HomeMy WebLinkAboutCrosswinds Campground Site Plans (2)
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEER .
P. O. BOX 1690
WILMINGTON, NORTH CAROLINA 28402
IN REPLY REFER TO
SAWEN--PM
Mr. John N. Morris, Director
N .C. Department of Natural Resources
and Community Development
P O Box 27687
Raleigh, NC 27611
Dear Mr. Morris:
Copies of the original Site General Development Plan and the revised plan
for the Crosswinds campground, B. Everett Jordan Lake, are inclosed for
your review and concurrence. Updated topography has enabled us to
consolidate the camp units and relocate the campers' boat launching ramp,
thus reducing length of road and restroom facilities.
Upon completion of your review and comments, we will furnish the plans to
our A-E contractor for his use in preparing an estimate for the sewage
disposal system
An early response is requested.
Sincerely,
E. G LONG, JR.
Chief, Engineering Division
1 Incl
Two maps