Loading...
HomeMy WebLinkAboutFW_ _External_ US Army Corps of Engineers Public NoticeCarpenter, Kristi From: Chapman, Amy Sent: Monday, July 24, 2023 8:12 AM To: Carpenter,Kristi Cc: Ward, Garcy Subject: FW: [External] US Army Corps of Engineers Public Notice Importance: High Follow Up Flag: Follow up Flag Status: Flagged FYI Amy Chapman, CPM Branch Chief 401 and Buffer Transportation Permitting Branch Department of Environmental Quality 919-707-3871 office amy.chapman(cDdeq.nc.gov ,�: D E '�` NORTH CAROLINA - kjlo� Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: CESAW-PublicNoticeList <CESAW-PublicNoticeList@usace.army.mil> Sent: Friday, July 21, 2023 10:22 AM Subject: [External] US Army Corps of Engineers Public Notice Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. As you requested, you are hereby notified that the Wilmington District, United States Corps of Engineers, has issued a Public Notice. The text of this document can be found on the Public Notices portion of the Regulatory Division Home Page. Each Public Notice is available in ADOBE ACROBAT (.pdf) format for viewing, printing or download at: https://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Public-Notices/ The current notice involves: SAW-2021-01091 Name: NCDOT HB-0001 Alligator River Bridge Tyrrell County Issue Date: 21 July 2023 Expiration Date: August 21, 2023 Point of Contact: Kyle Barnes Email: Kyle.W.Barnes@usace.army.mil Project Description: The NCDOT proposes to replace US 64 Tyrrell County Bridge Number 7 (Lindsay C. Warren Bridge) over the Alligator River in Tyrrell and Dare Counties (STIP No. HB-0001). The existing bridge, otherwise known the Lindsey G. Warren Bridge, is a two-lane, swing bridge and would be removed as part of the project. The proposed replacement structure would be a modern two-lane, high-level, fixed span bridge providing a vertical navigable clearance of 65 feet. The HB-0001 project proposes a 2-lane roadway and bridge, with 10-foot shoulders (5-foot paved on the approaches) and 8-foot paved shoulders on the bridge. Total project length is approximately 4.64 miles. The project area is variable along the project length, following the proposed slope stakes, plus 25 feet on either side of US 64; the corridor is 50 feet on either side of the proposed bridge. The project starts in Tyrrell County on US-64, just west of Fort Landing Road (Sta. 662+50). The new bridge alignment diverges from the existing US 64 alignment and passes north of the existing marina/convenience store and crosses the Alligator River to the north of the existing Lindsay C. Warren Bridge. The project ends in Dare County and ties back into existing US 64 past Old Ferry Landing Road (Sta. 907+60). The existing Lindsay C. Warren bridge traffic will need to be maintained during construction of the new bridge. Depending on duration of construction, regular maintenance of the existing bridge may need to occur. Marine traffic will also continue using the existing channel, except for the area where replacement will occur in the existing channel, and the swing span bridge would continue to function. Subscribe/Unsubscribe: This email was sent out os o result of subscribing to the Wilmington District regulatory program public notices. Please reply to this email with the subject or message "unsubscribe" to remove your address from future mailings. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.