Loading...
HomeMy WebLinkAbout20180179 Ver 1_WLS Yadkin01-GrassyCreekTributaries_MY3CreditReleaseLetter January 29, 2024 Regulatory Division Subject: Year 3 Monitoring Report Review and Credit Release associated with WLS Yadkin 01 UMB - Grassy Creek Tributaries Mitigation Site (AID SAW-2017-02528) Ms. Cara Conder Water and Land Solutions, LLC 7721 Six Forks Rd., Suite 130 Raleigh, NC 27615 Dear Ms. Conder: This correspondence is in reference to the monitoring report and credit release request submitted for the WLS Yadkin 01 UMB - Grassy Creek Tributaries Mitigation Site, Action ID SAW-2017-02528. The purpose of this letter is to transmit comments provided by the NC Interagency Review Team (NCIRT) during the review of the monitoring report and to confirm the annual credit release. The review of the annual monitoring report followed procedures outlined in Section 332.8(o)(9) of the Mitigation Rule. The comments listed below were provided by the NCIRT during this process. While it is not necessary to provide a response to specific comments at this time, please be sure to address the issues raised in future monitoring report submittals. Andrew Friedman-Herring, NCDWR 1. Overall, the stream flow data and geomorphology data look good. 2. Thank you for including photos of all of the problem areas. DWR supports continuing to monitoring the J-Hook structure for new signs of instability. 3. The vegetation height data is slightly concerning, with plots 4 and 7 having much lower heights than the rest of the project with only 2ft and 1ft respectively. Looking at the photos, there are a few trees in plot 7 that appear to be multiple feet tall. Is this average height data for plot 7 correct? Does WLS have an idea of why the heights might be so low for certain areas of the project? DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 Steve Kichefski, USACE 1. Appendix D - MY3 Cross-Sections: Are the % Change Bank Height Ratio numbers provided the change from one monitoring year to the next or since Baseline MY0? Visually, the graphs for xs- 5 and 6 show more variation from MY2 than xs- 10, please verify those numbers and graphs. 2. Bankfull event occurrences via pressure transducer on 3/3/2023 and 8/6/2023 (Table 7) do not seem to line up with large precipitation events and crest gauge bankfull readings (Figure 3). Please verify data and update? Based on our review of the monitoring report and the results of the NCIRT review, we confirm that you have satisfied requirements included in the approved banking instrument and mitigation plan for this site. Accordingly, with this correspondence we confirm the release of credits as shown on the attached credit release schedule. Thank you for your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact me by email at Steven.L.Kichefski@usace.army.mil or telephone (828)933-8033. Sincerely, for Todd Tugwell Chief, Mitigation Branch Enclosure cc (by email): NCIRT Distribution List