Loading...
HomeMy WebLinkAbout20071367 Ver 3_CAMA Application_20150928r North Carolina Department of Environmental Quality Pat McCrory Governor September 24, 2015 MEMORANDUM: TO: FROM: SUBJECT: Applicant: Project Location: 00--3— /S�( Donald R. van der Vaart Secretary VX [ SEP 2 8 2015 DENR - WA ER F2FSOiJ Karen Higgins 401 & St WWER PER�v1t "17fNG Division of Water Resources Courtney Spears Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Brian Vick Carteret County, Lot 74, Mariners Point Subdivision, Morehead City. Proposed Project: Proposes a pier and platform for Lot 974, Mariners Point S/D. As a requirement of the original Major Permit for the S/D, each lot would be required to apply for a major permit if docks were requested. Please indicate below your agency's position or viewpoint on the proposed project and return this form by October 14, 2015. If you have any questions regarding the proposed project, please contact Heather Styron, Permit officer at (252) 808 -2808. Ext. 216. When appropriate, in -depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Ave., Morehead City; NC 28557 Phone: 252 - 808 -2808 \ FAX: 252 - 247 -3330 Internet: www.nccoastal management, net An Equal Opportunity \ Affirmative Action Employer -Made in part by recycled paper DIVISION OF COASTAL. MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: Brian Vick (lot 74 Mariners Point) C/O Stroud Engineering 2. LOCATION OF PROJECT SITE: 1514 Galley Circle in Morehead City adjacent to Dill Cr. Photo Index - 2000: grids; 43 -529 S &T (9) 2006: grids; 43 -6325 E &F (16) State Plane Coordinates - X: 2684163.1 Y: 367658.7 Longitude: 76 °43'20.98 Latitude: 3444'19.08 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 9/11/15 Was Applicant Present — NO 5. PROCESSING PROCEDURE: Application Received and Complete — 8/25/2015 Office — Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Morehead City dated 9/28/07 Land Classification from LUP — Low Density Residential /Conservation (B) AEC(s) Involved: CW, EW, PTA (C) Water Dependent: Dock(yes) (D) Intended Use: Private (E) Wastewater Treatment: Existing — Morehead City Sewer Planned - none (F) Type of Structures: Existing — Roads and infrastructure Planned - pier and platform (G) Estimated Annual Rate of Erosion: N/A Source — N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Coastal Wetlands /Oyster Rock N/A N/A 1,212ft2 Incorp. 1,212ft2 Shaded (B) High Ground N/A N/A 18ft2 Incorp. (C) Open Water ( pier and platform) N/A N/A 399ft2 Incorp. 399ft2 Shaded (D) Total Area Disturbed: 1,629 ft2 (E) Primary Nursery Area: Yes (F) Water Classification: SA/HQW Open: No 8. PROJECT SUMMARY: The project is for a pier and platform for lot 74 of the Mariners Point s /d. As a requirement of the original major permit for the s/d each lot would be required to apply for a major permit if individual docks were requested. Field Investigation Report: Vick Lot 74 Mariners Point Page 02 9. Narrative Description: The lot 74 project is located at 1514 Galley Circle of Oglesby Rd which is part of the existing Mariners Point subdivision. Mariners Point was permitted through major permit # 167 -07 for infrastructure, 149 lots and a docking facility. Oglesby Rd. is found by turning right off of N. 20th St. in Morehead City in the area locally known as Crab Point. Dill Creek borders this site to the east and north. Lot 74 is 3.26 acres (14,916.08sf) in its entirety and is an average of 3.1 above NHW and has 151' of shoreline along the normal high water contour. There is an expanse (approximately 151' x 200') of Coastal Wetlands present along the shore adjacent to Dill Creek. This coastal wetland area contains Smooth Coordgrass (Spartina alterniflora).There are typical lawn grasses and scrub oaks along the high ground portion of the property. The lot to the west has an existing dock. There are scattered oyster beds within Dills Creek and along areas within the vicinity of this property. The water depths in Dill Creek are shallow (less than - 2'nlw), and according to the applicant, reach —2.4' NLW within the channel portion and — 1.3 to -1.9 at NLW at the waterward end of the proposed structure. Extensive field work confirms the soundings. The substrate in this area is thick organic mud. This section of Dill Creek is a Primary Nursery Area as designated by the Division of Marine Fisheries and the Division of Water Quality classifies it as SA/HQW waters. The area in which the proposed project would take place is closed to the taking of shellfish. Morehead City's Land Use Plan dated 2007 classifies this area as Low Density Residential and Conservation within the AECs. 10. Proiect Description: The applicant is proposing a 6' x 209' pier and a 14' x 28.5' L- head platform. They are not proposing any upland development at this time. The proposed pier would cross high ground for 3', coastal wetlands for approximately 206' and open water for 14' with a total length of 209'. It would then intersect a 14' x 28.5' platform area along the western portion of the platform. There are no slips proposed. The water depths along the platform area are -1.3' to 1.9' nlw. The most water ward portion of the structure would be located 2' -4' landward and parallel with the edge of the existing channel depending on location. Through previous permit activity in this area, the Division has determined that the configuration of marsh and oyster beds along the shoreline of this property establishes the point from which to measure the water body for the immediate area, creating a width of 61'. In consideration of this, the impedance into the water body by the structure consequently extends approximately 14' into the 61' body of water. The pier and platform would be located 165' from the west riparian access line and 45' from the east riparian access line. The riparian access lines where determined on the previous original major permit submittal for the subdivision in addition to field visits and aerial photography. The riparian access line is drawn perpendicular to the channel location that runs east to west. All water depths as well as the Field Investigation Report: Vick Lot 74 Mariners Point Page 03 outermost limit of the coastal wetland(oyster beds), channel location and water body width have been field verified by DCM staff. 11. Anticipated Impacts: The proposed pier as would incorporate 18 ft2 of high ground while shading and incorporating 1,212 W of coastal wetlands. A total 399 W of open water of would be shaded and incorporated, by the pier. There are no oyster beds containing healthy populations existing along the shoreline and therefore should not be disturbed during the construction process. There is the potential for temporary turbidity during piling placement. The Division of Land Resources approved the Sedimentation and Erosion control plan (CARTE- 2006 -440) on 6/19/06 with the DWQ Stormwater permit #SW8060625 issued on 7/12/06 for the existing s /d. Based on the determination of the water body widths by the Division and the District, the structure should not cause a hindrance to navigation due to the location of the existing coastal wetlands and oyster beds in the area. The coastal wetland area terminates approximately 205' waterward of NHW. The channel edge is located 21' from the north edge of the coastal wetlands. Since no formalized slips are proposed, there should be no turbidity or impacts from prop scarring. Name Heather Styron Date 9/24/15 Morehead City Narrative Major CAMA Application Vick Property Dock Lot 74 — Mariner's Pointe Subdivision Owner: Brian Vick 1514 Galley Circle Morehead City, NC 28557 (919)270 -5678 Engineer: Stroud Engineer, P.A. Charles M. Cullipher, PE 151 -A Hwy 24 Morehead City , NC 28557 (252) 247 -7479 Stroud Engineering, P.A. is requesting a CAMA Major Permit for an observation pier construction on Lot 74 of Mariner's Point Subdivision. The address for the project is 1514 Galley Circle, Morehead City, NC 28557. The Mariner's Point Subdivision's CAMA Major Permit conditions required that anytime development were to occur within the 75' AEC line and waterward that the work must be permitted through the CAMA Major process. The property's upland shoreline is 151LF along coastal wetlands that are part of Crab Point Bay, Stream Index #: 21 -30; Class SA;HQW. The lot is currently under construction with a 3 story house. Completion is expected this fall, 2015. The owner is requesting to construct 209 LF of a 6' wide wooden pier from the upland of Lot 72 to a 28.5' x 14' (399 sf) platform that borders the "One Quarter Line" of the water body. There are no proposed boat slips, boat lifts, tie piles or floating platforms with this pier construction. There are no oyster rocks in the vicinity of the proposed platform. This platform is beyond the extent of the coastal wetland but not impacting the channel. The extent of the channel within this body of water is determined from previously approved CAMA Major Permits for adjacent lots within Mariner's Point Subdivision. This is generally where -2' at NLW is met and the bottom remains at this elevation or gets deeper going toward the center of the water body. Attached is an exhibit from a previously approved CAMA Major Permit for an observation pier on lot 56 of Mariner's Point Subdivision that demonstrates the extents of the channel. This lot is approximately 700 LF downstream from Lot 74. \\ �111111R� / .9 = :a SEAL 037378 Business Name PmjeoNameN[applicubx$ Applicant 1: First Name M| Last Name Brian Vick Applicant 2: First Name M| Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 1514 Galley Circle | Morehead City /NC / | / ZIP Country Phone No. FAX No |US |910'270 '5878 om | ' | | / Street Address (if different from above) | City | State |z|P Email viokbhan@hotmaiioom\ ! .� l ] Business Name ) Stroud Engineering, Pa Agent/ Contractor 1 First Name NU Last Name Charles K8 |CuUiphev | � Agent/ Contractor 2: First Name M| Last Nome | ` Mailing Address / PO Box City State 151AHVVY24 | / | Morehead City |NC / ZIP Phone Nu1 Phone wu2 28557 | 252'247'7479 ext.225 em FAX No. Contractor # ' 252 247 4098 Street Address (if different from above) | City | State | ZIP | Email oouUipher@atroudonginoer.nom , <Fmnm continues on back> AUG 2� 1015 252'808'2808 ': 1'888'4mCOAST '' `mvvvv'mcmwamxanmmmagement.nwt Form DCM MP -1 (Page 2 of 4) APPLICATION for Major Development Permit - c- �, .N '���, -ate - rr.,,.; �:�s -..t, d M - ..r - -. .,`�'�! _.,s� �,;;•.r;� „C�.`-.= .,,r'�rN.;y °, =r"S. - 4v *_ -s=.- .. �.. ..�n,..:."_:x'"r_ -.r.t- r «:>r_ - , e � ' -•'4" nr4': ':'u�.� ';N ;y}'� -s , - - "ri'S; -. County (can be multiple) Street Address State Rd. # Carteret 1514 Galley Circle Subdivision Name City State Zip Mariners Pointe Morehead City NC 28557- Phone No. Lot No. (s) (if many, attach additional page with list) - - ext. I74, 1 1 , a. In which NC river basin is the project located? b Name of body of water nearest to proposed project White Oak River Basin Crab Point Bay c. Is the water body identified in (b) above, natural or manmade? ®Natural ❑Manmade ❑UnknownBr d. Name the closest majr water body to the rgposed project site IV _6_LPf4 e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ®Yes ❑No work falls within. Morehead City .:iE- ..:J" ;5 -• -.- _.. 4, ;_ ... � "- .'1,:. -- _ ,, j..;. w.,,+L'.;i': - w`,S.v - __ '£E': - ,*5a �'tr - � - :z`� �4. S %terDescri` tion= z:,.. -�=� "�� =`: ..�:> - �.�- �b�'�:._.'- ,�,w�rri:, _ = •��� a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 151 14,916.08 c. Size of individual lot(s) (If many lot sizes, please attach additional page with a list) e. Vegetation on tract Grass, small shrubs and landscaped areas f. Man -made features and uses now on tract 3 story house d. Approximate elevation of tract above NHW (normal high water) or NWL (normal water level) 3.1' ®NHW or ❑NWL g. Identify and describe the existing land uses adjacent to the proposed project site. Single Family Residential h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R10 -CU (Attach zoning compliance certificate, if applicable) ®Yes []No ❑NA I. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ❑Yes ❑No [DNA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ❑No ®NA National Register listed or eligible property? <Form continues on next page> 252- 808 -2808 .. 1- 888- 4RC®AST .. www.nccoastaimanagement.net n Form DCM MP -1 (Page 3 of 4) m (i) Are there wetlands on the site? (ii) Are there coastal wetlands on the site? (iii) If yes to either (i) or (ii) above, has a delineation been conducted? (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Town of Morehead City o. Describe existing drinking water supply source. Town of Morehead City p. Describe existing storm water management or treatment systems. On -site stormwater facilities under completed under a State Stormwater Permit APPLICATION for Major Development Permit ®Yes ❑No ®Yes []No -• 5 �":'.?`z-� - � - - Aga .���`'�'.:.^ : -Y �5,�A`ctivities�ar`►al' Im acts � =; � ,� �� _ - a. `Will the project be for commercial, public, or private use? ❑Commercial ❑Public /Government ®Private /Community b Give a brief description of purpose, use, and daily operations of the project when complete. This is a newly developed lot with a 3 story house that the owner would like to construct an observation pier from the uplands portion over coastal wetlands to the edge of the channel per the attached drawings. I c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored Pile installation will be top down over the wetlands and surface waters. Hand construction will be used to build the stringers, bracing and surface platform of the dock. d. List all development activities you propose. Construction of a 6' wide dock from the uplands portion of the site across the coastal wetlands that will terminate in a 28.5'x14' observation platform that is proposed beyond the coastal wetland but before the one quarter line. e. Are the proposed activities maintenance of an existing project, new work, or both? n/a f. What is the approximate total disturbed land area resulting from the proposed project? 0 ®Sq Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h Describe location and type of existing and proposed discharges to waters of the state There are none. i Will wastewater or stormwater be discharged into a wetland? If yes, will this discharged water be of the same salinity as the receiving water? j Is there any mitigation proposed? If yes, attach a mitigation proposal. <Form continues on back> ❑Yes ®No ❑NA ❑Yes ❑No ❑NA ❑Yes ®No ❑NA 252 - 808 -2808 .. 1- 888- 4RCOAST :. www.nccoastaImanagement.net Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit a. A project narrative. b. An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale. Please give the present status of the proposed project Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. N` ame�Williamxp,S-tyron rr; rAddr @ss POnBox: 2325 "Mo�eheadCityNC <8557 ., Phone No. g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary i. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N C Environmental Policy Act (N.C.G.S. 113A 1 -10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. ",' Y: S F"-. 4c�. ' :_ t. ' .i:!f`5__ i: �c.a..tsio_>i'n - sc+ . a..- �n-.. 3»> tl c - z `2Pti - ermncyi" s ^s+k.i: o°- .'}n .nu, nr ^ t o '. 'x7t t E, n_ .tr�e,: . r .:i -Y o:� n,.yL_ - - a-, n_ :a�l ,- :r i .Tw-:.',,: r;r ii 4"_ u � ✓„,rg ''p . «°: ` ;:,i:i�r1;'?- ;. : < "4'are.'_;�y`.;,n�"...ayj.,.Y:r'a.< r +. .y y� x - =_....,:ti..x;.:�.,- +.- _ _. jF %fl q-�- ` ...Hy. :am - Y:- .; ste_k"r - ° '4 17 �7 Ce a: : I understandy that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up monitoring of the project. I further certify that the information provided in this,application is truthful to the best of my knowledge. Date 8/18/15 Print Name Charles M. Cullipher, PE -/4 Signature dj== N a , Please indicate application attachments pertaining to your proposed project. ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information 252- 808 -2808 .. 1- 888- 4RCOAST .. www.nccoastaImanagement.net Form ®CM MP -4 R"A k Y (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. ss " i' "licati'le - - Thissecton not`a` K/NGafA'CIUTY�IVIi4Rll11;4 a. (i) Is the docking facility /marina: b. (i) Will the facility be open to the general public? ❑Commercial ❑Public /Government ®Private /Community ❑Yes ®No c. (i) Dock(s) and /or pier(s) d. (i) Are Finger Piers included? ❑Yes ®No (ii) Number 1 If yes: (iii) Length 209' (ii) Number (iv) Width 6' (iii) Length (v) Floating ❑Yes ®No (iv) Width (v) Floating ❑Yes []No e. (i) Are Platforms included? ®Yes ❑No f. (i) Are Boatlifts included? ❑Yes ®No If yes- If yes: (ii) Number 1 (ii) Number (iii) Length 28.50' (iii) Length (iv) Width 14.00' (iv) Width (v) Floating ❑Yes ®No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 0 ❑ Full service, including travel lift and /or rail, repair or (ii) Number of slips existing maintenance service ❑ Dockage, fuel, and marine supplies 0 ❑ Dockage ( "wet slips ") only, number of slips. ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ® Other, please describe: Observation Pier i. Check the proposed type of siting: ❑ Land cut and access channel []Open water; dredging for basin and /or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: m. (i) Will the facility have tie pilings? []Yes ®No (ii) If yes number of tie pilings? j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). N/A I. (i) Will the facility be open to the general public? ❑Yes ®No 252 - 808 -2808 :: 1- 888- 4RCOAST :: www.necoastaimanagement.net revised: 12 /27/06 Form 0CM MP-4 (Structures, Page 2 of 4) _ 3= - - -: DOClfi %1VG= Fi4ClLl.TY /IVIA`R/NA- OPERA` -Th � S _ OiV _ �•�. ;T�� n ®Tliie�secfionynot�a - licab %e��: a Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets ❑ Toilets for patrons; Number: ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of " Pumpout Available" signs proposed. f Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h Give the number of channel markers and "No Wake" signs proposed. i. Give the location of fuel - handling facilities, and describe the safety measures planned to protect area water quality j. What will be the marina policy on overnight and live- aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ❑Yes []No 252- 808 -2808 :: 1- 888- 4RCOAST:: www.nccoastaimanagement.net revised: 92/27/06 ForM DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines Platform is approximately 48' west of nearest riparian line Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 61' b. Proximity of structure(s) to adjacent docking facilities. Platform is approximately 292' east of nearest structure d. Water depth at waterward end of structure at NLW or NWL -0.9' at NLW e. (i) Will navigational aids be required as a result of the project? ❑Yes ZNo ❑NA (ii) If yes, explain what type and how they will be implemented. EiTh a. Give complete description: eilybock ullioh'er.'>,6P-Es -''Adthori'z'e Agent?.' z-z q, zl- ;Applicant, S. i g 252-808-2808 :: 1-888-4RCOAS4' :: www.necoastaimana-qement.net revised: 12127/06 VICINITY MARINERS DINTE OREHEAD CITY. NC COVE COURT I NlFD90x11B PG �t3NL5 5 7 PIN: fi]Bfi104i51T3000 SHEET a CF 1 PROTECT : PM1791 DESIGN FILE <e 1791 1CONSTRDCTION DWOS /CAMA3D.OGN 56 55 N /FOOOxii! Pb DR—S PINT 6]861 Dei60B9000 i / / I: 1e6.5] a ° W SHEET a CF 1 PROTECT : PM1791 DESIGN FILE <e 1791 1CONSTRDCTION DWOS /CAMA3D.OGN 56 55 N /FOOOxii! Pb DR—S PINT 6]861 Dei60B9000 'jYj ,„P„i. �,,Fl•r�fO�°°- z°n{u�` -:... I Ai A. Z -ir- �w---'' -_tl..q ��'-'--.;�I e�-�' sN� ?MKS.- Tael•° ° j�z:e .7J�rl °e;W!'. �� +.�w�. - esa D S - •I P\ y 11 11 9'•02'1 - ••�T N e4•iael ERM ITTENT ED tiE OYSTER I 1 1 143. D4 '. - _ _ "r_r . - --- -. _. I•g• __a __ _z -� 1 N33 n z9-E i $ II a r1 it IILW O. BB 'VC/ Iez.06 i � ♦ i I I2.a011 - ie zze T zae -:q'e - .zee z °t{ i�l '�' e -A =6 '' fix -__ _ ,'§ ._ 9 b �yi�I. ly b 0 xze z.ze -= z��lzssddd zze ;1;1 I 1 I - [oczEPGYSTEgT II I ROCK I Q REVISIONS: I � § DILL CREEK � �rrl�l D� PROPOSED DOCK PLAN 20 10 0 20 40 SCALE: 1 "= LOT % MARINERS POINTE MOREHEAD TDWNSHIP:CARTERET COONTY:NORTH CAROLINA CLIENT: TJ d JOYCE VELTMAN 'DESIGNED: DWG ADDRESS: 3301 BRIDGES ST DRAW' DWG V MHEAD CITY. NO 28557 PHONE: 252- 725 -3304 ©STROUDYEj7GINEBRING, P.A. ArrnuVeU: HDI: � la ASxgao Iii ��ll DATE: t eW1447'7AT9 6)25!09 _ A NOT POR_CONBTRUCTION __ SZT,L�— RONALD D CULLIPHBR PA 1' - 20' 1e6.5] a ° W '� � tq, qq s 169.65' TO NXM T z 6 DECKING - ^ 1 • N. x. Y. EL 3.1 IRE— x E EDGE DF ­3 TYPICAL DOCK SECTION D g � DOEPMITTENT b y 5. ' -ir- �w---'' -_tl..q ��'-'--.;�I e�-�' sN� ?MKS.- Tael•° ° j�z:e .7J�rl °e;W!'. �� +.�w�. - esa D S - •I P\ y 11 11 9'•02'1 - ••�T N e4•iael ERM ITTENT ED tiE OYSTER I 1 1 143. D4 '. - _ _ "r_r . - --- -. _. I•g• __a __ _z -� 1 N33 n z9-E i $ II a r1 it IILW O. BB 'VC/ Iez.06 i � ♦ i I I2.a011 - ie zze T zae -:q'e - .zee z °t{ i�l '�' e -A =6 '' fix -__ _ ,'§ ._ 9 b �yi�I. ly b 0 xze z.ze -= z��lzssddd zze ;1;1 I 1 I - [oczEPGYSTEgT II I ROCK I Q REVISIONS: I � § DILL CREEK � �rrl�l D� PROPOSED DOCK PLAN 20 10 0 20 40 SCALE: 1 "= LOT % MARINERS POINTE MOREHEAD TDWNSHIP:CARTERET COONTY:NORTH CAROLINA CLIENT: TJ d JOYCE VELTMAN 'DESIGNED: DWG ADDRESS: 3301 BRIDGES ST DRAW' DWG V MHEAD CITY. NO 28557 PHONE: 252- 725 -3304 ©STROUDYEj7GINEBRING, P.A. ArrnuVeU: HDI: � la ASxgao Iii ��ll DATE: t eW1447'7AT9 6)25!09 _ A NOT POR_CONBTRUCTION __ SZT,L�— RONALD D CULLIPHBR PA 1' - 20' a r1 it IILW O. BB 'VC/ Iez.06 i � ♦ i I I2.a011 - ie zze T zae -:q'e - .zee z °t{ i�l '�' e -A =6 '' fix -__ _ ,'§ ._ 9 b �yi�I. ly b 0 xze z.ze -= z��lzssddd zze ;1;1 I 1 I - [oczEPGYSTEgT II I ROCK I Q REVISIONS: I � § DILL CREEK � �rrl�l D� PROPOSED DOCK PLAN 20 10 0 20 40 SCALE: 1 "= LOT % MARINERS POINTE MOREHEAD TDWNSHIP:CARTERET COONTY:NORTH CAROLINA CLIENT: TJ d JOYCE VELTMAN 'DESIGNED: DWG ADDRESS: 3301 BRIDGES ST DRAW' DWG V MHEAD CITY. NO 28557 PHONE: 252- 725 -3304 ©STROUDYEj7GINEBRING, P.A. ArrnuVeU: HDI: � la ASxgao Iii ��ll DATE: t eW1447'7AT9 6)25!09 _ A NOT POR_CONBTRUCTION __ SZT,L�— RONALD D CULLIPHBR PA 1' - 20' b 0 xze z.ze -= z��lzssddd zze ;1;1 I 1 I - [oczEPGYSTEgT II I ROCK I Q REVISIONS: I � § DILL CREEK � �rrl�l D� PROPOSED DOCK PLAN 20 10 0 20 40 SCALE: 1 "= LOT % MARINERS POINTE MOREHEAD TDWNSHIP:CARTERET COONTY:NORTH CAROLINA CLIENT: TJ d JOYCE VELTMAN 'DESIGNED: DWG ADDRESS: 3301 BRIDGES ST DRAW' DWG V MHEAD CITY. NO 28557 PHONE: 252- 725 -3304 ©STROUDYEj7GINEBRING, P.A. ArrnuVeU: HDI: � la ASxgao Iii ��ll DATE: t eW1447'7AT9 6)25!09 _ A NOT POR_CONBTRUCTION __ SZT,L�— RONALD D CULLIPHBR PA 1' - 20' ti 1 N =. W W 1 F f- N I = i VICINITY MAP MARINERS POINTE MOREHEAD CITY. NC H-UlON 4 RIF HC INVESUENTS. LLC v PINS 638610471486 L „o W ;a m o � � W 4 EX. OROUND .n 60 30 0 60 120 I SCALE: 1 " =60' 0� Ex. DOCK��/ Z/ INE O � EDGE E — L 5 � COASTAL WETLANDS 205.73 eo N 0 � EDGE OF COATAL o \ WETLANDS o OYSTER ROCK \ O 0 o A �� Z. t \\ ° c o\ \ ° 00. O O =� 00, VA H I#H H"If I FI H-H 1414+H \ ` �� EDGE OF CHANNEL 8 0\ ,o PROPOSED 28' %14' DOCK PROPOSED 6' WIDE DOCK °0 0 0 0 0 OVER COASTAL WETLANDS 0 o o / �i n ONE OUARTER LINE y a / 1 V, r--------------------- -- o 0 o a o 0 0 o 0.o -- - a"ioa 8� 74.00' 223.29 —' 219.68' TO NHW DOCK PROFILE NTS NHW 3.t uV,,.a�, ��, ►,ti1,�1aj NLW 0.00 EDGE OF HARSH SIR T, z$' 7� ho T MBER PILES I 2 x 6 DECKING H.H.U. EL 3.1 N. L . tT. 0.00 TYPICAL DOCK SECTION NTS ��\\liI11 / / /// C A R 0 C) Ess ;a SEAL _ 037373[ �ti9•.F�yGINE \Q \\ rrll� a CAMA MAJOR VICK PROPERTY DOCK LOT 74 ° MARINER'S POINT MOREHEAD CITY TWSP. CARTERET COUNTY NORTH CAROLINAI,i 0 S STROUD ENGINEERING, P.A. V 151A HIGHWAY 24 MOREHEAD CITY, . .28557 DATE: t 52) 24� 4�9�p I NSE NO.0 -0847 8/17/15 G? //y S' / /f'- —_— SCALE: CHARLES . CULLYP ER P.E. 1" = 60' Q 4 4' a WILLIAM 0 STYRON. JR. PINT 6386104ID40T 1 1 1 11 z T T EXISTIJ, 7 74 I 1 DWELLI►NfGGI I 5 I I, I 5j6.1Z.541r % 5 is0. W ;a m o � � W 4 EX. OROUND .n 60 30 0 60 120 I SCALE: 1 " =60' 0� Ex. DOCK��/ Z/ INE O � EDGE E — L 5 � COASTAL WETLANDS 205.73 eo N 0 � EDGE OF COATAL o \ WETLANDS o OYSTER ROCK \ O 0 o A �� Z. t \\ ° c o\ \ ° 00. O O =� 00, VA H I#H H"If I FI H-H 1414+H \ ` �� EDGE OF CHANNEL 8 0\ ,o PROPOSED 28' %14' DOCK PROPOSED 6' WIDE DOCK °0 0 0 0 0 OVER COASTAL WETLANDS 0 o o / �i n ONE OUARTER LINE y a / 1 V, r--------------------- -- o 0 o a o 0 0 o 0.o -- - a"ioa 8� 74.00' 223.29 —' 219.68' TO NHW DOCK PROFILE NTS NHW 3.t uV,,.a�, ��, ►,ti1,�1aj NLW 0.00 EDGE OF HARSH SIR T, z$' 7� ho T MBER PILES I 2 x 6 DECKING H.H.U. EL 3.1 N. L . tT. 0.00 TYPICAL DOCK SECTION NTS ��\\liI11 / / /// C A R 0 C) Ess ;a SEAL _ 037373[ �ti9•.F�yGINE \Q \\ rrll� a CAMA MAJOR VICK PROPERTY DOCK LOT 74 ° MARINER'S POINT MOREHEAD CITY TWSP. CARTERET COUNTY NORTH CAROLINAI,i 0 S STROUD ENGINEERING, P.A. V 151A HIGHWAY 24 MOREHEAD CITY, . .28557 DATE: t 52) 24� 4�9�p I NSE NO.0 -0847 8/17/15 G? //y S' / /f'- —_— SCALE: CHARLES . CULLYP ER P.E. 1" = 60' H I#H H"If I FI H-H 1414+H \ ` �� EDGE OF CHANNEL 8 0\ ,o PROPOSED 28' %14' DOCK PROPOSED 6' WIDE DOCK °0 0 0 0 0 OVER COASTAL WETLANDS 0 o o / �i n ONE OUARTER LINE y a / 1 V, r--------------------- -- o 0 o a o 0 0 o 0.o -- - a"ioa 8� 74.00' 223.29 —' 219.68' TO NHW DOCK PROFILE NTS NHW 3.t uV,,.a�, ��, ►,ti1,�1aj NLW 0.00 EDGE OF HARSH SIR T, z$' 7� ho T MBER PILES I 2 x 6 DECKING H.H.U. EL 3.1 N. L . tT. 0.00 TYPICAL DOCK SECTION NTS ��\\liI11 / / /// C A R 0 C) Ess ;a SEAL _ 037373[ �ti9•.F�yGINE \Q \\ rrll� a CAMA MAJOR VICK PROPERTY DOCK LOT 74 ° MARINER'S POINT MOREHEAD CITY TWSP. CARTERET COUNTY NORTH CAROLINAI,i 0 S STROUD ENGINEERING, P.A. V 151A HIGHWAY 24 MOREHEAD CITY, . .28557 DATE: t 52) 24� 4�9�p I NSE NO.0 -0847 8/17/15 G? //y S' / /f'- —_— SCALE: CHARLES . CULLYP ER P.E. 1" = 60'