Loading...
HomeMy WebLinkAboutNCG021018_Inspection Report_20230905 Compliance Inspection Report Permit:NCG021018 Effective: Expiration: Owner: Cutler's Landscaping Inc SOC: Effective: Expiration: Facility: Cutler Mine County: Beaufort Camp Leach Rd Region: Washington Washington NC 27889 Contact Person:Donald Cutler Title: Phone: 252-923-5597 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 09/05/2023 Entry Time 10:30AM Exit Time: 12:OOPM Primary Inspector:Varun Prakash Phone: 252-948-3963 Secondary Inspector(s): William J Moore Phone :252-946-6481 Ext.26 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG021018 Owner-Facility:Cutler's Landscaping Inc Inspection Date: 09/05/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection was conducted on September 5, 2023. Permittee was not available on site. The following are the observations: 1. POM (pumping operation and monitoring) plan document for this for mine dewatering was not received along with this permit application. POM guidelines can be found in section G-2 of NCG02 permit draft as given below: https://www.deq.nc.gov/energy-mineral-and-land-resources/stormwater/npdes-general-permits/ncg020000-general-permit-20 10630-dem I r-sw/down load 2. Water accumulation with high turbidity was observed on this site along with steep slopes leading to erosion as shown in the picture attached. This turbid water is likely to bust benchmarks if released into the surface waters. This issue needs to be addressed in the POM describing what control measures will remove pollutants and turbidity from dewatering runoff from this site. Permittee to address turbidity issues before dewatering from this mne site. 3. In this permit application,the plot plan indicated 'sheet flow across wetland'through a 'level spreader', but the design of this level spreader was missing. Instead, we saw a ditch at the site where location of this level spreader is indicated on the plot plan. This ditch may lead to point discharge into surface waters. Design (dimensions, location, drawing etc.)of such a level spreader needs to be submitted for approval. Approval of the POM Plan may be required prior to coverage according to this General Permit NCG02. Therefore, issuance will be considered after above tasks are completed. Page 2 of 3 Permit: NCG021018 Owner-Facility:Cutler's Landscaping Inc Inspection Date: 09/05/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ❑ 0 ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: New project Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ 0 ❑ ❑ Comment: New project Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑ Comment: New project Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ 0 ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑ Comment: New project Page 3 of 3