HomeMy WebLinkAboutSW7090903_Annual Certificate of Completion (2024)_20240131 CERTIFICATE OF COMPLETION
Post-Construction Stormwater Annual Permit Certification
This certifies that Joseph Bradley has completed the Annual Permit Certification for Post-Construction Stormwater Permit SW7090903,State Employees
Credit Union-Camden, located in Camden, Camden County,on January 31,2024 in accordance with G.S. 143-214.7(b4). Please keep a copy of this
certificate for your records.The electronic record will be stored in the Department of Environmental Quality's digital repository permit file.
The Annual Permit Certification must be completed each year on or before the day of permit issuance, December 31. Failure to do so is a violation of your
permitting conditions and is subject to enforcement action per G.S. 143-215.6.
Jim Farkas
State Stormwater Engineer
Division of Energy, Mineral,and Land Resources