Loading...
HomeMy WebLinkAboutNCG030047_DMR_20240115Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 1/15/2024 CERTIFICATE OF COVERAGE No. NCG03 0 0 4 7 FACILITY NAME Raven Antenna Systems (DBA Global Skyware) COUNTY Johnston PERSON COLLECTING SAMPLES Brien McClenney LABORATORY Meritech Lab Cart. # 165 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2023 SAMPLE PERIOD ❑ Jan -June ® July -Dec or © Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA ❑Zero -flow []Watersupply ❑SA nl ❑Other JAN 17 2024 U PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 _..,MAI GII ES n No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks - - 100 mg/L or 50 mg/L4 6.0 —9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 2 12/11/2023 1 inch <2.5 mg/L 7.34 0.010 mg/L <0.010 mg/L 0.119 mg/L <5 mg/L <1 mg/L 3 12/11/2023 1 inch <2.5 mg/L 7.38 0.004 mg/L <0.010 mg/L 0.060 mg/L <5 mg& <1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites maybe eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Susan Warmuth Name (Print name) HR Director Title (Print title) � �s aoaZ/ Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period ?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/0 Parameter Code - 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: If you report a sample value in excess of the benchmark, you must implement firer 1, rer 2, or Tier 3 responses. See General Permit text. Permit Date:11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART AND PART MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALLTRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ❑ NG REGIONAL OFFICE CONTACT NAME: Thad Valentine Mail an origin/ copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Permit Date:11/1/2018-05/31/2021 15 any Dat SWU-245, last revised 11/1/2018 Page 3 of 3 rc_ Environmental quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit https:'/deq.nc.gov/about/divisions/energy-mineral-land-resources/ npdes-stormwater-gps Permit No.: N/C/ 1 / l l 1 / I or Certificate of Coverage No.: N/C/G/ Facility Name: (&&A7?qL j/, County: _Phone No. Inspector: / TL���1� t �� Date of Inspection: / Z/ Time of Inspection:(f1 Total Event Precipitation (inches): —4— All _— -_.— . - Permits require qualitative monitoring to be performed during a "measur--able sto----- rm event" A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour stone interval does not apply if the pemuttee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEMLR j Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: of Permittee 1. Outfall escription: Outfall No. Receiving Stream: SWU-242, test modified 06/e1/20t S Structure (pipe, ditch, etc.): t within the outfall drainage area: Page i of 2 2. Color: Describe the color of the dis haW gi2ng basi�lors r brown, blue, etc.) and tint (light, medium, dark) as descriptors: i 3. Odor: Describe chlorine odor, etc.): the discharge may have (i.e., smells strongly of oil, weak 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 10 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: d") 2 3 4 5 7. Is there any foam in the stormwater discharge? . Yes : No. 8. Is there an oil sheen in the stormwater discharge? eYes 4 No. ���V 9. Is there evidence of erosion or deposition at the outfall? Yes -No. /JO � 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. 'These conditions warrant further investigation. Page'2 of 2 SWU-242, Last modified 06/01/2018 Enwmnmenml Quality Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on fllling out this form, please visit https:ildeq.ne.gov/about/divisions/energy-mineral-land-resources/ npdes-stormwater-gps Permit No.: N/C/ // / / / / / / or Certificate of Coverage No.: N/C/G/ Facility Name: C LOR4L Syy) County: JU ft7 l G l Phone No. Inspector:.-Yl� Date of Inspection: Time of Inspection: `�` - Total Event Precipitation (inches): All permits require qualitative monitoring to be performed during a `measurable storm event" A "measurable storm event' is a storm event that results in an actual discharge from the permitted site outfali. The previous treasurable storm event must have been at least 72 hours prior. The 72-hour storm i interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DENfLR Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: 1. Outfail Description: Outfall No. Receiving Stream: swu-242, Last o,od!fied os1c!n_o!8 Structure (pipe, ditch, etc.): 0 G occur within the outfall drainage area: Page 1 of 2 2. Color: Describe the color of the disch�r e ing bad cpolors re brown, blue, etc.) and tint (light, medium, dark) as descriptors: = 1 ,� 3. Odor: Describe any distinct odors that -Ola di arge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): }l'` 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: C 1 i ? 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? 0 Yes 0 No. �> 8. Is there an oil sheen in the stormwater discharge? PYes Q No. 9. Is there evidence of erosion or deposition at the outfall? 0 Yes 40� No. 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SW-242. Last modified 06/01/2018