE DITCH �_ s I�IJEE �ETAIL 8- to l O v �J2q b EC DITCH TDING b� = m 62 SPEC DITCH GRADING e 3 e SPEt�gAITCH GI IN I i �% J LIJ O +� N v `L2� SEE DETAIL F� 71 - Z� e - - - - DETA�8�6 z Q} O - - - = O LIJ = � S 2— 15" = r W I_ m 6x¢e _�e— - —mE — _ � — a �eEo-s e L _ =' _ — — _0� o sz ae �ba me eZ __ = - - — rn8z_ H 2 IQ N-------------- ---- us Eer2a-PAVEaweaswa�___________ — — — — — -- - ----- — — — — -- a U) I ------�'--- _ R�MOVc-- 31 ----------- --- � — — — — — -- J —30 —30— — 4'PJVE9 SIiOl1LOFS3m —30 —30— —30 —30— I N --- -- ---- ---------- ----- 6Z ------ N EMOV jB 4'PAVED SHOULDER IW ti F -- — — — — — — — — _us rv�r�g�u8 zPAve Ro�rvAr_-- --- — _ -- ----- -- W—�— -- --- � --_ — — — s=— I2 — -- =rnT— 9PAVED-StlBtlt9ER — — 29_ _— e /1 2 �28 — 28 --Zz _2@--M 28 r — —L28 — — V' —01 A1— I — — —sue— [Z�J --- 1—----------inl-------------------M—OJ Al-- — --=vim-- a — — — — --------M------- ----- — O Z 9Z _� �_�Z-- ____ 8Z �- __ �_--------- - --------- -0 -- g------___ ___ 8�un- L,{) - _ _ - F- - - - -M- - - - - - Od -- _ SPEC 2` ITCI'r M �J+—Z`iAAbE 10AIN - } - �c��c----- 1 ibz - - - ------__-1xZ----—S—__9ET'4 --�bz —�—'i-----Jill _----M-----N —===03 -- ----- _---------_—_----------——— — — — — — — SITE 8 —— —� — ____—_=_—__ /---ssd-----OAd-- r---- — ssa----------ssE—-21ssr= _— -oin - - - - - - - - - - - - - - - - - — - - - - - - - - - - - - - - - - - - . - .. .. .. .. .. -- -- — — --- nl Od nL ssE L N ULVERT-OUTL���TTT CHA EL WOODS o"I�II I `9 �- a I I m SLOPEI'RP R F (BAN ;II Z9J SURFACE WATER IMPACTS °N�C, U �" cr_' SEE DETAIL 8-4� I — 28 2 bZ 1Ial I I z TEMPORARY SURFACE WATER IMPACTS k \z I �I I � � b �� m m � 31 91 510 0 I I I 4 DETAIL 8-7 DETAIL 8-8 Q n FILL IN WETLAND DETAIL DITCH ST EAM SB X / X� SPECIAL BASE DITCH I G3 I ONO` d TOE_ TOE PROTECTION IN WETLAND AREAS I Nm to Scale, INot to Scale, (Not to Smle) '� I KERN COMA ,INC. > s _ NATORAL SLOPE NONroI Groend' \ °`F\ °e vro�nd 3. 3'� "°"' SPEC v' DI " �09 MECHANIZED CLEARING GRDDND F 3.. "S° �D� 'w� I WeNond Area F` � F\°c slope SEE DETAIL 8- �l Nf^ Ditch SVV4 'x' d GEGTEKTRE �d �.! Min. D=1.5 Ft. c INK STABILIZATION d=1.0 Ft. d=1.0 Ft. I /CL 'TRIP PAP II EE DETAIL e s SEA ERM T D W 9D1Va' Ge°tenle Type of Liner= Class 'B'Ripat°p Type of Liner= CL 'B'Rip-Rap FROM STA. 13+31 TO STA. 13+50 -YIRPA- RT 7 % ROCK CHECK D EET 2 i 8 - EC 'Y'DITCH HAND CLEARING / O o f SEE DETAIL SH SEE DETAIL 8-2 FROM STA. 35+20 TO STA. 36+00-SRYIDY3C- IT FROM STA. 34+00 TO STA. 35+20-SRYIDI RTC�k DETAIL_' EN RG E I I SPEC 'V' ITCH N VEN COU 9 N 9 5 PE 'V' DITCH �P �LTDE1pl 8-2 8 3b� $E :DETAIL 8-2 C n,� SE D .AIL 8C-2 2 6b CL 'B'RIP P 2 I v ))) I ro-3D IN IO P E EST 2 TON a O EST 7 SY G R ti� /� i IGO --- �� c—I==_ -- —ti — _c C IN s' wr ' 10 =16 CFS\ \ / �f Q 2 ELBOWS b � (� \ b 6 / I w �s V10 =1.6 FPS 4 _—SRYlDY3 C� E U LTL�Cl GI " e�E SITE 10 2 LJ IQ / /CL 'B' RIPRIP RAP - 6 y ' B EST 2 TONS / N — —/ a F — -- // WETLAND WRR x I} EST 7 SY GIF `V / c� 2q - (/ Q E I� z� AY HT I b 22 SITES 9 ti PUE o o FOR -LET- PROFILE SEE SHEETS 38 & 39 a DIT H � / 2`a\`� ,g �c z FOR -LRT- PROFILE SEE SHEETS 38 & 39 *� SITE 8 pU 4 UE row / /�z /PUE E 28 PUE PUE PUE b m FOR -YIRPA- PROFILE SEE SHEET 62 I f—lCID CL 'B' RIP .o ,z FOR-YIRPD- PROFILE SEE SHEET 65 c� N STABILIZATIO m EF�DET S- Q $ 5 Y / Cl IP All �J C W RAP N 2 / �ST 8 T S ^ TOE PROTECTION B-D� m FOR FOR _DR2--PROFIEE SEE SHEET /7 EE e s OFILE SEE SHEET 79 WETLAND WG /esr z�s ti CIL'13'LL ROPE�ONLY) pz 2 ' 2 FOR-SRYIDY3�R PROFILE SEE SHEET 85 N WETLAND WF SEE DETAIL 8 8 �J (�" /1 PRELIMIN RY PLANS W NOT USB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USE POR 7W ACQUISITION Submittal February 6, 2024 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET C. A CK C ECK D STREAM SB BANK STABILIZATION ROCK CHECK DAM R-5777C RW SHEET NO. /CL 'I' RIP RAP ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 1 ROCK CHECK DAM 10' 5' 0 10' 20' INCOM PLE E FLANS SCALE: it y DO NOT USE FOR 6W ACOUBITION m E �� ,, PDE SPEC 'V' DITCH; CL 'B' RIP RAP PD EST 2 TONS SY G F DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED — _ — PERMIT DRAWING SHEET 32 OF 89 DATE: 1 /15/2024 0 0� o � s 1 oho 0 Cc SPEC 'V' ITCH 15" W/ 2 ELBOWS SITE 8 L Aft N 2G_ 1 15 RCP-IV -SRYlDY3C- m 2G1 29+ O 1@7'X7' RCBC 31+00 W/1FT SILLS 00 cl v DAYLIGHT DITCH 00 jOo0 1 O CJ M \ rn SPEC 'V' DITCH BANK STABILIZA 'I' W/CL RIP RAP PUE \ SURFACE WATER IMPACTS N �\ TEMPORARY SURFACE WATER IMPACTS \ I MECHANIZED CLEARING Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C JRY1DY3C7 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 150 PERMIT WIN SHEET 31 OF 8 D E: 1 / 1 5/ 02 WETLAND NVF 17SITE 8 co 0.0 0 0. 20 ME HAN ED CLEA 0 ING 30 � w g :l 2365 14 20.88 0• 01 0.020 0.020 2262 0.59 Z + 0.00 Lo Ln 0.0 0 0.1020 4:7 1 2452 O 0.012 0.1020 1 2248 2589 0.0 9 0.1020 4:1 :7 3.42 2572 0.030 0.030 24.3 1 0 1 0 1 0 140 110 160 0 0 0 0 L50 1 1 20 50 6 go 10 1 0 110 1110 130 1 0 1 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C 3RY1 DUC7 1 0 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 150 PERMIT WIN SHEET 3 F 8 D E: 1 / 1 5/ 02 0.0 0 0.1020 24.33 25 39 or ET N W SITE 9 0.0 0 0.1020 L IN WE LAN 3 4 .I M CH NIZE CL RI G 3.5 2a ao a o ET N W 0.0 0 0.1020 s " ILL I W TLA D s w SITE 9 110 M CHA IZE CL wr RIN 2 08 2368 0.020 0. 20 � � O 4 � 3:I 3 3 23.4 1 24 lz 3 + 0.00 0.020 0.1020 a s 3• 21.88 2425 33 + $0.00 0.020 0.1020 M 3: 4.2E 25.01 1 0 1 0 1 0 10 1 0 1 0 0 80 70 0 030 1 1 2D 60 0 80 90 1 1 0 110 1 0 1 0 M o 150 Submittal February 6, 2024 o, 0 n PROJECT REFERENCE NO. R-5777C SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng �L E DO NOT USE FOR E �L DNS ®W ACQUISITION C STA 6 + 9 -- LSA 3+ 2. G EL=3 .19 -LR- Y1R A- S E = 9 —O '-O " — 1 RP — DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3102:1 SK WE 6" BEVE LED HE D AL I 3:1 NO RMAL 3:1 SKEINEC .30 P OP 100 YR — — — —� T LT 4" 3, Exsr BED 1 T ILL PRO S EL 23.7 ICI, BED E EV 20 77 BED WATEF SURFACE 0 TO BE RE h k OV D S (NOT TO S LE) --NOTES: 1) NATIVE CU MkTERIA ERT SHALL FROVIDE BE EEN SILLS A CONTINUOUS It, THE 6.0' CO FR SISTS THE OF MATERIA STREAM BED THAT AT IS EX rHE PROJECT AVATE SITE IS AN UBJE MAY TO BE S PPRO BJECT AL BY TO P THEE RMIT CONDI GINE R IONS. SEP RATEL AND ATTI-VA ATTACHED Y D WELS. 7 0' 'ABOVE 4 NL BA MBER AK FU DF SIL L. S DETERMINED BY THE 1.0' INLET SILL A AND UTLET TB TB SILL 1, TB TB\ TB --- TB 11 ILL — iB PLA VIE 9�3 DET IL DETAIL CULV RT IN ET BAI K STkBILIZATION (Not to Scale) (N t to S ale) I 2:1 N u ow- d 0. D Tuckeotexti ' —KeyRi ra into a Mini um f lft Riprap Ge textile a inimu of 1 P) CHANNEL BED Channel B om(Ty) B (TY ) Lengtl,=41 Ft. (Var able) ngt t. Est. 6 Tons of Cla s 'I' Ri -Rap, Keyed In T pe o Liner CL 'I Rip -Rap - eyed -In in. D=2.5 . ace o ex i e 'Prop E t 170 CY D E Est. 1 5 SY eofex ile in Locatio s Dire ednby nginee Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. ° n R-5777C ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINC®Ng pL E E pL DNS DO NOT USE FOR ®W ACQUISITION CL STA 2+ 1 - RY1 Y3 - I E 1 7' 7' CB W 1FT SIL S ° , �� DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 3. 3:1 SKEWED 3:1 NORMAL + �_ Z=-- 4 �L3 La EM D T L " B VE ED HEADIAALL Tn IT TB RT PROP 100 NR B RT 23. O 3 19.7 AIrE RS RF CE ptr)EXS BED C B D LEV =1 .80 EXST BET) 10— SL PE ° C 0 cn r i9 a N 3 E a a LtD (NOI IL TO SC ALE) *N ES: 1) N C TIVE I LVERT ATERI SHALL L B PROVI EEN E A SILLS I CONTR 4 THE UOU 7.0' C FR D NSIST M T1 RING OF MATERIAL E STR CONS THAF AM BED A RUCTION. NATIVE IS E THE P 'AVAT ROJEC ATERIAL ED SITE A D MA BE UBJEC TO ERMIT CON ITION . SE 3 D ARAT N Y AN SET ATT LEVA CHED ON BY D F SILL WELS 7.0 AB 4) N VE ELkNK MBER FULL. OF SILLS DETEWINED B THE Et HEER. 1.0' INLE SILL 11 F AND OUTL SB SILL �T TB SIL _ — — 93 DETAIL (Not to tale) t r ,� N tural oun 1111 roun Tuck Ge textil Key ipr pin Ch nnel I lottom(Tyr) Pin CHANNEL BE Rip ap in Loc Lions Ea h Site (Variable) Directed by E gine r Lemg-Rip-pap tc be I stalle To 2 Outs de To d 2.0 3. Ft. of Di ch Sicpeso Juris iction I Stre ms s= on ot class I a ey - n, s. o ex I e Submittal February 6, 2024 O N � Q F LU L1J Q 2G1-D 00 i U1 j LL]- LU = Z J Al-2GL Q f� V) 1 DETAIL 9-1 DETAIL 9-2 DETAIL 9-3 SPECIAL BASE DITCH SPECIAL 'V' DITCH STANDARD BASE DITCH IN.le Smle) IN— Xale) INor to Smlel -At rurol F-1 1 °' Slope Ground Natural No 1 °T Natural A' ,7. Ground Groand 3.7 p F\°N°r DI pe Groped II ee II D Min. D=1.5 Ft. Min. D=1.5 Ft. Min. D=2.0 H. B=2 Ft. B=3.0 H. FROM STA. 78+50 TO STA. 81+00 A- RT STA. 83+00 -L- RT FROM STA. 77+00 TO STA. 78+50 -L- RT FROM STA. 81+00 TO STA. 83+00 -L- RT O 'ROM STA. 42+50 TO STA. 44+10 -SRYIA- LT FROM STA. 42+70 TO STA.43+57 -SRYIDY3C- LT LTT :ROM STA. 44+50 TO STA. 48+44 -SRYIA- LT FROM STA. 43+57 TO STA. 46+00 -SRY1 DY3C- LT :ROM STA. 48+44 TO STA. 53+44 -SRYIA- LT FROM STA. 47+50 TO STA. 49+28-SRYIDY3C- RT 'ROM STA. 53+44 TO STA. 56+50 -SRYIA- LT FROM STA.49+32 TO STA. 53+90 -SRY1 DY3C- RT FROM STA. 54+20 TO STA. 57+00 -SRY1 DY3C- RT «1 FROM STA. 10+50 TO STA. 13+15 -Y1 D2- LT V FROM STA. 11+00 TO STA. 12+50 -Y1 D2- RT SPEC 2' BASE SEE DETAIL 9-1 — E —; 7 � JL ll��t I zsri.lei-T3- 31tl0 I WOODS 21 I SPEC DITCH GRADING I I I I DETAIL 9-4 PIPE OUTLET CHANNEL STABILIZATION 2H INor ro Xole) (TYP) N-1 Bed Elevmion Grauno� � u�d a Tuck^ eorvxrile r o i " of th Georenile' m% CAannel Bed •Place Gemei. Under Riprop length T Ft. Naeablel in Lorarions oirzned M En9inear Est. 15 of Cl­i�Rap, Keyed -In Est. 30 SY SY 'I' RGeotaNile STA. 49+30-SRYIDY3C- R1 ECJ TARHEEL INVESTMENTS, INC. SPEC 2' BASE DITCH SPEC 2' BASE DITCH SEE DETAIL 9-1 SEE DETAIL 9-1 CL'B'RIP RAP EST 3 TONS EST 10 SY GF E E E E E-------—�—E E- � HW -JK7IH- SPEC DITCH GRADING 2GI - - - - - - - - - - - - - - - - - - - - - - - - - - - - - is ,Bl- - - .Er - �� ni- - 27I - 4-M4A1612 --�— ------ --- ---- --- REMOVE d,bz CL 'B'RIPRAP� ---- EST 2 TO =-- EST ONNNn .H - - - - - ROAOVE z �� --- - - GRASS =SPA NIDQC - - - - SEE ff70L -i GRASS- -�TLF�— — EST 90 CY DDE Y�aETAtt F, / H os ni SPAC�'"hPeD46�`° � I l o <we / F W SEE DETAIL 9 / 2 / / IDS NOIS S / yOV I SITE 11 SEEDETAIL9 2 QVE I CHANNEL STABILIZA ON W/CL 'I' RIP P o KERN COMPANY, A _SEE DETAIL -4 /R 1 0- MArC �. all l 11 HLINE INSET STREAM SC Y\5E { C/WETLAND WQQ / I CL 'B' RIP RAP fC / d/ l of SEE DETAIL q DITCH EST 3 TONS / L EST 10 $Y GF / /// % SITE 10 ��•\�}\-Cj'"1. .on _ 11 \V`fl /1 / �l/ / TIE TO EXTG DITCH w� WETLAND WRR C SPEC 'V' DITCH SEE DETAIL 9-2 I SITE 10 CL 'B' RIP RAP EST 2 TONS EST 7 SY GF E:�L7O��I---------^'---------'^-- l>-]45 rB —�dA-- DETAIL 9-5 SPECIAL DITCH GRADING 4 (Nm . Sm16) 4 J_ ag\1 SP .SEE CROSS SECTION$ N�'' Min, D=1.0 Ft. Q FROM STA. 83+00 TO STA. 85+50 A- RT FROM STA. 80+00 TO STA. 91+00 -L- LT DETAIL 9-6 Z SPECIAL DITCH GRADING 4 (Nar ro Xa16) 4 I o� p .- _ 6- SPA .�q�ge[F SP �Pg�O\E 'SEE CROSS SECTIONS Min. D-1.0 Ft. B= 'Variable FROM STA. 85+50 TO STA. 91+00 -L- RT 50' 25' 0 50' 100' SCALE: 1"=100' DITCH BERM TO EL 26.8 SEE SHEET 2D-4, DETAIL 13 PROJECT REFERENCE NO. SHEET NO. R-5777C 9 IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INC®MPLE7W E PLANS DO NOT USB POR ACOU ISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 37 OF 89 DATE: 1 /15/2024 CL 'B' RIP RAP + E E E EST 2 TONS CO _ R E—Es1zsY GF to O t (o L1J I LLJ Q z 2GI FS, SEE DETAIL SHEET -------FS SEE_------------- --- ----------- ---- W _ O 2D-4, DETAIL 12 J T- '4'PAVEO SHGULBER 15„ - 1 ni - U cy) ------- 3GH — — — I_ LLJ US HWY 70 EBL 2 r PAVER Q � _ -- -- a'PAveo snoumER --- -- 2 JI C� 1 CL 'I' RIP RAP _— GRA55 SPEC DITCH UKAIJINU EST 30 SY GF —SPEC DITCH -GRADING — — — — SEE-�EFML 9=6— -- ------ _SEE DETAIL 9=5 _ ______ _ IlD A\A/IAI!_ — ----- S hWY 70 WBL 24 PAVED ROALWAY — i l _ OF 89 -1 ---- ---- ---- ---- --+-- T— -- U o O ENI AR(LF AAr-KIT ---oe Al- --��--� 6 L: y - d]a .SI - - - - - - - - -1 - - _ _� -�-- --- 3>�--- --_-3 ---- y c > nib- --- -osn - � � ''��� {f M/tl 9NI151X3 XI ya c IA r Io-II- DUE A DUE DUE �UE DUE UEro IIA UE� II n I I —mDUm DUE I ro UE SPEC 'V' DITCH I L9 I SPE{ 'V' DITCH 6 I III 0� . WO5E9 DETAIL 9-2 I 4 CS I SEX Woods i I I a p III doNVO adsl I iI I a1N I II I I c� OaSI a I I 71" I III X I ENO e I I III I 3SnoH I I % Q I I L as I dwna I "9 X aivs/ S I * El p WETLAND WI I ROY M. ROY M. X a1N E80RN, EEORUX EBO N ET UX UX SURFACE WATER IMPACTS UTHIT, P. DOERNES ET UX MONTY A. CAMPBELL. ET UX TEMPORARY SURFACE WATER IMPACTS FILL IN WETLAND u WETLAND WRR WETLAND EXCAVATION ID CONSTRUCTION 02— STA,l3f15,0/ HAND CLEARING FOR -LLT- PROFILE SEE SHEETS 39 & 40 FOR -LRT- PROFILE SEE SHEETS 39 & 40 FOR -SRYIA- PROFILE SEE SHEETS T9 & 80 FOR-SRYIDY3C- PROFILE SEE SHEETS 85 & 86 FOR -YID2- PROFILE SEE SHEET 89 Submittal February 6, 2024 O Lo INUJ � co LU Q= iv O PA w w- LU = Z Cn U 0 — Q L� Q _ H — 1 J -- I Ja 9& DETAIL 9-1 DETAIL 9-2 DETAIL 9-3 SPECIAL BASE DITCH SPECIAL 'V' DITCH STANDARD BASE DITCH IN. re Smle) INot ro S<ale) INorro Smlel Freer DII Naruml Fronr -L '\ �r Slope Ground G—d Ground 3. !'� u< D.h Naruml A' ,7, J G�;\ Ground 'Y I eeDII F\off°r clone G—d 3.7 D F\�er D Min. D=1.5 Ft. Min. D=1.5 Ft. Min. D=2.0 H. B=2 FL B=3.0 H. ,7 FROM STA. 78+50 TO STA.81+00 -L- RT STA. 83+00 -L- RT FROM STA. 77+00 TO STA. 78+50 -L- RT FROM STA. 81+00 TO STA. 83+00 -L- RT O FROM STA.42+50 TO STA.44+10 -SRYIA- LT FROM STA.42+70 TO STA. 43+57 -SRYI DY3C- LT Ln FROM $TA. 44+50 TO STA 48+44 -SRYIA- LT FROM STA 43+57 TO STA 46+00 -SRYI DY3C- LT DETAIL 9-5 SPECIAL DITCH GRADING 4 (Nmm s<nle) `sr� ~✓�RYge<E N sr .SEE CROSS SECTIONSMin, D=1.0 Ft. ^ eN FROM STA. 83+00 TO STA. 85+50 -L- RT / FROM STA. 80+00 TO STA. 91+00 -L- LT m PROJECT REFERENCE NO. SHEET NO. R-5777C 9 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INCOMPLE E PLANS DO NOT USR POR 7W ACQUISITION FROM STA.48+44 TO STA. 53+44 -SRYIA- LT FROM STA. 47+50 TO STA. 49+28 -SRYI DY3C- RT STA. 49+30-SRYIDY3C- RT DETAIL 9-6 7 FROM STA.53+44 TO STA.56+50 -SRYIA- LT FROM STA. 49+32 TO STA. 53+90 -SRYI DY3C- RT SPECIAL DITCH GRADING FROM STA. 54+20 TO STA. 57+00 -SRYI DY3C- RT «1 FROM STA. 10+50 TO STA. 13+15 -Y1 D2- LT 4 (N.— scale) V FROM STA. 11+00 TO STA. 12+50 -Y1 D2- RT I /�0 8Z r v --$F— •�A�qe[ D NPR'�0`E StN sr r— J/IJ Balfour Beatty �'2g DOCUMENT NOT CONSIDERED FINAL �� �' / 'SEE CROSS SECTIONS B_n. D� floa61e. �� UNLESS ALL SIGNATURES COMPLETED FROM STA. 85+50 TO STA. 91+00 A- R7 '\Bz PERMIT D RAW I N G Q, 2� o so< boon CJ TAI; EF,L2 VESTMENTS, INC. ®2 / Q^/ 2q - SHEET 38 OF 89 SPEC 2'BASE DITCH ��jj (Zgb ABASE DITCH UUVJJ cL B RF ns� SCALE: 1"=1o� `+J \) SEE DETA{C"�1� ,Lid SEE DETAIL 9-1N�' `� �� DATE: 1 /15/2024 `\\ "V \ ^ ^ ITC ERM TO EL 26.8 N� ti I B 2 �ON." EE S ET ZD-D€fAIL 13 EST 3POST1 �g� E ®ZE yy �N} m�� �L'B'. RAP �28� Z + �T E �2 EYT 2 T N$ (fl q 2 ti R E E GF pp 2 28 Lr) O tee E� Q 0 HW g2 N �\ t - 0c , 3 (--\ - I- mREMOVE_ --- — — — -- (� WOODS CH GRADING 9 s E � [INIIii EST 90 CY DDE - SEEbETAtt V--T 2GI SHEET -------------------- — —--— —T— �-W� - — — — — — — — — — — — — — — — — — — — — v US HWY 70 EBL 24'PAVED -- ---- --- __ --- -- SHOHL9ER-- 2a —t7r RIPyfAP--- BZ -SASS— SAC BITCH OZ -- -- —SPEE 9HEH-GRABIN� ---- �sEE�EFML�=6— -- — - EST 30 SY GF'� _SEE DETAIL 9=5 ---_ __ __ ___------------- 7" S HNY 70 WBL 24 PAVED ROPL4✓AY — — — — — � --Ali--------- - $PEC^""W'IYIFC Ut SEE �DET� L 5 2 � N01$ S oU��+ SITE 11 J �_27 ti EECDETAIDLI CHANNEL TA IZA O ) KERN COMPANY, 1 _ EE DET R Vol Mqr ig . l 'RUNE INSET STREAM SC cP�4� r=(kND WQQ CT� \ ; ,lW. CL 'B' RIP RAP [ �a ' I / (ll EST 3 TONS PST 10 SY GF , o 0 I I 2 " � J 00'Og WETLAND WRR E W SPEC 'V' DITCH SEE DETAIL 9-2 / SPEC LAT 'V' DITCH of - EE DETAIL 9-2 SIT 10 ITO E G DITCH 121 E LAND WRR ID CONSTRUCTION rny�yiw�ss�.�r�� W LU ti I LU <` Q = L11 O + LCD f LLJ Lij Q U) 2 -- t t --- U o 0 cM O --_ LnW LU U) U 2 I a 11W I �I I I `a 2a 2 r ICI to zl DUE DUE DUE DU UEro IIA UE II ^p�m DUE ro UE ECLIrcH I VV 4 2 . SEi: DETAIL 9-2 i 4 CS �j II SERE nH1 6aOalaasl r l l Q / JI, I I bz I a _ — — - 3dAnd II I. aivs/ s I I Las I e /l] Na JJx I * ❑ ND p ale ROY M WETLAND WI I ROY M. ROY M. x EBORN, EEORN,T UX EBO N ET UX LIX SURFACE WATER IMPACTS UTHIT, P. DOERNES ET UX MONTY A. CAMPBELL. ET UX TEMPORARY SURFACE WATER IMPACTS FILL IN WETLAND WETLAND EXCAVATION FOR -LLT- PROFILE SEE SHEETS 39 & 40 FOR -LRT- PROFILE SEE SHEETS 39 & 40 HAND CLEARING I FOR -SRYIA- PROFILE SEE SHEETS T9 & 80 FOR-SRYIDY3C- PROFILE SEE SHEETS 85 & 86 FOR -YID2- PROFILE SEE SHEET 89 Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C Y1D2-1 1150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 1 0 110 120 1 0 1 0 1 1 0 PERMIT WIN SHEET 40 OF 8 JDATE: 1 / 5/ 02 a ti W w 3 0. 11 0021 :J 2.7 24 21 O FILL IN WET N SITE 10 A-A24 0.0 8 .020 AN CL RIN 23.19 51 2 .10 FILL N ETLA D W SITE 10 4: 0.040 0.04 LIN HAND CLEARING 23. 4 2493 23.30 o � XCA ATIO WE LAN SITE 10 .� 0 4:) 3.. HAN CLEARING 24.0 2 10 23.5 o 5 � ti w 30 04 0.440 % ;1 11 2744 + O O 24. 5 24. 0 0 w Q ti � D.02 0.023 4:) 3;) 2 10 25.00 10+ 0. 1 0 1 0 1 0 1 0 1 0 1 80 70 60 0 40 301 1 2 30 40 50 60 0 80 0 100 110 120 1 0 1 0 1 0 Submittal February 6, 2024 DETAIL 10-1 RIP RAP AT EMBANKMENT I Nato style) DBeb 101rom. Grace ,.o•roie. 1.5' Place Geole,t Under Riprap in Locations Key Rip— ii- Directed by Engineer Channel—..(T.) Type of Liner= CL T Rip-RaP, Keyed -In STA. 60+05-SRY1A- LT STA. 60+15-SRY1A- LT m DETAIL \ \ I SPECIAL BASEE DITCH I (Not to Scole) N NaNrol \ Oc Front m m Ground 3y A' Dith sl D F\hoc Slime I . Min. D=1.5 Ft. B=2 Ft. FROM STA. 56+50 TO STA. 60+03-SRY1A- LT FROM STA. 60+13 TO STA. 61+24-SRYIA- LT FROM STA. 69+65 TO STA. 70+50-SRYIA- LT FROM STA. 63+30 TO STA. 69+75-SRYIDY3C- RT ECJ TARHEEL INVESTMENTS, INC. SITE 12 RIP RAP AT EMBANKMENT I EST 42 TONS, EST 60 SY GF SEE DETAIL 10-1 PEC T 2' B SE D I r- N SPEC 2' BASE DITCH f— CL 'B' RIP RAP E LL1 _ -----CE U_I EST 7SYY GF W. L Q w -- L ; DO NOT SPEC DITCH GRADING BURY INVERT O SEE DETAIL 10-4Lo — N + o0D (.0 If) - I U) C 2GI --- II RAWING — -- O — UQ U5 REMOVES G J N DETAIL--- _ C DITCH GRA�G—� �_ — �3EE-DE1•AIL 10-4 -- � i - - -G ASS w - REMOVE RETAIN PROJECT REFERENCE NO. SHEET NO. 50' 25' 0 50' 100 R-5777C 10 ROADWAY DESIGN HYDRAULICS SCALE: 1" =100' SURFACE WATER IMPACTS ENGINEER ENGINEER /8 / / woods PRELIMIN RY PLANS DO NOT USE MIL CONSTRUCTION INCOMPLETE PLANS Noll� Balfour Beatty StN N on m UNI ET STATES OF AMERICA (CR TAN NATIONAL FOREST) D o sz / / oS G7 � 5 ❑ Ci y aNnoae Atlld / DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED UNITED STATES OF AMERICA PERMIT DRAWING W ONQ l N I lanoa l V55Va9 (CROATAN NATIONAL FOREST) SHEET 41 OF 89 STREAM SD — — REMOVE DATE: 1 /15/2024 g CROATAN PRESBYTERIAN CHURCH J lJ ( CpETA a C) f3 fJ Q Q m m W � / Il C l� SEEI 10 3 C3 — El EST 5 TO R EST 1 SY GF I / / Q F I Ji .11� \ ��� —11 SPEC 'V' GRASAAREAARKING .e£oD DITCH sz•ob.lez-1B- SPEC 'V' DITCH SPEC 2' BASE DITCH SEE DETAIL 10-2 °81 pityE HW C E __ SEE DETAIL 10-3 Nory M/a s oaz �\ E ER SEE DETAIL 10-3 T E E WO $ 0 as ,a0 an / 8^ E F —F -- + as' 96ssz- _WOOD $ / £L Zfab Nory M 1T-� - IS . � � < < > > C) -Mi---- — _— -- --- --- _ MH JN C0 LU 2G z-- — ------ f _ _ _ —— --------- --__—M___ i `Q ((�W -7 T3 ---------a-----l3 —s---M--- _-- --_- l d T- - SPEC�ITCH--GRABINC =--__� NMONNNn ON, SEE DETAIL 10-4 -- -----L-----------—----u�->rr-E SPEC TDfPC'H-G RANI - - -oj ni- - - i 40TCB M 1 Zq - - -- I FS, SEE DETAILSHEET - 70 ESL �VED 24'P ROADWAY 4' PAVED SHOULDER — � = A LU - �d B4T __ Uj ----------- ---- ---���__ �_--���-- TW DETAILTO -__.. � 1 c --- _ 0 A �WABL�FFI-- -----DITCH --__ 4'PAVEO SHOULDER S� J FL L{�lLL _ _ ...,. SEE DETAI-------- -5€E.UETAil-4=—_— EMO RVE ~ O — — -Lo - t - - - 2GI - - - PAVED SHD(iLDER — 70 ��� WBL 24=PAVED Fq�PINR#LE FILL Q 2 4, AIL 11 - 1tEMOVE -- REMOVE, dy REMO --- ��_- - _ 2GI-A _ _- Sad V =- M_-- _ -- — -- - - SITE 12 a — — �� — — — - __ _ — — _ _ __ �nr ONNNl1 ,8- v 0 -- - n3835n , n ICI 40TC X JE E . /DUf D fU .� p ab a I E )U€ \ -5 GI Q `� � DUE DUES - _ %' ++ ` / — ar+rR-n UE I Du II ozl II' O� X I IdESt ITS tl1H f'� CLD'B'RIP P DUE — DUE N a,el - LLl NDUE I dWtlif rr I I ✓ 1(11 BZ 2 , SPEC N' DIT \ EST 110 'ci' EST 2 TO S h I d •SI >- (•U Q I II dWtl2), I OMSPE H I I I 131Od ° z SEE DrIL 2 I o I EST 7 SY F I U tr ^ v OM S ETAIL IO-3 9tl4i M.9£ �" I AdONVJ (~!) I Q °j5, I RETAIN `\ d1H I, w m X N JJ X SITE 13 Ic h U m D� I ) co� p=Sl 1 \ 1 SCEC ITCH I fl J D T 10-2 E=ANNEL STA 1 ION FALLOW STREAM SD - \ X I© I— E rC r I C7 V I X T—N 6A SEE EA I ` 1 p NOJ f3 n� I m STREAM SP M / °$ KENNETH WENDALL 1 I I / mI I TYLERW z CONNOR, ET UX S N° I L �6i�ER Y AMOS W. o 1 \ CONNOR IV, SEE PERM) RAWIN K ET UX - SHEET OF 89 a I \\ FOR EN RGEME T �PEC TB E DITCH '''���///JJJ, SEED AIL 10-6 > ENJAMI 1 \\ B , / LEE it DURWOOD of NI \ \ \ 3n0a1erv,o I m LAURA C. / AMOS W. CONNOR o m EBORN RAY MALINA / LAURA C. I IV ET UX DETAIL 10-3 DETAIL 10-4 SPECIAL 'V' DITCH SPECIAL DITCH GRADING (N. to scale) 4 (Not to Smle) 4 Front I � I Ditrh Nat rot � !'� Oc Slape -^ Ground 3.T D F\oP`Oc ` sP� aN,R/, D \P0\E• sv BlP JNF Min. D=1.5 H. 'SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 10+00 TO STA. 11+38 -Y2- LT FROM STA. 91+00 TO STA. 99+00 -L- RT FROM STA. 62+00 TO STA. 65+30-SRY1A- LT FROM STA. 91+00 TO STA. 94+00 -L- LT FROM STA. 66+30 TO STA. 69+65-SRYIA- LT FROM STA. 95+50 TO STA. 105+00 -L- LT FROM STA 57+00 TO STA 60+00-SRYIDY3C- RT FROM STA 103 0 TO STA 105 00 L RT DETAIL 10-6 LAURA C. MALINA MALINA ' SPECIAL BASE DITCH DETAIL 1 GRADING / (Novo Scale) SPECIAL DITCH GRADING I 4 (Nat to scale) � Natural oI Front D —. Ground ,7.7 w Dkt, `— r `� VE / D FMi slope C qR \P0 5P e I alp JPg �. I Min. D=2.0 Ft. B=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ff. 1�.1 B= 'Variable FROM STA. 70+30 TO STA. 71+00 -SRY1 DY3C- RT FROM STA. 91+00 TO STA. 91+50 -L- RT / FOR -LLT- PROFIL EE SHEETS 40 & 4/ FOR -LRT- PROFILE SEE SHEETS 40 & 41 FROM STA.61+90 TO STA.63+30-SRYIDY3C- RT +9 + -- STA. 69+80 -SRYIDY3C- RT FOR -Y2- PROFILE SEE SHEET 65 �B anJ FOR-SRYIA- PROFILE SEE SHEET 80 FOR-SRYIDY3C- PROFILE SEE SHEET 86 N N f� 8� t � —28- J,,m �N �}lit l // g2 DETAIL 10-2 L r SPECIAL BASE DITCH \ g2 (Not ro Scole) Jai Ground 3/ A' D'RCh `) Slope J BZ I B Min. D=1.5 F. ylliu(I B=2 F. FROM STA. 56+50 TO STA. 60+03-SRY1A- LT 'Jg 26� FROM STA. 60+13 TO STA.61+24-SRYIA- LT Z ` FROM STA. 63FROM STA. 6`9//30 T��-O]]]] STA• 69+07550SRYiD \CURT v —� ECJ �TATaL INVE23,AEfJ , IN6J f SITE 12 zg < RIP W AT EMBAN ENT EST�d2 TOISEEES-q6 Y GF ETAI a PEC 2' N PEC 2' BAS I H �L'B' IP RA 26�7� E—��U'—�-- LL1 E LLI CE E SY L L DO NOT BURY INVERT SPE DI H GRA ING 8 SEE DETA 10-4 + \� Lo Q — .. LLJ O __ — LLJ U Q W _ sm-RF:MiOVE� _-- �C RhDIIIiIG G J _—�� DETAIL 1 _Z — _ C DITCH GRADi1HG-- MUEf—ILL10=4 Submittal February 6, 2024 IF— ( y �ti —� 2>------� 2B PROJECT REFERENCE NO. SHEET NO. n \ R-5777C 10 / 5O' 21, O SO' ' 100r ROADWAY DESIGN HYDRAULICS hThftu ENGINEER ENGINEER 27 l l /Il S SURFACE WATER IMPACTS SCALE: 1"=100 �, � "� // % by 2s /g I/ w000s 41 RETAIN / �8z�— TEMPORARY SURFACE WATER IMPACTS �9 Balfour Beatty � ED S A T OF AMERICA N / o os e � awn01V z T(� ❑ /ll� 9�f �j DOCUMENT NOT CONSIDERED FINAL TAN AIATION L FOREST z ti 5 Atl,d ,�/ [ Zr3 �s UNLESS ALL SIGNATURES COMPLETED --- I ��` gti PERMIT DRAWING N I lanoa �, UNITED STATESe& AMERICA s) Its STREAM SD / — ' /� ON� �1l\ „dssda� g� /O �CROATAN NATIONAL FORES�) 26 SHEET 42 OF 89 Clbe boo \ I —J / z 9 ®ti REMOVE / / /� h 3N/el I_—�— 2� �—� DATE: 1/15/2024 / CROAT,�N PRESBYTERIAN CHURC 26 O ny� 0 / ( SrI1(EC' 'V' TCH C SEE BETA 10-3 i Q w YZ 9d' /' E I I GRASS PARKING SPEC 2' BASE DITCH m EST TONS J AREA � (\\\ EST 1 Y F / / &U F I\ �� N ] 62'Ob£19Z I13- SPEC 'V' DITCH G Z1� SEE DETAIL 10-2 5/ / PEC ' ' DITCH \ QC E EE DET 10-3 Nory Mia SEE DETAIL 10- ^' \ \ ��- wo �2 S2 1, S O as aD P III s oaz B^ m E E E E_� i SLIO oos / I/ sL rvortbx, Is F -- --- 27 � W w —------_—_ z-- -- --- _ — �25 l33 .9co NMONNNn Ury� 0F.-� EPEE-BFTCY1-GRkDiNG'--- _� - — —i — SEE DETAIL l�:�i 4 23 3E€ I cc•SEE-DE7SHEET _ 27 ROAOINAY ��== _ W W = co _ �— S� J �WABLE-FILL� -- --- DIT GRABINi3-� m 4 PAVED SypN�pER v rj FL LEFT = O �5— _ 0 LL—FMy 70 WBL 24=PAY=D Z ¢ O —GisADu G 4 FQ 1tEMOVE -- REMOVdy Ldtl _ — — � — _ co REMO�--- --� _ _ — / - — -7TOVE - _ DFA — _ — _ — — — — _ _ —sse _ — �� 1 J LU SITE 12 co 3 ICI aoT X l�E Q DUf sZ (U .- � � DUE —="' ' _ _ � � � e I _ i E LI€ I _ - dL IP P �a1N DUE�DUE �N DUE `- F- I DU /fir — ON00 I I I ES T $ N DU W NDUE w I I (� dWOtla I I NI ✓ ; BZ I SPEC LIT \ EST I10 CL 'B' RIP P E dWtl2L. I MSP H I I I 3lOd 0� z SEED AIL N I EST 7 SYO F LJ n SI Q= OM S ETAIL IO-3 O'tl�d M.a I� II I Od51 I RETAIN N `. I `\ al 5 II AdONWVJ m I JN JI X—� I m I SITE 13 Ic f I co co ads) 1 I \ 1 Ee ITCH J I CD a ( / l I D�1E 1 p C D T 10.2 fl U ET CHANNEL STA I ION NG N ��� 7 STREAM SD II \ ti uNln� / I© FaL ow i E see e A I3 I - MM FOR LARG MENT �I I STREAM SP Q0 V I � KENNETH WENDALL r 1 ` �� I MATTH W z CONNOR, ET UX S >Ia l L I TYL R p \ o J Antos w. SEE PERMI RAWIN R \ COET LI IV, _ K I w1 ET ux �I SHEET OF 89 wl aI \\ \ I FOR EN RGEME T PEC 3' B E DITCH W - 1 I— SEE D AIL 10-6 1 w � > � BENJAMI w �6 LEE �' it DURWOOD of w \\ \ B 3naalerv,o ,,'m LMAL NA o EBORN RAY, ,... ,,,• 1 / LAURA C. I IAMOS W. CONNOR IV ET UX DETAIL 10-3 DETAIL 10-4 SPECIAL 'V' DITCH SPECIAL DITCH GRADING (Nw to..I.) 4 (Not to Smle) 4 Froal I � I Dikh Nat rol � !'� Oc Slaps E -^ Ground 3./ D F\oP`Oc ` SPA ap,R/, D \P0\' Sp BLe .1r0. Min. D=1.5 H. 'SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 10+00 TO STA. 11+38 -Y2- LT FROM STA. 91+00 TO STA. 99+00 -L- RT FROM STA. 62+00 TO STA. 65+30-SRY1A- LT FROM STA. 91+00 TO STA. 94+00 -L- LT FROM STA. 66+30 TO STA. 69+65-SRYIA- LT FROM STA. 95+50 TO STA. 105+00 -L- LT FROM STA 57+00 TO STA 60+00-SRYIDY3C- RT FROM STA 103 0 TO STA 105 00 L RT PRELIMIN RY PLANS W NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR �W ACQUISITION DETAIL 10-6 LAURA C. MALINA MALINA ' SPECIAL BASE DITCH DETAIL 1 GRADING / (Nw to Scale) SPECIAL DITCH GRADING I 4 (Nat to Scale) � Goes 3./ D ee a<a rroat D f\� Slope ` SPA •y4R \POSp / I e I dip NPs' �L\ Min. D=2.0 Ft. B=3.0 Ft. 'SEE CROSS SECTIONS p Min. D=1.0 F1. V�.1 B= 'Variable FROM STA. 70+30 TO STA. 71+00-SRY1DY3C- RT FROM STA. 91+00 TO STA. 91+50 -L- RT / FOR -LLT- PROFIL EE SHEETS 40 & 41 FOR -LRT- PROFILE SEE SHEETS 40 & 41 FROM STA.61+90 TO STA.63+30-SRYIDY3C- RT +9 + -- STA. 69+80 -SRYIDY3C- RT FOR -Y2- PROFILE SEE SHEET 65 �B anJ FOR-SRYIA- PROFILE SEE SHEET 80 FOR-SRYIDY3C- PROFILE SEE SHEET 86 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CL :aLMI" STA R(2-�SIQT 9 + B11RIEm L- I SITE -12" I --�C: —M A - 1-51 1. E. -102 CL S + 8 SRY A- C ST 0+ 4 SRY DY C- P GIP / 24' RCP 1" P 54" Rcp WS =19 .0 HD E NV 18 r Jg B LID TOP= 4.2 GI 17. 4 I T V B 16. 1@ 0' RCP INV Submittal February 6, 2024 DETAIL 17-2 DETAIL 17-3 N / DETAIL 17-4 DETAIL 17-5 PROJECT REFERENCE NO. SHEET NO. DETAIL 17-1 R-5777C 17 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH m CULVERT OUTLET BANK STABILIZATION CULVERT INLET BANK STABILIZATION (N.-smle) (Nofo Scale) (NON. scale) y 1Nofw Bcole) (N. to Scale) ROADWAY DESIGN HYDRAULICS on�n er ,,.* ENGINEER ENGINEER Nowrol A'� pzoe Slope NaNrPI p.\ oT From Nawral \ o<ot Fmnt I / ,q"P �ti^ d• �.•'° L aye tnA L Ground 3Dikh Gropnd 3� A' Dtkh l/l ry •%' Tuck GeofeMila Tuck -i=e le Gropnd 37 D F\ I D F\gz SIaPe / D Q\3h SIoP ti o Minimum of 1N o Minimum of 1N Key Rtpmp im pTYPI Key RiprPP �^f (TT) Min. D=1.5 Ft. Min. D=2.0 Ff. �, Min. D=2.0 H. Channel eonom lace Geme.lile Under C'.. .1 Rpnom Place GeoreNne Under '3:1 BEHIND B=2.0 Ft. B=3.0 Ft. •wo-a°P ro R5 ° II - o-RaP ro b. Inner I Riprap in y Ec g nz - ^ ED Riprop in LomNonz (TM) CNA N W Direned by Engineer fTYPI CHAN EL oriob eR ° ebb ED - Dinned by Engineer Ip FROM STA. 25+85 TO STA. 29+50 -SRY48- RT GUARDRAIL m m d °3+o n0 H. of one. sI„„ .a ro zN o°r,Ia. T°v Length Ft. Ff. � ro zeo�r.Ia. T°v qQ 0� Fsf.=18 Tonz of Class I Rip Rap,,keye �I sr..am° p p y �rrme°I sr.°am° _.y N ry ) FROM STA. 25+80 TO STA. 31+70-SRY48- LT FROM STA. 199+00 TO STA. 202+50 -L- LT FROM STA. 27+50 TO STA. 30+30-SRY3DY4 RT 8� FROM STA. 20+00 TO STA. 25+70-SRY4B- R7 FROM STA. 203+50 TO STA. 207+50 -L- LT �, d I Est 46 BY Geote file @t.-20 Tonz of Clazz 'I' R' Ra ke d In, Est 33 BY GeoteMile ter. FROM STA. 38+00 TO STA. 40+50-SRY3DY4C- RT I1 STA. 25+78-SRY4B- LT 25+75 SRY4B- RT ) 1 o ' T- w S SURFACE WATER IMPACTS H' w r m m m W -TEMPORARY SURFACE WATER IMPACT M/a aaJN NrvI151x3 o � o = STREAM SF — SEE PERMIT DRAWING PRELIMIN RY PLANS W NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB FOR, 7W ACQUISITION DETAIL 17-7 CULVERT INLET CHANNEL 1 Nol to Scale) Nalprol Nawml 50' 25' 0 50' 100'� Gropnd 37 D 9\ G,apnd Balfour Beatty LTprk Geotext le - GeotexKle g ° Mim'I of le SCALE: 1" 100' DOCUMENT NOT CONSIDERED FINAL Ke In Rip -Rap per Sfd. Dw 876.01 Min. D=2.OH. UNLESS ALL SIGNATURES COMPLETED Type of Liner= Class 'I' Rip -Rap B=4.DFt. PERMIT D RAW I N G Est. 80 Tons, Est. 170 SY Geoterzfile Est. 45 CY DOE CNN_ _ FROM STA. 30+30 TO STA. 30+95-SRY3DY4C- RT 1 1 SHEET 4 7 O F 8 9 Q _—� 0 NMONg \� SHEET 49 OF 89 DETAIL 17-8 \ NN I N SPECIAL DITCH GRADING e �- �NNN�,B _ FOR -E RGEMENT 4 IN—. �e°Ie) F Cc�,�uL�VvEe�RTQO�UITTLLEETT _ DATE: 1 /15/2024 --� _"- \\ \ \ - \- _TTN WR"51'nBi[I77.7'*- /CL T RIP IA 1 w��Is. 1 \\\\ \\\ \ \ SEE DETAIL 17-4 WOODS MICHAEL D. HARDISON, ET UX `5P E 'SEE CRO55 SEj - \ ��\\ \\\ \ \ \ r FROM STA. 199+00 TO STA. 203+00 -L- RT C I 1 \ \ \ E ro m FROM STA. 207+50 TO STA. 212+00 -L- LT FROM STA.204+00 TO STA. 212+00 -L- RT MICHAEL D. /HARDISON, ET X NC DEPT. OF TRANSPORTATION N \\� \\\ \ry _\M S C \�\ \\\ e o F FILL IN WETLAND Q ROBERT D. FISHER SPEC 'V' DITCH WOODS SEE DETAIL 17-1 \ \ F SPEC 'V' DITCH m \ \ $EEDETAILI7-1 MECHANIZED CLEARING ROCK CHECK DAM N SEE DETAIL SHEEF 2D-4 Fsbs:os �T3_ DETAIL 9 \ CULVERT OUTLET CHANNEL W/CL 'TRIP RAP (BANKS ONLY) SITE F \ \ V SNNVi SLOPE =0.30% CULVERT INLEF C EA OVG �\ / REMO� ` b0 / ,pS,F DETAIL 17-6 (BANK STABILIZATION d� �,y\ '\ o \ \\ Q O sMislx3 W/CL'I'RIP RAP N3 a X \ / SEE DETAIL 17-5 SPEC 2' BASE DITCH ODS31 V0 Sf18 SEE DETAIL 17-2 ®gl CL 'B' RIP RAP PEC 'V' DITCH \\ \ q� / - 0€ E57 2 TONS EE DETAIL 17-1 �- \_ EST 7 SY GF _ \ \ \� \ \\\SN1slk\ / /SPEC 'V' DITCH o lse WILDLIIiiROGNYG \ \ � \ / /SEE DETAIL 17-11 GRADE TO ENTRACE n REA(py�= ��=_ .\,� TIE TO EXTG SPEC 2' BASE DITCH CL 'B' RIP RAP _ I I'b o Tlw SS8 DITCH SEE DETAIL 17-2 EST 2 TON$ \. RE Jy I 1 d JN EfPU FGRASS EST 7 SY GF �� - - oc 0_ O - \ \ , \o \`• - - s eN six) W O 0 _ �ELBO - _ s — C. \ b N d O bd JI - % - - - - - - - m 00 DITCH GRADING r 1 N Q w --- __=_�_��1@TxTRCB .--Y-_��-- - n-- ETAILI - - U) Q � SSbb.O rr- (n-01 Al_---- = ABLE FIL �Z`� 10 --- SEE DETAIL 17-8--- --- ---- _- LL.I+ CD y =N� 2GI _ �_ w(1s/ �S --___ ---_—_ _ ___ UQw �U 2GI 15 2GI E - _ - - - - - - V10=1.6 FPS -'�/R_ �NLAACI F4 -- SPEC DITCH AD -------- -- -- —S�aD Q�= QN I� SEE = i% _ - 2GI - - - - _ _ _ �� SEEbETML==g---------- -- CV LLI n7 �- < L F U) 18" RCP -III s 2D F - - i- �NNN/7 Uc) _ _i- - /-- QO� C > * -- - - ------ �� CL 'B' RIP RAP EST 3 TONS }QLL, UE�10 SY GF I I — — 03 - a ONR x W�� DUE DUE DUE DUE DUE c I DUE lUELj� DUE cL, TIONSP SPEC VNIYMCH m - DUE DUES Y SPEC 2' BASE DITCH SEE D J \ T 7F 7F T I EST 7 SY GF CL 'B' RIP RAP SEE DETAIL 17-10 1 'ssI SPEC 2' BASE DITCH I SITE 15 DAVLIGF� DITCH W G 2 • - _ SEE DETAIL 17-2 SPEC 3' BASE DITCH \TT�.. ESTT7 SY NS GF U"1 E T D IN N 8/a SEE DETAIL 17-3 CULV T INLET CHANNEL s\�ITF7FWFLDLITE CTOSSING A ) I ELT III/CL 'I' RIPRAP (BANKS ONL p �N7 —(FM PROTECTION �LbP�Q2 T (FR'L SLOPE ONLY) $EEDETAILI7a SEE PER QRING-CL'B'RIPRAP WETLAND EXCAVATION p EST 2 TONS TIE FROM J3 1 SHEET 1 O 89 EST 5 SY GF UNITED STATES OF AMERICA EXTG DITCH fC FOR ENLARGEMENT SEE DETAIL 11-9 (CROATAN NATIONAL FOREST) \ r WETLAND WJ 7- HAND CLEARING 1 W00D5 DETAIL 17-9 \ \ Q TOE PROTECTION IN WETLAND AREAS DETAIL 17-10 DETAIL 17-11 \ \ Nof fo scale) SPECIAL 'V' DITCH SPECIAL BASE DITCH - �\dos IN— to $wlel \ s FOR -LLT- PROFILE SEE SHEETS 48 & 49 DkIt Nawrol GrounN 3'�\�'\off Nawml A'� oso< Slope \ \ wenand aea � t Nmpml \ From FOR -LRT- PROFILE SEE SHEETS 48 & 49 Gropnd 3.7 t•\�`+ \ d Gropnd 3.7 D F\°' 0id FOR -Y9- PROFILE SEE SHEET 77 D \ Slope Min. D=1.0 Ff. \ a=1.o H. Geatexne U Min. D=1s N. FOR -Y10- PROFILE SEE SHEET 77 \ � \ B=2.0 Ft. FOR-SRY3DY4C- PROFILE SEE SHEETS 90 & 9/ \ A Type of Liner= CL'B' Rip -tap FOR-SRY4B- PROFILE SEE SHEET 97 FROM FROM A. 311+50 TO OOS STA.111 92 SY94BR7LT \ 8 \ FROM STA. 31+16 TO STA. 31+53-SRY3DY4C- RT FROM STA. 32+00 TO STA. 37+30-SRY3DY4C- RT FROM STA. 10+50 TO STA. 11+00 -Y10- RT \ Submittal February 6, 2024 DETAIL 17-2 DETAIL 17-3 N DETAIL 17-4 DETAIL 17-5 PROJECT REFERENCE NO. SHEET NO. DETAIL 17-1 R-5777C 17 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH m CULVERT OUTLET BANK STABILIZATION CULVERT INLET BANK sTABIUZATION (Not to Sfolel INW to S 1e) Iy 1Nolto Sfple) (N. to Sfale) (Nalco scale) r ROADWAY DESIGN HYDRAULICS on�n "�f+ — t��°� �Pl- ENGINEER ENGINEER l4-1 A'� oTol Slope Nato, 1 •p.\ of From NP1-1 \ o< s Frant / 4�A'c 4 ^ d �"£� / F`Ground 3� Di h Ground 3� Dikh W L Tuck GeoreMila Tuck Geol 1. Groand 3�7 D F\� 'I D F\�851°Pe Y D Q\�° SIOP to inimum of1N tinimum m1R � � � KeY RipwP �^ pYPIKry RiprP�Min. D=1.5 FL L=J Min. D=2.0 Ff. U Min. D=2.0 Ff. Chan°el eonom loce GeoteMile Under Cho°°el aonam GaoreNne Under 1„1 llYPl CHANNEL ie aifria��irc cogs T°P den3 U=kO Ft, al D'nfh Sio an 1u Ri p in Locations '3:1 BEHIND B=2.0 FL B=3.0 F. g •Rio-aaP ro be o^ tm rnD Div by fag nz vP �nPC ry y°REo Directed by Engineer '�/ J h (✓ Drected En near N 1 FROM STA. 25+85 TO STA.29+00 -SRY4B- RT GUARDRAIL \\ m m Len lb 30 Ft. 2eom.d. TaP 'q0 FROM STA. 25+80 TO STA. 31+50-SRY43- LT FROM STA. 199+00 TO STA. 202+94 -L- LT FROM STA. 27+50 TO STA. 30+30-SRY3DY4 RT T d 30 R. of Dam saps °a S� (9 L 0 ht. Tonz of Class 'I' R'p Rap, keyed -In, Ezt. 46 SY Geotexlde Ezt.=20 Tonz of Clazz I Rip Rap, keyed -In, Ezt. 33 SY Geotextile FROM STA. 20+00 TO STA.25+70-SRY4B- R7 FROM STA. 203+50 TO STA. 207+50 -L- LT '6 .. - EROMS7A. 38+00 TO STA. 40+50-SRY3DY4C- RT I I STA. 25+78-SRY46- LT 25+75 - k,,- RT �'� 2Q �� SURFACE WATER IMPACTSUj II W /'� . �,w m -TEMPORARY SURFACE WATER IMPACT O — - — O M/a aaJN NrvI151x3 o = 5 _ �`Z� SEE PERMIT DRAWING STREAM SF PRELIMIN RY PLANS DO NOT USB FOR CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR 7W ACQUISITION DETAIL 17-7 CULVERT INLET CHANNEL I Not to Scale) N.-I N-1 Ground G,aand LTpd 50' 25' 0 50' 100' -...... Balfour Beatty Gealext le Gemexdle 9 ° °mi— of 1N - SCALE: 1"-100' DOCUMENT NOT CONSIDERED FINAL Kev-1n Rip-Rop per Std. Dw 876.01 Min. D=2.OFd. Type of Liner= 0.170 'I' Rip -Rap B=4.DFf. Est. 80 Tons, Est. 170 SY Geotexrile ESL 45 CV DDE p/a as RT 1 UNLESS ALL SIGNATURES PERMIT COMPLETED D RAW I N G FROM STA. 30+30 TO STA. 30+95-SRY3DY4C- N -_ 1 SHEET 48 UI' 89 SHEET 49 OF 89 DETAIL 17-8 Q SZ� SPECIAL DITCH GRADING —f-- E-N�ARGEMENT NLVE T 1=falel I DATE: 1/15/2024 W/CL 'I' RIP I ry00DS 5P wgRige F D p\P�x� sP SEE DETAIL 17 \ MICHAEL D. HARDISON. ET UX CROSS SECTIONS Min. D=1.0 F. 4 - / FROM STA.199+00 TO STA. 203+00' -L- RT I L ,y FROM STA. 207+50 TO STA. 212+00 -L- LT FROM STA. 204+00 TO STA. 212+00 -L- RT MICHAE/HARDISON,ETD X z f �ti NC DEPT. Of-`-fi1FAN5PORTATION �` \\ \ \ C n% ROBERT D. FISHER FILL IN WETLAND \ o SPEC 'V' DITCHo�- -0m WOODS SEE DETAIL 17-1 \\� \ ' SPEC 'V' DITCH * * I J ROCK CHECK DAM SEE DETAIL 17-1\ MECHANIZED CLEARING SEE DETAIL,�IEET 2D-4 FS'b6KO9l DETAIL 9 \ \ 13 CULVERT O�IW CHANNEL SITE L \�E _ \ / fti / SS33JV W/CL TRIP RAK NLYJ CULVERT LET C \ \ / REM NN\ \ AIL U K STA IL TION # \ \ \\ W b w lbg ( FlJ i - ,� .pSsM.sixa', y°,''1 W/CL 'I' C�O o N )SEE DET17-5^• SILO I 24�-SPEC�2' BASE DITCH \2 D ODS / x �\ \ \ 9 �� 00 _ 91\1— 31VD SI18 SEE`DF�FAIL 17-2 a \\ _ 'B' RIP RA \ PEC ' 'DITCH f \ / 0€ J EST ON5 E DE IL 17-1 \\ e'Ndslxa l / - o C _ }% IiiR G w II 1 1 F. Al lse /f n ��� TIE TO EXTG EC 2' BASE DITCH REMOVE0V1' --PITCH SEE pETAIL 17_2 ST 2 "TO _ — - L' EST 7 SY GF `' �� ,off ��\, \ '7S PUE oN s1x1 I c00 ��ELBo+r- LU U Q -l@7'x7'RCB-��� _ i��- _ TILLS A —9 24� 25� r > R Q _ _-` 5 _� --1 7'x7' 5 �Y7�/L REMOVE v �GRA55- _ � WT-SILLS ro 25 26 SEE DETAIL 17 3 --- — — — — w(z) i + 2GI _ �_ w(1L/ m 1S---__-- -- g HHw N - 2GI 15 2GI E - _ - - V10=1.6 FPS - 2 �` ' SPEC -DITCH GR7fDINaZ�-------- -- — - <C/) Q�ID SEE-DETML '\g----------- -- --_- —�-- c I SHE --'�- —� b2_.. C.J N W W I yti / I \ 1 _ ONNNN -- — _ UOOD >> —ti M \ �sn — — nmbta---- }+� C >> iR 2/ a NI SIX3 - _ --- _ 00LLJ CL'B' RIP P — 15- - - -oL nL2� - �QW EST 3 T 5' EST 10 S /a DrarrsTxa— � JE— D�EU Dll -9UE D�7€ DU DUE 03 c — — — — ��� DU \ SPEC Ya®WCH w 'a— DUE DUEC CL 'B'RIP RAP EST 2 TONS ` SPECm27 BASE DITCH SEED 1 I T\ SPEC T BASE DITCH T 7F 1 EST 7 SY GF CL 'B' RIP RAP \ SEE DETAIL 17-10 'ssl SPEC 3' BASE DITCH a \R DAVLIG�r DITCH EST 2 TONS 9G z N IR a SEE DETAIL 17-2 DETAIL 17-3 \ SITE 15 I EST 7 SY OF �521L � CULVFjtT INLET CHA NEL '�� W LDLITE OSSING \ 1'1 CL TRIP RAP (RANKS NL Q..- C1 �I PROTECTION SEE DETAI -7 EE PE IN EST 2 RIP PAP \ WETLAND EXCAVATION \ p TIE FROM S� J25E�, O jro87� EST 5 SY GF IJSI{TED STATES OF AMERRR� EXTG DITCH \ (c R $EE DET z ROATAN NATION OR ST) � WETLAND WJ a / NZ —Sz HAND CLEARING �i 1100D5 DETAIL 17-9 TOE PROTECTION IN WETLAND AREAS DETAIL 17-10 \� DETAIL 17-11 1� (Nat stale) \ ` �1+ SPECIAL 'V' DITCH SPECIAL BASE DITCH (11 ) IN°t to swlel I Not so $w1e1 ( 1 qz- 0 - LT- PROF1 9z' 5F(ETS 48 & 49 Dki, 1\ Natorol Gl—& 3'� \�'\O Nawml A'� °f c Slope \ \ wetland aep \ P Nmpwl \ From \ FOR -LRT- PROFIL�'Sk%EETS 48 & 49 Ground 3. A'' of Ditfh F7L 9 D d 7 D F\o$lope ten, FOR -Y9- PRO S E SHEET 77 a=1.0 F. U rR -SO- PROFILE OF SHEET 77 Geolexne B Min. D=1.5 F. -Y/O- PROFILE PROFIILtE SHEET k� l Type of Liner= CL'B' Rip-R.p B-2.0 FL 22 R-SRY4B- PRfIFJI�JSaE SH� 9 FROM STA. 31+50 TO STA. 31+92-SRY4B- LT g \ \ FROM STA. 32+00 TO STA. 37+30-SRY3DY4C- RT �' FROM STA. 10+34 TO STA. 11+00 -Y9- RT \ FROM STA. 31+16 TO STA. 31+53-$RY3DY4C- RT FROM STA. 10+50 TO STA. 11+00 -Y10- RT \ Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-69 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2,10 2 iO 2110 300 PERMIT WIN SHEET 52 OF 8 WERAND J D E: 1 / 5/ 02 o a � 3 EXCAVATION SITE 15 _ 26 bb e' 25.9 3.1 MEC ANI ED LEA ING 1 .28 2 2 + 0. 0 19.0 . 40 / 26 51 25.7 1.43 2 /-� 0. 0 19.10 ' n In cm :1 26 5. 36 6. 2 :l A: 25.5 4:1 / 8.58 2 / f 0. 0 19. 5 - J 1 2630 5. 25.40 - 18.73 2 0+ 0 0 19.1 25.55 J 18.88 2 26 0 f 0. 0 19.5 --- 2449 6; 25.70 1 19.03 / n oe 0 19.7 3 0 2 0 2 0 2,10 2 0 2 0 1 0 1 0 1 0 I 1 0 1 0 1 40 2 I 1 20 40 140 190 1 0 1 0 1 100 1 200 2 0 2 0 1 2 0 2 0 300 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-70 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 1 20 40 60 80 100 120 1 0 160 180 200 220 2,10 2 0 2110 300 PERMIT WIN SHEET 5 F 8 D E: 1 / 5/ 02 4- 43: \ 2663 1 - 0 n °D 25 0.02 - 2677 25.2 - 0.025 0.025 - 3 26 86 25.10 0\:\ - 0 0.025 0.02 3 _ 2689 5 68:1 A:1 7 - 4: - n An 1 41) WETLAND WJ SITE 15 0.025 0.02 °D MECHOkNIZED _ 26 87 \ 2 72°i1 7 HANDCL _ ARI G 23+0.0 0 Q WET ND WJ EX AVA ION SITE 15 0.025 3 ME CLE HAN RIN ZED �- _ 26 79 ioa 6.68 3:1 1813 2 2+ 0. 0 LOO 3 2L 2,10 2 0 10 1 0 1 0 1 0 1 L80 20 1 20 40 1 10 1 0 1 0 1 0 1 0 200 210 2 0 210 2 0 3 0 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. G n R-5777C C ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINC®Ng1�L1E ]E ]�L.�NS DO NOT USE FOR ®W ACQUISITION L STA 25 78-R4 P EL= 27.52 DOCUMENT NOT CONSIDERED FINAL 1 7' 7' CB W 1 FT SIL S UNLESS ALL SIGNATURES COMPLETED o �EWI II 4:1 NQRMkL B LT 22, TB RT 48" RCP 1F SILL RO ILE LO — — I --A-- C N = 18.1 __EKST cavar To 1FT SILL E REMOVED C a 1 N r r a N 3 E a a ( OT TO SCALE) SN LE BA RR UVET WISILLS . *NOTES: CULVE LOW T SH LOW U. PROVIDE CHA NEL. CO TIVE TINU TERA US L FROM DURIN IS SUB THE STREAM CO ECT 10 STRU AP BED TION. ROVAI AT TH NATIV BY TIF PROJ MATERIAL E ENGINEER ECT SI E 2 SILLS -LAY ARE T 5UEUBE .0 FT. WIDE, AST 3 DO 140T ABOV SIT BAN AFFACII-D ELE FULL, ATION B. OF S U. 0' 4 NUMBER ENGINEER. OF SILLS DETERfiINEID BY TIE 1 0' SILL AT INLET AND OU LET SILL —{ 1' �— TB TB TB SILL TB — g_ LANVIEW vns L BED ELE =1 .45 ZI)O/ DETAIL ET BANK ULVE OUT STA ILIZAT ON o S. Qe n� f m loco r d� Tuck eotextil a Min mum f lft honnel Bottom tlypj Place eotexble Und r YP) CHANNELBED d I Riprap in Loc .ions Leng h=3D Ft. Rip -Rap o b, In ailed to 2BOwsi a Top f Ditch S opes on Jnrisdkti nal Stre m ETAI BANK CULVE T INLET STABILIZATION (Notto Ge fOUn O �O Tuck eotextil a Mini um ltt honnel Bottom lac Pe Ieofexti a Und r YP) HANNE d BED I Riprap in Loc Lions Leng. =25 Y. ip_R,p lo be Ins ailed to 2B Ouisi a Top F Ditch 51 pes on erisdkfi nalSt.. s S vin Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. 0 n R-5777C ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINC®Ng1�L1E ]E ]�L.�NS DO NOT USE FOR ®W ACQUISITION CL STA 2 2 + 4 L— GP EL 29.6 —L T— I DOCUMENT NOT CONSIDERED FINAL SKEW 10 �—O I—O II UNLESS ALL SIGNATURES COMPLETED — RY3 DY C— I :1 NO 1. low :1 OWAL 3.10:1 S EW D BE EL D PROP 100YR 81' RCP WATERS RF CE PROP BED P OFI E E ST ED RO BE N SE AN SE B - FLOW FILLED Oil 4523=18.9 I.. tj LO E_ .37/D c a N ro a N 3 E a ■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■ ■��v����-1� I1y ETA L (I lot to S ale) —Natural Ground D 3•� Not I round Goteztil 9 a Mi(TYnimum m of 1ft INN-Mm- OMME■ INNOMENEEN INNEEM3001 NONMEMBER M Submittal February 6, 2024 DETAIL 18-1 DETAIL 18-2 DETAIL 18-3 DETAIL 18-4 DETAIL 18-5 SPECIAL BASE DITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL SPECIAL DITCH GRADING 50' 25' 0 50' 100, I Nof to Swle1 INot to Smlel (N°tt° Smlel (Nort° Scale) 4 I N— srolel 4 FmM NaoVr°I N°turol N°Nrcl N°t°r°I Ditch -" Gr°en G.wnd 1 Groend Ground 3. b'�Or Ditch N—t A'�,\et SIoPe ° d D 3:7 D 9 .� SCALE: 1"=100' D�� p\owe slope Ground 3.7 D F\0 Min. D-2.0 F. �TV Nnlm�meeof to `SPA qR/gB�FD a\Pe sP L-"..! Min. D=1.5 Ft. Min. D=1.5 H. B MaK.d=3.0 H. Ge°texlile B ° ITYP) P`_ B=20 H B=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ft. Length=40H. Key -In Rip-R°p per 5k. 0wg. 8)6.01 Min. D=3.OFt. FROM STA. 48+57 TO STA. 51+50-SRY3DY4C- RT Type of Liner=75 SY COIR FIBER MAT Type of Liner= CI— T Rip-Rop E=4.0R. FROM STA. 212+00 TO STA. 223+00 -L- RT FROM STA. 34+55 TO STA.42+62 -SRY4B- LT Est.35 CY DDE Est. 25 Tons, Est. 43 SY G—f,#h FROM STA. 212+00 TO STA. 220+50 -L- LT FROM STA. +50 T TO STA. +45 --SRY48- LT STA. 48+55-SRY3DY4C- RT STA. 42+70 -SRY4B- LT FROM STA. 216+00 TO STA. 217 -L- M FROM STA. STA.42 0 TO STA. 48+45-5RY3DY4C- RT FROM STA. 222 TO STA. 223+00 -L- LT Nq� DETAIL 18-6 I 8 STANDARD BASE DITCH ry 'y I Net t° Scale) 2011 N.—I N-1 Ground r°°n 3.7 D 3.1 Min. D=3.0 Ft. I R. BOYD JR. WETLAND WK 8=2.0 Ft. FROM STA. 43+90 TO STA. 45+00-SRY4B- LT RICHARD T. BOYD SALTWATER LAND STD T BASE DITCH IL COMPANY,LLC EST 205 CY DDE HJdnHJ DR SE D DETAIL SHEET 2D-3 SLOPE=0.73..%6 i AGS1 J INVFSTRELJ<JW, flLLC RVIEROALE UNITED STREAM SG WN STRUC RE W/TRASH RACK o METHODIST C URCH SEE DETAILS TS 2D-1 AND 2D-2 " SEE PERMIT DRAWING N DETAILS 1 AND 2 SHEET 58 OF 89 SITE 16 N L'B'RIP PAP JNOJ EC 2' BASE IT ST 5 TONS ¢ i - SEE DETAI 18-1 T 14 SY GF wX FOR ENLARGEMENT �B I 1S8 Sn9ASI a9 \ I i\ \ US \ \ \� I PIPE OL ET CHANNEL\ \ \ g ,O I \ I /CL 'I' RIP RAP iBMKS ONLY) I x LRR —31odr \ I I \ \ SPEC 2' B�SB DITZ`k� \ \ EST 5\ DE Otl,dICL '� DETAIL 18-1P \EST 3 TONS J/n I 10EST 10 SY GF dM psiCL 'B' RIP RAP I I I \ Y5EST 2 TONS ecessee��ia- I / ��1/9 I 0 OJ E T 7 S GF NON III I _ E E E bs E E E E 4° PA z 4- ~ — — >- c o LU — — U X 0 co- --- --M- --- - -�- 2G1- J N _---____ c< v) — -- — CI ---- ---- - — —1— — 2GI ——20-4,DEL Doti 0 C) d R 115918'PAVED�ROA Q LU _ --- - _ _ —te— a ///�) — .a V lSR -�� N I�. -IIIIIIIIIII� GRASS f PAVED SHOULDER �0 R �f� -inDITCHF-G_ _ v... : - - - -RL r PA SPEC III N.s Ilre .e�.. MBS£BlNO.Zd ya 1 E QI E b9 17 89\ \ — N330 JNOJ hI woods 7 \C dwnd \ C 'B'RIP P SnOl1w \ • ten\\ V Cl�i@I RIP a�'S\ } ES DNO NS10 \ W\ JNOD ESi 3 T NS Odsl ES 7 SY G NI \ — EST 10 S GIF / I \ — - I 4Y 7i SPEC '2`WE DIT JNOJ } '\ SEE DETAIL 1� �N00 \ JN00 ' MARTHA FISHER dwnd HARDISON, ET VIR d31S" \ JARVIS FRANKLIN \ HARRIS, ET UX GRIFFIN LEASING. LLC \ \ c UNITED STATES OF AMERI . \ (CROATAI•J�NATIO L FORES 1 {� I \\ 3 \ E \ U 1 1H WOODS CRAVEN COUNTY PIPE INLET CHANNEL W/COIR FIBER MAT - - SLOPE=1.25% SEE DETAIL 18-3 SPEC 'V' DITCH SEE DETAIL 18-2 O Ln RIVER BLUFFS LIMITED PARTNERSHIP SURFACE WATER IMPACTS PROJECT REFERENCE NO. SHEET NO. R-5777C 18 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS W NOT USE FOCONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR �W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 56 OF 89 DATE: 1 /15/2024 2GI-D 1s" , U o Lo UL 10 } + --- Lo LLI LLJ - co cn FOR -LLT- PROFILE SEE SHEET 49 FOR -LRT- PROFILE SEE SHEET 49 FOR -Y7- PROFILE SEE SHEET 76 TEMPORARY SURFACE WATER IMPACTS FOR-SRY3DY4C- PROFILE SEE SHEET 91 FOR-SRY48- PROFILE SEE SHEETS 97 & 98 O CV LU of W UI 2 U O iz 1;T Lo M W W Q 2 � H N U I Submittal February 6, 2024 DETAIL 18-1 DETAIL 18-2 DETAIL 18-3 DETAIL 18-4 DETAIL 18-5 SPECIAL BASE DITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL SPECIAL DITCH GRADING 50' 25' 0 50' 100, I Nof to Swle) (Not to S.1 I (N°t t° Smle) (Nott° Scale) 4 I N— S.6) 4 FmM NaoVr°I N°turol N°Nrcl NM°r°I Ditch -" Gr°en G.wnd 1 Groend Ground 3. b.�Or Ditch N-t A'�,\et SIDPe ° d D 3:7 D 9 .� SCALE: 1"=100' D�� p\o c Slope Ground 3.7 D F\0 Min. D-2.0 F. �TV Nnlm�meeof to `SPA qR/gB�FD a\Pe SP L-"..! Min. D=1.5 Ft. Min. D=1.5 H. B MaK.d=3.0 H. Ge°texlile B ° 0YP) P`_ B=20 H B=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ft. Length=40H. Key -In Rip-R°p per 5k. 0wg. 8)6.01 Min. D=3.OFt. FROM STA. 48+57 TO STA. 51+50-SRY3DY4C- RT Type of Liner=75 SY COIR FIBER MAT Type of Liner= Class T Rip-Rpp B=4.0H. FROM STA. 212+00 TO STA. 223+00 -L- RT FROM STA. 34+55 TO STA.42+62 -SRY4B- LT Est.35 CY DDE Est. 25 Tons, Est. 43 SY G—f,#h FROM STA. 212+00 TO STA. 220+50 -L- LT FROM STA. +50 T TO STA. +45 --SRY48- LT STA. 48+55-SRY3DY4C- RT STA. 42+70 -SRY4B- LT FROM STA. 216+00 TO STA. 217 -L- M FROM STA. STA.42 0 TO STA. 48+45-$RY3DY4C- RT FROM STA. 222 TO STA. 223+00 -L- LT Nq� DETAIL 18-6 I 8 STANDARD BASE DITCH ry 'y I Net I. Scale) 2011 N.—I N-1 Ground r°°n 3.7 D 3.1 Min. D=3.0 Ft. + R.BOYD JR. WETLAND WK 8=2.0 Ft. FROM STA. 43+90 TO STA. 45+00-SRY4B- LT RICHARD T. BOYD SALTWATER LAND STD T BASE DITCH I COMPANY.LLC EST 205 CY DDE H7811H0 DR SE D DETAIL SHEET 2D-3 SLOPE=0.73..%6 i NaSI J INVFSTRELJ<J ,flLLC RVIERDALE UNITED STREAM SG WN STRUC RE W/TRASH RACK rj METHODIST C URCH SEE DETAILS TS 2D-1 AND 2D-2 " SEE PERMIT DRAWING N DETAILS 1 AND 2 SHEET 58 OF 89 SITE 16 N L'B'RIP PAP JAOJ EC 2' BASE ITCH ST 5 TONS ¢ SEE DETAI 18-1 wX FOR ENLARGEMENT T 14 SY GF e I \ I P US \ PIPE�J�CCHAINEL\CL 'I' RIP S ONL L RIP LRAP '�3lodIt \ SPEC 2' E DITZ`k� \ _ 7 SYO F ICL' DETAIL 18-1 / 'S I0d a AILV8-4 w r \ EST I I J I ti S2 \ I 1 I \, EST 1(}2$ GF dM .9 Ili I CL ' RIP RAP 2 \N I / � � I I EST 2 TONS � OD E T 7 S GIF Nory Ria \ E E E E W)C E cn �_ bs C 4i 2 /a 9NI15ix3 0, 0 is aniLsix3 ll �1'e�y �� 3 — B p— SEE DETAIL IB-5 US 7U� - z/ gel US MNY /0 EBL 24' PAD'E9�ROADWAY _ � a PAVED SHOU �—52-4'PAVED 3776DZDETi-9� SZb2 rt A C--D1TChr GRADINTiM'i 70 WBL 2a PAVED ROAlANAY _ �_ — I ° __ __ 1 ` M8S£'37H0.ZL 1d 1 E QI �E A330 7 JN00 �� OODS SN\ I V \ C II�� @@ dWn i 'RIP P Sn8l1w 1\ w�\ tl- 0N00 CEil31T RNS S ✓�S 5TNOOINS', ES] 7 SY GNOJ \�\ �1 `—� _ EST 10 5 GF O.iSI JNOJ 11 `44uYY' M S 111I / I I Sp '2�BA.SE DIT , 1� �\ if9,Zi / Y_YIL'S 1—I ✓ 7�. \ SEDETAIL 1_ JNL I` L JN00 a0 MARTHA FISHER dwnd w� o HARDISON. ET VIR dAls— D \ JARVIS FRANKLIN z HARRIS, ET UX GRIFFIN LEASING, LLC 1 \ 26 \ ti \ UNITED STATES OF AMERI CROATAI• NATIO L FORES 1I \ \ a�7 \ - t � I —tZs� PEC DITCH GRA6IRZ;- I Jt ` W00 CRAVEN COLINTY E IN ET CHAT �J W/ OIR FIBER MAT - - �jSLID E=1. % SEE DETAIL 18-3 SPEC 'V' DITCH SEE DETAIL 18-2 O Ln RIVER BLUFFS LIMITED PARTNERSHIP SURFACE WATER IMPACTS z —ZF I PROJECT REFERENCE NO. SHEET NO. R-5777C 18 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS W NOT USE POCONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR �W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 57 OF 89 DATE: 1 /15/2024 o m O � t Lo Lu 0-1 W U) O W O + C� Z CO J N Q W Q C.0 (n J 2Gr-Et— t5" _- - 6 c:) ,IL 10 } + 1-- co Lo W Q W U) c ( WC' ,c 2S FOR -LLT- PROFILE SEE SHEET 49 FOR -LRT- PROFILE SEE SHEET 49 FOR -Y7- PROFILE SEE SHEET 76 TEMPORARY SURFACE WATER IMPACTS FOR-sRY3DY4c- PROFILE SEE SHEET 91 FOR-SRY48- PROFILE SEE SHEETS 97 & 98 Submittal February 6, 2024 l PROJECT REFERENCE NO. SHEET NO. R-5777C PW SHEET NO. SURFAC ATER IMPACTS \ �\ SG. / ^� O 83/�q Y ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER ? o, TEMPORA SURFACE WATER IMPACTS \ N I 10' 5' 0 INCOM PILE E PLANS 10, 20' 1 W NOT USE FOR ew ACOUBITION \ , SCALE:1"=20' WETLAND K ------- - - - - -- d v �� I DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 58 OF 89 i (Y3 \ PIPE UTLET CHANN Li 'I I I DATE: 1 /15/2024 W/CL RIP P (BANKS ON )i EST 25 T(", EST 50 SY F1 ESf 35 CY D Eq ; / CL 'B' RIP RAP EST 5 TONS I ' � co SITE 16 EST 14 SY GF emn o° o 00 0°0 A o Q) D 0 00 0000 O — — — — — — — o 0 4' r o - °O I o 00 0 000 0 / \ °00( 00 o 0 a - ° ° / SPEC 2'BASE o BURY VERT 1.0' Q o� I o 00 �O SI REM VE1 °QD Oo eo oQ) Oho 00 0A 1 0A0 °o 'D o 1 0 0 1- 1 -SRY4B - e ,VMOdObl G�YAVd ,8l 7661 NS OW _ M REMOVE / M a U 0� 1 �� 1 �J Al Submittal February 6, 2024 DETAIL 19-1 DETAIL 19-2 DETAIL 19-3 DETAIL 19-4 DETAIL 19-5 50' 25' 0 50' 100, SPECIAL T' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING STANDARD BASE DITCH (Ni f. Sr.l.) (Not to Swl.) (N. to SC.I.I 4 INm to Smle) 4 (Not to S.ol.) Dfch N.turol 14-1 SCALE: 1"=100' Nalpr.l !'� of Slope Grounl J A.\ of From Nofuml \ of Front .� �, I .— —. Ground 3 Groun Ground 3,.� t:.\O�°t ., p t\et Ni Groun 3.� D A'\�p< DiKh `1.4q JJJD--- �, p f Slope I e I f Slope SP /q \N0 SP Min. D=1.5 FL Min. D F.5 H. _. Min. D Ft. FL BCE NPR Min. D=3.0 H. B=2.0 H. B=3.0 H. 'SEE CROSS SECTIONS Min. D=1.0 Ff. B=2.0 Ft. ROM STA. 54+25 TO STA. 56+60 -Si LT FROM STA. 223+00 TO STA. 223+50 -L- LT FROM STA. 45+00 TO STA. 46+60-SRY4B- LT )M STA. 51+50 TO STA. 53+50-SRY3DY4C- RT FROM STA. 46+60 TO STA. 53+75-SRY4B- LT FROM STA. 58+50 TO STA. 61+15-SRY3DY4C- RT FROM STA. 223+50 TO STA. 224+50 -L- M )M STA. 53+50 TO STA. 58+50-Si RT FROM STA. 10+50 TO STA. 11+40 -Y8- LT FROM STA. 62+25 TO STA. 62+50-Si RT FROM STA. 223+00 TO STA. 234+00 -L- RT �Q FROM STA. 10+50 TO STA. 11+40 -Y8- RT FROM STA. 225+50 TO STA. 227+50 -L- M (9 ^-�} FROM STA. 226+00 TO STA. 234+00 -L- LT �A q....t I I I V ?0 DIAMOND INDUSTRIAL CORPORATION JTC INVESTMENTS. LLC JTC INVESTMENTS. LLC JTC INVESTMENTS, LLC JOYCE H. JOHNSON DIAMOND ORATION IAL _ STD T BASE DITCH N O I ONtlBtl _ EST 285 CY DDE N M 1 PSGdSI — LOPE=0.73% N EE DETAIL 19-5 I R WOODS CL 'B' TIP RAP Jay / EST 2 ONS \ ONtl9V EST 7 S Y GF \ 0dsi L__ I SPEC 'V'DITCH�\SEE DETAIL 19-1CL ' RIP RAP CUTOVER I 5�y CL ' IF RAP SEE \ \ HEDGE EST 3 TONS I ` EST TONS \ DRY DETENTION BASIN 4 EST 0 SY GF SPEC 2' BASE DITCH I EST Y GF E E SfE DETAIL SHEET SEE DETAIL 19-2 I s:� E PDE PDE PDE RDk PDE DE PDE E E} c c --- --- WOODS ��ancr� � eaara`.�- • SPEC �■ ��� DITCH GRADING OEM —1A-- O zO M os raw fo E8L za pw Roaowar — US 70 EB — — — ■■-f PAVES SHOULDER ll A SpEn � ! It����acsue■l���aaaaaalr�.�nnarllaK��� w � �Ittttttttttttttttt•ern e.•e Flna � • Fits E 21 10 S P + U SPEC 'V' DITCH CL 'B' RIP RAP 7F IF .T. 7F �--wroODS / I� I WOODSSEE DETAIL 19-1 EST 3 TONS / E T Y F dWlld n o CL'B'RIP RAP Wog EST 10 SY GF � Gmom II d31S I�I � SITE 17 � T ST 2 TONS _ SPEC T BASE DITCH II ST 7 SY GF / '� SEE DETAIL 19-3 rnDIT I III ,r �� WETLAND W 9-2 �� 3 I I Ilo� n And DNOC d315 / n 11W SME C �' DITCH ` — — — I E ETAIL 19-1 -— — — I ��m� o_ GdSI JC JACKSON HOMES.LLC SEE PERMIT DRAWING 4 m m SHEET 61 OF 89-i a pa w FOR ENLARGEMENT mQ — �� >�DANNY R. c III. � SPEC B,�SE DJ HARRISON. ET UX R. EARL JONES DANNY R. ON00 py I SEE DETAIL 1{ HARRISON, ET UX _ FILL IN WETLAND I I ll III �� III III WETLAND EXCAVATION o MECHANIZED CLEARING 3 Tnaasew .sl �" 3naasew .sl� 3 3naasew .sl � — PROJECT REFERENCE NO. SHEET NO. R-5777C 19 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE MI L CONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 59 OF 89 DATE: 1 /15/2024 FOR -LLT- PROFILE SEE SHEET 50 FOR -LRT- PROFILE SEE SHEET 50 FOR -Y8- PROFILE SEE SHEET 76 FOR-SRY3DY4C- PROFILE SEE SHEET 91 FOR-SRY4B- PROFILE SEE SHEET 98 Submittal February 6, 2024 DETAIL 19-1 DETAIL 19-2 DETAIL 19-3 DETAIL 19-4 DETAIL 19-5 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING STANDARD BASE DITCH I Not ro Srole) ( Not to Swlel I Not to Scal°I 4 I Nm to Scale) 4 (Not to Scale) D kh t4.1-1 Narorol '\ °t Slope Natuml \ of From NONmI \ of Front I —. Gmund Nalpral !' Groun 3� A'. JJJ--- 3 Groun Groand 3,.1 p\o'W°t .l p Uet Dirch Groaa 3.7 D A'\ �p< Dirch —' `Y,tq D X p f Slope I e I f Slope SP /q \N0 SP Min. D=1.5 Ft. Min. D=1.5 H. _. Min. D=2.0 FL BCE NPR Min. D=3.0 H. B=2.0 Ft. 11=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ft. B=2.0 Ft. ROM STA. 54+25 TO STA. 56+60-SRY4B- LT FROM STA. 223+00 TO STA. 223+50 -L- LT FROM STA. 45+00 TO STA. 46+60-SRY4B- LT )M STA. 51+50 TO STA. 53+50-SRY3DY4C- RT FROM STA. 46+60 TO STA. 53+75-SRY4B- LT FROM STA. 58+50 TO STA. 61+15 -SRY3DY4C- RT FROM STA. 223+50 TO STA. 224+50 -L- M )M STA. 53+50 TO STA. 58+50-SRY3DY4C- RT FROM STA. 10+50 TO STA. 11+40 -Y8- LT FROM STA. 62+25 TO STA. 62+50-SRY3DY4C- RT FROM STA. 223+00 TO STA. 234+00 -L- RT FROM STA. 10+50 TO STA. 11+40 -Y8- RT FROM STA. 225+50 TO STA. 227+50 -L- M FROM STA. 226+00 TO STA. 234+00 -L- LT I I JTC INVESTMENTS. LLC JTC INVESTMENTS. LLC JTC INVESTMENTS, LLC JOYCE H. JOHNSON STD T BASE DITCH N O EST 285 CY DDE N N SLOPE =0.73% SEE DETAIL 19-5 R 50' 25' 0 50' 100' himmild SCALE: 1"=100' Nq� q ?0 DIAMOND INDUSTRIAL CORPORATION DIAMOND IINDUSTRIAL _ I ^1L-- 1 OjS1 O— 1 ads �— I �N � � � WOODS S 'B' TIP RAP ` \ g I j J EST 2 ONS ^ (/\ EST 7 SONS GF c� ( C \\ I 00dSIV \\ x I--- I\ SEE DEfAIDL119 1 N CL ' ' RIP RAP CUTOVER 26 1 \ \ \ EST 3 TON$ q(Cj DRY DE T NTIO^ SIN 4 EST 0 SY GF SPEC 2'BAS"I CH I I t EST GF�E E \ .'4 �E D AIL $H T 9VEE DETAIL 19-2 I V .7 y PDE P E P N D PDE r 8 PDE E �y F _ J C_ I WOODS _ C.J ^ _ ' a 9NUS 18 � 26 wt O GD _7 _25 OA Lo CQ > W 0 Q W U) M O W O z + 00 M J N F- 2LU W G U) U) J 1 o 00 } + (71) Lo W W Q 2 U) U) I ---min- - US HWY 70 EBL 24' PAVED ROADWAY 11C 7n CC) M Q�N m� it DITCH E ETAIL 19-1 a 4N w �Z r m� a �a wo �w DANNY R. HARRISON, ET UX 91z 4'PAVED SHOULDER 9Z --T-- �EMOY1� z UIRC s SEE DETAIL 19-4 $PEC DITCH DING _9 -- — - — — — — �EE_�ETAIFI9-� REM SR ) SPEC 'V' DITCH / CL 'B' RIP RAP Tom, Z IF IT If -w0'0 Ind In I �J� WOODSSEE DETAIL 19-1 ') EST 3 TONS Q 1S ICI CL"RIB" P /CC ( <n ,�25L' EST1� F �� SITE 17 R F T �y ✓ _ EC 3' BASE DITCH I E D 19a� /\ EC BAS DIT rONOC 31S WETLAND W 9-2 �L aJsl JC JACKSON HOMES.LLC SEE PERMIT DRAWING m m SHEET 61 OF 89 FOR ENLARGEMENT DANNY R. HARRISON, ET UX R. EARL JONES J � 3naasew sl a� I ` � 3 FILL IN WETLAND WETLAND EXCAVATION MECHANIZED CLEARING Erb— e� PROJECT REFERENCE NO. SHEET NO. R-5777C 19 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR 7W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 60 OF 89 DATE: 1 /15/2024 O O co N CO 0 W U) Q 2 W ---- W O + O Z V N �RA67FfG— = N W Q U) SPEC "3'BASE D SEE DETAIL 41 FOR -LLT- PROFILE SEE SHEET 50 FOR -LRT- PROFILE SEE SHEET 50 FOR -Y8- PROFILE SEE SHEET 76 FOR-SRY3DY4C- PROFILE SEE SHEET 91 FOR-SRY4B- PROFILE SEE SHEET 98 Submittal February 6, 2024 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-79 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2,10 2 iO 2110 300 PERMIT WIN SHEET 62 OF. 8 VIETLAN I WIL JDATE: 1 / 5/ 02 49 0. 0 0. 20 ILL I A w TLA D 3 CA ATI N SITE 17 11 7 :1 2615 5. - - _ 5'24 :i a 0.02 0.02 ME HA - IZED CLEARING 2 2 0. 0 19.3 WETLAND L o s � o. o 0.20 25 E CAV 3 O SITE 17 24.0 �00 5.2261 .\ o.oz o.02 ME - A IZED CL RIN 2 126 / f 0. 0 19.58 49 40 0. 0 - 3 7 23.9 --t- 1 26. .255:1 9:1 25 5.9 87 0.02 0.02 2 / f 0. 0 19.80 a ti49 � 0 0. 2 3 3 3 23.7 4 \ :1 1 26. .568:1 :1 2580 5.9 2 .0 0.02 0.02 - 2 O f 50.00 0.03 a - 23.6 4:1 y _ '7 26.0 9.413:10.02 25 77 5. :1 23. 0.02 4: 7 _ :\ 0 f 2,50 f 00.00 0.25 0.025 23.47 4:\ t- 4 972:1 25.85 01:1 25 5.9I 80 7. 4 24.120 0.02C0.020 0.02 2 9 f 0. 0 0.42 3 0 2 0 2 0 2410 1 210 1 200 1 180 160 1 0 1 0 140 60 400 2 60 80 100 120 1 0 160 180 2 0 2 0 2,10 2 0 2110 3 0 DETAIL 20-1 SPECIAL BASE DITCH IN-. Scale) N.ter.l oc c Front Ground 37 D G �e Ditch � � � Q° slope l.-"J Min. D=2.0 R. B=3.0 R. F FROM STA. 67+30 TO STA. 68+16 -SRY48- RT FRO :OM STA. 62+50 TO STA. 63+58-SRY3DY4C- RT FR Submittal February 6, 2024 50' 25' 0 50' 100' - DETAIL 20-3 DETAIL 20-4 WETLAND WN SPESEE TAILD ITCH DETAIL 20-2 20-8 SPECIAL 'V' DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL iOF PROTE TION IN— to Scale) (Not to Sc.lel INot to Sc.le) SCALE: 1"=100' IL�LTsmPE. NLY) ^ Front N—I N.—I Notpr.l NONmI "I`L R P /-F /- Ditch Ground 1.\ Ground Ground Ground [� p ES Nat I p'`ec slope ?cl D 3.) D 3' } r "10=�0 CFS E55 SITE 19 Ground 3.y D Q Teck Geptenile `Tuck Geese file V10-98 FPS S AI . Min;ro.ro prin ° Minip,.ro ogle Y Min. D=1.5 Ft. Geotea;le B DYp) Geotexdle B (ryp) \ IF 7F T\� T T Length= 28 R. Length= 25 R. \ Type of Liner-CL T Rip R, - Keyed -In Type of Liner 11. 'I' Rip -Rap - Keyed -In Min. D=3.0Fd. OLFT u CHANNEL ABILIZAT�ON � 7F ROM STA. 56+60 TO STA. 57+85 -SRY48- LT Est 26 Tons, Est 55 SY Geore.tile Min.D=2.oR. Est 37 Tons, Est 65 SY Geote»ile B=4.OFL `7` �f` �h W',�L /IhRIP 1 Z� M STA 63+70 TO STA 66+25-SRY3DY4C- RT E.30 CY DDE B=2 0 - 3 OR V OM STA. 70+90 TO STA. 71+56 -SRY3DY4C- RT Est 10 CY DDSTA 58+70 -SRY48- LT � I T SE DE IS 20-6 STA. 63+69-SRY3DY4C- RT PROJECT REFERENCE NO. SHEET NO. R-5777C 20 LOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION INCOMPLE E PLANS Ib NOT USE POR 7W ACOU ISITION SEE PERMIT SHEET 70 89 ��� � + FOR EN EMEN �Hy Balfour Beatty' �VE*TP p NqQ 8y'yjj� GEORGE E. BROW /-N • ='n �N DOCUMENT NOT CONSIDERED FINAL V 1 UNLESS ALL SIGNATURES COMPLETED ?o,, / VERT L' PERMIT D RAW I N G DIAMOND CORPORATION JOHN BOYD JOHN BOYD HUGHES, ET UX PROPERTIES SHORE SOUTH SOUTH SHORE PROPERTIES, INC. m / / HW �� 7N SHEET 63 OF 89 HUGHES,ET UX 1 DRAWDOWN STRU RE W/TRASH RACK UJ s i / + O SEE DETAIL E S 2D-1 AND 21 -2 DATE: 1 /15/2024 i RJ' DETAILS 1 AND 2 N / N BA K STABIL TIC) JOHN BOYD /�3113HS sne uw R HUGHES, ET UX / 301DI1S3d / SEE (TAIL 20- STREAM SE O POMIT G 7NOD, \o / . CL 'B'RIP RAP H T b�F ON-O; CL'B'RIP / �E�,1•T '� 1 A EST 5 T EST 10 SY GF O EN LLRGE NT EST 4 SYO F / -i9 CL 'B RIP RAP OUTL CHAN L alH HEDdO WOODS EST 8 TONS EST 21 SY GF 40% RAP-fKS-ONLYI ~AD --<DGE WOODS LOPE= D \ND i \ SPEC DITCH a1H iFf. ,4, E w"j PUE zo z / PUE o DU pm PU DUE 7 COODS T DRSY DETENTION BASIN #5 R _ Rygg- EE DETAIL SHEET 2D 4 i ,cesc - .. .. -. .- .. F _ _ %_ ss xa+ozl �3- P oaory Mia CO- (0- - S .- -. -. .. rasa aNlislxa •� CL T.5 RAP m�� .. ._ - � EST 16 SY GF >-L0W WOODS �r W ODDS W t Q= REMOVE WOODS - -' - F CD + N - WM W I vJ �i e r LIJ -- -- - --_ - _ _ - - - 1--__ -' -- - _-_--- ---- -- -- - ---- - NI ,DETAIL II - _ --- — _ n dodo-Y4RPB- � (q --- ur------- --_ __ I / �\ 4'PAVED SHOULDER --- �- �a-- — --- — —-------- � ---SPED-Dl7�FC �AWRG— -- _O ----- PE�9fTEF1--6RABIN—r--------------------Ai�— W Q� L� s� �!!E lIFML"" SEE DETAIL 20-7 S 70 EB --- US HWY 70 EBL 24'PAVED ROADWAY --_ CD + -- a — -- — ---- ------- Z + N ��� --------------------- ---MJ JM _-- �6r— --- --- � --- � ----- 4'P ED SHOULDER SSVF79— �4' = V NH --- J W W ORA55 9f _ RE .9 _2GI I _ _ _ _ _ 4' PAVED SHOULDER LLJ �U)(f) O �PRaplpl(•� I SPEC DITCH GRADING -77 US HWY 70 WR 24'PAVEDROANAY SPEC DITCH GRADING (n� j I SEE DETA -- SPEC DITCH GRADING �9LxE01K01LPErL------ cpp nP1A1L 20 7— — — — — — — - a v Nr () N O G —1— 2GI Jnd d 2GI n i — G%tA55 1 — PC Of W �� + - - - -- -- - -- - --- --53-- ----- N -----sse---T-------sv--- - $-sse----'------ -- ----2GI---- - -2GI---s------------------ �e- a s W ----- ---------bs ---�5 --- - - - _ B __ W Q — SR 1/5918'PAVED RC I&AY 2D�-DETAIL 11 213-4, DETAIL 10 �� — --- ----p— — — — — -- — — — ---- --- — — — -- — -- --- -- — -- — — — --— _- — —ai n — — — — — — — — — i — — — — — — — --i — — — — — — — - — — — 3dOI U CD W Gs,oas,ol < M7a oeuso b ise,9z F - - _ - �- W < }�N 1 E C l UE ll ll 1l ll 1l 2 - I I1— PUE ` S lse • • • Sl W LI E E UE — — r co PD CL 'I RIP RAP E 310d ID 7— E —_ PUE C qQ W } e^o0D5 E Oyp Z EE'Wd TONS ST SY GF r` h +E Ii/� 9Vld dO8.91 ly IO \ I PUE P E I ^ C= SITE 18 I ll� ��,.,�II� A � ° a� _ wu) -- SPEC N' ITCH - L.� Ind \ SPEC 'V' DITCH U7 I �^ T llO SEE DETA 20-11 ll vl 011 011 Qll I I'-'ll O ll o ro� SEE DETAIL 20-2 I PIPE INLET CHANNEL \I I Ig�xo - I� ��4��§ \ • • • I 1SB •I/o- I W/CL 'I' RIP RAP `Jj+" 31tl9'�� d9° "\3�.tl l0 \ X STREA SE SLOPE=4.0% q \ SEEETETAIL 20-3 10 d0aNz1 _ _ � SEE PERMIT DRAWING SHEET 66 OF 89�IA ` III III ;e h� SPEC 3'BASE DITCH FOR ENLARGEMENT r I \ I 11W51 I III III SEE DETAIL 20-1 \ \ SN8I I n� III RIVER BLUFFS LIMITED PARTNERSHIP S SURFACE WATER IMPACTS F FILL IN WETLAND • • \ II�JI Ii m I I II II DGT VENTURES,LLC mq TEMPORARY SURFACE WATER IMPACTS MECHANIZED CLEARING DETAIL 20-6 DETAIL 20-7 DETAIL 20-8 DETAIL 20-9 PIPE OUTLET CHANNEL STABILIZATION SPECIAL BASE DITCH COASTAL MINI TOE PROTECTION SPECIAL DITCH GRADING (N.to style) STORAGE �N .I.) AND AREAS (Nat° sr.le) 4 I —style) 4 OF NEW BERN Nemr.l eea ON HWY 70, LLC `dot rural EI Nptprol ._ v Groend 3.y D p'�oec Drch N.—I Ground' .6.1 y\� trace ` Gro.nd sp 4RygDJP�P9 sp e�°" sli.pe wetmnd Are. t� Ir FOR -LLT- PROFILE SEE SHEETS 50 & 5/ S iuckGeoteatile " Min.D=1.s R. d =--J I FOR -LRT- PROFILE SEE SHEETS 50 & 5/ s" ro 1. SEE CROSS SECTIONS Min. D=1.0 Ft. B=2.0 FL d=1.0 Ft. GeoedBe • I FOR-Y4RPB- PROFILE SEE SHEET 73 ° M�Nrn - I FOR-Y4RPC- PROFILE SEE SHEET 74 ehe� el Bed •pl.0 GeWeMile Under R;pmp FROM STA. 234+00 TO STA. 241+57 -L- LT �J� Lenstn= zo n q.n.Nd ;n bwtionz Diretled by E�gi.... FROM STA. 234+00 TO STA. 246+00 -L- RT FROM STA. 68+24 TO STA. 69+00-SRY46- RT Type of uner= CL B' Rip -Rap ��' FOR-SRY3DY4C- PROFILE SEE SHEETS 91 & 92 Fsi 40 T°re�Est 7S SY G o'tm;, K'y'd-�n FROM STA. 236+00 TO STA. 239+50 -L- M FROM STA. 68+57 TO STA. 69+00-SRY4B- LT ''a FOR -SRY48- PROFILE SEE SHEETS 98 & 99 STA. 68+34-SRY4B- LT Submittal February 6, 2024 50' 25' 0 50' 100, - SPEC 2' E DITCH / DETAIL 20-1 DETAIL 20-2 DETAIL 20-3 DETAIL 20-4 WETLAND WN SEE TAIL 20-8 / SPECIAL BASE DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL �t` iOF PROTE TION SPECIAL 'V' DITCH (Not to Scale) INot to Scale) (Not to bcale) INol to Scalel SCALE: 1"=100' ILL smPE. NL Front N—I Nalvml L R /- Dibh Gropnd \ Ground bb,f-1 N-1 Natvml \ °c c Dkh Nat I Acc Slope ?:l D M1 Ground 3f D 3.� Ground G2I0 = 98 CFS ES ^ (� Ground 37 D A' �e Ground 3�f Y\moo' I` Tack Gepteeile LTvck GeeN.iile b10=1.6 FPS 5 AI SITE 19 �i Y D °Minimam prtn °Minimam efts Min. D=2.0 R. Min. D=1.5 Ft. Gwteaile B DYPI Geohxdle B (TYP) \7F�Jl B=3.0 R. Length= 28 R. Length= 25 R. Type of Liner-CL T Ri,,-R P -Keyed-In TYpa of Liner=CL T Rip -Rap - Keyed -In Min. D=3.OF4. OLFT ET CHANNEL $TABI�IZA N FROM STA. 56+60 TO STA. 57+85 -SRY48- LT Est 26 Toes, Est 55 SY Gwte.tile Min.D=2AR. Est 37 Tons,Est 65 SY G-te ile B=4.0Ff. `7` �f` �I` WFJjOL 'Z(I$`RIPY�G T FROM STA. +50 T TO STA. 68+16-SRY4B- RT FROM STA. 63+90 TO STA. 66+56-SRY3DY4C- RT Er 30 cY DDESTA. 63+69-SRY3DY4C- RT2 0 - 3.aFt. Est l0 CY DDSTA. 58+70-SRY4B- LT v� ELP DEiP.IL 16-6 N :OM STA. 62+50 TO STA. 63+58-SRY3DY4C- RT FROM STA. 70+90 TO STA. 71+56 �RY3DY4C- RT I DIAMOND INDUSTRIAL CORPORATION NI SPEC O --� LN~ ---- — )QLU _bZ GRA S � U) --- —¢ JOHN BOYD HUGHES, ET UX JOHN BOYD /1111HI HUGHES, ET UX STREAM SE EB�rT RA v ST 10 SY / SITE 18 f MM JOHN BOYD HUGHES,ET UX /,/ I + SflO 11W 4 77 3DaI1sJd SNNVi OV /A ,,iMIT I)R . , ONO3 % \ PE�fiHEHrtiRABll4E- -xe 11!lFRIL°!!f� � £Z F1� N GENIE T N1H C -L ` AP -ONLY) E w >D 'PUj . 7 DUE PL�' PROJECT REFERENCE NO. SHEET NO. R-5777C 20 LOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INCOMPL PANS DO ISITION SEE PERGALAA D�� o 6 SHEET O H :. FS2 RE�I E �Pl� � � � Balfour Beatty Nq� 8 eGEORGE E. BROW // rI N U • �N DOCUMENT NOT CONSIDERED FINAL ' V 1 t UNLESS ALL SIGNATURES COMPLETED 2 / r SOUTH SHORE SOUTH SHORE PROPER, S, r p1 ,- PERMIT DRAWING PROPERTIES, INC. / HW SHEET 64 OF 89 DRAW DOWN $TRU RE $H 2D-2 C"/u Ne V DATE: 1 /15/2024 SEE DETAIL 2D-1 N DETAILS 1 AND 2 TA IL TIO '� � $ E A 2� 6f IP TO ( ;L �5� CL 'B' RIP �4 E 4 S C\/� ESN5 / HEDg:P Woo 5 `* EST 2 Y (3F \ \/) WOODS 1n // � DRY DETENTION #5 � 10Z _ �l�- RY L{ -' - SSE DETAIL SHEET 2 ci P W yMie3-� SCLj' RIT RAP _ EST 16 SY GF -- _-- — dui— - --- ---- _� -- - ----- ------------------- S 70 EB J US HWY 70 EBL 24PAVED ROADWAY -- -- ___--- ".4 2 — — I 4' P ED R�U�EF — 5379M —25— 2�Ci -- 161— 42 bZ — SZ -{'PA2E95tlOtltBER —SZ —SZ— rINGs��- W -REMEVE USHWY 7o WBL 24'PaVEO ROADWAY �p�C DITCH GRADING SPEC DITCH GRADING 'PAVED SLOI/1PErL----- rurell 2r�r _— --- -- E-DETGL30.;'--------- 4 A —25 24 —21-----3GI NAY 2D�-DETAIL 11 R 2D-4, DETAIL 10 = - sz— ti 4� l- I T E l ll ll ll ii i1. / II 1 I — PUE 0 E - --26t CL' RIP RAP �26 E 3tllq>� 10 10 1 } W S ' \ Oy Z '0 EE'�d TONGE 9 I dOa .SI 1y v SY ST SITE 18 11 SPEC 'V' ITCH - �T III ll Y✓ oil Q SEE DEFA 20-11 oT Ir ll- 1l o PIPE I TfAPNNEL TIJ 9e� —� 'IpW/CL'I'RIP 31tl9STIR SE SLOPE=4.0SEE_ETAIL J SEE PERMIT DRAWING SHEET 66 OF 89 SPEC TBASE DITCH FOR ENLARGEMENT SEE DETAIL 20-1 \ RIVER BLUFFS LIMITED PARTNERSHIP SURFACE WATER IMPACTS FILL IN WETLAND TEMPORARY SURFACE WATER IMPACTS MECHANIZED CLEARING DETAIL 20-5 DETAIL 20-6 DETAIL 20-7 DETAIL 20-8 PIPE INLET BANK STABILIZATION PIPE OUTLET CHANNEL STABILIZATION SPECIAL BASE DITCH IN a tp Style) SPECIAL DITCH GRADING I No1Ip style I.I (Not to scale) 4 (Nett° -1.) 4 I °tssgt d. epW -G,'uu�e [ie°Nva nned Tuck GwtaMile rural pro) vE v Grovnd 3. p.� cf Dirch Key Dprop into bi nimam of IN Groan `S Ground SP AR/,QB D Q`Pe SP 'f �D� Y� °I Slope Channel0onom Po<e Geoteeile Under `Tuck Geoteatile J IF'-'. Min. D=1.5 H. ITvpl cNANN L eeD ro m ar tx 'SEE CROSS SECTIONS Min. D=1.0 Ft. (variable) 0ireci1 by Engineer t.s ° m:� B=2.0 Ft. myth Ft. Fr. Rop.wp ain.mll.a ,°sx oe„ae ep G°°t°'nl° eh°� °I e.d .pl FROM STA. 234+00 TO STA. 241+57 -L- LT =2.0 R, d p°.e°.nWin°°°I stream. au Geo-1b UMer Ripmp -20 Tons of Class T Pop Rap keyed -In, ESL 33 SY Gwt Ale -B t,= 30 Pt. N°'oblel in —i- Dbeded by Eginae, FROM STA. 234+00 TO STA. 246+00 -L- RT FROM STA. 68+24 TO STA. 69+00 -SRY48- RT Type of Uner= CL'I' Rip -Rep - Keyed -In FROM STA. 236+00 TO STA. 239+50 -L- M 68+20 -SRY48- RT Eat. 40 Tons, Est. 25 SY Geotmrile STA. 68+34-SRY4B- LT Ds �. .. F �' C N 0_M� -- -- WLU --- ------ -"i <Lli iPT —SZ— LU (z)- CD = J w Q L1_I -- Q - U7 - -25— to — U+N c`'> I— s � 'r-LU co JOH 4 Uo� (pN UE�� • • �� LJ ` m — E ^' N C� } z LU PUE�PUE 'I-= Eco (n (� ICI 2 vs \ / C V' DITCH I II \ � SEE AIL 20.�� • \ Sa�zl � ga I e w I \ r Z SN811W51 V 6 I DGT VENTURES,LLC / eyOoF —bG r COASTAL MINI DETAIL 20-9 TOE PROTECTI STORAGE ON IN WETLAND AREAS OF NEW BERN (N.. s<°I°I ON HWY 70,1-LC Y\col Wetland Are° E —J d=1.0 Ft. Geoteatile Type of Liner= CL 'B' Rip -Rap a FROM STA. 68+57 TO STA. 69+00-SRY4B- LT \l 1317 FOR -LLT- PROFILE SEE SHEETS 50 & 5/ FOR -LRT- PROFILE SEE SHEETS 50 & 5/ FOR-Y4RPB- PROFILE SEE SHEET 73 FOR-Y4RPC- PROFILE SEE SHEET 74 FOR-SRY3DY4C- PROFILE SEE SHEETS 9I& 92 FOR -SRY48- PROFILE SEE SHEETS 98 & 99 Submittal February 6, 2024 Submittal February 6, 2024 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED .q-HFFT A'.F—( 89 CL ST 2 5+ L- I n I rl A TE -4�t6j) CL STA 58 + 01 - RY B- CL SIA 63 + 5 SRY DY C- G IP \ NWE=8.4 36" RCP PK� CH N EL OP =26.1 C ANNEL BURIED 1.0 1@ 2" RCP 1 V 17. I Submittal February 6, 2024 I� FOR ENLARGEMENT ------------------- -- ----------- --------- -- ------ -------------�I�rj ------------ �II, 'Il lCA66 a ;u • A.a rift" pl �` i FAUWAFLAi WHOM i _ - � �. �►— c."..�., �',w' u...,:.,:.. ., �.: . ,:•.r., ...,�J.. fir,. f ' -i' _ � q +t . i 111�� • ��_ ® . -.,... ®I�I�I/U `:i�i.�1.� �� -- - _� . ,' ens _ .._, . ® ® u+. 1•s+� IIii■a� lii' a�� 1..�_I� �Illrr+rr�� �F tea_IF . h .;�, _.—' rr.ra /� •AA �--------- IKILMms. w�.. � ���®■fir "�._ -��� •::. •. ��� AM� a 372 EM, t 1 Y �k - Submittal February 6, 2024 DRAWINGSEE PERMIT FOR ENLARGEMENT - -_ - _ - ------------------- - _�ir •.1- l!!.r' _ :��— �a��i�GirZk�—�l�fi`si��l�'aa��l s �. Ili�;l'� �����.:, :,�����Ilf�ec?aZk��,�� 7��w_�v w n x ._- , , • •, • 1 , x -11MER, 0011 nr � ���.��- .:: _.. z�+n+� �?��*�r:r�'r— -_ ,.r��ei� � ���`•%ak..��7, "~ �'<A�li ��'`� -- h� _a_ a � M- ., _� :.�,•�® •:..� _ �. - _ � • - - � �—�'- �.><..++s�.. a—a�.._r�. �c� Cray - � — - - = _,.,,��• NEI _ •� a_.� s �11'IiQis4ni'iif .—� =�`»3 �� iTe ...., .�+�, ii --sue .. ... , _ . • � Ti i�i7iG€'NiiGEGi��ii�:�'�+i+�T�� �r.��i��i�i— .. �� ®e . .7! i°'S► �rL.ww�l�-J�'n der_. w���.. TTT:--:'-'7f_;'�.,.-'.�-�—,,.m - ,.��.---:,. i iglo1w,111. 11 ��rnu :r► .. •am_ .m..m - `aV \ G r !;14� ti >�� � �•F. ��Iw �1 !• �� � ®, . -� ,� 7i•��,F'�ne#Glf�"'� �►� 'N�•�•(I�Id�5i.r ��e ivwxa•I r �,•II F .�:�,y+ r ' %�I :'a _� 1x o ' �a ITV ►nym-~ .. _ __.'� a „. /� ,/ � 11 f IVA is .✓ o , n v T n Submittal February 6, 2024 FILL IN WETLAND * * MECHANIZED CLEARING OV'O 17'IV�J VN/70Nb'0 NlkN SITE 19 WETLAND WN _ _ 7F _ T _ _ 7F _ _ T \ 7F— / Tg�M\ /"7F 7F 7F 7F 9�M— — —7 7F T T �17F co 7F 7F 7F 7F 7F QIO-98 CFS— V10=1.6 FPS OUTLET CHANNEL STABILIZATION T 7F T T T 7F 7F W/CL 'I' RIP RAP 7Q+0O EST 40 TONS, EST 75 SY GF — 0000o a Hy BURY Q INVERT 1.0' r-A- i ' ktBbRY- / NVERT 1.0' i � HW BANK STABILIZATION W/CL 'I' RIP RAP SEE DETAIL 20-5 SPEC 3' BASE DITCH X x x rn o oo�oo E -SRY4B - / WOODS / SPEC 2' BASE DITCH R =-X-X� PROJECT REFERENCE NO. SHEET NO. R-5777C ^/qO PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOM PLE FE FLANS 25' 12.5' 0 25' 50' 1 OO NOT USE P R ew ACOUBITION SCALE: 1"= 50' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 70 OF 89 DATE: 1 /15/2024 Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C SRY4B-7 1150 1,0 1130 120 10 100 90 80 0 0 60 50 40 30 20 1 13 20 3 D 40 50 60 70 80 90 100 10 120 1 0 1,0 150 30 w 3 V1 �' 0.060 0.)60 3' - 4.1 — — — — pn — — -- --- 204' 1817 P I WIN 69 +50-00 HET 72 OF 8 DATE: 1 / 5/ 02 WE Lo D WN 0 SITE 19 � o.o 0 0. 60 MECHANIZED C EARI G :1 _ - 1917 17.51 SITE 19 WETLAND WN jn- w 10 0.060 0.)6(0 M CH NIZE CL ARI G g a 0.060 0. 60 - 1787 - 150 1 0 1 0 140 110 1 0 0 0 0 0 0 1 1 2 0 0 0 0 l 0 1 0 1 0 1 0 1 0 1 0 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C SRY4B-8 1150 1,0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 120 1 0 1,0 150 PERMIT WIN SHEET 73 OF 8 N 0.0 o. 57 D E: 1 / 5/ 02 — — — 3• �— --- 9.15 71 + 0. 0 WE LA D WN a s 3 Ln r' 0.0 0 0. 6 SITE 19 — — — — — — 1985 19. 2 71 + 0. 0 W TLX D W SITE 19 a a 0.0 0 0. 3: 426. -- -- — — — 20 25 19.5 7 + 0.00 w 0 N 0.060 1 0 4.22. -- -- --- — � _ 2058 1 .84 7 + 0.00 1 0 1,0 1130 1120 1 0 1 80 70 60 0 30 0 1 1 2 0 0 80 10 1 0 1 0 1 0 1 0 140 Submittal February 6, 2024 0 5 10 PROJ. REFERENCE NO. SHEET NO. R-5777C SRY4D-4 49 150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1120 1 0 1,0 1 0 40 PERMIT RAWING, SITE 20 O.To 0.HET CH NIZE CL RI G 7 F 8 3 7 H ND CLE R I G � E: 1/ 2535 qn 19 + 0. 0 W LA D WP SITE 20 a ILL I W TLA D 0.0 0 0. 40 3•. :l 2 41 19 + 0. 0 0.0 0 0.? . 40 :1 2409 jn 30 0.040 0. 40 jn 4' 4:7 2405 18+ 0.DO. 0.0 0 0.)40 1 2429 23.13 17+ 50. 00 L1 0 11.0 1130 1 0 l 0 1 0 0 0 0 0 0 20 11 2o 50 60 70 80 0 100 110 1 0 130 If) 1 0 Submittal February 6, 2024 CRAVEN CRAB JONATHAN COMPANY INC. FULCHER SPEC. 2' BASE DITC SEE DETAIL 25-1 SPEC. 'V' DITCH z SEE DETAIL 25-2 �I II� SURFACE WATER IMPACTS TEMPORARY SURFACE WATER IMPACTS 50' 25' 0 50, 100, SCALE: 1"=100' \ �q0 Vq PROJECT REFERENCE NO. SHEET NO. R-5777C 25 IOADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMIN RY PLANS W NOT USE PO CONSTRUCTION INCOMPLE E PLANS DO NOT USB POR �W ACQUISITION EMMA FRANCES FORD, ET AL Balfour Beatty BURNEY L. HAWKINS, ET UX DOCUMENT NOT CONSIDERED FINAL O UNLESS ALL SIGNATURES COMPLETED I+Nj SPEC. 2' BASE DITCH PERMIT D RAW I N G S118 NHIE MIT DRAWI G SEE DETAIL 25-1,1W51 T 77 OF 89 SITE 21 SHEET 75 OF 89 N GEME INLET CHANN LX fCL T R17.P IBANKS ONL - DATE: 1 /1 5/2024 WOODS xM85£/ll Zl I �EST.�CyepQE -I 0 \ r I SLOPE=3.00% -- - - - -- \ aN�D \3l _ _ _ CL 'B' RIPI RAP TIE TO DITCH EXTG i ll�\ \ ES�71T�6NS STREAM SJ E WOODS r x pNBs x C) I i�/ �� \\_ P — — =-E — — E E E w - F ; L L 24" BURY INVERT 1.0' F O w' M/N DNllslx3 _ ' O N -a� - - M/a ONll-3 ---- • - - - - - - - - � NMONNNfI ,Z CRAVEN CRAB COMPANY INC. Lf1 M CL 'B' RIP RAP EST 2 TONS EST 7 SY GF SPEC. 2' BASE DITCH SEE DETAIL 25-1 WILLIAM M. VIRTUEA ETUX M. VIRTUE, ET UX W REMOVE - - _ - - - 1,1910/ - a - - - - ' -SRY4A- LU GI-D VJ v/ —9— _ - _ ld O ---- -- ---od nl-- - - - --- ------e,nl---------__ - ---oe nl---- - --- ----------- -- ----_--_--------- _---_-_ WO — — sP€c nlTr�,PN�-- --------- ------- ---------- Z + SEE DETAIL 25-4^ S-70-EA5--- N N J �M F 2 — ---__----_-----_ —_-- ---- V---------- T -L- LU Ip c --- ---_ -- _GRASS ----- ---2GI'C --- -- -- - 1= ---- cQ G J FS SEE DETAIL SHEET 7SL-4,-DETAILIT SPEC DITCH GRADING SEE D 'L25-4 — — — ---- - -- —_- FL WABLE FILL —��� 2G1 _- ._ - �5=-------- —2Q11 0 i--. N s 15" - - - - - - - - - - - - - - - - - - - _ - - -- - - - - - ---------M------- > dal - - - -sv- - - - 3GT-D -- FS SEE DETAIL SHEET - - _+Ond -ss3- - - - - - - - - - - GRASS - --ssi-1- _ Nb2GI.m--- ��Z 2D ETAIL 11------LL.I AVMOVOH 03AVd 10P1bell as AVNOVO�I 03AVd,OZ bLll F'S �'RC���� -$RY4�2- „f9'6ZI REMOVE LUCP-III REMOVE --REMOVE REMOVE rvolry M/ VE —M —3Nil-I rs2—i t ll C3 - A3S ` O H� dO8 'I O 9,O1 18" AOS� IaQ 0 E nJs N9 18' Ai 9NUSIx3 �. US HWY 70 EBL 24' PAVED rPAVED SHOULDER FALS - -- —dad -}5 - �IVy1 TCH GRADIN - _- - = RE E N' d d.51 dO Au- DID D U U u — DUE DUE �D�IE DUB —DUE i}DUB cL-S'D JNOO lsp I I 3 Od e� II II 3lod J I E TTi N--lANln ,0 PEC 'V' DITCH I dwtlzl OM OVId I � JE D AIL 25-2 Np � • -- SFEC-V'DrtCFr CCLJJJ $EE DETAIL 25-2 pN851 pNe51 ONBSI Q ON851 © pN851 pN851 HO B ONBSI ON851 NLECTOJSR-577NB STR. #0 X X xx a X X l .8b X lHO ,9 X RIM ATION 011tld 311 N` 31tl0 DS_ - ONOO L I J o JNOJ w AdONVO —/ 011tld I� �dWNd S`2 dWfld QS - dWfld i �Y, dWNd L Np = dWfld O /' I r� �Q 011tld Od31S `zl `ii Od31S O �G $t0 W d31S J Gd31S d31SG d31S ONOO NNtll p/fly S NT8 O ROYSTON D. BLANDFORD PP f�I MICHAEL ONOO J-'Np �Np�UX LARRY W. ❑ — r O DAVENPORT, ET UX s I S 11 REBECCA C. FINER CJ EDWARD ROBERT P. JAMES L. DONALS L. RANDALL ALLEN PURYEAR & GOWING 0. LOYD, ET UX WOODCOCK, ET UX ROBINSON JR. GRAY, ET AL HILL, ET UX INVESTMENTS,LLC IN 2GT' d"nd d31S O REUBEN JULIUS LOGAN, ET UX DETAIL 25-1 DETAIL 25-2 DETAIL 25-3 DETAIL 25-4 SPECIAL BASEleDITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL SPECIAL DITCH GRADING (Not to Sca) (Noll° Sc°lef (Not to Swlel I Notro Scale) 4 DiKh NONmI Nprorol G—d Front 1 at Slope Ground 3 3� Ground Ground 3. A.� ct Dikh NOl°r°I p' d\0t7 D .� �* J °DI E��et Slope Ground 3.� D a;\ t� Tuck Geeteriile `5P�/,� D \P0 SP ` Min. D=1.5 Ft. Min. D=1.5 FL Georenila g ° MiN�pt of 1N [p NFL =2.0 Ft. Rey-Ie Rip-Rpp per Sld. D,.$76.01 Min. D=zoFr. *SEE CROSS S 8 ECTIONS Min. D=1.0 Ft. FROM STA. 65+70 TO STA. 66+70-SRY4A- LT Type of Liner= CI- T Rip -Rap B=3.OFf. FROM STA. 312+00 TO STA. 313+50 -L- LT FROM STA. 63+90 TO STA. 65+20-SRY4A- LT FROM STA. 18+40 TO STA. 25+30-SRY4D2- RT ES1.29 Tons, Est.52 SV Geotextile FROM STA. 312+00 TO STA. 315+00 -L- RT FROM STA. 66+90 TO STA. 75+47-SRY4A- LT FROM STA. 25+80 TO STA. 29+80-SRY4D2- RT FROM STA. 312+50 TO STA. 316+00 -L- M FROM STA. 75+70 TO STA. 75+90 -SRYAA- LT STA. 75+60-SRY4A- LT FROM STA. 322+50 TO STA. 324+00 -L- M CD �p O N 'IT L(0 F- >- r- L LI Q LU U. O L1J O Z N J M LLJ C) < LJJ Q 2 J i O (p Q + N } L1J W PAVEMENT REMOVAL FOR -LLT- PROFILE SEE SHEETS 56 & 57 FOR -LRT- PROFILE SEE SHEETS 56 & 57 FOR-SRY4A- PROFILE SEE SHEETS 94 & 95 FOR-SRY4D2- PROFILE SEE SHEET /0/ Submittal February 6, 2024 CRAVEN CRAB JONATHAN COMPANY INC. FULCHER SEE DETAIL 25-1 \\\) \ 'V' DITCH 'IfSPEC. ETAIL 25-2 �I O L" — - I O N �cMOW 10� Q W c H = 07 V) W O _ _ - - Z N N ---- J � -- =M W 33 W --- E£ cQ c/) - FS, SEE DETAIL SHEET I 751=4TT I 32 I O d-&15-" N V00 W--- Q LLIcn N JS 1 4J Otlld . —SEC-'V'ORCFr SEE DETAIL 25-2 I ONBSI J X Iltld tl`, -/ OJ dWfld LI \? Iti J �d3�s ROYSTON D.BLANDFORD MICHAEL Ju J. LONGO, ET UX S SURFACE WATER IMPACTS TEMPORARY SURFACE WATER IMPACTS CRAVEN CRAB COMPANY INC. WILLIAM M. WILLIAM M. un VIRTUE, ET UX VIRTUE, ET UX i;� I I CL 'B' RIP RAP / EST 2 TONS 3.,J N ., TEASE EST 7 SY GF,I`",] = 2- SPEC. 2' BASE DITCH 3\ SEE DETAIL 25-1 WOODS G� I � n J �A _ TIE TO 0A DITCH WOOS X ON951 X O I< £E- 30�i- —_ s FS SEE DETAIL SHEET FCF-lid _coven o= ti 50' 25' 0 50, 100, BURNEY L. HAWKINS, ET UX N � J $W81 PERMIT DRA Sf19dS� HE T 77 OF FOR G� X I oI i ONesl LE I I \ /C I' RI RAP IBA as \ 1r SL( DNM CL 'B' RIPI RA EST'2 LIONS p 1•. \ \ EST 7ISy AVq0 Vq ?0* PROJECT REFERENCE NO. SHEET NO. R-5777C 25 IOADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINA RY PLANS DO NOT USE MI L CONSTRUCTION INCOMPLE E PLANS DO NOT USE MR /W ACQUISITION EMMA FRANCES FORD, ET AL Balfour Beatty DOCUMENT NOT CONSIDERED FINAL SPEC, TEASE DITCH UNLESS ALL SIGNATURES COMPLETED A, vY l /^V SEE DETAIL 25-1 PERMIT D RAW I N G 89 SITE 21 SHEET 76 OF 89 CHA N L �E ���; V DATE: 1 /15/2024 I III \ \ I —\SN E E ry E —C is Orvusl 3 ; ; 2 " BUY INVERT �S zO-E-8 ----"'STA- --- �GzM c7tAss US HWY 70 EEL 24PAVED / Gj�JSQ} nos. 1 ., .oa- - .. �' nJ5 �N—'ej-18, „-� �, S as 1 N —F* D D,. Q D . E C UE DUE DUE f D$1$1 DID Z sr DDUE CL'B'RIP JNOJ I 3 Od tlld PEC 'V' DITCH " 1so I I -j dlvtla M I / Sr 2 N '� I E T 7 --1-A ,09 SAE D AIL 25-2 NO I \ (\/) ON851 N � ON9SI ON851 © 1 ON9 ON95I � ON85I N T TO1SR 577 TR #0 ONssl J \ C?l .8b ,B X X lHJ "9 6 SE BOX IM T .''- NO I I © ti o L_ Al 31VO � HJ .. T n WOODS 31tl`J NO n fld Vd I I �Q 4Y �dWOd S`2 Od QS d0 W dWfld�/ 333333 ltld O d315d31S J i / rJG 31S d3IS" it d 1S ONOJ�� I,„ 3 NNtl1fJ/f1Crl Z£- 5 l8 l 1 1 LA'S S S r JNOJEt PORTW. NO DAVEN,T UX r 5❑ _ O ❑ REBECCA C. FINER r?J EDWARD ROBERT P. JAMES L. DONALS L. RANDALL ALL EN PURYEAR & GOWING 0. LOYD, ET UX WOODCOCK, ET UX ROBINSON JR. GRAY, ET AL HILL, ET UX INVESTMENTS,LLC REUBEN JULIUS LOGAN, ET UX DETAIL 25-1 DETAIL 25-2 DETAIL 25-3 DETAIL 25-4 SPECIAL BASEleDITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL SPECIAL DITCH GRADING (Not to Sca) (Noll° Sc°lef (Not to Swle1 I Notro Scale) 4 Dikh N.—I N.—I N°Nrol Front 1 at Slope Ground 3 5� Ground Ground 3A.� ct Dikh N°lu.cl !' d\0t7 D .� �* J °D SIOPe Ground 3�� D a;\ t� Tuck Geeteriile D \P0 SP ` Min. D=1.5 Ft. Min. D=1.5 FL Georenila g ° MiNpt of 1N [p NPg =2.0 Ft. Key-Ie NVRpp —Sld. Dw $76.01 Min. D=zoFr. *SEE CROSS SECTIONS 8 Min. D=1.0 Ft. FROM STA. 65+70 TO STA. 66+70-SRY4A- LT Type of Liner= Clas T Rip -Rap B=MR. FROM STA. 312+00 TO STA. 313+50 -L- LT FROM STA. 63+90 TO STA. 65+20-SRY4A- LT FROM STA. 18+40 TO STA. 25+30-SRY4D2- RT Es1.29 Tons, Est.52 SV Geotextile FROM STA. 312+00 TO STA. 315+00 -L- RT FROM STA. 66+90 TO STA. 75+47-SRY4A- LT FROM STA. 25+80 TO STA. 29+80-SRY4D2- RT FROM STA. 312+50 TO STA. 316+00 -L- M FROM STA. 75+70 TO STA. 75+90 -SRYAA- LT STA. 75+60-SRY4A- LT FROM STA. 322+50 TO STA. 324+00 -L- M /HH O O N � L0 I— >- I` W X Q W c _ rn (0- - O W O z + (� LLJ J M � L W GC I - J I GJ- O �p -J - C14 V N H } Oo W W - � Q d U) PAVEMENT REMOVAL FOR -LLT- PROFILE SEE SHEETS 56 & 57 FOR -LRT- PROFILE SEE SHEETS 56 & 57 FOR-SRY4A- PROFILE SEE SHEETS 94 & 95 FOR-SRY4D2- PROFILE SEE SHEET /0/ Submittal February 6, 2024 \ PROJECT REFERENCE NO. SHEET NO. R-5777C SITE 21 N .qO 83jAq ���� PW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER SURFACE WATER IMPACTS INC®NIIPILE FE PLANS TEMPORARY SURFACE WATER IMPACTS 10' 5' 0 10, 20' 1 DO NOT USE FOR 6W ACOUBITION SCALE: 1"= 20' E E E DOCUMENT NOT CONSIDERED FINAL PIPE INLET C NNEL STREAM SJ UNLESS ALL SIGNATURES COMPLETED W/CL 'I' RIP EST RAP (BANK NLY)--\ TONS, PERMIT DRAWING _ EST _ GF SEE DETAIL -3 SHEET 77 OF 89 DATE: 1 /15/2024 P D ISPEC. --- ---—____ 3' BASE DITCH SEE DETAIL 26-1 00 0 BURY INVERT 1.0' HW i - 75 +00 76 +00 M / -SRY4A- W OD -4 ME 2G1-A 0 nl e— H o 1 1 US HWY 70 EBL 24' PAVED ROADWAY US 70 EB �`� Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R-5777C 200 0 0 0 ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER IINC®Ng1�L1E DO NOT USE FOR ]E ]�L.�NS ®W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CL STA 32 3+ L- L S A ' 5+ 50 SR 4A- SR 1C 1 6 " RICP IBURIED 1.0 ) G NW SE 17.2 1 i PROP INLET - — — — 6 " R P — — ii— INV 16.0 at 6" RC BURIED 1.)' =0.430 IN = 5.1 P T 24.91 @ 6" _ RC o OP 25 .5 1 at - 6" o CP IN =1 .4 Submittal February 6, 2024 DETAIL 26-1 DETAIL 26-2 DETAIL 26-3 SPECIAL BASE DITCH TOE PROTECTION IN WETLAND AREAS SPECIAL DITCH GRADING F FILL IN WETLAND 1 Not t° Scel°I 1 Na ro Sc°lel 1 N. m Seel 4 Netur°I Gro°ed 3. D1. Nat°rol A.. \ °c g\°� D� `\m. Slope Veeo°° �\ �' gRyBeo�He 5P MECHANIZED CLEARING �.! Min..0 Ft. F. ° .x. 8=2.0 Ft. d=1.0 Ft. Geotentile 'SEE CROSS SECTIONS Min. 11=1.0 R. °f Liner= CL'B' Ri Rn FROM STA. 324+00 TO STA. 326+00 -L- LT FROM STA. 75+90 TO STA. 80+90-SRY4A- LT T YP° P- P FROM STA. 324+00 TO STA. 326+00 -L- RT FROM STA. 81+65 TO STA. 83+20-SRY4A- LT F.RM STA. 3z�4100 TO STA. 336+00 -L- M HAND CLEARING Ln LV SEE PERMIT DRAWING HEET 77 OF 89 —I FOR ENLARGEMENT � F CL 'B' RIP RAP E SPEC. 2' BASE DITCH E T 7 SYO GF -I SEE DETAIL 26 l� E— N Q + FS SEE DE-ML - } LV ETAIL 10 e? 0�QLU C.?2 Cn 2GI Q LLI o i-- - - - - SPEC DITCH z + (� 2GI LL.I U Q LLI 1s" = Q (n -- --_—�v COLLAR I o ia 66" RCIVQ C ~ O LLI LJ.f 15" RCPIVB �nn Q= v / MDCB �ANNFfT >q v ° "o \�y CL'11'RIP RAP `•y \ EST 2 TONS f EST 7 SY GF RAVE - —E i- O M \ T T T T T m- T T T T T T T T T T T T 7p EMMA FRANCES FORD.ET AL \ \T T T T T T T T T T T T 22 T T T T T T T TOE PROTECTION 7F (FILL SLOPE ONLY) SITE CL'B'RIP RAP T T T T T T T T T \ EST 10 O S \ 1 EST 20 SY OF 1 T T T T TT T TT T SEE DETAIL 26-2 PPP`\ 1�T T T T T T T T T T T WETLAND WY T T T T T T T T 50' 25' 0 50' 100, SCALE: 1"=100' �q0 PROJECT REFERENCE NO. SHEET NO. R-5777C 26 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Ln PERMIT DRAWING SHEET 79 OF 89 DATE: 1 /15/2024 F M/N 'JNI151X3 t o � N L 00 of wLI -- ---- ---- o — SPEC—'HTRADING— ---- w o -------- SEE DETAIL 26-3 + Z (9 N —— Uj —_—_ — --- H Q W ------------------ SPEC DITCH GRADING I 15"RCP4 EI- a F T /J %✓ T T T T T T T T T T T T T T I i /T i`2F T T T T T T T T T T T T T T TI NICK ARNOLD ERNEST BARYON STARK 7 T / F T T T T ^IT T T T T T T T T T T !y I se ' — — — — — — — — —elM— — — — - \ lHJ .Rb L 7 T ; T T T T !T T g> WETLAND WZ - � T 7 T T T T I T T T T T IMPACTS SHADED GRAY \ 1 SPEC DITCH GRADING i arri�nry�''amr r.Tgo �.IMf s,r yglr.. PERMITTED UNDER R-5777AB /U-5713 PROJECT \ \ MICHAEL GLENN HDFFMAN, ET AL \ HARRY C. DDNCAN JR. I J FOR -LLT- PROFILE SEE SHEETS 57 & 58 FOR -LRT- PROFILE SEE SHEETS 57 & 58 FOR-SRY4A- PROFILE SEE SHEET 95 Submittal February 6, 2024 DETAIL 26-1 DETAIL 26-2 DETAIL 26-3 SPECIAL BASE DITCH TOE PROTECTION IN WETLAND AREAS SPECIAL DITCH GRADING F FILL IN WETLAND 1 Not t° Sc°I°I 1 Na ro Sc°lel 1 N. m Scelel 4 Netur°I Gro°ed 3. 6.� °c D'ncN Nat°rol Gro°nd' \ °c g\oQ° V 'I• \�; / D� F\°c Sloo° dAr° �F�\ sP AR�B�FD'0 5P MECHANIZED CLEARING �.! Min. D-1.5 H. ° d .x. 8=2.0 Ft. d=1.0 Ft. Geotentile 'SEE CROSS SECTIONS Min. D=1.0 Ft. °f Liner= CL'B' Ri Re FROM STA. 324+00 TO STA. 326+00 -L- LT FROM STA. 75+90 TO STA. 80+90-SRY4A- LT T YP° F- P FROM STA. 324+00 TO STA. 326+00 -L- RT FROM STA. 81+65 TO STA. 83+20-SRY4A- LT F.RM STA. 3z�4100 TO STA. 336+00 -L- M HAND CLEARING Ln N SEE PERMIT WING YSHEET F' —I E,NLARGEMT JJ\ �'S FB RIP RA� l E SP 2' BASE DITCH E T 7 SYO S f SE DETAIL 26-1 L I �\� E � N Q + F SEE DEDMTL - N LU ETAIL 10 Q LU �C O z+ --- _ SPEC N -S€€E€fA1L-SH = M z7-2&� LU Q U) -- --- I J I _ — — — --25— R O �✓ co LU LJ.J 15" CP-IV Z B M m Vi - -.NI- �/ O M 7F 7F T 7F T 7F 7F 7F T 7F 7F 7F 7p EMMA FRANCES FORD.ET AL . 6 TOE PROTECTION p `7F IF T 7F T T 7F (FILL SLOPE ONLY) /`�l SITE 22 \vJ CL'B'RIP RAP / OZ '� T T 7F 7F 7F 7F 'T \ EST 10 TONS \�\1 B' TIP RAP \ ST 20 SY GF ESTT7 \ 6 T T 2F 7F IF 7F T \ E DETAJL�6�1 T 7F IF IF T 7F WETLAND WY ,� ti \ 8 R mti - M/tl � * � 0� M/tl 'JNI151X3 —well---------gZ--- .I6-ZZeANREMODE —30" RCP —_ --�ANN G�-5777.44� —8��#0509-#0510 US--70-Wa / TQT T T T T TT� �T T I II IF F �- I \Z_/ T T T T T �- 6Z \ 28 \� 15" RCP -III / I � / NICK ARNOLD - WETLAND WZ IMPACTS S ADED GRAY \ PERMITTED UNDER R-5777AB /U-5713 PROJECT \ MICHAEL GLENN HUFFMAN, ET AL \ HARRY C.DUNCAN JR. I 50' 25' 0 50' 100, SCALE: 1"=100' �q0 PROJECT REFERENCE NO. SHEET NO. R-5777C 26 tOADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINA RY PLANS DO NOT USE FOR CONSTRUCTION INCOMPLE E PLANS DO NOT USE FOR /W ACQUISITION Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Ln PERMIT DRAWING SHEET 80 OF 89 DATE: 1 /15/2024 � Qti 0` Q + N 'ITj\ < Uj < U1J — — 1 �q - - SPEc�ITCH-GRADmT aC� ---- w O SEE DETAIL 26-3 + zLjj CO N 6z --- Q Q LJJ EC�s [CE-GRAWRG. 0f C J —43—F I STARI,�, J FOR —LLT— PROFILE SEE SHEETS 57 & 58 FOR —LRT— PROFILE SEE SHEETS 57 & 58 FOR—SRY4A— PROFILE SEE SHEET 95 Submittal February 6, 2024 0 10 20 PROL REFERENCE NO. SHEET NO. R-5777 L-115 300 2110 260 240 220 21 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2 0 2 0 2110 300 PERMIT WIN w T ND r I SHEET8 F 8 SITE 22 o JDATE: 1 / 5/ 02 49 3 FILL IN WELAN MECHANIZED HAND C CL EARI RIN G n. 020 0. 0 3 27. 0.025 7. 27 99 7.\ 0.025 .73 _ — ap SITE 22 WETLAND a a 3 FILL IN ET ND 40 \ .020 0.020 0 025 6.7 0.025 —_ 27.1 2z 78 .47 — 39+0.0 .020 0.020 0.025 6 ;\ 0.025 26. 27 58 .21 — - _ - 3 9+0.0 AD .020 0.020 0.025 6 .1 0.025 — 24.52 26.6 2�38 9 �- 38f0.0 71 1 .020 0.020 1 0.025 6.1 0.025 24.)4 4\ 26. i 69:1 _ _ 38f0.0 .020 0.020 0.025 0.025 23. b 26. 26 98 5. — 37+0.0 300 2 10 2 0 200 1Lo 160 1 0 120 100 60 402 20 60 1 0 140 1 0 1 140 1110 200 220 2,10 260 2110 300 Submittal February 6, 2024 0 10 20 PROJ. REFERENCE NO. SHEET NO. R-5777 L-116 300 2110 260 240 220 2110 180 160 1 0 120 100 80 60 40 20 20 40 60 80 100 120 1 0 160 180 200 220 2,10 2 0 2110 300 PERMIT WIN SHEET 812 OF 8 D E: 1 / 5/ 02 q,1 3.020 0.020 3;7 28. 0.025 10.8 7:7 29 10. 20 3 :1 0.025 213-0 lip an 40 q;1 020 0.020 3;7 0.025 9.7 7: 0.025 2 29 00 — q 020 0.020 3; 0.02s 9.7 g, :1 0.025 _ — 28. / 2990 27.78 - O O 2 O 2 W 3 W 3 3 40 q 020 0.020 3;7 0.025 8,2 .1 4:1 0,025 - 28.15 2859 27.52 WE LA D SITE 22 49 FIB IN METLkND 40 NEC:HA,NIZEP H D CLEARI LEA I G n .020 0.020 3: 0.025 7.7 . 0.025 — 28. 2839 7.25 — ET ND 22 0 z SITE W 3 FILL IN WETU,ND ECH H NIZ ND D C CLEARING EARI G �1 .020 0.020 3: 0.025 7. 3 2:1 0.025 3 0 2 0 2 0 2 0 2 0 2 0 1 0 1 0 110 1 0 140 60 40 2 11 810 1 0 1 0 1 0 14 11 2 0 2,10 2 0 2110 300 Submittal February 6, 2024 F- LU Lu CD 0 U) 1 W z J U QC G Submittal February 6, 2024 k-�\/ y � � �' Nl ��\ 2p, 2� �F%'OZ 1 \ \\ \ "mod M \z� =II� ik \ \ \ SPEC 'V' DITCH \ SEE DETAIL 32-1 50' 25' 0 50' 100, SCALE: 1"=1 11 �2J PQ VV a "\ N C I# �� �, \ A \�'� WALTER T. IVES, JR. ET U SITE 24 ,,0 NN II1JI I I/ RIP RAP LET N EL ONLY) ETAIL 32-4 \\ J E ERMIT DRAWING � 119 m1 ET�85OF89 may, t R G RY \ I z9 d °" �\/ \ N � ��, \ T l.o' T� EIS�4RGEMENT > I P.A.JE.-�.-_I L 2 z /2 I/ I I I -� Taal SITE 23 NN W/ FIBER ( I/ / R PE- \ SEED N / 1 l 21 SI V G \��> ) ` P1jE l Nl `SPEC V' DITCH '/�l \ 00 �- 1 77 P�� Vbf JR INVERT$ 1. ' u EST ti {ESSTT C EK8 v 0 SITE 24 20� �25� �z5✓ �� >\ o` \ /PLIE ,.� Li TELEPHOrvE A�_23 / 1 T �II—/�FL1•�_ LEGRAPH COMPANY EASENE \ 23 21\�� \ �kST 2220 SlY' GiiF 1� _/ 2 //� 22 a /— SE Df ETAIL 32�^/Z NJ1E\RSELL t ' •jll 1\ �� E HRECKEVV�T.ET UX rB INVERTS 1.0"•'— E N •COk�\s2 NC. I//I \ \ 2A 1 \ 110 \ \'m I \ f \\ DETAIL 32-1 DETAIL 32-2 PROJECT REFERENCE NO. SHEET NO. R-5777C 32 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT UBB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR /W ACQUISITION Balfour Beatty �' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWING SHEET 84 OF 89 DATE: 1 /15/2024 JAMES THOMAS KILLINGSWORTH, ET UX a�ag� � d�a No3 \Q �3 JOHN R.BOOHER,ET UX SPECIAL 'V'DITCH PIPE OUTLET CHANNEL SURFACE WATER IMPACTS IIA to Scale) ( NO UTL $cala) Front Nao� I Natural DHch 3.J .1 G.wn Ground 3;J� A-. ec Slope d p 3 D Min. D=2.0 F1. Min.D=1.5 Ft. B Mnz. d=,.D h. TEMPORARY SURFACE WATER IMPACTS B=3.0 F1. Length=42Ft. I FROM STA, 52+ 00 TO STA. 53+88-SRY1C- LT Type of Liner=120 BY COIR FIBER MAT 91 FROM STA. TO STA. --SRY1C- LT Est. 40 CY DDE FROM STA. 11+00 +00 TO STA. 14+00 +00 SRYI DY3C- LT STA. 54+60-SRY1C- RT FROM STA. 12+00 TO STA. 14+00-SRYIDY3C- RT DETAIL 32-3 TOE PROTECTION (Nw m Scale) oa '%��� SLOPE GaOUND d F GEOTEXIILE d=1.0 Ft. Type of l-i-- CI -A 'B' Rip -Rap FROM STA. 38+50 TO STA. 39+62 -Yl- RT FROM STA. 39+76 TO STA. 41+09 -Yl- RT FROM STA. 41+24 TO STA. 42+00 -Yl- RT DETAIL 32-4 PIPE OUTLET CHANNEL IN— S,-) Natural Ground 3 3� D Nmurol Ground d 1 Tuck Georexlile GeoteNile g a Minimum of 1N 0YP1 Min. D=3.OFt. Length= 30 Ft. d-4.0F. Type of Liner-CL'1' Rip -Rap - KeyedJn B=S.OFL- 11.OFt. Est 52 Tons, Est 90 SY GeateNila E� 90 IVarieble at52 at OoHet) STA. 40+90 -Yl- LT FOR -Yl- PROFILE SEE SHEETS 60 & 61 FOR-SRYIC- PROFILE SEE SHEET 84 FOR-SRYIDY3C- PROFILE SEE SHEET 84 Submittal February 6, 2024 Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 14+56 to 15+65-L- 1@7'x7' RCBC 0.005 0.006 0.006 40 15+16 to 15+65-L-LT INLET CHANNEL 0.005 0.004 19 19 14+56 to 14+87-L-RT OUTLET CHANNEL 0.015 0.002 54 11 2 20+07 to 20+70-L-LT ROADWAY FILL 0.010 22+60 to 22+81-L-LT 0.001 3 29+31 to 29+62-SRY1C-LT 42" RCP 0.007 4 29+69 to 29+80-SRY1 C-RT 42" RCP 0.001 5 29+70 to 32+33-Y1- ROADWAY FILL 0.494 0.080 0.001 18+37 to 22+01-Y1 LPD- 26+34-26+38-Y1 RPD-LT 6 14+31 to 16+39-SRY1 DY3C- 30" RCP 0.121 0.030 0.032 7 56+14 to 56+26-L-RT 66" RCP OUTLET CHANNEL 0.001 0.002 6 15 18+83 to 19+46 -Y1 RPD- 66" RCP 0.010 91 18+81 to 18+94-Y1 RPD-RT INLET CHANNEL 0.002 15 18+85 to 18+94-Y1 RPD-RT INLET BANK STABILIZATION 20 19+20 to 19+46-Y1 RPD-LT OUTLET CHANNEL 0.001 13 19+20 to 19+37-Y1 RPD-LT OUTLET BANK STABILIZATION 25 TOTALS*: 0.627 0.000 0.000 0.128 0.033 0.037 0.011 255 73 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 7 20+16 to 21+75-SRY1DY3C- 66" RCP 0.126 0.050 0.043 0.013 156 21+38 to 21+56-SRY1 DY3C-LT INLET CHANNEL 0.001 9 21+41 to 21+56-SRY1 DY3C-LT INLET BANK STABILIZATION 20 20+39 to 20+60-SRY1 DY3C- OUTLET CHANNEL 0.002 0.001 34 17 8 63+34 to 63+43-L-RT 1@6'x7' RCBC OUTLET CHANNEL 0.004 0.003 23 15 29+06 to 29+10-SRY1 DY3C- 1 @7'x7' RCBC 0.007 0.007 67 29+05 to 29+10-SRY1 DY3C-LT INLET CHANNEL 0.002 22 29+05 to 29+10-SRY1 DY3C-LT INLET BANK STABILIZATION 30 29+15 to 29+33-SRY1 DY3C-RT OUTLET CHANNEL 0.002 28 29+15 to 29+29-SRY1 DY3C-RT OUTLET BANK STABILIZATION 30 9 34+03 to 35+29-SRY1 DY3C-RT ROADWAY FILL 0.062 0.014 0.004 10 42+04 to 42+30-SRY1 DY3C-RT ROADWAY FILL 0.002 0.002 11+24 to 12+95-Y1 D2-RT ROADWAY FILL 0.013 0.010 0.029 11 49+26 to 49+33-SRY1 DY3C-RT 36" RCP 0.001 14 49+28 to 49+32-SRY1 DY3C-RT OUTLET CHANNEL 0.001 0.001 12 15 12 94+40 to 94+99-L- 60" RCP 0.008 105 61+06 to 61+14-SRY1 DY3C-RT 94+40 to 94+53-L-LT INLET CHANNEL 0.002 20 94+47 to 94+53-L-LT INLET BANK STABILIZATION 16 TOTALS*: 0.201 1 0.000 1 0.010 0.073 1 0.078 j 0.036 1 0.012 1 507 1 126 1 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 13 103+70 to 103+91-L-RT 48" RCP 0.003 18 103+70 to 103+79-L-RT OUTLET CHANNEL 0.001 0.001 20 11 14 25+64 to 25+84-SRY4B- 1@7'x7' RCBC 0.001 7 25+68 to 25+83-SRY4B-RT INLET CHANNEL 0.003 18 25+72 to 25+83-SRY4B-RT INLET BANK STABILIZATION 25 25+64 to 25+84-SRY4B-LT OUTLET CHANNEL 0.001 10 25+68 to 25+84-SRY4B-LT OUTLET BANK STABILIZATION 30 202+88 to 203+25-L-LT 1 at TxT RCBC 0.001 11 202+95 to 203+14-L-LT OUTLET CHANNEL 0.004 0.003 31 21 15 201+66 to 203+45-L-RT 2@7'x7' RCBC 0.099 0.043 0.033 0.089 16 220+32 to 220+55-L-LT 54" RCP 0.004 33 220+43 to 220+55-L-LT OULET CHANNEL 0.002 0.001 20 7 17 231+01 to 232+19-L-RT ROADWAY FILL 0.004 0.019 0.016 18 234+52 to 236+79-L- 72" RCP 0.017 223 235+03 to 235+22-L-RT INLET CHANNEL 0.001 0.001 26 10 236+47 to 236+79-L-LT OUTLET CHANNEL 0.002 0.002 16 21 TOTALS*: 0.103 0.000 0.062 0.049 0.089 0.036 0.012 460 98 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 19 68+13 to 69+40-SRY4B-LT ROADWAY FILL 0.022 0.025 70+47 to 71+03-SRY4B-LT 0.010 0.012 20 18+84 to 19+61-SRY4D- ROADWAY FILL 0.069 0.008 0.005 21 323+61 to 323+76-L-LT 66" RCP 0.006 64 323+61 to 323+69-L-LT INLET CHANNEL 0.002 0.001 23 12 22 329+01 to 331+42-L-LT ROADWAY FILL 0.138 0.018 0.019 23 39+61 to 40+24-Y1- 54" RCP 0.011 0.002 93 18 24 40+20 to 41+30-Y1- 54" RCP 0.012 0.001 126 18 40+71 to 41+03-Y1-LT OUTLET CHANNEL 0.005 0.001 30 10 TOTAL SHEET 84 OF 87 0.627 0.000 0.000 0.128 0.033 0.037 0.011 255 73 0 TOTAL SHEET 85 OF 87 0.201 0.000 0.010 0.073 0.078 0.036 0.012 507 126 0 TOTAL SHEET 86 OF 87 0.103 0.000 0.062 0.049 0.089 0.036 0.012 460 98 0 TOTAL SHEET 87 OF 87 0.239 0.000 0.000 0.063 0.024 0.036 0.005 336 58 0 TOTALS*: 1.170 0.000 0.072 1 0.313 1 0.224 j 0.145 1 0.040 j 1558 1 355 1 0 *Rounded totals are sum of actual impacts NOTES: Site 20: Wetland WP Total Take West of-SRY4D- Due to Loss of Function: 0.039 ac (Impacts not included in table above) Fill Mitigation = 2:1, Total Take Mitigation = 1:1 Revised 2018 Feb c- 0 a 3 E L a See Sheet to For Index of Sheets See Sheet t B For Standard Symbology Sheet 1 N R E OI 4 /o yz� pi 'C �4 EGIX ��ii OJECT lJ VICINITY MAP N.T.S. BEGIN TIP PROJECT R-5777C —I— POC STA.10 + 09.89 = —I— POC STA. 578 + 90.00 (R-1015) 4 Submittal February 6, 2024 STATE OF NORTH CARD I INA DIVISION OF HIGHWAYS CRAVEN COUNTY PERMIT D RAW I N G SHEET 1 OF 14°�° �`" bTATR PRQtF T REPRRENCE NQ 6EEET NO. TOTAL 9B8819 R-5777C ]� STATE PROD. NO. F.APROl.N0. DE6CRIPTION DATE: 1 /15/2024 44648.3.4 WA DESIGN -BUILD - LOCATION. U.S. 70 FROM THE HAVELOCK BYPASS TO EAST OF S.R.1116 (THURMAN ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNING, ITS AND STRUCTURES NAOOsiNq zo77 UTILITY WETLAND AND SURFACE WATER IMPACTS PERMIT BEGIN RESURFACING ONLY -Y3- STA. 13+04.73 BEGIN RESURFACING ONLY -SRY4B- STA. 10+69.02 BEGIN CONSTRUCTION END RESURFACING ONZY -Y10- STA.10+09.00 S BEGIN CONSTRUCTION BEGIN CONSTRUCTION END CONSTRUCTION -Y2- STA. 10+00.00-SRY/A- STA. 15+03.0] BEGIN CONSTRUCTION -Y3- STA. 13+16.85 END RESURFACING ONLY BEGIN CONSTRUCTION S OJ SRYlB- STA. 11+39.11 BEGIN BRIDGE -L- STA. 180+19.15L+� �RY4B- STA. 22+I7.00 � W END CONSTRUCTION -Y1- STA. 15+76.03A', �, 12 13 14 16—Lr 15 1 17/ ,'S?i �K p O [[[nnn -Y3R/'B- - _1,3�9 1 �`.. + ��II g 1 ��I fl� 111011111111111111 - �i,SRYLDYj 1 - _ - __ yO� ( O N e PIS' r J .t END CONS -Y5- STA. 1/+20.00 END BRIDGE END END CONSTRUCTION -L- STA. 180+98.74 -Y6- STA.11+00.41 -SRY7DY3C- >y W Y END CONSTRUCTION SITE 25 END CONSTRUCTION -Y3- STA. 27+90.87 -Y9-STA.10+8583 Q ::> C7 SITE 8 BEGIN RESURFACING ONLY SITE 6 g -SRY1C- STA. 16+59.21 BEGIN CONSTRUCTION O� END RESURFACING ONLY -DRI- STA. 10+04.06 : F'f BEGIN CONSTRUCTION N 18 19 -SRYIC- STA. 30+62./7 END BRIDGE -YI- STA. 27+44.40 +/- La N Z SITE 4 SITE 24 `J END CONSTRUCTION J -Y/- STA. 45+20.00 ' W \' Z J \ 2 — U Q� END CON: -Y7- STA. I THIS PROJECT IS WITHIN THE MUNICPAL BOUNDARY OF THE CITY OF NEW BERN CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. SITE 10 \l— i�+K \ y CONSTRUCT -Y8- STA.11+01.00 N END CONSTRUCTION -SRY4B- SITE 20 a NA003i�2 0 077 -RR4- -SRY4A- 22 23 24 -L- US-70 END TIP PROJECT R-5777C —I— POT STA. 355 + 64.22 = —I— POT STA. 250 + 00.00 (U-5713 IR-5777A&B) 6 -SR1aA INCOMPLETE ]PLANS DO NOT USE FOR R/W ACQUISITION ]PRELIMINARY ]PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Submittal February 6, 2024 ' 50' 25' 0 50' 100, PROJECT REFERENCE NO. SHEET NO. DETAIL 6-1 DETAIL 6 DETAIL 6-3 DETAIL 6-4 PERMIT DRAWING R-5777C 6 SPECIAL 'V' DITCH SPECIAL DITCH SPECIAL BASE DITCH SPECIAL DITCH GRADING /[,jq CALE: 1" =100' SHEET 2 O F 14 ROADWAY DESIGN HYDRAULICS 'l ENGINEER ENGINEER I — -1.) Fmm (Not scale) (N.. Spate) 4 I Nm ro S.W) /'\ N I A'� Sploepe NOluml OI Front N—I�\;.' G.puwd3, Fp' D\�\p G,eppd 3o,l� '��� F sDA E: 1/15/2024p I oISlope"B ��slope `sPv R/qe� JPp\P8 sP [��T Min. D=1.5 F1. " Min. D=1.5 Ft. lam.! Min. D=2.5 Ft. ` / 'in A.�O B=2.0 Ft. B=3.0 Ft. 'SEE CROSS SEC00N5 Min. D=1.0 k. G�7 'Y FROM STA. +75 TO STA. 37+50 -SRY1C- RT FROM STA. 23+00 TO STA. 25+50 -L- LT /'� F� M $TA. 26+00 TO STA. 35+50 �RY1B- LT FROM STA. 23+00 TO STA. 36+00 -L- RT FROM STA. 33+50 TO STA. 36+00 -L- MED A / FROM STA. 24+50 TO 26+00-SRY1B- LT 'l � �' DETAIL 6-5 SPECIAL 'V' DITCH INmm xple) F,on, COMPANY WEYERHAEUSER Balfour Beatty oe" N A'> e� ��^P^ LEE PDLISKO PLISKO StN Gsc G—d p,:. D F\p \ \ \\ \ DOCUMENT NOT CONSIDERED FINAL o P�� Min. D=1.0 Ff. JACKSON FAMILY, LLC UNLESS ALL SIGNATURES COMPLETED 2-2J. LLC FROM STA. 30+50 TO STA. 36+00-SRY1C- LT C) ,,\ \\\ \ SP 1sp Sp C T BASE DI H SLATEE 2' BASE DITCH F �X N ONO EE DETABS6-3 �\ SEE DETAIL 6-2 w� CL 'B' RIP RAP X015 O T ! X3NOO ww GF x I � \ \ I \� I DA851 WOODS 3rJ tV aHXsl 31V0 \ x x� �x—X - - -I \ \ ! 1 \ \ _ F!1 N I sne na) al } \ VA1 V 1 — oNou E 1 G 3SI 31 VO WOODS q F I O' �L 'B' RIPJRAP yD C NS O E �E as uw EST 3 TONS p E-� C F E + -zse E E C E— V - -- - --- � N W _ W MN i - �� -- - - - - - -- _ - - -- - -w- y _ rSE E-0ETAIL $H _ — — — - M - - - - - M - - - _�� n -_____ _ 2D-4DETAILII------------ ----- - RPE _ _-_ GRASS _-__ MOVE �1 W y — — Z O Uj 5 C DIT TRADING —+—__—_— ---- __ - _ - - - _ - - __--a1PAVED SHOULDER j — — _ W J N -- — REMOVE ------- _ --- 1 US HWY 70 EBL 24'PAVED OAWJAY — � (� I_ U Q W 2GI ls„ 2Gi — — ------ US 70 EB ------ — q•PAVED — — — Q N (� --___---- ----- --- — -- -- (q —�---- --- Es FS, SEE DETAIL SHEET FES 4 1E' RCP j, �_� 0 2D-4 DETAIL 12 US 70 WB GRASS GRASS MO E - 2HouLD� Z' PAVE $PE -SE-6N� —�J REMOVE— ---__ =���=SPEC �H DING --��� _ I _ -Cr'25 TONS AAJ?—--- --- --_-- _—�— US hWY 70 EBL 35'PAVED ROAA51'AY�- _ - --S�d5-S4_-=— --- --- — — — — ---- -- I � -------------------------- — Ln - n - -yi - - - - - a•PAVED SHOULDER = =y= _ _ / / f��_ - co LU CL 'B' RIP RAP WOODS -=oj- - - -•�- - - - - - _ - -- - 7 w / \\ - PxoP uro . - - _ LL EST 2 TONS PECD SE DITCH C� - -. U in EST 7 SY GF WOODS !PEC 'V' DITCH NC DEPT. OF TRANSPORTATION I '•'\ EE DETAIL b-5- _ of i TIE TO .. EXTG DITCH l Ln _ ---= E 'I' R _ T 20 " aP1u AY - - 5T 39 -- --- -IOU7- U + F- _ -w- - -- �ne.bz ----- ---7 -- ana.ez PUE � � LL.I PwoP olw Pow c POP -- uuya pUE � _ PUE (/)— `� NMONN- JAd.Z i - d'^ z PwoP orx Pow ylwF 'oP we Pow cAw�F woP ula .E� cupoulr PUE "- PwoP ulp TFc cuNpul, e:c Pow PUE or urc IE coxou�i ie PnoP- � we P 158 I S ETAIL III OlHsl '� -�\ OJ T 'T 7 7F \ DITCH WOODS om ws \� \ SITE 4 ��� DIRECTIONAL BORE w UG POWER, TEL of ���-�—�� gym\ KERN COMPANY, INC. N� WETLAND WD MOODS \' KENNETH McGOWAN ALL DIRECTIONAL BORE PITS BFFG LLC �y COUNTY AND HAND HOLES TO BE LOCATED OUTSIDE OF JURISDICTIONAL AREAS FOR -LLT- PROFILE SEE SHEETS 35 & 36 FOR -LRT- PROFILE SEE SHEET 35 & 36 Ha.oe FOR-YIRPB- PROFILE SEE SHEET 63 FOR HAND CLEARING FOR-SRYIC- PROFILE SEE SHEET- PROFILE SEE S88/& 82 PRELIMIN RY PLANS DO NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR �W ACQUISITION Submittal February 6, 2024 0 5 10 PROJ. REFERENCE NO. SHEET NO. R-5777C SRY1C-8 150 1 0 130 120 To 100 90 80 70 60 50 40 30 20 1 1 2 D 3 D 4 D 5 D 60 70 80 90 100 1 0 110 1 0 1,0 1 0 P RJAIT E RAW1N H EET %: Q F 14 D E: 1 / 5/ 02 0 0.042 0. 42 1 4' 2958 26.35 31 + 0. 0 SITE 4 40 E ILA ND D o a 5 AND CLE RIN ILL RESURFACING O LY 2938 - 3 + 0.00 -- 4� BLAND )VD 40 LSITE 4 ILL RESURFACINGH D CLEARING 3 29 07 3 + 0.00 ILL 8. RE URF CIN 28 81 2 + 0.00 do 1 0 1 0 1,10 1 0 110 100 L 0 0 0 0 1 1 2 0 0 0 0 1 0 1 0 1 0 1 0 1 0 Submittal February 6, 2024 PERMIT DRAWING SHEET 4 OF 14 DATE: 1/15/2024 c, I MATCHLINE-Yl-S 23,00 (SHEET 30) Sir IBM will % V) M ro-111- 0 IN I D—L '5 D-L D- "I OF TA 11111T 5 OR ENLARGEMENT ALL DIRECTIONAL OUTSIDE OF JURISDICTIONAL II F, 35 AND HAND HOLES —E SEE SHEEE - mono x.v it II 1ESHEETS �T D—L VATCHLINE k, -Y1- STA 36,00 (SHEET 32) GRAPHIC SCALE ILI- RAP �01 - Lai - HAND CUEARIIN. 1 11 3,111 WETLAND WE I PLANS Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C RY1DY3C-2 1 0 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1110 1 0 1,0 150 PERMIT WIN H E F 14 4:1 4: JDATE: 1 / 5/ 02 25.80 17+ 0.R a s WE LA D E W 3 SITE 6 3 7 4:1 4:1 3 25.6 2567 a WE LA D E ND CLEA ING 23,13 16 + 00. 001 a g WU LAND WE SITE 6 HIND --LEA RING 24.80 23 61 W 0.0 2 .10 W 3 3 0.0 3:7 5.40 2533 00 q; :1 5.70 2568 s �n M10 150 110 1 0 90 70 60 50 4 21 1 210 60 70 0 0 100 1 0 1 0 1 0 1 0 0 c Q r GO f :1 BANK STABILIZA W/CL 'I' RIP RAP 'XE DETAIL 8-3 Submittal February 6, 2024 DETAIL 8-1 DETAIL 8-2 DETAIL 8-3 DETAIL 8-4 DETAIL 8-5 SPECIAL BASE DITCH SPECIAL 'V' DITCH CULVERT INLET BANK STABILIZATION CULVERT OUTLET CHANNEL CULVERT INLET /OUTLET BANK STABILIZATION (No to Swle) (Nat to Swle) (N.110 Smle) (No I. Scala) (No. Swle) I From ]:I Ne1u�I 2et�nd Ditch '"mod NPNrvI Nmgrolepw N°Nrpl From \ °t Ground \ Ground "< d• Groand 3.7 D A'D of Ditch N .A" Slope 3.7 p 3' . F\col SIoI Groand 3�� D F\ uck Gvotwtile' d Tuck' m 1.`; Tuck Geore�tile Key Riprop into of 1N Ln p Minimum o11N Key Riprop inb Ge°textile B o Minimum of IN Channel BoNom (TY➢I -BJ Min. D=1.5 F. *3:1 BEHIND Min. D=1.5 F. ITy� CNpNNEL BED Channel BOHom(Typ) Ilya (TWO Place Geotertile Under B=2 Ft. GUARDRAIL Length=41 R. rvdvble) Length= 47 H. CHANNEL BED Ri ro in Le<miem Min. D=2.SF1. Each SNe (variable) Directed by Engineer FROM STA. 63+45 TO STA. 66+00 -L- LT Esc 60 Tons of cross T Rip-Rop, Keyed -In Type of Liner=CL 'I' Rip-Rop - Keyed -In Inn2. - 3 H. FROM STA. 63+50 TO STA. 77+00 -L- RT FROM STA. 28+70 TO STA. 29+05-SRYIDY3C- LT fo Top of Bank, Ezt. 24 CY DDE •Place Gewenile Under Riprep Ezt 50 Tonz, Ezf 85 SY Geote file d=2.5F. d=2.o - a.o Fc oo Rn s5i��mr� .o ¢n odm. o° FROM STA. 29+00 TO STA. 42+50-SRYIA- LT FROM STA.29+10 TO STA. 31+50 -SRYI DY3C- LT Ezf.t05 SY Geofedile on: D.,e..fed by Engineer -1170 CY DDE B=4.OF. Est.=30 Ton: of Clasz'I' Ripe Rap, kayo&ln, Est. 68 SY G—file t WOODS aCO T w r — (n SPEC 2' BASE DITCH SEE DETAIL 8-9 w0�. z + P� J (y) F- ---1 --- 2 LU MH 7NOJ UQw n Q U) PROJECT REFERENCE NO. DETAIL 8-6 R-5777 SPECIAL DITCH GRADING (No I. Swle) ROADWAY DESIGN 4 ENGINEER IPA ~y4R��\P0� SP *SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 66+00 TO STA. 69+00 -L- LT A FROM STA. 70+50 TO STA. 77+00 -L- LT Ji SHEET NO. ENGINEER PRELIMIN RY PLANS W NOT USB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR 7W ACQUISITION FROM STA. 30+50 TO STA. 31+60 -SRYIDY3C- RT STA. 13+30 -Y1 RPA- RT STA. 11+78-Y1RPD- LT STA. 29+10 -SRY1 DY3C- LT FROM STA.32+10TO STA.34+60-SRY1DY3C-LT M STA. 29+25-SRYIDY3C-RT PERMIT DRAWING r,0 FROM STA. 34+60 TO STA. 40+50 -SRYI DY3C- LT FROM STA. 41+50 TO STA. 42+70 -SRYIDY3C- LT FROM STA. 10+75 TO STA. 12+00 -DR2- LT SHEET 7 OF 14 FROM STA. 10+75 TO STA. 12+00 -DR2- RT -7, Balfour Beatty' DATE: 1 /15/2024>> i �L NTI� i SPEC 'V' DITCH ETA 'L 8 2 SPEC 2' BASE DITCH IL 8-I 10 CL 'B' RIP RAP O SST 2 TONS t� SPEC DITCH GRADING SEE DETAIL 8-6 E SPEC 2' BASE I SEE DETAIL 8-1 PNOP — GAS LINE E E SCOOM SPEC DITCH GRADING CL 'B' RIP RAP 2 TONS EST INUI wG cns LINE - SY GF - E E SPEC SPEC DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 50' 25' 0 50' 100, SCALE:1"=100' C LU LLJ Q I N v Q U) DITCH GRADING O SEE DETAIL 8-6 LU O -_-- _ - - - -- z + rn — —d A — — —2GI-D FS, CFF AlnL— ZTt'I q — — („� Q LJJ 21)= DETAIL 12 — 4'PAVED SHOULD od --n=� -- — �i ni— — F- ------------- --- US HW✓ 70 EBL 29'PAVED ROADWAY ----M / --- --- --- ___ __ Q I AND HAND HOLES TO BE LOCATED lQi II Im OUTSIDE OF JURISDICTIONAL AREAS STREAM SB � la I! 31vD1 41a � cy �I I ll,X 4 n DETAIL 8-7 DETAIL 8-8 DETAIL 8-9 3 WOODS X WOODS SPECIAL BASE DITCH TOE PROTECTION TOE PROTECTION IN WETLAND AREAS a y X Y', r(1] (N°t t° Swlel (Not to Scolel � a\ (No110 Swle) 2,J KER DIRECTIONAL BORE =1 � .B _ ii 3>0' SLOPE oc�w N°tur°I .°t Fr^^t SPEC 'DI Xg _ _ NnTURAL \f N-1 GroDnd' Groend 3� 3' Ditch ` UG TEL C CUR o..D d f wexond prep 3 F`\ D P°�g1 slop SEE DETAIL 8- BAN STABILIZATION A SVIN GEOTDTILE �d LBj Min. D=1.5 H. /C 'I' RIP RAP 0 C d=1.0 Ff. d=1.0 Ff. Ge°textile B=2 H. E DETAIL 8-5 11gOivd -- COMPANY, INC. Cn �J Type of Liner= Clwe'B' Rip-R,p Type Of Liner= CL'B' RipA p FRO - RT ROCK CHECK DAM - EC DETAIL HAND CLEARING SEE DETAIL SHEET 2D-4 I SEE DEFAIL 8-2 FROM STA.35+20 TO STA.36+00-SRriDY3C- RT FROM STA. 34+00 TO STA. 35+20-SRYIDY3C- RT DIRECTIONAL BORE DETAIL 9 SPEC 'V' E ITCH I RAVEN COUNTY UG POW, TEL PE 'V' DITCH SPEC ' ' DITCH SEE DETAI 8-2 v SE :DETAIL B-2 SEE D AIL B-2Q- CL 'B' RIP RAP EST 2 TONS 'o EST 7 SY P TE / IE_ — — — — — — R R TEL �ABLLG _ BLEB - E — — <� `— R 15" W/ < S pa � P' ` 2 ELBOWS GY ARSITE 9 PROPOSED 6" PVC SL ��� WOP UIG PG CAB 41'PNOP O/G:I]W LES— PROP wG PUE "oulT _ TABILI-T DIRECTIONAL BORE `� '1EEC IL 8-5 UG POW, TEL , \ 4 SRYIDYJC- / „E / - 2GI Pa° "` ' e�E SITE 10 oIa TT:Lo . " EST 2 TONS — _ _", F — -- — P"GpGIGP°�ppe"Q�EWETLAND WRR EST 7 SY GF F - - R oP OIN Pow L:nE —PROP DIN Pow LINE L x oP alx Pan LINE ND, U,B Pow CABLES oP a PUNCE,E v -o G FOR -LET- PROFILE SEE SHEETS 38 & 39 Ro uic Pw cABLEe PR PROP ufa Pow CABLES PUE m Tn FOR -LRT- PROFILE SEE SHEETS 38 & 39 PR PROP I E wG TEL ooNoulT PRaP G i I ROP G Pw BLEG PROP rB L ooNoulT - ooNou= oNo PUE — FOR-YIRPA- PROFILE SEE SHEET 62 PUE PUE TOM, W PUE PUE PUE PPUE PROP F1 g CL 'B' RIP v o FOR-YIRPD- PROFILE SEE SHEET 65 €[:S S�(FILEL Y GF / OPROTECTION SEE DETAIL 8-7 m m FOR -DR2- PROFILE SEE SHEET 77 WETLAND WG UGE POW, TELBORE SLOPE ONLY) FOR -SRY/A- PROFILE LEE SHEET 79 L 'B'RIP RAP FOR-SRYlDY3C- PROFILE SEE SHEET 85 EE DETAIL 8-8 ---- —_— -------- - REMOVE ---------- ------------ 4'PAVED SHOULDER _---- --------- -------- — — — — — ------------ -- ------ --_-- -------- —_ ---- --—4'PAVED SHOULDER -------- ---- ----------- --------------- — — — — — — — — --- — — -- US MNY 70 WBL 29'PAVED ROADWAY ----- _— —� 2 = � �— _ SHOULDER C 1f — 1T 1} — — W — f--_—If — —9'PAVED -- — I— _—W— — — — — - - - i� ^---- ----- ---- - -�J __��--"-------- —� T� - -Al ----d--------------d-GRABE*o ----K------------- _ — — _ JAL — — — — -- — — — — — — — °--------- ae nL - - - - - - - 9RkM-_------------------SPEC Z` -------------------W---------- - - - —Od Ai fTCfi- d --------- --"-----------------G1UbE o - dnl------ - - - - -- - ----- - -- fo -TN-----W------- S— s -__ — — — — — — — — — — — — — — — — — — — — — — — — �_z r = —z� -------------odnL----- - _ -__-=- oe Alni— — —OAd — — — �3'•r --r- - -- p — — — — — — — — — — — — — — — — — —ssJ— _ — — — — — — — — — —ssf— — — — — — ssi - i — — — — — — —ss — — — — - - _ -- ---- - ---- -_ — — — — — — — — — — — —ssi— — — — — — — — — — — — _ — _ — -_- � \ - _ - - - - -- — — -- — — —— —od ni-- — — — — — — — ai Ai — _ — ssi — — — — — — — — — — — — — — — — — — —od nL of Al - CULVERT OUTLET CHANNEL M/a 01 113,ZS'0 I I � I I M/a Ol d13 ,19'0 - .. - .. .. .- .- .. -. .. .. .. .. -. .. .. I'ORIa RAP (BANKS ONLY) WOODS I I I I III WOODS ALL DIRECTIONAL BORE PITS UT ILITY POLE IMPACTS (18" DIAM) SLOPE SEE DETAIL 8-4 !I I WOODS FILL IN WETLAND: 20 SF Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C 3RY1 DUC7 1 0 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 90 100 110 1110 1 0 1,0 150 PERMIT WIN H E F 14 D E: 1 / 5/ 02 0.0 0 0.1020 24.33 25 39 0 r 0 0.020 0.1020 4 •7 3.5 2a ao � o 0.0 0 0.1020 s" s w 2 08 2368 4 )TOO WETLA4,ND E 0.020 0.1020 � o SITE 9 4 3; 7 3 HAND LEAR NG 3 23.4 1 24.12 3 + 0.00 0.0 0 0.1020 a s 3• 21.88 2425 rn 33 + 0.00 0.020 0. 20 M 3: 4.2 z of 110 U o 1 0 1 0 1 0 140 0 0 0 0 0 1 p 1 2 0 0 0 0 1 0 1 0 1 0 1 0 1 0 1 1 0 I II I I I I I I I I I I II I I I I I I I I I I II II II II I I I SPEC 2' BASE D CH G B LINE SEE DETAIL 9-1 po 1I Gr CV _ w It OD -- I- LL.I ..�...�...�. U) W Q Submittal February 6, 2024 DETAIL 9-1 DETAIL 9-2 DETAIL 9-3 SPECIAL BASE DITCH SPECIAL 'V' DITCH STANDARD BASE DITCH I Neff° Smle) IN— kale) (N.. Smle) Frenf Natural NO NN1 F.NN 1 °t Slop Ground II ee II Ground 3.Y p PyN't SI pe Ground 3.2 F\o"°t/ p 3' D Min. D=1.5 Ft. Min. D=1.5 H. Min. D=2.0 N. B=2 Ft. B=3.0 H. FROM STA. 78+50 TO STA. 81+00 A- RT STA. 83+00 -L- RT FROM STA. 77+00 TO STA. 78+50 -L- RT FROM STA. 81+00 TO STA. 83+00 -L- RT O 'ROM STA. 42+50 TO STA. 44+10 -SRYIA- LT FROM STA. 42+70 TO STA. 43+57 -SRYI DY3C- LT Ln :ROM STA. 44+50 TO STA. 48+44 -SRYA- LT FROM STA. 43+57 TO STA. 46+00 -SRYI DY3C- LT :ROM STA. 48+44 TO STA. 53+44 _SRYIA- LT FROM STA. 47+50 TO STA. 49+28 -SRY1 DY3C- RT 'ROM STA.53+44 TO STA. 56+50 -SRYIA- LT FROM STA. 49+32 TO STA. 53+90 _SRYIDY3C- RT FROM STA. 54+20 TO STA. 57+00-SRYIDY3C- RT UT FROM STA. 10+50 TO STA. 13+15 -Y1 D2- LT C' FROM STA. 11+00 TO STA. 12+50 -Y1 D2- RT DETAIL 9-4 PIPE OUTLET CHANNEL STABILIZATION 21t (Nef fo Xolal a(Ty PI N 1Bed III.- Elevmi; n Gnun Ground ap,k mpfvxfile r n aIN Le GrofeNile' Cban del Bed m% ngth=12 H. (var' I 'Flare .—I. Under Ripmp bk in Lorofions UirzaM by Engineer Eat. 15 aClass'I'Rip-Rap, Keyed -In Est. 30 SY SY Geawcfile STA. 49+30 -SRYIDY3C- R1 ECJ TARHEEL INVESTMENTS, INC. SPEC T BASE DITCH SPEC 2' BASE DITCH :SEE DETAIL 9-1 SEE DETAIL 9-1 CL 'B' RIP RAP EST 3 TONS PROP U/G GAS4LIN G GV LI —E— E — _ — — — — — — - tttllpiiii H W -J 17JA- SPEC DITCH GRADING CL 'B' RIP RAP EST 2 TONS EST 7 SY GF PROJECT REFERENCE NO. SHEET NO. DETAIL 9-5 R-5777C 9 SPECIAL DITCH GRADING ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 4 (Na Sale) 4 ._ ._ Ip� gR�gBZ J .PNk sp 'SEE CROSS SECTIONS Min. D=1.0 Ft. Q FROM STA. 83+00 TO STA. 85+SO 4- RT FROM STA. 80+00 TO STA. 91+00 -L- LT DETAIL 9-6 Z SPECIAL DITCH GRADING 7 4 (N.. Scale) 4 D i _ ._ ��f Balfour Beatty StN Asp DOCUMENT NOT CONSIDERED FINAL I ^ I 'SEE CROSS SECTIONS � Min. D-1.o Ft. B= `Variable UNLESS ALL SIGNATURES COMPLETED FROM STA. 85+50 TO STA. 91+00 -L- RT PERMIT D RAW I N G 50' 25' 0 50' 100, SHEET 9 OF 14 DITCH BERM TO EL 26.8 SCALE: 1"=100' DATE: 1 /15/2024 SEE SHEET 2D-4, DETAIL 13 7 PRELIMIN RY PLANS W NOT USB Po CONSTRUCTION INC®MPLE E PLANS DO NOT USE MR 7W ACQUISITION NAE L­ cns uN CL 'B' RIP RAP + IQ E GP U/G w LIN EST 2 TONS f) O^ �° wa Lo � LU z I 1- � FS, SEE DETAIL SHEET I ZS'bLa13Z-13- 2D-4 DETAIL 11 2GI n 2GI-D I WOODS 2GI ` FS 2 E ETAIL DETAIL SHEET WOODS00 r 2GI 10 FS, SEE DETAIL SHEET I SPEC DITCH GRADING = - = _ LLJ W W .ZI M--� --M-I----M---- ----- ------------ -9 702eg------ -- ---- ---- ---- -- --_-- ------------ --- --- --- -- O 2 M 1 M M _ M _ _ W Z (q —� ,— � � - — -- —�,L— —�, -- -- — --- -- — Z ++ O -L - - -L- - 2D-4 DETAIL 12 �d n.-2GL - - - - - /_ - - �d nL �U nL ni_ _ _ -J Q tIL-SH -{"7»- i i Al-nl- �U nl C - - - - 2GI-D - �" = 6) UQ-D�^RR1L ---�- - ---- -- ---- --- --- -- ------ aPA�QS LPE�_-�5_-3GF MOVELij I— us Rwr 7o EBL 2q' PAVED Q Cn Q =-- --- -- 4'PAVED SMOumER --- -- Jt _ GRASS -- --- GRASS CL'I'RIP RAP----S4EE�ITCH-GRADING ---- SPEC DITCH�6- --- (n _ -- __ --- SPEC DITCH GRAD -----_ J ----------- ------ e, EST 90 CY DDE - EST 30 SY GI SEE DETAIL 9-5-___---- _---------- 0 o ro w ---- -- -� q•p�VFn c.vnll[/)Eo S MNY 70 WBL 24 PAVED ROALWAY _ SPA iV31DT -_ dbZ CL'B'RIP RAPS / SEE "L�-- --L-- -i-- ---- HW -- -- - --L-- ---- _ L _ ---- --L-_ ------/--`T- --L- (� Q Q ----- EST-2 To _� - --- - _y — i ni GRAS.L - C(Yi Q a - _ NNNfI .9 4 - - - E- - - ssi- - - - d - - - - -_- -ssi- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Ln W - - - - - - Y - — — — — W _ s .° REMOVE Mnv REMOVE REMOVE IY -os nIE ib E- b `JNIISI m U/G PqY ♦E /N /G�'L W PBDp Z% TEO Olx GW PROP I PROP ROP P DUE I DUE a U �UE DUE a Hen UE I I SPEC'�*yt--- NE / F e°s ' DUE LIE -DUm DUE m U SPEC 'V' DITCH SPE�'V' DITCH 6 Po I n I SEE DETAIL 9 / 2 d woSER DETAIL 9-2 SEX WOODS N015 S OV 1 I I J woods I I= 1 w odsl n l I / aoou'T DITCH lop. I III I I OjSI d III do wtlo I I { I aJN SEE DETAIL 9-2 77 ?0S CHANNEL STABILIZA ON eWi / I I 1 ` _ ❑ 1 11 X // INO a` s/ SITE 25 W/CL'I'RIP P I I I I I 1 I I ins P cP� KERN COMPANY, INC. SEE DETAIL -4 - I I 60 dvind I I, X alvo S 11 COMPANY 7 , / pia + Nl8 I MATCHLI E g DIRECTIONAL BORE N° A P N NSET UG COMM S X �H R0Y M. A �a G,a ROY M. ROY M. EBORN, EEORUX EBO N ET UX �JUX ERNEST P. DOUTHIT, ET UX N� iJ e 1l / a WETLAND WQQ ld I CRAVEN COUNTY RICHARD D. MONTY A. C '9 Lp / W / / , SPEC LAT 'V' DITCH HARDISON, ET UX CAMPBELL. ET UX C CL 'B' RIP RAP fC 0 1 SEE DETAIL 9-2 ,(� - EST 3 TONS ALL DIRECTIONAL BORE PITS v� �j I , / EST 10 SY GF /lI r _X ( l TIE TO AND HAND HOLES TO BE LOCATED D .GG F / EXTG DITCH OUTSIDE OF JURISDICTIONAL AREAS l W I SPEC 'V' DITCH ww o 0 E SEE DETAIL 9-2 W `" E D CONSTRUCTIONHANFOR -LLT- PROFILE SEE SHEETS 39 & 40 7IO2— ST,4,I3+/J).OI � CLEARING FOR -LRT- PROFILE SEE SHEETS 39 & 40 � �. FOR -SRYIA- PROFILE SEE SHEETS 79 & 80 Mg7CH I FOR-SRYIDY3C- PROFILE SEE SHEETS 85 & 86 LAVE INcc, FOR -YID2- PROFILE SEE SHEET 89 Submittal February 6, 2024 a .. MCMIMM It)t)!M r • ] l.i Y � a V : �r �I 10 .na ni. • - .. - �i�s�..z��l-��_ _- TT.• � is 31 - - �� v ell'II =3n1 of � � � S - - ,.... ��, ® ® SYiY-' �� �� _� .. � FYI i1�F1 III �� I�i�11� _ i — _ Inc �� --=— �.� -- r RF.,.,.. ! � J�P�,.�-�0��3 ���4'—�''.'.�"!A:T- �,� .�Ir... •�. �"3 �aer\vfzi!'�. `\` �i•av'r - ii.MF�s+n^7•�e� A 1 ul .a 11 , . . I 0AND HAND HOLES TO Submittal February 6, 2024 Submittal February 6, 2024 0 5 10 PROL REFERENCE NO. SHEET NO. R-5777C SRY4D-4 49 150 1 0 1130 120 To 100 90 80 70 60 50 40 30 20 1 13 20 30 40 50 60 70 80 0 1 0 110 1120 110 1 0 1 0 P wI N SITE 20 0.0 0 O. HA D CLEARING H E 1 F l 3r� AND CLE IN DATE: 1 / 2535 19 + 0.00 a a = w 3 0.0 0 0.040 30 3•. :l 2 41 19 + 0. 0 0.040 0. 40 :1 2409 49 jr) 0.0 0 O. 40 4' 4:7 2405 18+ 00. DO 0.0 0 0.)40 30 1 2429 17+ 50.100 150 110 1 0 110 110 140 1 0 0 I 0 O 50 1 1 2 30 40 0 70 80 90 H ±oL1, 0 1 0 110 to� Submittal February 6, 2024 Submittal February 6, 2024 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 4 29+79 to 30+89-SRY1C-RT UTILITY 0.037 6 15+01 to 16+52-SRY1 DY3C-RT UTILITY 0.065 9 33+49 to 34+26-SRY1 DY3C-RT UTILITY 0.018 10 42+03 to 42+44-SRY1 DY3C-RT UTILITY 0.029 20 19+01 Tto 19+56-SRY4D-RT UTILITY 0.032 24 41+21 to 41+38-Y1-RT UTILITY 0.001 25 46+04 to 46+32-SRY1 DY3C-RT UTILITY 0.003 TOTALS*: 0.000 0.000 0.000 0.000 0.185 0.000 0.000 0.000 0.000 0.000 *Rounded totals are sum of actual impacts NOTES: Site 10: Utility Pole Impacts (Fill -18" Diameter Pole) = 20 sf Revised 2018 Feb See Sheet to For Index of Sheets See Sheet t B For Standard Symbology Sheet 1 N R E OI 4 7D pi 'c �4 EGIN ��ii OJECT lJ VICINITY MAP N.T.S. BEGIN TIP PROJECT R-5777C —I— POC STA.10 + 09.89 = —I— POC STA. 578 + 90.00 (R-1015) 4 Submittal February 6, 2024 STATE OF NORTH CAROI ILA DIVISION OF HIGHWAYS CRAVEN COUNTY BUFFER D RAW I N G SHEET 1 OF 13 �`" bTATR PRQtF T REPRRENCE NQ 6EEET NO. TOTAL 9N8819 N.C. R-5777C I STATE PROD. NO. F.APROl.N0. DE6CRIPTION DATE: 1 /15/2024 44648.3.4 WA DESIGN -BUILD - LOCATION. U.S. 70 FROM THE HAVELOCK BYPASS TO EAST OF S.R.1116 (THURMAN ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNING, ITS AND STRUCTURES Nqo\ 03/Nq ?p77 BUFFER IMPACTS PERMIT BEGIN RESURFACING ONLY -Y3- STA. D+04.73 BEGIN RESURFACING ONLY -SRY4B- STA. 10+69.02 BEGIN CONSTRUCTION END RESURFACING ONLY -Y70- STA.70+09.00 BEGIN CONSTRUCTION BEGIN CONSTRUCTION -Y2- STA. I0+00.00 _� /AOSTA. 75+03.0� BEGIN CONSTRUCTION SITE 14 CS N TRUCTION ONLY GIRESURFACING 0 -Y3- STA.73+16.85 SRYIB-STA. 11+39.11 SITE 12GSTA. IB BR�G�S RY4B- STA. 22+I7.00 W END CONSTRUCTION -YI- STA. 15+76.03>,,, �, 12 13 14 L 16 _ I —�-' 17 CD O - - -YJRP9-� 1 + N -SRYIDY3 - N u:. _ 1 c GE U) END CONSTRUCTION 11+20.00 P END CONS ,TRUC X EL- STND A I80+98.74 +/- -Y5- STA. -Y6- STA.D+00.41 -SRYIDVX >y SITE 13 END CO RUCTION END CONSTRUCTION -Y3- STA. 27+90.87 -Y9-STA. 0+85.83 Q C7 I k, R"A AMA - wn A, M ME I r-M SITE 1 6 BEGIN RESURFACING ONLY SITE 23 Q -SRYIC- STA. 16+59.21 BEGIN CONSTRUCTION END RESURFACING ONLY -DRI- STA. 10+04.06 + tf BEGIN CONSTRUCTION N 18 19 -SRYIC- STA. 30+62.17 END BRIDGE -YI- STA. 27+44.40 +/- W N SITE 24 END CONSTRUCTION J -YI- STA. 45+20.00 ' W Z J U QEND CON: 2 -Y7- STA. I THIS PROJECT IS WITHIN THE MUNICPAL BOUNDARY OF THE CITY OF NEW BERN CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. c a 4- E L cl SITE 11 SITE 16 ��5 I N END pp NA003i CONSTRUCTION C2p77 [A.12+20.00 p 9GE +46.42 +� ® RR4 -SR-SRY4A- 22 23 24 -Y4RPB- -I- US-70 END TIP PROJECT R-5777C —I— POT STA. 355 + 64.22 = —I— POT STA. 250 + 00.00 (U-5713 IR-5777A&B) -SRY4A- IINCOM]PLETE ]PLANS DO NOT USE FOR R/W ACQUISITION PRELIMINARY ]PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED _U US-70 Submittal February 6, 2024 DETAIL 5-1 SPECIAL 'V' DITCH (Notto Scole) Front Ditch N.W.1 p'� pt Slope Q Ground b°n D F\o sc w q ROBERT B. \ O p7` Min. D=1.5 Ft. = HARDISON, ET AL 0 f� X FROM STA. 15+50 TO STA. 18+50 -L- RT w WETLAND Wi4w ' GOODWIN m N0 C ERT INLET M IJNEL''\ CREEK ¢ W/CL 'I' P RAP (BANKS tuJLl') m SEE DETAIL'S-51- ¢ ONOSI WOODS SPEC 2' BASE DITCH SPEC DETAIL T I E DITCH W/CL 'B' RIPRAP'� ` SEE -4 EST TONS, EST 131 SY GF >• SEE DETAIL 12 E 13Noa E E \ �\ - C O REMOV DITCH GRAD Z + ---_ I J � T---- U Q W — GRAss m J SPEC DITCH / I d / MO isl � I )LE ILIZATION W/ L 'II' RIP RA EE DETAIL 5 / / / L"' I DETAIL 5-2 SPECIAL 2' BASE DITCH I Not to Scale) N.—I o< Front Ground p't�yat si.p d 3'7 D F\ Tuck Gepteslil. a Geofe.tile B Minimum of 1N'0' Min. D=2.Ol d=1.01, Type of Liner= Class 'B' Rip -Rap, KeyedJn 8=2.0H, FROM STA. IA+On TO STA. IA+7O -SRY1 R- LT DETAIL 50, 25' DITCH SPECIAL BASE DITCH LPL-LLL�LL�r ( Not to 5mle) o S( Natural \ of F..N Gmpnd 3/ °eD Sikh _. Min. D=2.5 Ft. w 13=3.0 11. FROM STA.18+00 TO STA. 24+50-SRY1B- LT FROM STA.21+30 TO STA. 23+00 AL RT ? O' WETLAND WB JACKSON FAMILY, LLC / SPEC 3' BASE DITCH / / W00p5 W/CL 'B' RIP RAP SPEC 3' BASE DITCH EST 128 TONS, EST 335 SY GIF / / SEE DETAIL 5-3 —eTM— — —e —T' SEE DETAIL 5-8 CL 'B' RIP RAP �� I R x— E—E---- 2 TeNS 'c ' / — yy I M +B�— � � XT�' ma M/11 DNI151X3 OC`J i% �"i1110 I MIN= J Fk g < '� _ ���►' ° ae •`��� s NC DEPT. OF TRANSPORTATION VESET," �GF ••r •fJ1Vri �M.,�E�va %, ,I'T ? tl ; XIS F .�F KLMfl (ID 4. E<fl • ��''b���4L71An1�+rZ�.�' . I 24,. _ CLEAN OUT M ONlisrxa EXISTING DITCH N OR "/ OPES FLATTER REMOVE CLEAN O�— 0 LU o ? W N � J 1 PROJECT REFERENCE NO. SHEET NO. R-5777C 5 IOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USE PO CONSTRUCTION INCOMPLE E PLANS DO NOT USB POR ,W ACQUISITION Balfour Beatty �' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BUFFER DRAWING SHEET 2 OF 13 DATE: 1 /15/2024 1 UAVID A. / / ` � / � EXISTING DITCH SAX'4 , / / 3:1 SLOPFg OR E U I 1 did GOODWIN nq uw Ado vJ II e' / / / //� / I 1 I I TONS \ lk \ 71W CREEK r MICHAEL A. MILLER, ET UX �/ ti �g / �/ I I I -Lse I EST SY GF \ JEREMY R. / RODAMAKER DAVID A. SANBORN, ET UX CROATAN FREE WILL 1- BAPTIST CHURCH x I \ — _ — _ _ "\ � / j /� /// IiNo ee of \\ \ FREE \ �" I.,C WILL LL BBAAPTIST I I \\ ALLOWABLE IMPACTS ZONE 1 /// �,� CHURCH � I BdSI ALLOWABLE IMPACTS ZONE 2 / a // // / a I� I�� DETAIL 5-4 SPECIAL BASE DITCH (Nat to Smle) Noturol \ oc Front Ground 3.7 D p' Di1ch I� I� F\o�ot slope k.-"°� -.J Min. D=1.5 Ft. B=2 Ft. FROM STA. 13+50 TO STA. 16+00-SRY1B- LT DETAIL 5-5 CULVERT it CHANNEL IN— S 16) Nwurol Noturol Ground "I D 3.� QucGround k GeokMile Minimum of 1N Geotedile g IrYFI Min. D Key -In Rlp-R.p per5td.Dw 876.01 B=5.OFf. Type of U.n CI,,s' I'Rip-Rap'o Top Bank Est. 50 ions, Est. 80 SY Geotexlile Est. 35 CY DDE DETAIL 5-6 CULVERT OUTLET SCOUR HOLE STABILIZATION INMM S—) N.—I Bed Ground El —lion Notur a �n Tuck Geoteaiile a Mi— of 1N 2.0" 21 or IDTI GeoteMile' Fl�trerH " 6inin ur .b C lift d Ge WAI. Under Ripmp l 'th= 56 R. in L.c.tiom Di— by Engineer Tyye p Liner-CL'll' D>R.p 1. T p Bonk - KeyedJn OYn E11 210 —, Est 2d6 SY GeMex k STA.17+08 -SRYIC- RT STA. 16+78 -Si B- LT DETAIL 5-7 SPECIAL DITCH GRADING 4 (Not to Scots) 4 D spy A D 0 5P '�9g2F Npwp. 'SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 12+00 TO STA. 23+00 -L- LT FROM STA. 13+00 TO STA. 15+50 -L- RT DETAIL 5-8 SPECIAL 3' BASE DITCH ( Not to Scots) Natural Frain Ground p'� °c slope of D Dill 3.7 Po µark Veotealle Geo 1. B nim m f 1N IrYq Min. D=2.OFt. d=2.OFt. Type of Liner= Class'B' Rip -Rap, Keyed -In B=3.OFt. FROM STA IA+RO TO STA 1R+OO _SRY1R_ IT EE I I x CROATAN FREE WILL I D BAPTIST CHURCH I I � �� aJ R \ CROATAN FREE WILL I I — — — Eo% BAPTIST CHURCH \ 11WSl X WOODS — — \ ag\\ �, FOR LLTI PROFILE SEE SHEET 34 } \ 00 FOR -LRTI- PROFILE SEE SHEET 34 FOR -LLT- PROFILE SEE SHEET 35 \ FOR -LRT- PROFILE SEE SHEET 35 FOR-SRYIB- PROFILE SEE SHEET 8/ FOR -SRYIC- PROFILE SEE SHEET 83 WOODS Submittal February 6, 2024 BUFFER DRAWING R-5777c 7 314 SHEET 3 OF 13'^�' F `a �v 07y DATE: 1/15/2024 IN PIfpLIMIN RY�xPLANB T �- p � \ ze'%iru sia r d,Z INGtlMP E PLANB MATCHLINE 9�0� (SHEET 31)' Balfour Beatty st' 000um ex vo, / F a MATCHLINE-Y7-STA23+00(111EET30) wew.,,e xo F s Vic" c..e�"c of SEE BUFFER DRAWING ro :o / j I SHEET 4 OF 13 w I FOR RfFMFtNj Fu —IL xvcsruFnr& K. ,,, os aL i z � en,e ,oxs s see on.s„ Eat —' -- ----------- us ro we rs n-, v vrs o.x. TE as cF --- -- 3— rrs rEn . n<"wd wE W c � ••_ � f-_ -ar y _ �+ � �u.^3 ' 3d1. • Z1] — —_ -- _ _ _ _-__ - .. -' cnov §aht anxvur, xe. rl SITE ss7e no � w & -. __--— F •�Im - � of enr oG \ � Ipl I .. i� e e STREAM SA �k N I i iF ,wo., n.reM1e n..r<.,, .xau dwnoo. DfiAlLll DfiAIL sxc � x E, t LTT x ,..r,ro- e. " 5- LLL o xn n �n L 14 7. �w s..,o-sn,or,c n 6Aivw moo, e II l 1 r �-z ,�� er— LLT xo. na r.«so ,o .00 s,nor,o- s, I — — — — — — — — SEE BUFFER DRAWING F -uurrT irine scc sHc�rs i6.n'a x.s a,�;Bn ax MorF SHEET 5 OF 13 OR Yl PROF,t£ S££ SHEET 62 FOR ENLARGEMENT n� PROF, EEe sncEr u SEE SHEET 63 n.,o.,. MITIGABLE IMPACTS ZONE 1 vw., s , so o s.,. .,x�.r v Ys Po P,� sce sneer I / FORl —(E SEE SHEEE Tl " ,ox nti ,^GR SRY10/3C PROF,LE SEE SHEETS 84 & 85 DEruL _"" MITIGABLE IMPACTS ZONE 2 ..a 2�y� y5° n `I NiP 9 / "°_Ti >•°b YI- (STATELY PINES ROAD)/ -L- MATCHLINE l v -Yi-STA 36+00 (SHEET 32) n„-sr ov DPio 1PR-sTnc cow..rex CRAVEN GRAPHIC SCALE No0 e6 31311231 1i5I ACA 3/31123 Submittal February 6, 2024 Submittal February 6, 2024 0- If ;LLJ LLJ � - L.LI p z_+I� MH DI UQw Q U) J Submittal February 6, 2024 DETAIL 8-1 DETAIL 8-2 DETAIL 8-3 DETAIL 8-4 DETAIL 8-5 / SPECIAL BASE DITCH SPECIAL 'V' DITCH CULVERT INLET BANK STABILIZATION CULVERT OUTLET CHANNEL CULVERT INLET /OUTLET BANK STABILIZATION ( NM ro Sc°le) (Nat 1° Smle) ( Not ro Smle) (NO I. Scala) IN— to S.Il ) From P�yue� 2.1 -�?o��d N°Nnl NO-1 �Pl­ o�nd Dirch \Front NO -I A'� oc Slope Gro°nd JGround 3.D A' Dirch a pM° \marlop Groan3D F\dTk GrrilKey Ripr°p intomimum of 1X mp KeyRiprop°Minimum of1R Channel BoXomY➢IB Min. D=1.5 H. *3:1 BEHIND Min. D=1.5 Ft. ° mini m or IN Chpnnel BonomlTyp) GeorexRle B YPOYp) Georerrde Under GUARDRAIL RYE) CHANNEL BED CHANNEL B=2 Ft. Length=41 H. V° b,e) Length= 47 Fr. Riprop in Locations Min. D=2.SF1. Each SBe (variable) Dne<red by Engineer FROM STA.63+45 TO STA. 66+00-L-LT Esr. 60 Tons of Cl°ss'I'Rip-R°p, Keyed -In Typa of Liner=CL'I'Rip-R°p-Keyed-In d=2.5H. La^gth=30 Ft. FROM STA. 63+50 TO STA. 77+00 -L- RT FROM STA. 28+70 TO STA. 29+OS-SRYIDY3C- LT b Top of Bank, Esr. 24 CY DDE •Place Gewenile Under Riprap Ezt 50 Tonz, Ezt 85 SY Geotextile d=2.0 - 3.0 Fr. oo Rn sioe.5,��a� �a �n oar °p FROM STA. 29+00 TO STA. 42+50 -SRYIA- LT FROM STA. 29+10 TO STA. 31+50-SRYIDY3C- LT Est. 105 SY Georedi6 In Lamrane D.—d by engineer Esr 170 CY DDE B=4.OH. Esr.=30 Tone of class 'I'R1, Rap,Esr. 68 BY Gaaraahla FROM STA. 30+50 TO STA. 31+60-SRYIDY3C- RT STA.13+30-Y1RPA-' RT STA. 11+78-Y1RPD- LT STA. 29+10-SRYIDY3C- LT L(T FROM STA. 32+10 TO STA. 34+60 -SRYI DY3C- LT Ln STA. 29+25-SRYIDY3C- RT �� FROM STA. 34+60 TO STA. 4 0 + 5 0 -SRYIDY3C- LT FROM STA. 41+50 TO STA. 42+70-SRYIDY3C- LT FROM STA. 10+75 TO STA. 12+00 -DR2- LT �` FROM STA. 10+75 TO STA. 12+00 -DR2- RT MITIGABLE IMPACTS ZONE 1 J DATE MITIGABLE IMPACTS ZONE 2 SPEC 2' BASE D SEE DETAIL 8-1 SPEC 2' BASE DITCH i DETAIL 8-1 E—E CL'B'RIP RAP SPEC 'V' DITCH CL 'B' RIP RAP LEST 2 TONS SEE DETAIL B-2 —E--E EST 2 TON$$ EST 7 SY GF 'B' SY GF E C E E CL RIP RAP EST 2 TONS — EST 7 SY GF BANK STABILIZATIO W/CL 'I' RIP RAP SPEC DITCH GRADING E DETAIL B-3 SEE DETAIL 8-6 -_ - YIA- WOODS _I DETAIL 8-6 SPECIAL DITCH GRADING ( NOII. Smle) IPA «y4R/� " �\PO�� SP *SEE CROSS SECTIONS Min. D=1.0 H. FROM STA. 66+00 TO STA. 69+00 -L- LT A FROM STA. 70+50 TO STA. 77+00 -L- LT Ji FFER DRAWING EET 6 OF 13 �, Balfour Beatty StN : 1 /15/2024 O] DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 50' 25' 0 50' 100, E SCALE. 1' =11 _ _ r LU — LLJ PROJECT REFERENCE NO. SHEET NO. R-5777C 8 tOADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINA.RY PLANS DO NOT USE MI L CONSTRUCTION INCOMPLE E PLANS DO NOT USE MR 7W ACQUISITION a99 1 11- Ix3 - < < -YIRPA- 2GI SODOM SPEC 2' BASE DITCH SEE DETAIL 8-9 SPEC DITCH GRADING = SPEC DITCH GRADING SPEC DITCH GRADING SEE DETAIL 8-6 SE I - .. SEE DETAIL 8-6 ([.S6 Q ER - -- -�d1-- -�JL-- -ALL-- ------�JL-- 15" 1IWX7' RCBC -J n1- 2GI-D Fj CFF DFTA,I < T� _ _ HEE L n1- - - - �i n1- - - �i n1- - - -0i n1- - - —i nL- - L- 2D-4 DETAIL 12 J Al 4'PAVED SHOULD OGI --------------------- ------------_----- ---- --- -- ----- US HWY 70 EBL 24'PAVED ROADWAY M�/ ____ m REMOVE -- ---- --------------- ,81 4'PAVED SHOULDER jB----------_ ---- --—4'PAVED SHOULDER -------- ---- ------ ----- -------------- Q2=13.0 CFS, V2=1.8 FPS Q10=16.2 CFS, VIO=1.9 FPS US L,Wv 7D weL 2aa4VED ROADWAY -- ----- ---- 4' PAVED SHOULDER _ _-�_----- - --�-- 1-e - -- B �- --- -�- K-- -�-----X} _!_ n1- - - - - - - - - - - - - -od n1- - _ - - - - - - - - _ - -- - - - - - -03 - - - - - - - o - - - -OJ n1- - - - - - - - - - - - - _od At- - - - - - - - - - - -od n1- - - - - - _ - _ - _ �7- - - - - - - - - - n - - - - - - F-----d--------------d-GRRAABE*o 9RAIN--------------------_�FEer rcCMr M---------------GkobE �u 15RA1R ------ - - - - --------- - f--B---------4------ - d ----- -- — - - - SEE DETAIL 8-1 S- - -L - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ - _ s -- ��_--------- - - - -- - lye r = =�L� --'- --- -------- - - - --- _---oi n1 __ -- _-- --_ -- -__ - nt- - - - - _ - _ - - -SSJ _ - _ - - - _ - _ - -SSJoi nl- - - _ -Ssi OJ Al- _ - - - - - — - -SS- -oi n1�--� Of n1 \?Q{ 1r . - - - - _ - -55d- - - - - - - - -�- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - _ _ - _ _ - - .. - - - °° M/a 01 d13,La•o M/a 01 dl3 ,1TO _. .. / CULVERT OUTLET CHANNEL � I I I ' m W/CL 'I' RIP RAP (BANKS ONLY) WOODS I WOODS SLOPE=0.8% I I SEE DETAIL 8-4 I III WOODS .. .. .. .. d '� WOODS .. .. .. SITE 8 li,i I Flo I QI I m 31YDI 41°x ° .. .. .. u• 4 n DETAIL 8-7 DETAIL 8-8 DETAIL 8-9 STREAM SB ° iS X WOODS SPECIAL BASE DITCH TOE PROTECTION TOE PROTECTION IN WETLAND AREAS 0 I I ON Y', ,(1� ( NO. to Scolel (Nor r° Scolel (NOIo Swle) KERN COMPANY, I Q2=3.1 CFS, V2=2.7 FPS I QIO=3.9 CFS, VIO=2.8 F ANK STABILIZATION a CL 'I' RIP RAP EE DETAIL 8-5 o ROCK CHEC DAM —SEE DETAIL EET 2D-4 DETAIL 9 SPEC 'V' ETCH SEE DETAI 8-2 CL'B'RIP RAP �E EST 2 TONS I EST 7 SY GF a P \ C C 15" W/ < ELBOWS S ®09 C StlWK by 0 r&11Va . - .. EC "" DITCH SEE DETAIL _2 I RAVEN COUNTY PE 'V'DITCH v SE :DETAIL B-2 /CL 'B' RI PRIP RAP EST 2 TONS EST 7 SY GF � T Q2=0.7 CFS, V2=2.0 FPS SITE 8 Q10=0.9 CFS, V10=2.1 FPS fd4E' UE - STABILIZATIO EE DET up nP WETLAND WF / R1PgilA" v 41G11 TOW " 5 SY GF* FILL NATURAL 3�'CZ�P SLOPE NONroIGroend' .�.;\°c ca\^� Groend 3. $'N Fi SPE ''Dl� GRouND d F WO-d Area F`\ 7 � �D� P°68c slope SEE DETAIL E GEOTEXTRE �d L-Bj Min. D-1.5 Ft. d=1.0 Fr. d=1.0 H. B=2 R. Geole Sle KERN COMPANY, INC. Type of Liner= Class 'B' Ripat°p Type of Liner= CL 'B' Rip -Rap FROM STA. 13+31 TO STA. 13+50 -Y1 RPA- RT FROM STA. 35+20 TO STA. 36+00-SRYIDY3C- RT FROM STA. 34+00 TO STA. 35+20-SRYIDY3C- RT SPEC ' DITCH / SEED AIL 8-2 GRAD J_ T_ / e�E -SRYIDY3C- o � R e�E M w — PUE o G FOR -LET- PROFILE SEE SHEETS 38 & 39 PUE R Tn FOR -LRT- PROFILE SEE SHEETS 38 & 39 PUE PUE t�PON PUE PUE — r PUE — ✓ FOR-YIRPA- PROFILE SEE SHEET 62 CL 'B' RIP RAP CL 'B' RIP v v FOR-YIRPD- PROFILE SEE SHEET 65 SEE DETAIL 8-7 C G EST 8 TONS TOE PROTECTION m m FOR -DR2- PROFILE SEE SHEET 77 EST 21 SY GF (FILL SLOPE ONLY) FOR -SRYIA- PROFILE SEE SHEET 79 CL W RIP RAP FOR-SRYIDY3C- PROFILE SEE SHEET 85 SEE DETAIL 8-8 Submittal February 6, 2024 O N I Q F LU W Q VJ 2GI-D 00 I UJ L L]- LU = Z J O n.-2GL = Q V) 1 SPEC 2' BASE SEE DETAIL 9-1 7 � DETAIL 9-1 DETAIL 9-2 DETAIL 9-3 SPECIAL BASE DITCH SPECIAL 'V' DITCH STANDARD BASE DITCH IN.le Smle) IN— Xale) (Not to Smlel F-t lurol F-1 1 °' Slope Ground Natural No 1 °T Natural A' ,7. Ground Groand 3.7 p F\°Ng1 DI pe Groped II ee II D Min. D=1.5 Ft. Min. D=1.5 Ft. Min. D=2.0 H. B=2 Ft. B=3.0 H. FROM STA. 78+50 TO STA. 81+00 A- RT STA. 83+00 -L- RT FROM STA. 77+00 TO STA. 78+50 -L- RT FROM STA. 81+00 TO STA. 83+00 -L- RT O 'ROM STA. 42+50 TO STA. 44+10 -SRYIA- LT FROM STA. 42+70 TO STA.43+57 -SRYIDY3C- LT Ln :ROM STA. 44+50 TO STA. 48+44 -SRYIA- LT FROM STA. 43+57 TO STA. 46+00 -SRYI DY3C- LT :ROM STA. 48+44 TO STA. 53+44 -SRYIA- LT FROM STA. 47+50 TO STA. 49+28-SRYIDY3C- RT 'ROM STA. 53+44 TO STA. 56+50 -SRYIA- LT FROM STA.49+32 TO STA. 53+90 -SRYI DY3C- RT FROM STA. 54+20 TO STA. 57+00 -SRYI DY3C- RT C 1 FROM STA. 10+50 TO STA. 13+15 -Y1 D2- LT V FROM STA. 11+00 TO STA. 12+50 -Y1 D2- RT o ALLOWABLE IMPACTS ZONE 1 DETAIL 9-4 PIPE OUTLET CHANNEL STABILIZATION 2H INot /o Xole) (T1'P) N-1 Bed Elevmion Grauno� � u�d a Tuck^ eolvxrile Geotextile' m% CAannel Bed •Place Gemei. Under Riprop length T Ft. (Vaeabk) in Lo,ations oirzned M En9inear Est. 15 of -Rap, Keyed -In Est. 30 SY SY Cl-ass 'I' GeotaNile STA. 49+30-SRYIDY3C- R1 ALLOWABLE IMPACTS ZONE 2 ECJ TARHEEL INVESTMENTS, INC. SPEC 2' BASE DITCH SPEC 2' BASE DITCH SEE DETAIL 9-1 SEE DETAIL 9-1 CL'B' RIP RAP EST 2 TONS EST 7 SY GF CL'B'RIP RAP EST 3 TONS ST 10 SY GF _E—E E E E E�--E E E CL 'B'RIP RAP t _ E E EST 2 TONS co Li R E =Esczs —E —E O IF HW co LU I LLI Q s PROJECT REFERENCE NO. SHEET NO. R-5777C 9 t0ADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMIN RY PLANS DO NOT USB PO CONSTRUCTION INC®MPLE7W E PLANS DO NOT USB POR ACOU ISITION JL 11[[t I ZS'bLaIRZ-l3- `(h 31tl0 I WOODS 2( I SPEC DITCH GRADING I I I I -JK7 /A - SPEC DITCH GRADING 2GI - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1S ,B DETAIL SI.ter nl- - 2GI- 4-M4A1612 --�— ------ --- ---- --- REMOVE d,bz a_ 'B'RIPRAP� --- EB2 TO =-- -\R'hOVE GRASS _ EST 90 CY -DYDi- E --SEE-DETAIC _sEVrmL7 T— H Q2=1 --d- - -- Q--10=1 - - -JAd o Al-9- - 7 - -- _ - 3NI1SI j - I SP6d9*Y Dft SEE DETAIL WOODS NDIS / I / S oom/ / eUSEECD TAIILITCH 9 2 SITE 11 CHANNEL STA/CL 'I' TIZA ON W/CL RIP P COMPANY / o� KERN COMPANY, INC. SEE DETAIL -4 MA-rCHLIN STREAM SC loll � E I NSET SPEC LATDETAIL 'V'DITCH CL 'B' RIP RAP fC of EE DETAIL 9-2 EST 3 TONS EST 10 $Y GF TO .00 c EJCTG DITCH m \ 0_ % W / SPEC 'T DITCH ww o 121 E SEE DETAIL 9-2 4? w E D CONSTRUCTION YI02— STA,l3f15,0/ l>-]45 rB DETAIL 9-5 SPECIAL DITCH GRADING 4 (Nm . Sm16) 4 J_ ag\1 SP .SEE CROSS SECTION$ N�'' Min, D=1.0 Ft. Q FROM STA. 83+00 TO STA. 85+50 A- RT FROM STA. 80+00 TO STA. 91+00 -L- LT DETAIL 9-6 Z SPECIAL DITCH GRADING 4 (Na110 Xa16) 4 �J D I 6- .- .�q�ge(F SPA SP �PR'�0`E 'SEE CROSS SECTIONS ., Min. D-1.0 Ft. B= 'Variable FROM STA. 85+50 TO STA. 91+00 -L- RT 50' 25' 0 50, 100, SCALE: 1"=100' DITCH BERM TO EL 26.8 SEE SHEET 2D-4, DETAIL 13 Balfour Beatty StN' DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED BUFFER DRAWING SHEET 7 OF 13 DATE: 1 /15/2024 2GI FS, SEE DETAIL SHEET --—----_---———------- --- ----------- ---- W CD_ O O 2D-4, DETAIL 12 J T- ' n' 2GI-D 4'PAVED SHOULDER 15„ i n - i - U ------- 3GH --- � LLJ us wr 7o EBL 2a PAVEo — — Q co 2 c/) 1 CL T RIP RAP _— GRA55 SPEC DITCH GRADING ------ EST 30 SY GF SEE DETAIL 9-5 ____ ___-- ----_____ _- ----- — ----- 4v4yF lLl1Ea -4 ShWY 70 WBL 24'PAVED ROALWAY _ �— f -i --- ---- ---- ---- --i-- ------+--`T— --- U O O 24' PV4 END 8 - - - - 3 ` d56.SI — A N II DUE DUE DUE DUE & ro UE SPEC 'V' DITCH WOSEK DETAIL 9-2 I l I 4 CS d0 II 6 WOODS I Ill I I ci Odsl cj C� 0^B Q2=2.5 CFS,V2=1.7 FPS, _ I QIO=3.1 CFS, V10=1.8 FPS l &D _ OH Nand WETLAND I CRAVEN COUNTY N,8 O RICHARD D. HARDISON, ET UX M O - - - ------ -------- LIJ REMOVE REMOVE (n () W M/tl ONI151X3 of XI ya jUE A I All DUE UEro UE L$ I SPE{., 'V' DITCH 6 S I I I III rIXTAlk II eo aAsl a1H wv3 I I I I I X — I 3ivo/ 5 I La10 I X NO � A diH X ROY M. E80RN, ET UX EEORN, X EBO N ET UX ERNEST P. DOUTHIT, ET UX MONTY A. CAMPBELL. ET UX FOR -LLT- PROFILE SEE SHEETS 39 & 40 FOR -LRT- PROFILE SEE SHEETS 39 & 40 FOR -SRYIA- PROFILE SEE SHEETS 79 & 80 FOR-SRYIDY3C- PROFILE SEE SHEETS 85 & 86 FOR -YID2- PROFILE SEE SHEET 89 DETAIL 10-1 RIP RAP AT EMBANKMENT I Nato style) DBeh 101mm. Grade 1.o•mie. ls' Place Geolextile Under Riprap in Locations Key Rip— ii- Directed by Engineer Channel ROHomITyp) Type of Liner= CL T Rip-R,, Keyed -In STA. 60+05-SRY1A- LT STA. 60+15-SRY1A- LT m DETAIL \ SPECIAL BASEE DITCH (Not to Scole) N I NaNrol \ Oc 1 Front m m Ground 3.y D A' �a sl F\ Slope I ` Min. Ft. F. B=2 F. FROM STA. 56+50 TO STA. 60+03-SRY1A- LT ta FROM STA. 60+13 TO STA. 61+24-SRYIA- LT FROM STA. 69+65 TO STA. 70+50-SRYIA- LT FROM STA. 63+30 TO STA. 69+75-SRYIDY3C- RT ECJ TARHEEL INVESTMENTS, INC. SITE 12 RIP RAP AT EMBANKMENT ml EST 42 TONS, EST 60 SY GF SEE DETAIL 10-1 PEC T 2' B Q2 = 7.0 CFS, V2 =1.6 FPS Q1O=8.7 CFS, V10=1.6 FPS SPEC 2' BASE DITCH CL 'B' RIP RAP E w E LU CE EST 7�Y GE 1 ; L Q N L ; DO NOT SPEC DITCH GRADING BURY INVERT I0 SEE DETAIL 10-4 U) + WOOD CO LL7 - -- I C 2GI .. end .zl --------------�3315 ,9 --oa T-- LU Z o+__-- UREMOVE DETAIL 1(3=Z C DITCH GRADi1HG-- - ��3EE-DEl•AIL 10-4 - - - - - -G ASS _2AAd.�- R I LV - REMOVE -MOVE - - Submittal February 6, 2024 �/ / PROJECT REFERENCE NO. SHEET NO. 50' 25' 0 50' 100' R-5777C 10 4 v p / / MITIGABLE IMPACTS ZONE 1 SCALE: 1"=100' ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER 908� RETAIN woods MITIGABLE IMPACTS ZONE 2 / Ln E / /�� 0 Balfour BeattyStN IED STATES OF AMERICA TAN NATIONAL FOREST) o os I l p awnoa° Atlld DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED VO -1 „� �-- �� UNITED STATES OF AMERICA BUFFER DRAWING W ON07 l N I lanoa „°" 1 l VSS aD (CROATAN NATIONAL FOREST) SHEET 8 OF 13 STREAM SD - - Pei3Nf REMOVE el-_----� � : �� DATE: 1 /15/2024 CROATAN PRESBYTERIAN CHURCH o I H yRH ALLOWABLE IMPACTS ZONE 1 I Q2=4.4 CFS, V2=1.6 FPS / i QIO=5.5 CFS, VIO=1.7 FPS I SPEC' 'V' TCH C7 p p p p m m / / C SEE OETA 10-3 p 1 r &0 p ALLOWABLE IMPACTS ZONE $TONS E�% SY GF / / I JL] Q F \ ���� SPEC 'V' GRASS PARKING AREA .ecoD DITCH sz•oe.l9z-1B- \\\\ SPEC 'V' DITCH 2EG 2' BASE DITCH SEE DETAIL 10-2 ss�o��z•*II>IA - P III _ C E - _,9-E SEE DETAIL 10.3 Nory .x/a SEE DETAIL 10-3 s.oaz m E E� ER 3 ly0 S as ,a0 / E F '1- .9 0 WOODS * _ £I-rvorvR IS M m'.. < �F - _- -- ------ MH JN W M --L--GRASS---_-N_ ----- ----- - - ------------ - - - - -- -- -- >y---- -9 -M -)• -��' _co daasl -- ---- -----a- ----133 .8 _ -- -- d T- - YPEC�ITCFY-GRADING =--__� NMONNNn ON3 SEE DETAIL 10-4 ---- L---------------+�->rr-E -�✓' - - - m SPEC bffC'H-Gt^- 1 40TCB Zgry M f co -- ------- I ___ FS, SEE DETAIL SHEET --- - -- �� � SP�W1' 70 EBL 24�AVED ROADWAY PAVED SHOULDER '1�I L r L __---------- ---- __�--��==--===��-DETAILTO�t-_ 1 Z _ -- D -- -Fk4WABLE-FILL-=-- -- - - - - - - - - DITCH GRADING4'PAVEO -_-_-_ ��- SHOULDER ��- m .S� J T v AFL L{-FiL -L Q _..TC SEE DETAI 3=___ - ---_ -- - - - - REMOVE --- _ + -- - - �'__ - `M PAVED WBL 2 4, AIL 11 - - - - -i- - SHOU[DER_- � 24' PAV - ED FYLE FILL � Q 0 1311 _SPEC -9- 4' PLASTIC 1tEMOVE - - REMOVdy dy REMO----_- - _ 2GI-A co --_- --- -- _ _- Sad PRELIMIN DO NOT UBB PO RY PLANS CONBTRUCTION INC®MPLE E PLANS DO NOT U8B POR /W ACOVI8ITION RE - - -_ - n>5 j ,Rr•n oNliral; -scH1 - -.i -_- - - - _�_ �nr NMONNN(1,g- �--_-- _ E . /DUf Q - - - - V � �p ab d n3e35x a n ICI NQJ�E DUE �- - ++ U f E /fir I alx \ dL'B' IP P �a1H Q DUE DU - a,ei - _� I- lY D I ESt T S dWtla J I I ��'28 BZ 2 1 z1 SPEC 'V'DIT EST I10 LEST 21 TO SQ2=110 CFSV2=1.9 FP$ WOMSP '' H I I p0 SEE DETAIL I EST 7 SY F Q10=13.6 CPS, V70=2.0 FPS U l i I OM S ETAIL IO-3 °v-li�" N AdONVJ ^ I I NI p O1SI I I� RETAIN `\ a1H I, W m X N JJ X p m SITE 13 /o h N D I p 1 °dsI \ \ E I Ix It �ml �.1E " D I - N I a0 1 1 \\ 1 SCC D T 110-2 p E�OUTLET CHANNEL STA I ION STREAM SD 11 \ 1ANIn j Ip FALLGw �E SEE el 1 1 m .9£ 11" A N0 NOJ I p l l I I I STREAM SP > p / �DODS 1 N 4 I dl 1 / KENNETH WENDALL F- 1 I m� MATTHEW CONNOR, ET UX S No I TYLER Y I 0 V AMOS W. - POTTER 31 \ CONNOR IV, _ / 02=21.5 CPS, V2=2.0 FPS x ET UX I w1 m I o Q10=28.9 CFS, V10=2.2 FPS e w I \\ \ PEC E B E DITCH - 1 SEED AIL 10-6 r BENJAMI 1 3 LEE �' wl DU�RWOOD �I ,nt.�T� . n.,,non� �. „� \\ \ \ 3n0a1erv,o o m EBORN I- RAY / LAURA C. LA C. IAMOS W. CONNOR MALINA IV ET UX DETAIL 10-3 DETAIL 10-4 SPECIAL 'V' DITCH SPECIAL DITCH GRADING (N. to s<ala) 4 (Not to Scolel 4 Front I � I Dikh Nat col !'� Oc Slope E Ground 3.T D F\oP`Oc ` sP� ap,R/, D hP0\' sv BlP JNF Min. D=1.5 H. 'SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 10+00 TO STA. 11+38 -Y2- LT FROM STA. 91+00 TO STA. 99+00 -L- RT FROM STA. 62+00 TO STA. 65+30-SRY1A- LT FROM STA. 91+00 TO STA. 94+00 -L- LT FROM STA. 66+30 TO STA. 69+65-SRYIA- LT FROM STA. 95+50 TO STA. 105+00 -L- LT FROM STA. 57+00 TO STA. 60+00-SRYIDY3C- RT FROM STA. 103+90 TO STA. 105+00 -L- RT FROM STA. 61+90 TO STA. 63+30-SRYIDY3C- RT STA. 69+80 -SRYI DY3C- RT DETAIL 10-6 2A C. MALINA MALINA ' SPECIAL BASE DITCH DETAIL 10-7 / (Not to Scolel SPECIAL DITCH GRADING I 4 I Nat to Scale) Notaral ocac Front D -. Ground .7.7 p' Dkt, D FMi slope C qN \P0 5P e I �Blp JP& �. I Min. D=2.0 Ft. B=3.0 Ft. 'SEE CROSS SECTIONS p Min. D=1.0 Ff. 1��..11 B= 'Variable FROM STA.70+30 TO STA. 71+00 -SRY1 DY3C- RT FROM STA. 91+00 TO STA. 91+50 -L- RT / FOR -LLT- PROFIL EE SHEETS 40 & 41 FOR -LRT- PROFILE SEE SHEETS 40 & 4/ FOR -Y2- PROFILE SEE SHEET 65 anJ FOR-SRYIA- PROFILE SEE SHEET 80 FOR-SRYIDY3C- PROFILE SEE SHEET 86 Submittal February 6, 2024 N PROJECT REFERENCE NO. SHEET NO. DETAIL 17TC DETAIL E DITCH DETAIL 17� m N / DETAIL 17 4 DETAIL K STA R-5777C 17 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH —�� CULVERT OUTLET BANK STABILIZATION CULVERT INLET BANK STABILIZATION to Scale) ( Not to Si,06) I N— S 1l) r2 Iy Scale) ) Nor IN— saalel 1 Noll. � J � � ROADWAY DESIGN HYDRAULICS on�n / - '��°� �Pl­ �r'dENGINEER ENGINEER NawmlSlope Natu,P1 .\ oe From NaturalFra/4q�/Ground 3� Dikh Graand 3� ikh/J/ryL Tuck GeoTuck Georeiiile 3�7 D F\ '7 D F\'Be51°peD Q\deSIOP @ . ,o inimum °f1N tOinimem °F1R � � � 4 KeY RiproP �^ pyPl Kry RipraP �^ITYPI Min. D=1.5 FL L=J Min. D-2.0 Ff. UMin. D=2.0 Ff. / Chanel Ronom wce GeoteMile Under Cho°°.I aonom_ GaoreNne Under ED R„1 (IYP) CHANNEL I. air a��ireameDi Len9fh=30 Ft, of D'nrh RIo °n 1u Rii in Locations '3:1 BEHIND B=2.0 FL B=3.0 F. ti •Ri,,.p ro b. 1—r it RipraP in� cue nz d 3.O=k. °-R°p I ee "•b°RFo Directed by Engineer '�/ a ..r ry h (� Drected En FROM STA. 25+85 TO STA. 29+00 �RY48- RT GUARDRAIL \\ m m Len fb 30 Fr. zx ow, a. Tap 'q0 FROM STA.25+80 TO STA. 31+50-SRY43- LT FROM STA. 199+00 TO STA. 202+94 -L- LT FROM STA. 27+50 TO STA. 30+30-SRY3DY4 RT T d 3D N NDnd. saps °a S-i'. 8� L 0 Est. 28 Tonz of Class R'p Rap, keyed -In, Ez1. 46 SY Geotextde Ezt.=20 Tonz of Clazz I Rip Rap, keyed In, Est. 33 SY Geotextile FROM STA. 20+00 TO STA.25+70-SRY4B- R7 FROM STA. 203+50 TO STA. 207+50 -L- LT '0 FROM STA. 38+00 TO STA. 40+50-SRY3DY4C- RT ) I STA. 25+78-SRY4B- LT 25+75-SRY4B- RT Q , MITIGABLE IMPACTS ZONE 1 1 j m 2 MITIGABLE IMPACTS ZONE 2 OM/a a N ONUSIx3 + \ I II PRELIMIN RY PLANS DO NOT USB POI CONSTRUCIYON INC®MPLE E PLANS DO NOT USE FOR 7W ACQUISITION DETAIL 17-7 CULVERT INLET CHANNEL IN- to Scale) Natarol Nawml �Tark 50' 25' 0 50' 100' � Balfour Beatty Geafextil. GeMexdle B ° "'i"'�I of lx — SCALE' 1"-100' DOCUMENT NOT CONSIDERED FINAL K,,i Rip-Rop per Std. Dw 876.01 Min. D=2DFd. Type of Liner= Class 'I' Rip -Rap B=4.DFf. Est. 80 Tons, Est. 170 SY Geotexril, ESL 45 CV DOE RT 1 M/a as UNLESS ALL SIGNATURES BUFFER COMPLETED D RAW I N G FROM STA. 30+30 TO STA. 30+95-SRY3DY4C- N _ - � 1 SHEET 9 OF 13 cam ` MO STREAM SF III SPECIAL DITCH IG DING N o _ N I DATE: 1 /15/2024 —� NMONA,N& =` \ (Npf fa scale) — —w— ��'g CULVERT OUTLET R "R 4 f 1 � BANK STABILIZATION � 1 W/CL 'I' RIP RAP W �E Q2=6.1CFS,V2=2.5 FPS SEE DETAIL17-4 ODDS MICHAEL D. HARDISON. ET Ux `sr Q10=7.8 CFS,V10=2.7 FPS "SEE CROSS SECTIONS— \\ \\ \ \ IN I tN 02=3.7 CFS, V2=1.5 FPS FROM STA. 199+00 TO STA. 203+00 A_ RT C \ ��a \ \ \ P m m Q70=4.6 CFS, V70=1.6 FP$ FROM STA. 207+50 TO STA. 212+00-L-LT �\� \ \ \\\ \ \ \ FROM STA. 204+00 TO STA. 212+00 -L- RT HARDSON LETD X NC DEPT. OF TRANSPORTATION N \\� \ ry o ROBERT D. FISHER \\ \\ F Q2=1.2 CFS,V2=1.0 FPS Q70=1.5 CFS, V70=1.1 FPS ? SPEC 'V' DITCH SEE DETAIL 17-1 \\ \ \ SPEC 'V' DITCH WOODS �C m y SEE DETAIL 17-1 ROCK CHECK DAM _ SEE DETAIL SHEET 2D-4 FS'66:Os �T3_ DETAIL 9 SIT 3 \ \ U351 r CULVERT OUTLET CHANNEL J F \ \o� \ T SS33JV W/CL TRIP RAP (BANKS ONLY) \� \ \ NNVL SLOPE=0.30% CULVERT INLET OV 7 REM F` MS,F DETAIL 17-6 BANK STABILIZATION ID'' �M� '\ o \ \\ / 9 \o W10 b0 i - emusixa W/CL 'TRIP RAP �'3 a• \j�� \ SEE DETAIL 17-5^, X 11� SllBdsl I / SPEC 2' BASE DITCH ODS e~ ti �� \ \\ II 90 _ 91\1- 31V0 Sf18 SEE DETAIL 17-2 CL 'B' RIP RAP SPEC 'V' DITCH EST 2 TONS SEE DETAIL 17-1 - = EST 7 SY GF - \ /SPEC 'V' DITCH I G lse WILDLIFE CROSSING \ \\\ \ /SEE DETAIL 17-11 GRADE TO ENTRANCE TIE TO EXTG SPEC 2' BASE DITCH CL 'B' RIP RAP - \ E II I /'b o llw SS8 SEE DETAIL 17-2 RE Jy d ON—FGRASS DITCH EST 2 TONS \ \ \ I 1 EIPUE �� EST 7 SY GF \ �a \��, - - '>S eN slx3 I - �� _ ELBOWS - �`)I �' \\N yo3 JI - II _ — _ — —_ \ MLIJ �•- �_—_ 8 0 CFS, V2=2.0 FPS—�-� - - - -0 - �a nl- - P DITCH GRADING Jnd'z\\ �Q= U Q LU — — _ — — N(10-=2.1 FP$ �l@TxT RCB � _2 —��— �I M _ — I (n� SS'y WT316L5 ii� _ — — f _ — _— —ssi— — NJ LDLIFE C A —GRASS Q Ql 5.0 C - _ -- C�ITCi-F --- = LJJO t = - N - --FJ.OW_ABLE Fill ��� v --- -� --- SEE DETAIL 17-8- o — — — --- O +63 E - - - - - -ss o _ __— —� REMOVE _— --- ---- Z�� 2GI - REMO E'er! - - - _ _ - UJ /v YYO �_�_ ------ _--- LU UQw �— U O ^ 2GI _ - - - - - - - _---- (fl N .. IS°'2GI E - - - - - - - -ssD- - SPEC DITCH GD1Ni,--------- - Q(n= M - �SEE-DETAIL •� v --- C U) i --ii — 2GI_--_— —�-- QN SEE _ — — — —M — — — — — — ——Is,— — ---- --- N W SHEE — _ ` _— -2GI- — >_ Q LIJ 18" RCP -I s 2D- —= — — Ad.elom -- 0 H c— >' - -- VLU CL 'B' RIP RAP 4 i i — — --I Al— — — — — — _ — _LU LIE EST 10 ES 3 TONSY GF \ �~/ - 03/' — /a DNITsx3� ��_ DUE �I DUE DUE DUE DUE DUE — c — — — — �U)� DUE DUE E DUE CL'B'RIP RAP SPEC (�®WCH- DUE DUES _ --- �� EST 2 TONS SPEC 2' BASE DITCH SEE D M mJ - \ SPEC T BASE DITCH T 7F 7F 7F 7F EST 7 SY GF CL 'B' RIP RAP SEE DETAIL 17-10 1 'ssl -�-- SPEC 3' BASE DITCH \l DAYLIGHT DITCH ESTT7 TONS L[) IE W T G D IN Z^' M/a SEE DETAIL 17-2 Y OF SEE DETAIL 17-3 CULVERT INLET CHANNEL DLIITE CTOSSING M I I W/CL 'T RIP RAP (BANKS ONLY) DF,.TO NTRpNCi TOE PROTECTION \ SLOPE=0.25% \ 'I` '1` / (FILL SLOPE ONLY) I \ SEE DETAIL 17-7 / CL 'B' RIP RAP EST 2 TONS TIE FROM 1 \ j EST 5 SY GF UNITED STATES OF AMERICA EXTG DITCH WETLAND WJ SEE DETAIL I7-9 (CROATAN NATIONAL FOREST) \ 1 WOODS DETAIL 17-9 \ \ TOE PROTECTION IN. wETLAND AREAS DETAIL 17-10 DETAIL 17-11 \ \ ( Naf w slel SPECIAL 'V' DITCH SPECIAL BASE DITCH (Notes swle) - M\�,ef 1 Nof to swlel \ i FOR -LLT- PROFILE SEE SHEETS 48 & 49 naan Natural Glo & 3'� \�'\off Nawral � A', ocol Slope \ \ W.9.nd a.. t NalPml \ F-1 FOR -LRT- PROFILE SEE SHEETS 48 & 49 G,aPna 3.7 e Gropna 3.7 D\mat Diu FOR -Y9- PROFILE SEE SHEET 77 D \ slope Min. D=1.0 Fr. \ a-1.0 Ft. Gepe„file U Min.WF1.5 FL FOR -Y/O- PROFILE SEE SHEET 77 \ \ 8=2 F1 FOR-SRY3DY4C- PROFILE SEE SHEETS 90 & 9/ \ A Type of Liner= CL'B'Rip-R.p FOR-SRY48- PROFILE SEE SHEET 97 FROM STA. 31+50 TO STA. 31+92-SRY4B- LT \ FROM STA. 10+34 TO STA. 11+00 -Y9- RT \ g FROM STA. 31+16 TO STA. 31+53-SRY3DY4C- RT FROM STA. 32+00 TO STA. 37+ 0-SRY3DY4C- RT FROM STA. 10+50 TO STA. 11+00 -Y10- RT \ Submittal February 6, 2024 DETAIL 18-1 DETAIL 18-2 DETAIL 18-3 DETAIL 18-4 DETAIL 18-5 SPECIAL BASE DITCH SPECIAL 'V' DITCH PIPE INLET CHANNEL PIPE OUTLET CHANNEL SPECIAL DITCH GRADING 50' 25' 0 50' 100, INotto Swlel INot to S.1 I (N°t t° Smlel INot t° Scale) 4 I N— S.6) 4 FmM NaoVr°I N°tuml N°Nrcl N°t°r°I Ditch 3,.7G.wnd 1 Gro°nd Ground 3. b.`Or Ditch N°wml A'�,\et SIDPe ° d D 3:7 D 9 .� - SCALE: 1"=100' D�� p\oar slope Groued 3.7 D F\0 Min. D=2.0 FI. �TV Nnlm�meeof to `SPA qR/gB�FD a\Pe sP -"..! Min. D=1.5 Ft. Min. D=1.5 H. B M.K. d=3.0 H. Ge°texlile B ° ITYP) P`_ B=20 Ff. B=3.0 Ft. 'SEE CROSS SECTIONS Min. D=1.0 Ft. Length=40H. Key -In Rip-R°p per 5k. 0wg. 8)6.01 Min. D=3.OFt. FROM STA. 48+57 TO STA. 51+50-SRY3DY4C- RT Type of Liner=75 SY COE FIBER MAT Type of Liner= Clas T Rip-Rpp E=4.0H. FROM STA. 212+00 TO STA. 223+00 -L- RT FROM STA. 34+55 TO STA.42+62 -SRY4B- LT Est.35 CY DDE Est. 25 Tons, Est. 43 SY G—f,#Ile FROM STA. 212+00 TO STA. 220+50 -L- LT FROM STA. 42+75 TO STA. 43+90-SRY4B- LT STA 48+55 SRY3DY4C- RT FROM STA. 216+50 TO STA. 217+00 -L- M PROJECT REFERENCE NO. SHEET NO. R-5777C 18 tOADWAY DESIGN ENGINEER HYDRAULICS ENGINEER PRELIMINA RY PLANS DO NOT USE MI L CONSTRUCTION INCOMPLE E PLANS DO NOT USE MR /W ACQUISITION FROM STA. 40+50 TO STA. 48+45-SRY3DY4C- RT I - STA. 42+70 -SRY4B- LT FROM STA. 222+00 TO STA. 223+00 -L- LT 7 Nq18-6 STANNDA DIL BASE DITCH I� ALLOWABLE IMPACTS ZONE 8`?'Nq Net le 5e°let 20>> Balfour Beatty �' NMuml Nmuml Ground ALLOWABLE IMPACTS ZONE DOCUMENT NOT CONSIDERED FINAL Min. D=3.0 Ft. H R. BOY' JR. \\\\ UNLESS ALL SIGNATURES COMPLETED B=2.0 Ft. FROM STA. 43+90 TO STA. 45+00-SRY4B- LT RICHARD T. BOYD SALTWATER LAND STD 2' BASE DITCH BUFFER D RAW I N G COMPANY,LLC i EST 205 CY DDE HJdnHJ DRY SE D ETAIIL SHEET 2D-3 SLOPE=0.73% SHEET 10 OF 13 w N9S1 flf6 s J INV�STR�L Jt�'S; LLC RI ERDALE UNITED STREAM SG WN STRUC RE W/TASH RACK o ME HODIST C URCH O SEE DETAILS ETS 2AND 2D-2 DATE: 1 /15/2024 DETAILS 1 AND 2 w N SITE 16 N mRAP o ^: JNOJ EC T BASE ITCH LEST 51 TONS SEE DETAI 18-1 Q2=13.1 CFS, V2=1.9 FPS EST 1a SY GF wX Q10=16.3 CFS,V10=2.0 FPS7—:1I lsa sn9ASI \ P US \\ '. I \ \� I PIPE O CHANNEL\ \ I W/CL 'I' RIP RA ANKS ONLY) \ m X L 'B' RIP RAP 310dr \ Otl,d I I \ \ SPEC 2' BASE DITCH DETAIL 18-1 \ \ E T 51 DE P I I \ CL '� dJil . .20 q^ dJa .Sl I AILV8-4 w €ST 7 SY F � I \ EST 3 TONS J/n I I Q2=11.9 0 CFS, V2=2.0 FPS \ \ I I \ EST 10 SY GF \ \ Q10=14.8 I CFS, V10=2.1 FPS \ "' CL'B'RIP RAP I \ I I a v5 �/ I \ml I R I EST 2 TONS eseb sse£�1a- I\ \ / I UO C 0 OD E T 7 5 GF Nory rnia E � E E E E I E E N! E bs // I — C —� �3 0 —r 2 4 A mu o7�lt7 134�`!v�'+. .■ R B Jnd .ZI �B —A— — — — — — — 2J — 2GI-D 2GI—20-4,D - 11 —u— — SEE DETAIL 18-5 US 70 EB °` SEE DETAIL 18-5 2GI GRASS E GRADIN - C-vTChr GRADtwt 18-5 SEE DETAIL 18-5 —--C` — —1— — 2GI-D I — —1 GRASS — —ss,— '�i� 11111111111111111111111 � US HWY /0 EBL 24'PAVED ROADWAY ,'PAVED SHOU - ,'PAVED SHOULDER 10 70 weL 24'PAVED ROAlANAY SPEC DITCH GRADIRJ;— SEE--DETAII IE_T --- — — — — SR 1159 18'PAVED ROADWAY— ----- 2D-4 11 av a ---- - 31�� 'L `\PY Messre HJ zL — — Ld 1 E E - - \ a0 y0 A330 JNOJ hI WOODS PD G o Tiw o EPE \ C dwnd WOODS \ C 'B' RIP P Sn911A w\ \ tl- CAWI�d@ RIP a� 'S\ I / CRAVEN COUNTY ES DNOOINS', \ \ w JNOJ ESi13 T NS ES� 7 SY GNOJ \ a�EST 10 S GF 0dsl M Soo .\ \ I \ — - `v' Sp DIT \ i\ UOZI JN00 I PIPE INLET CHANNEL f \ W/COIR FIBER MAT SEE DETAIL 1�SNOJ V JNO7 SEE DETAIL5 8-3 MARTHA FISHER dwnd bs \ DITCH SPEC ' \ w o HARDISON, ET VIR d31S"'It OSEE DETAIL 18-2 to \ JARVIS FRANKLIN k�\ \ HARRIS, ET UX GRIFFIN LEASING. LLC RIVER BLUFFS LIMITED PARTNERSHIP UNITED STATES OF AMERI . \ CROATAN,�NATIO L FORES 1I \ \ \ 2GI-D 15" I U o v L0 UL 10 } + --- Lo LU W jet �U)(n FOR -LLT- PROFILE SEE SHEET 49 FOR -LRT- PROFILE SEE SHEET 49 FOR -Y7- PROFILE SEE SHEET 76 FOR-SRY3DY4C- PROFILE SEE SHEET 91 FOR-SRY48- PROFILE SEE SHEETS 97 & 98 Submittal February 6, 2024 Submittal February 6, 2024 RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type CROSSING IMPACT BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) 1 14+10 to 15+38-L-RT 1 @7'x7' RCBC X 4341 1002 5343 7 18+24 to 20+07-Y1 RPD- 66" RCP X 14348 9430 23778 19+87 to 22+25-SRY1 DY3C- 66" RCP X 15634 7634 23268 8 62+80 to 63+97-L-RT 1 @6'x7' RCBC X 4861 3266 8127 28+49 to 29+83-SRYIDY3C- 1@7'x7' RCBC X 9174 5173 14347 11 48+69 to 49+86-SRY1 DY3C-RT 36" RCP X 4005 2651 6656 12 93+83 to 95+19-L-LT 60" RCP X 8412 5612 14024 94+34 to 95+54-L-RT 60" RCP X 3451 2307 5758 13 103+16 to 104+48-L-RT 48" RCP X 3072 1628 4700 14 25+08 to 26+34-SRY4B- 1 @7'x7' RCBC X 5968 3782 9750 202+36 to 203+83-L-LT 2@7'x7' RCBC X 4729 3323 8052 16 219+82 to 221+07-L-LT 54" RCP X 3802 1503 5305 23 39+00 to 40+40-Y1- 54" RCP X 5493 3518 9011 24 39+74 to 41+77-Y1- 54" RCP X 10307 3839 14146 TOTALS*: 31020 1 14141 1 45161 1 66577 1 40527 1 107104 1 0 10 NOTES: 2018 Feb Submittal February 6, 2024 WETLANDS IN BUFFER IMPACTS SUMMARY WETLANDS IN BUFFERS ZONE 1 ZONE 2 SITE NO. STATION (FROM/TO) (ft) (ft) 7 18+24 to 20+07-Y1 RPD- 1 23 19+87 to 22+25-SRY1 DY3C- 8046 74 1 8 1 28+49 to 29+95-SRYIDY3C- 1 1 258 1 1 (TOTAL: 1 8305 1 97 1 sed 2018 Feb NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 1-15-2024 CRAVEN COUNTY R-5777C 44648.3.4 SHEET 13 OF 13 Rev.Jan 2009 See Sheet to For Index of Sheets See Sheet t B For Standard Symbology Sheet 1 N R E OI 4 7D 'c �4 EGIN ��ii OJECT lJ VICINITY MAP N.T.S. BEGIN TIP PROJECT R-5777C —I— POC STA.10 + 09.89 = —I— POC STA. 578 + 90.00 (R-1015) 4 Submittal February 6, 2024 STATE OF NORTH CARD I INA DIVISION OF HIGHWAYS CRAVEN COUNTY BUFFER D RAW I N G SHEET 1 OF 6°�° �`" bTATR PRQtF T REPRRENCE NQ 6EEET NO. TOTAL 9N8819 R-5777C ]� STATE PROD. NO. F.APROl.N0. DE6CRIPTION DATE: 1 /15/2024 44648.3.4 WA DESIGN -BUILD - LOCATION. U.S. 70 FROM THE HAVELOCK BYPASS TO EAST OF S.R.1116 (THURMAN ROAD) TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNING, ITS AND STRUCTURES Nqo\ 3/Nq ?p77 UTILITY BUFFER IMPACTS PERMIT BEGIN RESURFACING ONLY -Y3- STA. D+04.73 BEGIN RESURFACING ONLY -SRY4B- STA. 10+69.02 BEGIN CONSTRUCTION END RESURFACING ONZY -YIO- STA.10+09.00 S BEGIN CONSTRUCTION BEGIN CONSTRUCTION END CONSTRUCTION -Y2- STA. IO+00.00-SRYlA- STA. 75+03.0] BEGIN CONSTRUCTION END RESURFACING ONLY BEGIN CONSTRUCTION S O J -Y3- STA. 13+16.85 SRYlB- STA. 11+39.11 BEGIN BRIDGE -L- STA. 180+19.15 -SRY4B- STA. 22+I7.00 � W END CONSTRUCTION -YI- STA. 15+76.03>,,, �, 12 14 16 _ 7 1 17 v O -Y3R/'B- _ _-I,JRPA-� + u:. 1 ND GE U) END CONSTRUCTION 11+20.00 P END CONSTRUC X EL- STA I80+98.74 -Y5- STA. -Y6- STA.11+00.41 -SR17DY3C- >y / g �� END CO RUCTION 37 EXD CONSTRUCTION -Y9- STA. 0+85.83 Q -Y3- STA. 27+90.87 CIO _t'i1t1'it- Sao Ff END CONSTRUCTION LJ -YID2- STA. 13+15.01 SITE 8 SITE 7 BEGIN RESURFACING ONLY -SRYIG- STA. 16+59.21 SITE 23 BEGIN CONSTRUCTTON 00 END RESURFACING ONLY -DRI- STA. 10+04.06 BEGIN CONSTRUCTION + N 18 17fF'�ff -SRYIC- STA.30+62.17 END BRIDGE -YI- STA. 27+44.40 +/- W N SITE 24 N � r END CONSTRUCTION J -YI- STA. 45+20.00 ' W Z J U QEND CON: 2 -Y7- STA. ! THIS PROJECT IS WITHIN THE MUNICPAL BOUNDARY OF THE CITY OF NEW BERN CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. ` THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. ��5 I N END pp NA003i CONSTRUCTION C2p77 [A. 12+20.00 p 7GE ® RR4 -SR-SRY4A- 22 23 24 -Y4RPB- END TIP PROJECT R-5777C —I— POT STA. 355 + 64.22 = —I— POT STA. 250 + 00.00 (U-5713 IR-5777A&B) -SRY4A- IINCOMPLETE ]PLANS DO NOT USE FOR R/W ACQUISITION PRELIMINARY ]PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED _I- US-70 Submittal February 6, 2024 BUFFER DRAWING R-5777C 7 SHEET 2 OF 6'^�' F `a DATE: 1/15/2024 PMIMIN RY—PLAN8 INGtlMP E PLANB cr c� MATCHLINE e��� •� (SHEET31) - E �N���O� Banowueatty t� 0}, DOCUMENT cL "ia� rRPA �cxEu aWa G�Lvo9 a r / v MATCHLINE-Y7-STA 23+00(SHEET \ 30) y, eec Drcx cuDrve cu ,erocec xvssrusxrx xc. 1ee04"Iz m y ,w•• sec . uv DDex _ i���/ ii �i �i/ ' see De,urI anxew W O _ - - xu _ --------------------------- acry xr vansv u�w�w� U Q W ,o -- -- — — -- sca — --- — -- -- —__ -US 70 WB �F D _ __ _ - _ - w sse Dnusa io N - W't o _ msc vwrw _ _ _ _ - _ _ _ — _ - - aff os,.c rJ _ w ji " •33d1• yyn _ 5 � w "OJ , fa DeT ax avers •J "e • xiDa w �:, E '� ,� . °�� �, � a �, cD..x.. s f� , � �'•�� �, g. ,I I ICI �I III ,I. "�, ,�, e /�/r 77 IEE :ee Dear,.30 re�ary AM ;I,Di".' .sme cauxex1 xc a wry sv rr " z x 'T d 1 ie I I li w s u ortr Dnu� � r ona. Le oIcx_-I -'- ' � T � � � 'i i ago I �' SITE 7 C•" �e ssecw e� DDcx s v I� ,De aeDT D I �T�ascr :<.. s9.so ,o sT.xi«oo +-sr i rwas a<.s, .. a.«oo,o sr...xi.ae 11 s,r. a+xi. rss«ro:,,..9xi of p.`_, '"ua i� ,ri , c, s »,•,� DDcx c ,.D.-. s•.9«xi ro <.-., a.w. a,.,,so ,D s,.... 1sa.9.p D A„roo-.T ro sr....se Va „D Alf5 II es / / I Dxcn o �` as DIRECTIONAL BORE sa„c r ..o ron :oar.�saoao U.r ' T WE UG POW, TEL, COMM i?�ii�so senoncw Ce "F A- / -�' j�J on nw zenoro n.�i T. a sa Drac v I rw e rr ` ! N"w- - - SEE BUFFER DRAW_ - - -G ws w, ru,Dry "ID— SEEDToN a \ dwDn l /i BINysBcEiAILL74 FT prEEE sHc�rs j�'�.& D—LD� \R ry""q e 1 /� Il rr �` r x A SHEET 3 OF 6 FOR ENLARGEMENT ENT im NR YIRPB PROEIIE SEEESHEET 631 0.vn,v / o II 35 / 4+ PROFrt£ SHEET 62 � p O �� va01c Yr vo P�r� sEe sneer � �/ ALLOWABLE IMPACTS ZONE 1 °r vm�nc sEc s cE n _ FOR SRYIO/3G PROFrLE SEE EE/S H4 & 85 ALLOWABLE IMPACTS ZONE 2 "ONi aie Dewi =�yzOG NiP 9 - ® -YI- (STATELY PINES ROAD)/ -L- --ww s. De MATCHLINE NS vP� C'Z _ - Pq,. xi„ ^x... "•" x \/ \ <u -Yi- STA 36+ DDcx sse DD.,r a-�e ewx„. - 00 (SHEET 32) mm� Zm GRAPHIC SCALE® ryR-57nc D.,E CRAVEN �0 35 Q 3D 1?I PLANS D um er. BE wa 3131123 ® ACA 3131123 Submittal February 6, 2024 Submittal February 6, 2024 DETAIL 8-1 DETAIL 8-2 DETAIL 8-3 DETAIL 8-4 DETAIL 8-5 SPECIAL BASE DITCH SPECIAL 'V' DITCH CULVERT INLET BANK STABILIZATION CULVERT OUTLET CHANNEL CULVERT INLET /OUTLET BANK STABILIZATION (No to Swle) (Nat to Swle) (N.110 Smle) (No fo Scala) (No. Swle) From s:l Ne1u� GH9°tmaw� "'+n Ditch '"fir] NPNNI Nmgrolepw N°NNI \ of From Npturol , of Ground \ Ground "< d• p' Slope Groond 3.I D A- Ditch * Tack GeoreeAe Q\mat Slopa Groond 31/ D �\ uck Gvotvxtile' d Tuck GeotevNle Key Rip-p into mimum of1N v p Minimum o11N Key Riprop inb Ge°textile B o Minimum of IN Channel BoNom (TY➢I I�.I Min. D=1.5 F. *3:1 BEHIND Min. D=1.5 F. ITy� CNpNNEL BED channel B.Ho (Typ) Ilya (Typ) Place Geotertile Under 3=2 Ft. GUARDRAIL Length=41 R. Ve bl.) Length- 47 H. CHANNEL BED Ri ro in Le<miem Min. D=2.SF1. Each SNe (yonoble) Directed by Engineer FROM STA. 63+45 TO STA. 66+00 -L- LT Esc 60 Tons of Clo , T Rip-Rop, Keyed -In Type of Liner=CL 'I' Rip-Rop - Keyed -In Inn2. - 3 H. FROM STA. 63+50 TO STA. 77+00 -L- RT FROM STA. 28+70 TO STA. 29+05-SRYIDY3C- LT fo Top of egnk, Ezt. 24 CY DDE •Place Gewenile Under Riprep Est 50 Tonz, Ezf 85 SY Geote file d=2.5F. d=2.o - a.o Fc 1D1,1 sioe.i��,.�,a�� .o �n odm, FROM STA. 29+00 TO STA. 42+50-SRY1A- LT FROM STA.29+10 TO STA.31+50-SRY`1DY3C- LT Ezf.105 SY Geofedlle one0iremed by Engineer Ezt 170 CY DDE B=4.OF. Est.=30 Tons of Class' I' Rip p Rap, I,E,E -1., Est. 68 SY G—file PROJECT REFERENCE NO. DETAIL 8-6 R-5777 SPECIAL DITCH GRADING (No I. Swla) ROADWAY DESIGN 4 ENGINEER IPA «y4RED SP ��\P0� *SEE CROSS SECTIONS Min. D=1.0 Ff. FROM STA. 66+00 TO STA. 69+00 -L- LT A FROM STA. 70+50 TO STA. 77+00 -L- LT Ji SHEET NO. ENGINEER PRELIMIN RY PLANS W NOT USE Po CONSTRUCTION INC®MPLE E PLANS DO NOT USB POR 7W ACQUISITION FROM STA. 30+50 TO STA. 31+60-SRYIDY3C- RT STA. 13+30 -Y1 RPA- RT STA. 11+78-Y1RPD- LT STA. 29+10 -SRYI DY3C- LT Ln FROM STA. 32+10 TO STA. 34+0-SRYIDY3C- LT STA. 29+25-SRYIDY3C- RT BUFFER D RAW I N G� r,0 FROM STA. 34+0 TO STA. 40+50 -SRYDY3C- LT CD FROOM STA.1050+750TOSTA. STA.12+00R1 DR23LTLT ALLOWABLE IMPACTS ZONE 1 SHEET 4 OF 6 FROM STA. 10+75 TO STA. 12+00 -DR2- RT o � Balfour BeattyStN ' \ ALLOWABLE IMPACTS ZONE 2 DATE: 1/15/2024>> \\\\ SPEC 2' BASED DOCUMENT NOT CONSIDERED FINAL UNLESS AL SEE DETAIL 8-1 L SIGNATURES COMPLETED M \ SPEC 2' BASE DITCH •mow.__ i IL 8-1 co Fes„ 50' 25' 0 50' 100, ' � � � CL '.'RIP RAP [V SPEC 'V' DITCH CL W ,I{IP IRCI uic cns I. PnoP we cps 2 TONS PROP we cns u Q r ETAIL 8-2 �— p�FE EST 3VT 7 SY GF xE � CL'B'RIP RAP -� /F- 5Y G LINE E E E E SCALE: 1"=100' �-' ST 2 TONS i C LIB _ BANK STABILIZATIO E ���►►�� V i I LLJ W/CL 'I' RIP RAPAR R E DETAIL 8-3 ¢ to t- � O 1 - Y/A- + WOODS (n C+ F— CV r Lw A < _1ory Miarflw �_ — Q i- F� _ -Y/RPA- N �I saooM 3 — - U) (n c)) SPEC 2' BASE DITCH SEE DETAIL 8-9 rn LL.I O SPEC DITCH GRADING SPEC DITCH GRADING SPEC DITCH GRADING O SEE DETAIL 8-6 SEE DETAIL 8-6 L1 _ ------- ------S M MH ONO J r LL.I 15" = L1J UQ 196'X7' RCBC 2GI-0 i _ - _ - �j ni_ - —1 ni / Q �i n �Y1FT �1LL— _i__ -F- 13- r)FTAII SHEEL j - - - - —J nl- - m - Of nl- - — - - - 2D-4 DETAIL 12 s n 4'PAVED SHOULD tom— Orl I oa ni QN --------------- — --- US M 70 EBL 24'PAVED ROALWA--_----5/ 2 1 L vvt r---------------------- --- --- -- Q J % REMOVE - it I p➢---�'1Be�----- ---- ---—-------------- ---- --- dJ21 ��81 4'PAVED SHOULDER NMON I` — — — — — --- --- ---- --------------------- —_---- — -----r�---- -- F— EMOV jB 4' PAVED SHOULDER LLl F ��---------------------- US hWU 70 WBL 29'PAVED ROADWAY — — — — — ------ -- W{------------------ _— — — — M MM D 00 J,---------- 1 --- ---� ��-4'PAVED SHOULDER _ _ _ - _ _ - _ - _ _ - -- — -- - - -- - ------ M - _ ___ M ------od nL---------------------ae ni-------- o-----°d ni_-_-_--_-__--oe nl_ --- ----- dnI __ _-- --- —1u m_ - - o - _ - Ln — — — -- 7 GcnBE*o9RAIN-------------M—_---- �PEeY rrcH=M= — y�t,o»��o�tPnT�------ y, _ _M------------------------ ---_ ______- -______-___ T M _ _ - _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -M _ _ - - N _ _ _ _ _ _ _ _ _ _ _ Q -_- - - dniCl -----� _---oi ni-- -- -� naV- --------- - —-------ss- ----- --------------- - --- -sse- - -sv- - -sse- - a -ssi- - -ssa- - - - - - - - - - - - - C / OAd 9 �- nt- - - - - - - - - - - - - - - - - - - - -od ni- - - - - - - - - - - - - - -od ni- - - - - _ .. .. .. .. M _ .. .. .. - - - - _ - - - _ - - _ - - .. .. _ - _ - _ _ ai ni o1 ni QLA Q. gg MOO 01 613 ,L9'0 - - ' - M/a Ol dl3 ,19'0 0 R N CULVERT OUTLET CHANNEL WOODS I I I III 0- m W/CL 'I' RIP RAP (BANKS ONLY) WOODS SLOPE=0.8% I I I o I SEE DETAIL 8-4 I I III WOODS ' WOODS I _ II RIQa I I I m i - DETAIL 8-8 - 31VoII 4�a .. - .. a i c3 n X� DETAIL 8-7 DETAIL 8 9 WOODS 0. STREAM SB X X� WOODS SPECIAL BASE DITCH TOE PROTECTION TOE PROTECTION IN WETLAND AREAS a y I � JNO� Y', �� r(1� (No t° Swle) (Not to Scolel (Nol to Swle) IN KER DIRECTIONAL BORE I Pqq . M_�s ii \°��- S"LLLOPE o<F Natawl .gt Frem SPE�'DI UG TEL X _ NATURAL a'\f� WONl Ground' S\° Growd 3. 3' Ditch ` N C C S GRouND d f WeNond Arco 3F`\I � ,D� F\met slope SEE DETAIL 8- BAN STABILIZATION I A SvN GEOTEMLE �d �.1 < o d=1.0 Ft. d=1.0 Ff. Min. D. H. V /C 'I' RIP RAP p - _ Geotextile B=2 H. E DETAIL 8-5 SITE 8 Teolva KERN COMPANY, INC. J Type ofLmer= CI°Rs'B'Ripamp Type of Liner= CL'B'Rip4tgp FROM STA. 13+31 TO STA. 13+50-Y1RPA- RT j 7p o ROCK CHECK DAM'I� - EC N' DITCH FROM STA.35+20 TO STA. 36+00-SRYIDY3C- RT FROM STA. 34+00 TO STA. 35+20-SRYIDY3C- RT �7 �C�k ! I SEE DETAIL SHEET 2D-4 SEE DETAIL 8-2 DETAIL 9 F•(' SPEC 'V' ITCH C,RAVEN COUNTY // v I SEE DETAI 8-2 I PE'V' DITCH SPEC ' DITCH (n R 8 I v � SE :DETAIL 8-2 SEED AIL 8-2 GRAD / \ Q- CL 'B' RIP RAP E EST 2 TONS C _ P P EST 7 SY GF G RTO,�`— + —� E / R R �° °_,M T — — — — c M NLLM r cV 1s" wr < "� =`E§ P� wM T A°1— < <� R 2 ELBOWS Gy AR AR PROPOSED 6" PVC SL LLUU DIRECTIONAL BORE o 4 SRYIDYJC- U Lu - UG POW, TEL 2GI OR / RaPMIwT`'cW\ Pie F EST 2 TONS _ -aT / F pgOP ujG P� PUE - fc } EST 7 SY GF F _ R PR oc gld Pow L:nE e N -PROP grN Pgw L1NM M DP g1N PDF LINE MDP mD Pow .-IS' gP D G FOR -LET- PROFILE SEE SHEETS 38 & 39 r cpa 4d L E PMop M PRO. M roP PMo Mtg PgM cpMLEB PR PROP otg POW wMLec P PUE PUE m m POP wM TEL coNgx:TP PRE M TEL CO.OR -LRT- PROFILE SEE SHEETS 38 & 39 IG kEB �B Pow cpML M Pow cpMLEB PUE i, fd9E' PUE PUE owl >r m18 °PPLIE L PUE PUE PPUE — ° r XC0N0xET pUE FOR-YIRPA- PROFILE SEE SHEET 62 N P STABILIZATIO L PROP / CL 'B' RIP v -D FOR-YIRPD- PROFILE SEE SHEET 65 W ' RIP RAP �S 5 SAY GF� / CL 'B' RIP RAP SEE DETAIL 8-7 G G e' EST 8 TONS TOE PROTECTION m m FOR -DR2- PROFILE SEE SHEET 77 & EE IL 8-5 EST 21 SY GF (FILL SLOPE ONLY) FOR-SRYIA- PROFILE SEE SHEET 79 P P, I I WETLAND WF SCL WRIP EE DETAIL �B 8 FOR-SRYlDY3C- PROFILE SEE SHEET 85 Submittal February 6, 2024 Submittal February 6, 2024 RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT Site Station Structure ROAD PARALLEL No. (From/To) Size / Type BRIDGE ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 CROSSING IMPACT (ft2) (ft) (ft) (ft) (ft) (ft) (ft) (ft2) 7 19+86 to 20+23-SRY1 DY3C-RT UTILITY 257 695 952 8 28+63 to 30+31 -SRYI DY3C-RT UTILITY 1289 1471 2760 23 38+78 to 40+27-Y1-RT UTILITY 2117 1423 3540 24 40+60 to 41+89-Y1-RT UTILITY 1696 1123 2819 TOTALS*: 5359 4712 10071 0 0 0 0 0 NOTES: 2018 Feb Submittal February 6, 2024 C 0 a 7U y / 0 / 0 N7�) O 0 T N 0 N r L� it U O a ti N C*410) See Sheet 9 A For Index of Sheets See Sheet I For Standard Symbology Sheet PERRYTOWN END I �a PROJECT .m�rmac �Thur Sac \ m ` Oa 70 NP ^ P \ orepr \\ 0v l \ �s (SQ one Rd Riverdale t,� E� E F" P Harbor \� e�- Crooked Creek 70 Carolina Qti /Pines �a zrV� of Ca�F` Q-,l'10 �5 09 d7 d F BEGIN �� PROJECT 70 VICINITY MAP N.T.S. BEGIN -SRYIC- STA. 16+ PROJECT R-5777C END RESURFACING ONLY BEGIN CONSTRUCTION -YI- STA. 27 + 44.40 +/- END CONSTRUCT -YI- STA. 45+20.00 STATE OF NORTH CAROLINA DIVISION OF 111""HWAYS CIM VEN COUNTY STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. R-5777C I STATE PROD. NO. F. A. PROJ. NO. DESCRIPTION 44648.3.4 WA DESIGN -BUILD LOCATION: U.S. 70 FROM THE HAVELOCK BYPASS TO EAST OF S.R.Ill6 (THURMAN ROAD) TYPE OF WORD: GRADING, DRAINAGE, PAVING, SIGNING, ITS AND STRUCTURES "qo 83j"q 20� BEGIN CONSTRUCTION -Y3- STA.13 + 04.73 BEGIN CONSTRUCTION END TIP PROJECT R-5777C -L- POT STA. 355 + 64.22 = "�083� -L- POT STA. 250 + 00.00 w i BEGIN CONSTRUCTION 2017 (U-5713 /R-5777A&B) p -Y4- STA. 12+20.00 p co Q BEGIN BRIDGE \ � O -L- STA. 258 + 46.42 +/- iL END CONSTRUCTION O E v RR� -SRY4A- STA. 97 + 54.83 NO p n 7 Os-SRY4B- --SRY4A- 22 23 24 25 26 27 28 Q r _ I - _ 1-Y4RPB-14RPA� + SRY4A- �-- co - \ _ is a L- 'ra 7 R - Y 2-' �t�M;;f;`'ii.z _ l US-70 TO NEW BERN - {� b W asy TO THURMAN ROAD J w 2 S 1 r END CONSTRUCTION �, BEGIN CONSTRUCTION -SRY4D2- STA. 30 + 03.58 U END CONSTRUCTION a END BRIDGE END CONSTRUCTION -SRY4D2- STA. 10 + 71.20 F-- -Y8- STA. + 01.00 -L- STA. 259 + 50.50 +/- -SRY4D- STA. 34 + 53.02 END CONSTRUCTION END CONSTRUCTION RIGHT O F WAY STA. 10 + 98.00 -Y7- BEGIN MILL & RESURFACING ONLY -Y4- STA. 25 + 75.00 END MILL & RESURFACING ONLY -Y4- STA. 26 + 80.00 A PORTION OF THIS PROJECT IS WITHIN THE MUNICPAL BOUNDARY OF THE CITY OF NEW BERN CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. THIS IS A CONTROLLED ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES. PRELIMINARY PLANS ][DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES 50 25 0 50 100 DESIGN DATA ADT 2019 = 311800 ADT 2045 = 41« 800 K = 9% D = 5 5 % 0 * T = 8 /o V = 75 MPH (TTST = 3% + DUAL 5%) FUNC. CLASSIFICATION = INTERSTATE STATEWIDE TIER 11 PROJECT LENGTH LENGTH ROADWAY TIP PROJECT R-5777C = 6.509 MILES LENGTH STRUCTURE TIP PROJECT R-5777C = 0.035 MILES PLANS PREPARED FOR THE NCDOT BY: Baffoup Beatty NC LICENSE NUMBER F-0991 900 W TRADE ST STE 7I5, CHARLOTTE, NC 28202 HYDRAULICS ENGINEER P.E. SIGNATURE: �� NOR?� 0 Q� � ,r a +p op yRh ��Qo� PLANS 50 25 0 50 100 TOTAL LENGTH OF TIP PROJECT R-5777C = 6.544 MILES J 2018 STANDARD SPECIFICATIONS J. ADAM FREEMAN, PE RIGHT OF WAY DATE: JAN UARY 17, 2023 ROADWAY DESIGN ENGINEER, P.E. SIGNATURE: PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) PROJECT ENGINEER NARONG PHAL, PE NCDOT CONTACT: NCDOBYRON DESIGN -BUILD LETTING DATE: JAN UARY 17, 2023 PROJECT DESIGN ENGINEER Submittal February 6, 2024 0.02 STRUCTURE #1 BRIDGE AT -Yl- STA., 26 +59.57 OVER -L- STA. 48 +38.04 —Yl—(STATELY PINES RD.) CL I 53.5' i 0.75' 0.75' I i 0.02 0.02 0.02 0.02 I I GRADE\ CROWN POINT STRUCTURE TYPICAL SECTION STATELY PINES RD. -Y1- FUNCTIONAL CLASS = RURAL LOCAL L—(US-70) 0.02 ct —Yl— BRIDGE I l 58'-9" VAR. 71.75' TO 74.65' I —Yl LPD- 12'-0" 12'-0" 12'-0" 46'-0" 12'-0" 12'-0" VAR. 12'-0" 0' - 4 19'-9" 6'16" 19'-9" 3 W V) I I 0.05 0.05 0.05 0.01 0.05 VAR. VAR. 0.05 0.05 GRADE CROW GRADE\ OWN POINT CROWN POINT POINT TYPICAL SECTION UNDER STRUCTURE -L- FUNCTIONAL CLASS = INTERSTATE MINIMUM VERTICAL CLEARANCE = 17'-0" 12'-0" 0.04 25 Nj f ; US 70 Lo �—L _ 8:IPROP. BARRIER co IAU TL-3 B-77 �-'11 w#,-Vql TYPE B77 SKEW 8227' B-77 r' IAU 39" US TL-CGAU 70 0 N � /6:/TYP —�-- Q_ PROP. GUIDERAIL CGAU TYPE B-77 TYPE -77 PROP. GUIDERAIL CL N ~ it it US 70 N N ~ US 70 SC Sta. 13 +25.00 0 N o o 0 0 0 o - POC StG, 46+48.77, 47.00' B-77 SRS Sta. 11 +25.00 — � h oe RT _ cc L POT Sto. 48 +38.04 1 t —Yl— POT Sta. 26 f59.57 4.67 � ps /2 Q� SKETCH SHOWING BRIDGE /PAVEMENT RELATIONSHIP FOR —Yl— OVER —L— SCALE: 1" — 50' Submittal February 6, 2024 1'-7.5" * MEDIAN SHOULDER TO ACCOMMODATE ONE FUTURE 12' THROUGH LANE IN EACH DIRECTION & FUTURE 10' OFFSET. 58'-0" MIN. CLEAR ROADWAY 12'-0" 12'-0" 12'-0" 0.020 0.020 0.020 * DIMENSIONS PERPENDICULAR TO -Y3- AND VARY UNDER BRIDGE THROUGH CURVATURE OF ROUNDABOUT APPROACHES /DEPARTURES AS NOTED STRUCTURE #2 BRIDGE AT -L- STA. 180 + 59.,35 OVER -Y3- STA. 15 +55.07 L-(US-70) CL 46'-0" * 12'-0" 10'-0" 2'1 10'-0" 12'-0" I i d I 0.020, 0.020, A 0.020 0.020 I GRADE' CWN ROWt POINT POINT STRUCTURE TYPICAL SECTION -L- FUNCTIONAL CLASS = INTERSTATE -Y3-(FISHER AVE.) ct I I , • rviry i TYPICAL SECTION UNDER STRUCTURE FISHER AVE. -Y3- FUNCTIONAL CLASS = RURAL LOCAL MINIMUM VERTICAL CLEARANCE = 15'-6" FUTURE -Y3-(FISHER AVE.) CL I I , 58'-0" MIN. CLEAR ROADWAY 12'-0" 12'-0" 0.020, 0.020 rvii,4 i FUTURE TYPICAL SECTION UNDER STRUCTURE FISHER AVE. -Y3- FUNCTIONAL CLASS = RURAL LOCAL MINIMUM VERTICAL CLEARANCE = 15'-6" 12'-0" 1 , 1'-7.5" Ln � N N -Y3RPA- N �- �� ��s � NA�83iNgzp17 � �� W N � - 81 c ��G 14 +52.34 B-77 GREU (TL-3) I Z' 9 PS PRC Sta. 9' 12 ps co 65 P PROP GUARDRAIL B-77 6 S B-77 PROP GUARDRAIL G V) PROP.SBG PROP. SBG N N N US 70 o US 70 N N � N ter IAU � -L - PROP. GUIDERAIL °��o CGAU -L- TL-3 PROP. GUI DERAIL IAU TL-3 PT Sto. 15+ 7.51 " N 20° 06 27.3 W CGAU m � N US 70 US 70 N N PROP. SBG PROP. SBG N o C o REU (TL-3) PROP GUARDRAIL B-77 6' B-77 PS PROP GUARDRAIL � CAT-1 lz PS 12' SKEW - 70° 04' l3" 0 2 o R74' s oA c� SKETCH SHOWING BRIDGE /PAVEMENT RELATIONSHIP FOR -L- OVER -Y3- SCALE: 1" = 50' Submittal February 6, 2024 * MEDIAN SHOULDER TO ACCOMMODATE ONE FUTURE 12' THROUGH LANE IN EACH DIRECTION & FUTURE 10' OFFSET. 58'-0" MIN. CLEAR ROADWAY 1'-7.5" 12'-0" 12'-0" 12'-0" I l -0.020 .110.020 0.020 * DIMENSIONS PERPENDICULAR TO -Y4- AND VARY UNDER BRIDGE THROUGH CURVATURE OF ROUNDABOUT APPROACHES /DEPARTURES AS NOTED STRUCTURE #3 BRIDGE AT -L- STA. 258 + 98,34 OVER -Y4- STA. 18 +01.45 L-(US-70) CL 46'-0" * 12'-0" 10'-o" 2 10'-0" 12'-0" I I� II 0.020, 0.020 0.020 0.020 GRADE) GRADE CROWN CROWN POINT POINT STRUCTURE TYPICAL SECTION -L- FUNCTIONAL CLASS = INTERSTATE -Y4-(CAMP KI RO RD.) CL I BRIDGE I I 102'-0" 58'-0" MIN. CLEAR ROADWAY 12'-0" 12'-0" 12'-0" 0.020, 0.020, 0.020 -Y4 RAB- I-Y4�RCL * * CL I L 13.63 -23.95 i2 1 14 -15.84 1 17.5 -24.25 1 _ 14 -15.81, 2 13.68 -25.95 0.02 I 0.75' 0.02 0.02 0.75' 0.02 0.02 I VGRADE CROWN POINT TYPICAL SECTION UNDER STRUCTURE CAMP KIRO RD. -Y4- FUNCTIONAL CLASS = RURAL LOCAL MINIMUM VERTICAL CLEARANCE = 15'-6" 0.02 1'-7.5" o d PC Sto. 18+59.60 5" W PT Sto. 10 +94.86 a " j PT Sto.18+24.13 q2p>> +10 /9 o -L- POT St . 258 +98.34 = PC Sto. 11 +65.34 0 Y3 POT Stao 18 +01.45 N � VA WL=A zN N US 70 N b US 70 N N � �KIA r N N 25° lT /7.5" W —L— IAu T -3 c AU N 25° 17' 17.5" W `� � CGAU PT T Sta. 1 / tU1.27 } PROP. GUIDERAIL PROP. GUIDERAIL cj- N d N N US 70 US 70 N X SKEW PC S 89° /0' 39" PT Sta. 15+77.05 %- 00 PC Sto. 13 +76.48 s N �g 2 SKETCH SHOWING BRIDGE /PAVEMENT RELATIONSHIP FOR -L- OVER -Y4- SCALE: 1" - 50' Submittal February 6, 2024 i Submittal February 6, 2024 L 0 i Submittal February 6, 2024 i Submittal February 6, 2024 i Submittal February 6, 2024 CT M C- 0 L / cn / W W TZ FOR -LLTI - PROFILE SEE SHEET 34 FOR -LRT I - PROFILE SEE SHEET 34 FOR-SRYIB- PROFILE SEE SHEET 81 Submittal February 6, 2024 C CT LD t 0 1 L i U S cn / S DETAIL 5-1 SPECIAL 'V' DITCH ( Not to Scale) Front t Ditch Q Ground F I o\ tural p�\o�\e< Slope y„O G� • /�� offer w S ROBERT B. zo �9, \ Min. D=1.5 Ft. HARDISON, ET AL 6� z ,�, DB 1563 PG 123 V) N w PC G PG 24E s \ FROM STA. 15+50 TO STA. 18+50 -L- RT ��N \ Ln a =moo \ \ 0° Ln CD ry o �\ C VERT INLET\AN�NEL -LLT - PT Sta° l o N W/CL 'I' RAP (BANK$' ONLY) 7� o POC Sta. 16+84.89 LJj " SEE DETA�� 5 � 4- s m i' �91R, + 55.00 + 99.00 SPEC 2' B SE DITQbIUSI PRO GR EL �� \ 73.00' 104.00' WOODS SEE DETAI 5-4 DR E (TY j SPEC 2' BASE DIT6� W/CL 'B' RIPRAP - �G +87.00 EST To EST 131 SY GF >-74.00'+20.00 SEE DETAIL 5-2 �� 75.03 I , D 00 E +94.40 50 C o E E - _ AAR i 50 = - GRASS,oano ,ZIP 76=dU1= 2G1 050 T� w .A (STING RR/W - "D n l-I - illillillillillllll IF • / :r a II DETAIL 5-2 SPECIAL 2' BASE DITCH ( Not to Scale) Natural 1 0< Slone P Ground N e< Ditch d 3 7JDFlTuck Geotextile a Geotextile Minimum of 1ft (TYP) Min. D=2.OFt. d =1.0 Ft. Type of Liner- Class 'B' Rip -Rap, Keyed -In B=2.OFt. DETAIL 5-3 SPECIAL BASE DITCH ( Not to Scale) Natural 01 Front Ground 3• �e< Ditch / D F\o` Slope LB Min. D=2.5 Ft. B = 3.0 Ft. FROM STA. 18 + 00 TO STA. 24 + 50 -SRYI B- LT FROM STA. 21 + 30 TO STA. 23 + 00 -L- RT FROM STA. 16 + 00 TO STA. 16 + 70 -SRYI B- LT 6+82°90. SPEC 3' BASE DITCH 23.00. W/CL 'B' RIP RAP EST 128 TONS, EST 335 SY GF +21.00 SEE DETAIL 5-8 i� sta. +97.32 ��/PCC 77.00' CL 'B' RIP RAP +65.00 85.00' + 91.00 / +19.77 EST 2 TONS +38.00�i� f� 83.00' E E '36 EST 7 SY GF E 1.00 ° +17.87 +97.32 - -50 55� -55.00' M9S1 M „8b ° o I - nr0' 42" •- 053EISTING _55 - CCI-Al- , � +73.88 i - -Ai- - - CV /0,4 - - O NO O d� r RI F Fill X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 418 ELEVATION = 30.34 N 445225 E 2614282 OBL STATION 347,08.00 29 LEFT I BM18 RR SPIKE IN BASE OF 18" PINE �9 X X X X X X X X X X X X X X X X X X X X X X X X X x X X X X X X X X X X X X X X / N'qD wol �. �`\ 8�Nq 2 JACKSON FAMILY, LLC % P t ° +/ -T4 \8 DB 2799 PG 735 7F PB C PG 353 SPEC 3' BASE DITCH WOODS - _ J 11-6W ad09��19 SEE DETAIL 5-3 - �1W 46.50' +13. t L0 `1/ - �-�los ,ol REMOVE 1163 18' PAVED ROADWAY - \+ M �- - - - IN MI OWN _ .� .Me! 00 111 . i♦i 1� i •vl����� 1� 1-1-1-1-1- , " �` �Ii i�1i�1��% �■� �i�l��l�lt•Jt�isJ17:_R�'ii.•_�I���L_�1�1�1�1�1_I-1 1 - or �� • .,■_ MVV • �.v +91.00 _A�SFEC- '3'BASE DI M II 1131 00' �� N SEE DETAIL 5-�, 1101NOM 0;- ' lmo RETAIN ��- �• � 1 )Ad 1191 ° / \0dS1 �I_ dS1 0 +52.0 P to. l +6 105.00' i i �`'�u \3 b s RONOJ W C&h R \� 0 OLE ILIZATION O / W% L 'II' RIP RA i i MN ONO + 00 SEE DETAIL 5 ,� o b 5.00' o0 3 0 9 00', 05.00' w - )AVID A. i�/ o SANBORN, ET UX �' o ti N DB 2802 +77.60 z PG 22 61.00 , 105.00 c, 1 \ PT Sta. 16 +59.2/ \ d b �• �dONryO \ w JEREMY R. RODAMAKER �,� � DAVID A. SANBORN, ET UX DB 3519 PG 2170 oti �ti� DB 2399 PG 743 MB 9 PG 106 4 o ��ti �o� S V �"6 0s / DETAIL 5-4 SPECIAL BASE DITCH ( Not to Scale) Natural of Front Ground 3. �'' e't Ditch % D F\off Slope LBJ Min. D=1.5 Ft. B = 2 Ft. FROM STA. 13 + 50 TO STA. 16 + 00 -SRYI B- LT 3 _ �o c�v _ _ - - --_ O _ _ , ^ ,- S dl / oa __ �� 1�\ \ -® ��d 91 -M - - - _M- - - u, t1J �-- REBUKE -� - -53 DAd„bZ ------ 52-�- oNl b + 70.95 REMOVE I °° 24 d 0 °� - N�NN ACING ONLY w` 1 a - - - - - -1-1= _ - - - «� � W I REMO 52 -� J _ _ EX RAW _8 _ / REMOVE � ' �� � N L-�r w CLEAN OUT �� �6 2� - - R€MOV = REMOVE REMOVE �O TAIL y EXISTING DITCH 52 CLEAN OUT EXISTING R,W I l� J(d M NMONNNn „8 04�7o EXISTING DITCH N 52 / 41� RCP / o _- _ ° =M = - - - - - - - - -®- _- S - nl= REMOVE / CLEAN OUT / 52 / EXISTING DITC / / 52 REMOVE 52 I 052 519 \\ \\ 3.15 °Ln \0 \\ ^' j I �o� /CL 'B' P RAP m X MICHAEL A. MILLER, ET UX / / 70 I \ ��oj DB 1619 PG 899 i vim` / / / e/ o � � 1S9 I EST 7 S EST 2 TONS Q. w MB 9 PG 106 , 1\ �4 / \ �� / \ \ _ I u,\ \ C /O� 4119 S 1 I I I \ \ \ 08°BSI •zz,lo°9O s - CROATAN FREE WILL \ X l \ \ \\ BAPTIST CHURCH X N W DB 914 PG 591 \ ED _ CROATAN FREE \ ___ _ \ 03 _ Zb I� \ ///\ / • M/d O1 d13 ,98°0 b0°ZbZ lH� 8\ o \ \ \ -- % / 3 ,,91,9b°11 s • \ WILL BAPTIST I \ \ \ 41 Ol // DB 450 CHURCH 397 is 1 \ \ \ 83S1 I \ \ \ 7 I \ ' _ \ - \ I DETAIL 5-5 CULVERT INLET CHANNEL ( Not to Scale) Natural Natural Ground n� Ground Tuck Geotextile d a Minimum of 1ft Geotextile B (TYP) Min. D=2.5Ft. Key -In Rip -Rap per Std. Dwg. 876.01 B=5.OFt. Type of Liner=Class 'I' Rip -Rap to Top Bank Est. 50 Tons, Est. 80 SY Geotextile Est. 35 CY DDE DETAIL 5-6 CULVERT OUTLET SCOUR HOLE STABILIZATION ( Not to Scale) Natural Bed Natural Elevation Ground Natural r Grouna Tuck Geotextile a Minimum of 1ft 2.0' 2:1 or (TYP) Geotextile* Flatter (TYP) Existing Scour Hole Channel Bed *Place Geotextile Under Riprap (7ft) in Locations Directed by Engineer Length = 56 Ft. Type of Liner=CL 'II' Rip -Rap to Top Bank - Keyed -In (TYP) Est 210 Tons, Est 245 SY Geotextile STA. 17 + 08 -SRYI C- RT STA. 16 + 78 -SRYI B- LT X CROATAN FREE WILL�- �� BAPTIST CHURCH i 1 \� o \� �a �� DB 1556 PG 264 \ 80 I d \ Ob \ /��\ • / /\ /`�/ \ a1H \ I _ k \ \ \\ CROATAN FREE WILL I rl\no, Q BAPTIST CHURCH \\ \ /j/ / DB 1662 PG 389 \\ \ _A -l11NS1 \ \ \\ DETAIL 5-7 SPECIAL DITCH GRADING ( Not to Scale) I I SPA R/ D �P�'�* SP qe�F � P� *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 12 + 00 TO STA. 23 + 00 -L- LT FROM STA. 13 + 00 TO STA. 15 + 50 -L- RT \ FAV EMENT REMOVAL \ ' X WOODS W \ FOR -LLT( PROFILE SEE SHEET 34 FOR -LRT I - PROF/LE SEE SHEET 34 , - TA FOR -LLT - PROFILE SEE SHEET 35 \ FOR -LRT - PROFILE SEE SHEET 35 \ FOR-SRYIB- PROFILE SEE SHEET 8/ FOR-SRYIC- PROFILE SEE SHEET 83 FROM STA. 16 + 80 TO STA. 18 + 00 -SRYI B- LT o WOODS Submittal February 6, 2024 0 L n � 3 CVO 00 (v 0 DETAIL 6-1 SPECIAL 'V' DITCH ( Not to Scale) Front o� Ditch Natural �het Slope Ground .7 D \� Min. D-1.5 Ft. FROM STA. 30 + 75 TO STA. 37 + 50 -SRYI C- R' DETAIL 6-2 SPECIAL BASE DITCH ( Not to Scale) Natural o< Front Ground �e< Ditch D �C\off Slope LB Min. D=1.5 Ft. B = 2.0 Ft. FROM STA. 26 + 00 TO STA. 35 + 50 -SRYI B- Ll DETAIL 6-3 SPECIAL BASE DITCH ( Not to Scale) Natural \ of Front Ditch Slope Min. D=2.5 Ft. B = 3.0 Ft. DETAIL 6-4 SPECIAL DITCH GRADING ( Not to Scale) SPA *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 23 + 00 TO STA. 25 + 50 -L- LT FROM STA. 33 + 50 TO STA. 36 + 00 -L- MED 1 /At, �ShFFT I ?s91 PROJECT REFERENCE NO. SHEET NO. R -5777C 6 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION �O ?OR III lit WEYERHAEUSER Q COMPANY Ralfoup Beatty DB 370 PG 53 St\ PC H PG \90G DOCUMENT NOT CONSIDERED FINAL 14 46. 9 1 UNLESS ALL SIGNATURES COMPLETED 5 9 O n 0, + 3� 00•, ) �S i5, +0& j J V' 0066.00 ` C17 �M •F �s Q + 89. 0 o P 0,A .9 � 49.21'. o� 63.00' +5 \ \ � +14.0 WOOD o � ss �, 47.00 w I I SC Sta° I2+ lVE (TYP.)+99.0 40.00 63.00 N . daH „SI + 37.00 = b .00' PROP GRAVEL°° o-x X 1 i + 29.59 \� �\ �\ \ 0.00' + 64.03 55.00' �\ 44.0 DRIVE (TYP.) `- X 31e0�i\ X X�- -- X------I 44.00' \\ �� ��\ \ �� �. +16.0 +28.00 +8_00 N I sn® (sne) ai } I 21' +37.00\� s 3� .0 62.00' - ONO z G (P 51.00' 67.00' I 3S1 31V0 _ IC, ' n J WOODS +05.00 = I INC/NC +14.00 69.00' �\ \� 1 Q0� 6 9 + .00 b0 °° fig" Cr1�` W rY RPB V • -o F 54.00' I �0' �(L B RIP RAP YP, , 69.00' + 49.00' \ I+ 6.61 \iJ� E J E I �9 �1W 061 EST 3 TONS +17.00 O +02. )0 �� 142100' 1 !o - o �� - - - - - - I E ST 10 SY GF 56.00' 54.00' r - I E� m +31.49 0 I 1st --_-- _- E- --0610 E 1 �I: L 0 EP + f97.34 2/' „ E E - E _ E -� ` R D (� q' � W 24 0611 r----- - -- ----- ----„ �� � � . \ a �. W 0615 °g A� M/8 01 s-------- 18 °° 38.33 N R ° o N �331s MH dl3 ,80°Z �1W \ \ 31d � � I � 0 � �� � z .�" �`}- � - . M N I I EXISTING / o ld `�/d I S bo C]8 08� �I o o - - - 1 U� o awl Nn „b - N 2 - X__ _X -� ---- - I - - - - - - M- 1S8 - - - - - - - - --------- - - - MQv §dQ ��SI -- � - _ y�g.��l S �M- - 10nd ,zl -- -_- Z 8� - �HW- -- C - A VE 2. - -`- ----- o r 2GI-D PB- -n _ _ - _ _ LU O o --- ---_�_ I- G'Ht-FNCITI (=DT _ o--- �_� -- -_-_ -- --o�n - _ l72"�G1ESl_GL�R€ SCI�E N° - - - ---+11.26 A ,sE - - -L- +44.47 -4- I� ==QJ nl�-fE0.06 - - - - 0 - - - - 84.00-' - - - �DrL4 lo - - - -89.00'-O - O _ _ \� - - -0 1- - o -93°64 0 �} ��� J 0 CO LU to I = o ^o ��PAVED SHOULDER _Z % In N ��� -� - _ i o - +7�. _ _ _ _ �� nl- AY I N -� L b� � REMO `O PAVED ROADW T US HWY 70 EBL 24 y 2 ' obo - _ US 70 EB 66.6T i c, f66.6� - ~ ' ^ ' ^ Q 15,, 2GI O60 r 4' PAILEQ�H ER v, GRPROP°GUIDERAIL 2GI N - -� / o _� � N J Q _[- 2GI CGAU CGAU N J N ® I FES III RCP FES > �� o OR S o FS, SEE DETAIL SHEET 60 fl 0000 � r 1 N 0 2D-4 DETAIL 12 US 70 W B GRASS \ RASS SHOULDER I 2' PAVE SPEC biWG­ S DETAIL _ cs DITCH G DING I � - - REMOVE -°� Al CL 'I' RIP RAP- - EST 2 Ti71VS BL 35' PAVED ROADWAY / I z - - SST-4.5_SY GF US HWY 70 0-1 Al LO 60 - S�� AVED SHOULDER = =1�- _ _ �� _ �' - V 'I' - n - - - - - - - - _ LU -en8-9 CL 'B' RIP RAP WOODS - --- -=--o�_- - - - - - - --------- C _ EST 2 TONS PEC 3' ASE DITCH - - - - - - - _ FEN - - , (n E DE TA 6-3 - - Ej(T� DITCFir - _ �\- EST NC7SY DEPT GF TRANSPORTATION wooDs A ( SPEC 'V' DITCH _ _ _ - - M -_� - _ - - - - _ - C,4 _ _ _ SEE DETAIL 6-5 - - a �- F o� n1' �' �� - - «� N (NO RECORDS FOUND) _ - _ - - - EN R URFACING ONLY TIE TO _ __ - - - = ' \ 8 H - � �► o \ BEGIN NST RUCT ION + 62.17 EXTG DITCH _ - - - _ =/ T ��� ^ 47.00 _ _ CL sT o I TONS - RYIC- TA° 30+62°l7 C _ _ _ - _ - _ ��Y �' _ - - - - F _ 47 WW FENCE 9 SY GF __- _ _ - ;� i A i ' _ X`Sj\N� R/" H 16 - - 1 �\ -----M------ - - ----_ -M 0618 U (y li') M------ -_ ---- - - --IQ3- --- - N----=-0� ii F WOOD end „bZ - - - - - - - - o00 end ,bz < �n d - RYIC i H � -�- _----o�n1---- O61 - - (0 - d - - - - _ _ _ - - - - - -0-1 Al 103- - - - - - �r - P �J LLI ��- -1 - _ I - _ 0 ' W pUE -1- v M N r -p • PUE N W - - - P REMOVE - + 90.43 RESURFACING ONLY � `�' o . � _ ___ N o - _ m I I EX RNN - - Ln P E ��~n^ ---�- _ _ --- --.- - and„z � +61.00 n PUE vJ NMON� 8- _ - - - - - - - - - - - - - - - 3- ` - - - - -�M - = ss 1 49.00' E p Doo and z r -- - I� s = 3 nd z 21 i EX RrW �J� 3 EX5 1 EX BRMI-9lM IP o.06' R/w T Eo P I 76. 7' UE PUE I I� \ ,M W d E P PROP GRAVEL I f= 20.04' EIP TO R/W G R/ EIP'QO \ P -o 1SG W v FC 'V' DITCH C DRIVE (TYP.) SEE DETAIL 6 1 I I \ 061 T \ F most N WOODS I I 56°05'48" E � \ 1 I 22.03' EIP +00.00 \ I I 60.00' +62.43 I �i \ + +20 DAYLIGHT DITCH .00 I I \ 65.73' 6 3' E 79.00', 99.067 +1 �1WS1 I �0.00 �\ ejM mm I n , X 60.69' WOODS `� ` - +50.0 78.00' 99.00j'i� �n --- �HOX� \ �112.00' 7.00' _ J - 417 ELEVATION = 32°15 �o z Q O N 446293 E 2613815 �� KERN COMPANY, INC. w BL STATION 335+46. BB 58 LEFT O FT Sta° 30+62°I7 �^ - BM 17 RR SPIKE I N BASE OF 32 PINE 3 DB 1240 PG 828 X X X X X X X X X X X X X X X X X X X X X X X \� WOODS KENNETH McGOWAN \0o BFFG LLC DB 3574 PG 1683 %DB 3687 PG 522 �p CRAVEN COUNTY 0s DB 3109 PG 521 PC I PG IOA-IOG lH0 „Og ,08°6bZ M L1,60°1 N X DETAIL 6-5 SPECIAL 'V' DITCH �A Og•�g (Not to Scale) Front P�y�P� M 81,65°9Z N o Ditch °�Q Natural 3 ��et Slope ���\°�� C:,Ground FYQ,7 or D F\O 10 4` �L Min. D=1.0 Ft. \�PQ° � 'n 2-2J, LLC ND13 3521PG 25 FROM STA. 30+50 TO STA. 36+00-SRY1C- LT MB 10 PG 14 SP C 3'BASE DI H N/ ONO EE DETAlL16-3 I CL 'B' RIP RAP ]NO 80 T XX09 + 34.00 I + 44.0 ES ' 0 G F N PROP ASPHALT 67.00 I b 00 I DRIVE (TYP.) FROM STA. 23 + 00 TO STA. 36 + 00 -L- RT FROM STA. 24+50 TO 26+00-SRY1B- LT JACKSON FAMILY, LLC DB 2799 PG 735 PB C PG 353 LAT 2' BASE DITCH SEE DETAIL 6-2 PC Sta. 30+29°59 X 1 I 12 12 CANDICE CANDICE LEE LEE PLISKO PLISKO DB 3515 PG 1948 DB 3515 PG 1948 END CHL FENCE BEGIN WW FENCE C) -YIRPB- STA. s 6 C FCC Sta. 32+96°33 sJ� �� -YI RPB - T S Sta. /0 +00°00 = cr- Q -L- FOC Sta. 29+44°47, 47°00' LT I�N w 0 0 CONCRETE a�esl + 34.2 PAVEMENT REMOVAL FOR -LLT - PROFILE SEE SHEETS 35 & 36 FOR -LRT - PROFILE SEE SHEET 35 & 36 FOR -YI RPB - PROFILE SEE SHEET 63 FOR-SRYIB- PROFILE SEE SHEETS 8I & 82 FOR-SRYIC- PROFILE SEE SHEET 83 Submittal February 6, 2024 CT 6 c 00 V 3 N� O O N o \ li c9 / wit PROJECT REFERENCE NO. SHEET NO. tO R-5777C 7 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER 1 U� ® Hw ch' 22�23"S2 PRDENarM> N Roo BrnPoLANS SE C 2' BASE DITC Q 13.5 207E MATCHLINE F �� %3• N o \ \ ct7 (SHEET 31) ry GP/F �� Bow ft" \� `. o^' a iAC +54.62St%w y \ 4 h� 2s 0 'B' IP RAP +90.75 _ ��� 'O N �\^� O 2 TONS mod` DOCUMENT NOT CONSIDERED FINAL 60.00' / Yl "�% !� 77 P p o N EST 7 SY GF 75 60.00' UNLESS ALL SIGNATURES COMPLETED +57.75 � � � � \\x�\\\\\ o {y{y Q :\ \ \ M 17+00 TO 17+50-Y1RPA- RT 60. _ Np O ELIMINATE I CUT DITCH f 15" 75 l O SPEC 2' BASE DITCH LID kO CL 'I' RIP RAP \fT -y - - SEE DETAIL 7-1�� W/2 ELBOWS-� • 1 0 0. + W + 8d 2GI Q + N EST 20 TONS \ \ R O EST 39 SY GF � SPEC 4' BASE DITCH '•' N (� P - ��C\�2�n MATCHLINE -Y1- STA 23+00 (SHEET 30) \ _SEE DTAIL 7-2 SPEC DITCH GRADING / N 60.00' / / o Ow 02 02 F TO ELEV. 28.5 A\ FILL EMG POND SPEC DITCH SEE D TALD7-12 S p SEE DETAIL 7-12 ST Sta. 23+57.75 / 1 i I \ (DEWATER POND F / OQ PRIOR TO FILLING) G o , W +56J9 4' p I Lc) PIPE INLET CHANNEL W/CL TRIP RAP (BANKS ONLY) E=0.7% SEESLOPDETAIL 7-9 fE�OE 2� +80D0 7' \ 4 M1M�2.0ybA !� i PS 2 W I BURY INVERT 1.0' R / 5 � ru CL 'B' RIP RAP CP B� F I GRE > I EST 2 TONS / IRP (T ) J EST 7 S -Gf I SPEC 4' BASE DITCH C / 9L�/ 578 +2895 P5 I� I SEE DETAIL 7-1 / / 4 �tQ• 7t L^ nl % / a ��y/� F/ / / ECJ TARHEEL INVESTMENTS. INC. SPEC 2' SE DITCH / (n /-Ni CS //// o // Q p- j GI y• C / ' CS StG. 2/+57.75 / DB 2963 PG 224 SEE DETAIL 7-2_ / _ CD / / � / PC H PG 96F 4'+6574 Hi33i5 .8 ' � � // / // % N -.5: Lf)pp / CL 'B' RIP RAP ' �F I ms CL 'I' RIP RAP / /'' I ,� 6' +84.49 I EST 26 TONS EST 3 TONS C9 aP5 EST IO SY GF r C 1I EST 50 SY GF 25 1- Ll� a / TB 2GI TB 2GI / 4 - - i// // / / /j/ // / SI��J .°' / / o* tow N o / BEGIN APPROACH S 15 73 s v + F® _ �_�� 7 +/ Cfl = D -Yl- STA 25 / GRE +50 D- ExtsTwg R/w WOODS CL 21 TONS � P� C 0 3 0 8d-+7 - - ...i to a/ SPEC 4' BASE DITCH +00.0 TL-U A - - /''� CL'B' RIP RAP SEE DETAIL 7-1 EST 7 SY RIP BEGIN BRIDGE C M/n oFnLslz3 SAIL _ M - 'P i _/�/ TO �D�R,AI�Nj /j/ Q 'IT 3 TONS - - ®� PRO _ - - c ii/' 7�ROy-F4yR / Boa ^' '2 ' .I ' ' / EST 7 SY GF CL 6' RIP RAP Y/- STA Z5+90.99 74 P n ! i C EST 10 SY GF EST 2y5TY NS ' _ _ _ �s L of ^A �- '. •- .. .. -�. --��� ® E.STNG R/K-���ST' N 74 2GI -_---ice- �� E/%/fie /�// i �i�'� � 'ii� !' �''�i' ENE• > HW 15" o lv C i > -� ® ®+ - - _ - _ -0 ' d - - AYED ROPOMM % MMY 70 EEL 36' P P.2g.8LET GE- w� +47A0 YY > 2GI - - _ _ -_-_- - - _ - J1' - _ LU D ---- -- •----- .. .. .. .. .. .. .. .. .. 4+ .4 � - _ > -- - 74- R /// L REMOVE _ CHAT '��_ 553' � ~. nl / O - - _ SLOPE( IO%�' - - - - a - D_ - m 2GI // - - - - P / Yi i ----- ------------------------------ __ PRO _ W �� -' -_ _ - - - - - - - - - - - - - - - - - au ii Y P�IOERPIL 74 = _ �� E 1 _ d 63.69' U LU �5 EC-BIT6W- GBAD� _ ni- - 074 -�y a-77 �_ _ d9 tl GRASS _ z DETAIL 7-12 � ED SH U CD 4 P� 2 73 2GI-D��_ 4'PAV 7 � Q (o � PROP,GU/DER.NL 15„ ----- _ -- + 'v o- C StO. 13 IpER / °, nip / o ky°' � 2GI-D 73---____ US titiwy 7p EBL 24 PAVE0 ROADWAY 2GI + yy5 S GRASS REMOVE jIt00 � � / ROCK CHECK DAM J _► --- --- --- �_-- an +9055 v EC 2'BASE DITCH 4PAVED _i si' �'s ,°'�- ` hm ---- ____ __ --- a-- v a SEE DETAI� � � SEE DETAIL S DETAIL 9 +98.00 o o M - SHEET 2D4 III�y US 7D WB GRASS o H SPEC 'V' DITCH �� N' GY' SEE DTA -13 SEE DETAIL 7-3 0 / . /7+0%26 N o fyJh N� o 71 _ -- ----------------- �- CS 0 +400 Tmr----------------- � CB o: � 71 0 ��� sue' � �� � �' A BL ,^y /s EST 1 TON J+'y -- - ' _ ___ _ �Il� - � ' NK $TA I IZATION ' r $T 5 SY r � + 1. 52.34' C. W/CL 'I' RIP RAP s= 75 ---- a DETAIL �1-00D5 y(i 'O66.00' & 81.00 66.00' 0 5 -- -----� =U$ IAYY 7 WBL 24'PAYED ROADWAY �,REU TL-3 = �' �-_ CB 30" RCP I /� - I TOE P ECTION 51.4 '.& 66.00' - l- eP4VE0 SHOULDER SEE SHEET 2D-1, DETAIL 13 -L- �' / R ® _ - -e- - W DITCH BERM TO EL 29.5 Q f + d 9 BURY INVERT 1.0' �O O + i� AND BRIDGE m 24" RGP IV ES 0 TONSP 56 0 - - - - y8ssa DAYLIGHT g - - - - - - - - - - - -d- - - - - - -- -� - - _ -Yl- STA, 27+44.40 71 CL'B'�IP RAQ - - - _ - - - MONNNn � � � - lg / D 3' BASE DITCH O �aV 4 SEE DETAIL 7 10 4, '+25 (n --------- - - ------ -------------- --- -- - - - sse- ADITCH - +9 _ 71 + 7 - - - - •- - - - - - - - - - - - - -"- - - - - - - - - - - - - - - - - - - - - - - - - - - - - = L = NMONMNn .B d 70 TB Gl_ �$T�10N$ 3A _ \- \ LENGTH 387 LF, S OPE 0.39% +78.00 +78T 7' - - - - - - -N- - - - - - - - - - - - - - - - - - - .. 95. T 25 SY GF _ -Edit PR H SLAB 4b7 D. EST 14 _ � EST 26o cv DDE KERN COMPANY, INC. o0' LT' - SPEC 'V' -T - _ = =11L -i-i - •r = _L S�aZ ® _ _ _ .Yl- .��.L �-G 1 " P I-- _ _ _ -ss ]nd .D s `n o°•-' ! 3�1 SEE DETAIL 7-4 DB 1244 PC 925 SEFsfiEL11L 7- C - =T�� �� =' 7=E� ,llt�i- - j1�-" - - -6' - - - - 1 - - _Y i I ..::.......:.......: .................... UO CO �--'mac ------ __ -'Gp ���_ -oe uC--- ---+ -----c ------ --- ---- ----------nL--- - ----end.£- - --_-- \ - i-__------ -� -----B 2�I-ss@ENGT =-2.1 : --- --- - ]nd_ --ant- -- - '---�`�-------------- SEE C EAL11-- -• ---- OAd AZ OAd .91--------_---- �B9�i V - ---- _ -y iSIX .. I I 5 ,64.00' ---ecr- - - - - - -sse- - _ _ _ � - ��•sse-�-- SL PE=0.4° CL'6�'RIPRA 416 ELEVATION 31.31 �E•� i'- � w a - - I N 447716 E 2612518 s l URY wvERi 1.0' V; Lli I.1.1 \ ory «_ .. .. .. .. .. �/ STATION 316.37. BB 62 LEFT v \ rn BANK STABILIZATION EST 10iY-DD .. \ o N I 9 i �F 31 +75p i F PT S 0�. %/�/2..7 - 16Lfj=RR.SPIKE.IN.BASE OF 14' A......... /� /p1VRAP 0 o P.-EL-3zz.a.g3 \ _/ - /mow- I o EIP P B 2 L \\ J - SEE DTAIL h o w n t63.ea• - �o - + I .. 4.67 GI 7p 'RIP RAP N 35 4/'//.B•Ly o o g,. . I 80.66' mp WOODS 187.44' o PS I �I ESTSS +40.00 E .. .. ` E��t 15" W/ 20.00, +n Sto.1 +9/Al I 9 2 ELBOWS +30.00 {{�yy zo.00' F I o to.15+6829 a \ E- PUE SSPEC DT'VA' ILDI7T-C1H +03.090.', QVE 8+40c0 0' . 12.00' 65.00' E \ +z1m� ,0 73.00'. JN07 KERN COMPANY, INC. a B�" ��e C 'B'RIP P F I IM' �I ,� / Ds PUE 0 GF DB I240 PG 828 -� E T 2 T NS II a 8 wOp / I I O aA E +40.00 a O 7.• E T 7 S GFIIy 125.00' - P E 90.00'S � ao1Ya�N3D� I IX , Q � � � � ' I I p ! I s . o', b .00' � PT Sto. 26+75.55 PC Sta. 42+08.59 \ 3 % \ NMONNNn .Bf 1 JSTI II I III p F \ D / +31.00 -DRI- PC StG. 10+00.00 O' -SRYIC- PC StG. 43+53.30 s000G CONSTDETAIL 7-9 DETAIL 7-10 AIStPIPE INLET CHANNEL TOE PROTECTION Not to S.W) (Not to scale) 69.73' F SEECD IDLI7C3 1f`?'t1'. \ // ooa C F BA TION I I+ f / e Newrol \ N°wr.l �oAa n p� p I DS or' ,BEST TO P J �@p h o SEE DETAIL 7-6 qa o e / roun 37 D T.rxrGeote,nae GROUND 3 �� SLOFF pD$ j 'I LLI /�C. '�C Z'i I I / W/ I' RIP RAP +5 .00 \50 V• vn {� L uRAL EsS' a Nenimum o11N '•'\ GF : CRAV 4 COP ' TY +88.00 tk,00' d \ 73 PC I 9 A-OG �tn� A �I IBURY R Q� o / Q� Geeronge B OYP) GEOTExraE W'Op .91•b£2 `/ Vt I / /. I a Typetof L. CL'I'Ri,R.,-Keyed-In d=1.0 Ft. () INVERT 1.0' O Mtn. D=3.OFf 0S /2' Est 90 Tons,Esf 160 SY Geotexfile B=4.OFL T fLner= Closs 'B'Ri \ +73.00 \ .. 3.6LOZ.Fb S �jC aC TOEOTCTION a TOE PROTECTION H 80.00' Est 90 CY DDE Type ° IrRop 114.00' + 4. Wp / �t '� / FILL�5LOPFONZL4j �` / OQ .(FILL SLOPE ONLY) I / STA. 55+60 -L- LT FROM STA. 20+00 TO STA. 20+95-SRYIDY3C- LT \, KERN COMPANY, INC. �F A +, 66.00', .00' DO WpI / " I _CL 'B�RIP RAP . I� I CL 'e' RIP RA J` . f 5 PC SlG. 22+9420 FROM STA. 18+35 TO STA. 19+22-Y1RPD- LT 1DErAIL�C14� o� SEE DETAIL 7-1 7 DB 1240 PG 828 e1 W ELB S : / GRAdE TO DRAIN I ° I I - - \ CL B' RIP RAP 90.00' � ga �x JDETAIL 7-11 DETAIL 7-12 SYQ. 23+6929 Q SPECIAL BASE DITCH SPEC( / T E PROTECT ON 1 Nam SE DITCH GRADING 02 � GREU\ � O I x � �(,AL ITL-3)m I GI '� \I 4 {�'y O rn 3.00' I - �CFj I EST 10 TONS + .00 2 I Nm.r.I From � � EST 25 SY GF 4 .00 / kA� 15 RCP -IV DETAIL 7-1 DETAIL 7-2 p A 6s.o ` +a992 a' \ �1C �� I P E 72 p r\°"° s°liPhe �sPV ate JFybe`� ` sP SPECIAL BASE DITCH SPECIAL BASE DITCH 117 0 - - 00. 1 d' O q _ 2GI Q Q L B,� Min D- F • �/•4 t3 ,sue $ E DETAIL 7 10�' I Notro Smle) INotro &ale) s8.00, qAx RABZ- StG. 0t00.00 - P \ �C t�• /• \� / I� 2 (� -15 "SEE CROSS SECTIONS Min. D=1.0 F. G +45.00 WOOD( -�+97.00 B-3 R.II�, - - 50' .� 30" RCP II / �C I I s \ 50.00' & 8 0'�60.00', 72.00' A 2 II .. .. FROM STA. 36+00 TO STA. 37+00 -L- MED °Frenf 0. 9p' � R +7 ,$�C FS, SEE TNT �SaHEE I .. � � \ � 123.00' FROM STA. 36+00 TO STA. 42+50 -L- RT FROM STA. 58+50 TO STA. 62+00 -L- MED krounn� 2D-4 FAIL/V ID P° DsioPe,;,,A��-\m I I AFROM STA. 59+50 TO STA. 60+00 -L- LT U U 1.I \ I I I P� -I 7B°xi. f - II I A 6o nn' SPEC 'V' DITCH / ..0 \ . ._ _ . L 'B RIP RAP Min. D=1.5 Ft. Min. D=1.5 FL T TONS B=4.0 Ft. B=2 Ft. FROM STA. 36+00 TO STA. 47+35 -L- LT FROM STA. 55+72 TO STA. 59+50 -L- LT FROM STA. 49+85 TO STA 55+68 -L- LT FROM STA. 19+50 TO STA. 22+85 -Y1 RPA- RT FROM STA. 22+85 TO STA. 23+40-Y1RPA- RT FROM STA. 23+00 TO STA. 25+70 -Y7- RT FROM STA. 13+80 TO STA. 14+38 -YI LPD- RT DETAIL 7-3 DETAIL 7-4 SPECIAL 'V' DITCH STANDARD BASE DITCH 1 Naf ro Swlv) (Net fe Scale) From Ditch N oVrpl Npturol N I p'� °� SI.Pe r n '5' roun WOODS Ground J.7 D p\°�01 D Min. D=1.5 R. Min. D B=3.0 Ft. FROM STA. 41+30 TO STA. 45+30 -SRYIC- LT FROM STA. 51+55 TO STA. 55+30 -L- RT FROM STA. a5+00 TO STA. 50+00 -SRYIC- LT FROM STA. 13+20 TO STA. 1 - LT-Y1LPD- RT FROM STA. 500 00 TO STA. +50 - -SRYIC- LT 15+50-SRYIDY3C- LT FROM STA. 14+00 TO STA. 15+50-SRYIDY3C- LT FROM STA. 14+0 TO STA. 1a+0 -SRYIDY3C- RT FROM STA. 1 6 + 50 TO STA. 17+0-SRYIDY3C- LT FROM STA. 17+TO STA. 18+85-SRYIDY3C- LT FROM STA. 18+85 TO STA. 19+50 50-RYIDY3C- LT FROM STA. 26+5050 TO STA. 28+70-SRYIDY3G- LT DETAIL 7-5 PIPE OUTLET CHANNEL STABILIZATION I_ ro xnld No urol BNd .F 1 E-L. Ground , `-GrY°'uLnd 15, , / `Tuck Geofedile ° Minimum °f lA Gwtenila' Chpan (Bed d IV ri.ble) 'Flaw Ge.tenile U Under Riprop Len9fh=34 R. in L°c.ti°ns Directed by Engineer Est. 55 Tons of C111'I' Rip -Rap, KeyedA, Es:100 5Y Geotextile, Est.17 CY DOE DETAIL 7-6 PIPE INLET BANK STABILIZATION ( Not to Scale) epe eV`f'-Tr°un� Tuck Geote.Me Key ..IB into mMinimum �d- .1ft Ch�nnel Bottom N 1 (< 1 Race GeoLe ti Under CHANN BED Riprop in Locptions E IVeriablel Directed by Engineer d-'. 20 Ft. ID111D to be Imtelled to 2h Dutside Top d =1.5 - 3.0 R. d ' ' Est.-20 Tone of Clp ", Rip Rap, keyE&I.,l Est. 35 SY Geotextile STA.18+90-Y1RPD- RT STA. 20+50-SRYIDY3C- RT STA. 21+50-SRYIDY3C- LT DETAIL 7-7 DETAIL 7-8 PIPE OUTLET BANK STABILIZATION CULVERT OUTLET CHANNEL I Not. Sc 1.) INm fo Scale) mr] G°r.r.l N' 1 d. esstt ro„nd 3,7 D .\ a br T.rk Geofenile Key Riprop imo Minimum d1N Touch Geofexfiof Chonnel BOHom Popm Geofemile Under Groroiile B ini f1A (TYp) CH ELBED Riprop 'n Locations Len91h= 20 F, m% (von°blel Diremed by Engineer Min. D=2.SFf Len h=25 R. •z Rop ro b. m 11.d m xho Type of Liner=CL T Rip -Rap - Keyedan 9f mdd. Top d=2.5R. d=1.5 Ff. orD� pope: on ludsdidi.nol srnom: Est 39 Tons, Est fiB SY Geokxtile EsL=27 Tons of Clov'I' Rip R. , keyed -In, Ed. 50 SY G.-ile Esf 21 CY DOE STA. 19+25-Y1RPD- LT STA. 56+00 -L- RT \ SPEC 'V' DITCH SEE DETAIL 7-3 WOODS . // J.,y4 = - G. i 73 5" RCP 15" 3 CB R / CL'B'RIP P EST 1 N W/2 ELBOWS --- CB EST 5 SY F WO m q• j 73 S n 02 -72.00 2.67' & 36.00' J o.00 w 5 StQ. V .0, 00' oz o RJIy m . 2 F P MATCHLINE -Y1- STA 36+00 (SHEET 32) F ��19-4- : gel ' � : � , � r,••l') d �`�� (�.� 'e 1�J4� 1w1`' FAR 1 / r w� � I • I f/ SPEC 'V' DITCH SEE DETAIL 7-3 I / (/ DAYLIGHT DITCH / TOE PROTECTION / (FILL SLOPE ONLY) CL ETAIP RAP SEE DETAIL 7-14 E1�Lt'vu� -°w- ` � 123.885 DITC \ AYLIGHT DITC SPEC 'V' DITCH SEE DETAIL 7-3 SEE DETAIL 7-3 c 6 \ q .--.Do x 50.00'00' 80.0 , �o k & 90.00, C / +a (o 8 80.00, & EST TO •RAP 111`1 00 JF, 10 SY Q .00119.00' 50.00, & 80.00, O / z0 / +49.00 J� 119.00, Q + 00 / Q 80.00', 100.00' 80.00', 100.00' PT Sto.16+25J6 ,',,-IL WEST RAP EST 8 TONS EST 21 SY GF + 2. 50.00' & 75.00' +62.00 r0.00' & 75.00' TOE PROTECTION -(FILL SLOPE ONLY) CL 'B' RIP RAP SEE DETAIL 7-14 T 7 Y GF DETAIL 7-13 DETAIL 7-14 _BURY SPECIAL 'V' DITCH TOE PROTECTION IN WETLAND AREAS INVERT 1.0" IN—. S&.) I 1 Notro Smle Fronf Ditch °f dove Gro.n D F\off°c =Il Arc°� L STABILIZATION, Min. D=0.5 Ft. d 21P RAP d=1.0 Ft. Geotextile IL 7-5 FROM STA. 17+50 TO STA. 18+35 -Y1 RPD- LT FROM STA. 20+00 TO STA. 24+50-Y1RPD- RT Type °f Liner= CL'W Rip -Rap DETAIL 7-15 FROM STA.19+00 TO STA.20+90-Y1LPD- STANDARD BASE DITCH FROM STA. 14+50 TO STA. 16+15 -SRYI DY3C- RT (Not t° stele) FROM STA. 15+50 TO STA. 16+50-$RYIDY3C- LT FROM STA. 20+95 TO STA. 21+75 -SRYIDY3C- LT NrpotVrol Npourpl Min. D=1.0 Ft. STA. 49+60 -L- RT PAVEMENT REMOVAL 0 -Yl- DETAIL 7-16 26 STATELY SPECIAL BASE DITCH PINES RD. 1 Nof fo 5w1e1 N f rl \of Front Groun 3' Ditch 0 21 ��5 D F\°t $lope B Min. D=1.5 R. B=2.0 Ff. 315 310 FROM STA. 13 150 TO STA. 14+65-Y1RPA- RT 418 387 -L- -L- US 70 `\ / US 70 3 3823 -Y1- 11 STATELY 61 PINES RD. EST. 2019 /2045 TRAFFIC VOLUMES LOCATION: -Yl- (STATELY PINES ROAD)/ -L- TIP NO.: COUNTY: R-5777C CRAVEN GRAPHIC SCALE DESIGNED BY: DATE: 10 �5 0 50 too BB 3131123 go CHECKED BY: A^A DATE: 3�3/I23 PLANS 1 Submittal February 6, 2024 C t Q I n I LD DETAIL 8-1 DETAIL 8-2 DETAIL 8-3 DETAIL 8-4 DETAIL 8-5 DETAIL 8-6 PROJECT REFERENCE NO. SHEET NO. SPECIAL BASE DITCH SPECIAL V DITCH (Not to Scale ) Not to Scale) CULVERT INLET BANK STABILIZATION ( Not to Scale) CULVERT OUTLET CHANNEL (Not to Scale) CULVERT INLET/CUTLET BANK STABILIZATION SPECIAL DITCH GRADING ( Not to Scale) Not to Scale) R -5777C 8 ROADWAY DESIGN HYDRAULICS Front t Ditch Natural z l -,Natural rounT N iY round Natural N Natural n� Natural FkisT gP�t \ -' mound -y ENGINEER ENGINEER Natural o< Front 1 o �•1 t Natural *� yet Slope Ground o'.y D ot�e Ditch Ground 3• \o� F\ Sloe % e' km - Ground d \ Ground :y D 3' Tuck Geotextile Key �c s d* �o qNk e�`SS Tuck Geotextile \� Ri ra into a Minimum of lfr gp qR/q D\P� SP Riprap O P D Tuck Geotextile* �� a Minimum of lfr Key Riprap into Geotextile Y a Minimum of lft Channel B Bottom (TYP) �F JP (P PRELIMINARYPLANS Y I JL l� B Min. D=1.5 Ft. Min. D=1.5 Ft. 3:1 BEHIND B-2 Ft. GUARDRAIL ChannelBottomT (YP) (Np) CHANNEL BED Length 47 Ft. B (TYP) (TYP) Each Place Geotextile Under CHANNEL BED Ri ra in Locations Riprap SEE CROSS SECTIONS Min. D=1.0 Ft. �/ DO NOT USE FOR CONSTRUCTION FROM STA. 63 + 45 TO STA. 66 + 00 -L- LT (Variable) Length=41 Ft. ( Est. 60 Tons of Class 'I' Ri -Ra Keyed -in Rip -Rap, y g Type of Liner=CL 'I' Rip Site (Variable) Min. D=2.5Ft. ) Directed by Engineer -Rap - Keyed -In Length=30 Ft. *Rip -Rap to be Installed to 2ft0utside To d = 2.5Ft. p FROM STA. 66 + 00 TO STA. 69 + 00 -L- LT FROM STA. 63 + 50 TO STA. 77 + 00 -L- RT FROM STA. 28 + 70 TO STA. 29 + 05 -SRYI DY3C- LT to Top of Bank, Est. 24 CY DDE *Place Geotextile Under Riprap Est. 105 SY Geotextile in Locations Directed by Engineer Est 50 Tons, Est 85 S Est 170 CY DDE Geotextile d = 2.0 B=4.OFt. Est.=30 - 3.0 Ft. of Ditch Slopes on Jurisdictional Streams Tons of Class 'I' Rip Rap, keyed -In, Est. 68 SY Geotextile FROM STA. 70+50 TO STA. 77+00 -L- LT FROM STA. 29+00 TO STA. 42 +50 -SRYIA- LT FROM STA. 29+10 TO STA. 31 +50-SRYIDY3C- LT �% FROM STA. 30 + 50 TO STA. 31 + 60 -SRYI DY3 C- RT STA. 13 + 30 -YI RPA- RT STA. 1 + 78 -Y1 RPD- LT STA. 29 + 10 -SRYI DY3C- LT C) % FROM STA. 32+10 TO STA. -SRYIDY3C- LT � O STA. -SRYIDY3C- RT FROM STA. 34 + 60 TO STA. 40 + 50 -SRYI DY3C- LT FROM STA. 41 + 50 TO STA. 42 + 70 -SRY1 DY3C- LT FROM STA. 10 + 75 TO STA. 12 + 00 -DR2- LT FROM STA. 10 + 75 TO STA. 12 + 00 -DR2- RT 16 SPEC 2' BASE DITCH Ralfour Beatty O C �#1 StN � \ SEE DETAIL 8-1 ECJ TARHEEL INVESTMENTS, INC. DB 2963 PG 224 PC H PG 96F DOCUMENT NOT CONSIDERED FINAL +75.00 SPEC 2' BASE DITCH SEE DETAIL 8-1 UNLESS ALL SIGNATURES COMPLETED 7 +28.68 65.00' PT Sto. 34+74.89 Co W E E _ + 42.52 + 74.89 'V' DITCH - _ _ 75.06' E 60.00' CL 'B' RIP P +93.00 69.00' CL B RIP RAP SEE D -2 - ST 7 S GF E EST 2 TONS E E E E 0 1► CL 'B' RIP RAP - - - - - C EST 7 SGF Q� EST 2 TONS - - - - - - - - --- --- -- -- --- -- C LLJ co SY GF _ - POT Sta, + _ = 0813 -- LLJ BANK STABILIZATIO -L- POT StO, 66+6/.04.47.00' LT 'I' 2/' v 0815 0_ ' Q W/CL RIP RAP /QN/ SEE DETAIL 8-3 TS Sf' , „ A =04`00 OO -INC, C DITCH GRADING zt SEE ETAIL 8-6 Ln �n ° m° 9Q 75 m 47 WW FENCE -YIRPA- +46.16 36` O - A- -F � 6 WOODS 42.00, N° r\ 809 < �t M o 0 N O 0 0 0 0 N 0 N � o z + I � � W � PROP. GUIDERAIL� �v� " +20.08 + 33.06 Ri + 86.24 N � N �� GREU TL-3 ' �' . SBG ( )� � +46.19 < -EL-292+01.94 77.00 129.99' w pg1 47" WW FENCE � 77.00' W < < Ilslx3 < < < < > > 2GI 081 g > ~ C� N -YIRPA- +70 o S 57` 15' 08.52" E 081 = 2GI SOOOM 2GI-D (/� SPEC 2 BASE DI .00 O N cn �' a SPEC DITCH GRADING SPEC DITCH GRAD N O O N +/7.4 70 SPEC DITCH GRADING +33.06 z O+ .. N U_S �� EEC E I b SEE DETA 8 ♦� N c� N Dn Z O - -M- ¢ - M - - - - - - - - - - - M� - - - -. M - -SEE - M - - - - - - - - - - - - - - - - - - - - J M (0 FS� � DETAIL --0ji-- ------ -�dl-- CGAU C --o �� - 0811 -oil- --0di-- - - " - - �� 1 - -°1 --0�1- FRAIL 80 �' LLI 3N' 2GI-D 2D-4 DETAIL 12 16:1 U Q LLJ d 1 1 anb'X7' RCBC - - �d nl- - - --0MI nl- - W/1FT SILLS d n - - 4'PAVED SHOULDER �d 0 nl- - 2G1 0 10 2GI -L- o _ - �J Al- - nl- - �J nl- - V Q LLJ � � Q '_^ �/) N ~ N u11 US HWY 70 EBL 24' PAVED ROADWAY N N Q J J N �� �i�� REMOVE f 300' TAPER N GR 8I 'O o 0 0 4' PAVED SHOULDER N �1 NMO N gb`8Z-d01 E v ��;� ol� TyP° f54.56 _ 4' PAVED SHOULDER StG� 0 0 = +27 +04.90 _L- POTD-t�TS 00 US HWY 70 WBL 24' PAVED ROADWAY ,W W - M N H I MMI`)NO3 \° MM 3 03 ,b- �- 4' PAVED SHOULDER - C -- - M- - - - - - - - - -M- - =z - = 1i� - - - - - - 1 - - M- - - - -�--- -- M--- -- - - M 0 m - - �� - - - -Od nl- - - - - - - - - - - - ---- _-- - - - �- - - - -M- - - - - - - - - - - - - - - - - - -Od Ai GRADE to DRAIN - - - - - - -d- - - - - - - - - - - - - -- - - - - -- - - - - - - - - - - -Od Ai - - - - - - - - -d- - - - - - - - - - - - - - - -Od nl- - - - - - - - - - - -Od Alnl- - - - - - - - - - - - - - d - - - - - - - - - - - - GRADE t0 �f�ATN - - -Od nl- - - - - - - - - - - - - -_ -_ -_-_- - -d- - + - M - - - - - - - - - - - - - - - - - r - - - - - - - - - - - - - - - - - - - - M - - - - - - - - - - - ,`C - - - PEC -2 BASF °bnTCFT - - - - - - - - - - M - - - - - - - - - - - M - - - - - - - - - - - M - - - - - N -_ - =------------------ - --FRI -- ---- ------------- ------- ----------- Q - -- -\ � --o�nl------- A2iV - -- ��-- - --1- _- =L ---- -S ------ - - - -- --� -SSd- - S3- ------ -- -ssd- / �` end ,9 i1 -ssd- - ----------- - - -od nl- -SSd- - -�------- -SSA- - -- -od nl- - - - -SSd- - - - -- - -- ssd-- - - - - -- ---- - - - - - - - - -- - -ssd- - - - - - - - - - -ssd- - t - - - - - - - - - - - - - - - - -od Ai - - - - - - - - - - - - -od Ai- - - - - - - - - -od ni- - -- - - - - - - 05 EIP 0.87' EIP TO /W i I I I A EIP 0.61' EIP TO R/W bmib A m /CL RIP P (BANKS ONLY) WOODS I WOODS SEE $ 8-4 III S Sto. 12 00. 0 415 ELEVATION = 3d. 30 WOODS I ON N 448612E 2610916 WOODS i l I� I o� l� A. I �15" o II �i BM 15 RR SPIKE I N BASE OFP I f °p 3 d 0\ 1 H N x Co 4 35.0" E WOODS DETAIL 8-7 DETAIL 8-8 DETAIL N � +59.3 x ; �� ,N 2 * �y N0� WOODS TOE PROTECTION TOE PROTECTION IN WETLAND AREAS SPECIAL BASE ( Not to Scale DITCH DITCH ) O w 177' I l �^7 I 0 7 1 7.�5 (Not to Scale) (Not to Scale) C. , +51. I � z. � D e� 0 KERN COMPANY INC. 160. ( 17 .3pj s� ,� N DB 1244 PG 925 =S -M- ®09 21 t� 3' NATURAL �� �� FILL <\o SLOPE of ape Natural GA�ea� '01�`\\S\ Ground 3.7 D \ o Front SPEC V DI lop SEE DETAIL 8- C w N Q{� C Sdw E O GROUND d WetlandNatural \o{iet �N �o2S y o Q I L- .00 GEOTEXTILE d �d Min. D } 1.5 Ft. C v C N 5 0.00, PI raolda KERN COMPANY, INC = 1.0 Ft. d = 1.0 Ft. Geotextile / C 1 �� c° o I BA K ST BILIZATION 1 3 � DB 1244 PG 925 Type of Liner= Class 'B' Rip -Rap Ra Yp p- P Type of Liner= CL 'B' Rip -Rap Ra FROM STA. 13+31 TO STA. 13+50-Y1RPA- RT YP P- p W/ L 'I' RIP RAP ROCK CHECK DAM EC 'V' DITCH SEE DETAIL8-5 SEE DETAIL SHEET 2D-4 SEE DETAIL 8-2 FROM STA. 35+20 TO STA. 36+00 -SRYIDY3C- RT FROM STA. 34+00 TO STA. 35+20-SRYIDY3C- RT O +62.4 2.00 I 1 I DETAIL 9 SPEC 'V' ITCH N / CC 8 00 , 8 CRAVEN COUNTY +23.0 +4 .00 SEE DE T L 8-2 DB PG 521 73.00, � SPEC V DITCH .00' 85•0 O I GG CL 'B' RIP RAP +79.97 I 5' PC +AP 210A-IOG +09.8 I 1 SEE DETAIL 8-2 SPEC V DITCH R GRADE TO DRAIN !� / � O PD E EST 2 TONS 62.39 0 /0' -v 62. 4' 62.30' E SEE DETAIL 8-2 +93.10 - `�'° ' V' EST 7 SY GF R Z6°6ZZ +12.00 50.00' �� -�61.00 50.0 + o o - -- 51 W 3..ZO'blwj S D R C C N as oo < 080 63977 \ �- ---_ --- 15 W/ < ° > -- - ---C --- < -- - - ,A,---- Y ` / � I Q ^ E > 2 ELBOWS 080 +9 . & RT) ° �� < < < f45.10 24 + 5.07 8.90' I` PROP GUA DRAIL GREU (TL-3) �Oo o 00 08 INC. / ° TYP. LU 0 N ; 1 � � � N 61 ° 15' 25.0" W �\ +75.00 +06.25 -SRYI DY3C � N o 0 0 AT II - - - - r N Cl) to 10 � 0 o O o 0 0 - - - - - - _ - ------ i +16.00 81.00',0 00.00' Um; Uj +75.00 � 80 2GI I� 80 2GI er (� _ U) 5" RC -IV 80 DAYLIGHT "' DITCH < __CL B RIP RAP - - - PROP GUARDRAIL / ' r F ��� a° 7'X7' RCBC - ° 80 EST 2 TONS 80 EST 7 SY GF - _ - - - - / +93.10 W pUE -0 QV c FOR -LLT - PROFILE SEE SHEETS 38 & 39 +lo. °o � BANK STABILIZATION / W 50.00 & ° CL 'B' RIP RAP U� 0.00`, °° � � / y 1 SEE DETAIL 8-5 ,a U +12.00 rr �^ FOR -LRT- PROFILE SEE SHEETS 38 & 39 80 00' EST U PUE U PUE PUE 5 SY GF_ P E' PUE PUE PU PUE PUE RUE p- PUE 80.00', 105.00' FOR -YIRPA- PROFILE SEE SHEET 62 m+74. - - E +70.5 -DR2 POT Sto. 12+30.00 r CL 'B' RIP RAP LEST TOE PROTECTION C C +31.00 FOR -YIRPD- PROFILE SEE SHEET 65 80.0 +1 .0 +b 00\ 80.05'-SRYIDY3C- POT Sta.31+79.30 F 8 TONS TOE PROTE TION CL 'B' RIP RAP PC Sta. 37+93.10 r" M 80.00', 105.05' FOR -DR2- PROFILE SEE SHEET 77 125.0 ', 90. 90 \ PEC 'V' DITCH=90�00'OO° 1 EST 21 SY GF (FILL SLOPE ONLY) SEE DETAIL 8-7 PAVEMENT FOR -SRYIA- PROFILE SEE SHEET 79 0.00 ` iS \ +45.00 EE DETAIL 8-2 I 119.00, ,�1 CL B RIP P +23.00 +42.00 REMOVAL FOR -SRYIDY3C- PROFILE SEE SHEET 85 00', 79. \ SEE DETAIL 8-8 81.00', 106.00' 81.00', 105.00, Submittal February 6, 2024 SPEC 2' BASE DITCH SEE DETAIL 9-1 DETAIL 9-1 SPECIAL BASE DITCH ( Not to Scale) Natural 10� Front Ground 3•� D \o�ket Ditch F Slope LB Min. D=1.5 Ft. B = 2 Ft. DETAIL 9-2 SPECIAL 'V' DITCH ( Not to Scale) Front of Ditch Natural N% het Slope Ground 37 D F\o Min. D=1.5 Ft. FROM STA 78 + 50 TO STA 81 + 00 -L- RT I FROM STA. 77 + 00 TO STA. 78 + 50 -L- RT FROM STA. 81 + 00 TO STA. 83 + 00 -L- RT FROM STA. 42+50 TO STA. 44+10 -SRYIA- LT FROM STA. 42+70 TO STA.43+57-SRYIDY3C- LT I j FROM STA. 44 + 50 TO STA. 48 + 44 -SRYIA- LT FROM STA. 43 + 57 TO STA. 46 + 00 -SRYI DY3 C- LT I FROM STA. 48+44 TO STA. 53+44 -SRYIA- LT FROM STA. 47+50 TO STA. 49+28-SRYIDY3C- RT FROM STA. 53 + 44 TO STA. 56 + 50 -SRYIA- LT FROM STA. 49 + 32 TO STA. 53 + 90 -SRYI DY3C- RT FROM STA. 54+20 TO STA. 57+00-SRYIDY3C- RT Ln FROM STA. 10 + 50 TO STA. 13 + 15 -Y1 D2- LT I I C1' FROM STA. 11 + 00 TO STA. 12 + 50 -Y1 D2- RT I I I I I I I I I I i O I 00 I I I I I I I I I I I I I I I I I I I PROP RAVEL + 75.00 I DRIV (TYP, 70.00' I I E g� \- L N r o I I o0 FS, SEE DETAIL SHEET I 090 2D-4 DETAIL 11 I R/W MON I EL128�734.52 47"WW FENCE W 2GI-D > 31V0 i I WOODS 2GI 1 u SPEC DITCH GRADING = 00 NLn I I V wL. l r(V- W W <°� - - - - - _ (�lDE-R�9Jl� - 31 S , 8 . z (%) 0 S SEt DETAIL SHEET r - �� nl- - -0-1 nl- - J 2D , DETAIL 12 �� �� 2GI C)V Q N d= N ' REMOVE QO Q- in - I Q GRASS SPEC 2' BASE DITCH SEE DETAIL 9-1 CL 'B' RIP RAP DETAIL 9-3 STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground Ground D Min. D=2.0 Ft. I• `" ►' B = 3.0 Ft. STA. 83 + 00 -L- RT OO DETAIL 9-4 PIPE OUTLET CHANNEL STABILIZATION 2ft ( Not to Scale) (TYP) Natural Bed Elevation Natural Natural Ground Ground Tuck Geotextile ?' a Minimum of lft (TYP) Geotextile* Channel Bed Variable *Place Geotextile Under Riprap Length=12 Ft. (Variable) in Locations Directed by Engineer Est. 15 Tons of Class 'I' Rip -Rap, Keyed -In Est. 30 SY Geotextile IS STA. 49 + 30 -SRYI DY3C- RT 16 ECJ TARHEEL INVESTMENTS, INC. DB 2963 PG 224 PC H PG 96F SPEC 2' BASE DITCH SEE DETAIL 9-1 EST 3 TONS +43.00 EST 10 SY GIF 79.00' 60 009 PC Sta. 48+93.09 E E E E E_ C 1441 90 90 T HW SPEC DITCH GRADING ( I w I1w r(t•�.► • • " M�A o EST 90 CY DDE - o off -DETAIL 9-3- G � S- j� 'lY�J QC SEE IL=9 -l- - -1- - +68.40 -1- - HW - ---M ---GRASS49.89' ----- ---- H II - - -o-A nl- - - - - - OJ nl- - - - - - - �f♦ - - - -dam- - -SSj- - - - - - d - - - - -SSd- - - - - - 1.1• - 0 jc�l- G] m I Ln SEE ETA 9-2 / WEE L£NON M/,A / / C (18M) OS ,OOZ / / 0 D (WBL / / / F +00.00 +46.00 '� 67.00' 34.00 U-) OODS N91 / a- +46.00 SOOO/ SPEC 'V' DITCH Ct- SEE DETAIL 9-2 CHANNEL STABILIZA ON KERN W/CL 'I' RIP P ,. INC. 1244 PG / / � A �N x 0 �;A CP 0 CVO 00 Cv 0 \ lr Qoz LQ V 1� +24.00 KERN COMPANY, INC. SEE DETAIL -4 / 77.00' DB 1244 PG 925 MB6PG42 +42.76 Mq TCHL EX RiW +33.00 NE INSET Q 82.00' PC Sta. 10+38.99 -- / o l BRG BK N 2. 34' 44.2" W EX AW o P Sta. 12+19.13 +25.00 f30 47.00 0 / +36.00 'B' RIP RAP S EX RNV ST 3 TONS �/ / \~ SPEC LAT 'V' DITC / ST 10 SY GF DETAIL 9-2 l / -Y1 D2 - POT Sta.10 +00.00 = 3. / 00 / 61 0�7.8 E 77*1244 / a=90.19'54" 02 07 TIE TO EXTG DITCH POT Sta. 13 +15.01 SPEC 'V' DITCH SEE DETAIL 9-2 0 / ww LCo +15.01 EX RAN 0 ElV D CONSTRUCTION 0 FYI D2 - STA. /3 +/500/ DETAIL 9-5 SPECIAL DITCH GRADING ( Not to Scale) I I Spy *�gRrge�F SP 14 *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 83 + 00 TO STA. 85 + 50 -L- RT FROM STA. 80 + 00 TO STA. 91 + 00 -L- LT D ETAI L 9-6 SPECIAL DITCH GRADING ( Not to Scale) j D I _ SP � *��R/qe�F P�\P�'��* SP *SEE CROSS SECTIONS g Min. D=1.0 Ft. 1•=�I 6= *Variable FROM STA. 85 + 50 TO STA. 91 + 00 -L- R DITCH BERM TO EL 26.8 CL 'B' RIP RAP SEE SHEET 2D-1, DETAIL 13 EST 2 TONS EST 7 SY GF PROJECT REFERENCE NO. SHEET NO. R -5777C 9 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS ti DO NOT USE FOR CONSTRUCTION 7 CP A-3- 0 Rialf oup RealtyStN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 60.00' FCC Sta. 53+50.94 E- --- E E --- - E R E E 091 v WOO EXISTING R/W 2GI • to] Wei AM 1112 1� IIVi 11�1-11-�����-�: c� i • 'flora- 2GI Q� US HWY 70 EBL 24' PAVED 4' PAVED SHOULDER CL 'B' RIP RAP EST 2 TONS EST 7 SY GF O 73.00' LO E - E � - -E --- -- L0 O R �w 1 W r o o� co CL �t wp0� - j nl- .°�., O r W 1 CO ,�8°9Z=d01 Cl 'I, RIP RAP co 40' INC, 1 GRASS SPEC_ DITCH GRADING 4' SST 3-TONS- - PEC-DIICH GRADI G SEE -"DETAIL 9-6 1 °° SST 30 SY GIF SEE DETAIL 9 5 C' 4' p�VFn SHnFa 1(S HWY 70 W8L 24' PAVED ROADWAY -1- - - -1- - -1- - - -1- - - - - - -1-1- 1 0918 24 PV - -l- - END � O O �- --o�nl---------_1 ___ _ __ L() -1� O r - s - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ - - _ - - _ - - - - - - - - - - - - - - - + 1156 18' PAVED ROADWAY-SRYIDY3C- u ~ o REMOVE R SPIKE REMOVE REMOVE REMOVE W TW _ -0J nl- - - -OD Alr�- - - -0� nl M - -oJ Al- - - - - - - -oJ Ai- - - 3 dOb .SI- - - - - - - _ _ - �+ dl dl $rr < Jo J EXISTING R/W d13 �T3- X - Vd 1 vJ U) < o Noal 2 dl3 ---- o0 92 blA9 C �` 1 �izI cnI - I I l o M/8 O1 I )I d13 Ol 5 �i �1W fool I �I dl3 ,Lb° 92 1 N +91133 i i - DUE I I DUE U OUE DUE U , I UE l m DUE UE +75.00 ► I < 1 61.00' 1 I 1 1 ,�, SEE pETAIL 9-2 I I 1 F Sta. 49+58.19 d0% ,SI *� +67.00 w I ; ; I M X X WOODS 1 1 73.00' I I I N oN I I I I I 1 I 1 3 I I I I 03S1 v I 11 r I I I I I I N N IdONVO Il �J1H / ill WOODS 11 OdSI II z �1W r n 0 i 1 I I SPEC 'V' D CH 1 1 l X I I 0�� 1 i I SEE DET 9- � 11 ��-- O j I � PROP GRAV w 1 3SnoH 1 i I I DRIVE (TYP. I �� _ `�' 1 i ~s n I dN-1 9 r' o w 1 i X 31d J S I i w j 11 / w �✓ Q o 0 0 mo rn 6, �° a N NM zN 19 19 23 �Ln 6v M z N N X 2i1H N ROY M. rn z ROY M. Z ROY M. EBORN, z EBORN, EBORN, ET UX 15 ET UX ET UX 21 PG 238 25 1 7 DB 3332 DB 3408 O O ERNEST P. PC C PG 217 O PG 558 PG 505 DOUTHIT, ET UX PC A PG 3B �b°8S DB 1304 PG 1065 w MONTY A. CRAVEN COUNTY RICHARD D. zl°LS DB 1304 PG 1064 ZD DB 3109 PG 521 HARDISON, ET UX 3 „L�,SS,b9 s 3 .Lass°b9 S PC C PG 217 �' CAMPBELL, ET UX PC I PG IOA-IOG DB 2078 PG 339 bl°Z� J� PC A PG 3B DB 3134 PG 747 3 „£S,IZ.LZ N' ZI°III „IZ,-, 99 S 3 „IZ,Lb.09 S 00°bl 3 „IZ,Lb.09 S 414 ELEVATION = 30.09 N 449580 E 2609142 BL STATION 277+90.00 37 LEFT BM14 FILED "X" IN BONNET BOLT OF FIRE HYDRANT 3 .zS1917.09 S PAVEMENT REMOVAL FOR -LLT - PROFILE SEE SHEETS 39 & 40 FOR -LRT - PROFILE SEE SHEETS 39 & 40 FOR -SRYIA- PROFILE SEE SHEETS 79 & 80 FOR -SRYIDY3C- PROFILE SEE SHEETS 85 & 86 FOR -YI D2 - PROFILE SEE SHEET 89 Submittal February 6, 2024 C CD Q T L n- 1-1 U) DETAIL 10-1 RIP RAP AT EMBANKMENT ( Not to Scale) Ditch 10'min. Grade 1.0'min. f 1.5' Place Geotextile Under Riprap in Locations Key Riprap into Directed by Engineer Channel Bottom(Typ) Type of Liner= CL 'I' Rip -Rap, Keyed -In STA_ 60 + 05 -SRYIA- LT STA. 60+15 -SRYIA- LT DETAIL 10-2 SPECIAL BASE DITCH ( Not to Scale) Natural \ Ot Front Ground J. �' ;et Ditch y D F\d� Slope �� II Min. D=1.5 Ft. B = 2 Ft. FROM STA. 56+50 TO STA. 60+03 -SRYIA- LT FROM STA. 60+13 TO STA. 61 +24 -SRYIA- LT FROM STA. 69 + 65 TO STA. 70 + 50 -SRYIA- LT FROM STA. 63+30 TO STA. 69+75-SRYIDY3C- RT ECJ TARHEEL INVESTMENTS, INC. DB 2963 PG 224 PC H PG 96F RIP RAP AT EMBANKMENT EST 42 TONS, EST 60 SY GF 16 SEE DETAIL 10-1 IP RAP EST 2 TONS EST 7 SY GF E W CE _ --- Q U) ; r � �o �� (� +/� ,Q0 _ Li J V �n o N O SPEC 2' SEE DETAIL 10-2 + 55.00 77.00' E E DO NOTO SPEC DITCH GRADING BURY INVERZrF AL SEE DETI10-4 %\ WOODS m O s \ m N m co Q o, • r- N Pt<�� Z PEC LAT 2' B Ey 2GI WW FENCE Dnd_zl N RETAIN BEGIN CONSTRUCTION -Y2- STA. 10+00.00 "18 m m UNI ED STATES OF AMERICA (CRO TAN NATIONAL FOREST) DB 336 PG 61 POT Sta. 10+00.00 '` 5°/5 = to 35�0 REMOVE �1 I'i . 0� - �r _ I • Q U p Q Q� / If Q / / / 206°OS 1:1:1 / N 49'00'55" . 0 Se 0 °Os OD S / q / z b ON00 0 Cb8l 'Q a �' + 00 00 3�S b8 \ EX RIW, 40.00'��-'I. 102 / PT l - ► - N 5241 .3" E +43.0 5.00' / I / SPEC!'V' TCH + / C -Y2- SEE PETA 10-3 / +98.686/5 1 / 41.49' 1023 +36.00t W F 55.00' �� N �C E (510 R/W Pq ?,vWwglril Will I 10" ImmimD +/ Ma- Ln (10 190.85' ddDM/dl3 N 49°00'55" W 1 IJ -18 aNno�o _ � 1 w _ III \ oo O N 9 d��°n I O I 20 J cn o CROATAN PRESBYTERIAN CHURCH w o DB 781 PG 274 `° 7' DB 873 PG 342 DB 1190 PG 851 &4. 0 2.0 55.00' GRASS PARKING -+ AREA 00', 42.00' R/W MON SPEC 'V' DITCH-EL-261+40.29 SEE DETAIL 10-3 130.38' + 20.00 E 41.00' oS -7 - -1- - - - 18 UNITED STATES OF AMERICA (CROATAN NATIONAL FOREST) DB 336 PG 61 -PROP ASPHALT DRIVE (TYP.) +47.00 SPEC 'V' DITCH 53.00' SEE DETAIL 10-3 E EEXISE / R/W / +43.97 1. EXn: -1 'PQ` PROJECT REFERENCE NO. SHEET NO. R -5777C 10 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Balfour Beatty StN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PC Sta. 68+36.39 PT Sta.70+09.34 SPEC 2' BASE DITCH SEE DETAIL 10-2 + 72.00 WOODS 63.00' - E E > 0 2C HW l/VC° C t� -1 - TYP° * L L� 0 0 0 MH ON Q)LU W -M- - 40TZB- cc 47" WW FENCE 1018 24„ Z ,. -==�- , Al- -- - - -03 I 1 Ol O US 4' PAVED J HWY 2f1� 15" - - -d nl- B�E�A� V Q W W -� REMOVE_ - - GRASS 2G1 - - �� � I -- s9°s7=dot - - _ - _ --O-UI=RA/L - _ _ _ �-Ft6WABLF FIIL �- 70 ���WABLE-F�L� a US %� �- Q(n N o �� - - - DITCH GRADING o 4 PAVED SHOULDER i � _�� 1 Cr^ 1IITr^L J 19=d0 --�Pzc�sri�n - - N �D 10 QL C DITCH GRADING- -S iE DE fAl L 10-4 - - - - - - _0-- �An1---/ GIR FENCE A - _ -�FEfv10VE� 30.0 - -2R� °�� SR 56 1818 PA = l ci _ -MOVE REjv1OVE -- -nl ---03� EXISTING R/W 1LU`--- _ C M - _ _ -_ -� - EXISTING R/W „ dl3 '^ - - - NO 11 � >► V, S \\Tv\ SPE \ 11 r 18' u I►� o `.__---- /ET X buE v%Q 4 E '} o C ► I DV -T u EGR11 �`\ FCC Sta. 63+27 L� °8 I � S - z I I +47.00 I o i O \\ m ICD (%� Lsi lJE w I I Q +6 O N I ZI SPEC V DIT Q D I I aMSP� H I j o 3�Od 0�� 7'1 ,'- IoI N SEE DETAIL w � 1 aM RETAIN ,o � �o M \d1Ho ajSl \� \N N \ \\ w I 1 00 Q 11 a I w dONd j\ \\ w 1 Z Z \\ \\ N o w ` to. +48°36 , iw 111 ', w 01�� \ \ \ Z f) N N T `n I 1 > II N00 Z W00 ZD II ~ Q \ KENNETH WENDALL o\ 1 mo 01 m W s\\ DB CONNOR, E UX Lj o \ 53 m Z W c PC B PG 343 a \\ \ b6°951 X Z \ � N w \ v w \\ 3 II,SS°IS S t- n 2g r 31 KAREN D. CAMPBELL Q W cO cr 0 � O � DB 2555 PG 75 \\ r J° BENJAMI w PC I PG 19D ao N z1M LEE �' DURWOOD p ��,�.65 w w PC G PG 107E Cmrn EBORN ? RAY 6 w N mo DB 3556 M EBORN, MONTY A. CAMPBELL, ET UX w o 33 35 PGPC59 a ET UX DB 2677 PG 673LO 0 b KENNETH W. CONN DB 1910 PG 894 PC I PG 136D 90 PG 129H a N ? z1a DB 2936 PG PC B PG 34" DETAIL 10-3 SPECIAL 'V' DITCH ( Not to Scale) Front Ot Ditch Natural fk'1 et Slope Ground �' y F\O D Min. D=1.5 Ft. DETAIL 10-4 SPECIAL DITCH GRADING ( Not to Scale) CL I sP� qg�F J ptz *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 10 + 00 TO STA. 11 + 38 -Y2- LT FROM STA. 91 + 00 TO STA. 99 + 00 -L- RT FROM STA. 62 + 00 TO STA. 65 + 30 -SRYIA- LT FROM STA. 91 + 00 TO STA. 94 + 00 -L- LT FROM STA. 66 + 30 TO STA. 69 + 65 -SRYIA- LT FROM STA. 95 + 50 TO STA. 105 + 00 -L- LT FROM STA. 57 + 00 TO STA. 60 + 00 -SRYI DY3C- RT FROM STA. 103 + 90 TO STA. 105 + 00 -L- RT FROM STA. 61 + 90 TO STA. 63 + 30 -SRYI DY3C- RT -1- - L/You �ER -d01 REMOVE i 2 7 • - - -1 - o US yWY _ a 30.010,2 G I 2 _4 ETAI L 11 -1 - - -1- _ �E�OULDER ��� ROADWAY F --o� n1-�SEE`DfT�4+� _ REMOV�Va dda REMOVE +00.92 2GI-A 1019 1 - pia 30.00' =03 nr== C c 3 - - 10 41' R/ -o� nr -_ _--NMON�NII�- TW TW Sj- y� - -_ - - V V I _ 1 __ -off = 1 (Y) C:) t- . w +98.0 , Soloo +29.o DUE DUE 1014 - -� _ �- �. �- 4UU,' , , DUE +02.80 N ` I ESf ITONS 59 OO�1H 0, DUE DVE Ex ww 9 ► a a dl3 0 W PST 110 I AdONVO ' � I DN D I X 67.00' �1W o? rn CL 'B' RIP RAP +96.95 II \ o X EST 2 TONS m 11 SPEC' B gE ITCH E EST 7 SY GF / N \ D T I 10-2 X FALLOW �--� N I \�� XIANIA +27.00 E WQ I? Il m I w I z 67.97' & + 71.00 ^' \j 119.00' 124.00' / d I m o /� 3 Q° I m I = WOODS n� I m O ,r �n I O OUTLET CHANNEL STABILIZATION = �, o N 39 ' / �� I MATTHEW N N m 0') W/CL I RIP RAP v I m �a I n SEE DETAIL 10-5 ° ti z m I -(I. TYLER .,, mo �o "' POTTER 31 AMOS 2W O° � 0 CONNOR NIV ` n' 0-) Lu DB 3089 P 773 m PC I PG 5 ET UX �' 41 0 DB 1445 PG 846 o m PC I PG 76E o m PEC 3' B SE DITCH X_ ZO°OZI 41 " SEE D TAIL 10-6 .3„ ' 3 3,87,61°Lb S M 3nasia ,Ln 0-1 z 41 LAURA C. 4kMOS W. CONNOR IV ET UX o I BA3520 LAURA C. AMOIV, ET UX t, ET UX - LAURA C° MALINA MALINA 16 \ PC 3 PG 76E 427 115 c = PB 3PG7 PG 76E 119 PC IPG2176E 77 DPG3497 W PC 3PG7 76E 115 PC I PG 76E DETAIL 10-5 PIPE OUTLET CHANNEL STABILIZATION 2ft ( Not to Scale) (TYP) Natural Bed Elevation atural Natural Ground Ground Tuck Geotextile ?' a Minimum of lft (Ty Geotextile* Chan len Bed 'Place Geotextile Under Riprap Length=20 Ft. (Variable) in Locations Directed by Engineer Est. 35 Tons of Class 'I' Rip -Rap, Keyed -In Est.63 SY Geotextile STA. 69 + 80 -SRYI DY3C- RT DETAIL 10-6 SPECIAL BASE DITCH ( Not to Scale) Natural \ Ot Front Ground �. Q'' ;et Ditch % D F\O't Slope Min. D=2.0 Ft. B = 3.0 Ft. FROM STA. 70 + 30 TO STA. 71 + 00 -SRYI DY3C- RT DETAIL 10-7 SPECIAL DITCH GRADING ( Not to Scale) j D I _ SPA *�qR/,qe �\PsP *SEE CROSS SECTIONS g I Min. D=1.0 Ft. 1�=►I B= *Variable :ROM STA. 91 + 00 TO STA. 91 + 50 -L- RT �3 3 7 r_- 9S S PAVEMENT REMOVAL FOR -LLT - PROFILE SEE SHEETS 40 & 41 FOR -LRT- PROFILE SEE SHEETS 40 & 4/ FOR -Y2- PROFILE SEE SHEET 65 FOR -SRYI A- PROFILE SEE SHEET 80 FOR -SRYI DY3C - PROFILE SEE SHEET 86 Submittal February 6, 2024 C- CY t Q T L S Cn 69 orb, _ O _ ill � Ln 2p EXISTING NERR RiW _ END CONSTRUCTION 1$ -SRYIA- STA° 75+03.0I , ?® # � / IR BZ5J NPG707LN0RF�`6�0# UNITED STATES EIC2RD NCDOT R�a�NCEySrSOEwE(CROATANNATONAL FOREST) N DB 3530 PIG 1786 gO R� In DB 336 PG 61 - ExISTI c I \ NGNCRRRiWoo . 1SOd O o 3 DB 1531 PG 646 bxb rrr 610 N - I o '�oo �03 o woo NORTH CgROLIN O ass DS A R I�-1 I L,� RAILROAD CO A 1� snedsz DB 6g PG 312 A MP NY o cr 1 I ON00 dw 0.00 `° w �— �� d31s _ 80. 0'CID W00 S ` 93Zbo 6�0 -� s SPEC 'V' DITCH � �' � 24 \� N� H9 SPEC 2' BA S ITCH SEE DETAIL 11-1 ( +90.00 TIE TO EXTG01 TCH J I S EX RrW M�8 6 Nv +41.00 SEE DETAIL 2E + a2id 8��19 R I3 ,0£°OZ" FXISTI �� 0�1d0911I8� OM 121.00' & EX RW M C EXIS rl PROJECT REFERENCE NO. SHEET NO. R —5777C 11 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Rulfuur Beatty StN v DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I SR 1/57• _ ►♦/' � ♦ •• ram— ��� i . i . 1 1 ' ►�- �����,�:. • • .. - ��i�0�00�0��0�►ems► �_ Q _ — — — — — — M — _— — _ EC DITCH GRA — —Oj Al— — —P _ —T F 0- - ecr > — — — 1 004 �fEEE- D€T -4 ULDER I A 24° 47 WW FENCE +48.20 FO— — _ — _ — —1— R 9r) 77 00' O WAY m 1 EBL Z7_ ■ram �'i'�=��� ����� _ • .II .�� �I 1 GRASS CGAU.. I 1 • —1— 1-1-�:�J�I�H— T— � / 1�1��1�1�1�1�1� .�i�11E�gI�Y11�1��1�1�1�11�I n=iTl—I_I—II •• • � _ DE _ �I�I��1�1 n ` [�I • PEC DITCH GRADING I• • L_ f►_ .. . = 1 .. . \ I - ►I►ICl/C �iSL3 _ — ��G _ _ _ _ r�� ii ■ l . • r•= imi, AN --- ------ =10m; YARM y — -- _ A KIN I us ILIl— . _ — -- - — _ lowF3 —EVA Warm, _ ��.: ,'ate 1 , F ����"_ "�1i1+ • • • E� _ ��1•ia��'i!L`i� . • � � ��..,' �fV7. • i `�fL f•. �' '1�'� _ T I F � • �1 1 I • • ` .� .+ . L�� MANZ d11- LWRE.300 no. MR; _ ��� • ,��t% � • � � • ® . I 1 .e...9� �� 9O ® �� � �I ��� � ,lam' • • � , � g, i ' • ��� • _ l '�r O 1 /''`yyt�r� °tFl•, �II�]G�1� t f �tY'Y� _ �11h�I`M,r..� 1 _ �� / i •' I ® .. • i • "• \ • � . 1 1 1 r�-� ���_—�i - fir, � �•• �• IVA - � .i� ,�`�� —' • %II2lifst � �� • _ • �_ i!� ,.;5 I ,�l � • �' i 1 �iE���' ' 1 • • 1 �� A�'c� � y ' � ® — 1 1 1 �' •�,'— � �� � 1 1 1 111 � � •M�1�1 r-- C — I DUE CL 'B'DRIP RAP rrr rr / G Ao E-,z o ° E _ �/ X Q� pp - ;� �a X lH0 8b UE N E .� EST 2 T�S r rr 31d '� +49.90 � � w I I- ,( 31 b0 CL 'B' To IN EST 7 S F rr r EX N I +17.54 L A 0 ST 2ONS r r w• �a P 4 0 1 EX RrW GF S T 7 GF S 1H �X� 0 rr rrr �� +25.00 31d0 II� a I I ON 0 PUE ❑ OP 75.39 & 123.00 Q III ONO +35. 00 PUE X RIV (TYPk- L '4 0v 31d0 o�� �`brr rr �' FCC Sf0° 75+35°0/ PROP CO ZI I a I 53 129.00' d1H — ��,�r r %' DRIVE ( P.) o I �I I PROP ASPHALT 55 c r r zl I o p�Sl DRIVE O `=r r ALEXANDER z >I I Z I 43 o I o �0) o` o— 51 z GEORGE ELLIOTT, JR. ET UX o SPEC 3 BASE CH o RODRIGUEZ W I II DB 1291 PG 313 9 } m SEE DETAIL 11-3 �c 49 �° DB 3509 PG I 3�Cl m Pc I PG 74E 1N3W35tl3 X o o END ONST UCTI N MATTHEW TYLER ��� LEANG NGO ET UX z 13 (� s TA. 11+20.00 POTTER �s 45 y� � ,56�01 � DB 3089 PG 773 47 DB 3498 PG 555 g6 IS b I- aM o PC I PG 5G KENNETH W. PC I PG 74� 1N3w�a ,5c 3 80 91-1b S „80' Z°1 ml I I— ,86°SSI CONNOR, ET AL 61 S Z,90.K S 3 9�°b DB 3555 PG 1113 gZ°1b S 11 8611b S Q 9Z.1b S II OLti AMOS W. CONNOR Noo - X I I III w b8°soz IV, ET UX z DB 3427 PG 115 A CROATAN NICHOLAS A. s II� LLI o 3 "bo Is°6Z s PC I PG 76E � COMMUNITY BOUTIN, ET UX I I I I o N o iv CEMETERY DB 2837 PG 669 " F- p�Sl R II I m PG 384 PC H PG 131D a LO 31d03 III s II I z Z 0 F 5Z cn w ,00°05 ED Z 0� z w I N O C) I 11°bZ 1N I -3 ,d5,61°Sb S DETAIL 11-1 DETAIL 11-2 z SPECIAL 'V' DITCH SPECIAL BASE DITCH ZS d �S M n1J �0 0 o A ( Not to Scale) ( Not to Scale) Z103 ww�d� w o 0 Front 3 "b0 ROBERT W. HAND � o RICHARD MASON of Sloch Natural oc Front DB 3495 PG 806 HERB, ET UX r' e� Pe Natural A' �Ground 3. �� < Ditch Ground 3I F\d I T F\a��e 'zI--- PC H PG 131D m DB 3339 PG 411 FROM STA. 70 + 95 TO STA. 74 + 97 -SRYIA- LT FROM STA. 109 + 50 TO STA. 111 + 00 -L- LT ~ 3 „1�,61°Sb s PAVEMENT REMOVAL FROM STA. 77+20 TO STA. 83+75-SRYIDY3C- RT BY13 STATION 8 98„ 00 3 LEFT FROM STA.70+50 TO STA.70+95 -SRYIA- LT BM13 RR SPIKE SET IN PAVEMENT d13 DETAIL 11-3 SPECIAL BASE DITCH ( Not to Scale) Natural Front Ground 3• �' e< Ditch I D fC\O� Slope LBj Min. D=2.0 Ft. B = 3.0 Ft. CL 'B' RIP RAP x\ j I I EST 3 TONS 0 js/ j wo EST 10 SY GF IHO „8b � I 1 � � PUE I FIU OD 57 z PUE �+a w m KENNETH WENDALL �`—ONO,) CONNOR, ET UX +21.00 DB 3491 PG 58 ,; 132.00' 59 DB 952 PG 626 DB 952 PG 632 GARY R. GARERA DB 2595 PG 934 ,6L'8�1 3 „6�,6�°gz S IOZ DETAIL 11-4 SPECIAL DITCH GRADING ( Not to Scale) SP� *�gRrge�F DP�\Pg\ SP *SEE CROSS SECTIONS Min. D=1.0 Ft. DB 1871 PG 170 IITV,♦, 'VJ v IV JIP, IV7TVV -11- LI FROM STA. 71 + 00 TO STA. 76 + 50 -SRYI DY3C- RT FROM STA. 105 + 00 TO STA. 112 + 00 -L- RT 413 ELEVATION = 24.37 a FROM STA. 113+50 TO STA. 118+00 -L- RT N 450888 E 2607588 0 16g°66 3 ,,91,1, FOR —LLT — PROFILE SEE SHEETS 41 & 42 FOR —LRT — PROFILE SEE SHEETS 41 & 42 FOR —Y5— PROFILE SEE SHEET 76 FOR —SRYI A— PROFILE SEE SHEET 80 FOR—SRYIDY3C— PROFILE SEE SHEETS 86 & 87 Submittal February 6, 2024 DETAIL 12-1 SPECIAL BASE DITCH ( Not to Scale) Natural O't Front Ground 3• �' ;e< Ditch Slope LBJ Min. D=1.5 Ft. B=2.0 Ft. DETAIL 12-2 SPECIAL BASE DITCH ( Not to Scale) Natural O't Front Ground Ditch D Slope LBJ Min. D=1.5 Ft. B - 3.0 Ft. DETAIL 12-3 STANDARD BASE DITCH ( Not to Scale) Natural Natural Ground 3 ,�.� Ground D Min. D=1.5 Ft. B B = 3.0 Ft. DETAIL 12-4 SPECIAL DITCH GRADING ( Not to Scale) I 1 SPA R/qDP���* SP *SEE CROSS SECTIONS Min. D=1.0 Ft. I I I FROM STA. 90 + 20 TO STA. 94 + 43 -SRYI DY3C- RT FROM STA. 118 + 00 TO STA. 131 + 00 -L- RI FROM STA. 120 + 00 TO STA. 131 + 00 -L- LT FROM STA. 94 + 43 TO STA. 96 + 65 -SRYI DY3C- RT FROM STA. 83 + 75 TO STA. 85 + 53 -SRYI DY3C- RT FROM STA. 85 + 53 TO STA. 90 + 20 -SRYI DY3C- RT PROJECT REFERENCE NO. SHEET NO. R -5777C 12 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION rr • WOODS 0 r • WOODS SPEC 2' BASE DITCH • D SEE DETAIL 12-1 - • • t- s �M IN MI --c wcrav w. • 1-1-1���,•-1-I�u�1�u�u�1�1�1�1■��1�1�1�1�11�-�•�.�.�.��•�I�I�I�•�■.�•�•�m�.�-�I�I�I���i��1�I�I�I�I��1�1�1�1�1�■1�1�1�1�1���1�1■L^_.�1��1�1■ 1 1 I- •.• 1' ` SBA—SSMEN FS, SEE DETAIL SHEET 2GI • c+� _ —tm __ 3I �rlw•, • � -; ----� fJiS11f��I_1jJC�/ _� -• " / .��//L _ ✓/d 19�/4' ��_{� ` ,� • � � gee Uu • • i r '_- 7•50011 •� - • x =06 W � I I - M1.--'WIN, 7 �� ''�GRADING: • •ate -s• -s • ��L�/�E'\■ _EMI �� — �r■os� ii �� r 0 0 111,rs 68.26 WOODS 0) h 22 I I I I I I S I I ajSl SPEC 2' BASE DITCH I I SEE DETAIL 12-1 ❑S I I r� 1 I In4 __j li 1 _Ls�` PUE PUE E _ +13.00 PU 126.00' z l dONV 0 �n cb 6 N � �1W ti Df M w N n7 wa) Co QIn m c� `� 61�rn � N m ao i 12 1215 DRY DETENT BASIN #1 , � C 4 rJ 1210 4' RCP -III: _ 30 SEE DETAIL EET 2D-3 O \ — +68.26 SPEC 2' BASE DITCH 55.00' � / SEE DETAIL 12-1 +89.0 . i 55.00' + 64.00 72.00' 7. 26.0 IVLXL- / PROF GRAVEL STD 3' BASE DITCH II _CL w z5. WOODS DRIVE (TYP.) EST 5 TONS RIPRAP w o PUE EST 480 CY DDE gZ Z EST 14 SY GF E PUE PUE PUE SLOPE = 0.32 /0 3 „ Z I.LZ v G +39.00 p(/ SEE DETAIL 12-3 +45.0oc `,v 73 120.00' F � QVE 122.00' ^� +71.00 ELLIGAN WARD 138.00' DB 487 PG 261 CL 'B' RIP RAP +94.00 DENEISHIA S. 17' CL 'B' RIP RAP EST 2 TONS 140.00' SPEC 3' BASED CH FISHER, ET AL EST 3 TONS EST 7 SY GF Q�E SEE DETAIL 12-2 DB 3100 PG 62 F EST 11 SY GF ZI•I�I PUE PUE PUE PUE PUE 3 „�Z,81.1� S DRAWDOWN STRUCTURE W/TRASH RACK +99.00 �+36.00SEE DETAIL SHEETS 2D-1 AND 2D-2 181.00' 179.00'DETAILS 1 AND 2 c� 59 63 69 71 0 JAY HUGH WATSON, JR. ET UX UNITED STATES OF (CROATAN NATIONAL AMERICA FOREST) ANTHONY DB L. GRIST, ET UX 3395 PG 4 BEULAH MAE DB 1504 PG WARD 224 ANTHONY DB L. GRIST, ET UX 3395 PG I DB 991 PG 916 DB 336 PG 61 ,68.911 3 „91,VS.6Z S 67 PAVEMENT REMOVAL FOR -LLT - PROFILE SEE SHEETS 42 & 43 FOR -LRT - PROFILE SEE SHEETS 42 & 43 FOR -SRYI DY3C - PROFILE SEE SHEETS 87 Submittal February 6, 2024 C Q I �n L I LD PROJECT REFERENCE NO. SHEET NO. R —5777C 13 DETAIL 13-1 DETAIL 13-2 DETAIL 13-3 DETAIL 13-4 DETAIL 13-5 DETAIL 13-6 ROADWAY DESIGN HYDRAULICS SPECIAL BASE DITCH CULVERT INLET BANK STABILIZATION CULVERT OUTLET CHANNEL SPECIAL BASE DITCH SPECIAL 'V' DITCH SPECIAL DITCH GRADING ENGINEER ENGINEER ( Not to Scale) (Not to Scale) ( Not to Scale) ( Not to Scale) (Not to Scale) (Not to Scale) Natural oC Front Ground 3.y Ditch �J___ GraunrT Fk�sT,� ' round Natural Natural Ho eq�k d' ¢t`S��o Tuck Geotextile Ground 3 y p 1 Ground L 3�' Natural o Front a Minimum of 1ft d Ground 3.� �' Ditch Front pt Sope 1 Natural A' e< P Ground 3. �a � !' �� ���������� ����� D a��e< F� Slope B Min. D =1.5 Ft. �� D a�ie< Key Riprap into iTyp) Tuck Geotextile F� Slope Channel Bottom Place Geotextile Under Geotextile B a Minimum of 1ft B (Typ) CHANNEL BED Riprap in Locations (TYP) Min. D = 2.0 Ft. 7 p Min. D=1.5 Ft. SP �'P/q D ��P� SP e�F JP A� �,, DO NOT USE FOR CONSTRUCTION B = 2.0 Ft. (Variable) Directed by Engineer Length = 125 Ft. Length = 30 Ft. *Rip —Rap to be Installed to 2ft Outside Top Min. D = 2.OFt B = 3.0 Ft. Type of Liner=CL 'I' Rip —Rap —Keyed—In *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 131 +00 TO STA. 135+40 -L- LT d=2.0 Ft. of Ditch Slopes on Jurisdictional Screams Est 200 Tons, Est 430 SY Geotextile d = 2.OFt. Est.=22 Tons of Class 'I' Rip Rap, keyed —In, Est. 58 SY Geotextile B=4.OFt. FROM STA. 96+65 TO STA. 101 +71-SRY1 DY3C- CY FROM STA. 108 + 15 TO STA. 109 + 65 -SRYI DY3C- RT RT FROM STA. 131 + 00 TO STA. 144 + 00 -L- RT ' V FROM STA. 136 + 16 TO STA. 142 + 00 -L- LT FROM STA. 142 + 00 TO STA. 144 + 00 -L- LT Est 250 DDE STA. 101 + 75 -SRY1 DY3C- RT FROM STA. 135 + 10 TO STA. 136 + 07 -L- LT 2 DETAIL 13-7 SPECIAL BASE DITCH + Ralfoup Beatty SIN ( Not to Scale) DOCUMENT NOT CONSIDERED FINAL Natural 3.� �'� 01 \\et etch UNLESS ALL SIGNATURES COMPLETED D ��O Slope Min. D=2.0 Ft. B=2.0 Ft. EXISTING NCRR R/W EXISTING NCRR R/W FROM STA. 101 + 76 TO STA. 108 + 15 -SRY1 DY3C- RT I-n Q) NORTH CAROLINA RAILROAD COMPANY DB 68 PG 312 GVO�17/V& VN170b'b'0 141NON RAILROAD COMPANY NORTHINARAI�OANY (OWNER) FOLK SOUTHERN col.. .. .. .. .. .. .. CULVERT OUTLET CHANNEL N W/CL 'I' RIP RAP SEE DETAIL 13-3 0 a SPEC 2' BASE DITCH WOODS SEE DETAIL 13-1 SPEC 2' BASE DITCH WOODS SEE DETAIL 13-1 — . — - — — — — — — — — 0 A d z C — — — - - — -47" N — — — — — — —D331S , $ — — — — — — — — — — — — — — — o - ~ — — — — — — F 0— — —T F o— — g —T F 0— — �_T0— — — — — — — _— — — — o — — — — — — — — —T F 0— — — — — — — — — — — — — — —T F 0— — �331S ,,8T F 0— — —T F 0— — _o° — — — — — — — —TV FQ — _ _ 71 _ _ _ — _ — — — — — — —1— — — — XI IN NCRR R/W — — CSa 2 ELBOWS o0 °o o a� HWY 70 EBL 24' PAVED ROADWAY � 0b 81 4' PAVED SHOULDER _ 69°ZZ=dol Ia REMOVES PROP GUARDRAIL GRASS +83.53 GREU •1 CAT-12 G I (TL-3) TOP=23.34' +75.22 0 la 8:l Ia LU 0 ^ \ �15" PROP. SBG V) z + N N REMOVE 9r NMON�iNn + d� + 1305 Av HOULDFR +02.28 +5I.22 v U REMOVE N ~LU O O _ J N o _ �� PLOWABLE FILL a 130 US HWY 70 WBL 24' PAVED ROADWAY 4' PAVED _ US 70 EB ~ p N SHOULDER z Uj wDO I Q _ =�— — Dlisdid,1b 1301 2G1 WN 25`27'56.6"W--- o — — — — —— — — — — --------o-011SV�d.1b-- --------o— CU Q W n — J — — — — — — — — — — --0j nl— — __ — — — — — — — — --0� nl� —_ — — — _ — — — — — \ — �� 7�1 — —Oj nl— — — —— ---_L ----- — �� nl— — _ -- — �j nl— — — �� nl— — _ — j Al — J I _ "�—�,�— OAd„9==— ——— SSj----——-- — — — — —— ��ABLE— =— J---—--—————— — — — — —— — — — �+ -- ----__ _ — — — — ——-----�Ad'9----------- SPEC DITCH GRADI ___—= �— — I C%) � REMOVE REMOVE REMOVE REMOVE 1. SPEC DITCF�Dd "8 �' lbMGboN a3Add,8/ 95/l �1s �E=An-n-6 �� J _nI—NMO— P-0� —8 Odl 81 =—M—GRADING — — — — M— —�— Ob SIM- nl— — — —�ft 0a I _ = S3— — — — — — — — — _ — — — Id��1 SI -03 I I S3� — — — —53�� Ia�EXISTING R/W I S3� GI EXISTING R/W / I REMOVE dOd Sl R �� 13 1S8.5/ EXISTING R/W I _ I I d 130 I �` Q 0.12' EIP ICI CA ICI I r 1i8 ICI TO R/W ` ~ 0 o WOODS I S* DITCH G ING I I ONOD I I sNlna 130 ` TAIL 13-6 I I E DETAIL 13- —SIR — Y3C �.■. o Q 0 0 W o I I SEE DETAI 3-b z I I _� GI WOODS r\ Q_ I I N 25` 2T 56.6." W I I Wo w ' I Q �\ —1 0 I I REU (T 3) 0/. 4 OP GUARDRAIL CAT— 01_�"� 3sI i "' � .� I SNInd I �8b o + a'19SZ 52. �� 15" W/ + ° ' WOODS I \ I a)ID9Sl O' L- 2 ELBOWS o � I I I L I o 8d3 0„ 1303 — Li ICI --- -- C _— 1312 C— _-- ----- Iof z1311 oION C B' RIP RAP Sd31s N CL 'B' RIP RAP WOODS S I I ST 2 TONS I I_ I SPEC 'V' DITCH I I Iv _ a EST 2 TONS I am 21 E 7 SY GF SEE DETAIL 13-5 Id9 J EST 7 SY GF I O09 9 � II \ M I I ELBEA N. SPEC 2' BASE DITCH SEE DETAIL 13-1 I 1 PUE PUE I � 73 75 . PUE BAVIS UE _PUE PUE UE PUE PUE 1749 PG 996 W00� ^'m BANK STABILIZATION CL 'B' RIP RAP PUE PUE PUE PUE PUE PUE PUE PUE SPEC 3' BASE DITCH d13 z W/CL 'I' RIP RAP +52.00 6S �6 +60.00 EST 2 TONS SEE DETAIL 1 -7 0 125.00' DENEISHIA S. DORIS HICKS, ET AL 3 „�1,00°6z S SEE DETAIL 13-2 o ^ w EST 7 SY GF FISHER, ET AL DB 1487 PG 592 I 125.00' IL'91 ( VICKI NIXON o Q S PC F PG I96H 3 s PROP GRAVEL DB 3100 PG 62 ,si,00°6z JEFFRIES A DORIS Q DRIVE (TYP.) 3 Sl,ob°Sz S 1IS°001 L2°IZ u 77 DB 1749 m HICKS, 83 0 c� 3 "zb'9s°69 N PG 992 ET AL �' PC F PG I96H DB I487 MABLE z NIXON GIBBS 3 ,.Lb,9S°69 N LI°b8 PG 592 85 dl3 3 „SI,z�.6z S PC F DB 466 PG 275 PG I96H z oS°9L � � � 3„£I,S2°SZ S xxxxxxxxxxxxxxxxxxxxxx:xxxxxxxxxxxxxxxxx MARY HARDY WHITEHEAD,ET AL co z 412 ELEVATION = 23.55 DB 1704 PG 32 o 3.6, 2Lsz S N 452822 E 2606485 ANTHONY L. GRIST, ET UX z m� ° BL STATION 234.85. 00 47 LEFT DB 3395 PG I L BM 12 FILED " X" IN BONNET BOLT OF FIRE HYDRANT � o N m z z z z x x x x z z x x x z z z x x x x z z z x x z z z x z z z z x x z z z z x IV Fl Ig`�I 266 Od WIS 90 3 .�I,6�.Iz °21S 'S9910 s 993Z z m o � PAVEMENT REMOVAL m z wLn �LA A � , 00 ° L b W FOR —LLT — PROFILE SEE SHEETS 43 & 44 3 1D122.Sz S FOR —LRT — PROFILE SEE SHEETS 43 & 44 FOR—SRYIDY3C— PROFILE SEE SHEETS 87 & 88 Submittal February 6, 2024 C Q I n L I LD PROJECT REFERENCE NO. SHEET NO. R —5777C 14 DETAIL 14-1 DETAIL 14-2 DETAIL 14-3 DETAIL 14-4 ROADWAY DESIGN HYDRAULICS SPECIAL 'V' DITCH SPECIAL BASE DITCH STANDARD BASE DITCH SPECIAL DITCH GRADING ENGINEER ENGINEER ( Not to Scale) ( Not to Scale) ( Not to Scale) ( Not to Scale) Front Natural Natural Natural t Ditch b'1 o Slope Natural of Front Ground 1 Ground 3 D 3 1 1 —• PRELIMINARY PLANS Ground gt N.\ �?) D Ground 3•� D \pt�eC SSitch lope * d , ' Tuck Geotextile SP� �q q D \P� SP R� e�F DO NOT USE FOR CONSTRUCTION Min. D=1.5 Ft. � Min. D=1.5 Ft. Geotextile a Minimum of 1ft -1P B (nPl B=2.0 Ft. Length= 39 Ft. *SEE CROSS SECTIONS Min. D=1.0 Min. D=2.OFt Ft. A FROM STA. 109 + 65 TO STA. 115 + 09 -SRYI DY3C- RT Type of Liner=CL 'B' Rip -Rap -Keyed-In Est 25 Tons, Est 68 SY Geotextile d = 2.OFt. FROM STA. 144 + 00 TO STA. 157 + 00 -L- RT '`/� O FROM STA. 10 + 30 TO STA. 11 + 00 -Y6- RT FROM STA. 144 + 00 TO STA. 152 + 21 -L- LT FROM STA.152+24 TO STA.157+00 -L- LT Est 33 CY DDE B = 2.OFt. STA. 152+20 -L- LT ?QII Rulfuur Beatty StN DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED EXISTING NCRR R/W Ln Ln NORTH CAROLINA RAILROAD COMPANY DB 68 PG 312 NORTH CAROLINA RAILROAD COMPANY (OWNER) I ICA NORFOLK SOUTHERN RAILROAD (LESSEE) NORTH CAROLINA RAILROAD .. .. III STD 2 BASE DITCH SPEC 2' BASE DITCH W/CL 'B' RIP RAP SEE DETAIL 14-2 SLOPE=0.1% N SEE DETAIL 14-3 SPEC 2' BASE DITCH WOODS -c WOODS - SEE DETAIL 14 2 0 -- ------ k4_ — — —CAd.z1 —_w ( ---- — -- 31S ,8 _ -T F0- - -TV F� - - - - - - - - - -T IF - - - - - - - - -T FO- �� - -T F0- - F� -TV F� - TV FG- - - -T F0- - TV FO- - ° 3 ° - -T F0- - - -TV F0- - - -T -TV FO- FO- - - - - - - -TV FO - x IN N /w --_ --- - — _--- -- 4'PAVED SHOULDER _-- °3 ° US HWY 70 BL 24' PAVED ROADWAY- — - - 1421 U REMOVE 4'PAVED SHOULDER 0 GRASS TOP- DI 4'PAVED Uj SHOULDER 0 LO 0 N � � US HWY 70 EBL 33' PAVED ROADWAY N Z zO + M N d o US 70 EB 1415 o� � N Uj —1— 0GAt CG. 1 - - - - - - - -1- - - - - - 1 - - - - -1 - - - - ' - - 1 ��S — — — — W �b'iyfB _ 4' PAVED SHOULDER w TZ U Q W 15 " � — — — —1401 2GI — 2G1 ------ ---- 14— —�— — ° �� —0— — — — — — — — — .l, -- --- N 25 27 56.6 WOIlSV3d b — 0 — GRASS —=L _ —0— — — FES — —�— —— - -- —=-- - J 1418 MIN. DEPTH 24" _MIN. DEPTH - - J -- ---M A1=A U) _ A1- - 0� A1- - TJ --0� Al- - - - - - - �j �l- - - - �� �l- - �j 1 =���— _— =- - --0J - - - = - -0j 1 S 1 - - V�J - (� ifl — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — -SSA- - - - - - _- - - -SSA- - - - - i �€-M - - - - DVS - - - -SSj- - - - - - - - - - -SSj- - - - - - - - - - C I n A s , VMGVOIY 03Add ,8I 9911 gs 7 7 T�� 1 0 2GI REMOVE REMOVE REMOVE �d _ = < �Q 141� 2GI 15" — 14 — 1 / d02� SI — M — — _ — ��51 _S33 — — — _ dW0 M81 — 3d \ S3d NMON1iNn — - - - - --A A1�Rl R i $� WALL --`NW — — — —� 2�a1— — — M — — �53� — — M — — — S33 — — —R OV 1414 2C1 fig„ - -�1- - - -�1- 3 �� \ _ B-77 1 EXISTING R/W S33 - - I I ,( - - - - - - - - - - - - - -0� �1- - - - - - - +/4.09 47"WW FENCE 14 b10VE 0 \ I C'7 Ln ^ M n .04' R/W I,I d0 SI 1408 1"' I = N 0 o w I A I— 2GI-D d0 511 p I 1� I REMOVEA EXISTING R/W S33�RM18" 1 I RC - dWd Ell P 1 _ 1 P 1413 > fed t ULO 0 U r + � ` 1i39 �I z �� <_ 1416 d021 .SI I\� ��dCH ,81 W � � � 77.00 2GI I 1 TO EIP d ;•�, TO EIP � [— Q 0 W o 18" RCP -III oo WOOD um Ls8 - DITCH GRA - :ING `9 j I U:' I I o -SRY/DY3C- SPEC DITCH GRADING �0 C RA GM N Q IN Ll.l o �� n btt - 70.12' z - S6.6" w SEE DETAIL 14-4 s SE 14-4 0 jS1 6 = c o� r W I�- _ \ /6 DB 774 PG 17 NC DOT 6 = I S 1 P 1409 +o 0° I 03 0 18.001 sN1 aOf DB 3253 PG 608 I I J i PHI�NE L. 1� G�-- (� S 25°29'54" E .601 .05' oo`So1 I _ _ — — �� — F _ — — S -- -�_� — 25°24'46" E O-�wn� _ — _ F V) U) Cn 18 t bS,6% O d31S z 01 15 +89.82 W EX WW d13105. d13 S 3na 3na M .ZL aM N +36.67 °� � S 21°59'09" E — — — — — C D C R W 5 02 EX �/ WILLIAM L. BOR N 01 ,SI 3 � ,sl 3 S 25 25 3" E +11.00 N 40.00' n N 78.90' sNin SP C DITCH GRADING CL 'B' RIP RAP 9 02 NCDOTRIP W DB 1662 PG 8 78.0 SEE DETAIL 14- DB 1706 PG 661 z 15" RCP -IV WOODS 8 00' P E E R 0 +08.00 CL 'B' RIP RAP 72.00' EST 3 TONS SPEC 'V' DITCH EST 7 SaOoM EST 2 TONS ¢ SEE DETAIL 14-1 L9°60Z EST 7 SY GF 141 I F POT Sta. 11 *00.41 91 W v 95 011dd X w ° 011dd w EST 10 SY GF w 1 .bS,6z.SZ S Un—) 2 N 57° 23' 39.3' E I ..I D TH 1410 MIN. DEUE PUE a P m o? 03S1 oz 31d0 g7 in +39.00 dl3 113.00' P PUE PUE PUE O PUE PUE PUE PUE zo I CB +92.00 m o ti S PUE wQ II 0 118 00� 89 TAMMY KA +33.53 3 11 �� I �~ LEONARD G. DUNSTON b QO SATCHELL EX RNV 3 d�-w �� o O o: `� 6 CR DB 1706 PG 6 I z z �> S :I r END CONSTRUCTION LD +97. 4— II Y6— STA° 11 *00.4/ 113.00' 3 Ll,�b°LS m dwnd SS`b d31S w M w00DS 9 _ rn �o C3S1 N� N O RANDOLPH �, - Q u� PROP GRAVEL DB 1472 PG 272 m Zo ,62°6Z P Q� I I Q0 LO N o 87 3 . z,zz sz S x Iz NI z w III N z EX 61°IL II X 3.... K.SZ S 3 LI,�b.LS N �`O - 61 o 6 �, Q I �� TREMELL R. HICKMAN �' LYNN B. LID D. DUDLEY DB 2817 z HICKMAN DRIVE (TYP.) dl3 ,Z2°6b1 00`6s ,68°9L 13 dl3 Iz 3 b5,6Z°5Z S 3 LZ,zz.SZ S 3 LZ,ZZ°SZ S' c� III I dl3 ,b9°821 ��,8�°5Z S �'r)p 3N00 �3 °� 3�a,o� 00 `"c�4' z z w DB 2175 PG 338 PG 129 DB 2817 PG 132 d13 3na ,SI I I b 3- 3 oz Ld o0,0b dl3 C ZL 3 3 3na,sl I 8 o �° 59°LZI '� 2 96/ 3 ,0�,8b°Z9 „Soso d 1S N 0 51°SL bL°5b bL'6L 3 bS,9Z.SZ S 3.bS,9Z°5Z S 3,bS,9Z°SZ S 6 of � wzxxxxxxxxxxzzxxxxxzzxxxxxzzx 85 —Y6— POT — — /�/ o v StG. /0+00.00 = w ROBERT J. - I P I Q w PHIFFER, ET UX I o OIlVd N NICHOLAS JOSEPH ' McARTHY Q C3S1 1 ELEVATION = 27.90 0. DB 2516 PG 892 ED DONALD G. HEIM DB 3577 PG 1014 — o 041 w ° MARY HARDY WHITEHEAD, ET AL — 97°08 24 PC H PG 24A w J,1,� w � o o DB 2516 PG 926 PC H PC H PG 24A PG 24A � �N 454837 E 2605525 z BL STATION 212.51.00 60 LEFT DB 1704 PG 32 z J m BM 1 1 FILED " X" IN BONNET BOLT OF FIRE HYDRAN 3N 30�/ 03S1 ? wwRAMON o RODRIGUEZ 00 86 wv Y� w g� x DB 2531 PG 919 w DB 3579 PG 1109 PC H PG 24A 3 90'��.I� x w w z x x x x x x x w x z x x x x x x w z z x x x x x w w z z x x x x x x x S 0 o ASHLEY COLLIN COAKLEY ` ADRIANA ROSAS, ET VIR DB 3532 PG I w TRENT RIVER BUILDERS, INC. N DB 2273 PG 377 PC H PG 14B DB 3518 PG 994 w PC H PG 24A o BOGUE BLUFF — ENTERPRISES, LLC - DB 3546 PG 348 PC H PG 24A PC H PG 24A N Q Q Q L z PAVEMENT REMOVAL goo 60 o� FOR —LLT — PROFILE SEE SHEETS 44 & 45 FOR —LRT — PROFILE SEE SHEETS 44 & 45 FOR —Y6 — PROFILE SEE SHEET 76 FOR —SRYI DY3C — PROFILE SEE SHEET 88 Submittal February 6, 2024 DETAIL 15-1 SPECIAL BASE DITCH ( Not to Scale) Natural 101 Front Ground 3. Q' �e< Ditch D F\0� Slope LB J Min. D=1.5 Ft. B=2.0 Ft. DETAIL 15-2 SPECIAL BASE DITCH ( Not to Scale) Natural 01 Front 3• �' et Ditch Ground D F\0� Slope LBJ Min. D=1.5 Ft. B=2.0 Ft. FROM STA. 125 + 00 TO STA. 130 + 64 -SRYI DY3C- RT FROM STA. 157 + 00 TO STA. 163 + 85 -L- LT FROM STA. 129 + 00 TO STA. 136 + 60 -SRY1 DY3C- LT FROM STA. 135 + 85 TO STA. 137+ 50 -SRYI DY3C- RT FROM STA. 10+00 TO STA. 16+20-Y3RPB- LT O DETAIL 15-3 SPECIAL DITCH GRADING ( Not to Scale) I 1 sP� ge�F Sp P�\P���. *SEE CROSS SECTIONS Min. D=1.0 Ft. PROJECT REFERENCE NO. SHEET NO. R -5777C 15 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION NORTH CAROLINA RAILROAD COMPANY DB 68 PG 312 NORTH CAROLINA RAILROAD NORTH CAROLINA RAILROAD COMPANY (OWNER) NORFOLK SOUTHERN RAILROAD (LESSEE) cL 'B' RIP RAP PT Sto° 15+06°39 Balfoup Beatty AN v PC Sta. 158+78°97 SPEC 2' BASE DITCH-Y3RPB- PC Sta. 10+00°00 = EST 2 TONS WOODS DOCUMENT NOT CONSIDERED FINAL SEE DETAIL 15-2 - - - - - O<w 3+84°60, 47.00'- - - - - - -w- - - - - - - -EST 7 SY GF w- - - - - - - - - - - - - -w UNLESS ALL SIGNATURES COMPLETED -- - -- 0Ad,,Zl--- - ---- -w- - - -.-.- - - - - -.-.- - - - - - w - - - - - - - - - - - - - - - 1 - - - - -�- - - - - - - - - -�- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -T F 0- - - -T F O- - - -T F 0- - - -T F O- - - _ - - - - - 0 -TV F 0- - f- T' o; = - - - � S1LEf� - - - -T V F 0- - -(��F i( - - F 0- - T F 0- - -T V `0- - - - - �- - �- C n Ln US HWY 70 EBL 24'PAVED ROADWAYL:-7 L- O 4' PAVED SHOULDER - 1506 S6°9ZLn + GRASS • ZEN t•L�)•LI-iiif, �ra� ► 1 y �V.NOW, �Ii�rt�7�eli��ila:��►��i ���,.���►�e.�1�1�1��1�1�1�1�1��1�u�1�1�1�1�11�1�1�1�1�1��1�1�1�1�1��1�1�1�1�1�11�Fy1�1�1�1�u-1 _ __ "' � . � � � NOR REMOVE REMOVE ---_ • 1` VAN • 1 aL lk �il�i���� .�_ _ _ �� Qom► _ ��: - _ ___.til _ 1� JF>T��-r_r�:_ _= _ai�'C.Te►�I]1!�!i!���.- �r� �Sk i ��iitn"•�T.i_R�R_�_ • _ca N. • ��i'�o�� '��s/tY�`c _"'..�i��` . lip, AIR t� p■ -bkys ON BA nn - - aigs ��, ---__ __- n i �16 M.�=� ••! ITT - ' ' / ! • • 1 1=01 •_; �� .•a te ® _ „ :• : a` SEE DETAIL 15-3 III • • i • I �` � \ • 1 i i ,, � � O,\J � `• • � : 1• • � a -/ jF- r_(. - r-U/ Jl U• IUTI -L - POT Sta• 158 +68.06 47.00' RT, 0 = 04`00100' PUE PUE TRENT RIVER BUILDERS, INC. DB 2273 PG 377 PC H PG 14B C In 0 U) 0 L A � 3 CVO 0110 Cv 0 \C[� l9/ Z _ � +95.17 C o� o 000 +0 00' +20.43 W ' ll�' \�1 Q� 606 - W + 78.97 0� \ 000s - � \ 60.00 ,q - � � , s- 44/ B 3168 PG 165d2 v OF ASP 6°40'36" E Q o I RIVE (TYP. 261.04' ON S SE DITCH I I� Q i p I I DETAIL 15-2 + I \ S 25°51'47" E I I PC St /2U+ 8.97 I I z 00.00' I O - \_ \ O^ ry I I DM 0 I --- -�\ �- J O PUE PT Sta° l25 95. +67.7 +13.o I pUE z a�sl i i OF GRAVEL �� WIL IE EDNG RD Q I I ��� �0 3 °Q 0 113.00 I I m pU� ly0i RIVE (TYP) \ 11 DB 943 PG 899 I I M 0351 I \ PEC 2' BASE DITCH 6JJ \MB 3 PG 121 �i SEE DETAIL 15-1 Q m 10 m PF C .N9 I� CO N 121.00' TIE TO EXTG \ \ \ z 65.00 `N \� "J 0 o CLARFRANCES PRIMUS p CHANNEL \ 6iH I I z M DB 1310 PG 803 �n� OF +32.00 +15.28 Q j p� � Ln z 08°88 I�VSD \ \ \ 65.00' ► 100.00 F z miBSl N n 3 „bZ,lS°8Z LO S �n �I�IJ�/J WILLIS w pUF \ B RBARA ANN� NCIL, ET AL � �, Z SMITH, ET UX � Q Q M � \ /�� m DB 437 PG 18 0o CALVERT R. BLAKE, ET UX T o \ \ \ina B 79 PG 428 � N Ln DB 1533 PG 795 Pv O \ �/Q �v16 3 PG 121 0° z F z ' �� ROLAND BRAXTON rn l MICHAEL DARN \ �� x0.00 ET AL Z SIMMONS, ET UX 65.00' & 86.06' DB 1538 PG 241 Ln \ b C \\ MR 3 Pr 121 SHEENA R. NELSON z to°oll DB 2332 PG 163 3 ,61,bb°ZZ S ,9b°101 3 ,6b,8S°bZ S GEORGE ARTHUR SMITH JR. ET AL (NO DEED) rbN C O r5 IN � ,SZ � � C°L81 Q \ �� SPE 2' BASE DI CH Q� C \ SEE DETAIL 1 -2 .oG 'I' F\ 1510 "RCP-��� CL RIP RAPE +67. EST 2 TONS Ob HW EST 39 SY�-- 70.00' FOR -LLT- PROFILE SEE SHEETS 45 & 46 FOR -LRT - PROFILE SEE SHEETS 45 & 46 FOR-Y3RPB- PROFILE SEE SHEET 68 FOR -Y3RPC - PROFILE SEE SHEET 69 FOR-SRYIDY3C- PROFILE SEE SHEETS 88 & 89 +12.00 101.00' & GF SEED TAIL D 122.00' + 21.00 \\ 102.00' & 122.00' A� F I DB 1230 PG 828 \ o MB 3 PG 121 I A \ +57.00 ej F \ 123.00' "'03 \ Q 9 \ F. 45.00' h F Y. (per 0 Cj .o + 39.00 GF 82' & 116.00, ALBERT T. GUY, ET AL ,o DB 943 PG 889 6 MB 3 PG 121 lcol PRC Sta. 134+76.611z \ QJ 65.00' & 86.0 65 00 12 9.00' +76.61 \� e5 65.00' � oo + 32.00 F121.00' 76.b 5'�.00' G F �G- ��1 5� - Submittal February 6, 2024 CT (7 C` CS u, qa �'_ _ ` IB'SZ PROJECT REFERENCE NO. SHEET NO. 3.60.95.LZ 9 3 s F m ^ LONNIE ALSTON, JR. R-5777C 16 i- JANNIE ROBERSON IIS tr N` �M/a Ol d13 •£ ' .LL'£L JAMES s THE OBI FAMILY WILLIAM T. WIL __IIAM THOMAS ,,IJONATHAN H o DAVID LONNIE ALSTON, JR. DB 1767 PG 824 ROADWAY DESIGN HYDRAULICS DETAIL 16-1 DETAIL 16-2 DETAIL 16-3 DETAIL 16-4 .sz s d13 01 M/a.1z•o \ \ lz zeiz N 3.fio•L" s DOBSON, ET UX LIMITED PARTNERSHIP BENJAMIN r °�' IBENJAMIN H MATTHEWS, ET UX r SYLVIA GASKINS - HERNANDEZ BEULAH MONROE M ALSTON DB 1833 PG 696 SPECIAL 'V' DITCH SPECIAL BASE DITCH SPECIAL BASE DITCH STANDARD BASE DITCH o• ,A o. M 1 0.95. DB 687 PG 30 ^ DB 1624 PG 447 DB 1638 PG 362 '^ DB 539 PG 310 '^ DB 555 PG 443 "' DB 2447 PG 737 '� GUILLEN ET UX m DB 820 PG 422 - ^ FIELDS, ET AL ; ENGINEER ENGINEER I norm Sole) (Not to s. W) L+ \ \ w `V' MALACH ALEXANDER MB 4 PG 5 B 44 PP 5 N N� •mom r M I N°t r° s<cla) IN- \ MATTHEWS, ET UX S''- MB 4 PG 5 M G u,N MB 4 PG 5 MB 4 PG 5 MB 4 PG 5 DB 334d PG 82 m MB 4 PG 5 tin DB 2535 PG 514 _ �'or n Q \\ a POT Sto. IO+00.00 MATTHEWS ET UX M8 4 PG 5 MB 4 PG 5 < on<Ij n�Vrgl \ \ \ DB 4 PG 511 �^ N _ r A.>g< slog. orn<h N000^ol A.�oo[F N �'°°I o\ \emu+ MARGARET MB 4 PG 5 ; MB 4 PG 5 m 8 DB 515 PG 513 +n �� P PRELIMINARY PLANS Grt-d a./ F� '/ o �bx8` " D on°` D � \ BROWN, ET VIR � _ N s �, I r � .�/ 1 DO NOT 1713E FOR 0ON817lIIC[EON D Yo DB 814 PG 13T r Min. D=1.5 Ft. B Min. D=1.5 Ft. B Min. D=2.0 H. Min. D=2.0 Fr. B RAY MIN R� _ 0 MB 4 PG a+ FN DETAIL 16-9 WOODSdrys 1� o 0W°B=2.0 H. 8=3.0 Ft. 8=2.0MANNING, E UX 1 <-t �� 7 �,�m _ woops d315 \ 1 x j a1 rSPECIAL 'V' DITCH WOODS \�,d WOFROM STA. 18+80 TO STA. 21+00 -Y3- RT STA. 31+85-Y3RPC- RT DB 3490 PG 647 \ % O9 ¢ 35nOH 000 u• In°r r° s.olel G X Id3 �FROM STA.2000 TO STA.20+90 -Y3- LT FROM STA. 10+00 TO STA. 24+83-Y3RPA- RT FROM STA.14+50 TO STA.27+50-SRY3DY4C- RT STA.20+00-Y3RPD- LT MB 4 PG 5 ' ^I WOODS IIF-t ° �•ROM STA. 22+00 TO STA. 25+00-Y3- RT FROM STA. 16+20 TO STA. 23+45 -Y3RPB- LT i �0� N r , °`5ine\ WOODSFROM STA. 2+00TOSTA. 25+00 -Y3- LT FROM STA. 26+SO TO STA. 28+50-Y3RPC- LT WOODS'M/a Ol dl3 •Lb'0 1�1 XFROM STA. 28+50 TOSTA. 32+50-Y3RPC- LT FROM STA. 20+00 TO STA. 21+00-Y3RPD- LTr ONBSIrFROM STA. 21+00 TO STA. 23+50-Y3RPD- LT FROM STA.137+50 TO STA.148+50-SRYIDY3C- RT - 3.0£.bZ.SZ S QL •1 i .5b'211 3.LZ.9L92 S S FROM STA. 148+50 TO STA. 149+50-$RYIDY3C- RT d \ `1H7.bw % Min. D=LS Ft. aABSILEVONIA P. �n z vi '';;����FROM STA.10+20 TO STA. 14+50 -S DY4G- RT - % m OX851 JNOJ 1 of ° I a1FRAZIER o adsl r -� I wi4[FROM STA.10+75 TO STA.14+50-SRY3DY4G- LT DB 3226 \\Y s FROM STA.17+00 TO STA.17+75 -Y3- RT a1H 10r•za I 1 �N� o L 3N07 1 lAIWal��FROM STA.19+00 TO STA.20+00-SRY48- RT PG 72q o �Q ry bv^, rl a1H aLH in FROM STA. 17+15 TO STA. 18+00 -Y3- LT � DETAIL 16-8 \ , SPECIAL BASE DITCH MB 4 PG 5 ,' < I'O °1g+ Q _ Z i MA 01 d13 .18'OS ,n - ^I M/a of dl3 •80'66 M/a Ol d13 .26'Bb M/a p1 dl3 .Ob'Bb \1 1 ' .113 DOCUMENT NOT CONSIDERED FINAL DETAIL 16-7 (Nor ro S.W)M/a Ol d13.66 bb EXSTNG xcRa R/wN 1Tr E%STNG NCRR R Y g DETAIL 16-5 DETAIL 16-6 STANDARD 'V' DITCH r O. lO ` mu �� n 1 1 WOODS I I m SUILNtlld OM \ \ I^ i \\ 861s 3NO3 IVV d3a .S H11M A3S 1 OB I STANDARD BASE DITCH SPECIAL DITCH GRADING (Notes Smlel N.-I o• Fro° apz �o 111 � / �\ \ \ X \ \ 1 � W31SA5 oo aNV 30tlS-3WOH 1 -ssf I I ESS A (Nor ro Sc°lel 1Nar f° s-lel ro"n A'� Mgt D 1 \1 \ I I 3NO3 I fx� _ I _ - -ssf- - 1� 1 4 4 nor"rol D P° sl°P° L - i ON0.7_=I I - - - 1H3.81 !l I W u � � -, � \ � u �:� 7NOOI o d0 .. .. .. .. .. .. .. .. .. .. .. `i✓ �\ � - v 3Ad .Z' I WOODS I I NL WOODS LL } t(,�,� U SIGNATURES COMPLETED WY I N°Nrol N°ruml I I N°r 1 _ - a', p�iH3 .o �sNNOIS I ooDS I �y Ground roan .- �. ..- N. Gd Min. D=2.0 H. - -99f- - .. 1 X 3N015 `f�1'�/ {�'� (V a D VE D _ y_ dl I 3/O 13 \ 1® \ 1 3 0 `ti-' .. _ _ / b 1 tl' BEGIN CONSTRU 7Ad.2 - dl X -nX _ x -- 1 IO s � / r Groan ♦ B -95f- - ` � X 8P 'tM/,QBEFB=2.D H. -Y3- STA/3+04.73 `1 a9 A/ / _ _ _ - - - + ny -' Od13 \Y✓ " dl I I _ _ _ / W00 \ `I \} `v'� _ d f•9i- - - _ _ _ - - - / �d3a .SI - ' / 4 CV Min. D=2.5 H. B - __ a9 _ ----_- d _ a9 -r dW�J I fi a0� -I- Mi.. D-1.5 Ft. aO _ dl3 a� _ _ a0 B=3.0 Fr. 'SEE CROSS SECTIONS Min. D=1.o FL. FROM STA. 196+28 TO STA. 199+00 -L- L7 \\ 1 _x = _ _ -„- _ - - -_ �- - - -, - _M- - - - I _ - - - .. - -._ _ _ _ _ NMONMNn � �7Ad. ' FROM STA.11+17 TO STA.11+80 -SRY4B- RT NMONNNn o WOODS x E- \ a0 dry°.9 I I a STA. 28+60-Y3RPC- RT I \ `- w POT Sta. 12+00A0 WOODS d13 FROM STA. 179+00 TO STA. 179+50 -L- LT N H CAROLINA s ? .. .. .. .. .. .. .. .. .. .. .. .. .. .. S 44•pp•gg77 NORTR C NA RAILROAD COMPANY (OWNER) FROM STA. 181+50 TO STA. 192+00 -L- LT RAI},LnOAD COMPANY OVOY7roa N/70atlJ d NORTH CAROL/NA RAl AD PANT' (OW'N R) �dW3 •81 NOR N ANY (OWNER) pM d3a .81 0 R UUCC E8 .. o tp0 LqW .. .. .. �t ��q&0� q�RAIli7OpD C0Np .. NORF LK HE N RAILROAD (LESSEE/ FRO T . 190+00 T TA 199+00 -L- R PG 312 -R - NORFOLK SpITHERN RAILROAD ¢E55EEJ NORPBpI'�Lvli M7 ERII-17N1VAAD rIESSEEI _ �7 -r'`�1•n .. .. .. .. .. .. .. .. .. .. .. .. .. O.11 .. .. \� �l .. PC StO.12+Z�sStG26+2426 woo05 RAIL TH CAROOLINNA .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..�I9N2 .. .. .. .. .. .. - STA1A+7/J0ON .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ... .. .. .. .. .. .. .. .. .. .. .. �3-E�B am I CL 'B' RIP RAP CROSSING NUMBER \ �i✓ FENCE_ - CL 'B' RIP RAP 1 1 PC Sta. 18+10.76 RETAIN WOOD$ WOODS - - + = EST 2 TONS F E SPEC 2' BASE DITCH EST 2 TONS - - - O. 9 iEl f WOODS POT Sta. IO+0000 1 I eta .-. -,-.� -. -.- .-. -,-w- _ -. w 3Ad .Zl.. .. .. .. .. .. .. .. .. .. .. .. EST 7 Y F - -EC 68.09. - - \ zxorvsi/a n 1 s s G 722684U MP ST S 1 W - --------- - - ----------°------ -- --- -_------- °-------------°------- - - 9 71isY too.o7to aoNO%�3 7 SY GF x NM N Nn I " Sta. 23+( .4/ . 24+n.4i 47'WW�EN�F _T Fo- - T331S .8 -. Fo- - - �f f- - - �3�`.e CS D. CL 'B' RIP RAP a EIP F D - - - - - _ _ S .. .. .. .. .. T .. .. .. _ f ING / .-. C 0 - .a -of ny _ - _ - _ - _ _ _ _ _ - _ 2 7331S .8 / «� - 4 - RESURFACING ONLY ° O O In--- - _ _ _-x-si1. --_- - _311Sb7d O - - O E� N r C _ - 7- -of y_ _ - _ - - _ - - - X 3115tl1d •9 - - - - - - - - --- - �- - -x- - - -x- - AVMOVOa 03AVd AZ 3 N33aO Z6N a5 -�- �� + + �- ---- -mar- l---- ---- o --- \ _ _ -3. - - - - - +58.63 3Ad .Zi ��w► O ----- _ Z`- -; t1B5£81H3 .ZL NMONNNn .21 OL 1° + INC. I ��__ -- Q �d(9f N NANn Ol --__ -�_ ��� = 1._ - -o +20.00 .. .. .. .. .. .. .. .. 1 W7YP.8. In GRASS 86'LZ=d01 IO -a .Sl - �, 0\ 20� 06/27 165 - - _ 90.00' .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. G .. .. ---------- a ---------- - 3'E C`7 Q W --- _ ------ u --- \ \ Q - b: Cn _-- l= ���- _ B.. -Y3RP 3 311.00 Q mi ry REMOVE w 4/ r GRASS- --- _-- ; ® __ .2 FE * % i(- Ezl Twk R/w C I'- __ t o u PEC 2' ExISTIxc a/w �-of n Q I -- ----- -- -- - - ----- r � 1 -F- N V _--� � -y-� �- - DETAIL 16- \'STD 'V' D � � C (n L� ; �#^/_ _ RADE TO ILN EST 25 CY DDE + r -- �---------------- ------ UGH- co �� -V \ d0'LZ=d01 10 + SEE DETAIL 16-7 C D 6 SEE DETAIL 16-1 m _� -- ----- = -----= __ - ----- __ - - a - -- __ --_ -_______� LL1 O h Y 2GI 15"- - - - cRAss - �' Al- - - - - - \\-_ - - -_ _ _ ==_ -0' n= _-Y3RPA- +80.50 + ZS +83. (NO RECORDS FOUND) _ _'i A6.95' 1� 76 z � - - - - - - - - -- - - - - - - - - - - - - -_ _ - - - -10 _ - - < _ - = g f "-�� ' , - -9- - � fiEMOV tO. "`�- - �� REMOV LPj �� �i � nosa' N ATION � + Ln - �f y- - y Sta.14+83J1 - - - _ � - - - - ��� - -s� - - - � d - � _ �� C DEPT.OF TRANSPORT _ _ B' RIP _ nf_ SRS O t- � r --- __ _________ ___ _ _-sue--- __-- -___ ��_ - _-��______------- sr * sti ---- --- END BRIDGE-- -wn,- > _�_ ��- z � _ --- - _� �_ �_ �PECDITGR Y,HADIIQC SR nsf RYFaE AVAr1Wnr NM _ _ - _ _ _ > �_�- } .. +750 LU ---- - - -- ---- --- - P°=� --- RADIPIG_ _ - -2Gi ---_ _ �i� m- - Sta. 13+83J1 'FEN ETAIk i6-6 o n •B �f4 /,QO#98.74 11 � 1'- CS Li Q 3 .SI N_ S3Sn- W _ d7a .SI 33 •' 3 60 x/a 9N,sixf or 7 _ =yi _ _ =ssf _ -® FS,-Y'3RPq- REMOB9 �� �� y � � vE P J( }3� - __ _ 2LL4, DET 1 -- aol IG f nf_ Sta. //+75-0 SEE DE TA 8 No 1 a xe 1 /'ti!/ARDRMC�} +75D0 +50D0 - y_ _ - _ _ _ �.� _ - _ � � � '�i _ .. J _ SEE .. SC d7a. O FS,SEE DETAILS EE7 `>•ii oos o 2GI 15•• GREU (I'L- J +24D0 =-ice - n,_ - _ - _ - 7Ad,£ TS Sta. I0+75.00 I 1 F5, SEE '.®' 2D-4, DETAI 12 0" � •8 1675 > � 2GI B4/ -+- _ _ _ _ - � _ - _ -261 �_ � �� ��� � � � � ��� � -of nf_ _ - - - CL'B'RIP MB EST 5 TONS O %1/B - WOODS 2GI P V vl �_i-- - _ n, - - 4 US 7 u a -ssf -of ST 14 SY GF ISFD 3.BS:SbSS N ABAND Q d1H W o IAU _3 CGAU p. WOODS - _ -s _ '�i� f ny_ _ Ln,.{� w CGAU I iL-3 ,� ,-B o - MP 0 oPROP.GU/DERAI US .. 0 = �04�00'OO� � E ' z \ 0� L-3) + 1'XJ 9 2GI h 75 2 2 \ '1 n c � - ITCH GRA = = = of _ = s-= = _ --0f�' _ - - _ -25' NCDOT N� WEHEA6D.P 1 © 6o PROP GUAR L f73.14 �► 2GI F5, SEE o9'Lsx SEE _ _ Y =__ APED 1230 PG 775 z PG 121 1 NCDOT +25.00 lblo 2GI "' l 1 D-4, DETAIL 12 - - _ _ _ ��►- �� _�- ���-; 1 3 PG 121 1 • nW NCLT ""'' a-77 PROP,Sq•, _► 1617 - - - - h I DB B 3 PG 7 I ram. STATION NGGAS REGULATOR O _ _ - 115 DB 1656 PG 432 N N F Idol MB 3 PG I: STATION TO BE RE[OCAT 615 4CDOT-77 ;n = DB 5566 PG m \ NO3 - 1 <� 2GI AT 7 +7225,,� O DETENTION ASIN I BEGIN APPROA SLAB'�TG I + Q� o SEE DETAIL SHE 2D-3 z I ��/ b• 29.522 6 . ® SPEC 'V' DITCH b.5 o S T04'04' E 2T'04'04• E 3.8£.041Z S 1 SEE DETAIL 16-9 O F '• s � UNITED STATES a S 25.42' S M .Ib. IS j- .LS.00.LZ S \ � � rsT y a y M Q s.)2' \ NCDOT 1 BEGIN RIDGE EST 2 io - - _ (CROATIA NATIONAL FOREST CL 'B' RIP P ��yi' 61 zo zo F DB 336 PG 16 F a 3 LZ pB efts PG 605 EST 7 SY GF-Y3RAB- POC SlO. 2+24.92 3.6Z.55.£ S \ MB 3 PG 121 ce -L- STA /80+/9J5 7 FT- o .SPEC 'V' DITC G' \ m NCDOT - EE DETAIL 16-9 C SPEC 'V' DITCH ST Sta. 19+6794 CS Sta. (7+67.94 25' / 2GI 12.5' +37 DRAWDO N 5 UCTURE WRRASH RACK S SEE D IL SHEET ®1 a o \ - I , 1 NF SEE DETAIL 16-1 f - yy+- \ o SEE DETAS E 5 2D-1 AND 20.2 ? DB 1926 PG 856 i G 3lOd \ o N \ \ DETAILS 1 N NCDOT s m CL 'B' RIP RAP \ 63 OVIA 31od �• / TYP. V _-CL.AU- - - W 18" RCP -III N _ _ _ -Y3RAB- PC Sta. IO+OOAO = Esr Ns s � � � �.► _LIJ S +67.72 o xo \ ® 1 DB 1054 PG 260 `^ - - = EST 7 F i AI ,5 o o Q. SH o �► - yi - _ _z �S C 57.41' ry \ 7 1 MB 3 PG 0 _ _ \ -i \ � t1J241 b . 11"EE FILL IN EXISTING DTCH d9 15G / 2GI 2D-4, DETAIL - c) Sf0 O %yp CL ',g RIP RAP � TO NATURAL GROU D O. •/' �75" \ is � � TONER � -/ p 2 S TONS SPEC T BASE DITCH ;y g• BPD EST 3 TONS + 42.00' J OF 3a o / ® ST �SY GF SEE DETAIL 16-2 ;g c c - �) +67. 4 EST 10 SY GF 42.00'J� > 2GI \ 2 m < SPEC 'V' DITCH - S ND WW FE E ti1 CA - _ Y3RPD- +00.0 _ Q� o° n SAMUEL GRIFFIN V +n DB 904 PG 564 SEE DETAIL 16-1�-Y3RAB- ta.l= o \= TH 4.0x - / T �e3zdD Y3 POL ST CE pUF \•z �^ ti o z � D'IR � � /6, - �.\\ CB 5 32' � 4 S SEE DETAIL HEET 20.3 3 /5�05 - A //2'M��� Alt _ e � M 610 \ - - - r � 00� �� SPEC 'V' DITCH PO 1 tl o > 1 < i �� ` 3J 2 B ft SEE DETAIL 16' N h 4 C) 'v +n MIN > '_ir _ 18 P- ., N 4t� a lO � +5 00? `Y3RPC_ 65 HW c ?5� BABNOStlWS / C "V� I 63 CB �� \ Y 1 S„ ��> ��> 629 �_ �r } 1\ I C / R + S D TCH f -> M z FLORETHA W. BUGG a \ S ~ TYP' =' �® `° \ \\ ea > ' �' C) N LLI DB 1230 PG 775 e _LU MB 3 PG 121 6+ SHADE RAY S \ = o o v 'v µ,,, \ 64 CO' CL 'B'RIP E D WHITEHEAD, ET UX "&e 2S F 63 -\ �Zyc EST •, - 4 / - rL4' DE 4� + ' 57.00' > 1 DB 1129 PG 126 � O CL 'B' RIF RAP T 7 G P ONSE/F.�ETA ¢(' H• +15.05 > - (n U) (n L 'I' RIP RAP ��5yy J±y \\ z MB 3 PG 121 Ih FcT� * +If 'if' `v' 60.00' -� 1 T 0 TONS EST 7 SY GF ■ I 71.07' HW DUE DUE _ � E 50 SY GF jNpO ■ � � � � RY3 � C CL 'B' R .RAP DUE 38.00 PUE 65 _ ' R + 7.3 f R N ```` 5 ns.00, m � isd 166 � + DUE \ _ � � � EST 2 T Ns DUE�� N B' UE'�- EST 7 : GF +oz.76 +ta.00 DUES C F OR ;8'29'E CA ST C' N f� b \ \ -� +71110 98.00 98.00 CL'B'RIP RAP DUE pUE dl +5 5 32' LENGTH=20 LF,SLOPE=2.5% CHANNED 7' + 1. \ u� a.18+2 .8$, (' / DUE \+ 98.00' SPEC 3'BASE DITCH PT Sta.22+02.78 EST2 TONS SY G"..iii="..ii"".�DUE� SEE DETAIL 16-3 EST 7 F ...... NCDOT •p4• +15.42 CSCt0. 29+$L44 DETAIL 1 . �(� P 1 \ 9•E p 1 8.83' S 9' E \ D /iP - �, 7 4 - e � / + \ 409 ELEVATION 26.61 DB 2422 S 32�3�1f' UE EC LAT \V' Dfk H �B >/ OVE + 4. PC 134 - LENTGH=17 LF, SLOPE=0.3% PU - 02 ° SP C 'V' DITCH \ b 99.00' + N 458763 E 2603948 PUE EST 10 CY DOE PUE- SEE DETdIL 16-1 �B•R/w EIP SEE rnu16- m P � tt'r RAP �' BL STATION 169.96.00 58 LEFT 135.75 E � 51.50'4rE PUE SEE DETAIL 16-$UE� PCC StO: 608 \ b 0 EST 15 NS UE. DRAW WN STRUCTURE WD 20- RACK \ 2°38'29' N / D \x-SRY3DY4C- PT Sta.24++5A5 BM9 RR SPIKE IN BASE OF 22' PINE S ; 12•Iq' _ _ - p CL '2 RIP p k EST 30 5 GF SEED IL SHEETS 2D-1 AND 20.2 \ _ _ - 9• +16.00 EST 2 TO S 2 / DETAILS AND 2 k - +09.00 7TJ0' 6' w p TONS \ / � 1.06 I - _.......................................: 112. D0'-Y3RAB- P StO.Il+S E SY T \ q EST 7 SY G . )0' 7 / VE �X a• .4 94.00' ,p6.011 532'38'29' zz........z.........z:.......::..... r, N \ '� �sy. / x' O + \kiN WOODS -._. 3.6Z-8£.Z£ S •9z'B 410 ELEVATION 28. 76 < 1 \ _ Q $ \\p'( P �' \ - 3 91,p5.95 N 457121 E 2604464 ® \X>/ 3 .9Vbb.9S N Ol MN;=•I �Q ' �' O 7 QV� \\ FILL E G DITCH BY8 STATION 26. 19. 00 6 RIGHT - 1 3s.00'� T�ELE 26.5 BM10 FILED 'X' IN BONNET BOLT OF FIRE HYDRANT 1- I g / 9300 x� . +aa.00 MARY HUMPHREY SLADE :' ^ s;,+ ; P 57.00' & \\\ \y sNlna- . < zz....zzzz....zzzz zzzzzzzzzzzzzzzzzzzzz - A - \ \ O �- M J $ ❑ k DB 1054 PG 260 \ \ o `•Yf \ . ..� +44.00 MB 3 PG 121 z N f` m� D 4, V \ o, ? \� \ 45.00' & NCDOT �, 0 \\ \\ y\ X b R w 5 o v \ 95 00' DBG gRo28 �n •( Yo N I AlF SHEILA B. RICHARD SHEILA B. RICHARD `Ly P3 PG8121 '^ II 148 4g'4 A \\ 7. �/ \\ \ `� DB 1734 PG 489 DB 1734 PG 489 (I "I Q �� / Q\% PC H PG 71G PC H PG 71G MC MB 3 PG 121 MB 3 PG @I WILLIAM CLINTON �t\Q h PETIFER, ET UX NCDOT Q M 3 PG 439 DB 2238 N E \ N / J1 SPEC 'V' DITCH \ Y, `\ $ XCO ob. \ q� MB 3 PG 121 G!� \ Q '" e�\ GJ /\ � � \ I PG 43. \\ E DETAIL 16-1 I \ •' /%/ �� / I � \+y �./ e 7 z Sta. 12*22.82 A` - \ 5 c 3 .LO. � 6.14' I X .�. 11 S �. C \ --5-54.38'36' w Z`'0 \a \ r\ /QJ�-SRYlDY3C- POT Sta. 150 h A5 \ "• R / = M/8 p1 `-SRY3DY4C- PIT Sti./0+00-9/ - \ m +27.65 o04 -Y3- POT Sta.21+50.40 �" \\ ✓ \ \ G 45.00' i vtl•L� 02 \ 61$ NCDOT DB 629 PG 614 \ \ •°GF \ p >/ Irv/3Ci/ 48.0 ' i \ 1 08 NCDOT DB 856 PG 10 C. ,SRY o 12I \ MB 3 PG 121 � zz R +68.00+ �\ \ F 576.00 SPEC 'V' DITCH 8000, \ 98.00' & 98.00' & 119.00, 119.0( A& PVC .\\ SEE DETAIL 16-1Ln PUE \ +5.73' PSta.146+27.65 <w\ \\ �+ \ �- _ PROP GRAVEL pUE _ - +90.00 PVE DRIVE (1YPJ z \ ROLAND +9s.00 - BRAXTON, 65.00 96.00' & FLORETHA W. BUGG BARBARA ANN ET AL 96.00' 8 117.00' pU - PUE MB DB 133PC121 775UP RICHARD MATTHEWS 47.00STANC' TT1 \\ �' t0. 24+/9�/ DB 1538 PG 241 117.00' E BARB L, ET N MB 3 PG 121 PUE PU DB 763 PG 14B gp£L \\ DB 1579 PG 428 PUE PUE- +54.00 S oVE 02 \\ +y \ MB 3 PG 121 PUE +44.00 90.00' & \W +71.00 +80.00 9o.DO, & 110.00, 15'llb� b a 2 - p2 \ \ SPEC 'V' DIT H 4•+ \ 95.0a, & 110.00, -2.££ q YYY 115.00' j15 00'& 4 a SEE DE1rAAL116 1 N I - 1 \ \ \ SEE DETAIL 16 + \ +57.00 SPEC 2' BASE DITCH - m . �15 00'& SEE DETAIL 16-2 95 0o a SAMUEL oVE \I C 115.00, Z.- GRIFFIN, o .( 3 ) m HEIRS s Z 12 ASH E 3 DB 893$ \ r E ELSIE L. NOLAN, ET VIR PG 4680 120 11£1 DB 1862 PG 446 �N/a E P 3 .BD�ZA� GN`WY 3_ S C Y - rU � �• / \ LLZ f \\ 6 -Y3- 22 FISHER AVE. 12 10 299 303 387 391 -L- -L- US 70 10 US 70 16 12 -Y3- 18 26 FISHER AVE. 30 EST. 2019 /2045 TRAFFIC VOLUMES ►������������4PAVEMENT REMOV FOR -LLT- PROF/LE SEE SHEETS 46,47,& 48 -Y3- (FISHER AVENUE) / -L- FOR -LRT- PROF/LE SEE SHEETS 46,47.& 48 FOR -Y3- PROF/LE SEE SHEET 66 FOR-Y3RAB- PROFILE SEE SHEET 66 FOR-Y3RPA- PROFILE SEE SHEET 67 TIP No.: COUNTY: FOR -Y3RPB- PROFILE SEE SHEET 66 GRAPHIC SCALE R-5777C CRAVEN FOR-Y3RPC- PROFILE SEE SHEET 69 DESIGNED BY: DATE: FOR-Y3RPD- PROFILE SEE SHEET 70 50 5 0 10 100 BB 3131123 FOR-SRYIDY3C- PROFILE SEE SHEET 89 1 FOR-SRY3DY4C- PROFILE SEE SHEET 90 11111 10 CHECKED BY: ACA DATE: 3/3I/23 PLANS Submittal February 6, 2024 DETAIL 17-1 SPECIAL 'V' DITCH ( Not to Scale) Front of Ditch Natural p'1 \gt Slope Ground ? j D F\a\ Min. D=1.5 Ft. m CO H y v H� FROM STA. 25+80 TO STA. 31+50-SRY4B- LT FROM STA. 199+00 TO STA. 202+94 -L- LT FROM STA. 27+50 TO STA. 30+30-SRY3DY4C- RT FROM STA. 20+00 TO STA. 25+70-SRY4B- RT FROM STA. 203+50 TO STA. 207+50 -L- LT FROM STA. 38+00 TO STA. 40+50-SRY3DY4C- RT II W END' FESZYRFACING ONLY y W m m m Cal BEGIN CONSTRUCTION co SRY4B- STA. 22+17.00 O EXISTING NCRR R/W O + - 0 cV ���- _ _ - PT Sta. 22+94.66 y C NG pN NMON�Nn „g \ _ o NMON o �N� „8 F V) -W_ _ A t CULVERT OUTLET -, +99.53 BANK STABILIZATION W/CL 'I' RI RA DETAIL 17-4 CULVERT OUTLET BANK STABILIZATION ( Not to Scale) Natura�- __ Natural c(�r�ounda Fkis 8p'� \ ground egNK Et SSTuck Geotextile Key Riprap into �� a Minimum of 1ft Channel Bottom (Typ) Place Geotextile Under (Typ) CHANNEL BED Riprap in Locations (Variable) Directed by Engineer Length=30 Ft. *Rip -Rap to be Installed to 2ftOutside Top d = 3.0 Ft. of Ditch Slopes on Jurisdictional Streams Est.=28 Tons of Class 'I' Rip Rap, keyed -In, Est. 46 SY Geotextile STA. 25 + 78 -S RY4 B- LT DETAIL 17-6 CULVERT OUTLET CHANNEL ( Not to Scale) Natural Natural Ground 3 D 15A � Ground Tuck Geotextile Geotextile B a Minimum of 1ft (TYP) Key In Rip -Rap per Std. Dwg. 876.01 Min. D=3.OFt. Type of Liner= Class 'I' Rip -Rap B=5.OFt. Est. 60 Tons, Est. 105 SY Geotextile Est.52 CY DDE STA. 203 + 00 -L- LT DETAIL 17-5 CULVERT INLET BANK STABILIZATION ( Not to Scale) Nroun� FXisT ?� - motiatund � e" \ agHk e+SSA L Tuck Geotextile Key Riprap into �� a Minimum of 1ft Channel Bottom (Typ) Place Geotextile Under (Typ) CHANNEL BED Riprap in Locations (Variable) Directed by Engineer Length=30 Ft. *Rip -Rap to be Installed to 2ftOutside Top d=3.0 Ft. of Ditch Slopeson Jurisdictional Streams Est. =20 Tons of Class 'I' Rip Rap, keyed -In, Est. 33 SY Geotextile 25 + 75-SRY4B- RT DETAIL 17-7 CULVERT INLET CHANNEL ( Not to Scale) Natural Natural Ground 31 D 5% \ Ground Tuck Geotextile Geotextile B a Minimum of 1ft (T\'P) Key -In Rip -Rap per Std. Dwg. 876.01 Min. D=2.OFt. Type of Liner= Class 'I' Rip -Rap B=4.OFt. Est. 80 Tons, Est. 170 SY Geotextile Est.45 CY DDE FROM STA. 30 + 30 TO STA. 30 + 95-SRY3DY4C- RT DETAIL 17-8 SPECIAL DITCH GRADING ( Not to Scale) j � I .. c. x EX RNV P P WOODS SP �qR/ D \P�'� SIP / EX RW & 33.00' � \ \ SEE DETAIL 17-4 MICHAEL D. HARDISON, ET UX �e�F .IP+65.32 DB 2069 PG 973 +65. u+ *SEE CROSS SECTIONS Min. D=1.0 Ft. CY)\ \ \ \ \ \ \ y 68 .00 N FROM STA. 199+00 TO STA. 203+00 -L- RT 30 N N FROM STA. 207+50 TO STA. 212+00 -L- LT MICHAEL D. c + 05.80 m m + 95.00 m m FROM STA. 204 + 00 TO STA. 212 + 00 -L- RT \ \ � � \ \ \ \� RSV 68.00 HARDISON, ET UX 26 w \ \ M DB 1410 PG 1090 NC DEPT. OF TRANSPORTATION N o �C (NO RECORDS FOUND) \ \� \ \ \ \ N B GIN CONST RUCT IO N Uj \ \ m Ca- /0 - ST A. /0 +00.00 5 SPEC 'V DITCH \ , U� r CL_ SEE DETAIL 17-1 +74.1 \� \ v \ F SPEC 'V' DITCH WOODS F \ +86.32 ti \ +5 .42 SEE DETAIL 17-1 81 cj EX RM/ FxsT�G R/W \ EX RNd RE E \ + 77.30 PC Sta. 29+77.08 w w � 1 R 6 MON ^ ^ \ \ \ \ EX RNV 0jSI 9\ I29.4I' q 3 CULVERT OUTLET CHANNEL c\ W/CL 'I' RIP RAP (BANKS ONLY) CULVERT INL C /Y \\ \ \ i REM \1 1 A SLOPE =0.30% BANK STABILIZATIO °e /p�_ `S�g ��\ \� EXIS7�ING SEE DETAIL 17-6 W/CL 'I' RIP P " � g2 n_ ON \ \ � � • i / n 9' R/W SEE DETAI 7-5 +61.00 C \ EX 1 _ \ \O° /NC "� S 54 37,�0.1 W +25.89 c, 182.37' -Y10- POT Sta. 1/+40.80 = SPEC 2' BASE DITCH O SEE DETAIL 17-2 WOODS \ \ \ \ Rz -SRY4 - FOC ta.32+29. zl 71.00 _ PROP i CL 'B' RIP RAP +90.59 E \ \ \ Fk�sr Raw SEE DETAIL 17 12 LL - SPEC 'V' DITCH � � \ � \ �Nc GRAVEL x -°� Al_ EST 2 TONS 166.94' N SEE DETAIL 17-1 +62.61 \ o \ \ DRIVE i i 1 - _ EST 7 SY GF EX � ` \ \ ° \) + 21.28 O N \' EX RAW +68.71 W TO EXTG DITCH 0 40.44' _ =- _ Al C �~ SPEC 2' BASE DITCH CL 'B' RIP RAP +02.00 �hQ� Rf_ _ ° AV SEE DETAIL 17-2 EST 2 TONS 136.UU' o RE - �� o \ WILDLIFE CROSSING EST 7 SY GF A \ \o \� 8\ 8.31' O GRADE TO ENTRANCE N � 1 0 .ELBOWS CAT- W C)I 1 =L_ - C_ - J o ��� 1- - - f4 . 9 - - 0 � *98.00 N N f94 261- GREU P DITCH GRADING r CLij ) C --_- w CL 'B' RIP RAP +22.06/ EST 3 TONS 60.00' UE EST 10 SY GF DUE DUE PC Sta. 29+22,O6_,---- 7�---------- SPEC 3' BASE DITCH _ SEE DETAIL 17-3 DETAIL 17-9 TOE PROTECTION IN WETLAND AREAS ( Not to Scale) ,het Natural Ground/ \ o\S\0 Wetland Area d* d d = 1.0 Ft. Geotextile Type of Liner= CL 'B' Rip -Rap FROM STA. 31 +16 TO STA. 31 + 5 3 -SRY3DY4C- RT qy� -TL3 f78.79 --oj Al- DETAIL 17 ?0` PROJECT REFERENCE NO. SHEET NO. R -5777C 17 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Buifuup Beatty StN v DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED POT Sta.8+15.26 ,96°6�1 3 ,,9b,LO.9Z S 32 ROBERT D. FISHER DB 957 PG 309 MB 5 PG 88 3 OZ,LO. �.+93.15 vEX W ( �t I `�I •F Snqjsi Sta. �. • 6" CURB '1`� • ' ' ' ' , u IL -ILDLIFE ..yam �- ��- • �� �� � ' 1 It'iii11��1-1 �71 -1�: IIIIIIIIIIIIIIIIIN ES AWA In y � • • Rom' �; t • r• WJ= . - ,,•• ce/ G A WOODS IS" 00' - YID 2G1 - -ss- SEE-DETAIL R N 2G1 170 Exls - - - - ^" - - --_SRY3DY4C- +46 - - - -r N N ,On* O6� nNc ,W - -1 -1 - - - 25.W - - _ GI-D 7,3" -o° Al- 0 0 o D-4, DETAIL 11 18" RCP-11 I o o o PROP. SBG (.,- <o �------_ o GREU _ - _ = = 1 _ V _ lCC 170 TL-2)� O PROP GUAq/ 8:l TYPE 0 ®,M + 90.81 � __ --1 i` '� 50.00' AT I +15.9I co \ G R/W 1706 1709 �, _ + 4 .5 + 11.IV)65 00 _ 50.00' N/ WOODS - _EX +39.00 T � I DAYLIGH I DUE D UE DUE DUE CL 'B'RIP RAP +01.00 +18.52 �• � 80.00' A E DUE EST 2 TONS PRC Sta. 34+46.5/ +32.00 � EX R/VV DU \� 7F /` /` PRC Sta° 31 +90. EST 7 SY GF 62.00' CH +91.00 I SEE DETA�ILMa�-11 103.0+ & 110.00' +01.00 /` /` 7F 7F '� +75.00 CL 'B' RIP RAP SPEC 2' BASE DITCH-EL-151+78.06 G \ 73.00' & 84.00' EST 2 TONS SEE DETAIL 17-10 65.66' +31.0 103.00' & 110.00' m EST 7 SY GF - / EX RW I T D CULVERT INLET CHANNEL WILDLIFE CROSSING rr� -Y9- POT Sto.10+0/.00 W/CL 'I' RIP RAP (BANKS ONLY) \ DE O NT�gNC/E TOE PROTECTION-SRY3DY4C- FOC Sta. 37+65.05 +9 . 11 SLOPE=0.25% +56.00\7F 7F /I� I + . 0' (FILL SLOPE ONLY) 2 n 11. 2'. 11 11 1 42' SEE DETAIL 17-7 105.00' CL 'B' RIP RAP EST 2 TONS 408 ELEVATION = 27.82 TIE FROM 131 EST 5 SY GF UNITED STATES OF AMERICA N 460080 E 2603545 EXTG DITCH SEE DETAIL 17-9 (CROATAN NATIONAL FOREST) BL STATION 156+29.00 103 LEFT END CONSTRUCTION DB 336 PG I6 BM8 RR SPIKE IN BASE OF 31" PINE -Y9- STA. /0+85.83 11 w . 1 DETAIL 17-10 FAV MENT REMOVAL SPECIAL BASE DITCH ( Not to Scale) Natural 01 Front Ground Ditch D Slope Min. D=1.5 Ft. B=2.0 Ft. STA. 32+00 TO STA. 37+30-SRY3DY4C- R1 FOR -LLT - PROFILE SEE SHEETS 48 & 49 FOR -LRT - PROFILE SEE SHEETS 48 & 49 FOR -Y9 - PROFILE SEE SHEET 77 FOR -YIO- PROFILE SEE SHEET 77 FOR-SRY3DY4C- PROFILE SEE SHEETS 90 & 91 FOR -SRY4B - PROFILE SEE SHEET 97 (Not to Jcale) Front of Ditch Natural IN, \\et Slope Ground 1 Min. D=1.0 Ft. FROM STA. 31+50 TO STA. 31+92-SRY4B- U FROM STA. 10 + 34 TO STA. 11 + 00 -Y9- RT FROM STA. 10 + 50 TO STA. 11 + 00 -Y10- RT WIN FAN VIM 1 • . Rw SPEC 2' BASE DITCH • , i :... •W 11 11 • • . • 1 1� i 1 1 • 1 I. •.• WOODS Sta. +81.42} 2N Submittal February 6, 2024 DETAIL 18-1 SPECIAL BASE DITCH ( Not to Scale) Natural O� Front Ground I? Al \e< Ditch D F\o\ Slope Min. D=1.5 Ft. B = 2.0 Ft. DETAIL 18-2 SPECIAL 'V' DITCH ( Not to Scale) Front o� Ditch Natural bl% het Slope Ground 3 j D F\� Min. D=1.5 Ft. I I FROM STA. 48+57 TO STA. 51+50-SRY3DY4C- RT FROM STA. 34 + 55 TO STA. 42 + 62-SRY4B- LT FROM STA. 42 + 75 TO STA. 43 + 90-SRY4B- LT FROM STA. 40 + 50 TO STA. 48 + 45 -SRY3 DY4C- RT DETAIL 18-6 STANDARD BASE DITCH ( Not to Scale) DETAIL 18-3 PIPE INLET CHANNEL ( Not to Scale) Natural Natural Ground d 3•� D n�1 Ground Min. D=2.0 Ft. LBJ Max. d = 3.0 Ft. B = 3.0 Ft. Length = 40Ft. Type of Liner=75 SY COIR FIBER MAT Est.35 CY DDE STA.48+55-SRY3DY4C- RT DETAIL 18-4 PIPE OUTLET CHANNEL ( Not to Scale) Natural Natural Ground n� Ground 3'I D L Tuck Geotextile Geotextile B a Minimum of lft (TYP) Key -In Rip -Rap per Std. Dwg. 876.01 Min. D=3.OFt. Type of Liner= Class 'I' Rip -Rap B=4.OFt. Est. 25 Tons, Est. 43 SY Geotextile ,L6°11 „OZ,L0.9Z $ Natural Natural RIVERDALE UNITED I Ground 3Z D �.� Ground METHODIST CHURCH I 1\ , , DB 1025 PG 99 "B z S DB 559 PG 331 Min. D=3.0 Ft. B=2.0 Ft. J 6 34 FROM STA. 43 + 90 TO STA. 45 + 00-SRY4B- LT O N M ^-' z RICHARD T. BOYD 0 36 Q, DB 1535 PG 493 N PC G PG 17G HOdnHD KENNETH R. BOYD JR. U)o M 34 119SI DB 3526 PG 328 m 38 - O `1(.000 Rh ERDALE UNITED C AIL ME HODIST CHURCH I-n B 3121 PG 867 C/) �rnm w C1\I mmm N Ob°0�1 0� v to C:) = D3 NOD 1' �L ,bb,6S.81 S 0) o � ��oz, 32 L6°II �x Lo•9z S W Ise I Ise SnedS1 &S _ i �\ YO �\ Xo I 'B' RIPMRAP I os 6�1 3�Od \ SPEC 2' �E IT6 • O DV-ij DETAIL 18-1SLT 2 TOS o CL RAP PT SfO, 37+1/.62 EST 3 TONS /nST 7 SY GF C)1 w 0 �i EST 10 SY GF +65.00 0"5.0& o 00' PRO ASPHLT54.CL B RIP RAP 7 DR E (TY \/ I \II 9� b6+Sbl-�3- I I 6, EST 2 TONS Now M/d a. I I , PROP GRAVEL o/I+81.0( N E T 7 SY GF +11.62 Crw ► I �� irfi , 1813 E~ I I - �5 1816 --- / C 181 1 1 ► I C -_ 1814 - - - - o O 1 �XA S 18" 18o a;o lie ; --- - ---- - 4 EXISTING R/ / �M�/� N 1 - „ y %I9 d13 EXISTING R/Wllw R/W + 0N69 - ° ° EIP °- L.LJ n 1- V - - - - - M W - �QW o �/Lull 00 U) F-5, SEE DETAIL SHEET _ - -68 Ad .21 2 M I- - - - - 2n- .eeDETArL u - - ;_ _ _ _ mil 180 _ Al- i- - - - oJ Ai- 0j l- - - 2G1-D o N S SEE DETAIL C o _ SHEET 2D-4 Z p N �' `CIL-I US 70 EB 6_ : 52 �7�!!•' :�S�:G�1�1�1�1�1�■1�1�1�� ���1��1�1�11 SWAY t� 48.00' \ 35.00.1 tG. 43+46.3/ 45.00 & , + & 57.51' e9 59.00' -Y7- POT Sta. 10+0. 0 = 50 s\ -SR 3DY - POT S1 44+47 3/ \\ C 'B' RIP P Sr7j ° o-00/ o!�Y- +63.0 ES DNFiCDNSEX RW \ ES 7 SY GP# \ DNOD O� \\ SPEC L2`-BASE DITCH86 L91 \DNOD 3 ,S1,0S.6b \ SEE DETAIL 18-1- \ END CONSTRUCTION j 2 -Y7 - STA. /0 *98.00 \ \ \ JARVIS FRANKLIN \\\ HARRIS, ET UX DB 866 PG 401 V \ 3 \ UNITED STATES OF AMERI \\ CROATA�NATIO L FORES ) \ \ D 36 PG \ \ \ \ \ \ \ \ \ \ \ \ STA. 42 + 70-SRY4B- LT DETAIL 18-5 SPECIAL DITCH GRADING ( Not to Scale) I 1 *�qRi D P�'\� sP sP qe�F *SEE CROSS SECTIONS Min. D=1.0 Ft. _j FROM STA. 212+00 TO STA. 223+00 -L- RT cv FROM STA. 212 + 00 TO STA. 220 + 50 -L- LT C o FROM STA. 216 + 50 TO STA. 217 + 00 -L- M o FROM STA. 222+00 TO STA. 223+00 -L- LT 1 2Oil �Im co 42 40 JTC INVESTMENTS, LLC SALTWATER LAND DB 1613 PG 491 STD 2' BASE DITCH COMPANY, LLC PC G PG 17G EST 205 CY DDE _ DB 3406 PG 415 SLOPE = 0.73% PC G PG 17G SEE DETAIL 18-6 S9°9� DRY DETENTION BASIN #4 M ,8Z,90-�8 S SEE DETAIL SHEET 2D-3 O NwDRAWDOWN STRUCTURE W/TRASH RACK SEE DETAIL SHEETS 2D-1 AND 2D-2 SPEC 2' BASE DITCH `O o DETAILS 1 AND 2 SEE DETAIL 18-1 +93.00 152.00' -11CLj' RIP RAP \ 5 TNS \ i PIPE OU ET CHANNEL,\ Eg 14 SY GF W/CL 'I' RIP RAP AJNKS ONLY) ` \\ w \do_ b7'�Z=d01 Is°EST 5--,CY-DDE ��••ST EC DDE dDdSO „\ 1-0 I LID . ��II0 TAI LA 8-4 � o I d38 „SI 0-) .+68.00 I � 79 0 \ N I+ 4.00 ) 9.00 00 �a I H / .0 �a I +92.00 \m/ 75.00 65.00' R 1 YO 1 5 .00 �� C 0 001 ° �� PROJECT REFERENCE NO. SHEET NO. R -5777C 18 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Rulfuur Beatty StN v DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED t/I1 i '' _ .�' :i"�',' is � •' fit 12 Will 0 IZE, AN y=�= 11II i SHOULDER :1Ird1%i/s►7GLI1�///J7� GRASS u -- no MI LWAMM EIVE SR 1159 18'PAVED ROADWAY FS, SEE ETA T , r.7�ii'�� �� :..rub v ■� r +18.78 ' • O • tip, u ' 1 1 1 • 1 1 1 • 1 1 1 Co . I ,. , - - - - o ONOO / J I Z N - O / I I \' rn ONOD \o o o • MARTHA FISHER HARDISON, ET VIR dwndyo d31S es 3 bl,ol.6b S ,� - DB 3241 PG 727 z � 129 c� t . 2+23• O 116SISS.0/ GRIFFIN LEASING, LLC Cb DB 2954 PG 83 S w cv 2 SO Ob/ M „6S,SS 0/ s, o N z z N v � Cc cN f-7 w S O Q0 I0 Z �•iy�T3��IiF�.s wed � • .I�Ii:i71�■s:s:� . PROF. GUIbERAIL C 1812 15" I O --- -"' 2 D-4 DETAIL 10 0 + N� 0 L� W --- -- -o�nl-----lm E ni- ----� o Q W 01_0 P U) U 7' T R/W J' WO +69.00 60.00' �1w J 68.50' WOODS CD 131 O " 3 ,ZZSb6b9 N +69.00 S9°66 � N 60.00' & 3 .� I,Sb•b9 N CRAVEN COUNTY 77.00' DB 3409 PG 229 b0°001 3 gb,bl.SZ S PIPE INLET CHANNEL W/COIR FIBER MAT SLOPE=1.25% SEE DETAIL 18-3 SPEC 'V' DITCH SEE DETAIL 18-2 CD 130 RIVER BLUFFS LIMITED PARTNERSHIP DB 1216 PG 656 PAVEMENT REMOVAL FOR -LLT- PROFILE SEE SHEET 49 FOR -LRT - PROFILE SEE SHEET 49 FOR -Y7- PROFILE SEE SHEET 76 FOR-SRY3DY4C- PROFILE SEE SHEET 91 FOR -SRY4B - PROFILE SEE SHEETS 97 & 98 Submittal February 6, 2024 DETAIL 19-1 SPECIAL Y DITCH ( Not to Scale) Min. D=1.5 Ft. DETAIL 19-2 SPECIAL BASE DITCH ( Not to Scale) Min. D=1.5 Ft. B=2.0 Ft. DETAIL 19-3 SPECIAL BASE DITCH ( Not to Scale) Min. D=2.0 Ft. B = 3.0 Ft. DETAIL 19-4 SPECIAL DITCH GRADING ( Not to Scale) sP� R/,q D �P�� sP B�F -4 p� *CCC r`Dr1CC CCr`TIr11.IC AA:... r%-7 n Ca DETAIL 19-5 STANDARD BASE DITCH ( Not to Scale) FROM STA. 54+25 TO STA. 56+60—SRY4B— LT I I I I FROM STA. 223+00 TO STA. 223+50 —L— LT FROM STA. 45+00 TO STA. 46+60—SRY4B— Li ROM STA. 51 + 50 TO STA. 53 + 50 —SRY3 DY4C— RT FROM STA. 46 + 60 TO STA. 53 + 75—SRY4B— LT FROM STA. 58 + 50 TO STA. 61 + 15—SRY3DY4C— RT FROM STA. 223 + 50 TO STA. 224 + 50 —L— M ROM STA. 53 + 50 TO STA. 58 + 50—SRY3DY4C— RT FROM STA. 10 + 50 TO STA. 11 + 40 —Y8— LT FROM STA. 62 + 25 TO STA. 62 + 50—SRY3DY4C— RT FROM STA. 223 + 00 TO STA. 234 + 00 —L— RT FROM STA. 10 + 50 TO STA. 11 + 40 —Y8— RT FROM STA. 225 + 50 TO STA. 227 + 50 —L— M FROM STA. 226+00 TO STA. 234+00 —L— LT O pp O L W OC Q W (U O zO+ 00 M J N F-- 2 U Q W Q U) U) J i U O 00, 0 LU W � � 2 U) U 0 � 3 CVO 00 (v 0 ,6b°611 ,Zb°80� 3 Ob,LZoZZ S O p m O N �LU � W Cn (U W, i OLO N M Lu � < LU 2 U) U) U), FOR -LLT - PROFILE SEE SHEET 50 FOR -LRT - PROFILE SEE SHEET 50 FOR -Y8- PROFILE SEE SHEET 76 FOR-SRY3DY4C - PROFILE SEE SHEET 91 FOR -SRY4B - PROFILE SEE SHEET 98 Submittal February 6, 2024 C CT 7D N 0 i L i (-1 LC�1 cr / S t) a- / DETAIL 20-1 SPECIAL BASE DITCH ( Not to Scale) Natural of Front Ground 3. N' ;e< Ditch I D �C\°� Slope LB Min. D=2.0 Ft. B = 3.0 Ft. DETAIL 20-2 SPECIAL 'V' DITCH ( Not to Scale) Front of Ditch Natural Ground 3•I� N et Slope G Min. D=1.5 Ft. FROM STA. 56+60 TO STA. 57+85 -SRY4B- LT FROM STA. 67+30 TO STA. 68+16 -SRY4B- RT FROM STA. 63+70 TO STA. 66+25-SRY3DY4C- RT FROM STA. 62+50 TO STA. 63+58-SRY3DY4C- RT FROM STA. 70+90 TO STA. 71+56-SRY3DY4C- RT 46 DIAMOND INDUSTRIALjQ CORPORATION DB 2812 PG 128 JOHN BOY[ 6b°b�l HUGHES, ET 3 12160.SZ S DB 1957 PG 9 n� 48 S N JOHN X BOYD v 31�3HS H w DB 2931 PG 372 Co Qq PT StG, 58+53.68 CL 'B' RIP RAP EST 3 TONS EST 10 SY GF WOODS r�Q+39.00 ' N 5.00, + 15.00 ' 'DITCH °- +32.00 58.38' & 12.00 SEE DETAIL 0-2 70 83.00' 8iH 00 .84 DUE "�P1 DETAIL 20-3 PIPE INLET CHANNEL ( Not to Scale) Natural Natural Ground / ? I D `) Ground Tuck Geotextile Geotextile B a Minimum of 1ft (n'P) Length = 28 Ft. Type of Liner=CL 'I' Rip -Rap - Keyed -In Est 26 Tons, Est 55 SY Geotextile Min. D=2.OFt. D Est 30 CY DE B=2.0 - 3.OFt. STA. 63+69-SRY3DY4C- RT 52 JOHN BOYD HUGHES,ET UX DB 939 PG 283 i /T / SfqiiA 3a101i53d DETAIL 20-4 PIPE OUTLET CHANNEL ( Not to Scale) Natural Natural Ground 3 n� \ Ground I D Tuck Geotextile Geotextile B a Minimum of 1ft (TYP) Length = 25 Ft. Type of Liner=CL 'I' Rip -Rap - Keyed -In Min. D=3.OFt. Est 37 Tons, Est 65 SY Geotextile B=4.OFt. Est 10 CY DDE STA. 58+70 -SRY4B- LT 54 SOUTH SHORE PROPERTIES, INC. DB 2374 PG 623 OO N F 07.00 + 84.0( OUTLET CHANNEL STABILIZATION W/CL 'I' RIP RAP EST 40 TONS, EST 75 SY GF SEE DETAIL 20-6 /Vq 56 8 GEORGE E. BROWN DB 3304 PG 87 54 ?p w � `'� + 46.00 97.00' SOUTH SHORE PROPERTIES, INC. " o DB 1450 PG I PRC Sta. 66+18.4 CL 'B' RIP RAP EST 5 TONS EST 14 SY GF DRAWDOWN STRU RE W/TRASH RACK SEE DETAIL S EE S 2D-1 AND 2 I I DETAILS 1 D 2 / I SNNG1 0v 132.00' 22.00' +13.0 l / / a. 6/ 1 •78 �� II 70 00' & IP OUTLE CHANNEL +84.00 +25.0 CL R RAP (B NKS ONLY) ON -7 O ' 58.90' 00' / / 0 SPEC 2' BASE DITCH / SEE DETAIL 20-8 / TOE._PROTECTION (FILL SL_0PE- ONLY) 7F 7F 7F 7fCL R! V/t�RAP 7F 7F 7F T 7F 7F 7F T ES S GF7F -IF \ S E DETAIL 20-9 \/ \7F 7F T T 7F 7F 7F 7F T 7F 7F T Uy 0. 7 .00' 0 +45.00 -93m- ` _ O o _ 103.00' ag °oo s � nt _ °oaa 70.o0' F H PRDP\N 0- �� C9 R � 02 P 0 $ s GPI 1 �c ° v� BURY //INVERT 1.0' �O ° VERT 1. HW a i w SINGLE GATE, �47" H, 24' W/D 5 / � i � C NK STA TI W L 'I' RIP P 02 SEE ETAIL 20 Ln CL 'B' RIP RAP e �Q Ct' EST 8 TONS 00 N EST 21 SY GF ► 1 • • . 1 1 • v�i�� • DETAiL 20-4 / 11 11 11 ••1 All n +49.91 GF rMA �00- • r►. • i� U 1 /` _ •;�` - ��`�� - Mi!Illr ���. -s- .l�_ _ .�� _ra s �i J •� f_:•.�'�'�►rim •1 - C�� I -a _-L �6T• -� • •L- a• ■ ` �= smill 4'PAVED SHOULDER aret SEE DETAIL 20-7 SEE DETAIL 20-7 US HWY 70 EBL 24'PAVED ROADWAY • • i i .i . . ME W I SHOULDER SSVyo 2GI-Awr OM or LO �!�!=�:�i�i�r:,5il.'J,il� �1�1�1�_. �11�1�1�1�11�1�1�1�>•I�i��C�l�l�■I�I�I�I��IL 1JIL-J�1�1•�1�1�1/�A�1�1�1�1�1�1�1�1�1�1�1�1�1�1�1�1�1�1�1�_�I�I�I�I�I��1�1� REMOVE- CL 0C • MON • _ , r� NMI` # , �F��►� �� "� �eE �`� � v `-r Far -_--�._.��.� �� . , � • . , ♦' � sii e • 1 1 � • '�+ �\. . ��`.;� � � • ■� � . �� �T-c ` �� �-E. �■�1 •Jean - .��_ 'Zio..�_ s'a__ �- �� -- rtr.• ,. r �� 1�i1=Kid . • ; _ - - -•-�.� - � .- : , w�i _ ► � �!��:�'� � � � ► �i� �' . � �...�'�' , y � ;��•� �C�:I��� ���,�� �� � -� a-�'�•� - �I�l� Illy ' ' �'�i • . �.1�'�� 'mil\���V i 1 i .. ' :-� . ,►�� �._�I■�J�I�i1�, •� 11 � • 1 1 •1 11 _ �� .. � •� III - 11 • i i DETAIL 20-5 PIPE INLET BANK STABILIZATION ( Not to Scale) N�Ja�mtu� Natural Ground BASK �T\St� L Tuck Geotextile Key Riprap into a Minimum of 1ft Channel Bottom (Typ) Place Geotextile Under (Typ) CHANNEL BED Riprap in Locations (Variable) Directed by Engineer Length = 20 Ft. *Rip -Rap to be Installed to 2ft Outside Top d = 2.0 Ft. of Ditch Slopes on Jurisdictional Streams Est.=20 Tons of Class 'I' Rip Rap, keyed -In, Est. 33 SY Geotextile 68+20 -SRY4B- RT DETAIL 20-6 PIPE OUTLET CHANNEL STABILIZATION ( Not to Scale) Natural Bed Elevation Natural Natural Ground / Ground 1.5' Tuck Geotextile a Minimum of lft Geotextile* (NP) Channel Bed *Place Geotextile Under Riprap Length= 20 Ft. (Variable) in Locations Directed by Engineer Type of Liner= CL 'I' Rip -Rap - Keyed -In Est. 40 Tons, Est. 75 SY Geotextile STA. 68 + 34 -SRY4B- LT DETAIL 20-7 SPECIAL DITCH GRADING ( Not to Scale) I I SPA *SEE CROSS SECTIONS Min. D=1.0 Ft. DETAIL 20-8 SPECIAL BASE DITCH ( Not to Scale) Natural 101 Front Ground 3• �' 0 Ditch I D fC\d� Slope LB Min. D=1.5 Ft. B = 2.0 Ft. FROM STA. 234+00 TO STA. 241+57 -L- LT I FROM STA. 234 + 00 TO STA. 246 + 00 -L- RT FROM STA. 68 + 24 TO STA. 69 + 00 -SRY4B- RT FROM STA. 236 + 00 TO STA. 239 + 50 -L- M DETAIL 20-9 TOE PROTECTION IN WETLAND AREAS ( Not to Scale) °het O Natural Ground/ ,0•1 °� S\°pe Wetland Area �v\\ d COASTAL GENI \\ OF NEW BERN ON HWY 70, LLC DB 2460 PG 637 \ PC H PG 79H ,L6°b1=d01 J Ia d=1.0 Ft. ah // Geotextile Type of Liner= CL 'B' Rip -Rap FROM STA. 68+57 TO STA. 69+00 -SRY4B- LT i PROJECT REFERENCE NO. SHEET NO. R -5777C 20 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Rulfuur Beatty StN T DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED FOR -LLT- PROFILE SEE SHEETS 50 & 51 FOR -LRT - PROFILE SEE SHEETS 50 & 51 FOR-Y4RPB- PROFILE SEE SHEET 73 FOR-Y4RPC- PROFILE SEE SHEET 74 FOR-SRY3DY4C- PROFILE SEE SHEETS 91 & 92 FOR -SRY4B - PROFILE SEE SHEETS 98 & 99 Submittal February 6, 2024 C7 O- \ CV C9 X w I I e. /0 z4 1w 5 PROJECT REFERENCE NO. SHEET NO. M/B W3N 0n151%3 B It It orWLs1%3 B B N 9NIISl%3 } R-57TIC ROADWAY DESIGN 21 HYDRAULICS QMMygp EN ,TRENTALST....0 ENGINEER ENGINEER I I I kx0useDBPC FF8� 220602 zPRELIMINARY ZM ' PLANS o. s CROSSING NUMBERNORTH CAROLINA RAILROAD COMPANY IN 722688W MP EC 66.60 TION DB 68 PC 312 DO NOT TIBB FOR ODNS'fRIIC[[ON o NORTH CAROLINA as RAILROAD COMPANY POT S/O. IO+OOAO �� N POT StO. l2+OOA0 -Y4- POC STA.12+2000 a o DS 68 PG 312 _ OVOa71Va tlN/70WG H " _ ' dn O -R 4- OtlOaAVa VN/70aVD H1a0N O GVOY71VY VNrIOYV0 H1a0N AI NWCAROL/NA RALROAD ROAD (L F FR) NORPOLK 5IX/THERN RA/LROAD fLE55EE1 8 .. .. .. .. .. .. .. .. .. .. .. .. ... �� .. i= .. _ .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. - - _ .. .. .. .. .. .. ' .. �_,tn .. .. .. .. .. .. ..NNW .. .. .. .. .. .. .. .. .. .. .. .. .. .. , ft" St%w TOE PROTECTION - - O. +OO O " TN SPEC 'V' DITCH (FILL SLOPE ONLY) CL 'B' RIP RAP - - - _ _ _ _w_ _:" -1 TOE PROTECTION' "m REMO E 1 I SEE DETAIL-x-X .. .. n.. .. C ; OUTLET CHANNEL STABILIZATION CL 'B' RIP RAP o \ X- w 1 J OVE 'V' WOODS DOCUMENT NOT CONSIDERED FINAL - - - - - - EST 2 TONS EST 4 Sy E. TF '-F T F T T / WOODS W/CL 'I' RIP RAP EST 5 TONS N \ SPEC DITCH MBS£ 9'SHOZL X�x�X as x I 9,sZ-SRY4B- �(��# Sta.8/+85.23 = EST 48 TONS, EST 89 SY G EST,1 SY SEE DETAIL 21-4 -S A- PV/ IO+OOAO = NCDOT X DB 3492 Pc I216 UNLESS ALL SIGNATURES COMPLETED SEE DETAIL 21-8 7F F Fe E E 9L5 S C CH SEE DETAIL 21-15 oa E NCRR DAYLIGH DITCH ✓•m Fj E6 3 : - _ _ E_ E E _ E E 2 E € EX RNJ � F V x/B MON DNIISL%3 ExLSnxc NLRB /w NG 'f337� /OO'TAP R 4 2' E%ISTING NLRB R/N \ w/a wwoN ONuslx3 lZ \ TAPER 2 +g d13 01 M/a .LZ'0 dl3 1 +60.0 - Lc)\ oos - - - .o �'B5� bo.00' DOROTHY 0. PEEPLES I / i RAIL GREU (TIEo, ,� l6 Hw BURY INVERT 1.0' \ \ Lrj �\ 17 \ 3 Bet ` DB 1215 PG 340 / y PROP GU Bd F d \ h o m \ o o °I N o O N\ - o c o c ol-SR - - D E \ \ r N 25' 32' %.3" W__► H e 1500o �/ o .o ow �..�o RFD 6, ,- PRC Sto. 22+48.09 _ o +39.59 16 MICHAEL D. HARDISOMso ms ••HM'��eu&Y IN r 1.0' RED SCOTT SMITH, ET UX C Esr z6 rolNs� N / / NC OT - HW woo05 M \ a' -24.79 C, _ ; ; 1 -. 68 �_ 2 17 ,76 K 17 36"w \ 1 + / S&/0 0.00' y s \ � � W v Ep / 18" r / 56 c GEORGE E. BROWN O \ l8' 1 18 R � +15.22 - - az.00' - �' ..34io Y4- � D m , , +38.0§ CL 'B' RIP � - ° 90.00' -� - ., 96 EST 3 TON C ONVBV � E 60.00' +48.09 O 71.76' ^� WOODS MARY ALLEN WRIGHT, ET AL 7 Vj 86 y 65.00' Nl �N N C 6291 W000s DB 3304 PG 87 r, 89.30' SPEC T BASE DITCH +97.59 \ \ W/ -' SPEC 3' BA I ODS +78.00 1 /5 \- \ �� w - - - I n 2 E ti E - CA E '8 E E� E 77 99' +72.3 o x x DB 3052 PG 929 F h + 8.00 4 7 106.14' S/21°u'40'E SEE DETAIL 21-1 \ / 43.06' S DETAIL 21 a2.00' SEE - 4. .. - - 25+96 = o Q Y4R B POT StO. J8 � M 9" ss 90. - - - OT o• - a _ � � I W ^ \ •X ta/5+96.45 SPEC 3' BASE DITCH 702 SEE DETAIL 21-12 \ .. X T SPEC r BASE DITC X 5 2111.40• E - ZL X M R � � � � � � �' 124.64' -. .. + - " BANK STABI IZATION _ � e. + .Ol' 3= 4' - wrcL 'I' RIP RAP \ NCDOT ' $ UU _ �\ 100.00' \ a I a' . ti-Y4 - POC StD.19+64.42 \ � ~ Y - NCDOT = ,N � I WHITE g POgpPER7IES HOLDINGS LLC DB 3011 PG �590 �y ti' 68.00' '^ 0, SPEC 2' BASE DITCH SEE DETAIL 21-1 v oo F SEE DETAIL 21-1 + S 211I40• E +52.00 tta.a2' t.t9' E E 13700'M $yl } 107,02- x CB SEE DETAIL 21-6 p, , DB 3536 PG 169 2 _ S 2rn'40'E E 192.00' E 4 PC I PC 9A m s' 29. 'V' CB 1 Nv � DB T48 PG 55 70 N - m R a- f1OT StO. 25+22.78 I . iv 130' \ � PC H PG 33H N `JO DOROTHY OLESTER r'1 o .00' 128.00' i / / ``�iYY 58 %000 62 O O S 211140• E 8' SPEC DITCH 5 4 143.00' 2I11.4 SEE DETAIL 21-4 66 153.39' 30. 0 - = l 16 0. WHITE'S PROPERTIES *- .££'Pal '$,� - - CDOT B'P".Y4RAB- POC S a /9+5 RT HOLDINGS, LLC 3 sbeasz S CARTER PEE DB 1083 PG 836 © _ tMl' RIP RAP / / ONIOVOI 60 � % r OVICKI N. JEFFRIES ULICE W. RICHARDS a0 GRACE LEE TYLER ET UX DB 1659 PG 84� DB 1T49 PG 992 DB 1414 PG 90 ON tl O L!l NCDOT �. C 'I' RIP RAP � •q _ N DB 3304 PG 87 +87.0 EST 57 TONS GEORGE E. BROWN PC I PG BH _ 1a9.00' _ ST to4 SY GP DB 3304 PG 87 W +2z .0 . _ C IP RAP .89,!.00' � ' I 4 v6 I DB 2990 PG 813 I TE g a53 g M WHMARC 702 : PT St6J24+ • • OI P J� 0. 23+35.85 PR IEp TIEgg UE HOLDINGS, LLC + 8.00 is 1 snellry I DB 3011 PG 59O S B �`C 'CL 'B' RIP RAP PC A PC 199A URE w/TRASHl RA DR�DE-TAITL1 ET5 2DB EST 15 TONS E. A EST 30 Y GF > 2113 PG 259 S GEORGE BROWN � � DB 330;PG 87 $RS to. /5+90.89 - °� r CS Sta. /9+73 - 140.00' ppppDS +07.00 PIPE 0 L L$ CHANNEL'" V'P LE 100 LF, SLC EST 7 SY GF / B280 CY DOE Q � � awns EST 280 CY DOE E d315\O SEE DETAIL 21-10 ° \I IEST 3 TONS EST 10 SY GF e - 70 62 � I I I a DETAII 1 AND Od51 a °y _ °", 74 6' � w a s � •, , m I ro -/. PIKRE� OUTLET LEN TH=100 \ i d �j M CHANNEL 1 P° a `J +5 . a - a LF,SLOPE=04% \ OXBSI 83.00' o m + � ST StO. 20+9 / +71. pUE P- OXIgSI ;R 121.00' w + w +13.80 65.0 ' _ 16 + 7. _ N _ 5.00' 31tlG 31V0 ": q 15 A \\ Lv ST Sto. 19+91.13 X---•V1F-- s - y o . CS Sto. 18+7/J3 1 +55.50 \ SDVQ29 _,•, a0 / u y h GI L .� / \ ��CV o EST Y DDE \ +b 00 \ SEE D 21-2 - ' c m o 83. Qf18V 0 _ mN a ' ; 1 \ N! -o odsl TCH s o A 94.52' 0' P� S SEECDETAIDLI 21-4 2 2 A6 t C1B� 0%85I ---- I 8 _ .. SPEC 2' BASE DITCH I o SEE DETAIL 21-, 91 0 0a lTle1 v � t�'i \ o r1 °'`� Q•• I y �� x ry CIE'B'RIP RAP 98.31' & 120.00' LIO a +10.b % - �j UE �� 'TRIP RNP 158 `'(� pUE m E UE P ,� PUE o{ILL EXTG TCH �> \ p- \ o - ,PUE PUE � p - � +47.0015B +66. m + 1.13 PUE m PUE U I + 1.1 +55.00 - 71.54' 4y T StO. +56 PUE U EST 3 TONS �/[', v CL \ 66.7 PUE \ 31tl0 `-1 EST 26 TONS '' +62.00 v aB 15 PO . H a v \ \ � +76.97 44411f EST 11 SY GF \ \ p ~ 50 SY GF PUE PUE E PUE 59,,, _ 2. �Z, " f PEg CJi 93.91 _ lok \ + C k °� 1v 1s H ; o 15 IQ Z G cB\ ��w xox � `ti} � � o n dtla ji a 31V0 ---�_ CA - - - 62. 0 , � � / <a'<' DRY DETENTIO. � w000 L ET SEE DETAI 2 + .8 C 78.5 e L m >66,15$'fi�>--g�-F'�i xtiMWFH > HE E y G11 a 60.98' I AOS c� d� \ \ 65.00' O ,1 f a /1.0 S 13 EXISTING r 15 I - da vv 13 £ � 2A �2w A dCa cl p �- +62.52 _ _ / y _ O � a -1 !_ O X /- - - - �( X XMBS£ 9 1H3.ZL � d13SCOSto• 16 /d 1 ® .. .. .. '"'•re,ewe - - - - - - -w- - - - - - - - - W- - _ - - - - -" uM REM - 07 C d Da .91 d3a, q� REMOVE � Gi d0a JIX RN✓ -- - n 1',�O 11 °a v1 mA1OV0a 03ntld.B109/I a5 ---- moN C Ste. \ - -- /Y GJ // /ll J YI --- < o MOV W - - ----- - - RE - �- I -�-BRI- o O / --- _ -- - - - - - SERVICE RO l8'B5T - - - - - � O - ---, -- �- I Q:\I -- - ------ N ¢ Q. �•Y1F- .. .. ,- caws - _ - - 3115tl1 - - - - - - - - - - - _ ;E _ - _ - - - -w- - - - - - - - - - - ssd _ --- - - - - - - - - - - - - - - - Dr ___. - - - i - - - _ - - - OI1541d� - PT-S1.O. 1V+ - C°RAEIE-DRAII'r 1 lOJ9 0Ad °' - _ - _ _ - -- -- ssd - i'rRADE_TQ DRAIN - - JI1Stlld .B - - - -o �Ad.Z_ _ ss] CP IV fN �R8AS1� r L DAPS, ------ - ---- ------ " _------- - - -- - - - - ss] 9. _�,-g]a.1-=--•o-�-- ss] -� - -- ---- _ _-_ o � P � Q/ ---- - - - - -- -- - - --- 'F sse - _ __- - -------------------- -- ASS 0-77 - H P P GUARDRAIL _ EC DES Ce��v L -- _ = - --__ -�] 7nd� < 53d -] -__---_- T"77 - - }Q= ~ 'v o �(n > S3i PlIOP•BARPoER 2GI PAi0P.1pLEMT SLAB BARPoER/I15E WNL 2GI ®- N GRASS PLOWABLE FILL u- - - -a n,- - < W 2---_ ® 2GI P/IIBI? 11ORIE8f SLAB BAAW JVNSE WALL 2GI RA5$ IA -MASH TL-3 it L }• _ �`. 1I_I �WWWWF -- ---------------- __---- -n --------------- 10 -- APE 1TLttY fz---------- - I�-------�" ---- 4� ---- �+ ------ -- -- -sme- -- -- -- -- ---- - CPAYELSH�ILD�-------- -------------- ---• ----- ----------- -- ---- -- LU to -O Q �� O z US 70 EB SEE DETAIL 21-14 US hWY 70 ESL 24'PAVED ROADWAY z z ILOWAILI FILL US hWY 70 EBL 24' PAVED ROADWAY US 70 EB U PLOWABLE FILL - In R t\I � i'•� z oo - -- ----------------- - ---- - -------------------- ~ -- .4 ----- - --- ---- -- -- ---- ----------- --------- -- ------ ------- -� Z N - + J Cfl� = Jew `+ , { � 24" -- �D1DFT01112-- --_-_ ---- __----- ---- ----- _erg SEF DDFTAIL SHEEL ' 24" 2GI-A 15" �- 2GI ' 15•• 4'PAVED SHq/ R-ZD�DETAIC Tl-- ---_ a GRASS •99'£Z=dO11A -3 4 - `° z -d01 N ------- CGAU Q. ��-�_ --- -- ----------- -- FS,SEE-DEIALLSHEE7-4'PAVED SHOULDER -----T� -� DETAIL 12---- �EIdQV�-_-_ - ---- 12 --- 24" (� IN1I_I Q= _ PROP,GUIDERAIL ,I£'£Z=d01 FS,L$&B�ETAIL SHEET 4'PAVED SHOCLOER ___ _� ��aL t1 CGAU I0 -------4FR ^ �. 0 IA TL-3 3, PROP GI/IDERAIL GRq$S 12 FS, SEE DETAIL SH DETAI T ,65'ZZ=d01 -_ �----- T 12 __ CPAVED SNIXILDER__ --------- .Z6'£2=d01___ __ 2GI-A FS, SEE DETAIL SHEET 12 ___ PROP.IXIIDERAIL 10�,11'9Z=d01 n---rrET-a-tr�� R V ' N LLI -- -- ----- ------------ ---29Z _--------------- ----- o --- --� -- C �V) v --- O ^� ---- ---DREG-BITGkL GRAD1NCr - - - - - -YB-- SPEC DITCH GRAb1hTG� hwY 7/W�� PAVELiR0 AY °--- -- F=AB[F FI[L- n - - --- O- PEC HZ�RAZ� ro - - - - o -- o US hWY 70 WBL 24'PAVEO RLIdWAY ------- --- --- ---- - - G ---- --- ------- - - - - - - - - ----- - - ---- --- ---- -- REF DETAIL 2Lld-------_ ----- ------ _-_ -�-®_ -- SEE ---_-_ ^--------- ---------- -_-_----- ----- __ ------ -- - - - - - - -- G �Q + 2V 2GI Q, 2GI PAgW.11011ER! SLAB BAAWIER/NSE WAIL /Lgl U NCV IA h1PSH TLC - - - �•----_ JAd. 2GI E DETAIL 21-142GI ® eaRRi S W - - P �IAwAllm - - i\1 + R• + �(�I" - - GRASS - -- ss DI 2GI-D i - - - 6--Ste.784 ,/3- - P > S i- -r -<+--WYENf +- -i- - -+- - - m cRS3J s"- -- -ssa- - >n5 - t�,,.� GRA55 nd.� _ _ REMOVE - - /-Ste F9+9{Jess]--------------ss,----------- -- - A258t - sS -- ss, _ -55 -Ssi- + xte - - < GI - - - - oT - - - 8-77 - - - - - mLIJ --SSJ ---aW-III _LU 211 d .9 FI (1WARIF FIIL�-£I'£Z_d0 �� C/ . 5 � -_-3d].£ --- -- fir' i61- 4.+J-F-/J#J Q - kG =J/V. /J r- JVJ --2bl-fop P C, SR lI Ig'PAVED ROADWAY �-E ,DA, -- N �' ✓R✓E✓ ^D^°^w--- \m --OINC. 0 yj v SR 1111 OLD CHERRY lNT RO l8'PAVED RO D- ^y.SEE-DETAI! - - - - - _ • - - -3,7� - - ] ________N5��U�� - - - - - + - - - - - - -03 n,- - - - - - - - - - - -oa�LMOV du , -s - - --- - - - A`� nf3a51 CV _ + way \ I 01 dDa .91 +Ej/•13 ExlSiixC R/w E%ISTLNG R/w - - + ,.13 Sto. 13+76.48 B CB S5.8 ; 7 SPEC DES JB • �• YY,, ', I,-. ` t3 ADS O o N EI • Q EIP Q IP B POLE W/ h8 < cslE 3lOd EIP A3S E%LSTtNG R/N '13 dl3 Ol 15g I Q e3 3HS I S Vl �'y R O\VE dWnd 0.33' R/W ly `�' 15 H • E%L Uw t 0 N L� ill P / I 0 in �j•I"- N �C1_7� 48.36' 11 SLOP .71% S o - a CHORD EST vuMH C .Bg W/1 51'. S 14 7g (%• i�ew'^a. < CG7V " < 2 :w d 1S i �� < T IP !l•. CL'B'RIP RAPT + - o I� LU > i Q= -> S O N a o r S E DE At 21 2 2GI o o c o O`V A : N lion x/B P CA D �y LU 0?(oU) c - N ds +8318 +63.3 62.51 RE o © © c K � a 1 1 y FE 1 \\ 15 15 UE � SPEC 'V'DITCH E DETAIL 21 - -> 2GI-D +93.12 I'B' 5200' PUE � 18 - > U d' cs N RIP RA CHL FENCE SPEC 2' BASE DITCH P G, 4 ` EST 'SONS BE E C' EST 14 SY GF -Y� - R ��„ ` \ A SEE DETAIL 21-1 Cq \ Q y SI @ ` �. 1 1 i Si "; 03 9 : I ° I 1 / I I a1H I�' .^ II N a 14 I I OMj.{.Z I 1 X ISTDSto1 3 / I 9 � HJanHJ � / 3SI + 115 Owg$I 1 + 0.00 45.00' S ALL � E THOMAS P. SMALL ET AL • • P E 42.00' • PU PUE R / +85.40 14 ~ 60.3P NICOLE M. SHELTON, ET AL 13 \ z 69.44 I `` q mn ' I N a I I I / �� CL 'B' RIP RAP y SA II I I � J / 'a 40.0o PROP GRAVEL 0�. o ORNE mPJ MICCpppp��LL DENNI$ HARDISON, ET UX DB 2534 DB 165T PG 890 DB PG 100 I / / SPEC DITCH ,DING SEE DETAIL 21-11 TS Sta. /5+5697 E m 0.00 P lg z DB 3386 PG 493 HW Q• S K w i / EST 2 TONS WOODS GAL H a SPE 'I BAS EST 7 SY GF DS 5 520 m ` D T SEE' IL 21-3\ I 3.Ifz99Z.99 N E dwnd J / / �I Q + R SPEC 'V' DITCH h z 86.34' I \ � 'B' N S . I � 15 108.00 112.0 / / - ' ofl • • 3 ram° 7NOJ SEE DETAIL 21-4 0 21 \ P 1 I V C&G ISi m SPEC 'Dtl I SEE DE AI1g74H • IF-- I • • I J H W a d N n CL RIP RAP 09.97' EST 2 I \ \ PRC Ste. 24+42.38 EST GF 1 '^\ r Sta. +37.33 \ B Y INVERT 7.0'- 20+65.80 ON00�\ _Y 621 NCDOT 2 I a0 O �"Q1M / 97.00' DB 820 PG 517 .. © I _ - POT Sta. 26+99.33 = �I 1 Ilo 7.0 ANGLICANA CATHOLIC CHURCH m t DD' DB 1732 PG 756SEE CLEAN OUT EXTG. DITCH a PUE \ SPEC 3' BASE DITCH DETAIL 21-13 62.00' SPEC 'V' DITCH 15 Ste. 79+93 14 DGT VENTURES, LLC 1R, / • m o D83684PG 1T6o IONo7l I p _ _ +1 \ ,/, - \ I, -Y4- a. ba.00' 4 4 = c 3d W I -Y4RAB- OC Sta.l4+6 0.4.00'RT II \ 2 CL 'B' IP RAP + 4 / I - _Y4RPD x +. i I I z - - O. e : 7 w w / /1\ m ••••,•• •,•••••••,••••......••°••„•• / o+ ` ,A 3N00 4' 4' 406 ELEVATION 25.42 ° ^° �0lto }° q I 1 's £b'S1 LENGTH=100LF \62.00 3.£b.zs zz s \ Xt CL RAP \ I Esr B rods CC/ ° oNe SEE DETAIL 21-4 ti°o MARK A. MONTGOMERY DB IIH7 PG 674 THOMAS P. S ET AL 1L I o I .b0'$OI ---II 4 ---J 919 7 Im .Z£.bb.69 N .1T +38.47 EST TONS SPEC V' DITCH 91'OIZ 73.46' EST SY GF I SEE DETAIL 21-4 I \ PU �� •bb.L S III A - - + _ t II GF, \\ C I I / l S ml j \ N 464383 E 2681494 a r, / 14 14 I - 2, BL STATI . 108.66. 00 55 LEFT ��0 FF NCDOT dW9a B146 FIwwD ' IN BONNET BOLT' OF°FIRE'HYDRANT y \ ug q+q55 pR�E E MA .. ... ............. PG 1�0 I L AITTLEE ���ppS EST 21 SY GF -VHF T x ' + �� 1 I \� F Q \ �w �: \ QJ� DB 2534. 743 ^\ D8 1223 1006 \ .. DETAIL 21-7 DETAIL 21-8 -- • _ .1 • •�.�,� I W000s JS8 Q I II - M -Y4 t0. 4+ + SPEC 4' BASE DITCH .L DITCH BERM TO EL 26.0 +33.3 54.13' SEE DETAIL 21-5 £o EST 33 TONS SEE SHEET 2D-4, DETAIL 13 ,00' \ N EST 62 SY GF I I °6 n A D AG 14 0 P I m RIRDS A ICHARDS I HEIRS I I .Zo'002 wo005: pg g3 99 I aHW M. 0.5£.bZ N ar ' �. .01'OS 3.IS.SF.IZ z ,. - / +84.00 \ 74.00' ,U � 0 tea, PIPE OUTLET CHANNEL STABILIZATION TOE PROTECTION IN WETLAND AREAS INwm s<aLel (Nat to swlel Naw I Groand• Groun and Wetland Arco 3. F`\ 3�OH.02 g `---------J • • 3dOH.IrZ 3dOH .IrZ 1 \ •� r I---J • • 1 • 1 3N00 I II \ F 05 I FRED SCOTT TRENCHLESS INSTALLATION \ SMITH, ET UX 54" WELDED STEEL I I 71.00' °N DB 576 PG 473 1 0S I _ i 5 +az yg,p/ 1 °�' ; 6D.OD' (t`� - ■ p, 's v F S r a-z `y -_ - NC DOT `7 m : m' IT, X = A "P r �; TOE PROTECTION FILL SLOPE ONL ( n Q CL 'B' RIP RAP I\ Tuck Geore Mle Minimam of 1N d=1.0 F. d jlYry Geotextile GeoMnile' CF°nnel Bed Dace Gep Le D^der NPmp k^o*- Ro H. Ivadamel ," �,<,,,,", D„e<„d W E^B,",,, type of Liner= CL 'B' Rip -Rap o Lme.= CL'P Ri; - %eyed-* ONO3 I ap"' z I _ I L--- II n AllI l h • G �j \ I- I�N a " a d 03 +7 .67 I 84.00' 14 02 \ I �I \ \ I I III DB 2231 PG 280 c S m I I was .- w\ SIa. 22+79 II R' I o.0 76.49' 9S'661 I 1 M.00 £.M� 8b +13.7 1 ® c"p 'p9 QJ EST 5 TONS \ +78.00 \ EST 10 SY GF /jam/ 79.00 \\ SEE DETAIL 21-8 \ �) 1 �j L TOE PROTECTION ` LYNAIRE GROUP, LLC j% Es: ae tone En. ev sY Geme.,L. FROM STA. 69+00 TO STA. 69+31-SRY4B- LT STA. 77+10-SRY4B- LT FROM STA. 19+00 TO STA. 19+70 -SRY4D- RT DETAIL 2 DETAIL 21-10 PROTE 1_9 PIPE OUTLET CHANNEL OENAR seaCTION 1 Nene s<°I°1 pA ".-I Nau.I v l SOLOMON PELHAM, HEIRS 6£'101 M .00.6GbZ N' 41 +51.0 A z° 2 6 CL 'B' RIP RAP 0. Ru r^v^ \ DB 3159 PG 710 3' �& SLOPE mll 9 M. 0\ I DB 291 PG IIO -o ` \ I I N SPEC 'W DITCH 71.0 +72.2 I 2.88' 2' SEE DETAIL 21-4 EST 15 TONS PC C PG 99 EST GF GROUND F� d D=3.0 F. Il • I I ll / I 102,21 M DD 50.03' I 0\ I I I 14 1' z I JONATHAN LEE DUKE, ET UX N m -°° DB 3559 PG 20 w I MB 14 PG 48 OS 1 QJ SEE DETAIL 21-9 D AI Min. B Ud d=1.0 FL GEOTF%TILE B=4.0 Ft. STA. 24+00-Y4RPB- LT S Type of Liner= CI°s 'B'Rip-Rap 21-12 snellw JNDO --- --gyp , .0£'ZB 3 .9Z�LSZ' PRC Sta. 86+04.57 \ \ 2 I 1 - _ _ .54 1 Yo� J 40.86' ., - 2 co ° I R +1 5D Q 0<o°"anti 5FROM o SPECIAL STA BASE DITCH FROM TA. 18+001 TO TA. 9+00-SRY4D- RT (Nat. saal•1 J III I " QJ �ti� Na..I o, Fro", DETAIL 21-11 Gm"" D Fw"s • I E p \ ESB RTONS D +s7. t JI .4T PC StO. I2+63A6 45.05 & 60. °. I I1 R1 41.857 / PRC Sta. /6+/3.76 / s°lo; SPECIAL DITCH GRADING 4r_ I'dOt'O xOle) Min. D=2.0 Ft. B=3.0 W. *I J o \ + 0 +38.34 H C TAPER 50.80' 61.00' a I R 27.57 2' R I I 1 `�r I 3 .8Z.Sb5Z S + Q \,o, O 5 /j 0.00' 78.00' & 103.63' F + C $ \ 2 0 / / Z 1 CA + F F I I 44.70' A SPEC 2' BASE DITCH SEE DETAIL 21-1 sP '9•pige D PO sP FROM STA. 10+50 TO STA. 22+20-SRY4A- RT NPR J Ob +sb.00 6` \ TAPER C 77.00' & 103.00' +90.12 \ a A; 2T / 21 M w �.'_ N / 20 -Y4- 29 CAMP KIRO *SEE CROSS SECTIONS Min. D=1.0 Ft. J 63.00' ro I J'C- I c- _ Q - o ^ DETAIL 21-13 SPECIAL BASE DITCH (N°„° Scale) FROM STA. 246+00 TO STA. 251+00 -L- RT 3N00 in Q / P U E ,O G SRY40. - - - - - - - - - - - - - - - -- • SPEC 2' BASE DITCH +62.58 0 -, 1° D_ / I N6' 50.00' / G� N.� °r r Ditch 9 11 SEE DETAIL 21-1 63.00' o +15.06 `' n _ TYP. I � K +77.0o s 73.00, & 98.00' P°�e Slope L^ Mi". D=1s Fr. 12 �17 FOR -LLT- PROFILE SEE SHEETS 5/,52,& 53 FOR -LRT- PROF/LE SEE SHEETS 5/.52& 53 DETAIL 21-1 SPECIAL BASE DITCH DETAIL 21-4 SPECIAL 'V' DITCH (Nat. SaaI.) prom g 1 +748" F + gg 48. � � �_ 0 3 R + + 67.43 C J + a PT StO. 88+79.40 c a +a6.00 C 73.00' & 911.00' `r I � � � pUE -o -0 14 PUE SPEC 2' BASE DITCH C C LIE m m +4 . SEE DETAIL 21-1 I FRED SCOTT E7 UX a=3.0 Ft. FROM STA. 13+00 TO STA. 14+00 -Y4RPD- LT DETAIL 21-14 SPECIAL DITCH GRADING U$ 303 306 391 390 -L- -L- 7U U$ 7U FOR -Y4- PROFILE SEE SHEET 7/ FOR-Y4RAB- PROFILE SEE SHEET 7/ FOR-Y4RPA- PROFILE SEE SHEET 72 FOR-Y4RPB- PROFILE SEE SHEET 73 FOR-Y4RPC- PROFILE SEE SHEET 74 IH. to scale) DETAIL 21-2 DETAIL 21-3 D.1, PIPE OUTLET CHANNEL SPECIAL BASE DITCH Nd ` sloae (Na. sa°'°' Gr°"na 3;7 F\off°` 78.00' & 104.00' m 76.00' CL 'B' RIP RAP EST 5 TONS -SRY3DY4C- POT Ste.90+21.7/ _ SMITH, �� 59 _ .00 4. 68-SRY4D- POT Sta. 10+00.00 = 70.00' & 96.00' DB 142 PG 1054 r l 74'7 " - - 1 "at to s<al,I 4 FOR -Y4RPD- PROFILE SEE SHEET 75 FOR -SRY3DY4C- PROFILE SEE SHEET 92 "otuml Front °et Ditch fOU° D Pp6 slope 1 NatM swlel D Natarol Noturol Min. D=1.5 Ft. roan man N...I \ °`, From 3` Ground A' o Ditch +07.0o DETAIL 21-5 DETAIL 21-6 78.00' & 104.00' EST 14 SY GF " C SPECIAL BASE DITCH PIPE INLEF BANK STABILIZATION SRY3DY4C- - RY + a. +00.00 o RA1' 70.00' & 96.00' Io: 1 q ETTA LEE MOORE, HEIRS DETAIL 21-15 I 1 D e�E t,� WoEI P Np3' 4 5 27 21 FOR-SRY4A- PROFILE SEE SHEET 93 LOCATION: FOR-SRY4B- PROFILE SEE SHEET 99 FOR -SRY40- PROFILE SEE SHEET l00 -Y4- (CAMP KIRO ROAD) / -L- B Min. D=1.5 Ff. B=2.0 Ft. p D \O v FROM STA. 15+50 TO STA. 24+50-Y4RPB- LT F 510 e Min. D=2.0 Ft. B B FROM STA. 24+65 TO STA. 25+70-Y4RP6- LT Min.D=2.0 H. 1 I 1 I +67.00 Notre Scale Nat. Scale 101.00, Gma" -•goal +05.23 "°"` � DB 88 PG 738 MB 14 PG 48 3e SPECIAL BASE DITCH I I'< I " INa f. Scale) h sP Min. D=1.0 F. 6=0.0-4.0 H. -Y4-9 STA. 69+00 TO STA. 70+50 -SRY4B- RT 8=20 Ft. FROM STA. 10+50 TO STA. 11+00 �RY4A- LT B=3.0 Ft. FROM STA. 11+00 TO STA. 14+00-$RY4A- LT STA. 14+10LT FROM STA. 20+50 TO STA. 25+50-SRY4D- RT y"' From d' Nal��'"^wr E% RM/ & 46.71' Ditch Tuck Genre U St., Minimam of1N - I °CAMP N.f-I \ o• Font FROM STA. 248+50 TO STA. 255+50 -L- RT KIROFROM 48 TIP NO.: COUNTY: FROM STA. 70+50 TO STA. 77+57 SRY4B- RT FROM STA. 22+50 TO STA. 25+00LT -Y4RPB- STA. 81+50 -SRY3DY4C- LT FROM STA. 77+71 TO STA. 81+32 -SRY4B- RT FROM STA. 74+57 TO STA. 76+25 SRY3DY4C- RT Key wprap ,n,° � � Channel Sodom Rro' TTt I w roan 3_ N' Dixh F '/ D P°�8t slope FROM STA.250+00 TO STA. 256+00 -L- LT R-5777C CRAVEN -SRY4A- FROM STA. 10+40 TO STA. 14+00 �RY4D- RT FROM STA. 20+50 TO STA. 21+75 -Y4- LT FROM STA. 76+25 TO STA. 76+75 -SRY3DY4C- RT � 1.=.1 Min. D=3.0 H. Rrol CHANNEL BED PRI'op�pI. Geore ale, us de. II Iw I FROM STA.262+00 TO STA. 269+00 -L- RT FROM TO STA.268+50 -L- LT EST. 2019 /2045 TRAFFIC VOLUMES GRAPHIC SCALE FROM STA. 14+00 TO STA. 17+92-SRY4D- RT FROM $TA. 84+00 TO STA. 89+66 -SRY3DY4C- RT FROM STA.14+00 TO STA.26+50 -Y4RPD- LT FROM STA.78+00 TO STA.78+97 -SRY3DY4C- RT FROM STA. 78+97 TO STA. 80+00 _SRY3DY4C- RT FROM STA.81+00 TO STA.81+50 -SRY3DY4C- RT B=4.o Ft. Worioblel Dire°ed M En Pines. +80.00 Length=30 Ft. •R;op�Np,° b° I-Ln m adomid° EX RM' & 35.85' T°P d=3.o Fr. a zL°P.,°„/„.iwi^mn°Ls°.°m, 0: +80.00 B Min. D=o.75 H. I EX RhV & 36.85' B=2.0 Ft. I I3131123 TSTAA.062+00 FROM STA. 21+63 TO STA. 24+00-Y4RPA- LT FROM STA. 23+02 TO STA. 24+75-Y4RPB- RT DESIGNED BY: DATE: �� 25 5U 1�� BB FROM STA. 14+03 TO STA. 15+63 -Y4- LT FROM STA. 21+75 TO STA. 24+40 -Y4- RT FROM STA. 15+50 TO STA. 24+50-Y4RPA- RT FROM STA. 81+50 TO STA.84+00 -SRY3DY4C- RT FROM STA. 12+50 TO STA. 13+16 -Y4- LT FROM STA. 20+40 TO STA. 21+75 -Y4- RT E:r.=ao Ton: of Claas 'I'Rip Rap, keyed -In, Eat. 61 SY Geotextile 77+65 �RY4B- RT I a. I FROM STA. 77+44 TO STA. 81+60 -SRY4B- LT I I END CONSTRUCTION FROM STA. 22+73 TO STA. 25+00-Y4RPC- LT FROM STA. 24+02 TO STA. 25+75 -Y4RPD- RT CHECKED BY: DATE: FROM STA. 20+30 TO TA.25+50-Y4RPC- RT FROM STA.25+41 TO STA.26+50 -Y4- RT I I -Y4- ST,Q.26+-80.00 PLANS ACA 3/3//23 Submittal February 6, 2024 S cn 0 L � 3 CVO - o(aa CV 0— �!-C PROJECT REFERENCE NO. SHEET NO. DETAIL 22-1 DETAIL 22-2 DETAIL 22-3 R-5777C 22 SPECIAL BASE DITCH Not to Scale) SPECIAL 'V' DITCH Not to Scale) SPECIAL BASE DITCH DETAIL 22-4 ROADWAY DESIGN HYDRAULICS Front Not to Scale) -SRY4D- SPECIAL DITCH GRADING ENGINEER ENGINEER Natural N 0< Front Natural Ground .3• j Q' \;e< Ditch D \a Ground o Ditch R'1 tet Slope ac\ . j �\ i I t 1 o Front Ditch—• 4 ( Not to Scale) Slope D SPA F D \a'ke< /4Mer a Slope ��Ri PRELIMINARY PLANS � �� B Min. D =1.5 Ft. Min. D =1.5 Ft Min. D=1.5 Ft. SP \P�\� SP qe R �F .)P DO NOT USE FOR CONSTRUCTION B-2.0 Ft. FROM STA. 25+50 TO STA. 25+90-SRY4D- RT B=3.0 Ft. *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 25 + 00 TO STA. 37 + 90-SRY4A- LT FROM STA. 25 + FROM STA. 276 + 00 TO STA. 286 + 00 -L- RT 90 TO STA. 32 + 75-SRY4D- RT FROM STA. 10 + 00 TO STA. 13 + 00-Y4RPD- LT FROM STA. 273 + 00 TO STA. 282 + 50 -L- M FROM STA.274+37 TO STA. 281+50 -L- LT FROM STA. 283 + 00 TO STA. 286 + 00 -L- LT �Q 16°L� �S°b9 118°96 8�N 1 2 80 78 I O O 8 2 O Iz,Iz°sz S 3.1z,Iz°sz S 3 dZ,I&Sz S 84 82 O d o O 86 OII O Ralf oup BeattyStN DSC INVESTMENTS ti CO ti MARY ALLEN T AL WRIGHT,' PARTNERSHIP DB 3052 PG 929 � � w' v JOHN D. WRIGHT, JOHN D. ET UX WRIGHT, JOHN D. WRIGHT, ET UX " HOWARD D. RAWLS CYPRESS ISLE PROPERTIES, LLC ; DB 1134 PG 12 DB 1721 PG 13 ET UX DB 1493 PG 512 DB 698 PG 354 g DB 2322 PG 114 DOCUMENT NOT CONSIDERED FINAL DB 2365 PG 961 UNLESS ALL SIGNATURES COMPLETED �. Ln +97.00 N N 80 �° 82 O N N 96.00' o N INVESTMENTS PT Sta. 2 +06°72 PVE Y RPA- POT Sta. 17+47°26 = PARTNERSHIP DB 1134 PG 12 - POT Sta. 274+11°08, 47°00 LT ► I Pv = 04°00'00'� I I N � I I Q N NiidB v I snoiiA HSI 031dnliNno I c r I O N I I INS 21 , IIRIPj RAP j� °� Z i HEDGE Odvog��19 oN�/� T 8 S pGF ¢ I I +63.00 +93.00 \�`_ (J --\ 0' 85.00' PROP GRAVEL �Nool 'I HEDGE 0 / I CL 'B' RIP RAP EST 2 TONS �.^ 4 `�'.! �Q- 24, \ ?vE b� . I DR/'9E (TYP.) o i SPEC 2' BASE DITCH I EST 7 SY GF ('R \� o v ` I I EE DETAIL 2- CO oh \. Q I + + 22 P E PUE + 95.0 I I/ I I I PUE PUE , E PUE PUE PUE PUE PUE WOODS _ Icn 12211 --b 00' b 00, 1 210 ,_ _\ 20 I C 20 ► j _--- --- — W DS — C — ------------ I 4„ -- --- ------ — 1� 0.08' EIP o° ° � 5' EIP' 24' o o 20 o M d13 I TO R/W IP �EHIaV� o R MOVE T(1 R/ o0 0 20 -dOH 81 _ EXISTING R/W Q V, ` J N r C) O NC A. _- - N l b _ - ---_ —_ - — 3daH 81 00 o o - - d0b 81 _ LylJ ~- - - -- ----_ _= - - -_- _ - - - d -- - - - - - - - - - - -_ -- Q N - r - _ t t6 AT --- 1S8 ,8/ T _A - -- -S-t Y 12FMUV� -- --- N r LL W —� O O O O � N — Q n l — — — — — — — — — — / V L J / / / / ° J V V O LL W �j- W -------o - -- — l� -�223i -- --s -- - - - - - - - o - - - 3T�0+- - -- -- - - - _ — --- '-- _---- l/2" LARE SCREEN —----------6ET �n1-011 d,------- - - - - - - - - - - - o�nl — — -- ----- — -- - - - - - - - -_ - - - 2 - - - _- -0 N M 0 N \A N f 1 z = - Al- - -o n l G DING 2GI-D 20 - - - 1- 2GI-D - < ASS -Y4RPA- � N N DITCH GRADING SEED L 20 GRASS 20 0 SEE DETAIL 22- ~- I _ DETAII '))=A �O W O - - %EE SPEC �Ci-�GRABiPFCT z N <r N PLOWABLE FILL ► � U a � ��S 7n FR US HWY 70 EBL 24' PAVED ROADWAY SEE DETAIL 22-4 cr N W + (� N + z (D N J J W ;.,QV E in GRASS C U �GAUI I Ff r�ETAt�S I€€� N 25` 17' 17°5° w 4' P � %� � � 12 W 2GI 2GI-D V N _ PROP. GU/DERAIL 2 0 <r 2GI-D + 1 9 L ° 8 Z = d 01 GRASS 4' PAVED SHOULDER 2 0 PROP. GUIDERA/L Q < L J, J _13 Q _ � € v' U) -Z U � c �L FLOWABLE FILL = � vJ vv U US HWY 70 WBL 24' PAVED ROADWAY o o — �— � J -4'PAVED- SHOULDER ---------- ------ ------ o N - 4 PD- �► O o _ _ _1 - 0 + _ �- si - RFMnV-1--R 33 og _ _ _ _ Aav �- W _ SEE DETAIL22-3 f Aid � - - - - - - b-S1- - -ss�- - - - - � �� - - - - - - - - - - - =Fss— — — — - - - - - - - - - - - 8 - - - - - - - - - - -ss� _ _ _ --�_ _ = = = - ^l ssi= - - - - - - - - - —M and ,�zl --------------- -ss�— Q W � — — —Y� D- TS - _ ss�_ _ OVE -L- POTRASSfa°�9 ° + ° = o� t.� � I �,�� ---- -� �- - - - - - _ - - _ ------- �-------- -� --- ---/ 1H - - ----- — ~ C%) < _ 21 �< <�— << oAd 9 ,4�00 � \ 47" WW FENCE—�� _ _ — ----------------- — — — i __ C C (� °� 0.00 - — — — — — — — — — — — — — — -— — — — - - -_ 69 Y4RFD- +43. - - —°� Al AlL� 5 S to DRAIN �fS � � l� � n• it 0 + N w 4 0 /3`37VE ` �� ` _ — \ �l EXISTS S �° �� R'W SPEC 2' BASE DITCH / ONoO'� ti A WILLIAM R. HARPER 0 10 �� iW STING �� �G 24' REMOVE Sn SEE DETAIL 22-1 i3dSz l , o WOODS DB 1984 PG 211 .o �� R W l�I SW NM oN�Nl1 „ 1 ` _ ,,\ _ o REMOVE �w J/voO l ` 4 Q I/ Q 20.50 EIP3 \\ pq 1 M--___- OI1 S` I l �d _ 156 216 ` � < TOR _ _ o o _ _ ..,Z\ �`-_ J, l� y o� l� VEGETATION ------ --- � T _ _ _-_ _ _ -0 1 0 0 � _ � � DGT VENTURES, LLC �� DB 3255 PG 128 P / MOVE oo C ` / \ �� �� \ �� �O 219 \ i SR /// O 11 �� 9b 56.00' �/ - -°� A1_ 3 REMUVtE dl3 RY40 tiE RY PO/N o _ ° 1s�,- ��___L END CONSTRUCTION ` E p / / /� / ry / „s, + 55.61 — _ _ -_ _ ��s�_ o d0 wl � R 23'P ED _ qV ROgD H -SRY4D- STA. 34+53.02 fin d31 S w ti m // / � \o EX RNV c� ` �a� „S/ C W � 1 � � � qY r rr7 SPEC 'V' DIT H SEE DETAIL 2 / / / / / / / 0 00' & 68.00' 98.00 / / j' PROP ASPHALT DRIVE (TYP.) EX�ST/NG Riw PT Sta. 30+78.7 , REMOV — _ _ Mn\ \\ \ _ n ` S` S _ _ / I; '�' ��� = o � — _ � - EXISTING \ \J I SPEC 'V' DITCH O �3 _ R` SEE DETAIL 22-2 \ / U _ of "t��-_` of O \ _ _ , I �l�J��rr��`, o'er, �°� o0 0 0 0 0> / WOODS // Ss�_ _— S d/3,93. `�` �/ / 0 ` 0 ��_ �� — _3 I I S `v dOH�sI PROP GRAVEL DRIVE (TYP.) x 1 15 A I 3 I �- MARK G. BITTERLICH li/ '\3jOd M l ' ob�d l �— ss� /o` Aos MARK A. MONTGOMERY DB 1110 PG 674 OdSI �� �� DB 1341 LYNAIRE GROUP, LLC DB 1314 DB 3159 PG 710 lr� ON l l PG 230 // Oo/ a PG 404 / I / OM / // 9S / / ` o o o PC C PG 99 //' , / oti // o WINSTON C. BOWMAN, ET UX , / / / �l/ di3i' 1` M 1 ExIST� /I I NG Ri /o d0 I I W-/�/c� / I U 00 C-), DB 966 PG 985 / a // o��es/ d �� ti`b (3, \� JOHN PAUL GENTILE MiH o * 89 o� w ON00 / / / �,� //�\\PC F PG198G \ DB 3532 PG 999 dl3 6 481�/6.J,5 / 4PJ5 �O,SS ELEVATION = 28°85 / � a° �\ ��/ so S N 465884 E 2600806 , l&Od BY STATION 29, 05. 00 37 LEFT UbS oNOo BM5 RR SPIKE IN BASE OF 36" PINE _ PAVEMENT REMOVAL ti �---- - ' � FOR —LLT — PROFILE SEE SHEETS 53 & 54 Flo FOR —LRT — PROFILE SEE SHEETS 53 & 54 FOR—Y4RPA— PROFILE SEE SHEET 72 j L '��' w o S FOR—Y4RPD— PROFILE SEE SHEET 75 `' BRENDA FAYE 2 L2° FOR—SRY4A— PROFILE SEE SHEETS 93 & 94 M E L L E, ET V I R �� z FOR—SRY4D— PROFILE SEE SHEET /00 DB 2573 PG 851 Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. DETAIL 23-1 DETAIL 23-2 DETAIL 23-3 R-5777C 23 SPECIAL BASE DITCH SPECIAL DITCH GRADING PIPE OUTLET BANK STABILIZATION ROADWAY DESIGN HYDRAULICS ( Not to Scale) ( Not to Scale) (Not to Scale) � ENGINEER ENGINEER � atur�I--- N�untl FxiSTN round Natural Al oft Front 1 * ' c °qHK d` E+S�G Tuck Geotextile Ground 3• a Ditch (/ �� D F\° Slope SPA qR/qe D\P� SP J' a Minimum of lift PRELIMINARY PLANS Key Riprap into Min. D=1.5 Ft. !F JP Channel Bottom Place Geotextile Under DO NOT USE FOR CONSTRUCTION (TYP) CHANNEL BED * Riprap in Locations B=2.0 Ft. SEE CROSS SECTIONS Min. D=1.0 Ft. (Variable) ) Directed by Engineer FROM STA. 286+00 TO STA. 292+50 -L- LT Length=30 Ft. *Rip -Rap to be Installed to 2ftOutside Top d =4.0 Ft. of Ditch Slopes on Jurisdictional Streams FROM STA. 37+90 TO STA. 39+20-SRY4A- LT FROM STA. 289+00 TO STA. 291 + 5 0 -L- M For CL 'I' Rip Rap and Geotextile quantities, see Detail24-1. STA. 60 TO STA. 46 03 O t.?/ " FROM 39 + + -SRY4A- LT FROM STA. 2 93 + 00 TO STA. 295 + 00 -L- M FROM STA. 46 + 03 TO STA. 47 + 80-SRY4A- LT FROM STA. 294 + 50 TO STA. 299 + 00 -L- LT STA. 299 + 00 -L- RT FROM STA. 47 + 80 TO STA. 50 + 90-SRY4A- LT FROM STA. 298 50 TO STA. 299 00 M + + -L- FROM STA. 286 + 00 TO STA. 286 + 50 -L- RT FROM STA. 286+50 TO STA. 293+14 -L- RT FROM STA. 293+20 TO STA. 296+50 -L- RT �� " Rulfuur Beatty StN o Q � w 86 ° V 88 C O 90 v DOCUMENT NOT CONSIDERED FINAL CYPRESS ISLE PROPERTIES, LLC CHARLES TERRY BLYTHE O CHARLES C, MARR, ET UIX UNLESS ALL SIGNATURES COMPLETED DB 2322 PG 114 DB 3547 G) O> DB 764 PG 407 PG 290 cV N MB 10 PG 64 on' • / / I �T� SPEC. 2' BASE DITCH � SEE DETAIL 23-1 / �g C) CL B RIP RAP CL 'B' RIP RAP EST 2 TONS PROF GRAVEL I ( / DRIVE (TYP.J711 EST 3 TONS SPEC. 2' BASE DITCH EST 7 SY GF r I / QNV9v 3SanOD � EST 10 SY GF SEE DETAIL 23-1 CL B RIP RAP r l SPEC. 2' BASE DITCH PROP GRAVEL �a 58.00' �/ / `� / �\ 3300 RSPEC. 2' BASE / �J INIW rR DITCH +87.00 EST 2 TONS SEE DETAIL 23-1 SEE DETAIL PRAIE RIP RAP 23-1 49.00' EST 7 SY GF ° 49.19'/ 18 60 /) / EST 2 TONS WOODS E E E E— — / / EST 7 SY GF PUE 3lv UE PUE4 E /44.00 31v C E E - �1W E lw _----------- ---- -- ---------------------- ; 69' EIP ; * EIP ; ; HW 2311 30 — —; R/W MON EL12996' 28 310 Q (V N — 0 R/W _dl3 — o o go — — — — — I — — — d - = d3a 81 —d— lld�l 111dS > � O N — — — — _ — - = — - 1R> + c� I.JJ - o - - N - U rOVE - - o� �- _\-SRY4A- `� o W W o SR 1160 20' PAVED ROADWAY— T N 25` 17117,5" W o ■�► \ W Q in�— — — — _ _ _ =o� ^1= _ _ —" _____ J — 2D-4 DETAIL 11 CH FENCE WITH 30 < 2G1 Q 30 2G1-D GRASS 30 2G1-D S3H 111 FIR — J n — — - — - -oJ nl— C 2D-4 -- — — W �- - SPEE. EI �6R BtNC� �€E€TAI�23-2 C� -- — -- — �- �sP€C-DITC1-r �RADtNG — � CD CD + N SEE DETAIL 23-2 FLOWABLE FILL V SEE DETAIL 23-2 SPEC. DITCH GRADING LLJ z N �Q SEE DETAIL 23-2 � N + C� N __EB - Z60 J 00 N N W -drOVE REMOVE N 25° lT 17,5" W GRASS IQ —L 0 2G1-D CGAU CGAU er _ (V W _= � PROP. GUIDERAIL I =d 1 30 ASS PROP. GUIDERAIL V < W � _ C< G FLODJABl� �TCC -US�O-WB-- o C Q U� o , O - o AHV 1 AS PIPEAREADY RE OVE_D-------Ojni------------------ - — —SSj— — _ _ _ _ — — — — — — —SSj— — — - — — — — -- - - — — — — — �— — — — — —Ssj— — — — — — — — — — — — — — — — — — — — — —Ssj d�?J , bZ Odd „8 — — — — — — —— — — — — —,,, ns Odd Zl — — — — — — — — — — — — — — — — S33 —OJAl———— — — — — ——---0Jn1-- — — — — — — — — — — — — —SSj— — — — — — — — — — — —ssj— — — —ss�-- —----- —0 1 z-----------0dn1---- — — — — — — — Odd ,ZI — —_--___—_----- --- — _ C—---�----- -- 31 C' $o$g SPEC 2' BASE DITCH WOODS A SPEC 2' BASE DITCH 47" WW FENCE A / AIL 23-1 80°0�=d01 CL I' RIP RAP LSPEC 2' BASE DITCH EST 15 TONS A �o SEE DETAIL 23-1 1S8 EIP EST 30 SY GE SEE DETAIL 23-1 000 C 0.78' EIP i 3d4H ,SI TO R/W / �1I / TO R/W � IQ�D� IQ 3d4H ZI �nIQ L d i — -� -EL/62 96N65 130.00' /� 3iVO ---� - o I I Sn93Sl og i I NOGN cl ob��' X i I1 ONoO w o Ise N Qav �l�no0 �,,� �ZZZZ����ZZZZZ����ZZZZZ����ZZZZZ��Z�ZZZZ WALFRED BANK ST B IZATION W/ I' RIP RAP SEE ETAIL 23-3 J. HANSEN JR. ET AL 02$ dOlRJ31Nl _ sne�SS°I o�,03 °� 13 ,08°02 k C / Y� bb°0� dol 159 404 ELEVATION = 31.62 N 467282 E 2600082 DB 2336 PG 437 PC G PG 120E 160 O / f \ =dol H l IQ ti" w� 3dQ 5J KOTOWER O° BL STATION 76, 42. 00 37 LEFT BM4 RR SPIKE IN BASE OF 22" MAPLE / F wl PROPERTY LLC 9 DB 2445 PG 872 Z Z Z Z Z Z Z Z X Z Z Z Z Z Z Z X Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z / Mop lA / 1 0 DB 3334 PG 715 Nlop WILLIAM R. HARPER / / MKK PROPERTY, LLC �90 k VEGETATION DB 1984 PG 211 / DB 3569 PG 1152 bF I 11 25°02=d01� I " ONO:) cJ — 0 X IL 2 w" I IS9 / 1 �ONOOJL—/,\JJJJ WOODS/ / I I 31v9 `/ \ WOODS \ _ / a 7 �f 9D"Sill0 17F 9 OI1Sb d „z do3 / / o I do2j „8I i � ss R/W Mo T T T T �� J o � \ - ZS°BSI L S-9Z S 2+T \ �87M— o 1~OM w co, 49.55,5. / — dO2� I ob ,81 ll ° I N I OM`„�� � NI ALFRED J. HANSEN JR. ET AL NOJ I X III o o DB 2336 PG 437 PC G PG 120E % o/ NM0N1I - d1S,�9 �1� o/ A d/30 j� S/ n �`` `` ��=cj� �' �d13 Ol d13 a WOODS S ---1 � ��N AOS �dl3�S°�/ o. ti 1 I 18.5g / l` _d0� „bZ ALVIN MOORING To �Noo,�i ll�� ��1�� n ov / RiWP / �� ` `rii3 `_s; , — DB 3545 PG 1039 / / oho �— _ _ fN ` ` �yERRY z / l 370d J/Yo� ° o p ` d ass —end v / / Q �� �� ` Rp 22 �L� — �dOH „S/ I / / DITH H. STATEN �� 1 Pat/Eo �, _ _ I_ M� o EXISTING 7H�„Z� R,W I �. I 0 0 / 0N0 lDB911 PG 838 v` a� l� �OADItiAY l 1 I A c v /p `\ I 0�85/ ° ``\ Ssd _ oA _SSA `d` FOR —LLT — PROFILE SEE FOR —LRT— PROFILE SEE SHEETS SHEETS 54 & 55 54 & 55 20°I MM / I adSl o 4' EIP 86 dl ��l �M T o x 30 � — _ `�` FOR—SRY4A— PROFILE SEE SHEET 94 WILLIAM EARL HEATH, ET UX R'w i DB 888 PG 252 wooDs Y \ Submittal February 6, 2024 PROJECT REFERENCE NO. SHEET NO. R -5777C 24 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION I� 92 Raliour BeattyStN so moo. CRAVEN CRAB COMPANY INC. DOCUMENT NOT CONSIDERED FINAL DB 1075 PG 371 UNLESS ALL SIGNATURES COMPLETED O CHARLES C. MARR, ET UIX L s MB 10 PG 64 O O DB 764 PG 407 O MB 10 PG 64 u III II SPEC. 4' BASE DITCH SEE DETAIL 24-3 I SPEC. 2' BASE DITCH SPEC. 2' BASE DITCH SEE DETAIL 24-2 SEE DETAIL 24-2 +04.00 CL 'B' RIP RAP CL 'B' RIP RAP O EST 2 TONS 77.00' BURY IN T SPEC. 2' BASE DITCH EST 3 TONS SEE DETAIL 24-2 10 SY GF RIP RAP +72.00 W00 EST 7 SY GF T TONS 78.00 rAS EEST +21.00 T 7 Y GF - AA t- L_ -------------- E --- E E - E E E E -- E------------ `-- �� --_ - E C ; H 40 64.001 40 0.06' R/W MO -EL-53+90.47 409 HW 68000 4 41 EXISTING R/W TO R/W 129.95' d13 O i N0') L0S �n Q N I + O C14 woods LLJ �LnW jz� o � __ N25°17'17.5"W _ C� LU Q Q wooDs did ,8 2GI L FENCE. WITH - _ � '^ �/� VJ - ---_ojnl-- ---0�nl-- 40 2GI 15" 40 n L- +73.11 � 40 2GI >_ -- - 416 VJ vJ T1 0� Al- _4111 81 - - - -_-_- Nomw- -0� nl- - - - - - - _- - - -Oj nl H - - - - - - - - -0J nl- -UltmAIL lQ BIN6 S� O �PEC�EE N O LU ^ N DETAQILB14-5 L AV ADWAY SEA E D EITC-H- TA -5 �- LE FILE LLJ + cvB . FLOWA cv + Ln r z � N z J N ~ w 4' AVED SHOO DER ° ZO°££=d01 IC] REMOVE N 25° l7 /7.5 W GRASS -L- tK�DEPTH 413-2G1-,� IQ REMOVE J = r- M Uj 40 90°Z£=d01 REMOVE 40 w d GI -A FS, SEE DETAIL SHEET PROP.GUIDERAIL 4'PAVED SHOULDER - - - PROP. GUI AIL - V Q LU �` 1 o o / V SPEC DITCH GRADING PLOWABLE FILL a FLOW LE FILLS p \ CC\I `/'J o FLOWABLE FILL SEED TAIL2 �5 G J -- SEC BETS - 3- �4SPEC MICH &Ab11VG- J i 10 -oJnl---------= - - - - - - - - -- - - - --- ------ - - 2GI ssj------- - - - - -- ssl OA T I -A --- -- SSj- -- GRE T M__ ,- -- --M-- -- --M----- ----- -- - - - - - - -Oj Ai- - �\ M NCLw_-07T _ - - --- /rn ME _ s S SE DET S N Iq NF £we N 25° l7' 17.5" W PLOWABLE ILL p 40 C WW FE E o-SRY4D2- - 0+0 47 WOODS p �j REMOVE _ EMOVE REM4�VE o ; w END WW FENCE �N - ago � BEGIN CHL FENCE Q _ _ 1_-_- __-- doa ,81 3.28' R/w - d02i bZ -�� �g - r 1 �0S BURY INVERT 1.0' -SRY4D2- STA. O 3 4.00' h + 2.13 �, �j r (%� = d02� I TO EIP - -o� nl- -- - - - - , _ - EXISTING R/W 415 EIP I - - - - - - 1.07' 42 , B RIP RAP dl T� W ''2 TONS �- C I 42 419 18 418 ' vJ U) BANK STABILIZATION BEGIN CONSTRUCTION i -- �� - / \ I \� _ I SB OZ 1.05' EIP EST SY G _ MON SPEC 'V' DITCH TO R/W 0.91' EIP EIS 18 W/CL -SRY4D2- STA, 10*71.2 � o �o�� I _ � - C - - - �-EL-52+63.29 SEE DETAIL 24-4 TO R/W zs. TO SEE DETAIL 24-1 160 / O / \ +75 �� E 0 E 65 1��� ' P 0M X lb E CL 'B' RIP RAP \hl �� EST 2 TONS I DA DITCH N WALFRED J. HANSEN JR. ET AL 7.00 SPEC V, ITCH 00 --' 6 0' & 72. 0' �� - Q0JONO3 CHARLES D. HANSEN EST 7 SY GF DB 1369 PG 796 �\ CL I RIP RAP / P ASPHALT I DB 2336 PG 437 // + 82.00 N 0" E PC PG 120E o EST 26 TONS ! NE (TYP.) l� X �\ 29.m Sne i* w M8S£ EST 50 SY GF PC G PG 120E 15°7.82 5.00 & 72.0 91.00 I alH SPEC. V' ITC s� + 70.00PC �65.001 75.00 65.00' & SEE D TL 24 161 ROBER = ! I tE o ETL.UBRYDGE, _1 i b31�3HS DAYLI DITCH 4 \ � -� DB 1224 PG 499 r I GNOG s J I �� MB 9 PG 88 \\ �3 ONOO i sna �iw o- nos-•�-ssjZE16 �� z 7F � dog 1 G Z S ROYSTON D. BLANDFORD com TRITON �1W DB 2 10 PG 189 �(_11 DEVELOPMENT, LLC MB 9 PG 88 19°Z6Z I _ j 00 N - DB 2314 PG 14 0 3 OS,SZ.LZ S 98°LZ MB 9 PG 88 rn ' 101°9L£ M „Ob,Ob°b9 S 3.IZ,S£.SZ S 3 ��Zb,OZ.8£ N ,L8°LL 3.IS,8Z.SZ S g8°0g 60°SII 3 ,,IZ,S£.SZ S b£°Z bb.SS S 81°09 3 „Lb,00.£Z S -3 3 3 .Zb,OZ.8£ ,II°bl „05- .Lb,00.£Z S 3 ,,01,8£.b9 N ,SI°Ob 3 ,,SO,£S.b9 N 19b°OS -_- 3 ,,SZ,S1.£z S VEGETATION 403 ELEVATION = 30.25 N 468685 E 2599436 BL STATION 60+95.00 54 LEFT Fs'-] BM3 RR SPIKE IN BASE OF 30" PINE =___=xx x====x_________________________ TAMMY LOCKEY BUCK, ET VIR B GIII PIS 855 PPG 120E DETAIL 24-1 DETAIL 24-2 DETAIL 24-3 DETAIL 24-4 DETAIL 24-5 n U, PIPE OUTLET BANK STABILIZATION SPECIAL BASE DITCH SPECIAL BASE DITCH SPECIAL 'V' DITCH SPECIAL DITCH GRADING � O Not to Scale ) 0 � - - -PAVEMENT FxsT round Not to Scale) (Not to Scale) Not to Scale ( ) Not to Scale) REMOVAL roun epa' �Q Ng egnK d* E�SS\�G Tuck Geotextile Ground 3• �, Ditch Ground �?. �, tural Frontaet Ditch 1 Front t Ditch I ' Natural (k'1 het Slope 1 *� ` a Minimum of lft Key Riprap into �e< D F�a� Slope D Fla Slope Ground o' j D ��A ��* SPA gRjq D e�F (Typ) Channel Bottom Place Geotextile Under B B alH Min. D=1.5 Ft. Min. D=1.5 Ft. -4N Min. D=1.5 Ft. (Typ) CHANNEL BED Variable Direct in Locations (Variable) Directed by Engineer B = 2.0 Ft. B = 4.0 Ft. SEE CROSS SECTIONS Min. D=1.0 Ft. FOR -LLT - PROFILE SEE SHEET 55 & 56 Length=30 Ft. *Rip -Rap To be Installed To 2ftOutside Top � d =4.0 Ft. of Ditch Slopes on Jurisdictional Streams FROM STA. 11 + 90 TO STA. 13 + 75-SRY4D2- RT FROM STA. 299 + 00 TO STA. 312 + 00 -L- LT FOR -LRT - PROF/LE SEE SHEET 55 & 56 I�ONOO Est.=50 Tons of Class 'I' Rip Rap, keyedion, Est. 110 SY Geotextile FROM STA. 50+90 TO STA. 51 +13-SRY4A- LT FROM STA. 61 +46 TO STA. 62+30-SRY4A- LT FROM STA. 14+09 TO STA. 15+50-SRY4D2- RT FROM STA. 299+00 TO STA. 307+50 -L- M FOR-SRY4A- PROF/LE SEE SHEET 94 / FROM STA. 51 + 13 TO STA. 57 + 80-SRY4A- LT FROM STA. 15 + 98 TO STA. 18 + 40 -SRY4 D2- RT FROM STA. 304 + 50 TO STA. 312 + 00 -L- RT - - - - - -� STA. 299 + 00 -L- RT FROM STA. 57 + 80 TO STA. 61 + 46-SRY4A- LT FROM STA. 309 + 00 TO STA. 310 + 00 -L- M FOR-SRY4D2- PROFILE SEE SHEET /0/ FROM STA. 62 + 30 TO STA. 63 + 90-SRY4A- LT Submittal February 6, 2024 r a PROJECT REFERENCE NO R -5777C ROADWAY DESIGN ENGINEER SHEET NO. 25 HYDRAULICS ENGINEER 0 L � 3 CVO 00 Cv 0 '_�Cl� Q0/ 0 m m CRAVEN CRAB COMPANY INC. DB 1075 PG 371 MB 10 PG 64 SPEC. 2' BASE DITI SEE DETAIL 25-1 + 62.00 0.00' & 59.0 >_ Od133 M N W W C i 1 E EXISTING R/W — --O_:I Al— — 0 W `Q Z N N J = M W �<W �- Q UU) J cn m W � N 0 6) �W L� 94 W N JONATHAN BRENT FULCHER DB 3520 PG 727 MB 10 PG 64 0 w zl . 0 zl SPEC. 'V' DITCH Di EE DETAIL 25-2 `01 PROP GRAVEL DRIVE (T+ 50.00 PROP. GUIDERAIL Mi"6= 1E LOSE CRAVEN CRAB COMPANY INC. DB 1075 PG 371 MB 10 PG 64 V) ow lo_t' m 00 SPEC. 2' BASE DITCH = TIE TO EXTG SEE DETAIL 25-1 0 DITCH WOODS ° X' 70 EIF, d13 " REMOVE �I — M — Id 1.8„ ...__.. __....- -- -- 1 ��v -----oiA1 — ----- -0_� Al — _=4= 2 G 1-D L8'66 98 3 lSS,LI.Sz S WILLIAM M. CT)VIRTUEA ETMUX VIRTUE, ET UX Lo 21 DB 829 PG 84 ° N DB 891PG 238 MB 10 PG 64 ;° m MB 10 PG 64 98 CL 'B' RIP RAP EST 2 TONS. EST 7 SY WOODS Co c� r SI F-- ---- I ° 1---M-- 11 0 00 WA N w 9� 00. 0" s 10 EMMA FRANCES FORD, ET AL DB 2603 PG 396 DNOD a N SPEC. 2' BASE DITCH — Sne I SEE DETAIL 25-1 11WSl Sn83Sl NO I GI18SI I E INLET CHANN L X I j o 1 I /CL 'I' RIP RAP (BANKS ONL I I I EST 6 CY DDE X MBS�/1H0=,ZL I I I X I I SLOPE=3.00/ I c3NO 60 00' & SEE DETAIL 25-3 ----------- I ---- 1 97.00' 13� \\CL 'B' Rid L4P E E \ EST 2 IT9S +17.00 BEST Sly 1GF 50.00' & 73.00' Imo' �E E E _�� _ 513 BURY INVERT 10, TJiLG BLW Q -- — — — — 519 o o o J NMON\iNn ,z o0 00 _ M I '-SRY4A- I ; N 25° l7' 17.5" W w nn" O N 100 BURNEY L. HAWKINS, ET UX DB 1313 PG 686 MB 10 PG 64 —_— —�-—_ _— - - — —0J Al — — —0— _ _ :TAIL�SHEET 77.00' — — —° L—SS7 )E:TA[ 1-VoJAi--------- CGAU I CGAU 8z°6z=d0 well" `r 3 R3 bz , SEE DEITAt[_&H,EET — 2D-4, BElWb Ili — -SEA �E"rali US HWY 70 EBL 24' PAVED ROADWAY 4'PAVED SHOULDER 1 11 4'PAVED SHOULDER PROP. GUIDERAIL 1 4ETA1CC1 4—P �.r....�_ H ULDFR + _ 2G1 50 - PROP. BARRIER/NOISE WALL -NW2- 1I - _ff - — �5'r RCP- I — — — — — —ss�— — — — —M—_r — ves�— — — — '- — — — —ss - — — — — — — — — -2GT-� — — — ss� — ssj— — — — — — — — — — — — — —ssj— -_ REMOVE DAdA 0 � N � � —�— — — — — — �— — — � 2G1 50 61.50 & 77.00 end z1 — �— Dnd z 50 _ _ � 2D- ETAIL 11 — — — — — _- _— — — — — —M— — — — — — end ,—z TCH GRADIN — — — — —sue — �ss� — — — — 00 W o (VMOVON 03/lbd ,OZ bLll dJS (VMOVO�f O�Abd ,OZ 6Ll/ NS �' 11���-SRY4D2- N R/W MON REMOVE � REMOVE Q W �' REMOVE REMOVE - RE OVE ' " REMOVE 29.63" _ 25° /7 /7.5 REMOVE REMOVE RE ----- - S , I _ 1 __ __ '� ��Qy .� ' :aL+uy �i�Y� _vu • e':k�f�, is` a• . ee�s:pi= J. J....— �_ _ ji �' �i� o r� -mac • �a�a fii_►.;'O- ,•'�- - IY�� -lJ a �� - a • -G �'�M _ _�.a:� Fat _ f :� S : • • • iF ..���ii� �! �! �� - v1 - �, ,(Iy -ii qH Lei+ PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION Rulfuur Beatty DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED StN • r '• 4 ltmxm MRIn „ TZWA �1 'I. 1 lse,zl 52 nos O " dDa 81 8 nOS� 52 —�?o EIP W� — — 8' S2 18 — 0.77' R/ .00 1, < ON00,0/ +19.00 — 52 Imo DGE o� . ® b9,o/ N TO Ell 52 IMO 65.0O_ — — I n 0.54' R/W 2 Ip 52 48.00 R/w +13 DUE j8 I I -E 29.473.1 U P E ---- --- — �-- -- DU I D D DUE DUE o S Dl� 11 z o I I Z P AVF1 zo 9.00 END CHL FENCE `° 3�od (D � Z I I � EST O +97.00 0 SPEC. 'V' DI N 6, I I Z +20.00 ,�, dw a E TYP.J BEGIN WW FENCE Ob�3 L - o ROP CONCRETE i wT 7016 lNl� ,09 o w 53.00' SEE DETAIL 5- �' I I o 6; 4800' & 53.00' I —� b .00' i & 0' -L- STA. o D V P W � _ 60 N w 0 - w 12+16.6d_ o ROP ASPHAL m N o L o o W o m 58.00' SPEC. 'V' DITCH DR/V (TYP.) 0� - m - G�ieSl m rm I +28.00 C DING SEE DETAIL I m a Sl - 0118S1 \ C3 O1IeSI m O1ieSl 0N9SI W OyeSl N ECT TOdSR-577 A13 STIR. #0 01 G�18SI n \� X X „gb �H� X AHD g ISE BOX RIM LWTION .6' G�9 SEE DEAL 25-4 X X j D „86 1 I Q o�° o �G 31d0 �. T TE � D CONSTR TION 00 OINOD 31G0 �1iG i I N00 L] WOODS 31d0 OI1Vd 1 I = . jC r o dWnd ON00 ce dWnd S m IkdONV0 dWnd � Z -SRY4D - .� d 3.58 165 dWnd L �G dwnd (D /� I 011dd d31S �' Gd31S c� �lw d31S OlS �d31S dWnd 0 d31S Ji I I I ��� =I r= = O a Z 166 16 d31S x DNOD I M C3 GNOD,NV�I `J/nQr S y 8 r W N ROYSTON D. BLANDFORD 6 ONOD C� S S �G I s J 173 174 N 175 MICHAEL 168 DB 2399 PG 292 LARRY W. 1 7 O O m O w J. LONGO, ET UX O S r 170 S s MB 9 PG 88 DB 1331 PG 905 DAVENPORT, ET UX N I ❑ _ — O R N I o MB 9 PG 88 S DB 696 PG 379 REBECCA C. PINER �y 169 171 EUBE JUL US MB 9 PG 88 DB 1008 PG 877 � EDWARD DONALS L. RANDALL ALLEN LOGAN, ET UX ROBERT P. JAMES L. GRAY, ET AL HILL, ET UX DB 953 PG 883 MB 9 PG 88 PURYEAR & GOWING 0. LOYD, ET UX WOODCOCK, ET UX ROBINSON JR. MB 9 PG 88 INVESTMENTS, LLC DB 765 PG 509 DB 3346 PG 422 DB 1267 PG 85 D MB 9 1PG PG 691 D13 2�75PG G88523 ZI°SII 60°SII DB 3437 PG 643 MB 9 PG 88 MB 9 PG 88 MB 9 PG 88 I�°591 3 00.2Z S 60°801 60'201 MB 9 PG 88 OL°001 3 00.�Z 3 Lb,00.�Z S S 90°801 9896 ,LO°001 3.b�,9�.Lz S Lb,3 .Lb,00.fz S '60°001 L0°001 3 „Lb,��.Lz S 3 ,Lb,00.�Z S 3,1,00.�Z S 3 ,Lb,��.LZ S 3 „Lb,.LZ S DETAIL 25-1 SPECIAL BASE DITCH ( Not to Scale) Natural 1 oC Front Ground 3• Ditch j D Slope LB Min. D=1.5 Ft. B=2.0 Ft. DETAIL 25-2 SPECIAL 'V' DITCH ( Not to Scale) Front o� Ditch Natural p'1 het Slope Ground Min. D=1.5 Ft. FROM STA 65 + 70 TO STA 66 + 70-SRY4A- LT FROM STA. 63 + 90 TO STA. 65 + 20 -SRY4A- LT FROM STA. 18 + 40 TO STA. 25 + 30-SRY4D2- RT FROM STA. 66 + 90 TO STA. 75 + 47 -SRY4A- LT FROM STA. 25 + 80 TO STA. 29 + 80-SRY4D2- RT FROM STA. 75 + 70 TO STA. 75 + 90 -SRY4A- LT DETAIL 25-3 PIPE INLET CHANNEL ( Not to Scale) Natural Natural Ground 3 31 Ground L Tuck Geotextile j D Geotextile B a Minimum of lft (TYP) Key -In Rip -Rap per Std. Dwg. 876.01 Min. D=2.OFt. Type of Liner= Class 'I' Rip -Rap B=3.OFt. Est. 29 Tons, Est. 52 SY Geotextile STA. 75 + 60-SRY4A- LT DETAIL 25-4 SPECIAL DITCH GRADING ( Not to Scale) 1 _L I sP� *��Rige D g\P�sP lF J P *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 312 + 00 TO STA. 313 + 50 -L- LT FROM STA. 312 + 00 TO STA. 315 + 00 -L- RT FROM STA. 312 + 50 TO STA. 316 + 00 -L- M FROM STA. 322 + 50 TO STA. 324 + 00 -L- M PAVEMENT REMOVAL FOR -LLT - PROFILE SEE SHEETS 56 & 57 FOR -LRT- PROFILE SEE SHEETS 56 & 57 FOR-SRY4A- PROFILE SEE SHEETS 94 & 95 FOR-SRY4D2- PROFILE SEE SHEET /0/ Submittal February 6, 2024 O L n � 3 CVO 0 0 Cv O DETAIL 26-1 SPECIAL BASE DITCH ( Not to Scale) Natural 1 of Front Ground 3• " Ditch D F�°X Slope L_Bj Min. D =1.5 Ft. B = 2.0 Ft. FROM STA. 75 + 90 TO STA. 80 + 90-SRY4A- Ll + 83.00 63.00' & 97.00' E + 06.00 50.00' & 73.00' SPEC. 2' BASE WTCHR SEE DETAIL 26- DETAIL 26-2 TOE PROTECTION IN WETLAND AREAS ( Not to Scale) °X\eg �\ Natural Ground/ 3.1 ° S\°fie Wetland Area C =d d = 1.0 Ft. Geotextile Type of Liner= CL 'B' Rip -Rap DETAIL 2 6-3 SPECIAL DITCH GRADING ( Not to Scale) CL i sP� *SEE CROSS SECTIONS Min. D=1.0 Ft. FROM STA. 324 + 00 TO STA. 326 + 00 -L- LT FROM STA. 324+00 TO STA. 336+00 -L- RT FROM STA. 81 + 65 TO STA. 83 + 20-SRY4A- LT FROM STA. 324 + 00 TO STA. 336 + 00 -L- M FROM STA. 330 + 00 TO STA. 336 + 00 -L- LT CL 'B' RIP RAP EST 2 TONS EST 7 SY GF dc----- ----- ------ — E ---- — 0 �� j60;j EXISTING R/� x x����AA �M Z U QCn C:) 0 � C`) Q I Ln N ~ Wrr— U cd N 15" � ca r. OFi/l!l/L/ 1 ,Sb°LZ=dO REMOVE R-5777AB 20\ PROJECT REFERENCE NO. SHEET NO. R —5777C 26 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION B2110u' Beatty St\ DOCUMENT NOT CONSIDERED FINAL O UNLESS ALL SIGNATURES COMPLETED \ 7F 7F 7F 7F 7� 7F 7F 7F 7F 7F �,F 7F 7F 7F 7F 7� 7p EMMA FRANCES FORD, ET AL �\ DB 2603 PG 396 \7F 7F 7F 7F -IF �F T 7F 7F 7F 7F 7 7F 7F TOE PROTECTION C 7FT 7F 7F 7F 7F7F 7 (FILL SLOPE ONLY) CL 'B' RIP RAP \ I 7F 7F 7F 7F 7F 7F 7F 7F 7F 2F 7F EST 10 TONS +00.00 EST 20 SY GF 50.00' & 63.00' 7F7F 7` " � SEE DETAIL 26-2 7F T 7F 7F 7F 7F 7F CL 'B' RIP RAP R EST 2 TONS 1� EST 7 SY GE 7F 7F 7F 7F 7F 7F T 7F 7F 7F C R / R/W MON 1r, <609 19\*-----------EL-27+96.28 \s F 1511 _ 7F Izm�--------------------------- F .-. �GUARDRAIL v GREU (TL-3) Ln CO�� �n Q_ -SRY4A- \7F 4 C q 2-G 7F 7F 7F "Q_ Q � o- oo LLJ V N 25° 17' 17.5" W + 6o e,M , , ' +50.OQ o dOa abZ I 2D-4, DETAIL 1 D jQ 60 US 70-E-B- -L- ��PJ CTD & 5 LF #0509-#0510 us-70-Wa n _ rNL5 s�-- -- sj-- - --- �\— — i n 1 LO QN_____2GI-D��I——+ / +10.90 62D-4,D-ETAIL 11 9,MSTR. #0510 USING Co77.00' & 77.00'co Uj f '�i 7F � _i' EXTG 30" RCP " 7F Uj � I / � / �w�g — EIP v! R EWP (CONNECT TO R-5777AB E TIN /w�e�� /'I` I -CONNECT TO T. #9506 / 0.73' EIP _4 ,I\ TO R/W AB/ \m'> STR. #0503 /b '9�M ^/ /e 7F T T 7F N 7F T T T T T T T T T T T T T 7F ti / 7F T 7F 7F 7F o, a Qq /7F 7F co 7F 7F I�C ;F 7 0 T 7F 7F I OF � / 1r 4F, .-,IF 111�1WIRI-80 • - - - OJ ni — N 25* 17' 17.5" W 1 SPEC DITCH GRADING — — — nFT — qad GRASS I SEE DETAIL 26-3 — — — — — — — — — — — — — — — — — — — — — — —M— — — — — — M— — — — — — — — — — — EXISTING R/W - --------OJni-- -�- �HO„C U—5713/R—5777A&B I I BY OTHERS (TYP.) 6e S I � NICK ARNOLD ERNEST BARTON STARK DB 1046 PG 703 ��a -�s DB 1215 PG 227 Q 9 PC C PG 350 9 MHO „8b X = I / I a z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z z zN402 ELEVAT I ON = 30.22N�' o O _C� �o ZE T T IW �o IN J O W G 9 s0 N o MICHAEL GLENN HUFFMAN, ET AL DB 2775 PG 187 PC I PG 93C m N 471046 E 2598366 0 BL STATION 35+01.00 72 LEFT °- M"0266Sz BM2 RR SPIKE IN BASE OF 35" OAK `.0 :zzzz::::zzzzz:::::zzzzx::::zzz::::::zzz lcPa HARRY C. DUNCAN JR. S 9�0� DB 3277 PG 574 ti z � N •"' 0 00'OOZ M ,ZI,IS.bZ N ' 0� bs ni !S 00 S m 2 O Co ti O cn cv cn 96/ rr7 8� /0 S I - ZS°�ZZ 3 „01,8S,81 S PAVEMENT REMOVAL FOR —LLT— PROFILE SEE SHEETS 57 & 58 FOR —LRT — PROFILE SEE SHEETS 57 & 58 FOR—SRY4A— PROFILE SEE SHEET 95 Submittal February 6, 2024 IT CV O N l9 Submittal February 6, 2024 O ' N O � 0-) LU W C TZ U) U) LU z_ J 2 U C� G 03 N C- 0 L (-1 LC� n- 1-1 U) D- oo—%% N LU LU U) O Iq 0 ('M) U) e DETAIL 28-1 SPECIAL DITCH GRADING ( Not to Scale) PRELIMINARY ELIMINARY I DO NOT USE FOR CONSTR $ FROM STA. 348 + 00 TO STA. 355 + 65 -L- LT FROM STA. 348 + 00 TO STA. 356 + 00 -L- RT 20 J I Balfour Beatty DOCUMENT NOT CONSIDE s r UNLESS ALL SIGNATURES O N In O < < VERA KAYCAM GBE3,, LET AL 29 ---------- POT StG.100*99.22 O CONNECT TO R 5777AB \ _ O EXISTING R/W STR. #0636 — -----------r--------------�—I — ____= —� �� _// --� // �'� -- —SRY4A— /7'/705" W FS, SEE DETAIL SHEET 2D-4, —DETAIL 11 — — — CGAU CGAU ) U—57/3/R—5777A&B _ — — — — — — — BY OTHERS (TYPo) FFCF CU10FF�IL CGAU CGAU -- -- - - — —i— — N Hol ------ -------------------------------__---- -M 6 —--------------/------------------------------ ��----------------------------- V/�,--------- — F-S S€E-D1=WF------__— R-5777AB STR. #0630 DETAIL 10 — — — T T SPEC DITCH GRADING EXTSTI-RG w I i i - -oJ AT::- - - - - - 0S3 DETAIL 28-1 U-57/3/R-5777A&B �l Yq I BY OTHERS (TYPo) I x N3 H9n08H13AldG/M 33CM OM ,,96 j x II—X I I I I I I I I I I I I I I I I I I I BRICES CREEK BIBLE CHURCH D13 2149 PG 469 PC G PG 121H END CONSTRUCTION ENG T l P PROJECT —L — STA. 355 +64.22 (R—5777C) _ —L— STA. 250 +OOo00 (U—57/3/R—5777A&B) FOR -LLT - PROFILE SEE SHEETS 58 & 59 FOR -LRT - PROFILE SEE SHEETS 58 & 59 Submittal February 6, 2024 .C' s s �s o� s WEYERHAEUSER COMPANY DB 370 PG 53 PC H PG 90G s CANDICE LEE PLISKO DB 3515 PG 1948 3 XCP + 00.01 57.00' �V CO A., \ i.! Q� + 50.94 C 56.93' a SPEC 'V' DITCH SEE DETAIL 29-3 F�SyFFT, J DETAIL 29-1 SPECIAL BASE DITCH ( Not to Scale) Natural \ O Front Ground 3• �' e< Ditch D F\� Slope LB Min. D=2.0 Ft. B = 3.0 Ft. FROM STA. 37 + 00 TO STA. 51 + 00 -SRYI B- LT FROM STA. 49 + 00 TO STA. 51 + 00 -SRYI B- RT 62.00' TIE TO EXTG DITCH SPEC 'V-` H SEE DETAIL 2 DETAIL 29-2 SPECIAL 'V' DITCH ( Not to Scale) Front o� Ditch Natural �'� het Slope Ground Min. D-1.5 Ft. FROM STA. 37 + 50 TO STA. 42 + 00 -SRYI B- RT ECJ TARHEEL INVESTMENTS, INC. DB 2963 PG 224 PC H PG 96F DETAIL 29-3 SPECIAL 'V' DITCH ( Not to Scale) Front o� Ditch Natural p'� �g< Slope Ground 3 J D Min. D=1.0 Ft. FROM STA. 37+00 TO STA. 37+50 —SRYIB— RT PROJECT REFERENCE NO. SHEET NO. R —5777C 29 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER D p PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 00 \ N \ O V Rulfuur BeattyStN" \ DOCUMENT NOT CONSIDERED FINAL \ UNLESS ALL SIGNATURES COMPLETED '0o, CQRC</Nq A o�FR&C /CyT C04,,, r � FQSF�FNT + 52.00 R _ _ _ 70.00' PRC Sta. 46+53.04 +39.28 — 70.00' 7.0 SPEC 3' BASE DITCH / SEE DETAIL 29-1 -0lipO — — — , O / i -SRYIB- �F + 40.00 c � i 7 / 553.04 57.00' / / C o � i i i / 46.00, / / / MPS GNP -ENE �-� 30l �SNE O � m M 1► SPEC 2' BASE DITCH SEE DETAIL 29-1 ,s �Q AZ co FOR -SRYI B - PROFILE SEE SHEET 82 Submittal February 6, 2024 0 L ILL rc � 3 CV-c O 10 N 0 C9/ Wei POT Sta. 15+70e00 + 65.00 �5 W END CONSTRUCTION -DR3 - STA. l5 +60e00 PT Sta. 15+49e590000 +40 0PC Sta. I4+67e2TIE TO EXTG. DITCH C/ SPEC 4' BASE DITCH SEE DETAIL 30-4 441 / SPEC 3' BASE DITCH / SEE DETAIL 30-5 / / 44 CL 'I' RIP RAP EST 11 TONS (� EST 22 SY GF PT Sta. 13 +02e78 / + 00.00 45.0 ' 44 '� 3�011 PC Sta. 11 80e 0 I F 91.41 PROJECT REFERENCE NO. SHEET NO. Cyc R-5777C 30 ° I o �• iq��� ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER q + 51.01 ps � kq p�� 80.00' 0 s F PRELIMINARY PLANS NS DO NOT USE FOR CONSTRUCTION ° ► �► ` /�/ 06 / �sy Sl I ' + 95.00 T,q C 00 i i Q alfuur Ream v +40.00 MATCHLINE (SHEET 31) StN 68.00' ' ' DOCUMENT NOT CONSIDERED FINAL I II SPEC 2' BASE DITCH I SEE DETAIL 30-1 UNLESS ALL SIGNATURES COMPLETED • I I I I I� I / C / 01 FROM STA. 12+35 TO STA. 14+00 -SRYIA- RT / FROM STA. 23 + 40 TO STA. 2 7 + 00 -Y1 RPA- RT c r FROM STA. 18 + 00 TO STA. 19 + 50 -Y1- RT SPEC 2' BASE DITCH 1� Q I 25 SEE DETAIL 30-1 V I I I f29e59 I -06 I \� I PT Sta. 25+7/e59 -05 I +0.0 ' F FROM STA. 21 + 70 TO STA. 23 + 00 -Y1- RT FROM STA. 51 + 00 TO STA. 53 + 00 -SRYI B- LT I 03 FROM STA. 51 + 00 TO STA. 55 + 35 -S RY1 B- RT 15 'Y CL 'B' RIP RAP 2 ELBO S I \ 02 CT li /� �C^1 -r^k IC _ I +75.00 PS PS 60.00' / n yC .� Ob -6.00ccJ4 I 79.00' +10.51 05 60.00' w PC Sta. 11 +10e51 I 04 BEGIN CONSTRUCTION 1►A o I I +89.51 � �l Stae L�+U.).UU EST 7 SY GF LJI L IwI I S 7° 38' S9el" E s 01 4' I -Y PA- POT Sta. 27+72e68 = P0 Ps -YIRABI - POC Sta. 12+61e86, 4e00' LT +33.2 /S-- PC Sta. 26+57e87 ti 00 60.58 001 B 0 , -YIRABI - FOC Sta. 12+30e91 = ( F -YIRABI - PC Stae IO+OOe00 = -YIRABI - PT Sta. l3 +07e88 F LU w -Yl - PT Sta. 20 +03e36 + 45.00 7400' 15" RCP -I �� --� 41.00-DR3- STAe 11+50e00 I �� 03 - _ STA. 10 + 00 TO STA. 11 + 75 -SRYIA- LT / 0 DT Sta. 11 +20e00 I Nz� I F A. 53 + 00 TO STA. 56 + 04 -SRY1 B- LT P` / 00 U) 02 I 3 U -Yl- +80.00 +46.00 R G/ / oo -YIRABI - POC Stae 10+76e97 = N 47° 39' 04e0' o °G 50.00 50.00 56.00 CA - F \� P 15 0 C� -Yl- PT Sta. 2/+0/e36 00 POT Sta. I0+00e00 c� 1 CA CA F - - oo ce */5.08 + I F - - - - - - - 1 (� O - - - d- e PROP. 2'-6e C&G Ln PR P.2 -6 C& o _- N I PROP. 5'CONCRETE o MONO. ISLAND a �h N O J -- o N -Y/ - cv - o o N STATELY PINES ROAD N 46` 09' 12.2" E N N PROP 5' CONCRET 1 B D N MONO.ISLAND 4 15„ iicP-Ivy o N 46 09 /2.2 O E -Y1- P to. 12+00.00 = +22.00 200 TAPER LT.& RT. � �pp� 013 CB RoP ,,6� C&G-SRYIA- POT � + 00,00 = I R g�, 55.00 SPEC 2 BASE DITCH 15 W/ 2\ c$G _ P +86.04 w Iq SEE DETAIL 30-1 2 ELBOWS 9� z -SRYI B - P T ta. 56 +03.99 I 4 o - - W - - - - - - - - - - - - - I Hw E C E 47„ WW FENCE E E E w -� _ C I CB J CL 'I' RIP RAP 61 CP i C 3 +12.06 t +80.00 '4 - -� �301 CB CC Sta. Il +I1e37 15 TONS 512. M Al ST 31 SY GF I 3016 I 63.63' ASPEC 2' BASE DITCH 55.00' 63.54' -- EST 3011 009 ^ U SEE DETAIL 30-6 I w TIE EXTG. _ +09.41 FCC Sta. 12+02e70 I C 4 64 00I 4' 15 RCP�i DITCH - CQ � CI z I � I 76..00 CL 'B' RIP RAP +37.35 3010 of PS I G 55 Q I EST 2 TONS 15 RCP- 56.25 � PS I PRC Sta. 2 + 60e99 I- EST 7 SY GF \ 00 I I � _ \ Ol 02 -YIRABI - FOC Sta. 11+90e70, 4 00' LT I I SPEC 2 BASE DITCH I 5' 03 16 F I +18.99 02 I SEE ETAIL 30-1 I PS II' II' PS I FT Sta. 54+15.03 04 ECJ TARHEEL INVESTMENTS, INC. I Nz� o3 \ +15.03 I PC HgPG 96F224 , 05 55 00' \ �\ I -- ; SPEC 3 BASE DITCH SEE DETAIL 30-3 Nz� I w o -06 � vO � I � oz I + 1 49.16 9 l .00, + 40.00 5 \ 05 \ \ 06 61 \ \ o \ oa \ �A \ \ SPEC 2' BASE DITCH FROM STA. 11 + 75 TO STA. 13 + 80 -SRYIA- LT FROM STA. 12 + 00 TO STA. 15 + 50 -DR3- LT FROM STA. 12 +54 TO STA. 18 + 00 -Y1- RT \ \ v�40 9 S� TIE EXTG _ DITCH SPEC 3' BASE DITCH W/CL 'B' RIP RAP (BACKSLOPE ONLY) EST 90 TONS EST 170 SY GF SEE DETAIL 30-2 0 Y SEE DETAIL 30-1 PC Sta. 25+97e93 \ \ (3b+97.93 \ 5 \ o � °°a \ +98.00 70.00' F \ k��C) \ 63.00' o a 0 F l' oo Fr29 ` � CD` S ob `C' X % \ Gj P 0 g o$ °o c F Submittal February 6, 2024 DETAIL 31-1 SPECIAL BASE DITCH ( Not to Scale) Natural 01 Front Ground Ditch D Slope LB Min. D=1.5 Ft. B = 2 Ft. FROM STA. 14 + 00 TO STA. 19 + 00 -SRYIA- RT FROM STA. 17+00 TO STA.28+55 -SRYIA- LT FROM STA. 28+60 TO STA. 29+00 -SRYIA- LT O--- — + �n LLJ � \ O z (1r) o �� �� + 86.00 Q 65.00' LU < U) \ � +50.00 \ U) 60.00' \ \ � x \ SPEC 2' BASE DITC SEE DETAIL 31-1 \ d \ \ o \ \ c� 0 0 i n 0 � 3 CV � Oro CV 0 moo' (ED ECJ TARHEEL INVESTMENTS, INC. DB 2963 PG 224 PC H PG 96F 65.00' FRC Sta. 19+11.87 o� \ + 42.57 o� \ 65.00' 1O SPEC 2' BASE DITCH SEE DETAIL 31-1 \ 16 + 14.00 \ % 73.00' \ E \ \ Ln N FCC Sta. 26 +20.22 +25.00 + 34.00 74.00' i 75.00' R E E NAB 83/ � A 2077 SPEC 2' BASE DITCH SEE DETAIL 31-1 + 86.00 0.00, - 20.22 / i5.00' +20.21 ----- --� 50. MP PROJECT REFERENCE NO. SHEET NO. R —5777C 31 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY RY PLANS DO NOT USE FOR CONSTRUCTION B llou ' Beatty su v DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED �N / >�'A �N C) / 101 HW BURY j INVERT 1.0 �_�. o O HW 310 s BURY \ INVERT 1.9% / / / )0 50.W FOR -DR3 - PROFILE SEE SHEETS 78 FOR -SRYIA- PROFILE SEE SHEETS 78 & 79 .: Submittal February 6, 2024 I L H� G I W �G 3 - k_ ' m � \ 5 \ +18.00 PS 0.00', 101.00' I _ _ /(_ \\ �� 08.00 y \ + 97.6 8 00', 101.00' \ \ \ \ \ EX R/W \ ✓`r +16.34 SP 'V' DITCH �\ EX RW \ \ �'\ SEE DETAIL 32-1 (� s\ \ + 64.2 � \ \\\ \ 29.36' \ C\ d \ \ l P + P 1 'ram \ \ \ M OG� + 09.9 EX RrW b + N COM ANY, NC. � o \�9 �Nr I 7, b s \ srx� B 1240 G 82 3 00 OOr\\ �\ \ I o' + \ 3.0 O 01 +22. 0 O 3.0\ \ \\\\\ 103. \ \\ + 72.00 >91.00 i j` p4 �F -SRY1 - \ \ w \ \ +13.28 128.00' 114.00' PIPE OUTLET CHANNEL d W +94.0. oo \ EX R/W +09.00 N W/CL 'I' RIP RAP (BANKS ONLY W O I- 03 POC StO. 6 - \\0 + 4.50 �; 101.00' SEE DETAIL 32-4 Ln \ \ 54.50 7.52 W \\ E 1 \ -�30.0 SSRYIDY QRy 85 00' - 0 + 83.00 v �v oo' F + 05.93 84.00' + 90.89 D D EX RrW 15 6 I01 R 70 \� ��d BURY 48 52 250' TAPER (LT)' STA 9 D \ 20 INVERT 1.0' po ,/ + 30.00 + / 30 6 W - / �\ EX RNV -Yl- _ / r � 55 0 � 0 � + 67.63 � � , EX '� �� �� � \ \ � + 74.53 �s o07 48.11 l� TAPE (LT) d D P CN i o 42' 05' l7a � 500' APER (RT) W 007 O -Yl- + 63.00 0 67.09% R C) 20 03 Z -Yl- + 02.00 'p �i- H _ 70.00' J R 85 01 55 R 35' F' TOE PROTECTIO HW C 0 w - F w +46.00/ CL 'B' RIP RAP l5' / l5' + 46.00' EST 15 TONS N M F fir, W 77./5 �--EST 30 SY GF ti� 00 -SRY1C- 02 ' IN +77.00 56 SEE DETAIL 32-3 P E P E P E E� \ PUE PUE Q �' 68.00 2 o PT StG. 54 *64.27 + 02.00 ' H\ - ` 25.02', 97.00' %O CT N \ \ TOE PROTECTION � PIPE OUTLET CHANNEL /�\ U 04 QJ W/COIR FIBER MAT CL 'B' P m� CL 'B' RIP RAP SLOPE = 0.5% EST 20 TONS \ \ EST 10 TONS 320 +24.00 SEE DETAIL 32-2 BURY INVERTS 1.0 EST 40 SY GF EST 20 SY GF 0 78.00' -Y1- +00.00 SEE DETAIL 32-3 SEE DETAIL 32-3 CL 'B' RIP 138.00' ` 82000"' EST TONS• :::__::::_:zw:_:X X:::w:XXXXXz__:X::::zX + ., EST 21 SY GF ELEVATION = 29. 56 425 E V BURY INVERTS 1.0' 0�� �� SPEC 'V' D H 77./5 SEE DETAIL 32-1 N 448240 E 2613472 J BY16 STATION 10+68.00 29 LEFT / a BM25 RR SPIKE IN BASE OF 16" PINE +35.9 N 7 45.00' i + 41.00 A C/ 67.00', 93.00' KEDDB 240 P GN 828 C. E i Q p + 31.00 / O O 67.00 , 93.00 � o0 SPEC 'V' DITCH / Q SEE DETAIL 32-1 Y s, F �XO 0�S FT>1 DETAIL 32-1 SPECIAL 'V' DITCH ( Not to Scale) Front of Ditch Natural �'1 Mgt Slope Ground Min. D=1.5 Ft. FROM STA. 52 + 00 TO STA. 53 + 88 -SRYI C- LT FROM STA. 53 + 91 TO STA. 54 + 90 -SRYI C- LT FROM STA. 11 + 00 TO STA. 14 + 00 -S RYl DY3 C- LT FROM STA. 12 + 00 TO STA. 14 + 00 -SRYI DY3C- RT DETAIL 32-3 TOE PROTECTION ( Not to Scale) FILL NATURAL SLOPE GROUND d GEOTEXTILE d=1.0 Ft. Type of Liner= Class 'B' Rip -Rap FROM STA. 38 + 50 TO STA. 39 + 62 -Yl- RT FROM STA. 39 + 76 TO STA. 41 + 09 -Yl- RT FROM STA. 41+24 TO STA. 42+00 -Yl- RT PROJECT REFERENCE NO. SHEET NO. R -5777C 32 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION IN m n� � � Y 00 � Q m �P Rulfuur Beatty vSIN n da z = W rn �NCn DOCUMENT NOT CONSIDERED FINAL is 00 0 v UNLESS ALL SIGNATURES COMPLETED o m „Lb N /3 1N3W35d3 111111N ,S 3 I N zg° ��00, N /' 0Lq _0 m 3 ' 1311N ,S � � 1N3W35tl3 �1 s; P 3 m D m Z r m � WALTER T. IVES, JR, ET UX DB 1760 PG 731 o JAMES THOMAS KILLINGSWORTH, ET UX MB 7 PG 38 DB 582 PG 587 MB 7 PG 38 A END CONSTRUCTION cn N 6? 0? o o -YI - STA. 45+20.00 m CQ co �70 LP s z PT Sta. 47 -�87.16 rnmom z r�� I `o +34.00 0� o EX. R W of +36.44 I3 Izl y8 0' I I rn �� 1 I I \03 n +06.66 9 0 UE 45.6P n 1�- - ,OL X ,01 _ c NM0N\1Nfl_,9 777 N I Add0, N , M _ Ste% ONp n0S I - - - _ - - SSj - ONpO tv N00 0 Fdl d d13 010�d ,9 /8 +1 .88 I I 3r 0 I 01 + 7 PUE 19 EX EX �AND +5 .00 I CAROLINA TELEPHONE 1103 W TELEGRAPH COMPANY EASEMENT + 51.14 3 w� U� 55.00' �` 1-0JOHN 0- R, BOOHER, ET UX `-O`6 ` Q o DB 1724 PG 1058 55.09' --gym i�'' -�/ 11 N o �o MB 7 PG 38 BENJIE RUSSELL SCHRECKENGOST,ET DB 3484 PG 498 UX MB 7 PG 38 U) N � W lP 0, N rn 'OL°ZC,\ N 33 Z\° DETAIL 32-2 PIPE OUTLET CHANNEL ( Not to Scale) Natural Natural Ground d .3•I D �•� Ground Min. D=2.0 Ft. LB Max. d = 4.0 Ft. B = 3.0 Ft. Length = 42 Ft. Type of Liner=120 SY COIR FIBER MAT Est. 40 CY DDE STA. 54 + 60 -SRYI C- RT DETAIL 32-4 PIPE OUTLET CHANNEL ( Not to Scale) Natural Natural Ground 3 3.1 Ground I D Tuck Geotextile a Minimum of lft Geotextile g (TYP) Min. D=3.OFt. Length = 30 Ft. d = 4.OFt. Type of Liner=CL 'I' Rip -Rap - Keyed -In B=5.OFt. - 11.OFt. Est 52 Tons, Est 90 SY Geotextile Variable at Outlet STA. 40 + 90 -Yl- LT PAVEMENT REMOVAL FOR -Yl- PROFILE SEE SHEETS 60 & 61 FOR-SRYIC- PROFILE SEE SHEET 84 FOR-SRYIDY3C- PROFILE SEE SHEET 84 Submittal February 6, 2024 �1 W W r2 V J C) O N v ) I 1 W z_ J 2 U Q 75 0 CT M M c- 0 L i cn X 159 \ \:xx:**::::x:***::::::x*:::::xx:::::::x:: 423 ELEVATION = 29.45 N 458055 E 2605594 BY8 STATION 11.53.00 16 RIGHT BM23 RR SPIKE IN BASE OF 15" OAK O NEW JERUSALEM APOSTOLIC OUTREACH CHURCH DB 2731 PG 485 SHADIE RAY WHITEHEAD, ET UX DB 1129 PG 126 MB 3 PG 121 FROM STA. 25 + 00 TO STA. 26 + 15 -Y3- LT FROM STA. 2 6 + 80 TO STA. 2 7 + 90 -Y3- LT FROM STA. 25 + 00 TO STA. 26 + 80 -Y3- RT FROM STA. 26 + 80 TO STA. 27 + 90 -Y3- RT FROM STA. 2 6 + 80 TO STA. 2 7 + 90 -Y3- RT — —SS3_ 3 1 f�o UNITED STATES OF AMERICA (CROATAN NATIONAL FOREST) DB 336 PG 16 M/a JNIISIX3 - -SS3 —1- - SS3 — — ,lb'MGVOY G3AVC110E 3Ab' N314sl3 3 60// Ns — 4 3d4H .S1 — —nl— — S8°ZI 0` '°Z i n� nr c M .Sb,60.0s S M/61 ,LO°p z A41a pl=egll 3.SS,Sm 3no,sl —n4 ,SI — — N3 CYNTHIA ANN ROEDER DB 3539 PG 1617 PC H PG 61E MICHAEL G. LoCONTE, ET UX DB 2686 PG 921 PC H PG 61E JAMES VANCE BIBBS JR. ET UX DB 3492 PG 1599 PC H PG 61E COLE B. NASON, ET UX DB 2767 PG 733 PC H PG 61E MICHAEL ALAN FAULKNER, ET UX DB 3541 PG 219 PC H PG 61E THEODORE F. POATSY JR. ET UX DB 3488 PG 310 PC H PG 61E —SS3— (j J —SS�— ..t7 1J04 — — --0I L�VTd b — —ni— — oS� f0NN ev GN3 Ob'30 L T INNVVUUU HIUHLAINUJ — — COMMUNITY NMONANn H03 ASSOCIATION, INC. dO3 DB 2910 PG 329 a103 o3 PC H PG 61E as'o? X oI M/2j 01 3 '121,12 d13 ,ZI°0 S 91 6S S 3 v G� ■ a • SIP. ' o. • • 4� � � 0 m 1 1VOM ..II 60.Op IS SI°OS \ 3 11,6b.6S S 31 0 C o \\ ?\ \ a mm 5 \\ \\\ 000� \\ �r ` d n rQ d 1 Q3S1 _ 31S - � LYNNWOOD HIGHLANDS COMMUNITY ASSOCIATION, INC. DB 3012 PG 524 PC H PG 184E LYNNWOOD HIGHLANDS COMMUNITY ASSOCIATION, INC. DB 2910 PG 329 PC H PG 61E LYNNWOOD HIGHLANDS COMMUNITY ASSOCIATION, INC. DB 2910 PG 329 PC H PG 61E Q, 0 a3sl o p 03 � � M Z o r � 3n0 IS 3 S —3 N _--3 L8°9 I m 3 lOZ,Ib.6S S C4 w o N � m `n W d cn = o m cn m i9 w T LYNNWOOD o� HIGHLANDS COMMUNITY ASSOCIATION, INC. m m DB 2910 PG 329 o� , 5,b225°�� °0Z ,LO,z�°5 7, Qc c vo L d _ s s o', THOMAS J. m s` UKACENA, ET U s DB 3044 PG 658 PC PG 61E 3 i FOR —Y3 — PROFILE SEE SHEET 66