Loading...
HomeMy WebLinkAboutCrosswinds Campground Site Plans (2) DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEER . P. O. BOX 1690 WILMINGTON, NORTH CAROLINA 28402 IN REPLY REFER TO SAWEN--PM Mr. John N. Morris, Director N .C. Department of Natural Resources and Community Development P O Box 27687 Raleigh, NC 27611 Dear Mr. Morris: Copies of the original Site General Development Plan and the revised plan for the Crosswinds campground, B. Everett Jordan Lake, are inclosed for your review and concurrence. Updated topography has enabled us to consolidate the camp units and relocate the campers' boat launching ramp, thus reducing length of road and restroom facilities. Upon completion of your review and comments, we will furnish the plans to our A-E contractor for his use in preparing an estimate for the sewage disposal system An early response is requested. Sincerely, E. G LONG, JR. Chief, Engineering Division 1 Incl Two maps