Loading...
HomeMy WebLinkAboutDCM 16-24 NCDCNR Permit Class Permit Number NEW16-24 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to N.C. Department of Cultural and Natural Resource, 4605 Mail Service Center, Raleigh, NC 27699 Authorizing development in Beaufort County at adj. to Bath Creek, at 200 Front Street, in Bath , submitted electronically (PA-1099) on 10/26/23, including attached workplan drawings (17), C1 C17 dated 7/1/23. This permit, issued on January 30, 2024 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization Bulkheads and Storm Drain Outlets Replacement 1) The bulkheads and associated storm drain outlets shall extend a maximum of two (2) foot waterward from the waterward edge of the existing bulkhead at any point along its alignment at the time of construction. \[07H .0208(b)(7)(D)\] 2) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the approved bulkhead associated storm drain outlet alignments. \[07H .0208(b)(7)(B); 07H .0205(d)\] (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or other Signed by the authority of the Secretary of DEQ and the Chair qualified persons within twenty (20) days of the issuing date. of the Coastal Resources Commission. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered For Braxton C. Davis, Director hereunder requires further Division approval. Division of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. January 30, 2029 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee N.C. Department of Cultural and Natural Resource Permit No. 16-24 Page 2 of 3 ADDITIONAL CONDITIONS 3) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. \[G.S. 113-229(c1)\] 4) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, or other suitable materials approved by Division personnel. \[07H .0207(d); 07H .0209(d)(4)\] 5) The bulkhead shall be constructed prior to any backfilling activities. \[07H .0208(b)(7)(C); 07H.0209(d)(4)\] 6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. \[07H .0208(b)(7)(C); 07H .0209(d)(4)\] 7) All fill material, including rip rap, shall be clean and free of any pollutants except in trace quantities. \[07H .0208(a)(2)(B); 07H .0209(d)(3)\] 8) Unless altered herein, all backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. \[07H .0208(b)(7)(C), 07H .0209(d)(3)\] 9) No backfill material is to be placed within 30 feet of the normal high-water level, except that which will be used to backfill the area behind the permitted bulkhead. \[07H .0209(d)(10)(G); 07H .0209(d)(10)(A)\] 10) The rip rap material shall consist of clean rock or masonry materials such as, but not limited to, granite, marl, or broken concrete with no exposed rebar. It shall be of a size sufficient to prevent its movement from the approved alignment by wave or current action. \[07H .0208(b)(9)(G)\] 11) In order to reduce the potential for negative effects on the spawning migration of anadromous fish, no in-water work shall be permitted between February 1 and September 30 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. \[07H .0208(a)(2)(F)\] Sedimentation and Erosion Control 12) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. \[07H .0209(d)(4); G.S. 113A-102(a); 07H .0207; 07H .0208\] 13) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. \[07H .0209(d)(4); G.S. 113A-102(a); 07H .0207; 07H .0208\] 14) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. \[07H .0209)(d)(3)(B); 07H .0209(d)(3)(C)\] N.C. Department of Cultural and Natural Resource Permit No. 16-24 Page 3 of 3 ADDITIONAL CONDITIONS General 15) All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of petroleum products or any other hazardous waste, the permittee shall immediately report it to the National Response Center at (800) 424-8802 and provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act will be followed. \[07H .0208(a)(2)(B)\] 16) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. \[07J .0406(b)\] 17) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. \[07J .0209(a); G.S 113A-120(b)\] 18) The permittee and/or their contractor shall meet with a representative of the Division prior to project initiation. \[07J .0209(a)\] NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW-2023-01721). NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4497 and assigned the project DWR Project No. 2023116. NOTE: Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. NOTE: An application processing fee of $250 was received by DCM for this project.