HomeMy WebLinkAboutNCC232431_Modification Confirmation Email_20240201 Georgoulias, Bethany
From: lase rfiche.ncdenr.gov@mccicloud.io
Sent: Thursday, February 1, 2024 10:23 AM
To: nuwan.wijesuriya@duke-energy.com
Cc: Georgoulias, Bethany; nuwan.wijesuriya@duke-energy.com; edulkis@dewberry.com
Subject: [External] Modification Confirmation
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
This e-mail is to notify you that the modification information for COC No. NCC232431 for the project Castle Hayne 230kV
Sub- Folkstone 115kV Line Reconductor Phase 1 that you submitted on 1/31/2024 has been added to the permit file
records as of 2/1/2024.
Modification Reason: Other Revision(s)to E&SC Plan
Additional Details(if provided): Construction access adjusted due to existing overhead lines impeding access to
transmission vehicles. LOD increased less than 1 acre, from 300.3 acres to 300.9 acres.
You can find all Construction COC Permit files in our Document Repository here.
Questions? Please contact The NC Stormwater Program at(919) 707-3640.
Be sure to add laserfiche.ncdenr.gov@mccicloud.io to your contacts to avoid future a-mails about this application from
going into Spam filters.
The NC DEMLR Stormwater Program
512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612
This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not
monitored.
i