Loading...
HomeMy WebLinkAboutNC0026441_Report (Summary Table of Expenditures)_20240205 °•_° RECEIVED EDthfl of tier Ettp FEB 05 2024 Public Works and Utilities NCDEQ/DWR/NPDES 01/30/2024 Raleigh Regional Office Division of Water Resources/Water Quality Operations Section 3800 Barrett Drive Raleigh NC 27609 Water Quality Permitting Section/NPDES 1617 Mail Service Center Raleigh NC 27699-1617 Subject: Special Order of Consent (SOC) Summary Table of Expenditures Siler City WWTP NPDES Permit NC0026441 Chatham County Dear RRO: The Town of Siler City is submitting for your records two excel spreadsheets documenting expenditures relating to improvements to the WWTP and the WTP (except the Town's 6 MGD WWTP expansion and Collection System inflow and infiltration projects)through December 31, 2023, as required for Phase 3 of the SOC. Total expenditure for improvements for the WWTP to help with improvements and bring the WWTP back into compliance to date is $ 1,802,485.77. Total expenditure for improvements for the WTP and bring the WTP into compliance to date is $3,394,958.29. Sincerely, Chris McCorqu Town of Siler City Chris McCorquodale Director of Public Utilities cmccorquodale@silercity.org PO Box 769.311 N.Second Avenue Phone:919-742-4732•Fax:919-663-3874 Siler City,NC 27344-0769 www.silercity.org To advance a framework for our success through balanced governance,dynamic partnerships,and an engaged community. Town of slier City Special Order of Consent(SOC)for Wastewater Total Budget: $2,507,000.00 $ 60,000.00 $ 666,500.00 $ 220,000.00 $ 109,000.00 $ 1,065,000.00 $ 386,500.00 PO Number Date Vendor Description 32-712-0500 32-712-0700 32-712-1000 32.712-3400 32-712.4600 32-712-7400 34-714-7400 Attorney Fees NOV Fees Professional Services Lab Analysis Sludge Removal Capital Outlay-Equipment Sewer Rehab Project 7/1/2022 Synagro Sludge Removal $ 58,732.01 8/1/2022 Synagro Sludge Removal $ 7,034.19 8/1/2022 Synagro Sludge Removal _ $ 17,361.91_ 8/1/2022 Synagro Sludge Removal $ 51,064.44 8/18/2022 Poyner Spruill LLP Attorney Fees _$ 252.53 8/24/2022 Charles Underwood Oxidation Ditches $ 21,050.00 9/1/2022 NCDEO/DWR/NPDES NOV Fee $ 400.00 9/1/2022 Synagro Sludge Removal $ 19,104.80 9/1/2022 Synagro Sludge Removal _ $ 67,034.40 9/1/2022 Synagro Sludge Removal $ 919.77 9/9/2022 Electric Motor Floating Aerators $ 4,103.60 10/1/2022 Synagro _Sludge Removal $ 41,075.00 10/1/2022 Synagro Sludge Removal $ 11,501.00 10/1/2022 Synagro Sludge Removal $ 407.17 10/13/2022 NCDEQ/DWR/NPDES NOV Fee $ 20,043.59 11/3/2022 NCDEQ/DWR/NPDES NOV Fee $ 20,043.95 11/9/2022 Aeration Industries Floating Aerators $ 196,694.00 11/10/2022 Poyner Spruill LLP Attorney Fees $ 180.38 11/16/2022 Sanford Electrical Contractors Floating Aerators $ 30,852.72 12/1/2022 Poyner Spruill LLP Attorney Fees $ 1,043.92 12/1/2022 Synagro Sludge Removal $ 36,941.13 12/1/2022 Synagro Sludge Removal $ 91,350.80 12/1/2022 Synagro Sludge Removal _ $ 27,861.99 12/2/2022 Hazen and Sawyer SOC Support $ 4,935.00 12/9/2022 Poyner Spruill LLP Attorney Fees $ 72.15 12/14/2022 Electric Motor Oxidation Ditches $ 2,250.00 12/15/2022 Sanford Electrical Contractors Oxidation Ditches $ 1,171.50 12/19/2022 Sanford Electrical Contractors Oxidation Ditches $ 1,505.96 I 12/22/2022 NCDEQ/DWR/NPDES NOV Fee $ 20,043.59 12/22/2022 NCDEQ/DWR/NPDES NOV Fee $ 16,043.59 12/31/2022 McGill Associates SOC Support $ 408.00 Professional Services from December 1,2022 to 12/31/2022 Hazen and Sawyer December 31,2022 $ 3,325.00 1/1/2023 Synagro Sludge Removal $ 50,771.09 1/20/2023 Hazen and Sawyer SOC Support $ 3,915.00 1/31/2023 Hazen and Sawyer SOC Support $ 810.00 1/31/2023 McGill Associates SOC Support _ $ 3,322.00 2/1/2023 Synagro Sludge Removal _ $ 61,121.10 2/1/2023 Synagro Sludge Removal $ 52,509.07 2/1/2023 Synagro Sludge Removal $ 19,317.13 2/1/2023 Synagro Sludge Removal $ 33,756.59 I 2/1/2023 Synagro Sludge Removal _ $ 2,265.28 2/14/2023 Hazen and Sawyer SOC Support $ 5,287.50 _ 2/28/2023 McGill Associates _SOC Support $ 1,428.00_ 3/1/2023 Synagro Sludge Removal $ 2,285.15 - 3/1/2023 Synagro Sludge Removal $ 118,628.98 — 3/7/2023 Hazen and Sawyer SOC Support _$ 4,652.50 3/27/2023 Hazen and Sawyer SOC Support $ 2,337.50 4/1/2023 Synagro Sludge Removal $ 130,647.90 — 3/20/2023 Newterra Aerators $ 191,694.00 23-32-01 4/28/2023 McGill Associates Assistance with Moratorium $ 1,613.50 — 23-32-02 4/28/2023 Vand Solutions _Aerators - $ 11,593.90 4/28/2023 Poyner Spruill LLP Attorney Fees $ 3,852.73 i 23-32-03 5/1/2023 NC Division of Water Quality(NCDEQ) NOV Fee-1 Time SOC fee $ 100,000.00 Assistance for Notices of • 4/30/2023 McGill Associates Violation and Moratorium $ 2,829.00 5/5/2023 McGill Associates Personional Services $ 1,613.50 5/5/2023 Poyner Spruill LLP Attorney Fees $ 3,852.73 _ _ 5/25/2023 Synagro Sludge Removal _ $ 6,658.96 5/25/2023 Poyner Spruill LLP Attorney Fees $ 1,613.50 5/25/2023 Hazen and Sawyer Professional Services $ 1,080.00 5/25/2023 Vand Solutions,LLC Capital Outlay-Equipment $ 11,593.90 _ • 5/25/2023 McGill Associates Professional Services $ 2,829.00_ _ _ • Regulatory Issues& Procedures Advice re 5/31/2023 Poyner Spruill LLP Mountaire $ 541.13 5/31/2023 Sanford Electrical Contractors New Panels for Aerator Ditch $ 34,323.23 6/23/2023 Hazen and Sawyer Professional Services $ 3,325.00 6/23/2023 Poyner Spruill LLP Attorney Fees $ 541.13 6/23/2023 McGill Associates Professional Services $ 2,829.00 6/30/2023 Synagro Sludge Removal $ 81,997.03 6/30/2023 Accrued Prior Attorney Fees $ 162.00 6/30/2023 Accrued Prior Attorney Fees $ 72.15 6/30/2023 Accrued Prior Attorney Fees $ 2,385.00 6/30/2023 Accrued Prior Perfessional Services $ 5,772.50 7/28/2023 McGill Associates Engineering 21,000 8/3/2023 McGill Associates Professional Services $ 2,205.00 8/24/2023 Law office of William Morgan Attorney Fees $ 3,726.00 9/21/2023 Law office of William Morgan Attorney Fees $ 144.00 • 10/12/2023 McGill Associates Engineering 10,750.00, 11/3/2023 McGill Associates Engineering 18,500.00 11/3/2023 Law office of William Morgan Attorney Fees $ 162.00 _ 11/17/2023 NCDEQ/DWR/NPDES NOV Fees $ 3,226.36 11/27/2023 Hazen and Sawyer Professional Services $ 2,970.00 12/5/2023 McGill Associates Engineering 11,600.00 12/5/2023 McGill Associates Professional Services $ 10,546.90 12/15/2023 Hazen and Sawyer Professional Services $ 6,480.00 ' 12/15/2023 Hazen and Sawyer Professional Services $ 3,780.00 12/15/2023 Poyner Spruill LLP Professional Services $ 9,992.08 _ _ 12/15/2023 Law office of William Morgan _Attorney Fees $ 54.00 12/21/2023 The Brough Law Firm Perfessional Services $ 1,320.00 $12,184.35 5 176,574.72 $ 66,290.90 $ - $ 990,346.89 $ 495,238.91 $ 61,850.00 $ 1,802,485.77 $ 489,925.28 Town of Slier City Special Order of Consent(SOC)for Water Total Budget: $895,500.00 $ 45,000.00 $ 775,000.00 $ 75,500.00 PO Number Date Vendor Description 31-711-3400 31-711-4600 31-711-7400 36-716-7400 82-531 Capital Outlay- Solids Lab Analysis Sludge Removal Handling Water Plant Equipment project Improvements curtains for lagoon $ 10,000.00 Captial Outlay Equipment May-22 SKC Contracting creek restoration $ 50,000.00 7/1/2022 Synagro Sludge Removal $ 17,285.47 Sampler 8/1/2022 Synagro Sludge Removal $ 20,688.78 flow Meter 8/1/2022 Synagro Sludge Removal $ 988.50 Curtains for lagoon 8/18/2022 Abasco Capital Outlay-Equipment-Flow meter $ 5,400.00 Creek restoration 9/1/2022 Synagro Sludge Removal $ 27,022.08 Scada control for flow meter 9/1/2022 Synagro Sludge Removal _ $ 7,701.29 9/1/2022 Synagro Sludge Removal _$ 975.00 10/1/2022 Synagro Sludge Removal $ 2,000.00 10/1/2022 Synagro Sludge Removal $ 3,166.00 10/1/2022 Synagro Sludge Removal $ 1,732.00 10/1/2022 Synagro Sludge Removal $ 1,440.00 10/1/2022 Synagro Sludge Removal $ 9,427.94 10/1/2022 Synagro Sludge Removal $ 25,333.20 12/1/2022 Synagro Sludge Removal $ 950.00 12/1/2022 Synagro Sludge Removal $ 23,644.32 12/1/2022 Synagro Sludge Removal $ 7,211.52 ' 1/6/2023 Mizelle Construction Services Capital Outlay-Equipment $ 2,357.50 1/20/2023 USA Bluebook Capital Outlay-Equipment $ 6,801.54 2/24/2023 Charles Underwood Capital Outlay-Equipment $ 5,931.25 3/17/2023 State Electric&Lighting Capital Outlay-Equipment '$ 1,645.00 i 6/1/2023 Waypoint Analytical Lab Analysis $ 95.00 6/30/2023 Synagro Sludge Removal $ 34,684.72 I, 8/18/2023 Abasco Capital Outlay-Equipment $ 1,125.00 12/31/2023 McGill Environmental Sludge removal $ 8,810.68 2/15/2023 McGill Environmental Sludge Removal $ 21,742.06 2/28/2023 McGill Environmental Sludge Removal $ 29,738.06 4/3/2023 Waypoint Analytical Lab Analysis $ 951.00 5/1/2023 Waypoint Analytical Lab Analysis $ 947.00 6/1/2023 Waypoint Analytical Lab Analysis $ 2,028.00 ' 6/23/2023 McGill Associates Engineering 6,354.70 6/29/2023 ECS Southeast,LLP Construction 2,783.50 6/29/2023 ECS Southeast,LLP Construction 755.5 6/30/2023 Accrued Prior Construction 391,288.91 6/30/2023 Accrued Prior Construction 1,305,583.27 6/30/2023 Sanford Contracting Electrical _ 267,430.51 - 6/30/2023 Synagro Sludge Removal $ 34,684.72 7/28/2023 McGill Associates Engineering 4,800.00 7/28/2023 ECS Southeast,LLP Construction 4,381.00 7/28/2023 McGill Associates Engineering 4,784.00 8/3/2023 McGill Associates Engineering 9,774.90 8/3/2023 Charles Underwood Capital Outlay-Equipment _ 7,983.00 8/24/2023 ECS Southeast,LLP Construction 560.5 8/30/2023 McGill Associates Engineering 8,385.60 9/21/2023 ECS Southeast,LLP Construction 2,940.40 10/12/2023 McGill Associates Engineering 2,000.00 10/12/2023 McGill Associates Engineering 5,961.60 10/19/2023 Meritech Lab Analysis 150.00 10/19/2023 Sanford Contracting Electrical 592,891.90 11/3/2023 McGill Associates Engineering 4,600.00 11/3/2023 McGill Associates Engineering 1,200.00 11/27/2023 Carolina Technical Systems Construction 374.50 11/27/2023 Waypoint Analytical Lab Analysis 144.00 11/27/2023 ECS Southeast,LLP Construction 2370.60 11/27/2023 Sanford Contracting Electrical 392176.07 12/5/2023 McGill Associates Engineering 8246.20 12/15/2023 Enthalpy Analytical,LLC Construction 530.00 $ 95.00 $ 283,152.34 $ 91,243.29 $ 12,784.00 $ 3,007,683.66 $ 3,394,958.29 Town of Siler City NPDES#NC0026441 WWTP Nutrient Removal Optimization Quarterly Report:4th Quarter 2023 Introduction In accordance with NPDES Permit requirements this report is provided to document implementation of the optimization report and performance of the WWTP during the 4th quarter of 2023.The primary focus of this information is nutrient removal, however data on plant operations for other parameters are included as they influence the nutrient removal performance. Phosphorus (TP) removal is achieved with chemical precipitation and performance has been consistently good with effluent TP averaging less than 0.02 mg/I during the 4th quarter 2023.Therefore, no further review of TP operation is included. Optimization Report Recommendations The optimization report was prepared in 2020 based on data from January to September of 2020. Operating parameters at the time are shown in Table 1 below. Table 1: Influent Wastewater during Optimization Study Daily Daily Average Parameter Average during for 4th Quarter Optimization 2023 (2020) Flow(mgd) 3.26 2.29 BOD(mg/I) 228 253 NH3(mg/I) 19.5 26 TN (mg/I) 35.0 51 TKN (mg/L) 34.1 TSS (mg/I) 167 TP(mg/I) 3.34 2.3 The report recommends utilizing Simultaneous Nitrification/Denitrification (SNDN)to achieve nitrogen reduction.The recommended parameters include maintaining dissolved oxygen (DO) in the oxidation ditches between 0.8 to 1.2 mg/I and maintaining an FM ratio of 0.04 to 0.05 lbs BOD/Lbs MLVSS with MLVSS between a concentration of 3,400 to 4,200 mg/I. Optimization Implementation During the 4th quarter of 2023 the overall performance of the Siler City WWTP has been very good with average effluent BOD of 0.22 mg/I, and Ammonia of 0.23 mg/I.The influent BOD has remained relatively f Town of Siler City-Siler City WWTP EMC SOC WQ S22-033 Quarterly SOC Progress Report 4th Quarter 2023 Please accept this submittal as a quarterly progress report for the work and activities for the Town of Siler City under the Special Order By Consent. Scheduled Activities paragraph 2(a) Quarterly Reports Quarterly Nutrient Optimization Report and Quarterly SOC Report were submitted on October 30, 2023 Collection System Permit WQCS00056 Permit for Main Interceptor Replacement Project was Submitted on February 28, 2023,Sewer Extension Permit was issued on April 19, 2023. ARPA Sewer Rehabilitation Project Engineering Report was submitted on May 1, 2023, (not a formal activity), ER review is pending with NCDEQ however Survey work is complete and design is underway for this project. Permit application for a variance for low slope in some rehabilitation areas was submitted but was returned due to new NCDEQ policy. Currently working on encroachments and final design. Main Interceptor Project is included with scope for WWTP expansion and has been delayed based on delays in acquiring funding. Since funding has been secured with a letter of intent to fund from NCDEQ DWI, project is expected to go to bid soon.Town is continuing work to acquire easements for the project. All other Activities are scheduled for future quarters and are currently expected to be on schedule. NPDES Permit NC0026441 IUP Permits were issued to Mountaire Farms, Brookwood Farms, and the Siler City Water Treatment Plant on May 19, 2023. Mountaire Farms requested an adjudicatory hearing for their permit which was held on July 21. Mountaire is currently appealing the results of the hearing. Appeal is scheduled to be heard on February 15, 2024 Supplemental Aeration Equipment has been installed in the oxidation ditch basins.The installation was complete on May 26, 2023 with initial email notification on May 30 and a formal letter on June 29, 2023 notifying NCDEQ of completion. Additional Wastewater Flow Pursuant to Paragraph 4 Issuance of flow this quarter has been given to: Chatham Veterinary 500 GPD Dogwood Downs 600 GPD Last quarter Ingle Street Subdivision was initially given 1080 GPD @ 120 gallons but has been reduced to 675 GPD @ 75 gallons.