Loading...
HomeMy WebLinkAbout20171122 Ver 2_2017-1122 v2_GUC_Task 7 Credit Release Request__20240205Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 February 3, 2024 Fx: (919) 755-9492 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Raymond Holz, raymond.holz@davey.com, (919) 604-9314 Through: RESTORATION SYSTEMS, LLC Restoration Systems (RS) formally requests a credit release for the GUC Bank Parcel (2017-1122 v2) for assignment of the Conservation Easement to the Site’s long-term steward, the North Carolina Wildlife Habitat Foundation on May 31, 2023. Recorded at the Pitt County Register of Deeds, Bk 4414 Pg 847-875. Per the approved credit release schedule, which is included in the Attachments to this request, RS is requesting the release of Task 7 credits. Credits Requested for Release Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration Task 7 74,594.288 RBMUs Task 6 (MY3) & Task 8 (MY4) withheld. Buffer Preservation Task 7 341.217 RBMUs Task 6 (MY3) & Task 8 (MY4) withheld. Buffer Enhancement -- -- -- Generated Nitrogen Nutrient Offset Task 7 5,904.483 NOC (N.) lbs. Task 6 (MY3) & Task 8 (MY4) withheld. Delivered Nitrogen Nutrient Offset (Jordan sites only) -- -- -- Generated Phosphorus Nutrient Offset Task 7 380.294 NOC (P.) lbs. Task 6 (MY3) & Task 8 (MY4) withheld. Delivered Phosphorus Nutrient Offset (Jordan sites only) -- -- -- Sincerely, Raymond Holz Attachments: 1) Approved As-built Credit Totals 2) Signed MBI Credit Release Schedule 3) Credit Release Summary Table 1. GUC Mitigation Site, 2017-1122v2, Project Credits Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter NO if ephemeral or ditch 1) Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (ft2) Total (Creditable) Area of Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Convertible to Riparian Buffer? Riparian Buffer Credits Convertible to Nutrient Offset? Delivered Nutrient Offset: N (lbs) Delivered Nutrient Offset: P (lbs) Buffer Rural Yes I / P Restoration 20-29 2, 7B 401 1 75%1.33333 Yes 300.751 No —— Buffer Rural Yes I / P Restoration 0-100 2, 6B, 7A, 7B, 8 1,491,585 1 100%1.00000 Yes 1,491,585.000 Yes 0.000 0.000 ——— Nutrient Offset Rural No Ditch Restoration 0-100 5, 6A, 420,657 1 100%No —Yes 21,950.434 1,413.778 Nutrient Offset Rural No Ditch Restoration 101-200 5, 6A 382,282 1 33%No —Yes 19,947.962 1,284.803 Nutrient Offset Rural Yes I / P Restoration 101-200 2,6B, 7A, 7B, 8 1,460,125 1 33%No —Yes 76,191.257 4,907.306 ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— Totals:2,263,063 1,491,986 Enter Preservation Credits Below Eligible for Preservation (ft2):497,329 Credit Type Location Subject?Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (sf) Total (Creditable) Area for Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits Buffer Rural Yes I / P 0-100 2, 8 64,781 64,781 10 100%10.00000 6,478.100 Buffer Rural Yes I / P 101-200 2 10,492 10,492 10 33%30.30303 346.242 Buffer — Buffer — Buffer — Buffer Preservation — Buffer — Buffer — Buffer — Buffer — Buffer — Preservation Area Subtotal (ft2):75,273 Preservation as % Total Area of Buffer Mitigation:3.8% Ephemeral Reaches as % Total Area of Buffer Mitigation:0.0%Square Feet Credits 1,491,986 1,491,885.751 0 0.000 75,273 6,824.342 0 1567259.181 1,567,259 1,498,710.093 1491986 Square Feet Credits Nitrogen:118,089.653 1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).Phosphorus:7,605.887 last updated 11/22/2019 2,263,063 TOTAL AREA OF BUFFER MITIGATION (TABM) TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset: Preservation: Total Riparian Buffer: Tar-Pamlico 03020103 19.16394 297.54099 Restoration: Enhancement: Mitigation Totals GUC MBI - Approved 02-18-2020 GUC ‐ Credit Release Summary  2017‐1122 v2 As‐Built Approved "Restoration" RBMUs: 1,491,885.751 1. BPDP approved, etc. 20.00% 298,377.150 20.00% 298,377.15 0.00 8/5/2020 2. Post Construction 20.00% 298,377.150 20.00% 298,377.15 0.00 8/5/2020 3. As‐built + bond 10.00% 149,188.575 10.00% 149,188.58 0.00 9/4/2020 4. Monitoring Y1 10.00% 149,188.575 10.00% 149,188.58 0.00 4/19/2021 5. Monitoring Y2 10.00% 149,188.575 10.00% 149,188.58 0.00 3/24/2022 6. Monitoring Y3 10.00% 149,188.575 Withheld 7. Transfer to Stewardship 5.00% 74,594.288 TBD 8. Monitoring Y4 5.00% 74,594.288 Withheld 9. Monitoring Y5 10.00% 149,188.575 TBD Total Released to Date 100.00% 1,491,885.751 70.00%1,044,320.03 0.00 As‐Built Approved "Preservation" RBMUs: 6,824.342 1. BPDP approved, etc. 20.00% 1,364.868 20.00% 1,364.87 0.00 8/5/2020 2. Post Construction 20.00% 1,364.868 20.00% 1,364.87 0.00 8/5/2020 3. As‐built + bond 10.00% 682.434 10.00% 682.43 0.00 9/4/2020 4. Monitoring Y1 10.00% 682.434 10.00% 682.43 0.00 4/19/2021 5. Monitoring Y2 10.00% 682.434 10.00% 682.43 0.00 3/24/2022 6. Monitoring Y3 10.00% 682.434 Withheld 7. Transfer to Stewardship 5.00% 341.217 TBD 8. Monitoring Y4 5.00% 341.217 Withheld 9. Monitoring Y5 10.00% 682.434 TBD Total Released to Date 100.00% 6,824.342 70.00%4,777.04 0.00 As‐Built Approved NOC (N.) lbs.: 118,089.653 1. BPDP approved, etc. 20.00% 23,617.931 20.00% 23,617.93 0.00 8/5/2020 2. Post Construction 20.00% 23,617.931 20.00% 23,617.93 0.00 8/5/2020 3. As‐built + bond 10.00% 11,808.965 10.00% 11,808.97 0.00 9/4/2020 4. Monitoring Y1 10.00% 11,808.965 10.00% 11,808.97 0.00 4/19/2021 5. Monitoring Y2 10.00% 11,808.965 10.00% 11,808.97 0.00 3/24/2022 6. Monitoring Y3 10.00% 11,808.965 Withheld 7. Transfer to Stewardship 5.00% 5,904.483 TBD 8. Monitoring Y4 5.00% 5,904.483 Withheld 9. Monitoring Y5 10.00% 11,808.965 TBD Total Released to Date 100.00%118,089.653 70.00% 82,662.76 0.00 As‐Built Approved NOC (P.) lbs.: 7,605.887 1. BPDP approved, etc. 20.00% 1,521.177 20.00% 1,521.18 0.00 8/5/2020 2. Post Construction 20.00% 1,521.177 20.00% 1,521.18 0.00 8/5/2020 3. As‐built + bond 10.00% 760.589 10.00% 760.59 0.00 9/4/2020 4. Monitoring Y1 10.00% 760.589 10.00% 760.59 0.00 4/19/2021 5. Monitoring Y2 10.00% 760.589 10.00% 760.59 0.00 3/24/2022 6. Monitoring Y3 10.00% 760.589 Withheld 7. Transfer to Stewardship 5.00% 380.294 TBD 8. Monitoring Y4 5.00% 380.294 Withheld 9. Monitoring Y5 10.00% 760.589 TBD Total Released to Date 100.00%7,605.887 70.00% 5,324.12 0.00 Date Approved MBI Release  Percentage MBI Release  Percentage Lbs. / Task per MBI  %Difference RBMUs / Task per  MBI % % Released by DWR Amount Released by  DWR (lbs.)Date Approved MBI Release  Percentage RBMUs / Task per  MBI %% Released by DWR Amount Released by  DWR (RBMUs)Difference Date Approved Task  Task Difference% Released by DWR Amount Released by  DWR (RBMUs) Task  Difference Date ApprovedTask MBI Release  Percentage Lbs. / Task per MBI  %% Released by DWR Amount Released by  DWR (lbs.)