Loading...
HomeMy WebLinkAboutNC0021849_Application (ATC)_20240201 (13)State of North Carolina DWR Department of Environmental Quality Division of Water Resources Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 K. Residuals Management Plan ❑ For all new facilities, expanding facilities, or modifications that result in a change to sludge production and/or sludge processes, provide a Residuals Management Plan meeting the requirements of 15A NCAC 02T .0504(il and .0508; the Plan must include: ❑ A detailed explanation as to how the generated residuals (including trash, sediment and grit) will be collected, handled, processed, stored, treated, and disposed. ❑ An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. ❑ A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application. ❑ If oil, grease, grit or screenings removal and collection is a designated unit process, a detailed explanation as to how the oil/grease will be collected, handled, processed, stored and disposed. ® Not Applicable. SECTION 4: PROJECT INFORMATION A. WASTEWATER TREATMENT PLANT FLOW INFORMATION — COMPLETE FOR NEW OR EXPANDING FACILITIES 1. Provide the following flow information: Plant Flows Existing Plant Design 1.0 MGD Current NPDES Permit Limit 0.7 MGD Current Annual Average (past 12 months) 0.41 MGD For Past 12 Months: Start Date: December/2022 End Date: November/2023 For Past 24 Months: Start Date: month/yr End Date: November/2023 Maximum Month 0.64 MGD 0.51 MGD Maximum Day 0.86 MGD 0.85 MGD Peak Hour 2.2 MGD 2.2 MGD APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 5 DWR Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 B. WASTEWATER TREATMENT FACILITY DESIGN INFORMATION — COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR TREATMENT PROCESS MODIFICATIONS 1. Have all of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities been met by the proposed design and specifications? ® Yes or ❑ No. If no, provide justification as to why the requirements are not met, consistent with 15A NCAC 02T .0105(n): 2. Provide the design influent and effluent characteristics that are used as the basis for the project design, and the NPDES permit limits for the following parameters: Project Basis of Design Influent Design Influent Design Influent Concentration Concentration Load - Current (Must be (Must be Annual supported by supported by Design Effluent Average (past Engineering Engineering Concentration and/or NPDES Permit Limits 12 months) if Calculations Calculations (monthly average) Parameter Available [Section 3.H Section 3.111)Load Ammonia Nitrogen Not Measured Not Measured Not Measured 4.0 mg/L Summer 4.0 mg/L Summer 8.0 mg/L Winter 8.0 mg/L Winter (NH3-N) mg/L mg/L lb/day Biochemical 15.0 mg/L Summer 15.0 mg/L Summer Oxygen Demand 96 mg/L 110 mg/L 643 lb/day (BOD5) 30.0 mg/L Winter 30.0 mg/L Winter Fecal Coliform 351100 per 100 mL 35/100 per 100 mL Nitrate + Nitrite Nitrogen (NO3-N + Not Measured mg/L Not Measured mg/L NO2-N Total Kjeldahl Not Measured Nitrogen mg/L Not Applicable, Monitored, No Limit Monitored No Limit mg/L Total Nitrogen mg/L Not Applicable, Monitored, No Limit Monitored No Limit lb/year lb/year Not Applicable, Monitored, No Limit Monitored Not mg/L, Total Phosphorus Not Measured Not Measured Not Measured Reported mg/L Not Applicable, Monitored, No Limit mg/L mg/L lb/day Monitored No Limit lb/year lb/year Total Suspended Solids (TSS) 99 mg/L 120 mg/L 701 lb/day 30.0 mg/L 30.0 mg/L 3. Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? ® Yes or ❑ No. If no, describe how and why the Permit Limits will not be met: _ APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 6 DWR Division of Water Resources 4 State of North Carolina Department of Environmental Quality Division of Water Resources APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT FORM ATC 10-23 Per 15A NCAC 02T .0505(i), by-pass and overflow lines are prohibited. Is this condition met by the design? ® Yes or ❑ No If no, describe the treatment units bypassed, why this is necessary, and where the bypass discharges: Per 15A NCAC 02T .0505(k), multiple pumps shall be provided wherever pumps are used. Is this condition met by the design? ® Yes or ❑ No. If no, provide an explanation: 6. Per 15A NCAC 02T .0505(1), power reliability shall be provided consisting of automatically activated standby power supply onsite capable of powering all essential treatment units under design conditions, or dual power supply shall be provided per 15A NCAC 02H. 0124(2)(a). Is this condition met by the design? ® Yes or ❑ No. If no, provide (as an attachment to this Application) written approval from the Director that the facility: ➢ Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks, and ➢ Has sufficient storage capacity that no potential for overflow exists, and ➢ Can tolerate septic wastewater due to prolonged detention. 7. Per 15A NCAC 02T .0505(o), a minimum of 30 days of residual storage shall be provided. Is this condition met by the design? ® Yes or ❑ No. If no, explain the alternative design criteria proposed for this project in accordance 15A NCAC 02T .105(n): 8. Per 15A NCAC 02T .0505(g), the public shall be prohibited from access to the wastewater treatment facilities. Explain how the design complies with this requirement: The WWTP has a fence around the facilty and a gate at the front of the facilty to restrict access. 9. Is the treatment facility located within the 100-year flood plain? ❑ Yes or ® No. If yes, describe how the facility is protected from the 100-year flood: C. WASTEWATER TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION — COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR MODIFIED TREATMENT UNITS 1. PRELIMINARY AND PRIMARY TREATMENT (i.e., physical removal operations and flow equalization): No. of Plan Sheet Specification Calculations Treatment Unit Units Type Size per Unit Reference Reference Provided? (Yes or No) Manual Bar Screen 2 Bar Rack 2.2 MGD at peak hourly flow M1.01 05 50 00 Mechanical Bar 2 Step 2.2 MGD at peak hourly flow M1.01 46 21 26 Screen Grit Removal 1 Vortex 2.2 MGD at peak hourly flow M1.01 & 46 23 23 M 1.02 Flow Equalization -- gallons Primary Clarifier Circular ft diameter; ft side water depth Primary Clarifier Rectangular square feet; ft side water depth Other APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC 10-23) Page 7