Loading...
HomeMy WebLinkAboutNCC205034_NOT Closeout Documents_20240130 LSa NORni C;ARGLENA January, 31 2023 To: Garris Evans Garris Evans Lumber Company 701 West 14th St Greenville, NC 27836 SUBJECT: Local Sedimentation and Erosion Control Program Project Closeout Bucklin III (20-13) Mr. Evans, The City of Wilson has determined that permanent ground cover sufficient to restrain erosion has been established. No additional self-monitoring or self-inspections are required. The project is currently in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have questions, please contact me at (252) 299-8616. Sincerely, - - I Dustin C. Eldreth, CFM Civil Engineer Cc: Brandon Galloway, City of Wilson Johnnie Webb, City of Wilson Kyle Manning, PE, CFM, Assistant Director of Public Works