HomeMy WebLinkAboutCrosswinds Marina Breakwater, B. Everett Jordan Project DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 26402-1890 IN REPLY REFER TO Project Management Branch SUBJECT: Crosswinds Marina Breakwater, B. Everett Jordan Project Mr. Torn R. Wells Superintendent of State Parks Division of Parks and Recreation North Carolina Department of Environment, Health and Natural Resources 12700 Bayleaf Church Road Raleigh, North Carolina 27614 Dear Mr. Wells: We are pleased to inform you that the Crosswinds Marina Breakwater has been completed and was accepted by the Division of Parks and Recreation (OPR) representatives an May 14, 1998, for the purposes of operation and maintenance, Staff members of both the Corps and DPR were present on May 14 for the pre-final inspection. DPR's acceptance was made with the condition that the Corps would complete several items listed in Enclosure 1. A copy of the marked up as-built drawings will be provided by the contractor upon completion of his work and will be provided to Mr. Fred Hagenberger as soon as we receive them. A set of final as-built drawings will be provided to DPR once we have completed them. Any problems that are suspected to be covered as warranty work should be addressed to Mr. Bill Black at our Raleigh Resident Office. All other issues or concerns should be addressed to the undersigned. Please sign on the appropriate line below accepting the facility on behalf of the Division of Parks and Recreations for signature by the appropriate DPR official acknowledging their acceptance of the facility for operation and maintenance purposes and return to this office as soon as possible. Upon receipt of official acceptance, our Savannah Real Estate Office will be working with the State to amend the lease agreement to incorporate the new breakwater into the conditions of the lease. With the completion of the Crosswinds Marina Breakwater, all recreation facility work at B. Everett Jordan has been completed. We look forward to working with you and the other State agencies involved to bring this project to total completion to the satisfaction of both the State and the Corps of Engineers. If you have any questions or concerns, please call me at (910) 251-4671. Sincerely, Glenn McIntosh Project Manager Enclosure Exhibit E -2- We, the undersigned, accept the Crosswinds Marna Breakwater for the purpose of operation and maintenance on behalf of the State of North Carolina: Authorized Representative of State of NC, Date Division of Parks & Recreatiom Copy Furnished: Mr. John Morris Director, Water Resources Division North Carolina Department of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Fred Hagenberger Assistant Chief, Planning and Development Division of Parks and Recreations 12700 Bayleaf Church Road Raleigh, North Carolina 27614 Mr. Mike Seigh Park Superintendent Jordan Lake State Recreation Area 280 State Park Road Apex, North Carolina 27502 ENCLOSURE 1 WORK ITEMS TO BE ACCOMPLISHED BY CORPS AS CONDITIONS OF ACCEPTANCE OF CROSSWINDS MARINA BREAKWATER BY NORTH CAROLINA DIVISION OF PARKS AND RECREATION FOR THE PURPOSE OF OPERATION AND MAINTENANCE 1. Install anchor line intermediate anchors. 2. Install warning buoys (six in all, same type, installed on breakwater anchors). Change end buoys so that they would be the same "Restricted - No Boats" warning buoys as the rest of the buoys. 3. Correct drainage at top of rip-rap in work area. Currently the repaired area does not drain properly to funnel drains. 4. Fill in crack on funnel drain apron. 5. Copy of all contractor submittals that Identify materials used for the breakwater that might be involved in maintenance actions such as chains, anchor ropes, etc. 6. Provide and install 5 flashing orange lights. (Lloyd Williamson will purchase these plus extra ones.) NOTE: It is estimated that it will take approximately three weeks (End of first week of June 1998) to complete all actions by the contractor.