Loading...
HomeMy WebLinkAbout310438_Sludge Survey (Reporting)_20240129 PLAN OF ACTION(POA)FOR LAGOON SLUDGE REDUCTION Facility Number AWS310438 County Dupiin Facility Name: Bill Costin 1-4 Farm Certified Operator Name: William J Costin,JR v Operator#: AWA19638 La oon 1 Lagoon 2 La oon 3 Lagoon 4 La oon 5 La oon 6 a_Lagoon Name/Identifier b.Total Sludge Depth(ft) 14' 3 c. Sludge Depth to be Removed for Compliance i d.Sludge Volume to be Removed 2 c n G•Z (gallons) D '7 D e.Sludge PAN()1bs/1000 gal) NIA F.Liquid PAN (Ibs/1000 al) N/A �g.PAN of Sludge(Ibs)(d x e)/1000 RECEIVED JAN 3 0 2024 IVC DEGUDVVR Centtal mice -V-- A l+3$ NARRATIVE: Use this section to describe the method(s)that will be used to lower the sludge depth. If microbe use is planned,specify the product to be used. -plans w-ems. -�'e�- Ca`/on Cvc.1/-E G5 n-e r r09 a S 1 u CcCOC 1u "A'h VU 0L<5&w) PC ro wdec) -1-ti-e -4-o ir1ce i'v c- Gl n r sl � -?Ia ns a r`e- f-6 a 1 s-1 u d 1, c ra)olan�? �w_�s t dam- -,-k-t s'f r &j ' f j'o," .+-o j a "o-lyn y Lu Ke Y-f . 6L I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability,the information is accurate and correct I further certify and acknowledge that compliance with regard to sludge accumulation must be achieved within two years of the original sludge survey indicating non-compliance. Sludge Survey Date: d 1 3 Compliance Due Date: l "G _ Phone: G'i C) . 2,S 51 Facility Owner/Manager(print) Date: Facility wn rlMana r(signature) Return this form to: Animal Feeding Operations Unit RECEYM NC Division of Water Resources 1636 Mail Service Center Raleigh, NC 27699-1636 JANI Q rm24 NO UEQ/DWfi SPOA 3-22-2010 Page 2 of 2 Central Office 1,- Appendix 1.Lagoon Sludge Survey Form Revised August 2008 A.Farm Permit or DWQ Identification Number �y j B.Lagoon Identification C.Person(s)Taking Measurements � J C o i 77 k- # 'e D.Date of Measurements E.Methods/Devices Used for Measurement of: —` 1 a.Distance from the lagoon liquid surface to the top of the sludge layer: b.Distance from the lagoon liquid surface to the bottom(soil)of the lagoon: c.Thickness of the sludge layer if making a direct measurement with"core sampler": F.Lagoon Surface Area(using dimensions at inside top of bank): `, (acres) (Draw a sketch of the lagoon on a separate sheet,list dimensions,and calculate surface area. The lagoon may have been built different than designed,so measurements should be made.) G. Esti number of sampling points: r ess than 1.33 acres:Use(8oints b.If more than 1.33 acres, acres x 6= ,with maximum of 24. (Using sketch and dimensions,develop a uniform grid that has the same number of intersections as the estimated number of sampling points needed.Number the intersection points on the lagoon grid so that data recorded at each can be easily matched.) H. Conduct sludge survey and record data on"Sludge Survey Data Sheet"(Appendix 2).Also,at the location of the pump intake,take measurement of distance from liquid surface to top of sludge layer and record it on the Data Sheet(last row);this must be at least 2.5 ft.when irrigating. I. At the time of the sludge survey,,also measure the distance from the Maximum Liquid Level to the Present / Liquid Level(measure at the lagoon gauge pole):_jam f u� J. Determine the distance from the top of bank to the Maximum Liquid Level q (use lagoon management plan or other lagoon records) K. Determine the distance from the Maximum Liquid Level to the Minimum Liquid Level r (use lagoon management plan or other lagoon records) } L. Calculate the distance from the present liquid surface level to the Minimum Liquid Level 5 (Item K minus Item I,assuming the present liquid level is below the Maximum Liquid Level): M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the lagoon bottom(average for all the measurement points): 7.""'' N. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the top of the sludge layer(average for all the measurement points): a 1 U. Vr O. Record from the Sludge Survey Data Sheet the average thickness of the sludge layer: _ P. Calculate the thickness of the existing Li uid Treatment Zone(Item N minus Item L): Q. If Item 0 is Brea than;item P,proce o the Wor�csheet for Sludge Volume and Treatment Volume. If Item ual to or lessthmr'Iiem P,you do not have to determine_v014mes. DateCompletedby Print Name Signature DECEIVE® JAN 3 0 2024 NC DEQ/DWR Central Office T Appendix 2.Sludge Survey Data Sheet* Revised August 2008 Lagoon Identification: Completed by: _ J t ... ` ->� .r- Date: Print Name Signature (A) (B) (C) (C)minus (B) Grid Distance from liquid Distance from liquid surface Thickness of sludge layer Point surface to top of sludge to lagoon bottom (soil) No. Ft.&in. Ft.(tenths) Ft&in. Ft. tenths Ft.&in. Ft. tenths 2 4 ° •� , 5 Q C 7 ' 8 9 10 i 11 12 l 13 14 15 16 17 18 19 20 21 22 23 24 Number of points with 1 X X readings �C Average Of points ' At pump X X X X intake *All Grid Points and corresponding sludge layer thick es m be shown on a sketch attacbed to this Sludge Survey Data Sheet. See Appendix 4 for fivers i,from inches to tenths of a foot. UVE® 3 0 2024 NC DEQ/DWR �- Central Office /j s ' Y Appendix 3. Worksheet for sludge volume and treatment volume Revised August 2008 The average thickness of the sludge layer and the thickness of the existing Iiquid(sludge-free)treatment zone(are determined from information on the Lagoon Sludge Survey Form(Items O and P,respectively). In this example,the average sludge layer thickness is 2.5 feet and the existing liquid treatment zone is 3.5 feet.If the lagoon has a designed sludge storage volume,see notes at end of the worksheet. The dimensions of the lagoon as measured and the side slope are needed for calculations of sludge volume and of total treatment volume.If the lagoon is a standard geometric shape,the sludge volume and treatment volume in the lagoon can be estimated by using standard equations. For approximate volumes of rectangular lagoons with constant side slope,calculate length and width at the midpoint of the layer, and multiply by layer thickness to calculate layer volume,as shown in the example. For irregular shapes, convert the total surface area to a square or rectangular shape. For exact volumes'-for lagoons with constant side slope,the"Prismoidal Equations"may be used. t Example Your lagoon L Average Sludge Layer Thickness(T) 2.5 ft. 2. Depth of lagoon from top of bank to bottom soil surface(D). 11 ft. 00 /1 , 3. Slope=horizontal/vertical side slope (S) 3 2� 4. Length at top inside bank(L) 457 ft. 6) 5. Width at top inside bank(W) 229 ft. ) -7 a 6. Length at midpoint of sludge layer �f L,,,=L-2 S (D-(T/2)) 3985 ft. 7. Width at midpoint of sludge layer 1--7 W.=W-2 S(D-(T/2)) 170.5 ft. 8. Volume of sludge(Vs): Vs=Lm Wm T 169,860 ft3 1 I L4, G 3 L, 9. Volume in gallons: Vsg=V*7.5 gal./fO. 1,273,950 gal. - �^ 10. Thickness of existing liquid tmt.Zone (Y} 3.5 ft. , 11. Thickness of total treatment zone(Z) 6.0 ft. -q, `I `f Z=T+Y (Appendix 3 continued on next page) � C�l 324 C DEq/DWFt Central Office Revised August 2008 Appendix 3. Worksheet for sludge volume and treatment volume(continued) 12.Length at midpoint of total tint.zone 409 ft. � JF ` ' z- a Cn d f_ Lz=L-2(S)(D-(Z/2) 13. Width at midpoint of total tmt.zone 181 ft. Wz=W-2(S)(D-(Z/2) I -7 0 14.Volume of total treatment zone(Vz) 444.174 ft' }o "'.�` Vz=Lz WzZ 15. Ratio(R)of sludge layer volume to total r '' Treatment volume R=Vs/Vz 0.38 If the ratio exceeds 0.50,than a sludge Plan of Action may be required. Check with DWQ for information on filing the Plan of Action. J Note: If the lagoon has a designed sludge storage volume(DSSV), subtract that volume from both the volume of sludge(Vs) (Item 8)and from the volume of total treatment zone (Vzj(Item 14),and take the ratio: R=(Vs—DSSV)/(Vz—DSSV) Example: If DSSV= 85,000 ft3,then R=(169,860-85,000)/(444,174-85,000) R=84,860/ 359,174=0.24 Appendix 4. Conversion table from inches to tenths of a foot. Inches Tenths of Inches Tenths of foot foot 1 0.1 7 10.6 2 0.2 8 10.7 RECEI 3 0.2 9 1 0.7 4 0.3 10 0.8 JAN 3 0 2024 5 0.4 11 0.9 5 D 0.5 iW E-QIDWR Central Office