HomeMy WebLinkAboutSAW-2023-01253_Provisional Notification.pdf DEPARTMENT OF THE ARMY 1 - WILMINGTON DISTRICT,CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON,NORTH CAROLINA 28403-1343 January 26, 2024 Regulatory Division Action ID. SAW-2023-01253 Billy E. Lee Town of Cary PO Box 8005 Cary, North Carolina 27512-8005 Dear Billy E. Lee: This is in response to a Pre-Construction Notification (PCN) SAW-2023-01253 received on November 21, 2023, and considered complete on January 25, 2024. In submitting the PCN, you requested verification that the proposed project is authorized by a Department of the Army (DA) Nationwide Permit (NWP). The work affecting waters of the United States is part of an overall project known as Town of Cary Dredging Project. The activities in waters of the United States include dredging and bridge stabilization. The project involves impacts to 4 acres of Symphony Lake for dredging. Regulated activities include temporary impacts for 20-linear feet (500 square feet) for a temporary bridge for transportation. Permanent impacts would include 20-linear feet (525 square feet) for installation of gabions to stabilize existing bridges The project is located at 13001 Regency Parkway, Cary, Wake County, North Carolina. This letter is a provisional notification that your proposed project has been reviewed under NWP Number 14 Linear Transportation. In accordance with 40 CFR Part 121 (401 Rule), the Corps cannot take final action on the NWP verification request until the procedures outlined in the 401 Rule for an individual Water Quality Certificate (WQC) have been completed. Specifically, a Department of the Army (DA) permit or verification cannot be issued until a Section 401 WQC has been either issued, waived, or denied, and the neighboring jurisdiction review process described in 40 CFR 121 has been successfully completed. Conditions of the Individual Section 401 WQC, will generally become conditions of any final NWP verification letter. Should state action on the required WQC approve a project different from that shown on the current application, a modification to the PCN will be required. You should notify our office of any such changes as substantial changes may require further evaluation. -2- As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine Fisheries) does not preclude the requirement for obtaining DA authorization (e.g., an NWP/RGP verification letter) prior to commencing the work. In all future correspondence, please refer to file number SAW-2023-01253. A copy of this letter is forwarded to State and/or Federal agencies for their information. If you have any questions, please contact Alexi Archer, at 912-837-9860, or by email at Cristin.A.Archer@usace.army.mil. Sincerely, Alexi Archer Project Manager, Raleigh Field Office Copies Furnished: