Loading...
HomeMy WebLinkAbout20150959 Ver 1_More Info Received_20151008 (2)<1 ATE PROPERTY D ON MITCHELL COUNTY GIS DATA m m D O z DEFLECT TQ_BA-C FISHINA 2330 2325 2320 - 2315 o� I � Q II sT LLSE"R1 S F DEFLEC S AL*(G SECTION..O S BANK ON RIVE IGHT%-BfED WILL DETERM, C CAT!1WIN THE FIELD. CORP ATE SALyA D TREES TO DEFLECTORS TO E SA f XI M EXTENT PRACTICAL. a � k 0 23 K� \: 2330 , _. -- PLAN VIEW 1 " =40' i i i i i 0 +00 0 +50 1 +00 1 +50 2 +00 2 +25 STATION 2355 2350 2345 r- 2340 m 2335 Z 2330 2325 2320 2315 " THIS PLAN DOES NOT PURPORT TO SHOW ALL EXISTING UTILITIES, LINES, APPURTENANCES, ETC., AND THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES, PIPES, VALVES, ETC. AS SHOWN ARE IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR THE ENGINEER. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES, LINES, PIPES, ETC. BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT RESULT FROM THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES, PIPES AND VALVES. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY CONFLICTS WITH EXISTING AND PROPOSED FACILITIES TO DETERMINE IF AN ITEM WILL NEED TO BE RELOCATED. THE ENGINEER HAS MADE NO EXAMINATION TO DETERMINE WHETHER ANY HAZARDOUS OR TOXIC MATERIALS ARE PRESENT OR CONTAINED IN, UNDER, OR ON THE SUBJECT PROPERTY OR ITS WATERS, OR IF ANY HAZARDOUS OR TOXIC MATERIALS HAVE CONTAMINATED THIS OR OTHER PROPERTIES OR ITS WATERS IN ANY WAY WHATSOEVER. NO SUB - SURFACE EXAMINATION OF ANY TYPE HAS BEEN MADE BY THE ENGINEER, AND ACCORDINGLY, NO OPINION IS EXPRESSED OR INFERRED ON ALL SUCH MATTERS. FURTHER, NO OPINION IS RENDERED AS TO ANY VIOLATION OF ANY ENVIRONMENTAL LAWS OR REGULATIONS, EITHER FEDERAL, STATE, OR LOCAL RELATED TO THE INFORMATION SHOWN ON THIS PLAN AND THE ENGINEER IS IN NO WAY LIABLE FOR ANY VIOLATION OF SUCH ENVIRONMENTAL LAWS SHOULD SUCH EXIST. NOTES: 1. NO WORK IS TO BEGIN ON THE LITTLE ROCK CREEK PORTION OF THIS PROJECT WITHOUT BFED PERSONNEL ON SIGHT TO PROVIDE CLARIFICATION AND OVERSIGHT. 2. ACCESS TO LITTLE ROCK CREEK IS VERY LIMITED. 3. EQUIPMENT SHALL BE SMALL ENOUGH TO NEGOTIATE A 9' WIDE OPENING AND SAFELY PASS UNDER THE POWER LINES. Regional Curve Info Drainage Area (sq mi) = 23.1 BKF Xsec Area (sq ft) = 182.8 BKF Q (cfs) = 1,094 BKF Width (ft) = 60.9 BKF Mean Depth (ft) = 2.9 Width-to -depth ratio = 20.7 STATION CROSS - SECTION 6 1 " =20' (HORT) 1 " =20' (VERT) TO THE BEST OF MY KNOWLEDGE, JUDGMENT, 60% PROGRESS DRAWINGS AND BELIEF, THESE PLANS MEET APPLICABLE DO NOT USE FOR CONSTRUCTION NRCS STANDARDS, AND LOCAL AND STATE REGULATIONS. N ..... qRp Q SEAL 025442 %, ENGINEER •' ,OR' R. 8n.... DATE �cof, O ° M c') 3Ua 3 � L �hm N o o a W a 0 � d (D m W c W + g Pp_ Q 4 N mm m� a iii 3U v¢ O O U W J Q- Z ti O ¢ c p PZ z .o Q Z N v Q Z Wo cr Q CO Q. C� Z "> C J W om cu cc c U 00 U Z� U c Cc J J Sheet 5/11 POWER POLE = I qARROW ACCESS ROAD = PROPO DEFLEC ED OR — J — STATION CROSS - SECTION 6 1 " =20' (HORT) 1 " =20' (VERT) TO THE BEST OF MY KNOWLEDGE, JUDGMENT, 60% PROGRESS DRAWINGS AND BELIEF, THESE PLANS MEET APPLICABLE DO NOT USE FOR CONSTRUCTION NRCS STANDARDS, AND LOCAL AND STATE REGULATIONS. N ..... qRp Q SEAL 025442 %, ENGINEER •' ,OR' R. 8n.... DATE �cof, O ° M c') 3Ua 3 � L �hm N o o a W a 0 � d (D m W c W + g Pp_ Q 4 N mm m� a iii 3U v¢ O O U W J Q- Z ti O ¢ c p PZ z .o Q Z N v Q Z Wo cr Q CO Q. C� Z "> C J W om cu cc c U 00 U Z� U c Cc J J Sheet 5/11