Loading...
HomeMy WebLinkAbout20150959 Ver 1_More Info Received_20151008From: Carrie Boyd <carrie@bfec.org> Sent: Thursday, October 08, 2015 10:43 AM To: Moore, Andrew W Cc: Leslie, Andrea J; 'Alexander, Tasha L SAW'; connor@bfec.org; 'Adam Williams' Subject: McCurry Stream Restoration - Amend Plan Set Language Attachments: McCurry 60% Site Plan REV 10.8.2015-SHT 5 LRC.pdf Andrew - Given concerns regarding the impact of harvesting of boulders on-site at Little Rock Creek to existing Hellbender populations, we are removing that language from our "Notes" on Sheet 5 of the Site Plan Set. The contractor will be responsible for bringing all necessary boulders from off-site to construct natural channel design structures proposed for Little Rock Creek and Big Rock Creek. I'm attaching a pdf of the revised Sheet 5 for your or any of the copied parties' records. We will plan to have you and appropriate staff from WRC at a pre -construction meeting with the contractor present. I'll be in touch in spring 2016 as the project proceeds towards construction. Thanks, Carrie Carrie (Boyd) Caviness, Ph.D. Brushy Fork Environmental Consulting, Inc. 5902 Highway 421 South Mountain City, TN 37683 ph/fax. 423.727.4476 cell. 919.656.4543 www.bfec.orq