Loading...
HomeMy WebLinkAbout550007_Add-Info Response_20240119Susta�inRNG January 19, 2024 Ms. Christine B. Lawson Engineer Animal Feeding Operations Division of Water Resources North Carolina Department of Environmental Quality 512 North Salisbury Street Raleigh, NC 27699 919.707.9129 Re: Additional Information Request Application No. ADC550007 Beam Dairy Dairy Manure to Renewable Natural Gas Anaerobic Digestion Project Lincoln County, North Carolina Dear Ms. Lawson, We are pleased to submit the attached additional information as requested in the Additional Information Request letter dated January 9, 2024 for the Beam Dairy Cattle Farm Digester Waste Management System General Permit Application No. ADC550007. The additional information was discussed during a January 9, 2024 call and site visit conducted January 16, 2024 for the proposed dairy manure -to -renewable natural gas (RNG) anaerobic digestion (AD) facility to be located at Beam Dairy, 3058 Johnstown Road, Lincoln County, Cherryville, NC. In accordance with the Request, the following items have been addressed for continued review of the permit application: Permit Owner — The current permit, AWC550007, for the above referenced animal feeding operation, Beam Dairy, is issued to Mr. John Beam. Mr. Beam is the owner/permittee. The application form lists SRNG-Beam, LLC as the owner. The Farm Digester System cannot be permitted separately from the animal feeding operation. Please clarify the ownership and provide either an updated application for with Mr. Beam's information and signature or change of ownership documentation. Response: Revised application page with Mr. John Beam listed as owner/permittee and signed accordingly included as Attachment 1. Property Ownership — it appears that the proposed digester location is on a separate parcel with separate ownership. Please clarify. If the parcel is under separate ownership, please provide a copy of any lease agreement or easement. Response: The digester will be located on Lincoln County North Carolina Tax Parcel ID M6749 (PIN 2691295249) owned by Beam Dairy LLC. Beam Dairy is located across parcels with ownership listed as Beam Dairy LLC and Beam Landholding LLC. Beam Dairy Sust ainRNG LLC is owned by Mr. John Beam and the operating dairy. The tax map is included as Attachment 2 with a related lease agreement. Biogas Use as a Renewable Energy Resource — Session Law 2023-63 (2023 Farm Act) requires that the gases collected by a farm digester system begin to be used as a renewable energy resource as quickly as feasible, but no later than within six months of the collection of gases. Until the gases are being used as a renewable energy resource the gas shall be flared rather than vented. Response: Confirmed. A flare will be located at the project site to flare biogas/renewable natural gas until ready for loadout to trucks for injection to a pipeline to be used as a renewable energy source. The flare P&ID is included as Attachment 3. A proposed schedule for gas production and utilization is also included. Gas Generation Estimate — Please submit an estimate for the daily volume of biogas to be generated by the proposed Digester. Response: A Startup and Commissioning Plan (O&M Plan) is included as Attachment 4. The Plan includes gas production estimates. Site Map — Please provide a clearer site map for the facility including existing and proposed structures. Please include locations of well, emergency flare, biogas upgrading system, and biogas transfer station. Indicate all applicable setbacks (i.e., 100 feet from well). The drawings 22301-G-100 and 223100-G-110 are difficult to read. Response: Electronic versions of the figures are included as Attachment 5 which should provide requested detail with better resolution than the printed hard copies. Utilities — Please provide a diagram/map indicating location of utilities, especially overhead utilities, with respect to the farm digester system. Please confirm that flare locations comply with appropriate setbacks for utilities. Response: Electronic versions of the figures are included as Attachment 5 which should provide requested detail with better resolution than the printed hard copies. Overhead power and utilities are shown. Previous relocation plan is also included. 100-Year Floodplain — Please provide a map showing the location of the farm digester system and the 100-year floodplain. No component of a farm digester system may be constructed in the 100-year floodplain. Response: Floodplain maps reflecting location of the digester in Zone X are included as Attachment 6. Reception Pit Overflow — Please verify that the design for the reception pit includes overflow protection and that any overflow would go to the waste lagoon. SustinRN Response: Electronic versions of the figures are included as Attachment 5 which should provide requested detail with better resolution than the printed hard copies. Pit overflow goes to the existing pond. Condensate — Please indicate intended disposal of condensate from the biogas upgrading system. Response: Electronic versions of the figures are included as Attachment 5 which should provide requested detail with better resolution than the printed hard copies. Condensate goes to the existing pond. Secondary Containment — Is secondary containment planned for any part of the farm digester system? With the proximity to surface waters and the municipal water intake downstream, you are strongly encouraged to consider the use of secondary containment for the reception pit and any other areas you deem appropriate. Response: Electronic versions of the figures are included as Attachment 5 which should provide requested detail with better resolution than the printed hard copies. Manure overflows from the digester system are designed to flow to the existing pond. Leachate/Waste Milk — Will silage leachate and/or waste milk be introduced to the digester system? If so, into which structure — digester or lagoon? Response: Silage leachate and waste milk are not planned for processing in the digester. Waste milk and silage leachate will follow current management practices and/or would flow to the pond and not the digester. Safety — Please provide specifications regarding safety. Will there be biogas pressure release valves? What precautions are being taken with respect to hydrogen sulfide? Please include information regarding safety signage. Response: A Startup and Commissioning Plan (O&M Plan) is included as Attachment 4. The Plan includes safety for H2S. Signage will follow NRCS 366 and applicable standards. Pressure relief devices are shown on the P&IDs. Influent/Effluent Sampling — Please indicate location for sampling of influent to and effluent from each digester. Response: A Startup and Commissioning Plan (O&M Plan) is included as Attachment 4. The Plan includes locations for applicable sampling. Operation and Maintenance (O&M) Plan —The O&M Plan should be updated for the new farm digester system. Please refer to NC NRCS Standard 366-Anaeorbic Digester for the minimum information to include. As noted in our discussion today, the O&M Plan should address any new areas for routine inspection by the operator; the specific example from our conversation today was to checking diversions and stormwater flows for signs of erosion or overflow into waste structures. Checking drains and overflow pipes is also recommended. O&M Plan should also address any safety concerns and methods related to the farm digester system. SustaAlinRNG Response: A Startup and Commissioning Plan (0&M Plan) is included as Attachment 4. Odor Control Checklist — Thank you for including your Odor Control Checklist. The Cattle Odor Control Checklist Form was updated in 2023. While not required, you are strongly encouraged to utilize the updated form. I am enclosing a copy for your convenience. Response: Received. The updated form will be utilized as necessary. Air Quality Permitting — Please provide information regarding any Air Quality permits, and/or applicability determinations regarding this project. Please provide information about if applications have been filed, permits (if issued), and/or results of an applicability determination. This includes any permits for the Biogas Upgrading System Response: A Permitting Applicability Determination letter dated January 9, 2024 from the Division of Air Quality indicating that the facility is exempt from permitting is included as Attachment 7. Please include the expected timeline regarding construction of digester system and utilization of gas as a renewable energy resource. Please confirm that timeline also complies with Session Law 2023-63. Response: A proposed schedule for construction, gas production, and utilization is also included in Attachment 3. Please verify a flare would be available and used if necessary for compliance with Session Law 2023-63. Response: Confirmed. A flare will be located at the project site to flare biogas/renewable natural gas until ready for loadout to trucks for injection to a pipeline to be used as a renewable energy source. The flare P&ID is included as Attachment 3. A proposed schedule for gas production and utilization is also included. During the site visit on January 16, 2024, additional detail was requested regarding the digestate piping design and construction associated with the digestate line into the pond in order to ensure that erosion or other destabilizing mechanisms were addressed with an anti -seep collar. Response: Electronic versions of the figures are included as Attachment 5 which should provide requested detail for the anti -seep collar for piping into the pond. Please do not hesitate to contact us if you have any questions or need any additional information. Best Regards, p.p Charles Kontz, SRNG-Beam, on behalf of Beam Dairy SustainRNG Attachments cc: Mr. Darrell Hill, SustainRNG Mr. Josh Cunningham, Cunningham & Associates Mr. Charles Kontz, SustainRNG Attachment 1 Revised Farm Digester Application Form R GENERAL INFORMATION: 1.1 Facility name: Beam Dairy 1.2 Print Owner's name: John P Beam IV 1.3 Mailing address: 3058 Johnstown Rd. City, State: Cherryville, NC Zip: 28021 Telephone (include area code): ( 704 ) 300 - 9642 Fax: (_) - Email: jpbeam4(c_yahoo.com • Physical address: 3025 Johnstown Rd. City, State: Cherryville, NC Zip: 28021 Telephone number (include area code): ( 704 ) 300- 9642 Latitude 35.427127729303030' Longitude-81.37595796987598' (Decimal Degrees from Google Earth) 1.5 County where facility is located: Lincoln 1.6 Facility location (directions from nearest major highway, using SR numbers for state roads): From Hwy 321 in Licolnton take exit 24 W onto NC-27 W/NC-150 for 1.8 miles. Turn right onto W Main St for 0.3 miles. Continue to NC-27 W for 0.9 mi. Sharp left towards NC-182 W for 100 ft then turn right onto NC-182 W for 5.7 mi. left onto Johnstown Road for 2.2 mi 1.7 Farm Manager's name (if different from Landowner): Same_ 1.8 Lessee's / Integrator's name (if applicable; circle which type is listed): N/A 1.9 Facility's original start-up date: 1990 Date(s) of facility expansion(s) (if applicable): 2000, 2006, 2019 1.10 Design Contact name: Michael Shepherd Phone (339) 940-8901_Email: OPERATION INFORMATION: • Facility number: 55-0007 2.2 Operation Description: Please enter the Design Capacity of the system. The "No. of Animals" should be the maximum number for which the current swine waste management system is permitted. Tyne of Swine No. of Animals Tune of Poultry No. of Animals Tyne of Cattle No. of Wean to Feeder Layer Beef Brood Cow Feeder to Finish Non -Layer Beef Feeder Farrow to Wean (# sow) Turkey Beef Stocker Calf Farrow to Feeder (# sow) Turkey Poults Dairy Calf 100 Farrow to Finish (# sow) Dairy Heifer 70 Wean to Finish (# sow) Dry Cow 250 Gilts Milk Cow 1400 Boar/Stud Other Type of Livestock on the farm: No. of Animals: 1820 2.3 Acreage cleared and available for application (excluding all required buffers and areas not covered by the application system): 632.5 Acres Required Acreage (as listed in the CAWMP): 210 Acres Existing Application Area (pre -construction): 632.5 Acres Proposed Application Area (post -construction): 632.5 Acres Is there a change to the existing WUP? YES or NO (circle one) Is the Existing WUP attached? YES or NO (circle one) Is the New (if applicable) WUP attached? NA YES or NO (circle one) List and Describe all Storage/Treatment Structures Below: • DIGESTER or other PRIMARY TREATMENT: (double click on "Select" for drop -down menu box) Treatment Existing. Name of Type of Type of Ttl Capacity p Re 'd Capacity q Unit Type (Y/1) Treatment Liner Surface Area Cover (cu. Ft.) (cu.ft.) Unit Material Material N DVO 11,664 186,624 NA Plu flow Y Screw NA NA NA Press N DAF 172.5 6,154.76 NA a.1 Are engineering designs, drawings, specifications, and details attached? YES or NO (circle one) b. SECONDARY TREATMENT/STORAGE: (double click on "Select" for drop -down menu box) Name of Storage Unit Existing? (Y/N) Type of Liner Material Surface Area Ttl Capacity (cu. Ft.) Req'd Capacity (cu.ft.) 1Lower Y 16,610.5 156,132 2Upper Y 36,985.3 327,452 3-Field Y 38,186.4 376,893 MRP Y Other 400 7,185 Total 867,662 755,898 2.5 Are KNOWN subsurface drains present within 100' of any application fields? one) 2.6 Are KNOWN subsurface drains in the vicinity or under the waste management system? one) • Does this facility meet all applicable siting requirements? YES or NO (circle YES or NO (circle YES or NO (circle one) • Describe Water Movement between Barns, Digesters, and Storage Ponds (double click on "Select" for drop -down menu box) Pump Station or Minimum Pump Plan Sheet Location Gravity pipe Size Ca aci Reference GPM TDH Pump Station 6-in 264 11 22301 -G-100 P-001 Pump Station 6-in 264 11 22301-G-100 P-001 22301-G-100 Pump Station 6-in 264 11 P-001 22301-G-100 Pump Station 6-in 264 11 P-001 22301-G-100 Pump Station 6-in 43 11 P-001 22301-D-002 Pump Station 3-in 43 11 DO1-00047-04 P-003 22301-D-002 Pump Station 3-in 43 11 D01-00047-04 P-003 Permit AWC55- 0007-1 Pump Station 4-in 264 11 22301-G-100 22301-D-002 DO1-00047-04 P-003 3. REQUIRED ITEMS CHECKLIST: Please indicate that you have included the following required items by signing your initials in the space provided next to each item. Applicant's Initials 3.1 One completed and signed original of the application for Digester Animal Waste Management System Application Form. JPB 3.2 A general location map indicating the location of the animal waste facilities and field locations where animal waste is land applied and a county road map with the location of the facility indicated. JPB 3.3 Documentation that new digester structure(s) meets the Swine Farm Siting Act, for swine operations. NA -NOT A SWINE OPERATION 3.3.1 Site Map. The scale of this map shall not exceed 1 inch = 400 feet. 3.3.2 All proposed digesters to occupied residences > 1500 feet OR no closer than existing setback. Existing setback = feet 3.3.3 All proposed digesters to schools, hospitals, churches, outdoor recreational facilities, national parks, state parks, historic properties, or childcare centers >_ 2500 feet OR no closer than existing setback. Existing setback = feet 3.3.4 All proposed digesters to property boundaries >_ 500 feet OR no closer than existing setback. Existing setback = feet 3.3.5 All proposed digesters to Public Water supply wells >_ 500 feet. 3.3.6 The map shall show the location of any property boundaries and perennial streams, or rivers located within 75 feet of waste application areas. 3.3.6 The map shall show the location of any property boundaries and perennial streams, or rivers located within 75 feet of waste application areas. 3.4 One copy of all engineering documents, including, but not limited to, calculations, JP B equipment specifications, plan and profile drawings to scale, construction materials, supporting equations or justifications. • A detailed narrative of the Farm Digester Animal Waste Management System. JPB 3.6 A copy of the CAWMP which must include the following components. Some of these components may not have been required at the time the facility was initially certified but must be added to the CA TrTlMP for permitting purposes: JPB • The Waste Utilization Plan (WUP) must include the amount of Plant Available Nitrogen (PAN) produced and utilized by the facility • The method by which waste is applied to the disposal fields (e.g., irrigation, injection, etc.) • A map of every field used for land application • The soil series present on every land application field • The crops grown on every land application field • The Realistic Yield Expectation (RYE) for every crop shown in the WUP • The PAN applied to every application field = The waste application windows for every crop utilized in the WUP The required MRCS Standard Specifications • A site schematic • Emergency Action Plan • Insect Control Checklist with chosen best management practices noted • Odor Control Checklist with chosen best management practices noted • Mortality Control Checklist with the selected method noted 3.6.1 S Lagoon/storage pond capacity documentation (design, calculations, etc.); please be sure to include any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility • Site Specific Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (Composting, waste transfers, etc.) 4. EN INEER' S CERTIFICATION: I t � 3k, V/- (P.E. representing Owner's name listed in question 1.2), attest that this appli has been reviewed by me and is accurate a parts of this application are n a,t completed included, th' p i ion ae ge ill be �� (Facility name listed in question 1.1) complete to the best of my knowledge. I understand that if all required Iffiat if #11 required supporting information and attachments are not incomplete. DateE 5. FARM OWNER/PERMITTEE CERTIFICATION: I, John P. Beam (Owner/Permittee name listed in question 1.2), attest that this application for Beam Dairy (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Cinnofi.ra —Date 1-12-24 6. MANAGER'S CERTIFICATION: (complete only if different from the Farm Owner) I, (Manager's name listed in question 1.7), attest that this application for (Facility name listed in question 1.1) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned as incomplete. Signature Date THE COMPLETED APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION ANIMAL FEEDING OPERATIONS PROGRAM 1636 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1636 TELEPHONE NUMBER: (919) 707-9129 ELECTRONIC SUBMISSION IS ENCOURAGED. EMAIL TO: RAMESH.RAVELLA@NCDENR.GOV 7. SURFACE WATER CLASSIFICATION: This form must be completed by the appropriate DWR regional office and included as a part of the project submittal information. INSTRUCTIONS TO NC PROFESSIONALS: The classification of the downslope surface waters (the surface waters that any overflow from the facility would flow toward) in which this animal waste management system will be operated must be determined by the appropriate DWR regional office. Therefore, you are required, prior to submittal of the application package, to submit this form, with items 1 through 6 completed, to the appropriate Division of Water Resources Regional Operations Supervisor (see page 6 of 6). At a minimum, you must include an 8.5" by 11" copy of the portion of a 7.5-minute USGS Topographic Map which shows the location of this animal waste application system and the downslope surface waters in which they will be located. Identify the closest downslope surface waters on the attached map copy. Once the regional office has completed the classification, reincorporate this completed page and the topographic map into the complete application form and submit the application package. 7.1 Facility Name & Number: 7.2 Name & complete address of engineering firm: Telephone: ( ) Email: 7.3 Name of closest downslope surface waters: Fax: ( ) 7.4 County(ies) where the animal waste management system and surface waters are 7.5 Map name and date: 7.6 NC Professional's Seal (If appropriate), Signature, and Date: TO: REGIONAL OPERATIONS SUPERVISOR Please provide me with the classification of the watershed where this animal waste management facility will be or has been constructed or field located, as identified on the attached map segment(s): Name of surface waters: Classification (as established by the Environmental Management Commission): Proposed classification, if applicable: Signature of regional office personnel: (All attachments must be signed) DIVISION OF WATER RESOURCES REGIONAL OFFICES (4/2020) Date: Asheville Regional WQROS Supervisor Washington Regional WQROS Supervisor Raleigh Regional WQROS Supervisor 2090 U.S. Highway 70 943 Washington Square Mall 1628 Mail Service Center Swannanoa, NC 28778 Washington, NC 27889 Raleigh, NC 27699-1628 (828)296-4500 (252)946-6481 (919)791-4200 Fax (828) 299-7043 Fax (252) 946-9215 Fax (919) 571-4718 Avery Macon Beaufort Jones Chatham Nash Buncombe Madison Bertie Lenoir Durham Northampton Burke McDowell Camden Martin Edgecombe Orange Caldwell Mitchell Chowan Pamlico Franklin Person Cherokee Polk Craven Pasquotank Granville Vance Clay Rutherford Currituck Perquimans Halifax Wake Graham Swain Dare Pitt Johnston Warren Haywood Transylvania Gates Tyrell Lee Wilson Henderson Yancey Greene Washington Jackson Hertford Wayne Hyde Fayetteville Regional WQROS SupervisorMooresville Regional WQROS Supervisor Wilmington Region WQROS Supervisor 225 Green Street, Suite 714 Fayetteville, NC 28301-5094 (910)433-4300 Fax (910) 486-0707 Anson Moore Bladen Richmond Cumberland Robeson Harnett Sampson Hoke Scotland Montgomery 610 East Center Avenue Mooresville, NC 28115 (704)663-1699 Fax (704) 663-6040 Alexander Lincoln Cabarrus Mecklenburg Catawba Rowan Cleveland Stanly Gaston Union Iredell Winston-Salem Regional WQROS Supervisor 450 Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Phone (336) 776-9800 Fax (336) 776-9797 Alamance Rockingham Alleghany Randolph Ashe Stokes Caswell Surry Davidson Watauga Davie Wilkes Forsyth Yadkin Guilford 127 Cardinal Drive Extension Wilmington, NC 28405-3845 (910)796-7215 Fax (910) 350-2004 Brunswick New Hanover Carteret Onslow Columbus Pender Duplin Attachment 2 Tax Parcel Map Lease Agreement Lincoln County, NC Office of the Tax Administrator, GIS Mapping Division Lincoln County and its mapping contractors assume no legal responsibility for the information contained on this map. This map is not to be used for land conveyance. The map is based on NC State Plane Coordinate System 1983 NAD. Date: 1/16/2024 K• 10830 1287 M 649 f YY�ry� 10519 "4 I ��•Y � � �'`^'k i � •�. 5 ff f 51287 ` 7.17 M1313 t 4 Parcel ID M649 Owner BEAM DAIRY LLC Map 2691 Mailing 3058 JOHNSTOWN RD Account 0210211 Address CHERRYVILLE,NC 28021-9163 Deed 1111 111 Last Transaction Date 06/28/2019 Sale Price $0 Plat Subdivision Lot Land Value $0 Improvement Value $12,789 Total Value $12,789 Previous Parcel -----All values for Tax Year 2023 ----- Description 1987 14 X 72 FLEETWOOD Deed Acres 0 Address 2822 JOHNSTOWN RD Tax Acres 0 Township HOWARDS CREEK Tax/Fire District CROUSE Main Improvement MANUFACTURED HOME Value $12,789 Main Sq Feet 1008 Stories 1 Year Built 1987 Zoning District Calc Acres Voting Precinct Calc Acres Watershed Not in a watershed Sewer District Census County Tract Block Not in a watershed Flood Zone Description Panel Not in a Floodzone BK 3240 PG 173 - 176 (4) DOC# 665651 This Document eRecorded: 04/06/2023 04:07:31 PM Fee: $26.00 DocType: M/LSE Tax: $0.00 Lincoln County, North Carolina Danny R. Hester, Register of Deeds MEMORANDUM OF LEASE PREPARED BY AND RETURN TO: Sustain RNG, LLC c/o James W. Wallace, Esq. 1447 South Tryon St. Ste, 301 Charlotte, NC 28203 STATE OF NORTH CAROLINA COUNTY OF LINCOLN This Memorandum of Lease is entered into this 31 st day of March, 2023, by and between Beam Landholding, LLC, a North Carolina limited liability company ("Lessor') and SRNG- Beam, LLC, a Delaware limited liability company ("Lessee'), pursuant to which Lessor has demised to Lessee, and Lessee has accepted such demise from Lessor pursuant to a Lease Agreement dated March 30, 2023 (the "Commencement Date"), as may be amended from time to time (the "Lease"). Leased Property: A portion of 3058 Johnstown Road, Cherryville, NC 28021, which is more particularly described on Exhibit A attached hereto and made a part hereof. 2. Initial Term: The initial term of the Lease, shall commence on the Commencement Date and shall expire fifteen (15) years after the Commercial Operation Date (as defined in the Lease), unless sooner terminated as set forth in the Lease. 3. Renewal terms: Two (2) additional periods of Five (5) years each. 4. Easements: Lessor grants Lessee certain easements on the Leased Property for access, construction, utilities, maintenance, repair, replacement, and other related uses, as are -more-fully-set forth in the -Lease. The purpose of this Memorandum of Lease is to give reebrd notice of the Lease and of the rights created thereby, all of which are hereby confirmed and alf terms of which are incorporated into this Memorandum of Lease by reference, including the defined terms of the Lease. submitted electronically by "The Deaton Law Firm, PLLC" in compliance with North Carolina statutes governing recordable documents and the terms of the submitter agreement with the Lincoln County Register of Deeds. BK 3240 PG 174 DOC# 665651 This Memorandum of Lease may be executed in any number of counterparts, each of which shall constitute an original and all of which, when taken together, shall constitute one instrument. IN WITNESS WHEREON, the parties have executed this Memorandum of Lease as of the date first above written. LESSOR: Beam Landholding, LLC ' �, Title:..� STATE OF NORTH CAROLINA COUNTY OF LINCOLN I, the undersigned, a Notary Public of the State and County aforesaid, do hereby certify that �a�j() P {3 , 9 V , the lylttb ] M v [insert title] of 4 hQ f L , CLL personally appeared before me his day and acknowledged the due execution of the foregoing instrument for the purpose stated therein and in the capacity indicated. Witness my hand and official stamp or seal this day of l , 20C3 [AFFIX NOTARY SEAL - NOTE THAT SEAL MUST BE FULLY LEGIBLE] BK 3240 PG 175 DOC# 665651 LESSEE: SRNG-Beam, LLC By• N Ge73­4n es W. IV a ace Ti ' e President STATE OF NORTH CAROLINA COUNTY OF MECKLENBURG I, the undersigned, a Notary Public of the State and County aforesaid, do hereby certify that James W. Wallace, the Vice President of SRNG-Beam, LLC personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purpose stated therein and in the capacity indicated. Witness my hand and official stamp or seal this 30th day of March, 2023. Aak* A RANDEE S COHEN tary Public NOTARY PUBLIC (official signature of Notary) Mecklenburg County North Carolina My Commission Expires August 29, 2027 Ir- (Official Seal) Randee S. Cohen (Notary's typed or printed name) My commission expires:August 29, 2027 [AFFIX NOTARY SEAL - NOTE THAT SEAL MUST BE FULLY LEGIBLE] BK 3240 PG 176 DOC# 665651 EXHIBIT A The Project Site is located within a parcel of real property more particularly described in Deed Book 2379, Page 744 of the Lincoln County Register of Deeds and visually identified by the red dashed bordered area in the pictorial below. The Project Site location is centered at 35.4271301 North,-81,3771618 West. THIS MAP MAY NOT BE A CERTIFIED SURVEY AND HAS NOT BEEN REVIEWED BY A LOCAL GOVERNMENT AGENCY FOR COMPLIANCE WITH ANY APPLICABLE LAND DEVELOPMENT REGULATIONS AND HAS NOT BEEN REVIEWED FOR COMPLIANCE WITH RECORDING REQUIREMENTS FOR PLATS. Attachment 3 Flare MID Project Schedule VAPOR INLET VAPOR INLET 3" *FA3 IGNITION PANEL (MODEL: DSI) NOTES: 1. NO POCKETS 2. 300 BTU/SCF MIN * SUPPLIED BY HERO FLARE REV SRNG-Beam Schedule Gantt Sustain RNG 1447 South Tryon Street, Suite 301 SustainRNG Charlotte 28203 SRNG-Beam 3058 Johnstown Road Cherryville 28021 Exported on: 1/15/2024 at 8:02 PM EST Page 1 of 1 Data Updated: 10/2/2023 Attachment 4 Startup and Commissioning Plan (O&M Plan) Sust �inRN� SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN EXECUTIVE SUMMARY This document provides a succinct narrative for commissioning and startup activities for the Beam Dairy Anaerobic Digestion and Renewable Natural Gas production. The scope of the Commissioning activities covered by this document includes the following systems: • Explanation of purpose and Process • Overall Process Flow • Equipment provided • Automation provided • Activities and sequenced needed to put system into operation. • Instructions for specialized steps. • Theory of operation and biochemical principles are provided in a separate Operations and Maintenance Manual. Page 1 of 10 SuSt �inRNG SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN I) Introduction: A) Purpose: In a Concentrated Animal Feeding Operation (CAFO) such as the modern dairy farm, the amount of cow manure generated is substantial and must be properly handled and disposed in order to maintain the necessary hygienic conditions in the barn areas. This project will use anaerobic digestion to convert all of the manure at the Beam Dairy, 3058 Johnstown Road, Cherryville, Lincoln County, North Carolina, into biogas which can be purified for injection into the gas grid as "Renewable Natural Gas," abbreviated as RNG. The process flow diagram is shown in figure 1. The project location and site plan are shown in figures 2 and 3, respectively. As of September, 2022 the Beam farm has Holstein Lactating Cows, Jersey Lactating Cows, and 100 dry cows for a total of 1700 cows. The manure generated by the herd is equivalent to 1650 wet cows An engineering Mass and Energy Balance (MEB) has been prepared and the calculations predict that the project will generate energy in the following quantities: 1) Biogas production: 179,543 scfd (standard cubic feet per day) 2) Biogas production: 125 scfm (standard cubic feet per min) 3) Methane (CH4) production: 75 scfm (standard cubic feet per min) 4) Methane (CH4) production: 103,643,398 MMBtu/Day (million BTU per day) 5) Methane (CH4) Per cow basis: 0.063 MMBtu/Day/Cow B) The project consists of two (2) major subsystems: Page 2 of 10 SuSt �inRNG SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN 1) The anaerobic digester (AD) is provided by DVO Inc of Chilton, Wisconsin https://www.dvoinc.com/ The DVO digester is an inground concrete rectangular tank operated as a plug -flow reactor. (Plug flow moves from inlet to outlet without changing direction. The plug flow technology is robust and simple to operate.) The AD encloses the biological process which breaks down manure and produces biogas — a mixture of methane, carbon dioxide and small amounts other gases. The methane is the intended product and the other gases are impurities. 2) The biogas upgrade system (BUS) is provided by Galileo Technologies of Middlesex, NJ https://www.,galileoar.com/us/about-us-2/ The BUS separates the methane from the other gases and compresses the methane to high pressures for transportation to an offsite location where it can be injected into the gas grid. 3) Construction: DVO and Galileo each provide equipment and support the construction, installation and startup of operations. 4) Start-up will consist of testing every piece of equipment in a logical sequence and then slowly running equipment simultaneously to enable all processes to operate together. When all equipment is operating as a system the loading will be increased until full loading is achieved. The system will be monitored for performance parameters. C) Interim Operations: The biological process of anaerobic digestion can be started and operated independently of the purification process to generate RNG. The biological process is more complex and requires more operator attention so it will be started first at a low rate and then increased to a level where the RNG purification can be started. The biological process has a turnup/turndown range of 0-100% The Galileo biogas Upgrade system has a turnup/turndown range of 50-100%. D) Through the dairy optimization process, not only is energy created, but targeted nutrients are conserved, and the water used in the process is recycled for continual use on the farm, creating a closed cycle sustainable operation allowing for the dairy to be in harmony with the environment. The effluent (digestate) remaining after energy recovery is essentially unchanged with regard to the quantity of liquid but the total nutrients contained in the liquid will be substantially lower following post AD treatment. With the phosphorus removal treatment aspect of the post AD treatment, the fertilizer value of the digestate is improved for nearby field application. The digestate also has much lower associated odor than the undigested manure. E) The content of this document assumes that the facility construction is performed by individuals competent in the relevant trades and the commissioning and startup staff are professional technicians with relevant education and training and career experience in the operation and maintenance of systems for treating water, wastewater, manure, etc. Therefore, the content of this manual will be adequate for such Page 3 of 10 SuSt �inRNG SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN professional staff while omitting extraneous detail and avoiding verbosity. II) Resources: Commissioning and Start-up of the system will be carried out under the direction and approval of SRNG staff, coordinated by the following resources: A) Owner — Sustain RNG — personnel and responsibility: 1) Rick Wilcox - CEO 2) Jamie Wallace - Chief Legal Officer 3) Charles Kontz - Strategy & Development Manager 4) Randee Cohen - Administration 5) Danny Hertz — Gas Assets B) Beam Dairy Farm C) Contractors and Project Manager — Global Construction Group, LLC 1) Electrical & Instrumentation Subcontractor — D) Manufacturers' Representatives. 1) DVO Inc. 2) Galileo Technologies E) Consultants reporting to Sustain RNG and responsibility: 1) Bob Hickey; Bob.Hickeyksustainrng com; 585-746-2866; Lead AD 2) Mike Shoemaker; Mike. Shoemaker(c�r�,sustainrng com; (404) 808-6300; Lead AD 3) Mike Hickey; mike.hickagsustainrnacom; 517-281-2965; MEB/Analytics 4) Jim Wallace; Jim.Wallace(cr�,sustainrng com; (517) 614-2007; Lead Nutrient Recovery 5) John Kouba; John.Kouba(asustainrngcom; (414) 704-9025, AD/O&M Support 6) Tom Getz; tom.getz(csustainrng com; 812-345-3717; O&M III) Process Summary. The flow through the entire system is depicted in the Block Flow Diagram Figure. There are the major unit processes which are central to the flow and treatment of the manure through the system. All of these have associated instruments and ancillary equipment Page 4 of 10 SuSt �inRNG SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN which enables the entire system to run concurrently. The major unit processes and functions are as follows: A) The farm has 6 barns referred to as Barns 1 through 6. The western barns, Barns 1, 2 and 3 are scraped into new pumping stations which move the liquid to the main existing pump station with mixing agitation. B) The existing pump station receives flushed manure from Barns 1, 2 and 3, and is agitated with mixing to prevent settling and transfers the mixed liquid manure to the Digester Reception Pit at the project site. The mixed liquid is then heated with heat exchangers and pumped to the digester C) The heat exchangers use warm effluent from the digester to preheat the manure before it enters the digester. D) The digester is a horizontal, in -ground, tank with a hydraulic residence time of 22 days. The digester technology is provided by DVO Inc, 820 W Main St, Chilton, WI. DVO has supplied 140 on -farm anaerobic digestion systems world-wide since 1999. The DVO portion of the project is being supplied on a turn -key basis. 1) Hydraulic pattern: The liquid moves in a plug flow manner meaning that the material entering on a given day will theoretically leave as effluent 22 days later. The plug flow design does not mix the tank longitudinally. 2) Heating: there are additional heating loops within the digester to maintain the manure temperature at 101 °F which is considered ideal for the microbes. 3) Anaerobic digestion: Specialized bacteria convert degradable material in the manure to biogas which is a mixture of approximately 60% methane and 40% carbon dioxide plus traces of other gases. 4) Configuration: The digester tank is 16 ft overall height; 14ft to top the of water level; 162 ft long and 72 ft wide ; 1,220,000 gallons liquid volume; 1,400,000 gallons total volume including the gas headspace. 5) The digester is designed so the plug flow proceeds first in one direction and then passes around a separator wall and returns in the opposite direction. In the waste treatment profession, this type of digester technology is known for accepting high concentrations of suspended solids. It will produce biogas from both dissolved organic constituents and suspended particles. E) Process Boiler: The process boiler is a water heater which provides hot water to warm the digester. F) Biogas Upgrade System: Modular system that removes hydrogen sulfide and carbon dioxide from the biogas stream to create pipeline quality RNG. This system also includes a compressor to inject the pipeline quality RNG into tube trailers for transport to the interconnect facility. This system has a turndown:tumup ratio of 50:100% Page 5 of 10 SuSt �inRNG SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN G) Post AD treatment: AD digestate will first be treated with a screw press to remove fibrous solids which the farm will utilize as bedding for the dairy cows. Next, the liquid digestate stream from the screw press will be treated with a cationic polymer to enhance separation of suspended solids from the liquid digestate stream in a dissolved air floatation (DAF) system. Much research has shown that the system removes the majority of phosphorus from the digestate stream going back to the farm's lagoons. Following this, the cleaned digestate stream will flow back to the farm's lagoons to be stored and land applied. H) Separated solids are returned to the barns for bedding. Separated effluent is sent to a lagoon for storage prior to land application. I) SCADA: Supervisory control and Data Acquisition is the multi -component system of automation comprised of PLCs (programable logic controllers - industrial computers,) personal computers, instruments, data communication functions and the site -specific computer code that enables the entire system of components from different sources to function automatically, control facility equipment and maintain historical records of all process measurements. These PLCs all communicate through a network that enables all processes to be monitored and controlled from computer workstations at the facility or a remote off -site device. J) Flare system and controls to destroy biogas or RNG during startups and malfunctions: The flare piping is equipped with meters to track flare gas flow. IV) Ancillary equipment: Those equipment items which are between the major unit processes but do not provide actual treatment or processing including pumps, instruments, blowers. V) General Sequence of Startup - certain processes cannot be operated until supporting processes are ready. The following is the general sequence for startup. The expected durations for certain steps are listed in table 1 A) All liquid and solid handling systems must be operational and piping leak tested. B) Flare burner and controls and flashback protection must be functional. C) Process boiler must be functional. D) Anaerobic Digester filling and loading. 1) Fill AD with liquid manure which has been diluted to 10% total solids. Page 6 of 10 SuSt �inRNG SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN 2) The DVO digester effluent structure has a underflow baffle and overflow baffle in series to create a gas seal in the top of the digester. When manure spills over the overflow baffle the digester is sealed. 3) Heat the digester at 2°F per until the temperature reached 101 'F. Biogas production will gradually increase as the temperature increases. 4) Begin loading the digester at 25% of loading and increase in daily increments of 5%. 5) Pass biogas to flare until quantity reaches 80 scf at which point the biogas upgrade system can be started. E) Biogas separation. The Galileo system can be started when raw biogas generation reaches 50% of the system capacity. VI) Staffing and Manpower A) Beam Dairy Farm employees will operate and maintain the barn scraping and liquid manure pumping stations. B) SRNG will operate and maintain the heating and anaerobic digestion and biogas upgrade systems. One full time employee is intended for this work with occasional backup from regional employees. (a) SRNG employees are required to observe all safety precautions including: (i) Safety signs at designated areas outlining potential safety concerns (ii) Wear personal H2S monitors in gas upgrading area (b) SRNG employees are required to monitor the operation for environmental impacts including: (i) Check that all water sources are discharging to proper locations (ii) Retaining ponds integrity are intact (iii) No ground erosion from rain water runoff (iv) Applicable influent sampling to be conducted at PT-5 Digester Reception Pit (v) Applicable effluent sampling to be conducted at dissolved air floatation (DAF) discharge P-9 to Pond 001. C) The Beam Dairy Farm employees will operate and maintain the effluent screw press and dissolved aeration separators. Page 7 of 10 SuSt �inRNG SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN Figure 1 Beam Dairy Anaerobic Digester and RNG Process RxP 6 N1S REUMAI �,� p s � LNG Wc�eil vG omcn Awe LkF IY}YK /`% rFr.H�G 401GCE PUW SL%TW gCGSR]3Y PP 1V M%NG 1EN F%GwLER R�.G RA PWP L LAWplS J LAxO APPICPIgNI, SOlsPF] xnrvuR[ g � 9Y FAPo/ I, I 11 11 y PLMP ES � Ilg 8Y @Idl II NESI 9%Rv � I SCRn�E] xnrvuRC I , FMY OERhxW. nrtM d.4�x NxuE M Bnrs 49F.�6 Page 8 of 10 SuSt �inRNG SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN Figure 2 Site Location Sustain R NG — CONFIDENTIAL AND PROPRIETARY --------------- I f �enrilk HC 3.7' D}ie]wrUSES b:A9} t nmmemvlest N[xs kfLISGSWig) FIGURE 1—SfTE LOCATION MAP Sustain RN G 3078 JOH NSTD•WN RD BEAM DAIRY {HERRYYILLE, ur4comcoUN7Y, w igmiz1 AIIGUSf3A22 37.427EE131. -a1.3797276 ' By: F—tsird Emi—.fti,. u[ Page 9 of 10 Sust inRNG Figure 3 Site Plan SRNG Beam Dairy FACILITY COMMISSIONING & STARTUP PLAN H Ra,�RO EXISTING PIT •1 —� EXISTING PIT— r � � � � xy i eARw soo 1 BARN UG all 3Lw BARN 10a /, I NEW PIPING NEWPIT AND PUN P B'OIA. EARN 200 NEW PIT AND PUMP r DIA NEW PIPING EAISTING PIT 2D'X2d HMPIPING _ EIOEo1f AISKIDS Z 90'X45'PRD — — — EARN 60 PARLOR _ — J EK1511 NG DRAIN LINE TOM 'TING E%ISTING SEPTIC FIELD PARLOR LIN6•. / 1R%4v DVO EOUIPMENT ROOM — 4vx4 GAF&SCREW PRE34, X W� 40' _ SEPARATOR SOLIDS PRER ---_--- 4Dx4n WASTEWATER RETURN LINES DIGESTER BIIILDINC 46 x13R ENCM41Pll R TO CONTROL 81 W IRONROD W CAP—ag EIEY.E2S.17 PRoP TANK y .i 1B x 4' ITTP. 3j PROCESS FI nes �yy 5ffA'RPDIUB / DIGESTERFLARE � r 50'A'RPDINB DIGESTER BIDGA4 LINE _Yf DIGESTER 75x 1B4' DIGESTERHEATING F AND MMING LINES AARN766ORY Page 10 of 10 Beam Dairy Service Log Digester 1- Skid Pit Blower Clean Air Inlet Filter - Week Change Blower 011, Grease Motor and check belt Tension - Eve 4.6 Weeks Date Technician Name Hour Meter Reading Date Technician Name Hour Meter Reading Miscellaneous Service Work & Notes Date Technician Name Notes Beam Dairy Service Log Digester 1- Flame Arrestor Cleaning Log Flame Arrestor #1 Flame Arrestor #2 Date Cleaned Technician Name Method of cleaning Date Cleaned Technician Name Method of cleaning Miscellaneous Service Work & Notes Date Technician Name Notes Beam Dairy Service Log Hot Water System Rust & Corrosion inhibitor - Check Weekly 750.1,000 PPM Bag Filter - Clean/Replace Monthly or As Needed Date Technician Name PPM Concentration Level Date Technician Name Clean I Replace Miscellaneous Service Work & Notes Date Technician Name Notes Beam Dairy Service Log Digester 1- Gas Recirculation Blower - Service Interval 4-6 Weeks Check each box to signify service task was completed, if task was not performed leave box empty. Date Technician Name Hour Meter Reading Oil Change Motor Greased Motor/Blower Inlet particulate filter Pressure Switch Vacuum Switch Alignment cleaned Functioning Properly Functioning Properly Miscellaneous Service Work & Notes Date Technician Name Notes Beam Dairy Service Log Digester 1- Heating System Solenoids - Service Annually Zone 1 Zone 2 Zone 3 Date Technician Name Operational Operational Operational Cleaned & (YIN) Cleaned &Inspected (YIN) Cleaned &Inspected (YIN) Inspected Miscellaneous Service Work & Notes Date Technician Name Notes Beam Dairy Service Log Digester 1- Gas Mixing System Solenoids - Service Every 6 Months Zone 1 Zone 2 Zone 3 Zone 4 Date Technician Name Manual By- Manual By- Manual By- Manual By- Cleaned & pass Pressure Cleaned & Inspected pass Pressure Cleaned & Inspected pass Pressure Cleaned & Inspected pass Pressure Inspected Differential Differential Differential Differential Miscellaneous Service Work & Notes Date Technician Name Notes Attachment 5 Electronic Figures Id 0 = o ~ w O > F- ry 0 LU w U) co w O J U U) _ Lu m J OQ Z () J Z W W W z = (D F— Z F— W 2 < H Q (D _ Z U — Z_ z Z Z H U) U of } LU F- 0 L 00 w g = J F = Z F-_ Q U) L W_ J W d J 0-0 = U) U) U) W ry of W Q Z z O Q F- J Q Q W �= m l Z J W J LL � Z Z O Q U _j Lu J W F— N U � E O F- = U) H w =) Ur Q Q O ~ Z Q U) a — ry- w w U) F- =) z w O O U Z Z O O F— U U LL LU J Q — w O (Y 75 W = F--: H = O (� UY O z O Z U W U ry W I W U) z_ = (D F— Z Z_ W r-) 75 W_ Q 0 = OO m z � Z W Z U) =) CD z W O � w U) o Z Q0 F- _O ory a z F- O =) O Q = o O 11 LUz — w F- a R 1 n o n n r! E, n LJ I 1 !l LJ V LJ L 1 V 11 - - I I Beam Dairy Farm Digester System SustainRNG APPENDIX C Item 3.4 Beam Dairy Plans and Layouts 22301-G-100 22301-G-110 22301-G-11 Beam Dairy Digester System Process Flow Diagrams 22301-D-001 22301-D-002 22301-D-003 22301-D-004 22301-D-005 Beam Dairy Piping & Instrument Diagram Lift Pits P-001 P-002 P-003 Beam Dairy Equipment List Beam Dairy (Sustain RNG) Anaerobic Digester— DVO Drawings State Digester General Permit Application October 2023 Id 0 = o ~ w O > F- ry 0 LU w U) co w O J U U) _ Lu m J OQ Z () J Z W W W z = (D F— Z F— W 2 < H Q (D _ Z U — Z_ z Z Z H U) U of } LU F- 0 L 00 w g = J F = Z F-_ Q U) L W_ J W d J 0-0 = U) U) U) W ry of W Q Z z O Q F- J Q Q W �= m l Z J W J LL � Z Z O Q U _j Lu J W F— N U � E O F- = U) H w =) Ur Q Q O ~ Z Q U) a — ry- w w U) F- =) z w O O U Z Z O O F— U U LL LU J Q — w O (Y 75 W = F--: H = O (� UY O z O Z U W U ry W I W U) z_ = (D F— Z Z_ W r-) 75 W_ Q 0 = OO m z � Z W Z U) =) CD z W O � w U) o Z Q0 F- _O ory a z F- O =) O Q = o O 11 LUz — w F- a R 1 n o n n r! E, n LJ I 1 !l LJ V LJ L 1 V 11 - - I I e p 2 � ~ w O > H W Q w w U) U) w O ry J U) U �— Q U Lu m J O Q J Z J_ FY LLB } w w z = U F— Z F— w 2 < H Q O = z (D Z_ Q Z Z Z H M u) U W } LU F— z L D m w Q = J H p = Z F- Q U) Q ry LU J w J 0-0 =) U) U) U) w of G� w az Qoz J Q Q w p- m l Z J w J Q LL p Z Z O Q U J w F— N U ry O H 2 U H w Z) Q a0 F- Z Q U) a- G� w w U) F- =) z w =) � O ry O U Z Z O W Q F- U U LL LU — J Q w O of w = F� H = O C� G� Fy O a z O z U w O U Z o LUi LU u) z _ F- Z z LU— o � = p U O m Z LU Z LU� U U CD LLZ O W p U p Z S Q w d Z H O =) pz O Q = of O LL v) LUz- w = Q F- 0- 1 A M n n C C n LJ I I !l Li V L-1 L 1 V 1 1 - 9 11 I Id 0 = o ~ w O > F- ry 0 LU w U) co w O J U U) _ Lu m J OQ Z () J Z W W W z = (D F- Z F- W 2 < H Q (D _ Z U — Z_ z Z Z H U) U of } LU F- 0 L 00 w g = J F = Z F-_ Q U) L W_ J W d J 0-0 = U) U) U) W ry of W Q Z z O Q F- J Q Q W �= m l Z J W J LL � Z Z O Q U _j Lu J W F- N U � E O F- = U) H w =) Ur Q Q O ~ Z Q U) a — ry- w w U) F- =) z w O O U Z Z O O F- U U LL LU J Q — w O (Y 75 W = F--: H = O (� UY O z O Z U W U ry LLJ I LU (n z = (D F- Z Z_ W r-) 75 W_ Q 0 = OO m z � Z W Z U) =) CD z W O � w U) o Z Q0 F- _O ory a z F- O =) O Q = o O 11 LUz — w F- a R 1 A o r+ r% C C !- LJ I I !l LJ %., L., L_ 1 V I 1 9 11 11 I e p 2 � ~ w O > H W Q w w U) U) w O ry J U) U �— Q U Lu m J O Q J Z J_ FY w } w w z = U F— Z F— w 2 < H Q O = z (D Z_ Q Z Z Z H M u) U W } LU F— z L D m w Q = J H p = Z F- Q U) Q ry LU J w J 0-0 =) U) U) U) w of G� w az Qoz J Q Q w p- m l Z J w J Q Z p Z Z O Q U J w F— N U ry O H 2 U H w Z) Q a0 F- Z Q U) a- G� w w U) F- =) z w =) � O ry O U Z Z O W Q F- U U LL LU — J Q w O of w = F� H = O C� G� Fy O a z O z U w O U Z o LUi LU u) z _ F- Z z LU— o � = p U O m Z LU Z LU� U U CD w Z O W p U p Z S Q w d Z H O =) pz O Q = of O w v) LUz- w = Q F- 0- 1 A M r+ n C C f- LJ I I !l Li V L-1 L 1 V 1 1 - 9 11 I e p 2 � ~ w O > H W Q w w U) U) w O ry J U) U �— Q U Lu m J O Q J Z J_ FY w } w w z = U F— Z F— w 2 < H Q O = z (D Z_ Q Z Z Z H M u) U W } LU F— z L D m w Q = J H p = Z F- Q U) Q ry LU J w J 0-0 =) U) U) U) w of G� w az Qoz J Q Q w p- m l Z J w J Q Z p Z Z O Q U J w F— N U ry O H 2 U H w Z) Q a0 F- Z Q U) a- G� w w U) F- =) z w =) � O ry O U Z Z O W Q F- U U LL LU — J Q w O of w = F� H = O C� G� Fy O a z O z U w O U Z o LUi LU u) z _ F- Z z LU— o � = p U O m Z LU Z LU� U U CD w Z O W p U p Z S Q w d Z H O =) pz O Q = of O w v) LUz- w = Q F- 0- 1 A m r+ 11 C C f- LJ I I !l Li V L-1 L 1 V 1 1 - 9 11 I e p 2 � ~ w O > H W Q w w U) U) w O ry J U) U �— Q U Lu m J O Q J Z J_ FY w } w w z = U F— Z F— w 2 < H Q O = z (D Z_ Q Z Z Z H M u) U W } LU F— z L D m w Q = J H p = Z F- Q U) Q ry LU J w J 0-0 =) U) U) U) w of G� w az Qoz J Q Q w p- m l Z J w J Q Z p Z Z O Q U J w F— N U ry O H 2 U H w Z) Q a0 F- Z Q U) a- G� w w U) F- =) z w =) � O ry O U Z Z O W Q F- U U LL LU — J Q w O of w = F� H = O C� G� Fy O a z O z U w O U Z o LUi LU u) z _ F- Z z LU— o � = p U O m Z LU Z LU� U U CD w Z O W p U p Z S Q w d Z H O =) pz O Q = of O w v) LUz- w = Q F- 0- 1 A m r+ 11 C C f- LJ I I !l Li V L-1 L 1 V 1 1 - 9 11 I s Q 2 � ~ W O > ry Q W W cn (n W O ry, J Cf) U Cn = Q U Lu m J O Q Z (,� J Z ?j W W W z 2 C7 � Z W H Q C7 _ Z U — Z_ Q Z Z HZ � N U of >: w � � L m w g 2 J � Q U) LU J W IL J 0-0 p U) U) U) w W C)f w QZ Qoz Q � J Q Q W m l Z J � W J p Z Q Z Z O Q U Q J W � N U � O � 2 w ry, Q �O re-Z Q cn 0-- C)f w w cn � p z w p cr- O re- O U Z z O 0pz � U U LL LU J Q — w O elf > W H 2 O U_ of ry O� H 0 Z U W � Z U � 0 LL.I 1 W Cn Z 2 (D Z Z W Q Q W_ = CD O z m — � z w z U p O U Z LL O w Q cn p z zo <o orv- a z � O O Q = of O U) w w z — w ry, 2 Q 1 A o P, m C C !- LJ I I /- % LJ V L./ L 1 V 1 1 - 7 C s Q 2 � ~ W O > ry Q W W cn (n W O ry, J Cf) U Cn = Q U Lu m J O Q Z (,� J Z ?j W W W z 2 C7 � Z W H Q C7 _ Z U — Z_ Q Z Z HZ � N U of >: w � � L m w g 2 J � Q U) LU J W IL J 0-0 p U) U) U) w W C)f w QZ Qoz Q � J Q Q W m l Z J � W J p Z Q Z Z O Q U Q J W � N U � O � 2 w ry, Q �O re-Z Q cn 0-- C)f w w cn � p z w p cr- O re- O U Z z O 0pz � U U LL LU J Q — w O elf > W H 2 O U_ of ry O� H 0 Z U W � Z U � 0 LL.I 1 W Cn Z 2 (D Z Z W Q Q W_ = CD O z m — � z w z U p O U Z LL O w Q cn p z zo <o orv- a z � O O Q = of O U) w w z — w ry, 2 Q 1 A M I- 11 C C f- LJ I I /- % Li V L./ L 1 V 1 1 - 7 C 2 � ~ w O > H 0� 0 w w cn cA w O J U cn _ E (D Lu Fy m J O ¢ z (7 J Z J_ ry, w } w w z H Z H w H75 ¢ C7 = Z (.D — Z_ � Z Z Z H � C/) U Of } w Z - L Z:) E Lu Q = J Q Y 0 J w d J 0-0 Z) C/) U) U) w Q:� W LL ¢ Z Z O Z J ¢ ¢ w P: m L Z J w J LL Q Z O Z¢ U LU J w � N U ry O H 2 C H Lu ZD ry ¢ ¢ O �z ¢ cn a— Xw Lu u) H D z w Z:) W O ry O U Z Z O Q � U U LL. w J Q — w O w m H H = OU_ w Fy O CL z O Z U Lu Z:) Z U mLU 1 w Ln Z_ 2 U � Z Z w L] 2 U O Z m z L z w M CQ U (� LL z O w co Z ¢ 0 rK d Z H O H O O C/) w w Z — w r" 2 ¢ H d 1 1-1 Li V L J L I V I I 7 I 2 � ~ w O > H 0� 0 w w cn cA w O J U cn _ E (D Lu Fy m J O ¢ z (7 J Z J_ ry, w } w w z H Z H w H75 ¢ C7 = Z (.D — Z_ � Z Z Z H � C/) U Of } w Z - L Z:) E Lu Q = J Q Y 0 J w d J 0-0 Z) C/) U) U) w Q:� W LL ¢ Z Z O Z J ¢ ¢ w P: m L Z J w J LL Q Z O Z¢ U LU J w � N U ry O H 2 C H Lu ZD ry ¢ ¢ O �z ¢ cn a— Xw Lu u) H D z w Z:) W O ry O U Z Z O Q � U U LL. w J Q — w O w m H H = OU_ w Fy O CL z O Z U Lu Z:) Z U mLU 1 w Ln Z_ 2 U � Z Z w L] 2 U O Z m z L z w M CQ U (� LL z O w co Z ¢ 0 rK d Z H O H O O C/) w w Z — w r" 2 ¢ H d 1 1-1 U V L J L I V I I 7 I c Q ry = 0 ~ W O > UY Q W w cn Un w O UY J in U � U Lu m J F--- J O¢ z (D J Z J_ ry W W W z S C7 � Z W 2 � CD _ Z U Z_ Q Z Z Z ¢ Z Uj U LU } w � Q — Z � L � m ua ¢ = J � Q S Z Q ril W J W � J O Q in U) Cl) W (L' ry W ¢ Z Q O z J ¢ ¢ W m l Z J � W J Q LL Q Z Z O ¢ U >- Q J W � N U rr, O � S Un w ¢ ~O ~ Z ¢ Un a — rf- W w U) z W O rr- O U Z z O O F7- ULL w J Q w O ce 7- W S F--: � 2 O (� Ur rr, O >- w Z O W U � O U z 0 L W U Z 2 (7 F- Z Z W 7- LLI Q 2 Q U O z m — : Z w z U O U Z S O w Q Un Q Z ZD ¢Q Q O Q� w z � O �7- O O Un w w z — w UY 2 ¢ � w 1 A n /'I rl% r r /'+ 1 1 I I /1 L) LI L 1 L I V I I " i 7 C 1 OF 5 EQUIPMENT LIST CLIENT: SRNG JOB. NO.: 22301 BEAM DAIRY BY: AMJ CHARLOTTE, NORTH CAROLINA CHECKED: JC REV.: B DATE: 8/29/2023 CUNNINGHAM ENGINEERING Tag Number PID Service Design Materials Manufacturer Insulation REMARKS AGITATORS A-5 MANURE (PT-5) Belt Driven GEA Electro Mix GEA Houle None A-5M MOTOR 460/3/60, 20HP A-6 AD EFFLUENT (PT-6) Belt Driven GEA Electro Mix GEA Houle None A-6M MOTOR 460/3/60, 20HP PUMPS P-1 MANURE (PT-1) Belt Driven, 16", 6" Discharge, 264 GPM @ 11 psig GEA Houle None Includes agitator prop P-1 M MOTOR 460/3/60, 20HP P-2 MANURE (PT-2) Belt Driven, 16", 6" Discharge, 264 GPM @ 11 psig GEA Houle None Includes agitator prop P-2M MOTOR 460/3/60, 20HP P-3 MANURE (PT-3) None EXISTING P-3M MOTOR P-4 MANURE (PT-4) Belt Driven, 16", 6" Discharge, 264 GPM @ 11 psig GEA Houle None Includes agitator prop P-4M MOTOR 460/3/60, 20HP P-5 MANURE (PT-5) 43 GPM @ 11 psig GEA Houle None P-5M MOTOR 460/3/60, 5HP P-6 AD DIGESTATE 43 GPM @ 11 psig GEA Houle None P-6M MOTOR 460/3/60, 5HP P-7 PRESSATE TRANSFER 43 GPM @ 11 psig GEA Houle None P-7M MOTOR 460/3/60, 5HP, VFD Rated P-10 HOT WATER RECIRC GRUNDOS GRUNDOS TP80-240 P-10M MOTOR 480/3/60, 3HP VESSELS / TANKS / PITS PT-1 LIFT PIT (BARN 100) 6FTo x 8FT Concrete BY CONTRACTOR None PT-2 LIFT PIT (BARN 200) 6FTo x 8FT Concrete BY CONTRACTOR None PT-3 LIFT PIT (BARN 300) Concrete None EXISTING PT-4 LIFT PIT (COMBINED) 10FT x 10FT x 13FT (LxWxH) Concrete None EXISTING PT-5 RECEPTION PIT 20FT x 20FT x 10FT (LxWxH) Concrete BY CONTRACTOR None PT-6 AD EFFLUENT PIT 12'-0" x 26'-5" x 16'-0" (LxWxH) Concrete BY VENDOR (DVO) None PT-7 PRESSATE PIT 6FTo x 8FT Concrete BY CONTRACTOR None 39 min retention time V-1A/B/C PROPANE 18' x 4'o, 1000 gal CS None 2OF5 EQUIPMENT LIST CLIENT: SRNG JOB. NO.: 22301 BEAM DAIRY BY: AMJ CHARLOTTE, NORTH CAROLINA CHECKED: JC REV.: B DATE: 8/29/2023 CUNNINGHAM ENGINEERING Tag Number PID Service Design Materials Manufacturer Insulation REMARKS EXCHANGERS E-1 AD WATER HEATER T8 35"x16"x19" (HxWxL) 2.0 MBTU/hr 316SS Alfa Laval FLARE F-1 AD FLARE BY VENDOR (DVO) PILOT GAS: X SCFH @ Y PSIG F-2 BIOGAS FLARE CARBON STEEL MATERIAL HANDLING SPA SCREW PRESS FAN SPA M MOTOR 460/3/60 10HP SP-2 SCREW PRESS FAN SP-2M MOTOR 460/3/60 10HP CV-1 FIBER CONVEYOR CV-1M FIBER CONVEYOR MOTOR 460/3/60 5HP CV-2A DAF CONVEYOR CV-2AM DAF CONVEYOR MOTOR 460/3/60 5HP CV-213 DAF CONVEYOR CV-213M DAF CONVEYOR MOTOR 460/3/60 5HP PACKAGED EQUIPMENT - HYDRONICS B-1A/B BOILER 1,250,000 BTU, 0.96 EFF (EA) 316SS LOCHINVAR FBD1251 B-1AH/BH HEATER 120/1/60, 5 FLA, 6 MCA 3OF5 EQUIPMENT LIST CLIENT: SRNG JOB. NO.: 22301 BEAM DAIRY BY: AMJ CHARLOTTE, NORTH CAROLINA CHECKED: JC REV.: B DATE: 8/29/2023 CUNNINGHAM ENGINEERING Tag Number PID Service Design Materials Manufacturer Insulation REMARKS PACKAGED EQUIPMENT - GALILEO GAS UPGRADE SKID HE-500 GLYCOL COOLER PQ-500 PACKAGE CHILLER 30kW @ 5C LWT, 2.6barg discharge FLUID CHILLERS INC AIR10000-BP-460/3-SPEC V-010 SCRUBBER K-020 RAW GAS BIOBLOWER K-020M MOTOR AC-030/40 AIRCOOLER AIRBOX SHARED AC-030M MOTOR V-100 SCRUBBER 3 kW HE-101 RAW BIOGAS HEATER V-200/201 H2S COLUMN 1 V-300/301 H2S COLUMN 2 F-302 DUST FILTER V-400 SCRUBBER K-401 1ST STAGE COMPRESSOR AC-403/404 1 ST STAGE AIR COOLER AIRBOX SHARED AC-403M MOTOR V-405 SCRUBBER K-406 2ND STAGE COMPRESSOR AC-408/409 2ND STAGE AIR COOLER AIRBOX SHARED AC-408M MOTOR V-410 SCRUBBER F-411 COALESCENT FILTER F-412 COALESCENT FILTER F-413 COALESCENT FILTER HE-414 ACID GAS HEATER 3 kW MRO-601 MEMBRANE VESSEL MRO-602 MEMBRANE VESSEL MRO-603 MEMBRANE VESSEL V-604 SCRUBBER V-700 SCRUBBER 4OF5 EQUIPMENT LIST CLIENT: SRNG JOB. NO.: 22301 BEAM DAIRY BY: AMJ CHARLOTTE, NORTH CAROLINA CHECKED: JC REV.: B DATE: 8/29/2023 CUNNINGHAM ENGINEERING Tag Number PID Service Design Materials Manufacturer Insulation REMARKS K-701 3RD STAGE COMPRESSOR AC-703A/B 3RD/4TH STAGE AIR COOLER AIRBOX SHARED AC-703M MOTOR K-704 4TH STAGE COMPRESSIOR K-706 5TH STAGE COMPRESSOR AC-705 5TH STAGE AIR COOLER F-708 COALESCENT FILTER F-709 COALESCENT FILTER F-710 COALESCENT FILTER V-950 IA VESSEL PACKAGED EQUIPMENT - DVO ANAEROBIC DIGESTER PU001 TK001 HEAT TREANSFER GRUNDOS GRUNDOS TP80-240 PU001 M MOTOR 480/3/60, 3HP TK001 AD WATER STORAGE TANK PU201 DIGESTER HEATING ZONE GRUNDOS TP80-240 PU201 M MOTOR 480/3/60, 3HP PU202 DIGESTER HEATING ZONE GRUNDOS TP80-240 PU202M MOTOR 480/3/60, 3HP PU203 DIGESTER HEATING ZONE GRUNDOS TP50-160 PU203M MOTOR 480/3/60, 1.5HP P0100 DIGESTER HEATING GRUNDOS TP80-160 PU100M MOTOR 480/3/60, 3HP BL110 DIGESTER MIXING BLOWER ROOTS 406J BL110M MOTOR 480/3/60, 15HP, XP TOSHIBA ECP4104T F100 FLAME ARRESTOR GROTH 7618 F101 FLAME ARRESTOR GROTH 7618 PU130 SLUDGE RECYCLE FLYGT 3085 PU130M MOTOR 480/3/60, 3HP BL100 SLUDGE PIT ROOTS 22URAI BL100M MOTOR 480/3/60, 3HP TOSHIBA 0032SDSR41A-P 5OF5 EQUIPMENT LIST CLIENT: SRNG JOB. NO.: 22301 BEAM DAIRY BY: AMJ CHARLOTTE, NORTH CAROLINA CHECKED: JC REV.: B DATE: 8/29/2023 CUNNINGHAM ENGINEERING Tag Number PID Service Design Materials Manufacturer Insulation REMARKS PACKAGED EQUIPMENT - DAF PHOSPHORUS RECOVERY P-301 DAF RECIRC PUMP P-301M MOTOR 480/3/60, 30HP C-302 AIR COMPRESSOR C-302M MOTOR 480/3/60, 5HP P-302 DAF SKIMMER P-302M MOTOR 480/3/60, 0.5HP SP-303A/B/C DEWATERING CYLINDER SP-303AM/BM/CM MOTOR 480/3/60, 4HP P-304 POLYMER FEED PUMP P-304M MOTOR 480/3/60, 0.5HP A-305A/B/C POLYMER MIXER A-305AM/BM/CM MOTOR 480/3/60, 0.75HP CV-306 POLYMER AUGER CV-306M MOTOR 480/3/60, 0.25HP PACKAGED EQUIPMENT - INSTRUMENT AIR COMPRESSOR C-1 INSTRUMENT AIR COMPRESSOR 56 ACFM @ 125 PSIG QUINCY QGD15, HEATLESS DESSICANT DRYER C-1M MOTOR 460/3/60, 20HP, 20 FLA HE-1 INSTRUMENT AIR DRYER V-1 INSTRUMENT AIR RECEIVER BEAM 1)A1Ft)((S1JS1=A1 4 FZ JG) 820 West Main Street P.O. Box 69, Chilton WI, 53014 Phone: 920-849-9797 At4A1F.1R1Z1E11C 1)1GE7.S1r1EFt www.dvoinc.com NOTE: THESE STAMPED PLANS MEET NRCS CODE 313. CONTRACTORS/OWNERS ARE RESPONSIBLE FOR FOLLOWING ALL LOCAL APPLICABLE CODES & REGULATIONS DURING INSTALLATION OF THE DIGESTER AND BALANCE OF THE PLANT: INCLUDING BUT NOT LIMITED TO NRCS 313, 366, AND 364 ISOMETRIC VIEW educed using a 3-Dimensional ation Model (BIM) in Autodesk's actural REVIT model is intended with conventionally drawn 2- i details for use in the preparation awings and for the coordination of its with the other major building ructural REVIT model will not include every individual structural component that is necessary to estimate and construct the building, nor will every conflict be recognized. The structural REVIT model is not intended for any other use such as quantity take -offs or detailed cost estimates, as it may not contain all structural elements. The use of the structural REVIT model for any purpose beyond the preparation and coordination of bid or construction drawings is at the sole discretion of the user and the user shall assume all liability for such use. ©2022 Larson Engineering, Inc. All rights reserved. V o o N � O � O r U7 O 0-) O •Ln Q Ln E 000 O L c " L L = .� w�CD NM o 0 L ui o J W000� NQ� LO a) U)_ � EO o M - 00 V i C.0 N . in X � O Vim0 ai_0 CDU0 � d D_ z w J U W Z OOE%H 0 � a Z W 0 _ Q � Z � °C 0 0 z Q — � Ww H m Cl) 0 J Cf) W 0 a o� z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION 1 06/20/2023 REVISED INDEX Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: TITLE SHEET GENERAL STRUCTURAL NOTES: A. BUILDING CODE; 1. INTERNATIONAL BUILDING CODE 2015, AMERICAN CONCRETE INSTITUTE (ACI) 350-06 2. ASCE 7-10 LOADING EXPOSURE C: Ce=1.0 GROUND SNOW Pg=15 PSF FLAT ROOF SNOW Pf=12 PSF SNOW IMPORTANCE FACTOR Is=0.80 WIND IMPORTANCE FACTOR Iw=1.00 BASIC WIND SPEED = 105 MPH 3. SEISMIC CRITERIA - CHERRYVILLE, NC SIDS = 0.247 SD1 = 0.158 SDC "C" SITE CLASS = D le = 1.0 4. MINIMUM LIVE LOAD = 25 PSF B. MATERIAL STRENGTHS 1. POURED -IN -PLACE CONCRETE, F'c......... 4500 PSI @ 28 DAYS TYPE 2 - CONCRETE STRENGTH TESTING IS THE RESPONSIBILITY OF CONCRETE CONTRACTOR - CONCRETE BATCH TICKETS AND TEST DATA SHALL BE COPIED TO DVO - MIX DESIGN TO BE SUBMITTED TO DVO PRIOR TO POUR FOR APPROVAL - THE WATER -CEMENT (W/C) OR THE WATER-CEMENTITIOUS MATERIAL (W/CM) RATIO SHALL NOT EXCEED 0.42 FOR ALL CONCRETE CONSTRUCTION - THE MINIMUM CEMENTITIOUS MATERIAL REQUIRED SHALL BE 564 POUNDS PER CUBIC YARD OF CONCRETE. THE CEMENTITIOUS MATERIAL MAY INCLUDE A MAXIMUM OF 25% (BY WEIGHT) OF FLY ASH OR A MAXIMUM OF 30% (BY WEIGHT) OF GROUND GRANULATED BLAST -FURNACE (GGBF) SLAG. MIXES CONTAINING BOTH FLY ASH AND GGBF SLAG SHALL NOT EXCEED 30% IN COMBINATION (TERNARY MIX) AND NO MORE THAN 25 PERCENT SHALL BE FLY ASH. THE REMAINING CEMENTITIOUS MATERIALS SHALL BE PORTLAND CEMENT. - CONCRETE CYLINDER TESTING SAMPLES SHALL BE TAKEN AT 50 CUBIC YARD INTERVALS AND ANY REMAINING VOLUME OVER 50 CUBIC YARD INTERVALS. 2. GROUT FOR PC PLANKS KEYED JOINTS TO BE 3000 PSI GROUT, FULL LENGTH OF PLANK. GROUT SHALL BE A MIXTURE OF NOT LESS THEN ONE PART PORTLAND CEMENT TO THREE PARTS FINE SAND, AND THE CONSISTENCY SHALL BE SUCH THAT JOINTS CAN BE COMPLETELY FILLED BUT WITHOUT SEEPAGE OVER ADJACENT SURFACES. THE GROUT SHALL ACHIEVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 3000 PSI. 3. REINFORCING STEEL ............ ASTM A615, GRADE 60 4. ALLOWABLE SOIL BEARING PRESSURE MINIMUM ....... 3000 PSF 5. PRECAST PLANK SHALL BE DESIGNED BY PRECAST PLANK SUPPLIER - PRECAST PLANK SHALL CONTAIN BOTH TOP AND BOTTOM STRANDS AND BE DESIGNED TO WITHSTAND AN UPLIFT FORCE OF 144 PSF - DESIGN PLANK FOR (Pg) SNOW LOADS PER ASCE 7-10, FIGURE 7-1 WITH A 12 PSF MINIMUM AND LIVE LOAD = 25 PSF - PRECAST PLANK SHALL BE CONSTRUCTED FROM TYPE 2 CONCRETE - PRECAST PLANK SHALL BE CONSTRUCTED AND ERECTED WITHIN PCI TOLERANCE GUIDELINES, DESIGNED BEARING LENGTH IS 3-1/21, - PRECAST PLANK CONSTRUCTION PLANS SHALL BE REVIEWED BY DVO, INC. PRIOR TO ACCEPTANCE C. FOUNDATIONS 1. ACTUAL SOIL BEARING CONDITIONS SHALL BE CONFIRMED PRIOR TO CONSTRUCTION, TEST RESULTS COPIED TO DVO. 2. PROVIDE SUFFICIENT TEMPORARY PROTECTION TO PREVENT ALL EXPOSED SUBGRADE FROM FREEZING. DO NOT PLACE CONCRETE OR BACKFILL OVER FROZEN SOIL. 3. KEEP ACCUMULATED RAIN WATER AND SURFACE RUNOFF AWAY FROM BEARING STRATUM. DO NOT ALLOW WATER TO STAND IN THE EXCAVATION AND SOFTEN THE SOILS AT OR BELOW BEARING LEVEL. 4. BASE SLAB MUST BEAR ON 6" OF COMPACTED GRAVEL OVER UNDISTURBED VIRGIN SOIL. 5. ALL BACKFILL MATERIAL SHALL BE FREE DRAINING SAND, AND CLEAN NATIVE FILL; BACKFILL HEIGHT; 14' MINIMUM, 15' MAXIMUM 6. BASE SLAB MUST BE A MINIMUM OF 2 FEET ABOVE WATER TABLE. D. CONCRETE REINFORCING STEEL 1. CONCRETE COVER FOR REINFORCING STEEL SHALL BE AS FOLLOWS (UNLESS OTHERWISE NOTED): - 2" CLEAR FROM ALL INSIDE AND OUTSIDE FACES ON WALLS - 1-1/2" CLEAR FROM TOP OF FLOOR - 2" (MIN.) CLEAR FROM BOTTOM OF FLOOR - 3" CLEAR FOR FOOTINGS 2. ALL BENT AND STRAIGHT REINFORCING BARS SHALL BE 60 GRADE STEEL. ALL STEEL SIZES ARE IMPERIAL SIZES. HORIZONTAL BAR LAPPING SHALL BE AS FOLLOWS: #4 - 16", #5 - 20" AND #6 - 24". 3. PROVIDE CORNERS TO MATCH ALL HORIZONTAL BARS WITH REQUIRED LAP SPLICE LENGTH. 4. ALL REINFORCING BARS SHALL BE PLACED AS SHOWN IN DETAILS UNLESS OTHERWISE NOTED. E. VINYL WATER STOP TO BE GREENSTREAK 705, 732, OR EQUAL WITH ALL JOINTS WELDED. F. EXPANDING SEALANT SHALL BE: SIKA SWELLSTOP OR APPROVED EQUAL. G. ANC' HOLES DRILLED IN THE DIGE TER FLOOR, FOR CORMWORK ATTACHMENT, WHEAtHER THEY ARE NOT DRILLED ALL THE WAY THROUGH OR DRILLED THROUGH BY ACCIDENT, SHALL BE FILLED WITH EITHER THE DEWALT AC100+ OF THE HILTI HY-200 ADHESIVES. CONTRACTOR MUST FOLLOW MANUFACTURES INSTALLION INSTRUCTIONS. H. FENCE TO BE CONSTRUCTED 6' FROM OUTSIDE WALL PERIMETER TO PREVENT TRUCK, TRACTOR, AND COW TRAFFIC. I. THE GENERAL CONTRACTOR AND/OR OWNER SHALL BE RESPONSIBLE FOR THE TEMPORARY SAFETY REQUESED FOR THE DIGESTER DURING CONSTRUCTION WHICH WILL INCLUDE BUT IS NOT LIMITED TO THE PROTECTION OF ROOF OPENINGS IN THE PRECAST PLANKS AND THE ROOF LEADING EDGES UNTIL THE DIGESTER IS PROPERLY BACKFILLED. CONCRETE CURING THE AGE OF STRIPPED CONCRETE OR SLABS SHALL BE AT LEAST 7 DAYS BEFORE ANY LOAD (INCLUDING BACKFILL) IS APPLIED OTHER THAN THE WEIGHT OF THE WALL, FORMS, SCAFFOLDS FOR SUCCEEDING LIFTS OR LIGHT EQUIPMENT. BACKFILLING ONCE THE CONCRETE IS PROPERLY CURED, 6' OF BACKFILL CAN BE PLACED AROUND THE TANK PRIOR TO PRECAST TOP BEING PERMANENTLY FASTENED. AVOID BACKFILL CONTAINING LARGE ROCKS, HARD OR FROZEN SOIL LUMPS, OR CONSTRUCTION DEBRIS. EARTHFILL SHALL BE PLACED IN 8-INCH LIFTS, PRIOR TO COMPACTION. BACKFILL AROUND STRUCTURE GRADUALLY AND UNIFORMLY AROUND ALL SIDES OF THE STRUCTURE. COMPACT SOIL TO NOT LESS THAN 85% OF MAXIMUM DRY DENSITY ACCORDING TO ASTM D 698, STANDARD PROCTER TEST. ADJACENT TO STRUCTURE DO NOT OPERATE HEAVY COMPACTION EQUIPMENT WITHIN 6' OF THE STRUCTURES. DO NOT OPERATE COMPACTION EQUIPMENT, IN EXCESS OF 15,000 LBS., BETWEEN 6' AND 2' OF THE STRUCTURES. EARTHFILL SHALL BE PLACED IN 8-INCH LIFTS (PRIOR TO COMPACTION). COMPACT IN A MANNER ADEQUATE TO PREVENT DAMAGE AND ALLOW THE STRUCTURE TO GRADUALLY AND UNIFORMLY ASSUME THE BACKFILL LOADS. COMPACTION SHALL BE ACCOMPLISHED BY MEANS OF MANUALLY DIRECTED POWER TAMPERS OR PLATE VIBRATORS WITHIN 2' OF STRUCTURES. EARTHFILL SHALL BE PLACED IN 4-INCH LIFTS (PRIOR TO COMPACTION). COMPACT IN A MANNER ADEQUATE TO PREVENT DAMAGE TO THE STRUCTURE AND ALLOW THE STRUCTURE TO GRADUALLY AND UNIFORMLY ASSUME THE BACKFILL LOADS. GRADING THE TANK SITE SHALL BE GRADED TO PROVIDE DRAINAGE AWAY FROM THE TANK AT A MINIMUM OF 1 % SLOPE. OPERATION DAY TO DAY OPERATION OF HEAVY EQUIPMENT IS PROHIBITED WITHIN 6' OF PERMANENT STRUCTURE WALLS. COUPLINGS ALL COUPLINGS AND SLEEVES ARE TO BE PROVIDED BY CONCRETE CONTRACTOR. CONSTRUCTION INSPECTION PLAN PRIOR TO ANY SITEWORK, A PRE -CONSTRUCTION MEETING SHALL BE CONDUCTED BETWEEN THE OWNER, DVO, EXCAVATION CONTRACTOR, CONCRETE CONTRACTOR, CONSTRUCTION INSPECTOR/ENGINEER OF RECORD, SITE ENGINEER, AND IF REQUIRED BY LOCAL CODE THE NRCS/COUNTY LAND CONSERVATION DEPARTMENT. CONSTRUCTION INSPECTOR TO LOCATE ACTUAL WALL AND FLOOR JOINT LOCATIONS ON "AS -BUILT" PLAN RELATIVE TO NORTH ARROW. PROVIDE FINAL COPY OF "AS -BUILT" PLAN TO THE ENGINEER OF RECORD FOR APPROVAL CONSTRUCTION INSPECTOR MUST BE COMPETENT IN INTERPRETING CONSTRUCTION DOCUMENTS, FAMILIAR WITH TYPE OF CONSTRUCTION. CONSTRUCTION INSPECTOR WILL BE RESPONSIBLE FOR AS -BUILT DOCUMENTATION, CONSTRUCTION INSPECTION LOG, AND PHOTOGRAPHS CONSTRUCTION INSPECTOR TO INSPECT REBAR SIZE, LOCATION, SPACING, AND WATERSTOP LOCATIONS IN FOOTING AND SLAB PRIOR TO CONCRETE POUR. SLAB IS TO BE POURED AS INDICATED ON PLAN TO COMPLETE THE TANK. CONSTRUCTION INSPECTOR TO INSPECT REBAR SIZE, LOCATION, SPACING, AND WATERSTOP LOCATION IN EACH WALL SECTION PRIOR TO CONCRETE POUR. WALL IS TO BE POURED AS INDICATED ON THE PLAN. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY DVO INC. AT (920) 849-9797 24 HOURS PRIOR TO THE ABOVE ITEMS BEING READY FOR INSPECTION. INSPECTED ITEMS INCLUDE BUT NOT LIMITED TO THE FOLLOWING -NUMBER AND SPACING OF FOOTING REINFORCING -SPACING OF TYPICAL FLOOR SLAB REINFORCING -SPACING OF WALL DOWELS -FOOTING WATERSTOP JOINT -SLAB WATERSTOPS, IF REQUIRED -SPACING OF WALL VERTICAL AND HORIZONTAL REINFORCING -WALL WATERSTOP AT JOINT AFTER WELDING TO FOOTING WATERSTOP -FORM TIE HOLE PLUGS AT INSIDE FACE OF WALL -GROUTED FORM TIE HOLES AT OUTSIDE FACE OF WALL -PIPE PENETRATIONS AS PART OF APPROVED DIGESTER PLANS CONCRETING IN HOT WEATHER - ATMOSPHERIC AIR TEMPERATURE IS GENERALLY ABOVE 80' F 1. FOR THE PURPOSE OF THIS SPECIFICATION, HOT WEATHER IS DEFINED AS ANY COMBINATION OF THE FOLLOWING CONDITIONS THAT IMPAIR THE QUALITY OF FRESHLY MIXED OR HARDENED CONCRETE BY ACCELERATING THE RATE OF MOISTURE LOSS AND RATE OF CEMENT HYDRATION, OR OTHERWISE RESULTING IN DETRIMENTAL RESULTS: A. HIGH AMBIENT TEMPERATURE (GENERALLY ABOVE 80 DEGREES FAHRENHEIT) B. HIGH CONCRETE TEMPERATURE C. LOW RELATIVE HUMIDITY D. WIND VELOCITY E. SOLAR RADIATION 2. IN HOT WEATHER, OR UNDER CONDITIONS CONTRIBUTING TO QUICK STIFFENING OF THE CONCRETE, THE TIME BETWEEN THE INTRODUCTION OF THE MIXING WATER TO THE CEMENT AND AGGREGATES AND DISCHARGE SHALL NOT EXCEED 45 MINUTES UNLESS A SET -RETARDING ADMIXTURE IS USED MEETING THE REQUIREMENTS IN SECTION 3 OF THIS SPECIFICATION. 3. SPECIAL PROVISIONS SHALL BE MADE TO IMMEDIATELY PROTECT AND CURE THE CONCRETE DUE TO RAPID DRYING CONDITIONS. CONCRETE SURFACES SHALL NOT BE ALLOWED TO DRY AFTER PLACEMENT AND DURING THE CURING PERIOD. IT MAY BE NECESSARY TO: A. RESTRICT PLACEMENT TO EARLY MORNING, LATE AFTERNOON OR EVENING. B. RESTRICT THE DEPTH OF LAYERS TO ASSURE COVERAGE OF THE PREVIOUS LAYER WHILE IT WILL STILL RESPOND READILY TO VIBRATION. C. USE A FOG SPRAY TO RAISE THE RELATIVE HUMIDITY OF THE AMBIENT AIR. D. MOIST CURE THE CONCRETE SURFACE AS SOON AS THE SURFACES ARE FINISHED AND CONTINUE FOR AT LEAST 24 HOURS. E. SCHEDULE MIXER TRUCKS TO AVOID WAITING TIME SO THE CONCRETE WILL NOT BEGIN TO SET. F. SUSPEND PLACEMENT UNTIL CONDITIONS IMPROVE. CONCRETING IN COLD WEATHER - ATMOSPHERIC AIR TEMPERATURE IS LESS THAN 40' F 1. CONCRETE MIXTURE A. CONCRETE MIXING WATER AND THE AGGREGATE SHOULD BE HEATED i. WHEN CONCRETE IS ADDED TO THE MIX, THE TEMPERATURE OF THE MIXING WATER SHALL NOT EXCEED 140' F ii. TEMPERATURE OF THE AGGREGATE SHALL NOT EXCEED 150°F B. TYPE II CONCRETE SHOULD BE USED. C. ONLY NON -CHLORIDE NON -CORROSIVE ACCELERANT MAY BE USED 2. CONCRETE SHALL BE INSULATED OR HOUSED AND HEATED IMMEDIATELY AFTER PLACEMENT. 3. THE TEMPERATURE OF THE CONCRETE AT THE TIME OF PLACING SHOULD BE BETWEEN 55°F AND 75°F 4. THE TEMPERATURE OF THE CONCRETE AND AIR ADJACENT TO THE CONCRETE SHALL BE MAINTAINED AT NOT LESS THAN 50'F NOR MORE THAN 90°F FOR THE DURATION OF THE CURING PERIOD A. IF THE MINIMUM TEMPERATURE REQUIREMENTS ARE NOT MET AND THE CONCRETE DID NOT FREEZE, THE PROTECTION TIME WILL BE EXTENDED A PERIOD EQUAL TO TWICE THE NUMBER OF HOURS THE TEMPERATURE WAS BELOW THE MINIMUM TEMPERATURE. 5. CONCRETE SHALL BE CURED FOR A PERIOD OF AT LEAST 7 DAYS AFTER IT IS PLACED. THE CURING PERIOD MAY BE REDUCED IF THE REQUIRED CONCRETE COMPRESSIVE STRENGTH IS CONFIRMED WITH COMPRESSIVE TEST RESULTS. 6. COMBUSTION HEATERS SHALL HAVE EXHAUST FLUE GASES VENTED OUT OF THE CONCRETE PROTECTION ENCLOSURE AND SHALL NOT BE PERMITTED TO DRY THE CONCRETE. 7. THE CONTRACTOR SHALL FURNISH DVO A RECORD OF DAILY MAXIMUM AND MINIMUM OUTSIDE AIR AND CONCRETE SURFACE AIR TEMPERATURES DURING THE CURING PERIOD. THE RECORD SHALL INCLUDE TEMPERATURES AT SEVERAL POINTS ALONG THE CONCRETE. 8. AT THE END OF THE PROTECTION PERIOD, THE CONCRETE SHALL BE ALLOWED TO COOL GRADUALLY. THE MAXIMUM DECREASE AT THE CONCRETE SURFACE IN A 24-HOUR PERIOD SHALL NOT EXCEED 40°F. STRUCTURAL ABBREVIATIONS: SYMBOL LEGEND: @ - AT DL - DEAD LOAD IBC - INTERNATIONAL BUILDING CODE R/W - RIGHT OF WAY & - AND DN - DOWN ICF - INSULATED CONCRETE FORM REF -REFERENCE AB - ANCHOR BOLT DWG - DRAWING ID - INSIDE DIAMETER REINF - REINFORCED, REINFORCING, REINFORCEMENT ACI -AMERICAN CONCRETE INSTITUTE DWL -DOWEL I.S. - INSIDE FACE REQD - REQUIRED COMPACTED AFF -ABOVE FINISHED FLOOR E -EAST IN - INCHES REV - REVISION NORTH ARROW GROUT GRAVEL AISC - AMERICAN INSTITUTE OF STEEL CONSTRUCTION EA -EACH INFO - INFORMATION S -SOUTH AISI - AMERICAN IRON AND STEEL INSTITUTE EE - EACH END INSUL - INSULATION SDR - STANDARD PIPE RATIO NORTH ALT -ALTERNATE EF - EACH FACE INT - INTERIOR SECT - SECTION AMT -AMOUNT EJ - EXPANSION JOINT JT - JOINT SF - SQUARE FEET ANCH -ANCHOR EL - ELEVATION KO - KNOCK OUT SGL - SINGLE ANSI -AMERICAN NATIONAL STANDARDS INSTITUTE ELEC - ELECTRICAL KSF - KIPS PER SQUARE FOOT SHT - SHEET APPROX - APPROXIMATE ENCL -ENCLOSURE KSI - KIPS PER SQUARE INCH SIM - SIMILAR AR - ANCHOR ROD ENGR - ENGINEER L - STEEL ANGLE, LENGTH Si - SAWED CONTROL JOINT SECTION NUMBER ARCH - ARCHITECT, ARCHITECTURAL EOS - EDGE OF SLAB LBS -POUNDS SLIP -SLOPE - CLEAR ASCE - AMERICAN SOCIETY OF CIVIL ENGINEERS EQ -EQUAL LF - LINEAL FEET SOG - SLAB ON GRADE ___ CONCRETE STONE ASTM - AMERICAN SOCIETY OF TESTING & MATERIALS EQPT - EQUIPMENT LL - LIVE LOAD SPA - SPACED, SPACING, SPACES SHEET WHERE DRAWN AVG -AVERAGE ES - EACH SIDE LT - LIGHT SPEC - SPECIFICATION BLDG - BUILDING EST - ESTIMATED MAS -MASONRY SQ -SQUARE BILK -BLOCK ETC - AND OTHERS MATL - MATERIAL SS - STAINLESS STEEL BLKG - BLOCKING EW - EACH WAY MAX - MAXIMUM STD -STANDARD BM -BEAM EXIST - EXISTING MBR -MEMBER STIFF - STIFFENER BOT -BOTTOM EXP - EXPANSION MECH - MECHANICAL STL -STEEL BRDG - BRIDGE, BRIDGING EXP JT - EXPANSION JOINT MED - MEDIUM STRUCT -STRUCTURAL DETAIL NUMBER BRG - BEARING EXT - EXTERIOR MFR -MANUFACTURER SY - SQUARE YARD - SPRAY FOAM NATIVE BS - BOTH SIDES F - FAHRENHEIT MID - MIDDLE SYM - SYMMETRICAL --- INSULATION/SEALER SOIL BTWN - BETWEEN f'c - MINIMUM 28-DAY CONCRETE STRENGTH MIN - MINIMUM SYS -SYSTEM SHEET WHERE DRAWN C - STEEL CHANNEL SHAPE f m - SPECIFIED MASONRY STRENGTH MISC - MISCELLANEOUS T&B - TOP & BOTTOM CANT - CANTILEVER FB - FLAT BAR MTL - METAL, MATERIAL TEMP - TEMPERATURE CAP - CAPACITY FD - FLOOR DRAIN N -NORTH THK - THICK CB - CORNER BAR FDN - FOUNDATION NIC - NOT IN CONTRACT THIRD - THREADED CC - CENTER TO CENTER FF - FINISHED FLOOR No. -NUMBER TOC - TOP OF CONCRETE _J CIF - CUBIC FEET, COLUMN FOOTING FIN - FINISH, FINISHED NOM - NOMINAL TOF - TOP OF FOOTING Cl - CAST IRON FLR - FLOOR NS - NEAR SIDE TOGB - TOP OF GRADE BEAM CIP - CAST -IN -PLACE FRPF - FIREPROOF NITS - NOT TO SCALE TOJ - TOP OF JOIST RIGID FOAM COMPACTED CJ - CONSTRUCTION JOINT FRT - FIRE RETARDANT CA - OVERALL TOM - TOP OF MASONRY INSULATION SOIL CL - CENTERLINE FS - FAR SIDE OC - ON CENTER TOPG - TOPPING DETAIL NUMBER DESCRIPTION CLG - CEILING FT - FOOT, FEET OD - OUTSIDE DIAMETER TOPL - TO OF PLATE 3 DETAIL-� CLR - CLEARANCE, CLEAR FTG - FOOTING 0. F. - OUTSIDE FACE TOSL - TOP OF SLAB S001 1" - 1'-01, CMU - CONCRETE MASONRY UNIT Fy - YIELD STRENGTH OF STEEL OPNG - OPENING TOW - TOP OF WALL SHEET WHERE DRAWN VIEW SCALE COL -COLUMN GA -GAUGE OPP - OPPOSITE TYP - TYPICAL CONIC -CONCRETE GALV - GALVANIZED OZ -OUNCE UNO - UNLESS NOTED OTHERWISE CONSTR - CONSTRUCTION GB - GRADE BEAM PC -PRECAST VEF - VERTICAL EACH FACE CONT - CONTINUOUS GC - GENERAL CONTRACTOR PCF - POUNDS PER CUBIC FOOT VERT - VERTICAL CONTR -CONTRACTOR GEN -GENERAL PCI - PRESTRESSED CONCRETE INSTITUTE VIF - VERTICAL INSIDE FACE VINYL WATER STOP PC OR WET CAST CSK - COUNTERSINK GR -GRADE PE - PROFESSIONAL ENGINEER VOF - VERTICAL OUTSIDE FACE LIFTING HOOK CTR -CENTER GRND -GROUND PERP -PERPENDICULAR VOL -VOLUME CTRD -CENTERED HC - HOLLOW CORE PL -PLATE W - WEST REVISION NUMBER CY - CUBIC YARD HDG - HOT DIPPED GALVANIZED PLF - POUNDS PER LINEAL FOOT W/ - WITH DBL - DOUBLE HDPE - HIGH -DENSITY POLYETHEYLNE PNL -PANEL W/O - WITHOUT DEFL - DEFLECTION HDR -HEADER PREFAB - PREFABRICATED WCJ - WALL CONTROL JOINT DEG -DEGREES HEF - HORIZONTAL EACH FACE PRELIM - PRELIMINARY WEJ - WALL EXPANSION JOINT DEMO - DEMOLITION HEX -HEXAGONAL PREP - PREPARATION WF - WALL FOOTING DEPT -DEPARTMENT HGR -HANGER PSC - PRESTRESSED CONCRETE WGT - WEIGHT DIET - DETAIL HGT - HEIGHT PSF - POUNDS PER SQUARE FOOT WL - WIND LOAD DIA - DIAMETER HIF - HORIZONTAL INSIDE FACE PSI - POUNDS PER SQUARE INCH WPFG - WATERPROOFING DIAG - DIAGONAL HK -HOOK PVC - POLYVINYL CHLORIDE PIPE WS -WATERSTOP DIM - DIMENSION HORIZ - HORIZONTAL PVMT -PAVEMENT WWF - WELDED WIRE FABRIC HOF - HORIZONTAL OUTSIDE FACE QA - QUALITY ASSURANCE YD -YARD HS - HIGH STRENGTH QC - QUALITY CONTROL HSS - HOLLOW STRUCTURAL SECTION QTY - QUANTITY @2022 Larson Engineering, Inc. All rights reserved �o �CN N 2 Cn �rn O • < I E o 0') 0 L � � L L = C,)a .� w�CD o C0-5 Cn o L I_LI J 00 WNQ� 0 cY) LO a) a) o� 00 am _E6 E o (0 - 00 V � (0 Cnxorno �m a)_0 C i C)U0 � z w J U W Z H O N a � Z W v 0 = _ O Z m w W Coll) 0 J D Cf) W a z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION 1 06/20/2023 REVISED NOTES Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: GENERAL STRUCTURAL NOTES NIlITCC. 1. A WALL CONSTRUCTION JOINT IS REQUIRED AT EVERY FLOOR JOINT. 2. WALL CONSTRUCTION JOINTS SHOULD BE A MINIMUM OF 15' FROM ALL CORNERS. 3. WALL CONSTRUCTION JOINTS SHOULD BE A MINIMUM OF 10' FROM THE SLUDGE PITS, REMOVEABLE PLANKS AND STAINLESS STEEL BEAM AREAS. 4. FLOOR & WALL CONSTRUCTION JOINT PLACEMENT SHALL BE SUBMITTED FOR APPROVAL PRIOR TO ANY CONCRETE PLACEMENT FLOOR SLAB FLOOR SLAB HAD BEEN DESIGNED FOR A MAXIMUM ALLOWABLE PRESSURE OF 1,000 PSF. NORTH 1 FOUNDATIO s � 00 1 /8" = V-0" N PLAN ©2022 Larson Engineering, Inc. All rights reserved v o o N � O � O r Cn O 0-) O • V= QMco E 0�00 O L M L L = .� w�(D o C L Uj Q W00 NQLO a) 00 am U)�E �U� o (0 00 V i (0 N . in X M O m N -0 CDU0 Q01 d 0_ Z W J U W Z H O � a �Z W o 0 _ Q � 0 0 z Q - � w H m W Coll) 0 J D Cf) W 0 a o� z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: FOUNDATION PLAN REMOVABLE WET CAST - COVER OVER SLUDGE PIT (BY PRECAST SUPPLIER) 2'-0" x 2'-0' IN PLANK 1 A' n11 01 53'-0" 5'-0" 27'-0" 8'-0" 57'-0" 15'-0" le 8'-0" 17'-0" OPENING 3 ACID CHAMBER WEIR GL OPENING S101 WALL TYP. (1) PLACES (2) PRECAST PLANK; 1 W/LIFTING POINTS T S201 1 1 S304 2 S304 S201 0 — — — — C b C b — — — — — — — — — — — — — — — — — — — — — — — — — — 3 z w OPEN LU 0 , S200 0 in i 1 s2oo 1 S305 Q- — — -- — — -- — -- — -- — -- — O -- — — — — — — — — — — — — — — — — — — — — o as 04 a - o . 2 2 ba a S304 S304 3 n I S20 �n (V I 1 S202 T co I I o I I co 2 I a a o O o o OPENING GROUTED PLANK -J OVER EFFLUENT PIT MIXER PORT OPENING 2 TYPICAL (4) PLACES S101 6'-0„ 2' -0" OPENING OPENING 63' - 0" 68' - 0" 33' - 0" NORTH PLAN VIEW (PRECAST PLANK 1/8" = 1'-0" a it CD m Y z Q J n 16 DIGESTER WALL EDGE MIXING PORT LOCATION CENTERED BETWEEN (2) PRECAST PLANKS 2 MIXING PORT DETAIL S101 1/4" = 1'-0" n' F' - (1" oppmKi , 3 AC I D C HAM S101 1/4" = 1'-0" DIGESTER WALL EDGE WEIR WALL LOCATED BELOW OPENING BER WEIR WALL i MUST BE REMOVABLE APICAL (2) PLACES ©2022 Larson Engineering, Inc. All rights reserved v o o N � O � O r 07 O 0-) O • V= E QMco w 0�00 O L M L .� w�oN 0 0 L ui J 030� WNQ� O M Ln 5 O U) -E E SU,4- 0 (0 - 00 V N .E- in x M 0 Vimo a�� C:)00 S zao_ w J U W Z H 0 a � Z W � 0O<z _ 0 _ 0 z m w W Coll) 0 J n Cf) W 0 a o� Z W ac.) SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: PLAN VIEW (PRECAST PLANK) 101 SPRAY -ON TOP -COAT EXTENDING DOWN EXTERIOR WALLS T-0" 4" OF SPRAY -ON SEALER/INSUL TO COVER TOP OF BIOGAS CHAMBER AND EXTEND DOWN EXT WALLS T-0" FROM TOP OF PC PLANKS (OVERLAPPING FOAM INSUL 2") 4" FOAM INSULATION STARTING Z-10" FROM TOP OF PC AND EXTENDING TO FOOTING, TYPICAL ON ALL EXTERIOR WALLS 0 ih 10" GROUTED PC PLANK ZSLOPE AWAY a FROM DIGESTER APPLY SPRAY -ON EPDXY UNDER -COATING TO UNDERSIDE OF PC PLANK, EXTEND DOWN SIDE WALLS 3'-0" MIN //X/ BACKFILL RECOMMENDATIONS PER TREMONT 1 ENGINEERING GEOTECHNICAL REPORT 221065.20R1 ice/ice/ice/ice/ice/ice/ice/ice/ice/ice ��i��i��i��i��i��i��i��i��i��i��i��i��i� //� FABRIC; O 8E MINIMUM FABRIC LAP SMAINTAIN 12" TONE AROUNDUDRAOIN TILELEAR\\//\\//\\//\\//\\ \/\\//\//\// \\\\\\\\\\\ 1 ELEV. 808 III III III III i — III —III —III III III III " III - SOIL IMPROVMENTS PER REMOVE ANY TOPSOIL AND TREMONT ENGINEERING MAINTAIN MINIMUM OF 12" 6" PERFORATED PERIMETER DRAIN UNDISTURBED ADDENDUM TO GEOTECHNICAL COMPACTED STONE UNDER TILE DISCHARGED BY GRAVITY TO NATIVE SOIL REPORT 221065.20R1 FOUNDATION AND BASE SLAB, APPROVED SUMP SYSTEM A A A A PER GEOTECHINICAL REPORT DRAINAGE AND BACKFILL DETAIL 1/2" = 1'-0" NOTE: DVO REQUIRES THE INSTALLATION OF A DRAIN SYSTEM AROUND THE PERIMETER OF THE DIGESTER FOUNDATION GRADE ©2022 Larson Engineering, Inc. All rights reserved v o o N � O � O r Cn O 0-) O • V= QMco E O�op O L M L L = .� w�CD o C L Uj Q W00 NQ� 0 cY) LO a) ti a) o Cr) U) !E E �U0 o �oN.E- CnxxM0 �m ai_0 �b0 S Zao_ w J U W Z H 0 N Q Z W Q � z 0 z Q — � w H m W Coll) 0 J Cf) W `wo a Z W ac.) SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION 1 06/20/2023 REVISED NOTES Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: DRAINAGE AND BACKFILL DETAIL 0 zo SECTION 3/32" = 1'-0" 5 ". 1upir.1Y 164' _ 0" XW OF CONC AT EACH SIDE OF WALL OPENING BAR SIZE IS TO MATCH TYP VERT REINF 149'-0" 1'-0" 12'-0" 1'-0" 0000 00000 00000 00000 00000 00000 00000 o 0 0 010 0 0 0100000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 00000 0 0 0 0 0 0 0 0 00000 00000 00000 00000 00000 00000 00000 00000 00000 000 000 0000 o EFFLUENT PIT zo o " 9'-0" 4'-0" 2 SECTION S200 3/32" = 1'-0" SECTION 1 /8" = 1'-0" FF" - n" 'LUENT PIPE LER END DE WALL) ©2022 Larson Engineering, Inc. All rights reserved. v o o N O LO � 47 O• Q co E 0M U L � g L .� w�No 0 C L W 0 Ja 00 N C W00 0-0 NQd 0 co O 1- U) = M 6 E c U -itO Co CO U i CON. >O O M O op0 Z W J U W Z H O 0 N � a Z W a zp Z a_ Ww co0 JJ D Cf) W %xM000 Q o� Z W a � SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: SECTION VIEWS 18" SDR 35 PVC OVERFLOW PIPE CC (COUPLER END FLUSH TO OUTSIDE 1 S300 2 S300 1 SECTION S201 1 /4" = 1'-0" SECTION 1/4" = 1'-0" JLUUl7t YI I AMM M\ JA(-'.,AI nl- MIAll DAr7)O Oil Ql�LJOn mxlr� IAIM I ICAIT rNDC 2 S300 ©2022 Larson Engineering, Inc. All rights reserved v o o N +-I n � (n a)rn O • < ' E O�oo 0 L M L .� w�C) o C L Ui Q J 0000-0 � WNQV) 0 LO a) a) =6E o (ZU0 N in X M . O m N � CDU0 CN 00 W J U W Z H O N a � Z W � 0 _ Q � 0 z Q � w Cl) 0 J D M Cf) W %%wo a o� Z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION 1 06/20/2023 REMOVED OPENING Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: SECTION VIEWS J J 0 2 S30 SEE DETAIL 4/ S302 FOR BEAM REINF r, J >J c EC c H U) Q 0 NORTH 1'-0" DIGESTER ACID CHAMBER 3'-0" 6'-0"WEIR WALL 3'-0" , 12'-0" SLUDGE PIT WALL DETAIL 1 1 /2" = 1'-0" SECTION 1 /2" = 1'-0" 2 17 1'-0" JTED PC PLANK NG BY PC INSTALLER) FAIL PIT AIL OR :INF ALL -STER )TE: PLANK AND REMOVABLE =T CAST PANEL NOT SHOWN )R CLARITY ©2022 Larson Engineering, Inc. All rights reserved v o O N r U5 �0-) OQMc�o E o�oo 0 L � � L L = "' .� w�(D o L r W Q a W J 00O� NQ� 0 cY) LO a) � o1- _E6 E o (0 - 00 V N .E- in x M o Vimo a�� C)b0 00 CN W J U W Z H O N a Z W o Q � 0 0 Z Q mw W Cl) 0 J D M Cf) W 0 a o� Z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: SECTION VIEWS AND DETAILS S202 10 28 (1) #6 BAR CONT SPRAY -ON TOP -COAT EXTENDING DOWN EXT WALLS 3'-0" 4" OF SPRAY -ON SEALER/INSUL TO COVER TOP OF BIOGAS CHAMBER AND EXTEND DOWN EXT 3 WALLS 3'-0" FROM TOP OF PC PLANKS S300 (OVERLAPPING FOAM INSUL 2") 0C�00 00000ko— GR MAX: 15-0" 3000 PSI GROUTED JOINTS BY PC INSTALLER GR MIN: 14'-0" 10" GROUTED PC PLANK 4" FOAM INSUL STARTING #7 BARS @ 9" OC, VOF 2'-10" FROM TOP OF PC AND EXTENDING TO FOOTING, TYPICAL ON ALL EXT WALLS #8 BARS @ 9" OC, VIF /A 0 2" CLR -2" CLR 01 lo � J U N Cy o' J U Cl) 1'-6" 4'-0" APPLY SPRAY -ON EPDXY UNDER -COATING TO UNDERSIDE OF PC PLANK, EXTEND DOWN SIDE WALLS 3'-0" MIN #5 BARS @ 10" OC, HEF #5 HOOKED DOWEL 34 (MATCH VERT REINF SPACING) 10 6" VINYL WATERSTOP, REQUIRED AT ALL EXT WALL -TO -FLOOR JOINTS lif J CV �1 2 #5 @ 12" OC EW TYPICAL NON -LOAD BEARING WALL S300 1 /2" = 1'-0" 2" CL WATER ❑ STOP 00 w m 7-5 #5 HOOKED DOWEL @ 12" OC (HOOKS ARE TO BE HORZ ALIGNED WITH VOID) DETAIL CONC AND REINF J BY WALL CONTRACTOR U d 00 (1) #4 HAIRPIN @ 3'-0" OC A FLOOR SLAB REINF: #5 BARS @ 12" OC EW in VIEW "A -A" GROUT PLUG BY PC SUPPLIER (REPEAT DETAIL EVERY 3'-0") BLOCK OUT BY PC SUPPLIER 0 4 S300 GR MAX: 15'-0" GR MIN: 14'-0" 4" FOAM INSUL STARTING - 2'-10" FROM TOP OF PC AND EXTENDING TO FOOTING, TYPICAL ON ALL EXT WALLS 2" C co 1'-6" 1'-0" 4'-0" 2" CLR SPRAY -ON TOP -COAT EXTENDING DOWN EXT WALLS 3'-0" 4" OF SPRAY -ON SEALER/INSUL TO COVER TOP OF BIOGAS CHAMBER AND EXTEND DOWN EXT WALLS 3'-0" FROM TOP OF PC PLANKS (OVERLAPPING FOAM INSUL 2") 10" GROUTED PC PLANK (GROUTING BY PC INSTALLER) APPLY SPRAY -ON EPDXY UNDER -COATING TO UNDERSIDE OF PC PLANK, EXTEND DOWN SIDE WALLS 3'-0" MIN #7 BARS @ 9" OC, VOF #8 BARS @ 9" OC, VIF #5 BARS @ 10" OC, HEF #5 HOOKED DOWEL 34 (MATCH VERT REINF SPACING) 10 6" VINYL WATERSTOP, REQUIRED AT ALL EXT WALL -TO -FLOOR JOINTS �1 2 #5 @ 12" OC, EW '2 TYPICAL LOAD BEARING WALL S300 1/2" = 1'-0" 10 28 U FLOOR SLAB REINF: #5 BARS @ 12" OC EW s CONC AND REINF BY WALL CONTRACTOR 2" CLR 1'- 6" OfBLOCK OUT BY v PC SUPPLIER (1) #6 BAR CONT c� 0 N f- WATER STOP GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC ❑ VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" 00 m 3 1/2" BRG INTO VOID AT ALL OTHER LOCATIONS �w • ® #4 HAIRPINS @ 48" OC MAX PLACE IN HOLLOW CORE AS SHOWN #5 HOOKED DOWEL @ 12" OC (HOOKS ARE TO BE HORZ ALIGNED WITH VOID) y 2'- 0" DETAIL @2022 Larson Engineering, Inc. All rights reserved v O O N � O 2 � i rM 0 Crn O ■ Q A co E a)�M O ��0� U L M 4 L CY) .� w�No 0 C Cn W 0aN (B J � 00 � W NQdQ� O co � o U)=M U)�6 E c U -it O Co CO U i CO O C u X a)O N -a �2 C0,010- a 11 z w J U W Z O (3 N � M a Z W a O z a_ Lw co 0 J (f� W a z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: EXTERIOR WALL SECTIONS AND DETAILS S300 0 Zo O co INNER WALL 1/2" = 1'-0" (2) #4 BAR CONT J U N ❑ w �m w "^^ AN/ ^"' TOP -COAT EXTENDING VALLS 3'-0" CONC AND REINF BY WALL CONTRACTOR 1'-6" BLOCK OUT BY PC SUPPLIER 1/2" BRG -ON SEALER/INSUL TO COVER TOP ;HAMBER AND EXTEND DOWN EXT =ROM TOP OF PC PLANKS VG FOAM INSUL 2") D PC PLANK 3Y PC INSTALLER) Y-ON EPDXY UNDER -COATING DE OF PC PLANK, EXTEND WALLS 3'-0" MIN 34 10 FLOOR SLAB REINF: #5 BARS @ 12" OC EW \ Lf ) GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" INTO VOID AT ALL OTHER LOCATIONS (1)#5x3'-0"LG DWL@48"OC PLACE IN HOLLOW CORE AS SHOWN #4 HOOKED DOWEL @ 12" OC 8 (HOOKS ARE TO BE HORZ ALIGNED WITH WALL) 24 0 O 4 S301 s 4"X4" SPRAY FOAM COVING ON BIOGAS SIDE OF WALL. ALSO SPRAY COVING ON TOP 3'-0" OF VERT JOINTS WHERE THE SLUDGE AND EFFLUENT PIT WALLS MEE THE CHAMBER WALLS 6" VINYL WATER STOP 2" O � a U N ' � N `o 2'-0" CHAMBER DIVIDING WALL 1/2" = 1'-0" (2) #4 BAR CONT J U N DETAIL ill = 1'-0" ire w �m W WATER STOP SPRAY -ON TOP -COAT EXTENDING DOWN EXT WALLS 3'-0" 4" OF SPRAY -ON SEALER/INSUL TO COVER TOP OF BIOGAS CHAMBER AND EXTEND DOWN EXT WALLS 3'-0" FROM TOP OF PC PLANKS (OVERLAPPING FOAM INSUL 2") 10" GROUTED PC PLANK (GROUTING BY PC INSTALLER) APPLY SPRAY -ON EPDXY UNDER -COATING TO UNDERSIDE OF PC PLANK, EXTEND DOWN SIDE WALLS 3'-0" MIN 4"X4" SPRAY FOAM COVING ON BIOGAS SIDE OF WALL. ALSO SPRAY COVING ON TOP 3'-0" OF VERT JOINTS WHERE THE SLUDGE AND EFFLUENT PIT WALLS MEE THE CHAMBER WALLS #7 BARS @ 9" OC, VEF #5 BARS @ 10" OC, HEF CLR #5 HOOKED DOWEL 34 (MATCH VERT REINF SPACING) 10 6" VINYL WATERSTOP, REQUIRED AT ALL EXT WALL -TO -FLOOR JOINTS 1 2 #5 @ 12" OC EW CONC AND REINF BY WALL CONTRACTOR 1'-6" BLOCK OUT BY PC SUPPLIER 1/2" BRG FLOOR SLAB REINF: #5 BARS @ 12" OC EW Lf ) GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" INTO VOID AT ALL OTHER LOCATIONS (1)#5x3'-0"LG DWL@48"OC PLACE IN HOLLOW CORE AS SHOWN #4 HOOKED DOWEL @ 12" OC 8 (HOOKS ARE TO BE HORZ ALIGNED WITH WALL) 24 @2022 Larson Engineering, Inc. All rights reserved v O O N � O 2 U LO �rn O ■ QAcp E �M o 0� U L M 4 L .� wNo 0 C 0') Cn L I1J 0 J 00 N C W00 0-0 NQd V) W Z �= O �(!) N a Z W 0 = a O z a_ Lw co 0 J Cf) W %wo a o� Z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: INTERIOR WALL SECTION AND CHAMBER DIVIDING WALL SPRAY -ON TOP -COAT EXTENDING DOWN EXT WALLS 3'-0" 4" OF SPRAY -ON SE) OF BIOGAS CHAMBE WALLS 3'-0" FROM T1 (OVERLAPPING FOAI FLOOR SLAB REINF: #5 BARS @ 12" OC E' 10 28 (1) #6 BAR CONT SLUDGE PIT SECTION (WEIR WALL 1/2" = 1'-0" 2" CLR 0 WATER o STOP 00 uJ uJ #5 HOOKED DOWEL @ 12" OC (HOOKS ARE TO BE HORZ ALIGNED WITH VOID) 3 DETAIL S302 1 " = 1'-0" ry J U CONC AND REINF BY WALL CONTRACTOR 1'-6" 3 1/2" BRG BLOCK OUT BY PC SUPPLIER GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" INTO VOID AT ALL OTHER LOCATIONS #4 HAIRPINS @ 48" OC PLACE IN HOLLOW CORE AS SHOWN 2'-0" All SPRAY -ON TOP -COAT EXTEmnimn, DOWN EXT WALLS 3'-0" 4" OF SPRAY -ON SEALER/IN OF BIOGAS CHAMBER AND WALLS 3'-0" FROM TOP OF I (OVERLAPPING FOAM INSU 10" GROUTE (GROUTING APPLY SPR) TO UNDERS DOWN SIDE 4"X4" SPRAT BIOGAS SID COVING ON WHERE THE PIT WALLS P FLOOR #5 BAR: SLUDGE PIT SECTION (GAS WALL 1/2" = 1'-0" 19'_7" CONC AND REINF BY WALL CONTRACTOR REMOVABLE WET CAST A A OVER SLUDGE PIT 2" CLR CLR (1) #6 BAR CONT CONC AND REINF (1) #6 BAR CONT 1" BY WALL CONTRACTOR 1" a s a tr a _ Q - a J o d° as - U � a as a� N (3) ADDITIONAL #6 x 12'-0" LG HORZ w w BARS EACH FACE 00 w #3 TIES @ 4" OC FOR BEAM EXTEND 2'-0" PAST BOTH WALLS, SEE DETAIL 1 / S202 4 DETAIL S302 1 " = 1'-0" #5 HOOKED DOWEL @ 12" OC 10 (HOOKS ARE TO BE HORZ ALIGNED WITH WALL) 28 d 10 28 (1) #4 HAIRPIN @ 3'-0" OC #5 HOOKED DOWEL @ 12" OC (HOOKS ARE TO BE HORZ ALIGNED WITH VOID) CLR WATER STOP 00 m uJ (3) #4 HORZ BARS EACH FACE CONT (2) #6 HORZ BARS CONT `'— #3 TIES @ 12" OC FOR N BEAM EXTEND 2'-0" PAST WEIR WALL, SEE DETAIL 1 / S202 5 DETAIL S302 1" = 1'-0" 0 M R" GROUT PLUG BY PC SUPPLIER I I I I I I I I I I I I I I I I I a I I I I I 00 I I � d ' kf I I I (REPEAT DETAIL EVERY 3'-0") BLOCK OUT BY PC SUPPLIER (rLHIN VltVV) @2022 Larson Engineering, Inc. All rights reserved v O O N 2 6rn O ■LO cp E a) �M O ��M U = M 4 L CY) .� w�NN O 0 L I1J 0 J 00 N C W00 0-0 NQd O co u7 � o U)=M U)�6 E c U -it p Co CO U i CON. >U O M O C O 0L � 0_ Z W J U W Z H O (!) � N oc a � Z W v a _ O Z a_ Lw co 0 J D Cf) W %moo a o� Z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 VIEW ISSUED FOR REVIEW 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: SLUDGE PIT SECTIONS AND DETAILS BLOCK OUT BY PC SUPPLIER GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" INTO VOID AT ALL OTHER LOCATIONS #4 HAIRPINS @ 48" OC PLACE IN HOLLOW CORE AS SHOWN 2'-0" 2 DETAIL_ S303 1" = V-0" CONC AND REINF BY WALL CONTRACTOR 1'- 6" 1 1/2" CLR U 3 1/2" WATER STOP 0 0 00 m w SPRAY -ON TOP -COAT EXTENDING DOWN EXT WALLS 3'-0" 4" OF SPRAY -ON SEALER/INSUL TO 3 COVER TOP OF BIOGAS CHAMBER S303 AND EXTEND DOWN EXT WALLS 3'-0" 2 FROM TOP OF PC PLANKS S303 (OVERLAPPING FOAM INSUL 2") i -3 0 0000 10" GROUTED PC PLANK GR MAX: 15'-0" (GROUTING BY PC INSTALLER) J GR MIN: 14'-0" APPLY SPRAY -ON EPDXY UNDER -COATING TO UNDERSIDE OF PC PLANK, EXTEND DOWN SIDE WALLS 3'-0" MIN APPLY SPRAY -ON EPDXY UNDER -COATING TO UNDER SIDE OF PC PLANKS, EXTEND DOWN TO BOTTOM WALLS 4" FOAM INSUL STARTING 4"X4" SPRAY FOAM COVING ON WITHIN EFFLUENT PIT T 2'-10" FROM TOP OF PC AND BIOGAS SIDE OF WALL. ALSO SPRAY EXTENDING TO FOOTING, COVING ON TOP 3'-0" OF VERT JOINTS TYPICAL ON ALL EXT WALLS WHERE THE SLUDGE AND EFFLUENT PIT WALLS MEE THE CHAMBER WALLS #7 BARS @ 9" OC, VOF #7 BARS @ 9" OC, VEF #8 BARS @ 9" OC, VIF _ 0 O #5 BARS @ 10" OC, HE #5 BARS @ 10" OC, HEF ifl #5 HOOKED DOWEL (MATCH VERT REINF 2" CLR 2" CLR 2" CLR 2" CLR SPACING) #5 HOOKED DOWEL (MATCH VERT REINF 34 SPACING) 34 10 6" VINYL WATERSTOP, 10 REQUIRED AT ALL EXT WALL -TO -FLOOR JOINTS 6" VINYL WATERSTOP, REQUIRED AT ALL EXT FLOOR SLAB REINF: WALL -TO -FLOOR JOINTS #5 BARS @ 12" OC EW U N d (1) #6 BAR CONT #5 HOOKED DOWEL @ 12" OC (HOOKS ARE TO BE HORZ ALIGNED WITH VOID) 28 0 #5 @ 12" OC EW #5 @ 12" OC EW U "o 12'-0" 1'-0" 1'-6" `Y' 17'-0" 1 EFFLUENT PIT SECTION S303 1/2" = 1'-0" 10 A (1) #6 BAR CONT �A CONC AND REINF v BLOCK OUT BY GROUT PLUG B) BY WALL CONTRACTOR N PC SUPPLIER PC SUPPLIER 00( (2) #4 HAIRPINS @ 48" OC PLACE IN HOLLOW CORE AS SHOWN 6" 2'-6" 3 DETAIL S303 1" = 1'-0" GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC 1/2" BRG o VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" 0o m INTO VOID AT ALL OTHER LOCATIONS w — WATER STOP #5 HOOKED DOWEL @ 12" OC (HOOKS ARE TO BE HORZ ALIGNED WITH VOID) 28 10 (REPEAT DETAIL EVERY 4'-0") BLOCK OUT BY PC SUPPLIER VIEW "A -A" @2022 Larson Engineering, Inc. All rights reserved v o o N a) 0)rn O ■LO Q�� E M 0 M U L �LoM F .� wN �o 0 0.) ch 0 L I1J J 00 00 0- W NQd V) 0 co o 1- E c U 0 Co CO U i CON. (1)O d) 0 3: c C p � a 11 z w J U W Z �= O �(!) N a Z W a 0 = z� 0 0 Z a_ Lw CIO`)0 JJ m Cf) W %wo a o� Z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: EFFLUENT PIT SECTIONS AND DETAILS 4'- 0" 2 4'-0" REMOVABLE PC PLANK TYPICAL GROUTED CORE AND HAIRPIN @ 48" OC, 8 SEE DETAIL 4/ S300 S304 S304 4'-0" (2) ADDL GROUTED CORES AND HAIRPINS EACH SIDE OF REMOVABLE PLANK, SEE DETAIL 8/ S304 1 Q� I � I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I -------------------- ---------------------- --4n I- k----------------------------- #5 DOWELS @ 12" OC SEE DETAIL 4/ S300 (3) ADDL #5 HOOKED DOWELS @ 6" OC STAGGERED 1" FOAM JOINTS AT END OF REMOVABLE PC PLANK ONLY �\ PLAN VIEW - REMOVABLE PLANK OUTSIDE WALL S304 1/2" = 1'-0" NOTE: DO NOT GROUT SIDES OF 4" INSULATION/SEALER REMOVABLE PLANKS NOT SHOWN FOR CLARITY (SPRAY FOAM ONLY) (3) ADDL #5 HOOKED DOW SEE PLAN VIEW FOR SPAC ELS ING) � (2) REMOVABLE PLANK (3) ADDL #5 HOOKED DOWELS @ 12" OC STAGGERED DO NOT GROUT SIDES OF REMOVABLE PLANKS (SPRAY FOAM ONLY) (3) ADDL #5 HOOKED DOWELS SEE PLAN VIEW FOR SPACING) 3'- 9 1/2" +/- 4'- 5 1/2" +/- 3'- 9 1/2" +/- 4'- 5 1/2" +/- 3'- 9 1/2" +/- (3) ADDL #5 HOOKED 5 (3) ADDL #5 HOOKED #4 DOWELS @ 12" OC DOWELS @D 2 OC O GROUTED PC PLANKS S304 DOWELS @ 12" OC, SEE DETAIL 2/ S301 STAGGERED STAGGE L I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 3 Lruuli iVVV VVi iVli iVi iVu VVull uVV 304 I I I I I I I I I I I I I I I I u uu � u u u TYPICAL GROUTED CORE 1" FOAM JOINTS AT (2) ADDL GROUTED CORES AND #5 DOWEL AND #5 DWL @ 48" OC, END OF REMOVABLE BARS EACH SIDE OF REMOVABLE PLANK, SEE DETAIL 2/ S301 PC PLANK ONLY SEE DETAIL 5 S304 4'- 0" (2) 4'-0" REMOVABLE PC PLANKS 4'- 0" 02 PLAN VIEW - REMOVABLE PLANK INSIDE WALL S30� 1/2" = 1'-01, NOTE: ALL BEAM REINFORCING IS ADDITIONAL TO TYPICAL WALL REINFORCING :D�00000�C)-07)""(70 �O�OaO�O O"00' Ob O700OOO (3) #6 x 12'-0" LG HORZ BARS EACH FACE tit O"tl 8'- 411A11Tlrl�- O"tl Tlrl�- 11 !1 1L�1 TI 11 !1 k�r/ rwv� ttvo — . — v - -- @ 6" OC EACH FACE NOTE: 4" INSULATION/SEALER NOT SHOWN FOR CLARITY (2) #4 BAR CONT U N w m w ELEVATION VIEW - REMOVABLE PLANK S304 1/2" = 1'-01, CONC AND REINF BY WALL CONTRACTOR 1'-6" BLOCK OUT BY PC SUPPLIER L GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" INTO VOID AT ALL OTHER LOCATIONS • (2) ADDL GROUTED CORE AND #5 x 3'-0" LG DOWEL EACH SIDE OF REMOVABLE PC PLANK (3) ADDL #5 HOOKED DOWELS @ 12" OC, STAGGERED 10 28 L5 --\ �)SECTION VIEW - PLANK INSIDE WALL 2" C (2) #4 BAR CONT = 0 00 m �w ,, •• ��•• V •, •••• 1`Y/ r1vvL ttU V Cr% I U/-% 0 @ 6" OC EACH FACE NOTE: TYPICAL WALL REINF NOT SHOWN FOR CLARITY NOTE: 4" INSULATION/SEALER NOT SHOWN FOR CLARITY CONC AND REINF 1'- 6" BY WALL CONTRACTOR U BLOCK OUT BY iv PC SUPPLIER — GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" INTO VOID AT ALL OTHER LOCATIONS — TYP. GROUTED CORE AND #4 HAIRPIN @ 48" OC / 1'- 8" — WATER STOP — TYP. #5 HOOKED DOWELS @ 12" OC 10 28 6 SECTION VIEW - REMOVABLE PLANK INSIDE WALL S304 1" = 1'-01, NOTE: DO NOT GROUT SIDES OF 4" INSULATION/SEALER REMOVABLE PLANKS NOT SHOWN FOR CLARITY (SPRAY FOAM ONLY) (3) ADDL #5 HOOKED DOWELS SEE PLAN VIEW FOR SPACING) 7 (2) REMOVABLE PLANK O Q10, I �00000�CT-0-�DFO 0"'1010 (4) ADDL #8 VERT BARS @ 6" OC EACH FACE 4 ELEVATION VIEW - REMOVABLE PLANK OUTSIDE WALL S304 1/2 = 1'-01, NOTE: 4" INSULATION/SEALER NOT SHOWN FOR CLARITY J U (1) #6 BAR CONT iv 0 WATER ❑ STOP 00 m w (3) ADDITIONAL #6 x 12'-0" LG HORZ BARS EACH FACE 8" #3 TIES FOR BEAM REINFORCING l (SEE DETAIL 3/ S30,FOR SPACING) \ co III CONC AND REINF BY WALL CONTRACTOR REMOVABLE PLANK BY PC SUPPLIER 1" FOAM SPACER TYPICAL #5 HOOKED DOWELS @ 12" OC 10 28 �(70 SECTION VIEW - REMOVABLE PLANK OUTSIDE WALL S304) 1" = 1'-01, DO NOT GROUT SIDES OF REMOVABLE PLANKS (SPRAY FOAM ONLY) (3) ADDL #5 HOOKED DOWELS SEE PLAN VIEW FOR SPACING) 4 NOTE: ALL BEAM REINFORCING IS ADDITIONAL TO TYPICAL WALL REINFORCING NOTE: TYPICAL WALL REINF NOT SHOWN FOR CLARITY (4) ADDL #8 VERT BARS @ 6" OC EACH FACE NOTE: 4" INSULATION/SEALER NOT SHOWN FOR CLARITY CONC AND REINF BY WALL CONTRACTOR 2" CLR 1'- 6" U (1) #6 BAR CONT iv 0 BLOCK OUT BY PC SUPPLIER • • WATER • GROUT PLUG BY PC SUPPLIER. STOP INSTALL 18" INTO PC VOID AT o CONNECTION TO WALL. INSTALL 0° • PLUGS 4" INTO VOID AT ALL OTHER w LOCATIONS • • (2) ADDL GROUTED CORE AND #4 HAIRPIN EACH SIDE OF REMOVABLE PLANK • (3) ADDITIONAL #6 x 12'-0" LG HORZ BARS EACH FACE #3 TIES FOR BEAM 2'- 0" REINFORCING (SEE DETAIL 3/ S304 FOR SPACING) 8" (3) ADDL #5 HOOKED DOWELS lo @ 12" OC STAGGERED 10 28 SECTION VIEW - PLANK OUTSIDE WALL S304 1" = 1'-0" @2022 Larson Engineering, Inc. All rights reserved v o o N LO �rn O ■ QAcp E oM o tn�M U L � L .� w�No 0 o L I1J 0 J�D W00 NQd 0 co o � �zt.!M U) 6 E c U -it p Co CO U 1 Co N .� >U O M O 00 N C O L 00 0 _ z w J U W Z ^� o C!) � N a Z W a 0 = z� 0 p Z a_ Ww m coO J J D Cf) W %xM000 Q o� Z W a � SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: REMOVABLE PLANK DETAILS T 41 11' - 10" 11' - 3" BEAM -7" MOUNTING 0 14\ 1L17 _. 7r nn I n f IAll 11 non />n SS BEAM (TOP VIEW) 10'-0" ELEVATION VIEW - STAINLESS STEEL BEAM 1" = 1'-0" ul_' Ivl I ��l.ET FORMED BY CONCRETE CONTRACTOR SPRAY -ON TOP -COAT EXTENDING DOWN EXT WALLS 3'-0" 4" OF SPRAY -ON SEALER/INSUL TO COVER TOP OF BIOGAS CHAMBER AND EXTEND DOWN EXT WALLS 3'-0" FROM TOP OF PC PLANKS CONIC AND REINF BY WALL CONTRACTOR BLOCK OUT BY PC SUPPLIER w GROUT PLUG BY PC SUPPLIER m W O (1) #5 x 3'-0" LG DOWEL @ 48" OC U PLACED IN HOLLOW CORE AS SHOWN z Q Lo WALL DETAIL - STAINLESS STEEL BEAM 1 " = 1'-0" 1/2" x 7" LG 304 SS WEDGE BOLTS (2) EACH END OF BEAM, 5" ANCHOR EMBED (FOLLOW MFR INSTALLATION INSTRUCTIONS) @2022 Larson Engineering, Inc. All rights reserved v o o � N O 2 Cn O • QMco E O 0�00 (n � � U L = c ._woo C Q L LLI J LU 00 CN 0 cY) LO a) a) o1- U)� E O (0 - 00 V i (0N . in X M O m N � CDU0 Qo` d 0_ z W J U W Z H O a � Z W � 0 _ _ O Z m w W co 0 J D Cf) W %Moo a o� Z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: STAINLESS STEEL BEAM DETAILS ADD INSIDE AND OUTSIDE CORNER BENT REINFORCING BARS AS SHOW SIZE AND SPACING TO MATCH TYP. HORZ WALL REINFORCING U.N.O. TYPICAL OUTSIDE CORNER DETAIL 1" = 1'-0" ADD INSIDE AND OUTSIDE CORNER BENT REINFORCING BARS AS SHOW SIZE AND SPACING TO MATCH TYP. HORZ WALL REINFORCING U.N.O. TYPICAL INTERIOR CORNER DETAIL 1.1 = 1'-0" ©2022 Larson Engineering, Inc. All rights reserved v o o N � O � O r Cn O 0-) O • V= QMco E 0�00 O L M L L = .� w�(D o C L Uj Q W00 NQ� 0 cY) LO a) a) o� 0,400 6 E �U,4- o (0 - 00 V i (0 N . in X M O m N -0 O O O Q01 d 0_ Z W J U W Z H O � a �Z W o 0 _ Q � 0 0 z Q - � w H m W Coll) 0 J D Cf) W %Moo a o� z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: CORNER REINFORCEMENT DETAILS 6" VINYL WATER STOP REQUIRED (C r 9,_n„ 1,_n„ 7,-n„ 3'-6" 1 3'-6" , SUMP PIT BASE DETAIL 1/2" = 1'-0" SECTION 1/2" = 1'-0" 9'-n„ r, -n„ 1,-n„ 1,-r„ SECTION 1/2" = 1'-0" WATER STOP EW #5 HOOKED DOWEL (MATCH VERT REINF SPACING) 45 10 SLAB REINF: #5 BARS @ 12" OC EW @2022 Larson Engineering, Inc. All rights reserved v o o N � O 2 Cn O • � QMco E 0�0p O (n � � U L = c .� w�C) o C L Uj O J 00 LU CN V) 0 c0 LO a) a)01'- U)� E O (0 Co V i co N in X M . O m N � CDU0 CQ01 d 0_ Z W J U W Z H o N a �Z W o 0 _ Q � 0 0 z Q - m w W co 0 J D Cf) W a z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: SUMP PIT BASE DETAIL S307 2 S308 #7 BARS @ 9" OC, VEF #5 BARS @ 10" OC, HEF DIGESTER SIDE SEE DETAIL 4/ S308 FOR #8 @ 4" OC ADJACENT TO WEIR WALL 2" CLR Ivy. J,I 2" CLR SPRAY -ON TOP -COAT EXTENDING DOWN EXT WALLS 3'-0" 4" OF SPRAY -ON SEALER/INSUL TO COVER TOP OF BIOGAS CHAMBER AND EXTEND DOWN EXT WALLS 3'-0" FROM TOP OF PC PLANKS (OVERLAPPING FOAM INSUL 2") 10" GROUTED PC PLANK (GROUTING BY PC INSTALLER) APPLY SPRAY -ON EPDXY UNDER -COATING TO UNDERSIDE OF PC PLANK, EXTEND DOWN SIDE WALLS 3'-0" MIN 4"X411 SPRAY FOAM COVING ON BIOGAS SIDE OF WALL. ALSO SPRAY COVING ON TOP 3'-0" OF VERT JOINTS WHERE THE SLUDGE AND EFFLUENT PIT WALLS MEE THE CHAMBER WALLS ACID CHAMBER SIDE #5 HOOKED DOWEL (MATCH VERT REINF SPACING, SEE 2/ S400 FOR ALTERNATE DOWEL DETAIL) 01 6" VINYL WATERSTOP, REQUIRED AT ALL EXT 0 WALL -TO -FLOOR JOINTS n_ N �1 2 "' 1' - 0" �#5 @ 12" OC EW , 4'-0" , 1 ACID CHAMBER DIVIDING WALL S308 1 /2" = 1'-0" 71 011 440 /N All f"%fl %/CC 34 10 FLOOR SLAB REINF: #5 BARS @ 12" OC EW UP I IUN: UEN I EH WALL 5EU I IUN MAY BE PUUHEU LA I EK, HOWEVER ACID CHAMBER STUB WALL SHALL BE POURED MONOLITHICALLY WITH SIDE WALLS MINIMUM OF 10'-0" FROM EACH CORNER. ACID CHAMBER DIVIDING WALL - REBAR 1/4" = 1'-0" GROUT PLUG B) PC SUPPLIER (REPEAT DETAIL EVERY 3'-0") BLOCK OUT BY PC SUPPLIER I_1 VIEW "A -A" (PLAN VIEW) 1'-0" CONIC AND REINF BY WALL CONTRACTOR (1) #4 HAIRPIN @ 3'-0" OC 6" 2'-0" 2 DETAIL S308 1" = 1'-0" VC PIPES NING IL 6/ S400 x4'-0'I DIAG BARS -ACE OF CONIC AT ZNER OF OPENING )DL VERT BAR TO EACH FACE AT EACH SIDE OF WALL OPENING S TO MATCH TYP VERT REINF D, 10" OC, HEF GROUT PLUG BY PC SUPPLIER (REPEAT DETAIL EVERY 3'-0") BLOCK OUT BY PC SUPPLIER IG1 (1) #6 BAR CONT BLOCK OUT BY PC SUPPLIER GROUT PLUG BY PC SUPPLIER. INSTALL 18" INTO PC VOID AT CONNECTION TO WALL. INSTALL PLUGS 4" INTO VOID AT ALL OTHER LOCATIONS WATER STOP #5 HOOKED DOWEL @ 12" OC (HOOKS ARE TO BE HORZ ALIGNED WITH WALL) 28 10 00 O 0- LLI 0- 0 J U) - - - I - I - SUMP PIT BASE DETAILS 3 ACID CHAMBER WIER WALL S308 1/2" = 1'-0" 0 (-)�010( L J L L J 5 n @2022 Larson Engineering, Inc. All rights reserved V o 0 N O �o O •Ln QA(oo E Cn 0 (n L 0-) L L ="' .� w�CD o C L Uj Q J 00 WNQ� 0 cY) LO a) � o1- _E6 E �U'�I- O (0 - 00 V I (0N . in X M O m N _0 op0 CQ01 d 0_ z w J U W Z H O N a � Z W � 0 _ Q � _ O Z mw W Coll) 0 J Cf) W a z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: ACID CHAMBER DIVIDING WALL SECTIONS AND DETAILS S308 z 0 cn Q w � 11� w Q J > w w w U) W z Fy0 z w J Z w w Lu ww O cn INSIDE OF W SPRAYED ON 4" SEALER/INSULATION TO - COVER TOP OF BIOGAS CHAMBER AND EXTEND DOWN SIDE WALLS 2'-10" FROM TOP OF PRECAST (NO COVER OVER PITS) SPRAYED ON ACRYLIC TOP -COATING EXTENDING - DOWN SIDE WALLS 2'-10" (NO COATING OVER PITS) 0 SPRAYED ON SEALER/INSULATION AROUND ALL - PENETRATION PORTS PRIOR TO UNDER -COATING CORE DRILL THRU PRECAST PANEL FOR — PENETRATION PORTS, CONTACT PRECAST SUPPLIER FOR LOCATION OF HIGH TENSILE STRANDS LOCATED IN PRECAST PANELS PENETRATION PORT WILL VARY IN SIZE AND SHAPE PENETRATION PORT MOUNTING PLATE MUST BE SECURED TO PRECAST PANEL AND SEALED WITH ROOF CEMENT PRIOR TO FINAL INSULATION AND TOP COATING 0 PENETRATION PORT DETAIL n 3" DIA SCH 40 PVC PIF CENTERED IN WALL H OPENING VARIES SEE ELEVATIONS SECTION A -A DVO WALL PENETRATION DETAIL 3/4" = 1'-0" WALL CONTRACTOR TO FILL VOID WITH NON -SHRINK HYDRAULIC GROUT 4"X4" SPRAY FOAM COVING ON BIOGAS SIDE OF WALL. ALSO SPRAY COVING ON TOP 3-0" OF VERT JOINTS WHERE THE SLUDGE AND EFFLUENT PIT WALLS MEE THE CHAMBER WALLS SPRAYED ON EPDXY TO COVER ALL PIPE PENETRATIONS AND MIXING HOODS z 0 W Q w � � w Q J > w w w U) W z ry0 C7 � z w J Z w w ru ww O cn DVO SUPPLIED HDPE PLATE ANCHOR TO WALL, INSTALL PIPE THRU HOLES IN PLATE TO SUPPORT PIPES AND CREATE SPACE FOR GROUT WALL CONTRACTOR TO FILL VOID WITH NON -SHRINK HYDRAULIC GROUT DVO SUPPLIED HDPE PLATE ANCHOR TO WALL, INSTALL PIPE THRU HOLES IN PLATE TO SUPPORT PIPES AND CREATE SPACE FOR GROUT OUSIDE OF WALL 3 DVO WALL PENETRATION DETAIL S400 1.1 = 1'-0" 0 INSIDE OF W w t= ry 0 LL C PATCH TIE HOLE W/ SIKA QUICK VOH GR( 1'- 0" WALL WALL FORM TIE PLUG DETAIL 1 1 /2" = V-0" LINK SEAL DETAIL (OPTIONAL 1 " = 1'-0" PATCH TIE HOLE W/ SIKA QUICK VOH GROUT SIKA X-PLUG SIZE PER MANUFACTURES PRODUCT DATA SHEET NOTE: ALTERNATE WALL TIE PATCHING DETAIL SHALL BE SUBMITTED AND APPROVED BY DVO PRIOR TO USE IL IS INTENDED ONLY FOR WALL IONS THAT ARE REQUIRED LLS HAVE BEEN POURED. WHEN PLACE SLEEVES IN WALLS PRIOR 'OURS. CORE HOLE SIZE PER LINK SEAL SPECIFICATIONS FOR PIPE SIZE INSTALL LINK SEAL AROUND PIPE PER MANUFACTURER SPECIFICATIONS OUSIDE OF WALL EXISTING WALL POUR APPROVED ADHESIVES: - POWERS AC-100 + GOLD - HILTI HY-200 VF) ADHESIVE ANCHORS SHALL BE INSTALLED PER THE MANUFACTURES WRITTEN INSTRUCTIONS ALL SUBSTITUTIONS TO APPROVED ADHESIVES MUST BE APPROVED BY DVO, INC. 5'-0" ALTERNATE INTERIOR WALL BASE DOWEL DETAIL APLY APRROVED EPDXY BEHIND RETROFIT WATER STOP / /I / I / SCALE: 3" = V-0" / NEW WALL POUR #4 x 29" LG DOWELS WITH 5" EMBED (MATCH HORIZ REINF SPACING) DRILLED HOLE (SEE NOTES) 1/8"x1-1/4" STAINLESS STEEL BATTEN BAR FASTENED WITH 1/4"x2-1/4" STAINLESS STEEL ANCHOR BOLTS @ 6" OC GREENSTREAK #581 PVC RETROFIT WATER STOP AT WALL CONSTRUCTION JOINT APPLY EXPANDING SEALANT ON EACH SIDE OF WALL DOWELS ENTIRE LENGTH OF WALL APPROVED ADHESIVES: - POWERS AC-100 + GOLD - HILTI HY-200 ADHESIVE ANCHORS SHALL BE INSTALLED PER THE MANUFACTURES WRITTEN INSTRUCTIONS SUBSTITUTIONS TO APPROVED ADHESIVES MUST BE APPROVED BY DVO, INC. 5 ALTERNATE WALL INTERSECTION DOWEL DETAIL S400 1 " = 1'-0" (NON WIER WALLS) @2022 Larson Engineering, Inc. All rights reserved v o o N co �rn O •LM QMc�o E 0 Ln M U � U L 0') L L = a- I' .� w�CD o L r w —0O W J 00O� NQ' 0 cY) LO a) a)r_0') -o1- 0,400 0-) E � U - O L(0 Co V in X M O m N _0 CDU0 CONO d D_ z W J U W Z H O � (.7 � Z W v Q � _ O Z mw W co 0 J (n W z W a SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION 1 06/20/2023 ADDED DETAIL Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: MISCELLANEOUS DETAILS 6" VINYL WATER STOP REQUIRED (GREENSTREAK 705 OR 732) CENTERED ON WALL AT CONSTRUCTION JOINT CONSTRUCTION JOINT APPLY EXPANDING SEALANT OUTSIDE OF WALL N J U 2" CLR-/ '-2" CLR INSIDE OF WALL WALL CONSTRUCTION JOINT DETAIL S401 / 1 " = V-0" 6" VINYL WATER STOP REQUIRED (GREENSTREAK 705 OR 732) ire o � 1� 2 1'- 6" MIN 1 1/2" 1'-6" GREENSTREAK SPEED DOWELS 6" LONG SLEEVE - ELIMINATES THE NEED TO GREASE DOWEL APPLY EXPANDING SEALANT ry J U N � 1'-6" 1'-6"MIN 3/4" DIA. x 12" LG (MINIMUM) SMOOTH DOWEL @ 16" OC FLOOR CONSTRUCTION JOINT DETAIL 1 1" = 1'-01, VLVVI\L U/"lVL VLlIL WATER STOP TO SUBBASE WITH SPIKE @ 36" OC (MAX) GREENSTREAK 772 INSTALLATION NOTES: CENTER BULB BASE SEAL PVC WATER STOP FLOOR CONSTRUCTION JOINT DETAIL 2 1" = 1'-01, -HE FOOTING FORM BOARDS ALONG THE INTENDED FLOOR JOINT LINE. ) THE NAILS IN ADDITION TO THE CENTER ALIGNMENT FIXTURE WHEN >AG IN THE LINE. ED BELOW THIS LINE AND SECURED TO THE COMPACTED GRADE AS ILE THE STRING LINE WILL BE REMOVED TO FACILITATE SLAB POUR. SE SEAL JOINT AREA, INSURE CONSOLIDATION OF CONCRETE AROUND WITH THE USE OF IMMERSION VIBRATOR. @2022 Larson Engineering, Inc. All rights reserved v o o N � O U LO � 47 O ■ Q co E tn�0M U L � g L .� w�0 0 0 � L I1J 0 J 0000 C)Q� W NQd 0 co � o U)- � M :E 6 E c U -it 0 Co CO U 1 CON. CnxxM0 3: 00 op0 C0,01 a 11 z w J U W Z H O (!) � N oc a Z W a 0 = z� 0 0 -� Z a_ Ww m co0 JJ D Cf) W `o a Z W a � SEAL Date: Design Firm# Revision Schedule No. Date Description A 1/20/2023 ISSUED FOR REVIEW 0 1/24/2023 ISSUED FOR CONSTRUCTION Project#: 36220372 Drawn by: EWF Checked by: JGM Sheet Title: CONTROL AND CONSTRUCTION JOINT DETAILS DIGESTER1 HEATING SYSTEM i PROPRIETARY PROPERTY OF OM9 INC. PROPRIETARY PROPERTY OF OM9 INC. PROPRIETARY PROPERTY OF OM9 INC. NOI1Df12llSNOD 2i0H C73SVlllb lON - 19S M3IAId 'dno0 je SNOININU P 1uasu00 uallpm ssaadxa aqj Inoq}IM bullels uol}ona}suoo jo/pue '5ulpplq 'uol}on/;suoo of pa}Iwll jou jnq 'anlsnloul 'aanaosjegM asodind Aue aoj pasn aq jou pegs pue lied ul ao alogm ul peonpoidw aq jou Aew pue dnoaq SNOWW113o Aliadoid anlsnloxa aqj we sjuawnoop palmosse pue sueld asagl w m Cl) LL rn Q w U LL Q Q 00 v Cl) 0 Cl) T N 0 00 LL U N U 0 0 c w C: U) U C]) LLL,,,,,,,, 0 "* \ NO O J o F-+ Q m v NQ U J C") /Zw =\� LL L� Q ,�� 0 o — •`\ O .�` U %%% U W U) O ry z O LU o m co w o Z ISMS - Nb'�d �02i1N0� 1N�InIIa�S aNb' NOIS02i� o o N z z M v Q "� `dNI�02ib'D H12iON - Jl1Nf10D N�ODNI� z rd; Q < ? M U U U II m w V LU Ln N*d* N0I1MJDSDC1 NOISIAD2l Diva u WV19 � E) S ZS9T-D 'ON �ISNDDII `dNI-IMWD H12iON W00'SU0ww11-mmm VZT8'££8.6T6 X` =1 TS617'998'6T6 l91 L09LZ D,N '01a1e'd I ZOT @j!nS 'peold A4!uul OTVS 3�Idd0 HDI31Vb S2if10 HJf102iH1 Q3/\3IHDb NOISIA 2if10A 00000 • • ]Hi lt/ C TdVdl\dd I]NIMVd(I SIHl • • W LU U w ❑ Z z O w O w 0- J z w< w LU ~ < Y ❑ LU Q O w D LL Z J 2 LL LL Oo z z Cn U) O < < Q 0 O i O Co L U Q W Oz w LU � 0 cn Z C) Z U w w U OU U U uj O Z = Z O Z< Z W I- < m LZU Q 00 w U W IL LU O z w -j Q Ur J ❑ F- ❑ ❑ CC W' Fn I- Z 0- > < U J U ❑ z 0 0� J Z < < CO w 1w < m U Q Q OU (n W J w U' J J Ow O w ❑W � -j g > J ~ ❑ Q _ ❑ z LU m Lu 0 O J 0 = Cn � w < O cn O < O o W LL W z 0 2i m cn LU W (n Z ly W Z ❑ U Z w❑ J W CL Z o 0 U O Z >uw WLU J ❑ Cn U)Oz JZ W J o z < LU 2 w w O 2 z z< W W J<_ < c) co Cn < W W W W ~ W < J~ 0C OH UZ NZ < W J W F- >U Cam JU < O JO U H W U J ❑ I- ❑ < z W J LL Z w ❑W m H = Z (A LU m <Z LL W ~< ❑ W ZI- CnCL < OYJ �o NW IL Q ? w ? U J Z Z a w o Z< Z 0 J 1- Z CO W U) O = w m Ill H L LI W < W w LU Cn L I < Z W W O N - Of = Z Z Z Ill Z w Z z � 0 CC = J 0 U CO Z Z I- � W O ZO Y LL z o Q LWL LU0 ZO~ U< O 0=a �z W z J ❑ U O J 2< U D U) Z LL J Z> _- < 2 z L Cn o Cn CC W >- � CL Cn Z J� Z g LL W O < < zci - o w QY cn� 0= >Q �_ z_- w OQ U > J I- ~ _< w C J J~ > ~ < Z < O O 0C CC 0 L d O 00 2 = (D0 W WZ) <Z Q I-_ ❑ < LU0 a-F- Wa 1-Cn 0- zW � �� 2O ��_ �� OLLJ >_O �� zw Ww Q J � Cn Z Z W W Y U < W w 2 0 U) w- 2~ 0 w Z 2< o O O H W d W LLu z w Q 0 W ❑ CA LU LUH ~ w W F5 a LU Z ~ J H J W w❑ = H < w < Z Cn ><> CC m ~ LL1 w Q w< w❑ a U _ J J J J W J U J> U J W p❑p Z z > 1 LU Q Q❑ ❑ Cn ❑ Q Q Q Cn o� U' < OE _> d . LU < H W W J Z z= O J z Q I- I- ❑ g J = I- 0 Q g W (_� U a U 1- w 0 m O U _j 00 CL U) Cn (n z W� O U) I- Z CC O I� X z a Z= = J O C) U) LL 2U 0 z zQ E= 0Y zU) LLU' U ❑cnW O< OO U C\I C7 4 L6 (.r` 06 0') O I 1 / II I IZ p I / -j\ I I f\ \ LU LL LL 1 \ a I o Q Cy l \ I I W W LU W 00 LLJ \ I J ED CIO < U) w \ I I \ 1 � z \ Q O\ \ \ \ Q I \ \ \ \ \ \ \ I I I \ \ < w w \ _ > U �,� C• - �O co r Q \ I \ \ y \ \ \ \ -ZqL / I \ 1 ► I \ �/ \ O h C \ II \ \\ Z I �O \\ Z c=n \ \ I I \ I O < \ \ \ I \ \ / I LL t \ \ I / /I I IIIIII I / ' I 1� l I III IIII / I II l I IIIIII / I I / I I I IIIIII 1 I o f I I IIII I I I IIIII I / I I I IIIII I //I� I I I IIIII I / I I IIIIII I ,. / �\ I I I IIIIII / I\ I I IIIIII I I II IIli1 �II�I I I II I IIII 11'I I -\ I I I IIII' � l / \ I I , I I IIII LLJ U W C) Cn J O W z U) m CW G Y W 2 M LU U) G� z z 0 u) z O U m� z wz O U z J < LL w J o LU ❑ O E C6 -j III LU J O IL Z w� 0 Y� C m LU 00 < Of < 0 U �O W Z 1 j (nY Cn Q0 < ou) ❑ LU Qz ~W Y w Cn< w -U) 2 U Z: LU w O ❑ CO wU) 0 CL <�LU Q� w w� ww o UOf < � -M Q w � cn = 0 0 W< C/) gZ2 w C/) < LU<OJ 0~ z wwQ z0 >� O Op Q =<QLu Q W < Z ? Z ❑ U N U) LU LU co z w < 2i co Z < J ca 0m Fn < �J �00= Q 00 = 0C U) LL 0 = C) wz Q 00� Qo ❑ O OU 0- M of LL 00 C7 u N M L0 --oT \ / L / ` I W O z z 0 O CW G U) O U) W ❑ z I— W cn Z a Lz U J LL J� M m<w �w LU ofCn LL>Uc)���0 ❑F- o z00 Z zm �a �lri =WCn ❑O >Q 0w0 J U) -i zU 2 mW zp w� z�LL <O2Lu � U U w< O w i w W O�Q 1-❑ H J I-gmX W z§OJQ= 2❑ z1w ww �wQ00U)d <w�ozcn W I Z < Z LJ < I- Z❑ J m ZO� < Z Q< oo=>w °LL owo� z<<QoQ YUX zw I-<0�=- Q� 02F- LU ❑ >o2Sm QW J� WZZW>-N❑❑ M 0W<9 0LL1� ❑W Y- U)O �N H LL � > U W� w❑ W w ❑ 0< IL Z Z< J w Z< 0 Ow�2 Q< �Q Z=I=QW 0< cnU)zw�3 W I- w O 0 Z w w J l- w Lu Z 00 O L1 Z0w U)2 ❑w W OwZ�L~L❑Cncn LL 00 o>- Q zQ m -U)00-<LU-z 0OY LL< �(L LU U LU J g0 of� W� Ww W >-ow�0Cn LL O� ~ _o �= w O Y m< W w m LU < O�� 0 <Q ❑❑ z� wCnW>-c) �ELLI~�� LL W❑ < m w Z~ O m O Z= z ❑ Ill z z> Ill U U W w J J Q L Q U < U ❑ W 2 Coe U< < W o W W= N N W❑� U Q OU W w l= O zcnEL UCn �z 0-ZOcnCn<J>2 W Z 0 1-- I-t=� 0z w0 �I-- QzO���_�Z❑O CCH� d� HCn� WJOOcn�cnoD--iI I.- Z OCn O W ❑ LU J-j0 wW z WU UWwcoCnzzz W�<LL �JO wQ0 �_ <Wwzp0w�Zw�❑�wF--< UOtL z� az~ww�0 =<WWP� 00 w Y O LL O O Cw m a 0 O w❑ < <<❑ w `.=w z� IYZW���LUL)LULLW <- J m Ow z> U Z <J2J~ JwJLL O (n LU 0 CQ ° O d z= H w Z 0 j 11 «m 0 Q-j z❑2 W w~ 0��0 w- OZZ I-❑ ZLL QLU n❑wZ�cn❑W1--0 LU �< J W m Q J W o 2i N U 00 g< 0 z IL0<❑ W w U W Z ❑ 2<= 0, U J W J❑ J J a U Q O❑ �<=ZLwL� LL, Cn2LL_j00 LULLCnZL1J Q WW 1-OZ)ZLL0-.I�OO«�cnZF-J=O=❑WC) u 000U=OzzQ�❑=<�0?I-U)z 0 0� LL wLuF--, ❑�UZ�<w=cnXwow �O ❑ >- ZOU«Zcn00W<W 0GO L 008-0 Zm0U)Z�IYO�Z0Y 0Z J�co LL ❑u)z Z❑U -zzz��mZ0 wLLJ zQo❑❑wW�❑w� OZ❑U' W W WWLLJO❑>UCn< I-z<�oQm❑ cf)Q0CZI-�_ woJUwJwQm ^>❑0C❑1-Z O H=� Z❑❑ J Z Q w< w w J❑ 0 0 Z O w CD U)< WO<❑2CnCn<CLCn1-2wZ<<CnU) <Of 2 c~i) C\ M .4 LO c6 r�- 00 6 Li W O LL W o (Do C)0-z z z:)❑ W m = w Ww U LU LU z �o I-Z Z W WC0 J~ LU J< 2 �z< LU �a a_ LL ❑ o Z W ❑w IL Z OJ 0 > < IL CnZ Qu) U� O OJ LLJ N O ❑ W U)❑ Z C/)�Oo z U U _ LL 0Jcf) 0 LLaa� � O O0,0 L LU Ln LU_ < O ❑u _ _ Z:J I I- - cf) N J U LL W J ❑ J co W <cn �z_ULL F-0 wuiQ O o❑QWCn LU=W Cn w Cn Z LL LU 0C � J - - LL W I- ❑ 2 Lr) NW2�1-a0Ww M(�2 m��CrYLL > LU LL ❑LL~ ❑=�=U W a� LU �0L<utY J�>UN Xw W w=Z0°0l_��0 I- LU Q YLL, w Z_ Z= W> �0Cnm LL W Z<a ~J�Q N J W J 0< D� wLLJ Z Qw <Q= LUz~z�0L I- lYa= cf) U-C/)-OJ}z=z cnw � z�g<�- 1zO=dQ z>W DCnUQa-L� Y w 0 m w W Z m❑ w❑ w�=OW zor-w00---Lmom<J Q W ZLLUWCAW= U W O EL zY w- � 0 w z m �XXu Up 0-❑w0���jCanWZ<Q Y « Z I- Ye LLI W - LOU wcn Ucnw��wo1-UIZ 0 0 fn�NM4 (n� N M �-7f, r ` \\_/ / D A ' -A, \ J I I 1xlI,i�l IIIII II 1 IIIL/I�/�11/ I ``r I x J -mil I \ o C All I r L; C\ oc LC; C\ oc Q 00 C) N W Q 0 L.L 0 J O 2 H H Cn LU U ❑ N U z w O<Z O Q LL,z ZU0 LU m>_U O w Z ❑ W 0r)0- H U _j Uj U)OQ Z J Z O J J Q W U m Z W J Q Z WC) U cn L Y w Z Q LL O U Of o W m Q W w Q IL U Z O m � Z: w Q O) LLLL a 0 LLLL LLJ Q Z W z o C)f0- LU W 2-j> w LU0O �_ Y 0- � O (� (n in co a Cn Cn 0 cn J 1 1 JO 1 1 0 co £8 GVN i1 w co Cn 0 Q U m U z Z LC C N 0 v O H co LO c w ~ a . 00 CO) z w Z0 = C9 m Ww 0 v aa. Q ^ Z LU 00 a J Z O Q z 0 N a_ cn o to w O (� U co LU a 0 s o d J Cl)o �.. a Q c a o w zo0 W w U) J H w w D 0 0W Lf) J Q U Cn W J_ LL 0 oa LU z w w w M U Z < < < J U U U W z a LU 0- o o > � J Cl) = ihihM W = J a z CN CN CN CN LiJ - N N N N � 0 N M N v 0 0 0 0 P N 0 - 0) N 0) M N ti r-- N 00 O LL Q O O o O a (0 M 0) � Lr) O 0 Lfl Z3� w LL 0 0 0 0 Ca LLLq op o J 2 0- - 0 04 D c) > L '` � o W a LL N M N 4 U a, w U) E; J It CM M W z o 0 0 0 z a > 0 0 0 0 Z U z w ~ LL o Ln Q 06 LU c)0 0 6 0 6 0 6 0 6 LLI c) LL Q z U W Q) z 42- o v f/) LL q- 0) (0 N 00 N r- CQ c U o N Ch L6 C) Lo a 00 o = N N N N Q - Z 6 6 6 06 cB U U 0 Lq 0 Lq 0 Lq 0 Lq 0 0 0 0 U 0 Q a Q Q CV U? 00 N 0 0 0 z LL LL 0 LO m N W J 0 L w N M Q L U L U U L N Z ❑ c ca N U O L0 o Lr) 00 M 00 000 9'90s 000^ oMo I -06� wCOo <w UJ LL oo z / Cn ~ o 0 U) 00 9'L09 z U) LU J Z � p �w C) o cop � UO UJ U) 99'8 �8 L "60s ❑ooLU L`) _ J Lo > M / ~ CV C:) / � O 00 06 O co z � / ❑ 5Z'6 18 Z0 oN GZGs > Z LLaa �M 0 -/❑� 000M00 LO 2 0 rn 00 D 00Z o0 Lq �0zZ ❑~__ 6L'6�9 ZS6s M LO 00 00 O I- CD 00 O o J U c\I � _ ❑ O Z N LOo sscg O N LO o LO O COI COI COI 00 0 0 co LLI J I.L ji j j OLLI L LI U U cn C/) N z0w _ U) 0 O + 0 O LC) + O i 6nnp-Z02i3-0'170-LE£-86b99\(]0\IaagS\JMC]\(84b9S) Aalep weaq -L\bu/ule;sns-8Lb9S\LS£\:s VAPOR INLET VAPOR INLET 3" *FA3 IGNITION PANEL (MODEL: DSI) NOTES: 1. NO POCKETS 2. 300 BTU/SCF MIN * SUPPLIED BY HERO FLARE REV Id 0 = o ~ w O > F- ry 0 LU w U) co w O J U U) _ Lu m J OQ Z () J Z W W W z = (D F— Z F— W 2 < H Q (D _ Z U — Z_ z Z Z H U) U of } LU F- 0 L 00 w g = J F = Z F-_ Q U) L W_ J W d J 0-0 = U) U) U) W ry of W Q Z z O Q F- J Q Q W �= m l Z J W J LL � Z Z O Q U _j Lu J W F— N U � E O F- = U) H w =) Ur Q Q O ~ Z Q U) a — ry- w w U) F- =) z w O O U Z Z O O F— U U LL LU J Q — w O (Y 75 W = F--: H = O (� UY O z O Z U W U ry W I W U) z_ = (D F— Z Z_ W r-) 75 W_ Q 0 = OO m z � Z W Z U) =) CD z W O � w U) o Z Q0 F- _O ory a z F- O =) O Q = o O 11 LUz — w F- a R 1 n o n n r! E, n LJ I 1 !l LJ V LJ L 1 V 11 - - I I e p 2 � ~ w O > H W Q w w U) U) w O ry J U) U �— Q U Lu m J O Q J Z J_ FY LLB } w w z = U F— Z F— w 2 < H Q O = z (D Z_ Q Z Z Z H M u) U W } LU F— z L D m w Q = J H p = Z F- Q U) Q ry LU J w J 0-0 =) U) U) U) w of G� w az Qoz J Q Q w p- m l Z J w J Q LL p Z Z O Q U J w F— N U ry O H 2 U H w Z) Q a0 F- Z Q U) a- G� w w U) F- =) z w =) � O ry O U Z Z O W Q F- U U LL LU — J Q w O of w = F� H = O C� G� Fy O a z O z U w O U Z o LUi LU u) z _ F- Z z LU— o � = p U O m Z LU Z LU� U U CD LLZ O W p U p Z S Q w d Z H O =) pz O Q = of O LL v) LUz- w = Q F- 0- 1 A M n n C C n LJ I I !l Li V L-1 L 1 V 1 1 - 9 11 I Id 0 = o ~ w O > F- ry 0 LU w U) co w O J U U) _ Lu m J OQ Z () J Z W W W z = (D F- Z F- W 2 < H Q (D _ Z U — Z_ z Z Z H U) U of } LU F- 0 L 00 w g = J F = Z F-_ Q U) L W_ J W d J 0-0 = U) U) U) W ry of W Q Z z O Q F- J Q Q W �= m l Z J W J LL � Z Z O Q U _j Lu J W F- N U � E O F- = U) H w =) Ur Q Q O ~ Z Q U) a — ry- w w U) F- =) z w O O U Z Z O O F- U U LL LU J Q — w O (Y 75 W = F--: H = O (� UY O z O Z U W U ry LLJ I LU (n z = (D F- Z Z_ W r-) 75 W_ Q 0 = OO m z � Z W Z U) =) CD z W O � w U) o Z Q0 F- _O ory a z F- O =) O Q = o O 11 LUz — w F- a R 1 A o r+ r% C C !- LJ I I !l LJ %., L., L_ 1 V I 1 9 11 11 I _ ore --- __-___�_ TEMPORARY C/.IN TRUCIRON ENTRANCE- o� -_ -INLET P_RCTiGR.N -- - - --' -m?I _ R (TVP) -\-LI—S -` --------__•� _ _ _ _ _'� mmmmmm� min -- m 0 -mmm� IN I ks I�1��-II1�I u.sD THIS I.DD z+DD —K STRM PROFILE - ______ _• I / I `RELOCATE11 D ELEC RIC SERVICES —CWXA LXt'T GLASS SFl P R P LL L o AA PROFlIE SCALE VELOCRYDISSIPATIOR PAD VDP DOUTESIGN PIPE OR•Ex STONDEMP 319NG SCALE I'-30' LET SLOPE V10 _x gm Inm) (�I ) N LEI') wmlx IIAI�1 rmINCDon a PERMANENT CHANNEL SCHEDULE (CAapferR05 _NCQEQ E6EG Flaming aMDesgn Mama,) xnMS NGTH DA ACCUM I� ao SLOPE V SHEAR DEPIII PRF�A W'P " DF ?L ioPE RMANENT IFTI N01 NCI 0 Ilwxq IOS31 IFnFTI x ALUE /8) IPSFl IPTI I -2) RTI RTI @4 Sgvl uxIND GRASS GRASS GPASS IMF - NAG C350 I CONSTRUCTION SEQUENCE SEDIMENT/SKIMMER BASIN REMOVAL SEQUENCE1. ONCE A GOOD STAND 011 1 "Al BEEN ESTABLISHED AMC APPROVAL FaoM urvcoLN C.LTRY IRS BEEN oRTA'r 3. DBER GA KIMs,ARDENT E.SEDIIPPAPMPaoNs GTDPE PIPING. RISER OUTLET STRUCTURE. COI GMDETHEBASIIAM N AREA oOFINISHED GRADE ASSHOWN ONTAVPROVEG PLANE ANT_ 5. BEED AID STABILIZE All IIETURBED AREAS IMMEDIATELY. oNr. NN THEeouNoARIE ovsiHi eIT.TIN LµAooI FORMS FOUND ON WIU- BE LEFT SHORT AMD EXTENDED THROUGH BASIN AREAS AFTER SITE HAS BEEN . (LOCHNi DICATES THE LIMITS OF ULTIMATE DISTURBANCE. STOCKPILE AREA NOTES STOC�ILLTE utEA C. MA%IMUM HIEIGHT BHALLNOT EXCEE030 FEET. 1. STOCHFILE nREAS SHALL SE HEFT WRHIIN FROFOSEDILIMITS SHOWM ON EDI�MSNT RUNOFF. STOCKPILE I. SEEDING OR COVERING OF PILES WITH TARPS OR MULCH IS REQUIRED AND WILL REDUCE WATER FROM RUNNING UNDERNEATH THE PLASTICAT THE TOP OF THE SLOPE TO N EEP FOR FUTURE ISE AFTER THE PROUIECT IS COMPLETE(BUILDERS, ETCIPTHE FINANCIAL RESPONSIBLE PARTY MUST NOIIFY LINCOLN COUNTY OF A NEW MAIHTAMA VEGETATIVE BUFFERAT THE TOE OF THE SLOPE(W PRACTIC�' HERE TOTAL DISTURBED AREA 2.08 AC LDD LIMITS OF DISTURBANCE SILT FENCE -- DI VERSION DITCH ® INLET PROTECTION O SEDIMENT BASIN POROUS BAFFLES SILT FENCE OUTLET SKIMMER WRAP CHECK DAM �N Capo'`'h f yam': INE� P� z //Z(P(OO NOT RELSbASNO FOR CONSTRUCTION �a IN LATS P IN Am C rc E � a 3 s DmA31 �3 • 1 =30 LU F 66418 SC4.2 s 0 = 0 ~ LL O > 0 W W C/) (n W O w J C/) U � CO = 0 U Lu F , m J H O Q z (j J Z J_ n- W } W W Z = U H Z W H Q C.7 = Z U Z Z Z H � u) U cl� } LU 0 — z � L m W Q = J � 0 F Q Y 0 w LLJ J W � J 0-0 Z:) C/) U) U) Lu w C. W Q Z Z Z O Q J Q Q W m l Z J W J c M 0 Z O Z Z U } 0 J w F-- N U w O U w ry Q Q O F- z Q co a — W w Lu <n F- =) z w ZD O U Z 20 w Q F- U U LL LLI J 0 — W O of W H = O _U O a F-a_ Z U Lu � Z U r 0 LU i w cn z = c7 F-Z z w — � o = o c7 O Z m Z LU Z w � u) U U w z O W U) Z Z 0 S Q Q O 0 ry a z F- O =) O Q = O U w w z- -F- w ry = Q 1 A M f� r\ r' r" f 1 1 1 1 1 rl% L) 11 LJ L I V I I Attachment 6 Floodplain Maps ON Legend North Carolina Floodplain Mapping Program Panels 0 PolitioaIAre as Stream Centerline Cross Sections fir— Levee Flood Hazard Areas - AE Floodway (AE) 0.2 % ChanoeAnn uaIFlood Hazard � Future Conditions 1%Annual Chance Flood Hazard National Flood Hazard Layer FIRMette .., FEMA Legend 81o23V'W 35o25'48"N I - l .V,000 0 250 500 1,000 1,500 2,000 Basemap: USGS National Map: Orthoimagery. Data refreshed October, 2020 SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT Without Base Flood Elevation (BFE) Zone A, V, A99 SPECIAL FLOOD With BFE or Depth zone AE, AO, AH, VE, AR HAZARD AREAS Regulatory Floodway 0.2%Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile zone x ®`Future Conditions 1% Annual Chance Flood Hazard zone x Area with Reduced Flood Risk due to OTHER AREAS OF Levee. See Notes. zone FLOOD HAZARD ��� Area with Flood Risk due to Leveezone D NO SCREEN Area of Minimal Flood Hazard zone Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard zone D GENERAL -- - - Channel, Culvert, or Storm Sewer STRUCTURES IIIIIII Levee, Dike, or Floodwall V Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation a - - - Coastal Transect ^-^^-5n— Base Flood Elevation Line (BFE) Limit of Study Jurisdiction Boundary — --- Coastal Transect Baseline OTHER _ Profile Baseline FEATURES Hydrographic Feature Digital Data Available N No Digital Data Available MAP PANELS Unmapped YThe pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 9/8/2022 at 12:59 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Attachment 7 Division of Air Quality Permit Applicability Determination ROY COOPER Governor ELIZABETH S. BISER Secretary MICHAEL A. ABRACZINSKAS Director Mr. Rick Wilcox CEO SRNG-Beam, LLC - Beam Dairy 1447 South Tyron Street Suite 301 Charlotte, NC 28203 NORTH CAROLINA Environmental Quality January 9, 2024 SUBJECT: Permit Applicability Determination Applicability Determination No. 4040 SRNG-Beam, LLC - Beam Dairy Cherryville, Lincoln County Facility ID No. 5500132 Dear Mr. Wilcox: The Division of Air Quality received your letter on September 29, 2023, requesting that this office determine whether an air quality permit is necessary for the proposed dairy manure -to -renewable natural gas facility located at 3058 Johnstown Road, Lincoln County, Chenyville, NC. In light of the information provided, personnel of the Division of Air Quality have reviewed your letter relative to applicability to air quality permits, and our determinations are listed as follows: 1. SRNG Beam, LLC Beam Dairy (Facility ID. 5500132), Lincoln County, North Carolina is exempt from permitting per 15A NCAC 2Q .0102(d) since the facility -wide actual emissions of particulate matter (PM10), sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, hazardous air pollutants (HAP), and toxic air pollutants (TAP), each are less than five (5) tons per year and the total potential aggregate emissions of these pollutants are projected to be less than 10 tons per year. 2. This facility will be recommended for a compliance assurance visit (CAV). North Carolina DepartmentofEnvironmental Quality J Division of Air Quality D Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, NC 28115 704.663.1699 T I 704.663.6040 F N Rni anouw. OagNneM N GVImmmeMA 9u9� Mr. Wilcox January 9, 2024 Page 2 Therefore, this office has determined that an air quality permit is not required for the SRNG Beam, LLC Beam Dairy (Facility ID. 5500132). It should be noted that this exemption from the permitting requirement does not exempt SRNG-Beam, LLC - Beam Dairy from complying with the applicable emission control standards. Any emissions resulting from the SRNG Beam, LLC Beam Dairy (Facility ID. 5500132) must be accounted for on all facility wide emission summaries. Furthermore, should you decide to modify the process such that the result is an increase of emissions of air pollutants including toxic air pollutants, an air quality permit may be required and SRNG-Beam, LLC - Beam Dairy should submit a permit application to this office prior to such actions. You are advised that future regulations including National Emission Standards for Hazardous Air Pollutants (NESHAP) may be promulgated and adopted by the Division which apply to this type of manufacturing facility. If so, SRNG-Beam, LLC - Beam Dairy may be required to apply for an air quality permit for this equipment at that time. This exemption from the permitting requirement is based upon your statement that the source will be operated under the threshold levels as outlined in the regulation. Please be advised that the operation of any air pollution emission sources which results in emissions in excess of the threshold levels without an air quality permit is a violation of 15A NCAC 02Q .0101, "Required Air Quality Permits." If this facility is required to obtain an air quality permit for this equipment in the future because of increased emissions, each day of operation of the emission sources without an air quality permit represents a separate violation. Such violations maybe subject to enforcement action pursuant to NCGS 143-215.114A. If you have any questions with reference to the above matter, please do not hesitate to contact Karyn Kurek at 704-235-2220. Sincerely, Melinda Wolanin, Regional Supervisor Division of Air Quality, NCDEQ KAK:tm cc: Laserfiche https://nceonnect,shaepo int.com/sites/DAQ-MRO/Counties/LINCOLN/00132/5500132_EXEMPT_LTR_20240109.doex