Loading...
HomeMy WebLinkAbout20130223 Ver 4_Application_20151001e „a S�nTF q� `, �+, �$� ywy� � * ,_ � �� .���,. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT L. MCCRORY GOVERNOR September 30, 2015 U. S. Army Corps of Engineers Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 ATTN: Mr. Dave Bailey NCDOT Coordinator NICHOLASJ.TENNYSON SECRETARY SUBJECT: Request for Modification to the Section 404 Individual Permit and Section 401 Water Quality Certification for the proposed Greensboro Western Loop from north of SR 2176 (Biyan Boulevard) to SR 2303 (Lawndale Drive), Guilford County, Division 7. Federal Aid Project No. STP-NHF-124(1), WBS Element No. 34820.1.2, TIP No. U-2524C and D. REFERENCE: USACE Individual Permit Action ID SAW-200 1-2 1 1 25, dated August 1, 2013. USACE Individual Permit Modification Action ID SAW-2001-21125, dated March 25, 2014. USACE Individual Permit Modification Action ID SAW-2001-21125, dated June 19, 2015. NCDWR Project No. 20130223, Certification No. 3965, dated July 2, 2013. NCDWR Pt•oject No. 20130223_v2, Modification to Certification No. 3965, dated April 15, 2014. NCDWR Project No. 20130223_v3, Modification to Certification No. 3965, dated June 25, 2015. Dear Sir: The purpose of tllis letter is to request a modification to the United States Army Corps of Engineers (USACE) Section 404 Individual Permit and North Carolina Division of Water Resources Section 401 Certification for the above referenced project. The NCDOT is submitting for approval for replacing the previously listed 37 linear feet of bank stabilization at Permit Site 5 with 37 linear feet of permanent fill impacts. Once the new 10'x6' reinforced concrete pipe culvert (RCBC) was constructed at Permit Site 5, it was discovered that water was flowing under the culvert. The Division believes that this is groundwater that was trapped during the backfilling of the culvert. This flow is dett•imental to the structure foundation and could eventually cause settlement of the new structure or collapse of the wing walls. After consultation with the Geotechnical Unit, the NCDOT proposes removing the stt•eambed material from the area within the wingwalls to an elevation below the culvet�t footing. Then place geotextile fabric MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT S� ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RnLEiGH NC 27699-1548 TELEPHONE: 919-707-6000 FAX: 919-212-5785 WEBSITE: NCDOT. GOV LOCATION: CENTURY CENTER, BUILDING B 1020 BIRCH RIDGE DRIVE RALEIGH NC 27610 and rip rap mixed with the excavated material and cap with a one foot layer of the original streambed material. This activity would occur within the same footprint for which the 37 linear feet of bank stabilization was originally proposed at this site. Please see Table 1 below and the attached revised Permit Drawing Sheets 9, 9A and 39. Table 2 on page 3 has been updated to show current required mitigation from the NC Division of Mitigation Services (DMS) for Section C. The revised DMS acceptance letter, dated September 21, 2015, is attached. Table 1. U-2524C Surface Water Impacts (Final) Impacts Impacts Permanent Temporary Permit Site requiring requiring No. Impact Type Impact NCDWQ USACE Impact Length (ft) mitigation (ft) mitigation (ft)1 Length (ft) 48" RCP 385 385 385 13 1 StaUiliz tion 11 11 OZ 3 0" RCP 13 03 13 14 2 Bank 32 324 Oz Stabilization 11 03 OZ 36" RCP 338 338 338 20 3 Stab lization 10 10 OZ 3A 36" RCP 30 30 30 10' x 7' RCBC 331 331 331 46 4 Stab liz tion 30 30 OZ 10' x 6' RCBC 725* 725` 725# 40 5 Bank Stabilization �* 0 0 Fill 90 03 90 SA Bank 25 03 OZ Stabilization 6 Fill 60 OS OS 15 30" RCP 227 227 227 10 7 Stab liz tion 11 11 OZ 7A 15" RCP 57 03 57 54" RCP 412 412 412 20 8 Stab lization 13 13 Oz 10 Bank 16 03 OZ Stabilization Bridge, 204 204 204 20 13 Roadway Bank 60 60 0 Stabilization 22 03 OZ U-2524C & U-2524D Individual Permit Modification Application Table 1. Continued Permit Site Impact Type No. Permanent Impacts Impact requiring NCDWQ Length (ft) miti�ation ( Impacts Temporary requiring Impact USACE Len th ft .___�___ ir �1 g � � HC1 Utilities 40 HC2 Utilities 20 HC3 Utilities 20 HC4 Utilities 20 HCS Utilities 2� I1� Utilities 40 Totals 3,113 2,819 2,812X 358 �Determined fi•om USACE during verification site visit on July 25, 2012. ZMitigation for bank stabilization not required by USACE. 3Mitigation not required by NCDWR (less than 150 linear feet of steam). 4Same stream as Site 1; different stream than stream with 11 feet of bank stabilization. SStream deemed unimportant by the USACE requiring no mitigation by USACE and NCDWR. 6Different stream than stream with 22 feet of bank stabilization. �Stream identified by Colonial Pipe Lines and not field verified by NCDOT, USACE, or NCDWR since it was outside of NCDOT project area limits during field verification process. *Numbers that have changed sine the June 2015 Permit Modification Table 2. Revised U-2524C Re uired Com ensato Miti ation Summa Final) Stream Impacts in Riparian Wetland Impacts Len th ft ac Required USACE 2 g 12 2:1 4.42 @ 2:1 Miti ation ' @ 1.73 1:1 Total USACE 5,624 10.57 Mitigation Required NCDWR 2�g19 at 1:1 6.15 @ l:l Miti ation Total NCDWR 2,g19 6.15 Miti ation A copy of this pennit modification application and its distribution list will be posted on the NCDOT website at https•//connect ncdot.�ov/resou�•ces/Environmental/Pa�es/default.aspx. Thank you for your time and assistance with this project. Please contact Erin Cheely at either ekcheely a,ncdot.�ov or (919) 707-6108 if you have any questions or need additional information. Sincerely, , -- C�- �� _�.._.�.. ��ti Richard W. Hancock, P.E., Manager Project Development and Environmental Analysis Unit cc: NCDOT Permit Application Standard Distribution List U-2524C & U-2524D Individual Pet•mit Modification Application 3 Pat McCrory Governor North Carolina Department of Environmental Quality Division of Mitigation Services September 21, 2015 Mr. Richard W. Hancock, P.E. Project Development and Environmental Analysis Unit North Carolina Department of Transportation 1548 Mail Service Center Raleigh, North Carolina 27699-1548 Dear Mr. Hancock: Subject: EEP Mitigation Acceptance Letter: Donald R. van der Vaart Secretary U-2524C / D, Greensboro — Western Loop from North of Bryan Boulevard to Lawndale Drive, Guilford County The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the compensatory stream and riparian wetland mitigation for the subject project. Based on the information contained in the 404 Individual permits and 401 Water Quality Certifications issued in 2013 and 2014, the impacts are located in CU 03030002 of the Cape Fear River basin in the Central Piedmont (CP) Eco-Region, and are as follows: Cape Fear 03030002 SICP Impacts* *Some of the stream and Stream Cold Cool Warm 0 0 7,416.0 id impacts may be proposed to be n Wetlands Riparian Non- n.�__:__ 6.15 Coastal Marsh at a 1:1 mitigation ratio. See n Buffer (Sq. Ft.) Zone 1 Zone 2 0 0 application for details. This mitigation acceptance letter replaces the mitigation acceptance letter issued on February 26, May 17 and May 22, 2013, May 20, 2014 and June 26, 2015. DMS corrunits to implementing sufficient compensatory stream and riparian wetland mitigation credits to offset the impacts associated with this project as detemuned by the regulatory agencies in accordance with the In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-707-8420. Sincerely, ,.� � cS�--�,�.P James B. tanfill Asset Management Supervisor cc: Mr. David Bailey, USACE — Raleigh Regulatory Field Office Mr. Dave Wanucha, Division of Water Quality, Winston-Salem Office File: U-2524C/D, Revised 6 1652 Mail Service Center, Raleigh, North Carolina 27699-1652 Phone: 919-707-8976 4 Internet: www.nceep.net An Equal Opporiunity 1AffirmativeAction Employer—Made in paRfrom recycled paper � � � Permit Sheet 9a of 39 (added 9/3/15) � � i � i � � � ! ! � � . .: E� � .- y .Y;w �� � � s �, ���i �•_•; : ��• �'�•.-- �. ���.� �`,. tfL.. � �r � � �' ;� �x•: ' r� ti, �, �' � y: v' �"1 ,,r ��� ��� '�► ,, �,� _- ,;��� �� � �� �..� � ;���.,�. ��. �: �;°' "� � ��� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � • �i ��r�i� �f C���s I ��p�.�� ��ac�d �r� � �ft th�ck ���er on t�p �f ���e I� �e������� a� ��e �ot��m �f t�� 3� deep k�y ��r� i�ft ��nc� cha�nr�f b��d e��ar����io�� ����� ��p��� ��d de�r��s ��d ��ry� 12" �����r ����� � ��d E���r�t��r� ���h ����v��ed ��re��b�d �a�er��� • �� r: r,r' . ' I Y" : ,;.� ' '� � �;'1i ��"i ' `ti,.;?' t,�" : � �`..--.-...---�-�.._� � _ '� � r �^', ♦ X /✓ �'< "1 : R �' � +....-�✓ w I l. s"� ,ri � � � r.�;.�:, � �. _ . rt _ � � � r a 'Y. � �� � r �� . � • , . � �j � r �, � ��'.-1� �/� �- �t�'t� J""1`"�Lx"� �� ��" �'�-r,, t^\-� '�'�.'�q' � �', � u��C. ,:�^ �� ,t�%�` R • `� �*r"^ � '���'�.�l�r � r � � ��'��:�i �.Q����� � . �� ha##�� � �, - ...r�.._ � . Sc�a.., w��#� ,r+��r► �S �cc.�#i�r..s o��� ♦ . � a i � � � � � � � �� ������� WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 283+36 TO 286+34 48" RCP 0.10 - - 0.02 - 0.03 0.01 385 13 - -L- 286+11 TO 286+22 Bank Stabilization - - - - - - - 11 - - 2 -L- 287+09 TO 287+21 30" RCP - - - - - 0.01 0.01 13 14 - -L- 287+00 TO 287+30 Bank Stabilization - - - - - - - 11 - - -L- 287+11 TO 287+17 Bank Stabilization - - - - - - - 32 - - 3 -L- 296+40 TO 297+18 36" RCP - - - - - 0.03 0.01 338 20 - -L- 296+44 TO 296+52 Bank Stabilization - - - - - - - 10 - - 3A -L- 296+82 TO 297+00 Roadway - - - - - 0.01 - 30 - - 4 -L- 312+90 TO 313+91 1@ 10' x 7' RCBC - - - - - 0.06 0.01 331 46 - -L- 312+95 TO 313+13 Bank Stabilization - - - - - - - 30 - - 5 -L- 314+67 TO 321+11 1@ 10' x 6' RCBC - - - - - 0.10 0.01 688 40 - -L- 314+72 TO 315+05 fill - - - - - - - 37 - - 5A -L- 320+86 TO 321+95 Roadway - - - - - 0.01 - 90 - - -L- 320+78 TO 321+04 Bank Stabilization - - - - - - - 25 - - 6 -L- 323+60 TO 324+44 - - - - - - 0.04 0.01 60 15 - 7 -L- 345+01 TO 345+88 30" RCP 0.01 - - - - 0.03 0.01 227 10 - -L- 345+74 TO 345+85 Bank Stabilization - - - - - - - 11 - - 7A -L- 345+02 TO 345+49 Roadway - - - - - 0.01 - 57 - - 8 -L- 358+77 TO 360+2g 54" RCP - - - - - 0.05 0.01 412 20 - -L- 359+46 TO 359+57 Bank Stabilization - - - - - - - 13 - - 9 -L- 380+47 TO 382+86 Bridge - - - 0.02 0.40 - - - - - 10 -L- 387+31 TO 387+46 Bank Stabilization - - - - - 0.01 - 16 - - 10A -Y3DET- 11+23 TO 13+92 Temporary Detour - 0.01 - 0.01 - - - - - - 11 -L- 389+65 TO 398+04 Bridge - - - 0.19 1.44 - - - - - 12 -L- 399+62 TO 408+51 Bridge & Roadway 2.57 - - 0.36 0.96 - - - - - 13 -L- 407+72 TO 415+79 Hazardous Spill Basins, Bridge, 1.25 - 0.34 0.65 1.57 0.03 0.01 204 20 - Roadway & 66" RCP -L- 409+67 TO 409+73 Bank Stabilization - - - - - - - 12 - - -L- 410+77 TO 410+89 Bank Stabilization - - - - - - - 12 - - -L- 411+08 TO 411+42 Bank Stabilization - - - - - - - 36 - - -L- 414+83 TO 415+16 Bank Stabilization - - - - - - - 22 - - 14 -L- 419+09 TO 420+79 Bridge 0.11 - - - - - - - - - TOTALS: 4.04 0.01 0.34 1.25 4.37 0.42 0.09 3113 198 - Notes: Permanent Wetland Impacts from bridge construction = 0.11 acres Temporary Wetland Impacts from work bridge construction = 0.14 acres See Sheet of for a detailed breakdown of the proposed bridge construction impacts.