Loading...
HomeMy WebLinkAbout20080499 Ver 3_Local Government SMP approval_20151002�oNNOfKfgyF TOWN OF KERNERSVILLE 9 COMMUNITY DEVELOPMENT DEPARTMENT cRPCMTEO ,yi• Curtis Swisher, Town Manager P.O. Box 728 Kernersville, N.C. 27285 -0728 October 2, 2015 Mr. Brian Hall Samet Corporation Agent for TDO Land Holdings, LLC 309 Gallimore Dairy Rd Greensboro NC 27284 Telephone (336) 992 -3579 Fax (336) 996 -4822 RE: Stormwater Management Plan — Conditional Approval Proposed Triad Business Park — Phase II — Old Greensboro Road Extension Kernersville, North Carolina Dear Mr. Hall: Please consider this letter as the conditional approval of the Stormwater Management Plan for the proposed Triad Business Park — Phase II — Road Extension linear project. The Stormwater /Watershed design plans and drainage design calculations for this project were submitted to my office and have been revised and approved according with the Town of Kernersville Watershed/Stormwater regulations. In order to obtain a final Watershed / Stormwater Permit approval there are additional conditions that must also be met. CONDITIONS: 1. Submit a Construction Performance Surety (can be in form of performance bond, standby letter of credit or cash) to the Town of Kernersville for an amount equal to one hundred and twenty percent (120 %) of the total construction cost of the storm water control structure. Please submit unit cost information pertaining to all storm water control structures and /or bids from the contractor hired to perform the work and any change orders related thereto as a method to determine the basis for cost of the work for the construction of the BMP. The Engineering Division will review and approve the total cost estimation for the construction of the BMP. 2. Provide a deed of easement for review and approval by the Engineering Division. Following approval of submitted document, the deed of easement shall be recorded in the office of the Register of Deeds. Page Two October 2, 2015 Mr. Hall 3. Provide an Operation and Maintenance Agreement for the BMP (Wet Detention Basin) for review and approval by the Engineering Division. The approved Operation and Maintenance Agreement shall be recorded in the office of the Register of Deeds. 4. Provide an Operation and Maintenance Plan for the Wet Detention Pond for review and approval by the Engineering Division. The approved Operation and Maintenance Plan shall be signed and notarized by the owner. 5. Pay the corresponding Watershed /Stormwater fees. If you have questions or comments, please do not hesitate to contact me. Slncer' ' Ana Jaramillo, P.E. Stormwater Engineer Town of Kernersville Community Development Department Direct (336) 564 -1615 P.O.Box 728 ai aram i I loQ.toknc.com cc: Matt Johnson, PE. Triad - design -group Sue Homewood. NC DENR Winston Salem Regional Office Curtis Swisher. Town of Kernersville Manager Jeff Hatling. Community Development Department Director File Copy File name: Triad Business Park — Phase II — Old Greensboro Road Extension