HomeMy WebLinkAboutNC0040070_Staff Report_19780104Part i -
STAFF REPORT AND RECOMMENDATIONS
INSPECTION OF EXISTING WASTEWATER DISCHARGE
1. Place visited: City of Gastonia Water Treatment Plant
Gaston County
2. Date: January 4, 1978
3. By: B. Keith Overcash. Rex Gleason
4. Persons contacted: Iierschal Jordan, Don Osborne
5. Jirec7cions to site: The water treatment plant is located at the corner
of East Falls Street and East Long Street in Gastonia.
6. The bearing and distance to the existing: )tint of effluent discharge
is: Approximately 300 feet west of the ,a c fr C-r��atvient ul ant at
Longitude 310 12' 20" and Latitude 350 1:
7. Size: There does not appear to be sufficient area available at this
site for wastewater treatment facilities.
U. T000ara!):1�/: ::)11in 1, 5-1:i �iopc,s.
9. Locatioli U1' tr':t)lve�lIiii';. kmrr,Xl;1:i ;'j , l i . fCe, C
1'•.). .�.iC'_:ltllii•; �Cr•_, ,. il1�l:Aii:atl tr1LUCaT'_/ Cv �' tlx: 1,i''r•':
(a) Classi 'ic:acitr�: i
1+)-yF?rir t{1SCiCFs.
(C) >.'t ii...;,1? for rls:i a'1.1 'Jlulll- as 't!'ll as
for i i' "111 '. ''O(ItilIC, l tt'lil 3;i:' ul'/ _ „ i :1' �isLl" " e"!Cgn- as a
sourL? of is 6'?r su),ol V ror or fo0j-hroC-2SSing
pur;)uscs .
Part II - DESCRIPTINOF PROPOSED TREATMENT WORKS
There are no .xisting wastewater treatment facilities at the Gastonia
later Treatment Pl ;i:rt. Filter backwash water and sludge from the settling
basins are bei Ili? li scharged directly to tie "rface waters without
treatment. The City plans to construct a wastewater collection system
at the water plant and discharge the wastewater to the sewerage system
for treatment at the Long Creek Wastewater Treatment Plant.
The City has proposed a schedule for the construction of the proposed
facilities in order to eliminate the discharge to the surface waters
of the State. However, this Office felt that an excessive amount of
time (two years) to accomplish the proposed construction had been projected
by the City. A meeting was held in this Office on June 12, 1978, with
Mr. Graham Wilson and Mr. John Schuler of the City of Gastonia; Mr. Dick
Moore and Mr. Henry Moore of Moore, Gardner & Associates; and Mr. Rex
Gleason and Ar. K,aitii ilvercash of the Division of Environmental Management
in attendance to discuss the proposed schedule. The City does not feel
that a shorter time schedule would be feasible. It is, therefore,
recommended that a Special Order by Consent be prepared which includes
AA
Page Two
the proposed time schedule and that a Permit be issued containing the
final effluent limitations assigned to this point of discharge.
Part III - EVALUATION AND RECOMMENDATIONS
It is recommended that a Permit be issued for the continued discharge
of the wastewater from the Gastonia Water Treatitient Plant including the
following final effluent limitations:
Parameter
Fi ow
TSS
Settleable Matter
Turbidity (Above background)
Effluent D. 0. (illinimum)
Temperature
pH
Discharge Limitations
Monthly Avg. Weekly Avg.
1.2 MGD
30 mg/l
0.10 1,11/1
50 JT'..'
5
6-9
45 mg/l
0.15 ml/l
50 ird,s
5 mg/l
*The temperature of the effluent shall be such t:iat it will not cause
a tem,,)arature in tie receiving stream of more t ian 5°17 a6ave ambient
s .raa,,i 4a,.er
T;-Ia follu.!1n'.; 1:.. 5; ",.:.ul fur ..ac C')11Si,i'u 1i jti ,;:J11,:ction system
a 41-,11 pia',; 1.. lr r ii1 i? t.l' ias ]:xi`�--icii sewerage
Sys ..I ,•'i i i l i j-i .e•a' . i,i tom" acial r:: -r
1 )1 i11 )I ztt. 1,!, :C1"lcai Jjis on o,
2. Fart .:,; 0, � or rur,� li'ii -----
J.
on ,>r-`-
4. Cuvipl ec-- ti• is J o„i anj Cease 111 i i s•-- ids" s to sure ace waters
or t is ;a c�, oi; , r l ors ```Y
The following int>.�ri.i effluent lii-iiitations should also be included in the
Special Order b;l .onsent:
Parameter
TSS
Settleable Matter
pH
Temperature
Li,mi tations
Monthly !_ a. Weekly Avg.
60io mg/l 900 mg/l
75 ml/1 100 ml/l
6-9 s.u.
*
*The temperature of the effluent shall be sucn as to not cause a teiperature
in the receiving stream of more than 50F above ambient stream water
temperature.