HomeMy WebLinkAbout20150959 Ver 1_More Info Received_20151008From: Carrie Boyd <carrie@bfec.org>
Sent: Thursday, October 08, 2015 10:43 AM
To: Moore, Andrew W
Cc: Leslie, Andrea J; 'Alexander, Tasha L SAW'; connor@bfec.org; 'Adam Williams'
Subject: McCurry Stream Restoration - Amend Plan Set Language
Attachments: McCurry 60% Site Plan REV 10.8.2015-SHT 5 LRC.pdf
Andrew -
Given concerns regarding the impact of harvesting of boulders on-site at Little Rock Creek to existing Hellbender
populations, we are removing that language from our "Notes" on Sheet 5 of the Site Plan Set. The contractor will be
responsible for bringing all necessary boulders from off-site to construct natural channel design structures proposed for
Little Rock Creek and Big Rock Creek. I'm attaching a pdf of the revised Sheet 5 for your or any of the copied parties'
records.
We will plan to have you and appropriate staff from WRC at a pre -construction meeting with the contractor present. I'll
be in touch in spring 2016 as the project proceeds towards construction.
Thanks,
Carrie
Carrie (Boyd) Caviness, Ph.D.
Brushy Fork Environmental Consulting, Inc.
5902 Highway 421 South
Mountain City, TN 37683
ph/fax. 423.727.4476
cell. 919.656.4543
www.bfec.orq