HomeMy WebLinkAboutNCC200309_NOT Closeout Documents_20240130 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200
County: Orange Project:UNC Medical Education Building River basin: Cape Fear
Person financially responsible:UNC-Jonathan Pruitt,Vice Chancellor of Project#: ORANG-2020-007
Finance&Operations
Address: Campus Box 1000,Chapel Hill,NC 27599-1000
1. Project Location: Paul Hardin Drive,Chapel Hill
Pictures: Yes-Digital
2. Weather and soil conditions: Sunny and windy Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Stephanie Grubbs Title: Stormwater Specialist
Inspection report: Sent Report Date given/sent: January 11,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Abdulrahman Fayad Others present:
Date of inspection: January 10,2024 Time arriving on site: 11:40 AM Time leaving site: 12:03 PM
CC: