HomeMy WebLinkAboutSW3210803_Annual Conformance Plan (2024)_20240130 McKIM&CREED ENGINEERS
SURVEYORS
PLANNERS
CONFORMANCE PLAN-BELLE MAR SUBDIVISION
Non-Conformance Item:Vegetated Conveyance located between Lots 1 &2.
Issue:Vegetated conveyance was disrupted by on-lot grading.
Actions to be taken to bring item into conformance:
1. Coordinate with homebuilder on requirements for vegetated conveyance
to meet permit conditions.
Anticipated timeline: 1-2 weeks
2. Homebuilder to regrade on-lot and construct vegetated conveyance per
approved plan to meet permit conditions.
Anticipated timeline: 2-3 weeks (pending permitting weather conditions)
8020 Tower Point Drive
Charlotte, NC 28227
704.841 .2588
Fax 704.841.2567
www.mckimcreed.com