Loading...
HomeMy WebLinkAboutNCC231709_NOT Closeout Documents_20240130 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Yadkin Project: Smithtown Retail 44kV Tap Four Pole Bent River basin: Yadkin-PeeDee Person financially responsible:Duke Energy Carolinas,LLC-Kevin T Mason Project#: YADKI-2023-005 Address: 1. Project Location: Shady Grove Church Road,East Bend Pictures: Yes-Digital 2. Weather and soil conditions: Sunny,40s,wet soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes 526 South Church Street,Mail Code 109Q,Charlotte,NC 28202-1006 If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: January 19,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions,please contact me at Robby.Deans@deq.nc.gov or by phone at(336)776-9658. Reported by: Others present: Date of inspection: January 11,2024 Time arriving on site: 10:45 AM Time leaving site: 10:55 AM Robby Deans