HomeMy WebLinkAbout20181732_Elimination of Alternative 4 from Further Studies (Revised CP-2)_20151006 Carpenter,Kristi From:Baloch, Zahid M Sent:Tuesday, October 06, 2015 1:22 PM To:Buncick, Marella Cc:Michael.Batuzich@dot.gov; Steven.L.Kichefski@usace.army.mil; vanderwiele.cynthia@epa.gov; Chambers, Marla J; Gledhill-earley, Renee; Chandler, Reuben D; rwcook@ci.charlotte.nc.us; Baloch, Zahid; Cox, Charles R; Hood, Donna; john.marshall@wpcog.org Subject:RE: R-2307 Elimination of Alternative 4 from Further Studies (Revised CP-2) Attachments:CP-1 Revised and CP-2 Sing Form 08-13-2014.pdf; R-2307 CP-2A Concurrence form singed 06-15-2015.png.pdf; Revised CP-2 Concurrence Form 10-1-2015.docx Hi, Thank you, Marella for your response. Team, So for I have approval from the following team members: 1.Mitch Batuzich- FHWA 2.Steve Kichefski – USACE 3.Renee Gledhill-earley- SHPO 4.Donna Hood – NCDENR 5.Zahid Baloch – NCDOT 6.Marella Buncick- USFWS 7.Robert Cook – CRTPO Please let me know if you have any questions. As soon I get all Members response I will send the revised CP-2 for your signature. Again thank you for support. Zahid Baloch, P.E. Project Planning Engineer Project Development & Environmental Analysis Unit NC Department of Transportation Office 919-707-6012 From: Buncick, Marella \[mailto:marella_buncick@fws.gov\] Sent: Tuesday, October 06, 2015 12:30 PM To: Baloch, Zahid M Cc: Michael.Batuzich@dot.gov; Steven.L.Kichefski@usace.army.mil; vanderwiele.cynthia@epa.gov; Chambers, Marla J; Gledhill-earley, Renee; Johnson, Alan; Chandler, Reuben D; rwcook@ci.charlotte.nc.us; John Marshall <john.marshall@wpcog.org> (john.marshall@wpcog.org); Baloch, Zahid; Cox, Charles R Subject: Re: R-2307 Elimination of Alternative 4 from Further Studies (Revised CP-2) Zahid, I have no objection to removing Alt 4 from further consideration. Marella On Fri, Oct 2, 2015 at 1:50 PM, Baloch, Zahid M <zbaloch@ncdot.gov> wrote: 1 Merger Team, This e-mail is to request your input on the removal of Alternative 4 from further consideration and to not carry this alternative forward to the public hearing. I am attaching proposed revised CP-2 form and Alternative 4 Evaluation for your review. Also I am attaching for your reference singed CP-1/CP-2 and CP-2A from as well. This request is based on discussions held during the CP2 A meeting in which it was noted by some members of the team that although Alternative 4 is a "reasonable" alternative it may not be "prudent" due to the following factors: * The horizontal alignment is controlled by the southern boundary of the Terrell Historic District (HD). * Minimal horizontal curve radii are being used to minimize impacts to properties south of the Terrell Historic District. * The alternative will have two 175'long, curved bridges with a 42' vertical clearance over a "finger" of Lake Norman to avoid rock formations. * The alternative will not have access control. * There are 4 stream crossings, including 1 non-jurisdictional stream, associated with Alternative 4. These crossings result in approximately 1,300 linear feet of jurisdictional impacts, 125' feet of minor stream relocations, and approximately 1,000 linear feet of parallel non-jurisdictional stream impacts. The high fill section (due to the presence of rock) is a contributing factor in the amount of stream impacts. * Impacts a church recreational area. * Impacts one high-voltage transmission tower. * There are two additional FERC crossings of Lake Norman. * Alternative 4's connection to Sherrills Ford Road results in a classification change (to local collector)- requiring a larger minimum ditch width. This results in impacts to properties within the Historic District. The primary action item to emerge from the CP2A meeting was that NCDOT would provide to the team an evaluation of the prudence of Alternative 4 which would include cost estimates and preliminary impacts (include minor stream impacts) in a matrix comparing Alternatives 1, 2, and 4. Additionally, a HPO Effects Consultation Meeting was held on June 30, 2015 and Alternative 4 was determined to have an Adverse Effect on the Terrell Historic District due to the foreseeable development and possible change to the superstreet intersection at Hob Road. 2 In consideration of the "Adverse Effects" call on this alternative, in combination with the significant impacts to streams, challenging geometric design constraints, safety and operational issues, additional FERC regulated crossings of Lake Norman and impacts to riparian buffers, NCDOT would like to request that the Merger Team review the attached Alternative 4 Evaluation and determine the appropriateness of removing this alternative from further consideration. It is NCDOT's opinion that this alternative, while feasible under NEPA, is no longer a prudent alternative based on the factors previously described. Please find attached the Alternative 4 Please provide your Evaluation document and a proposed revised CP2 form for your consideration. comments to me by October 8th . If you have any questions prior to providing your responses please contact me via email at zbaloch@ncdot.gov or by telephone at 919-707-6012. After getting your comments we will send the revised CP-2 form for everyone signature. Thank you for your time and consideration. Zahid Baloch, P.E. Project Planning Engineer Project Development & Environmental Analysis Unit NC Department of Transportation Office 919-707-6012 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. -- Marella Buncick USFWS 160 Zillicoa St Asheville, NC 28801 (828) 258-3939 ext 237 fax (828) 258-5330 3