HomeMy WebLinkAboutNC0026441_Report (Summary Table of Expenditures)_20240205 °•_° RECEIVED
EDthfl of tier Ettp FEB 05 2024
Public Works and Utilities
NCDEQ/DWR/NPDES
01/30/2024
Raleigh Regional Office
Division of Water Resources/Water Quality Operations Section
3800 Barrett Drive
Raleigh NC 27609
Water Quality Permitting Section/NPDES
1617 Mail Service Center
Raleigh NC 27699-1617
Subject: Special Order of Consent (SOC)
Summary Table of Expenditures
Siler City WWTP
NPDES Permit NC0026441
Chatham County
Dear RRO:
The Town of Siler City is submitting for your records two excel spreadsheets documenting expenditures
relating to improvements to the WWTP and the WTP (except the Town's 6 MGD WWTP expansion and
Collection System inflow and infiltration projects)through December 31, 2023, as required for Phase 3 of the
SOC.
Total expenditure for improvements for the WWTP to help with improvements and bring the WWTP back into
compliance to date is $ 1,802,485.77. Total expenditure for improvements for the WTP and bring the WTP into
compliance to date is $3,394,958.29.
Sincerely,
Chris McCorqu
Town of Siler City
Chris McCorquodale
Director of Public Utilities cmccorquodale@silercity.org
PO Box 769.311 N.Second Avenue Phone:919-742-4732•Fax:919-663-3874
Siler City,NC 27344-0769 www.silercity.org
To advance a framework for our success through balanced governance,dynamic partnerships,and an engaged community.
Town of slier City
Special Order of Consent(SOC)for Wastewater
Total Budget: $2,507,000.00
$ 60,000.00 $ 666,500.00 $ 220,000.00 $ 109,000.00 $ 1,065,000.00 $ 386,500.00
PO Number Date Vendor Description 32-712-0500 32-712-0700 32-712-1000 32.712-3400 32-712.4600 32-712-7400 34-714-7400
Attorney Fees NOV Fees Professional Services Lab Analysis Sludge Removal Capital Outlay-Equipment Sewer Rehab Project
7/1/2022 Synagro Sludge Removal $ 58,732.01
8/1/2022 Synagro Sludge Removal $ 7,034.19
8/1/2022 Synagro Sludge Removal _ $ 17,361.91_
8/1/2022 Synagro Sludge Removal $ 51,064.44
8/18/2022 Poyner Spruill LLP Attorney Fees _$ 252.53
8/24/2022 Charles Underwood Oxidation Ditches $ 21,050.00
9/1/2022 NCDEO/DWR/NPDES NOV Fee $ 400.00
9/1/2022 Synagro Sludge Removal $ 19,104.80
9/1/2022 Synagro Sludge Removal _ $ 67,034.40
9/1/2022 Synagro Sludge Removal $ 919.77
9/9/2022 Electric Motor Floating Aerators $ 4,103.60
10/1/2022 Synagro _Sludge Removal $ 41,075.00
10/1/2022 Synagro Sludge Removal $ 11,501.00
10/1/2022 Synagro Sludge Removal $ 407.17
10/13/2022 NCDEQ/DWR/NPDES NOV Fee $ 20,043.59
11/3/2022 NCDEQ/DWR/NPDES NOV Fee $ 20,043.95
11/9/2022 Aeration Industries Floating Aerators $ 196,694.00
11/10/2022 Poyner Spruill LLP Attorney Fees $ 180.38
11/16/2022 Sanford Electrical Contractors Floating Aerators $ 30,852.72
12/1/2022 Poyner Spruill LLP Attorney Fees $ 1,043.92
12/1/2022 Synagro Sludge Removal $ 36,941.13
12/1/2022 Synagro Sludge Removal $ 91,350.80
12/1/2022 Synagro Sludge Removal _ $ 27,861.99
12/2/2022 Hazen and Sawyer SOC Support $ 4,935.00
12/9/2022 Poyner Spruill LLP Attorney Fees $ 72.15
12/14/2022 Electric Motor Oxidation Ditches
$ 2,250.00
12/15/2022 Sanford Electrical Contractors Oxidation Ditches $ 1,171.50
12/19/2022 Sanford Electrical Contractors Oxidation Ditches $ 1,505.96
I 12/22/2022 NCDEQ/DWR/NPDES NOV Fee $ 20,043.59
12/22/2022 NCDEQ/DWR/NPDES NOV Fee $ 16,043.59
12/31/2022 McGill Associates SOC Support $ 408.00
Professional Services from
December 1,2022 to
12/31/2022 Hazen and Sawyer December 31,2022 $ 3,325.00
1/1/2023 Synagro Sludge Removal $ 50,771.09
1/20/2023 Hazen and Sawyer SOC Support $ 3,915.00
1/31/2023 Hazen and Sawyer SOC Support $ 810.00
1/31/2023 McGill Associates SOC Support _ $ 3,322.00
2/1/2023 Synagro Sludge Removal _ $ 61,121.10
2/1/2023 Synagro Sludge Removal $ 52,509.07
2/1/2023 Synagro Sludge Removal $ 19,317.13
2/1/2023 Synagro Sludge Removal $ 33,756.59
I 2/1/2023 Synagro Sludge Removal _ $ 2,265.28
2/14/2023 Hazen and Sawyer SOC Support $ 5,287.50 _
2/28/2023 McGill Associates _SOC Support $ 1,428.00_
3/1/2023 Synagro Sludge Removal $ 2,285.15
-
3/1/2023 Synagro Sludge Removal $ 118,628.98
—
3/7/2023 Hazen and Sawyer SOC Support _$ 4,652.50
3/27/2023 Hazen and Sawyer SOC Support $ 2,337.50
4/1/2023 Synagro Sludge Removal $ 130,647.90
—
3/20/2023 Newterra Aerators
$ 191,694.00
23-32-01 4/28/2023 McGill Associates Assistance with Moratorium $ 1,613.50
—
23-32-02 4/28/2023 Vand Solutions _Aerators
- $ 11,593.90
4/28/2023 Poyner Spruill LLP Attorney Fees $ 3,852.73 i
23-32-03 5/1/2023 NC Division of Water Quality(NCDEQ) NOV Fee-1 Time SOC fee $ 100,000.00
Assistance for Notices of
•
4/30/2023 McGill Associates Violation and Moratorium $ 2,829.00
5/5/2023 McGill Associates Personional Services $ 1,613.50
5/5/2023 Poyner Spruill LLP Attorney Fees $ 3,852.73 _ _
5/25/2023 Synagro Sludge Removal _ $ 6,658.96
5/25/2023 Poyner Spruill LLP Attorney Fees $ 1,613.50
5/25/2023 Hazen and Sawyer Professional Services $ 1,080.00
5/25/2023 Vand Solutions,LLC Capital Outlay-Equipment $ 11,593.90 _
• 5/25/2023 McGill Associates Professional Services $ 2,829.00_ _ _ •
Regulatory Issues&
Procedures Advice re
5/31/2023 Poyner Spruill LLP Mountaire $ 541.13
5/31/2023 Sanford Electrical Contractors New Panels for Aerator Ditch $ 34,323.23
6/23/2023 Hazen and Sawyer Professional Services $ 3,325.00
6/23/2023 Poyner Spruill LLP Attorney Fees $ 541.13
6/23/2023 McGill Associates Professional Services $ 2,829.00
6/30/2023 Synagro Sludge Removal $ 81,997.03
6/30/2023 Accrued Prior Attorney Fees $ 162.00
6/30/2023 Accrued Prior Attorney Fees $ 72.15
6/30/2023 Accrued Prior Attorney Fees $ 2,385.00
6/30/2023 Accrued Prior Perfessional Services $ 5,772.50
7/28/2023 McGill Associates Engineering 21,000
8/3/2023 McGill Associates Professional Services $ 2,205.00
8/24/2023 Law office of William Morgan Attorney Fees $ 3,726.00
9/21/2023 Law office of William Morgan Attorney Fees $ 144.00 •
10/12/2023 McGill Associates Engineering 10,750.00,
11/3/2023 McGill Associates Engineering 18,500.00
11/3/2023 Law office of William Morgan Attorney Fees $ 162.00 _
11/17/2023 NCDEQ/DWR/NPDES NOV Fees $ 3,226.36
11/27/2023 Hazen and Sawyer Professional Services $ 2,970.00
12/5/2023 McGill Associates Engineering 11,600.00
12/5/2023 McGill Associates Professional Services $ 10,546.90
12/15/2023 Hazen and Sawyer Professional Services $ 6,480.00
' 12/15/2023 Hazen and Sawyer Professional Services $ 3,780.00
12/15/2023 Poyner Spruill LLP Professional Services $ 9,992.08 _ _
12/15/2023 Law office of William Morgan _Attorney Fees $ 54.00
12/21/2023 The Brough Law Firm Perfessional Services $ 1,320.00
$12,184.35 5 176,574.72 $ 66,290.90 $ - $ 990,346.89 $ 495,238.91 $ 61,850.00 $ 1,802,485.77
$ 489,925.28
Town of Slier City
Special Order of Consent(SOC)for Water
Total Budget: $895,500.00
$ 45,000.00 $ 775,000.00 $ 75,500.00
PO Number Date Vendor Description 31-711-3400 31-711-4600 31-711-7400 36-716-7400 82-531
Capital Outlay- Solids
Lab Analysis Sludge Removal Handling Water Plant
Equipment
project Improvements
curtains for lagoon $ 10,000.00 Captial Outlay Equipment
May-22 SKC Contracting creek restoration $ 50,000.00
7/1/2022 Synagro Sludge Removal $ 17,285.47 Sampler
8/1/2022 Synagro Sludge Removal $ 20,688.78 flow Meter
8/1/2022 Synagro Sludge Removal $ 988.50 Curtains for lagoon
8/18/2022 Abasco Capital Outlay-Equipment-Flow meter $ 5,400.00 Creek restoration
9/1/2022 Synagro Sludge Removal $ 27,022.08 Scada control for flow meter
9/1/2022 Synagro Sludge Removal _ $ 7,701.29
9/1/2022 Synagro Sludge Removal _$ 975.00
10/1/2022 Synagro Sludge Removal $ 2,000.00
10/1/2022 Synagro Sludge Removal $ 3,166.00
10/1/2022 Synagro Sludge Removal $ 1,732.00
10/1/2022 Synagro Sludge Removal $ 1,440.00
10/1/2022 Synagro Sludge Removal $ 9,427.94
10/1/2022 Synagro Sludge Removal $ 25,333.20
12/1/2022 Synagro Sludge Removal $ 950.00
12/1/2022 Synagro Sludge Removal $ 23,644.32
12/1/2022 Synagro Sludge Removal $ 7,211.52
' 1/6/2023 Mizelle Construction Services Capital Outlay-Equipment $ 2,357.50
1/20/2023 USA Bluebook Capital Outlay-Equipment $ 6,801.54
2/24/2023 Charles Underwood Capital Outlay-Equipment $ 5,931.25
3/17/2023 State Electric&Lighting Capital Outlay-Equipment '$ 1,645.00 i
6/1/2023 Waypoint Analytical Lab Analysis $ 95.00
6/30/2023 Synagro Sludge Removal $ 34,684.72 I,
8/18/2023 Abasco Capital Outlay-Equipment $ 1,125.00
12/31/2023 McGill Environmental Sludge removal $ 8,810.68
2/15/2023 McGill Environmental Sludge Removal $ 21,742.06
2/28/2023 McGill Environmental Sludge Removal $ 29,738.06
4/3/2023 Waypoint Analytical Lab Analysis $ 951.00
5/1/2023 Waypoint Analytical Lab Analysis $ 947.00
6/1/2023 Waypoint Analytical Lab Analysis $ 2,028.00
' 6/23/2023 McGill Associates Engineering 6,354.70
6/29/2023 ECS Southeast,LLP Construction 2,783.50
6/29/2023 ECS Southeast,LLP Construction 755.5
6/30/2023 Accrued Prior Construction 391,288.91
6/30/2023 Accrued Prior Construction 1,305,583.27
6/30/2023 Sanford Contracting Electrical _ 267,430.51
-
6/30/2023 Synagro Sludge Removal $ 34,684.72
7/28/2023 McGill Associates Engineering 4,800.00
7/28/2023 ECS Southeast,LLP Construction 4,381.00
7/28/2023 McGill Associates Engineering 4,784.00
8/3/2023 McGill Associates Engineering 9,774.90
8/3/2023 Charles Underwood Capital Outlay-Equipment _ 7,983.00
8/24/2023 ECS Southeast,LLP Construction 560.5
8/30/2023 McGill Associates Engineering 8,385.60
9/21/2023 ECS Southeast,LLP Construction 2,940.40
10/12/2023 McGill Associates Engineering 2,000.00
10/12/2023 McGill Associates Engineering 5,961.60
10/19/2023 Meritech Lab Analysis 150.00
10/19/2023 Sanford Contracting Electrical 592,891.90
11/3/2023 McGill Associates Engineering 4,600.00
11/3/2023 McGill Associates Engineering 1,200.00
11/27/2023 Carolina Technical Systems Construction 374.50
11/27/2023 Waypoint Analytical Lab Analysis 144.00
11/27/2023 ECS Southeast,LLP Construction 2370.60
11/27/2023 Sanford Contracting Electrical 392176.07
12/5/2023 McGill Associates Engineering 8246.20
12/15/2023 Enthalpy Analytical,LLC Construction 530.00
$ 95.00 $ 283,152.34 $ 91,243.29 $ 12,784.00 $ 3,007,683.66 $ 3,394,958.29
Town of Siler City
NPDES#NC0026441
WWTP Nutrient Removal Optimization
Quarterly Report:4th Quarter 2023
Introduction
In accordance with NPDES Permit requirements this report is provided to document implementation of
the optimization report and performance of the WWTP during the 4th quarter of 2023.The primary
focus of this information is nutrient removal, however data on plant operations for other parameters
are included as they influence the nutrient removal performance.
Phosphorus (TP) removal is achieved with chemical precipitation and performance has been consistently
good with effluent TP averaging less than 0.02 mg/I during the 4th quarter 2023.Therefore, no further
review of TP operation is included.
Optimization Report Recommendations
The optimization report was prepared in 2020 based on data from January to September of 2020.
Operating parameters at the time are shown in Table 1 below.
Table 1: Influent Wastewater during Optimization Study
Daily Daily Average
Parameter Average during for 4th Quarter
Optimization 2023
(2020)
Flow(mgd) 3.26 2.29
BOD(mg/I) 228 253
NH3(mg/I) 19.5 26
TN (mg/I) 35.0 51
TKN (mg/L) 34.1
TSS (mg/I) 167
TP(mg/I) 3.34 2.3
The report recommends utilizing Simultaneous Nitrification/Denitrification (SNDN)to achieve nitrogen
reduction.The recommended parameters include maintaining dissolved oxygen (DO) in the oxidation
ditches between 0.8 to 1.2 mg/I and maintaining an FM ratio of 0.04 to 0.05 lbs BOD/Lbs MLVSS with
MLVSS between a concentration of 3,400 to 4,200 mg/I.
Optimization Implementation
During the 4th quarter of 2023 the overall performance of the Siler City WWTP has been very good with
average effluent BOD of 0.22 mg/I, and Ammonia of 0.23 mg/I.The influent BOD has remained relatively
f
Town of Siler City-Siler City WWTP
EMC SOC WQ S22-033
Quarterly SOC Progress Report
4th Quarter 2023
Please accept this submittal as a quarterly progress report for the work and activities for the Town of
Siler City under the Special Order By Consent.
Scheduled Activities paragraph 2(a)
Quarterly Reports
Quarterly Nutrient Optimization Report and Quarterly SOC Report were submitted on October
30, 2023
Collection System Permit WQCS00056
Permit for Main Interceptor Replacement Project was Submitted on February 28, 2023,Sewer
Extension Permit was issued on April 19, 2023.
ARPA Sewer Rehabilitation Project Engineering Report was submitted on May 1, 2023, (not a
formal activity), ER review is pending with NCDEQ however Survey work is complete and design
is underway for this project. Permit application for a variance for low slope in some
rehabilitation areas was submitted but was returned due to new NCDEQ policy. Currently
working on encroachments and final design.
Main Interceptor Project is included with scope for WWTP expansion and has been delayed
based on delays in acquiring funding. Since funding has been secured with a letter of intent to
fund from NCDEQ DWI, project is expected to go to bid soon.Town is continuing work to acquire
easements for the project.
All other Activities are scheduled for future quarters and are currently expected to be on
schedule.
NPDES Permit NC0026441
IUP Permits were issued to Mountaire Farms, Brookwood Farms, and the Siler City Water
Treatment Plant on May 19, 2023. Mountaire Farms requested an adjudicatory hearing for their
permit which was held on July 21. Mountaire is currently appealing the results of the hearing.
Appeal is scheduled to be heard on February 15, 2024
Supplemental Aeration Equipment has been installed in the oxidation ditch basins.The
installation was complete on May 26, 2023 with initial email notification on May 30 and a formal
letter on June 29, 2023 notifying NCDEQ of completion.
Additional Wastewater Flow Pursuant to Paragraph 4
Issuance of flow this quarter has been given to:
Chatham Veterinary 500 GPD
Dogwood Downs 600 GPD
Last quarter Ingle Street Subdivision was initially given 1080 GPD @ 120 gallons but has been reduced to
675 GPD @ 75 gallons.