HomeMy WebLinkAboutNCC240301_Site Plan or Location Map_20240205 iN I ) I �., o CONSTRUCTION SCHEDULE \� I A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY Os4/ I.Obtain all necessary pennies cord plan approvals.Erosion and Sediment Conenl(E&5C)permit and a Certificate of Coverage NCGS 113A-54.1°IS AVAILABLE FOR USE IT CAN BE COMPLETED BY HAND OR G°4 ? (COC)mast be oMamea bef any land disturbing activities owns Acopy of the E&SC permit the COC and shard copy of the COMPLETED AS AN EXCEL SPREADSHEET. �a[� plan must be kept on site,preferably M apemril box,and accessible dosing inspw6on, AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED N G p k'/r �E O 2.nstall gravel constro<lion entrances first then silt fences reinforced silt fence \ I I EROSION AND t'AEW = Mr owere and wanes. \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A a�sanoe g 4 e 3.Fero lot grog gandexbingaay accessary areas on melo[s as may are started. \ ` I NCAC 048.0131 STATES THAT°...DOCUMENTATION SHALL BE ACCOMPLISHED BY OLD US 4214.Begin lot grading and ASUSAon activities \ I I INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE I s.Begin mcominue with hwu wnmmmion activides. / \ \ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, 0.9 BR 1z91 421 6.Finish all rough gating and hovae consmmdon. o ��� V.InsmllJmeways,walks and patios. I DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, a E.Begin fine grading oflot areas //� 1 PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION 5� 9.Final grassing,mulching and stabilizing of lot In most cases this will involve the installation of sod on the lot The silt fence will / \ CONTROL PLAN. SR-1291 remain in place until the lot is sodded or grassing is stabilimd and rakes hold. \ a• ,,,14" q 10.The convactm shall conduct Self-inspections of the erosion and sedimentation crnvol measures and complete me following / �� \ \ \ \ \ \ \ .+�o n combined self-inspection form found on the DEMLR website F v yU htyas:/Iwww.degac gov/abour/divisions/energy-mineral-end-len-resources/stormwaterlsmrmweer-prograMnpdes<onstruc[ion-program. m Twelve moons ofcomplere inspection forms shall he kept on site and available for inspection at all times.lt is recoowendeda \ \ \ \ ` SODDING w� O� A ¢ copybekept inapemlim box.Refi G.S.113A-54.1 tluough G.S.113A-5]Sections lSANCAC 04A.0101 through lSA tl h NCAC 04E0504 General Permit NCG 010000 NPDES for Construction Activities. / / \ \ \ \ .4�O 3 I I.Self-inspections far erosion and sedimentation control measures are to be performed at least once every seven calendar days and I) 'sry°'n w2 ruy within 24 hours awry rain event of greater men l inch.Any needed repairs shall be made immediately m maintain measures as (/^\` .....\ pp designed.All ESC measures shall be maintained as specified in me construction details on this plan.Arain gauge shall be installed / / / \ 1 _ \ \ \ \ \ �� g L at the Protect site for monimdng. \ R12.Inspection Afterd ALRinforms eletters.whrn to project is complete,mepmmion report,conmUDEMLRm close out the E&SC // I \ 1 \ \ \ "1���� ' Plan.After DEMLR informs the peanina of the project close out,via inspection report,the permitme shall visit / \ SITE -A P °Pm RONe "deg.n¢goy/N.01"to submit an electronic Notice of termination(e-NOT).A S100 atmual general permit fee will he°bargN psu pTarMNma cos �,,t)PYa until the a-NOT has been filled out. \ ye�� 2�n 0 m N g 0 O9 �,cw"9'� / \ \ \\ \ MS AM IHUNPECTe - �W GnC .^We w£ L8T0f/PR G0 QA �;0 \ 1 \ \ wale 5.GO-rt.MUST BE MATCHED CORRECT,. 4. 0 9 N_ ,5$�T' v Ivv 11v MaapUB ROM 9f� "¢ \ \ \\ / / \-, \ \ \ \ \ -. ... \ \ sR Tx ,?z4 40 `y,+ \ wh • A q-G y cog p bun Om ? �` \\ / tp2 • ` \� II � PG3°5. \ '"MC" '�I� cj X� b o 0 \\ // /_ ` \ \ O \ / \1 ROLL S.\ '(` .� Pilll �..l,4iK ef1 ACHIEVE Fear IT+WELL rt. sec 0,O v Pit FARRAR °! �e,U0 �w�Pit \ \ \ -/ / 1 OPEN \ \ ' m II \G I I ' WITH THE sat AS SOON AS THE SOO IS IMMEDIATE, ?AAPPEARANCE OFAGOOD SOD mold 1 ar- eMowex Sur . MooRfs w]M 1 \ / \ I CONSTRUCTION I VICINITY MAP 41°��� � � 1 DDNST�IC QN / LotEI I iii IIIII a -j" i , /� SPACE / 16 / LIMITS I / I Y 11 �OY�II�II O�II N.T.S. 1 I I I rq ( 15 / I i y DATE: PAGE: -� I I �fcs I I �ii w�r,«ra r- .. SILT FENCE \ 1 I 1 \ \F Nr // _\ _ // I it llllllll IIIII III IIIIIIII;1 ; T� / 1a 1 I tl C I / / // /// 19 LIMITSI I DATE PAGE TaP ors LTr 12 14 I LotlPla� C N / ONSTRUCTIO MusT sr AT cnc .' - - ''''''''.\ I / „EwAsrEos NE J l 13I / / STEEL FENCE POST / I I 14 / '•B" '•C' •'D" "E'• '•F" _"G" "H'_ WIRE FENCE / \ / CONST CTION I I / / LI ITS �, RowAREaLo N moNTvl / se e ,,,,, \BURv 10 \ I I I I/ 4/ 20 R n r r� �� WASHED STONE AND HARDWARE IN WARE I I / , / R Notts R llCI:ll -F Hous Hous f- Notts 'Hous Hous Notts WIRE FENCE CLOTH FILTER OF wfi] :. STEEL FENCE ANDNARDWARE FILTER FABRIC. I '2�RR M�, I/ ( / ..,,...MA' I ERF aRc NOTES: INTO SOLD GROUND I -. f / / /I / IL I �J ne-'� I oN GRouNO O / / _- I n+r re-T n->->-T ? Tn r rt>- I 1.Hardware cloth and gravel should overlay the silt fence at least 12 \ I _ I 21 FOP Tie-7 .T.., r 0/ �' 2 Stone outlets should be placed on low elevation areas of silt fence O ".. / - I JOn \� \ l I LEGEND Notes. •t••' \\ 1 - 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland \\\` and based on field conditions. cb / g URY MAINTENANCE - / - - \\ S Coe \\\` 23 1 I ry boundary and/or around protected trees,providing a adios of at least 1.25 feet for each el{ yy @ inch of trunk diameter. of 1.Per NCG-01,Inspecloutlet at lest once and after each or Oa / I an I yV O I Mom. 2.Install Silt Fence on the low elevation sides of each lot Install Silt Fence outlets shown on BURY WIRE FENCE ANDFLOW DIRECTIO HARDWARE CLOTH 8'OF UPPER EDGE / / SILT FENCE FILTER FABRIC rvTRENCN greater rainfall event Complete any required repairs immediately. �, __ 41... I / I I I DrvERs ory DTCN �o-T� schema(Gtl'agram and field adjusted,(necessary for placement at low points.If era 2 Freshen stone when sediment accumulafon exceeds 6lnches a 3 Kea h free of debris to provide adequate flow. O / I / ( L / g� p cant genus and have different land owners or builders,each lot should haveindividual S It p mesh prov qua ¢ _ ib° AlwnODs LT socks Fences. SEM..VIEW 4 Remove sediment when half of stone outlets covered Z -_ A � �{�'/+' T / II / Y'/ 7 CSILTONSTRUCTION FENCE lou sB ® 3 Install required Slit Fe within 10 feel of Ilne to ensure there Is no conflict with 5 Replace stone as needed to fee Yore de watering - corvsmucT ON ENTRANCE septic t property re the installation of sediment \NG Envir1r rentur.Lyey r 8 I s / a p csysem.tsth responsibility of the builder t L. SILT FENCE OUTLET I I `' / I 4A,m,a measures does r p m septic systemand repair a,ea(B) least one Construct Entrance/Exit-t b - tall d per W. / /( 7 // 1 5.Waste bhs and other areas dedicated f ghg bu Id rig meter al waste shall be at 6 / 't'I`-+t 1least50feetawayfrom stormdrelnInlets d 'ageditches unlesskcanbes shownthe[/ other alternative exists If tit s separat of be ace evetl these areas must be /� AA onto ned bee nd S It Fence\ � / II Ay I 6.Inlets downstream oftlsturbances shoultl be protectetl streets should be swept when 4 t++11 mentfromthe construct onadvty sCresentaDATE PAGE: \ fasiit sock/ atte o I I I , Ecro;ddo naddRo alsue t EmOs oo andearl metnt coWlaeta is aretooidrewoutosaftOW+� 7 sc ro I " T ---- TYPICAL LOT tAVOUT WITH ROADSIDE DITCHES MY til ]IIIs1 k -rt ,zclr' n.. =1r ll eataotaga�eI Ia es I a2 gthn pan era1 / 1 IS WM m / I"'� DATE: PAGE: secT ON secT ory bernm lne roe orelaws I°<ameeal°w Ieebaend a minimum of sa I I b, . I 1 I et=nae The a;=iwn� roe,a;g g n�t dmthe i i I LP )1) ver.ally Own,through he °,° GROUND STABILIZATION / iI I :I:: sock/wall.Stakes should maximum interval of 4 feet'rammwd at a SITE AREA STABILIZATION .... I ( IOEXCEPTIONS ����•of 0 feet Ht.silt sock,sattle Is Owed in a 4 " DESCRIPTION TIME FRAME III1 ��,Q �, ,14 1 1 UNTRENCTo Wood Mulch or Com N2 he gghht of log at g naa M n a (t PERIMETER DIKES, 7 DAYSNONEsaMETR GroEwsTAL roN eascrete Mocks shall be used hehi.Me silt SWALES,DITCHES / I1QJ "/Owe••"`""°""em••`�41.01I`°`"""•M11.11,'. &SLOPES1 I 1 1 1 1 1 1 1 1MAINTENANCE, HIGH QUALITY 7DAYS NONE / �����������::-.. �• COMPOST oar xna sow RATES t. Inspect silt sock/wattle at least weekly and after accumumentany WATER ZONES I \ •'.,V .. •1111I I I•1� forUAP nten<hMulch or edSo« • I A �, 02w pe o. z" 12 `� 3 P f�g (HOW) / � a Mln. i i • B(g> BOOK (so:m>(Sao:m) ac SLOPES STEEPER 7 DAYS IF SLOPES ARE I T� , ` e. 4. Sheet Wort' f axmum Slope F so Fee 1`00 1F�0 tF s THAN 3:1 10•OR LESS IN 1, L \ - y N' Sin sock Maximum Gen) (ids Feet i2za raj I t 11 `I 1 - y',r--`>- �'°/L LENGTH AND ARE C \ Wpf le rem, (',m) (an m) er ",njemo= , u. ts. 22. w. ""getl bspe NOT STEEPER I'll I arr\ $jleg in g in mix mid 9mix a' n ern` sue am THAN 2:1, 14 , nRY; m/ m/ oaa [eat m/4 meaaarehesbeenPermaaen.B.Pbe d. e DAYS ARE conswDuon: Me nteranee./m/m) /m/m) /m/m) ymym) ymym) ALLOWED I \ I \ 1.Cleartheentranceantlexit areas all vegetation,roots,antl other objectionable 1.PerNCGthe gravel[at least once a week antlafter sac"1 dice or SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION SLOPES 3:1 OR 14 DAYS 7 DAYS FORmate,ialantlprDpeny grace rl. g,eate„a nrall,make any,egntretl,epee Immeaiatet.\ \ I 2.Place[he gravel to the specifle gretle and dimensions shownon the plans,end 2.Maintain the gravel pad in a condition m prevent mud or sediment FLATTER SLOPES GREATER smooth it. fromleavingthe constmetlonsite.This may require periodic THAN 501 IN \ Providedrelnagetoconywater to a sediment trap or other sukable ou0et. toptlressingwith2inchstone.LENGTHI \ 4.Use geotextile fabrics in oMer to improve stability of the foundation in locations 3.Immatliately remove all objectionable materials spilletl.washetl or ALL OTHER AREAS 14 DAYS NONE(E%CEPT subject to seepage or high water table. tacked onto public roadways. WITH SLOPES FOR PERIMETERS FLATTER THAN 4:1 AND HQW ZONES) N. CONSTRUCTION ENTRANCE/EXIT \ DATE: Wire Fence Filter Fabric PAGE: \ areal Post gMex.smnaem strength reMcvdm vdre fence eMv.Ears atrergth mbncwgnoul sore fence Wre Fence Wire Bodckf'ortrench \ Pact Steel Peat thoroughly General Erosion Control Noteses n -�mw ,.Only the areas shown shop be disturbed. ` � PAGE 1 of 2 Plastic , , z All disturbed areas moll be grassed and \ TOTAL DISTURBED ACREAGE: 0.59 ACRES mulchedf .• as soon as possible and maintained �/ \ aMla. Pemanent gayer s established. _ _ \ LOT EROSION CONTROL PLAN j \ \ \ ltate LOTS 16 & 19 . e to g ma� d - _ - -\ 1 �-; \ I JONES CREEK ConsWUion: Filter Fabric \ \ _\ \ T. \ \ I / 12..Construct har.plamay impound seot the harder^men ced° a ems; synthetic filter CROSS RE°N°"VIEW MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION MEADOWS sufficient water are of the core) Hlg mnrea 3.Construct Me>aaaly bale`n theaN rdomxonly la at u'wort post of a feet mmimu"m avoid When e neIxttpes FOR aontos,ebttomof•reerr mean fastened s reidy nforcement,me ment,theadaofthe MeuPExtend General-All measures will be inspected and corrections made after runoff producing falls,or at least once per week minimum.The builder will insure that the construction activities on anyparticular lot do not adverse) affect anyof the installed erosion control measures.If lot construction dictates,measures will be a. of the fence aort standard Nh Mort plastic m0o-enesh astned wreamtm<emem,n Il Nan In meppame 1 Pece pro grain PPa Y Wo ties should k:nyeavere palnl�ediarely. relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. AVID RESIDENTIAL, LLC M1ommO nfenes...space poets a maximum of a feet awn.Supports should be Wien 2,chew weetabr,c�of a 44wwew fence collapse,mar,dwampose. secuGravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic toptlressing with 2-inch stone,After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all restenNhOle bacw"tosraops gdae,notnnewaAremeshsupport.ce.Becurely objectionable materials spilled,washed,or tracked onto public roadways. UPPER LITTLE RIVER TOWNSHIP HARNETT COUNTY e.fain me niter fabric directly to posts.Were or gasn<tip Iles should have a minimum or 50 pound tensile sttorage volume r«one net as recce pressure on the Silt Fence-Sedimentfences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure strength. vate m y inches P e proposed uns,or B deemoTage<arena"oldundermlmrrgtheferr<eaanng that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. SCALE: �" ADD' DECEMBER 2023 Excavate the be.rier.oa col 4i mRernove s.iment deposits Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE .Place 12 Inures off afebn°along me bottom and side of the trench. and bang theaea m grade land WNW it after the contributing 100 0 50 100 200 400 B.Bad.the trench with soil placed over the filter fah.and compact.Thorough compaction of the badmu is 4 drelnage area nee been properly MMAisea and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. cnixd io sill fence performance. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be M 10.mean attach nnermb,eesea existing tr.s. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET I ANC-Envirq,rrer tol,Jpeg SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 fit. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE lW-0106 LAST SAVED:12/13/2023 11:45 AM LAST PLOTTED:12/13/2023 10:36 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\A&G RESIDENTIAL LLC\23-265s-OB JONES CREEK MEADOWS-EC\PLANS\JONES CREEK EC-LOTS 16&10.132VG