Loading...
HomeMy WebLinkAboutNCC201173_NOT Closeout Documents (2)_20240117 TOWN OF CLAYTON rCARp Engineering Department ® �i 111 E. Second St.,P.O.Box 879 -Ili :;_2 ,,€ �Olv Clayton,NC 27528 Phone: 919-553-5002 �G� s sis 69 Fax: 919-553-1720 186 EROSION CONTROL INSPECTION REPORT Inspection Information Date: 11/02/23 Type of Inspection Construction Stage Date of Inspection: 11/01/23 ❑ Initial Inspection ❑ Pre-Construction ❑ Routine Site Inspection ❑ Initial Grading Inspection by: Josh Cotten ❑ On-Site Meeting ❑ Infrastructure ❑ Progress Inspection ❑ Temp Site Stabilization Others Present: N/A 0 Final Inspection ❑ Vertical Photos: 0 Yes: ❑ No ❑ Plat Inspection ❑ Final Site Stabilization ❑ Spot Check Inspection Weather and Site Conditions: ❑ Complaint Inspection Sunny, 50 degrees Development/Owner Information Project Name: Amelia Point Project Number: County 19-143-C TOC 21-90004 Project Location: This Report Sent To: Shotwell Rd/Amelia Church Rd Email: nathan@nlevans.com 0 File Copy Land Owner of Record: Person Financially Responsible for Land Disturbing Cloudbreak Investments,LLC Activity: 0 Same as owner 1. Is site currently under a notice of violation? ❑ Yes 0 No 2. Potential National Pollutant Discharge Elimination System (NPDES)Violation? ❑ Yes 0 No If yes, see section 7. 3. Has sedimentation damage occurred since last inspection? ❑ Yes Z No If yes,where? (Check all that apply) ❑ Lake/Natural watercourse on the tract. ❑ Lake/Watercourse off the tract. ❑ Riparian Buffered Area ❑ Other: 4. Is the site in compliance with the Town's Soil Erosion and Sedimentation Control Ordinance? 0 Yes ❑ No If no, see section 5. Revised 10/1/2020 5. Violations: ❑ 5a. No approved plan, Chapter 156; ❑ 5h. Inadequate buffer zone, Chapter 156; 156.103(3) and Article 2; 156.217 156.104(1) ❑ 5b. Failure to follow approved plan, ❑ 5i. Graded cut and fill slopes too steep, Chapter 156; 156.104(7) Chapter 156; 156.104(2) ❑ 5c. Failure to submit revised plan, Chapter ❑ 5j. Unprotected exposed slopes, Chapter 156 Article 2; 156.215 156; 156.104(2) ❑ 5d. Failure to provide adequate ground ❑ 5k. Failure to install and/or maintain cover, Chapter 156; 156.104(4) measures, Chapter 156 Article 9; 156.900 ❑ 5e. Insufficient measures to retain ❑ 51. Failure to conduct and record self- sediment on site, Chapter 156; 156.103(4); inspections, Chapter 156 Article 3; 156.300 Article 4; 156.400(5) ❑ 5f. Failure to take additional protective ❑ 5m. Unacceptable fill material, Chapter measures, Chapter 156 Article 9; 156.901 156; 156.104(3) ❑ 5g. Failure to have approved plan onsite, ❑ 5n. Other(describe) Chapter 156 Article 2; 156.214 6. Comments: Items repaired. 7. Corrective Actions: N/A 8. Photos: Revised 10/1/2020 Page 2 of 3 ' 1,, 1--* • - Kr s �I `F Af 1 ' - , , fix, ,, fix", Ia 1111!rNe N" - - n 9 p j� .6, �' Sd !A 0 "t � d ; ,,yak' t`tir�- �' r a `� .A ,fie "�`'dt"Y e i, .t,-; v,piO4 ..�s' �J•. F i w 1;ri, • . n11 4 z ►� 1IIIIIII�Il�111�111iII�II�'�,,, „;, '�.tifaii�u��liiiulil { �������nnun�ai ktIR - ., `' ,- ems. . �,v icy ,:" , 4' !.,e •N.. aJ 3.� aw --s -_ z � '':« ;� �$.it �.'$x.+s;s0 '� .. .. �: j E< y�" z. t ~r "x dam" �'4S.��,ti '�xa`� 3'�!'� :::;,.; � � S'f •• Sv-? � * Revised 10/1/2020 Page 3 of 3