HomeMy WebLinkAbout20150927 Ver 1_More Info Received_20151006
Homewood, Sue
From:Mack Summey <mack@asheboro.com>
Sent:Tuesday, October 06, 2015 12:50 PM
To:Homewood, Sue
Subject:REMC Solar Site
Attachments:scan676.pdf; remc letter_20151006121334.pdf; 20151006125109.pdf
Hi Sue
Attached are the plans and letter for your review.
If you need anything else just let me know.
Thanks!
Mack
H. Mack Summey, Jr., PE
Summey Engineering Associates, PLLC
Engineering - Land Planning - Consulting P.O. Box 968 Asheboro, NC 27204 Office - 336-328-0902 Fax - 336-328-0922
Email: mack@asheboro.com
Your message is ready to be sent with the following file or link
attachments:
scan676.pdf
Note: To protect against computer viruses, e-mail programs may prevent
sending or receiving certain types of file attachments. Check your e-mail
security settings to determine how attachments are handled.
1
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
Pre -Construction Notification (PCN) Form
A. Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the
®Section 404 Permit El Section 10 Permit
Corps:
1 b.
Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps? ❑ Yes
® No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1 e.
Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit:
because written approval is not required? Certification:
® Yes ❑ No ®Yes
❑ No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for mitigation ❑ Yes
® No
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
❑ Yes
® No
below.
❑ Yes
® No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
2.
Project Information
2a.
Name of project:
Randolph Electric Membership Corporation Solar Site
2b. County:
Randolph
2c.
Nearest municipality / town:
Asheboro
2d.
Subdivision name:
N/A
2e.
NCDOT only, T.I.P. or state
project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
Randolph Electric Membership Corporation
3b.
Deed Book and Page No.
2236/1170
3c.
Responsible Party (for LLC if
N/A
applicable):
3d. Street address:
879 McDowell Road
3e.
City, state, zip:
Asheboro, NC 27204
3f.
Telephone no.:
336-625-5177
336-626-1551
3g. Fax no..
3h.
Email address:
fred.smith@randolphemc.com
Page 1 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4.
Applicant Information (if different from owner)
4a.
Applicant is:
® Agent ❑ Other, specify: Owner
4b.
Name:
Fred Smith
4c.
Business name
(if applicable):
Randolph Electric Membership Corporation
4d.
Street address:
879 McDowell Road
4e.
City, state, zip:
Asheboro, NC 27204
4f.
Telephone no.:
336-625-5177
4g.
Fax no.:
336-626-1551
4h.
Email address:
fred.smith@randolphemc.com
5.
5a.
Agent/Consultant Information (if applicable)
Name: H. Mack Summey, Jr., PE
5b.
Business name
(if applicable):
Summey Engineering Associates, PLLC
1342 E. Salisbury Street
Asheboro NC 27204
336-328-0902
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f.
Fax no.:
336-328-0922
5g.
Email address:
mack@asheboro.com
Page 2 of 11
PCN Form — Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID)
1 b. Site coordinates (in decimal degrees):
1 c. Property size:
2. Surface Waters
7659198355 & 7659184659
Latitude: 35.66766
(DD.DDDDDD)
37.83 acres
2a. Name of nearest body of water (stream, river, etc.) to UT to Little River
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Yadkin -Pee Dee
Longitude: - 79.835907
(-DD.DDDDDD)
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Existing site is mostly wooded, Gentle rolling terrain. Land use around site is undevelopedl. Site bounded by Highway to
the north & east sides, undeveloped woods to the south & west..
3b. List the total estimated acreage of all existing wetlands on the property:
1.442 ac
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
2570 If (1010 Perennial , 1560 Intermittent)
3d. Explain the purpose of the proposed project:
To construct a driveway across a stream on a piece of property being developed to produce solar energy. There are no
other access points availible to reach subject property without stream crossing.
3e
Describe the overall project in detail, including the type of equipment to be used:
Clearing, grubbing, installation of erosion control measures and stream crossing is involved in initial construction. Site to
be graded by use of tandem axle dump trucks, track loader. Stream Crossing and ford will be installed by use of track
hoe.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / ❑ Yes ® No
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final
of determination was made?
❑ Unknown
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): 11 Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for ❑ Yes ® No ❑ Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
Page 3 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ❑ Yes ® No
6b. If yes, explain.
Page 4 of 11
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ® Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d, 2e. 2f
Wetland impact Type of jurisdiction
number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ — non -404, other) (acres)
W1 ❑P❑T
W2 ❑P❑T
W3 ❑P❑T
W4 ❑P❑T
W5 ❑P❑T
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ No
❑ Yes
❑ Corps
❑ DWQ
LJ Corps
❑ DWQ
❑ Corps
❑ DWQ
❑ Corps
❑ DWQ
❑ Corps
❑ DWQ
❑ Cor s
W6 ❑P❑T
ElNo
❑DWpQ
❑ INT
® DWQ
2g. Total wetland impacts
S2 ❑ P ®T
Pump Around
2h. Comments:
® Corps
® DWQ
7
75
S3 ❑ P ❑ T
3. Stream Impacts
❑ Corps
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete
this
question for all stream sites impacted.
❑ INT
❑ DWQ
3a. 3b.
3c. 3d.
3e.
3f.
3g.
Stream impact Type of impact
Stream name Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ®P ❑ T
18' Rock Ford
UT to Little River
® PER
® Corps
7
18
Page 5 of 11
PCN Form — Version 1.3 December 10, 2008 Version
❑ INT
® DWQ
S2 ❑ P ®T
Pump Around
❑ PER
❑ INT
❑ PER
® Corps
® DWQ
7
75
S3 ❑ P ❑ T
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
l
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
93
3i. Comments: Summary - 18' Permanent Rock Ford and temporary pump around structures
Page 5 of 11
PCN Form — Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. I 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number — 1 (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
_Temporary (T) j
01 ❑P❑T
02 ❑P❑T
03 ❑P❑T
04 ❑P❑T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction propc
5a. I 5b. 1
then complete the chart below.
5c. 5d.
Wetland Impacts (acres)
Stream Impacts (feet)
Pond ID Proposed use or purpose
number of pond
Flooded Filled I Excavated Flooded Filled Excavated
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5e.
Upland
(acres)
Flooded
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction: 1
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer,
then complete the chart below.
If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D
of this form.
6a.
❑ Neuse
El Tar -Pamlico El Other:
Project is in which protected basin?
❑ Catawba
❑ Randleman
6b. 6c. 6d.
6e.
6f, 6g.
Buffer impact
number — Reason
Buffer
Zone 1 impact Zone 2 impact
Permanent (P) or for Stream
name mitigation
(square feet) (square feet)
Temporary (T) impact
required?
6 ❑
1 P❑T
-❑Yes
❑ No
_
B2 ❑P[IT
❑Yes
❑ No
B3 ❑ P ❑ T
❑ Yes
❑ No
6h. Total buffer
impacts
6i. Comments:
Page 6 of 11
PCN Form — Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Stream thru property is very meandering and option chosen used narrowest section of stream possible to cross with least
stream disturbance. The use of a ford was chosen over pipes to minimize impacted area.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Temporary dewatering will be performed within the impacted area and all dewatering structures will be removed when
completed.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for ❑ Yes ® No
impacts to Waters of the U.S. or Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps
❑ Mitigation bank
2c. If yes, which mitigation option will be used for this ❑ ro Payment to in -lieu fee ram
y program
project?
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type
Quantity
3c. Comments:
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached. ❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
❑ warm ❑ cool ❑cold
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non -riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form —Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑ No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
1 6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 8 of 11
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? Exist. 26.62% , Prop. 26.92 %
2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: The only impervious addition will be a
gravel access drive.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program
® DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
3b. Which of the following locally -implemented stormwater management programs
apply (check all that apply):
3c. Has the approved Stormwater Management Plan with proof of approval been
attached?
4. DWQ Stormwater Program Review
4a. Which of the following state -implemented stormwater management programs apply
(check all that apply):
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
5b. Have all of the 401 Unit submittal requirements been met?
N/A
❑ Phase II
❑ NSW
❑ USMP
❑ Water Supply Watershed
® Other: None
❑ Yes ® No
❑
Coastal counties
❑
HQW
❑
ORW
❑
Session Law 2006-246
❑
Other:
❑ Yes ® No
® Yes ❑ No
® Yes ❑ No
Page 9 of 11
PCN Form — Version 1.3 December 10, 2008 Version
F.
Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1 a.
Does the project involve an expenditure of public (federal/state/local) funds or the
❑ Yes ® No
use of public (federal/state) land?
1 b.
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c.
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter.)
Comments:
2.
Violations (DWQ Requirement)
2a.
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b.
Is this an after -the -fact permit application?
❑ Yes ® No
2c.
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3.
Cumulative Impacts (DWQ Requirement)
3a.
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes ® No
additional development, which could impact nearby downstream water quality?
3b.
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4.
Sewage Disposal (DWQ Requirement)
4a.
Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
None required
Page 10 of 11
PCN Form — Version 1.3 December 10, 2008 Version
6. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
❑ Yes ® No
❑ Yes ® No
❑ Raleigh
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
The USFWS website search engine.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NOAA Habitat Conservation Website
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ❑ Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NC Listings in the National Register of Historic Places as of 8/3/12
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑ Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? Randolph County GIS
Fred Smith
Applicant/Agent's Printed Name
c
8/13/15
ppficant/Agenfs Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 11 of 11
PCN Form — Version 1.3 December 10, 2008 Version
Summey Engineering Associates, PLLC
Engineering • Land Planning • Consulting
P.O. Box 968
Asheboro, NC 27204
Phone: 336-328-0902 • Fax: 336-328-0922
October 6, 2015
Re: 401/404 Revised Permit
REMC — Solar Site
DWQ# 15-0927
Randolph County, NC
SEA Job No. E-3199
Sue Homewood
NC DENR Winston-Salem Regional Office
Division of Water Resources — Water Quality Programs
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Dear Ms. Homewood:
We have received your letter dated September 28, 2015 concerning the above referenced
project. Below we offer the following responses:
1. We have provided an overall site plan that shows the entire site with all existing
development and the proposed development of the solar panel site with driveway
access.
2. The intermittent stream location has now been properly shown on the map. It
actually begins off the property. The proposed location of the drive is the best
location on the property for the stream crossing in that we are minimizing the
impacts at this location due the existing terrain.
3. The PCN form has been revised as requested. The proposed stream crossing
location shortens the overall stream length by eight (8) feet but by using the
selected location, we reduce impacts by much more than that due to the fill that
would be needed to pipe the stream. This location minimizes all the impacts on
the crossing. The ford crossing was chosen due to the amount of now which goes
thru the existing stream. Careful consideration of these flows was made due to
the possibility of stormwater overflowing the channel and flooding the area due to
the installation of pipes which could back up the water. The ford crossing allows
the cross sectional area of the stream to be maintained which eliminates the
chances of flooding to occur.
4. The only new impervious area being created on this site is from the gravel access
road which is approximately 4600 sf. All of this new impervious area will flow
overland through grass shoulders along the new drive. Minimal grading will be
performed and the gravel will be slightly above grade, flows will travel overland
and not be concentrated. Minimal tree clearing is proposed also. Should a full
scale Stormwater Treatment plan be required, it would disturb more area than
originally proposed and in our opinion, not be efficient.
Should you have any questions or comments please do not hesitate to call.
Very Truly Yours,
Summey Engineering Associates, PLLC
H. Mack Summey, Jr., PE Yy
HMSJ/hmsj
c: File
POLE
RACK
POLE �� EXISTINGSOF
GRAVEL
RACKS �-
CONCR�
41,
e
x LINK FNS
CN
TEMPORARY`
ROCK CHECK "'DAM
TEMP. SKIMMER BASIN # 1 �
L=82' W=41'AD=2' WEIR=12'
=SURFACE AREA REQ'D.=3,352 SF
VOLUME REQ'D.=3.180 CF
r" TEMP KY
1
�V
RO
"
1
i
DB 1420 PG 1181
$,
17 71,11
itt
P,.'
DB 1666 PG 1445
7T
�
,TEMPORARY
105
DITCHES, & SLOPES
"" SILT FENCE
3.
.,
b 4,
r=
ALL BEARINGS ARE
GRID BEARINGS.
5.
IRON PIPES AT ALL CORNERS UNLESS
'rt
I
SLOPES 3:1 OR FLATTER
3. �.
��
(
11',
Iqq
7.
EXISTING LAND USE: OFFICE & EQUIPMENT STORAGE
8.
PIN NO. 7659198355
f
100
_
r�
41
b =4
I
f
..<.
� ;..:_�.„
-,},..p
1. ...5.
€.
..1.7
....,A.,..
€ b
Ws.. U -55
a.i I,..
F
t •.
95
I i�S
4
.,
iS ',at
f.T-14
HI
90
,A
GLA
i
_, , ,
, o-.• p.....
.�..,.
;. a..,..i M
.;.w, >.
.,... ,,. (;
-... 3 ,r... .5... 3. . p
Llj�......,..,
...y., fi
85
L
; ;gam
}.~ _ _L:_�.L
_ _
0+00
0+05
0+10
0+15
0+20,,,.0+25__'O
030 +35
4 0+45 0+50---0-+_-_5
5 0
60 0+65
TEMP. SKIMMER BASIN # 1 �
L=82' W=41'AD=2' WEIR=12'
=SURFACE AREA REQ'D.=3,352 SF
VOLUME REQ'D.=3.180 CF
r" TEMP KY
1
�V
RO
OUTLET
\
DEED REFERENCE:
DB 1420 PG 1181
TIMEFRAME
DB 1666 PG 1445
2.
�
,TEMPORARY
J_
DITCHES, & SLOPES
"" SILT FENCE
3.
.,
37.83 ACRES
4.
ALL BEARINGS ARE
GRID BEARINGS.
5.
IRON PIPES AT ALL CORNERS UNLESS
OTHERWISE NOTED.
SLOPES 3:1 OR FLATTER
6.
CURRENT ZONING:
B2 AND LI
7.
EXISTING LAND USE: OFFICE & EQUIPMENT STORAGE
8.
PIN NO. 7659198355
& 7659184659
I
f
/
w
� 1
POL --
RACK ,.
GRAVEL CONSTRUCTION
ENTRANCE
TEMPORARY BYPASS PUMP &
PIPING TO ROUTE WATER AROUND
THE CONSTRUCTION AREA. /
AREA "D"
�Disturbed Area:
/ PROPOSED
'f W GRAVEL
/ ACCESS DRIVE
Gravel
FA
STOR TER NOTE:,_---- . ..... /__A�
ormwate, be from/gravel"A11rough
gross shoulder. No"_ -St-
are
be pilp'ed or channeled. Overl nd flow only
y�
perre uirp�ments of 40114n,6- Permit.
LIMITS OF ,CONSTRUCTION y
TEMPORARY
DIVERSION DITCH
(
wm (- - - - - f, I -- - - - - - - - - - - -
M.PORA �/ x - TD TD T►1 ® TD
SIFT FENCE - �} r _
DisturbedW Area: 0.04 ac / 2b0.00,
AREA B
TD / i_
_r
L.L
TEMPORARY
DIVERSION DITCH, TD
PROPOSED,SKIMMER
SKIMMERS : 2.0"
,ORIFICE RADIU 0.7 In.
ORIFICE DIAMETER. 1.5 In. / }f
TEMPORARY
f x\
TEMPORARY
/ SILT, FENCE
...........
t.
,
�}
I }
PROPOSED/ v
SOLAR PANEL,AREA /��
/! TDA
_-
ij
ARUk(p>„
Disturbed 0.64 ac 777-77777/
r
T.
!'t
Drclr�age Area* .0.75 ac.
/ Disturbed Area: 0: ac
AREA "A " " TO BE CLEARED ONLY. STUMPS TO
/. BE CUT TO UND LEVEL AND ENTIRE ARbk TO
STABILIZED IMMED LY WITH GROUND TREE h lUU
'50 00,
AREA 9,C» /
Disturbed i rea•. `, /
1.63 ac /
/
i
/
/
/
!
/
r
VICINITY MAP
NTS
GENERAL SITE
NOTES:
1.
DEED REFERENCE:
DB 1420 PG 1181
TIMEFRAME
DB 1666 PG 1445
2.
PLAT BOOK/PAGE:
PB 28 PG 55
NONE
DITCHES, & SLOPES
PB 60 PG 40
3.
TOTAL SITE AREA =
37.83 ACRES
4.
ALL BEARINGS ARE
GRID BEARINGS.
5.
IRON PIPES AT ALL CORNERS UNLESS
OTHERWISE NOTED.
SLOPES 3:1 OR FLATTER
6.
CURRENT ZONING:
B2 AND LI
7.
EXISTING LAND USE: OFFICE & EQUIPMENT STORAGE
8.
PIN NO. 7659198355
& 7659184659
SEQUENCE OF CONSTRUCTION
1. OBTAIN PLAN APPROVAL FROM NCDENR- LQ AND ALL
OTHER APPLICABLE PERMITS PRIOR TO STARTING PROJECT.
2. INSTALL GRAVEL CONSTRUCTION ENTRANCE
3. INSTALL TEMPORARY STONE CHECK DAM IN STREAM BELOW PROPOSED RIP -RAP DAM LOCATION.
4. INSTALL TWO(2) CLASS 1 RIP -RAP DAMS WITH POLYETHYLENE FABRIC ON THE FACE TO HOLD WATER.
(ONE ON EACH SIDE OF PROPOSED STREAM FORD) SEE DETAIL SHEET 2 OF 2
5. BEGIN A BYPASS PUMPING OPERATION FROM THE UPSTREAM SIDE TO THE DOWM STREAM SIDE.
6. INSTALL STREAM FORD AS PER DETAIL
7. WHEN STREAM FORD IS COMPLETED STABILIZE ALL DISTURBED AREAS AND REMOVE BYPASS PUMP
AND RIP -RAP DAMS.
8. INSTALL GRAVEL DRIVE FROM CONSTRUCTION ENTRANCE TO STREAM FORD.
9. REMOVE TIMBER FROM CONSTRUCTION AREA.
10. INSTALL SILT FENCE WITH ROCK OUTLET ON WEST SIDE OF ACCESS DRIVE.
11. INSTALL INSTALL SILT FENCE ON SOUTH SIDE OF SKIMMER BASIN #1 LOCATION.
12. INSTALL SILT FENCE ON NORTH SIDE OF CLEARED AREA "A" AND ROCK CHECK DAM.
13. INSTALL SKIMMER BASIN #1 WITH ASSOCIATED TEMPORARY DIVERSION DITCHES.
14. CLEAR & GRUB AREA "C" & "D".
14. INSTALL GRAVEL ACCESS DRIVE.
15. STABILIZE ALL DISTURBED AREAS
16. INSTALL SOLAR PANELS
17. WHEN SOLAR SITE IS COMPLETED AND ALL AREAS ARE STABILIZED, REMOVE EROSION AND SEDIMENT
CONTROL MEASURES AND STABILIZE THESE AREAS.
GROUND STABILIZATION CRITERIA
SITE AREA
STABILIZATION
STABILIZATION
DESCRIPTION
TIMEFRAME
TIMEFRAME
EXCEPTIONS
PERIMETER DIKES, SWALES,
7 DAYS
NONE
DITCHES, & SLOPES
IF SLOPES ARE 10' OR LESS IN
SLOPES STEEPER THAN 3:1
7 DAYS
LENGTH & ARE NOT STEEPER
THAN 2:1, 14 DAYS ALLOWED
SLOPES 3:1 OR FLATTER
14 DAYS
I DAYS FOR SLOPES > 50 FEET
IN LENGTH
ALL OTHER AREAS WITH
14 DAYS
NONE
SLOPES FLATTER THAN 4:1
GRAPHIC SCALE
30 0 15 30 60 120
( IN FEET )
1 inch = 30 ft.
..._"-" ..__A
VICINITY MAP
NTS
GENERAL SITE NOTES:
1. DEED REFERENCE: DB 1420 PG 1181
DB 1666 PG 1445
2. PLAT BOOK/PAGE: PB 28 PG 55
PB 6O PG 4O
3. TOTAL SITE AREA = 37.83 ACRES
`t 4. ALL BEARINGS ARE GRID BEARINGS.
5. IRON PIPES AT ALL CORNERS UNLESS
OTHERWISE NOTED.
\Y 6. CURRENT ZONING: 82 AND LI
7. EXISTING LAND USE: OFFICE & EQUIPMENT STORAGE
8. PIN NO. 7659198355 & 7659184659
UTILITY NOTES:
1. WATER & SEWER SERVICE LINES TO BE INSTALLED
IN ACCORDANCE TO THE NORTH CAROLINA
PLUMBING CODE.
2. ALL UTILITY LOCATIONS TO BE COORDINATED WITH
LOCAL UTILITY COMPANIES.
3. REFER TO ARCHITECTURAL PLANS FOR EXACT
LOCATIONS OF WATER, SEWER, GAS, ELECTRIC,
TELEPHONE, & CABLE SERVICES.
4. IF FIELD CONDITIONS VARY FROM PLAN, CONTRACTOR
TO CONTACT ENGINEER IMMEDIATELY.
1411019011
EXISTING IMPERVIOUS AREA
WN PROPOSED IMPERVIOUS AREA
(ACCESS DRIVE ONLY)