Loading...
HomeMy WebLinkAbout20240160 Ver 1_More Info Received_20240202 (2)Corps AID Number: Example: SAW-2017-99999 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 6. Future Project Plans 6a. Is this a phased project?* O Yes O No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -construction notification. D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Q Wetlands Q Streams -tributaries O Buffers O Open Waters O Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. "W." will be used in the table below to represent the word "wetland". W1 2a1 Reason * (?) Grading 2b. Impact type* (?) P 2c. Type of W. * mland Hardwood For- 2d. W. name* Wetland A 2e. Forested * Yes 2f. Type of Jurisdicition*(?) Corps 2g. Impact area* 0.063 (acres) W2 Workpad/Cans T Bottomland Hardwood For Wetland A Yes :J Corps 0.009 (acres) Add 2g. Total Temporary Wetland Impact 0.009 2g. Total Permanent Wetland Impact 0.063 2g. Total Wetland Impact 0.072 2i. Comments: See Appendix 1 - Impacts Map for approximate acreage. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. "S." will be used in the table below to represent the word "stream". 3a. Reason for impact* (?) 3b.lmpact c. Type of impact* 3d. S. name* 3e. Stream 3f. Type of 3g. S. width* 3h. Impact type* F Type*(?) Jurisdiction" length* S1 Grading Permanent - Fill S2 (UT-1 To UT-1 Intermittent Both 2 70 Average (feet) (linear feet) sz Grading Permanent � Fill To UT-1 ff Both Average (feet) (linear feet) S3 Workpad/Causew Temporary - Workpad/Causewa S2 (UT-1 To UT-1 Intermittent Both 2 19 Average (feet) (linear feet) H Workpad/CausewTemporary Tworkpad/Causewa S3 (UT-1 To UT-1 Intermittent Both 1 13 Average (feet) (linear feet) Add another impact ** All Perennial or Intermittent streams must be verified by DWR or delegated local government. 3i. Total jurisdictional ditch impact in square feet: 3i. Total permanent stream impacts: 81 3i. Total temporary stream impacts: 32 3i. Total stream and ditch impacts: 113 3j. Comments: See Appendix 1 - Impacts Map for approximate acreage. E. Impact Justification and Mitigation 1. Avoidance and Minimization