Loading...
HomeMy WebLinkAboutNC0090000_Site Mitigation Plan Quaterly Report_20240202Colonial Pipeline Company Jeff Morrison Environmental Program Manager, Remediation January 29, 2024 Ms. Brandy Costner North Carolina Department of Environmental Quality Division of Water Resources — Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 RECEIVED FF% 02 NCDEQ/DWR/NPDES Re: Site Mitigation Plan Quarterly Report 4Q 2023 (October 2023 - December 2023) Colonial Pipeline Company — 2020-L1-SR2448 / Pipeline ROW Release NPDES Permit No. NCO090000 Huntersville, Mecklenburg County, North Carolina 28078 To Whom it May Concern, As required by National Pollution Discharge Elimination System (NPDES) Permit No. NC0090000, Section A.9.b.(ii) effective August 1, 2023, Colonial Pipeline Company (Colonial) is submitting this Site Mitigation Plan Quarterly Report 4Q 2023 for the time period of October 2023 — December 2023 in connection with the Huntersville-Concord Road (State Road 2448 [SR 2448]) pipeline release located in Huntersville, Mecklenburg County, North Carolina. At the time of this submittal, the Town of Huntersville and Colonial are finalizing the requirements to the civil and landscaping plans to obtain the necessary approvals for site development. Upon finalization of the site development plans, Colonial will submit the final Site Mitigation Plan to the North Carolina Department of Environmental Quality / Division of Water Resources as per NC0090000, Section A.9.b.(i). Colonial anticipates that the next quarterly report (Site Mitigation Plan Quarterly Report 1 Q 2024) will be submitted in April 2024. If you have any questions or concerns regarding the attached Site Mitigation Plan Quarterly Report 4Q 2023, please do not hesitate to contact me at (770).819.3566. Res pec-tfu l ly, Jeff D. Morrison 3925 Anderson Farm Road, Austell, Georgia 30106 colpipe.com I Follow us: 0000 TRIC 114 Edinburgh S. Drive, Ste. 200 T 919.827.0864 Cary, NC 27511 TRCcompanies.com January 25, 2024 Jeff Morrison Environmental Program Manager, Remediation Colonial Pipeline Company 3925 Anderson Farm Road Austell, Georgia 30106 Subject: Colonial Pipeline SR 2448/Pipeline ROW NPDES Permit No. NCO090000 Site Mitigation Plan Quarterly Report 4Q2023 Huntersville, North Carolina Dear Mr. Morrison: This Quarterly Site Mitigation Report for reporting period October 2023 — December 2023 (4Q2023) has been prepared as required by National Pollution Discharge Elimination System (NPDES) Permit No. NC0090000, Section A.9.b.(i) for the Colonial Pipeline Company (CPC) Huntersville-Concord Road (State Road 2448 [SR 2448]) pipeline release site located near Huntersville, Mecklenburg County, North Carolina (Site). The on -site groundwater treatment system construction has not yet begun and is therefore not operational at this time. As such, there are no nuisance conditions (noise, odor, or vapors) as a result of groundwater treatment that need to be mitigated at this time. As required by the Town of Huntersville (Town), a series of figures were submitted to the Town on November 14, 2023 to obtain the necessary permits and approvals for site development, including assemblage of the groundwater treatment components that are required to comply with NPDES Permit NC0090000. The November 14, 2023 submittals to the Town included the following: ■ Proposed Site Plan — Depiction of existing features, proposed groundwater treatment system location, proposed stormwater control measures, and proposed landscaping areas. ■ Grading and Drainage Plan 1 — Depiction of proposed drainage features and construction specifications for the southeast portion of the Site. ■ Grading and Drainage Plan 2 — Depiction of proposed drainage features and construction specifications for the portion of the Site south of Huntersville-Concord Road and north of the groundwater treatment system. ■ Grading and Drainage Plan 3 — Depiction of proposed drainage features and construction specifications for the south-central portion of the Site. ■ Turning Movement Analysis — Depiction of tanker truck movement analysis for loading and unloading at the Site. ■ Overall Site Plan — Depiction of proposed vegetative planting areas throughout the Site. Mr. Morrison Colonial Pipeline Company January 25, 2024 Page 2 On December 6, 2023, CPC was notified by the Town that modifications to some of the above -listed figures were necessary. Upon receiving the Town's December 6 modification request, CPC requested an in -person meeting with the Town to discuss the requested modifications. A meeting between the Town and CPC to discuss the requested modifications occurred on January 10, 2024. Based upon that meeting, a revised drawing set is currently being prepared and will be submitted to the Town for approval in the near future. Upon receipt of the Town's approval of the modified submittals, the Site Mitigation Plan originally submitted to the North Carolina Department of Environmental Quality (NCDEQ) on September 29, 2023 will be amended with final versions of the above listed drawings, and the Revised Site Mitigation Plan will be submitted to NCDEQ. Should you have any questions or require additional information, please do not hesitate to contact me at (845) 853-5388 or by e-mail at cmacionus@trccompanies.com. Sincerely, TRC Environmental Corporation Chelsea Macionus Project Manager TRC