HomeMy WebLinkAboutWQ0014391_Monitoring - 12-2023_20240112Monitoring Report Submittal
Permit Number#*
Name of Facility:*
Month: * December
WQ0014391
Builders First Source
Report Information
Type *
NDMR, NDAR-1, NDAR-2, NDMLR
Confirmation Email Address:
Name of Submitter: *
Signature:
Date of submittal:
Initial Review
biowater@aol.com
Randall Jarrell
Reviewer: Wanda.Gerald
Year:* 2023
Upload Document*
BFS NDMR 12-23.pdf
PDF Only
5.72 M B
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
1 /12/2024
This will be filled in automatically
Is the project number correct?* W00014391
Is the monitoring report accepted?* Yes NO
Regional Office* Raleigh
Reviewer: _anonymous
Review Date: 1/31/2024
FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page I of :;,,
Permit No.: W00014391
Facility Name: Builders FirstSource - Apex Yard WWTF
County: Chatham
Month: December
Year: 2023
PPI: 002
Flow Measuring Point: ❑Influent ❑ Effluent ❑ No flow generated
Parameter Monitoring Point: ❑ Influent Effluent ❑ Groundwater Lowering ❑Surface Water
Parameter Code — 0
50050
00310
31616
00610
00625
00620
00600
00400
00665
00530
0
O
c
y
O
OR
,o
CD
to
coE E
o
E
E
Q
_
Z
_
Z
aF
0 2
Z
°E
a�
N
t
a-
o cmm a_
N N
w
24-hr
hrs
GPD
mg/L
#1100 mL
mg/L
mg/L
mg/L
mg/L
su
mg/L
mg/L
1
550
2
550
3
550
4
13:40
0.5
550
5.95
5
1,194
6
1,194
7
1,194
8
1,194
9
1,194
10
1,194
11
12:45
0.5
1,194
6.37
12
1,194
13
1,194
14
1,194
15
1,194
16
1,194
17
1,194
18
12:40
0.33
1,194
8.78
19
498
20
498
21
498
22
498
23
498
241
498
25
498
26
498
27
11:25
0.42
498
8.24
28
288
29
288
30
288
311
1
288
Average:
792
Daily Maximum:
1,194
8.78
Daily Minimum:
288
5.95
Sampling Type:
Estimate
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
3,750
30
200
15
30
Daily Limit:
Sample Frequency:
Monthly
3 X Year
3 X Year
3 X Year
3 X Year
3 X Year
3 X Year
Weekly
3 X Year
3 X Year
FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page Z of 4
Sampling Person(s)
Name: Randall Jarrell
Name
Certified Laboratories
Name: Eurofins
Name: Wastewater Management, L.L.C.
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit?
❑ Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if nacaseani
Operator in Responsible Charge (ORC) Certification Permittee Certification
ORC: Randall Jarrell Permittee: Goldston -Apex Properties, L.L.C.
Certification No.: 23925 Signing Official: Randall Jarrell
Grade: Phone Number: 919-210-2500 Signing Official's Title: ORC
Has the ORC changed since the previous NDMR? ❑ yes No Phone Number: Permit Expiration:
l l2 2`i l i zL(
Signature Date Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 5 of
•.: VVQ0014391
Facility Name: Builders • - Apex Yard WWTF
County: Chatham
Month: December Year: 2023
Field Name:
Field Name:
I
r;
at this facility?
Area (acres):
Area (acresy.
Area (acres):
Area (acres):
Cover C ro�:
■ YES■ NO
Hourly-.
•
. -.
. -.
1
• -.
.
Annual F iate (in):
ate
ate C.ny
Field Ir
®'
==12
�
��
-_-_
-_--
-_--
-_--
Month Floating. .
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page IL of
WQ0014391
Facility Name: Builders• - Apex Yard VVWTF
County:.
December
Did irrigation occur
Field Name:
I
Field Na
Field Name:
I
this facility?
Area (acres)-
•at
•
i�
•
Cover Crop:
=�E
YES NO
Hourly Rate (in)
Hourly Rate (in):
ate (in):
I
Annual Rate®
Rate (in):
ate (in):
,0
... •
• .. •
1Annual
® •
. .. .
B •Field
.. •
•
• .. •
•
FEW
INM
MW
�MMM�
m
mm=
®MIMMMMME
m
IMMMM
IMMI
■ANN�ANN
m
MMIMMBMW
IMM��I��
m
IMMEMN
IM
INM��
����
■����
����
m
WM
IMMI
����
����
�■���
����
m
o®®EMM
MMI���
m
MMIMM
MIM
INM
�INM
���■�
����
®IMMEMN
IMMI
��■�■�
����
����
����
®IMMIS
IM
m
IMMEM
INMMMIMM
m
IMMUM
MIMI
MIMIEM�■�
mom®=M1
�■��■�
����
BMW
m
MEM
IM
mIMMEMIMME
����
����
��■�■�
����
mMMIMMMI
����■����MIMMonthly
Loading:,
12 Month Floating Total
MIEM
iaai;
as
�
aiioa
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1)
Page _i of a
No.: VVQ0014391
Facility Name: Builders FirstSource - Apex Yard WWTF
County:Permit
December
irrigation occur
FieldDid
r
r
r
at this •
Area (acres):r
r
r
r
r
..Giver
-
..
--... •
Field Irri..
■ ■ •Field
Irrigated?■
■ •
..
■ ■ •Field
Irrigated?■
■ -
County:tNo.: WQ0014391 Facility Name: Builders FirstSource - Apex Yard WWTF
DecemberYear: 2021
Field Name.
irrigation occurField Name: a a
at this facility?Area (acres). Area (acres) .
Cover Crop::11
Pine 'Trees Cover Crop: Pine Trees
YES F� NO
Fiourly Rate (in�7
Hourly Rate (my
���Annual
Rate (in):
rigated?11
FZI YES NO
NO
Field
Irrigated?
YES
NO
M
ARM
EM
Monthly Loading:
12 Month Floating Total (in)
FORM: NDAR-1 05-16
NON -DISCHARGE APPLICATION REPORT (NDAR-1)
Page -i of—v
Did the application rates exceed the limits in Attachment B of your permit?
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
Was a suitable vegetative cover maintained on all sites as specified in your permit?
❑ Compliant ❑ Non -Compliant
0 Compliant ❑ Non -Compliant
0 Compliant ❑ Non -Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site?
0 Compliant ❑Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
El Compliant ❑Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
ORC: Randall Jarrell
Certification No.: 23925
Grade: Phone Number: 919-210-2500
Has the ORC changed since the previous NDAR-1?
❑ Yes 2 No
v - �_j I ( (0 ( Z'-t
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
Permittee Certification
Permittee:
Goldston - Apex Properties, L.L.C.
Signing Official: Randall Jarrell
Signing Official's Title: ORC
Phone Number: 919-201-0347 Permit Exp.:
Signature Date
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
.t v
Builders First Source
12 Month Rollinq Total Application In Inches
2023
2023
2023
2023
2023
2023
2023
2023
2023
2023
2023
2022
2023
Field
Jan
Feb
March April
Mav
June
July
August
Sept
Oct
Nov
Dec
Total
1
0
0
0
3.88
0
0
0
0
0
2.8
0
0
6.68
2
0
0
0
3.88
0
0
0
0
0
2.8
0
0
6.68
3
0
0
0
3.93
0
0
0
0
0
2.88
0
0
6.81
4
0
0
0
3.88
0
0
0
0
0
3.9
0
0
6.75
5
0
0
0
3.97
0
0
0
0
0
2.8
0
0
6.77
6
0
0
0
3.97
0
0
0
0
0
2.8
0
0
6.77
7
0
0
0
3.97
0
0
0
0
0
2.87
0
0
6.76
8
0
0
0
3.88
0
0
0
0
0
2.87
0
0
6.75
9
3.99
0
0
0
0
0
4.78
0
0
0
0
1.92
10.69
10
3.26
0
0
0
0
0
3.91
0
0
0
0
1.59
8.76
11
2.55
0
0
0
0
0
3.07
0
0
0
0
1.29
6.91
12
3.23
0
0
0
0
0
3.74
0
0
0
0
1.52
8.49
13
2.26
0
0
0
0
0
2.69
0
0
0
0
1.08
6.03
14
3
0
0
0
0
0
3.44
0
0
0
0
1.38
7.82
15
2.55
0
0
0
0
0
3.07
0
0
0
0
1.2
6.82
16
2.19
0
0
0
0
0
2.69
0
0
0
0
1.04
5.92