Loading...
HomeMy WebLinkAbout20150910 Ver 1_Approval Letter_201509307i1 North Carolina Department of Environmental Qual)ty a Pat McCrory Donald R. van der Vaarl Governor Secretary September 30, 2015 DWR # 15 -0910 Jackson County Rene Rata 1061 SW 20`t' Street Boca Raton, FE 33486 Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION Raia - 247 Undala Trail - Lake Glenville Dear Ms. Raia In accordance with your application dated August 27, 2015, approval has been granted for the impacts listed in the table below. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and any additional conditions listed below. Project impacts are covered by the attached Water Quality General Certification Number 3898 and the conditions listed below. This certification is associated with the use of General Permit Number 30 issued by the U.S. Army Corps of Engineers. Please note that you should obtain or otherwise comply with any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) .Erosion and Sediment Control, Water Supply Watershed and Trout Buffer regulations. , - -- IMPACTS APPROVED The following impacts we hereby approved provided that all of the other specific and general conditions of the Certification, General Permit and/or Buffer Rules are met. No other impacts are approved, including incidental impacts. Type ofImpact Amount Approved Permanent Above Pool Below Pool Open Waters 0.0117 (acres 0,0117 acres 1601 Mail service Center, Raleigh, North Carolina 276991601 Phone: 919-707-8600 1 Internet:v .ncdenr.gov M Enuel oppomnity 1ARrmative krM ,Employer — Merle In part by recycled paper Rene Raia -247 Undala Trail DWR # 15 -0910 Page 2 of 4 ADDITIONAL CONDITIONS 1. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Cert ifrcation(s)/Permit/Authorizafion and is responsible for complying with all conditions. 2. All banks shall be laid back to at least a 2:1 (length: height) slope and riprap applied at the water / land interface (at full pool). Riprap shall be placed as a linear protective measure upon the regraded slopes. Stone used in stabilization shall be of a size and density sufficient to prevent movement by wave or current action and shall consist of clean rock or masonry material free of debris or toxic pollutants. The rip -rap shall be installed over a toed in filter fabric to prevent soil erosion behind the stabilized area. This authorization shall in no way be construed as allowing the installation of a bulkhead or seawall. 3. Replant or allow the re- establishment of native vegetation in areas within the project boundary where it has been removed. Per Exhibit . l of the Duke Shoreline Management Guidelines. 4. The permitee shall require its contractors and/or agents to comply with the terms and conditions of this permit in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated . with the construction or maintenance of this project with a. copy of this Certification. A copy of this Certification, - including all conditions shall be available at the project site during the construction and - - - maintenance of this project. [15A NCAC 02H .0507 (c) and 15A NCAC 02H.0506 (b)(2) and (c)(2)j This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 15013 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http: / /www.neoeh.com/ or by calling the OAH Clerk's Office at (919).: 431 -3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). Rene Raia — 247 Undala Trail DWR# 15 -0910 Page 3 of 4 The petition may be faxed to the OAH at (919) 431 -3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAR within five (5) business -- days following the faxed transmission. Mailing address for the OAH: Ifsending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699 -6714 Ifsending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609 -6285 One (1) copy of the petition must also be served to DENR: Sam Hayes, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, . NC 27699 -1601 This letter completes the review of the Division under section 401 of the Clean Water Act as described in 15A NCAC 02H 0.500. Please contact Tim Fox at 828 - 296 -4664 or tim.faxnancdenr.eov if you have any questions or concerns.. Sincerely, G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 3898 Certificate of Completion Rene Raia — 247 Undala Trail DWR # 15 -0910 Page 4 of 4 cc: DWRARO401 files ec: Bob Martin —Bobs Docks /Seawall Co. Kevin Holland — Duke Energy David Brown - USACE Asheville Regulatory Field Office Andrea Leslie - NCWRC Stan Aiken — DEMLR Ashley Rodgers - DEMLR G: \WR \WQ\ Jackson \401s\ Non - DOT\ Raia - Lake Glenville \APRVL.40lRaia9- 30- 15.doe i i