HomeMy WebLinkAboutNC0071528_Remission (Request)_20231009October 9, 2023 Mr. Andrew H. Pitner, P. G., Assistant Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Subject: Notice of Violation and Assessment of Civil Penalty for Violations of North Carolina General Statute (G.S.) 143-215. 1 (a)(6) and Permit No. NC0071528 Lake Norman Woods Homeowners Association Lake Norman Woods WWTP Case No. LV-2023-0237 Catawba County Mr. Pitner, Thank you for allowing the Lake Norman Woods HOA the opportunity to respond to this Notice of Violation dated September 13, 2023; received September 20, 2023. This response pertains to the (5) Ammonia Nitrogen daily maximum exceedances, and (1) subsequent NH3N monthly average exceedance events that occurred during the June 2023 monitoring period. The NH3N exceedances were caused by various complications with WWTP's air system that had adversely affected the plant's operations at the time that these violations occurred. Reconstruction of the air head at the WWTP are scheduled to begin during October 2023, and are in the early stages of execution. The strategy is to replace the air head on WWTP with new galvanized header and stainless steel drops, replace the existing return piping to the head of the plant with new schedule 80 PVC, and empty and clean the plant and re -seed with 3,300 gallons of new sludge. As an interim solution, operators increased the air flow output and blower RPMs to allow for greater turnover in the tanks, in addition to brushing down the walls of the aeration basin, and agitating the bottom of the basin to bring settled solids from the anoxic zone back up to the aeration basin for treatment. This has proven to be highly successful for lowering ammonia nitrogen levels, of which no further exceedances have occurred since June 2023. Construction Schedule and Total Cost of Travel, Labor, and Materials for Replacement of the Air Header at the Lake Norman Woods WWTP: • Replace air head on WWTP including new galvanized header and stainless steel drops - $17,495.79 • Replace existing return piping with new schedule 80 PVC to head of plant - $2,675.00 • Pump out existing sludge and replenish with 6,600 — 9,900 gallons of new sludge — (estimated) $15,000.00 TOTAL: $35,170.79 As a small community association, it is very expensive for us to make such repairs. We believe that the Lake Norman Woods HOA and WWTP operational staff have responded to these issues to the best of our ability and in good faith. We are confident that upon completion of the reconstruction efforts that effluent quality will be greatly improved. It is always our goal to remain in compliance with regulations set forth by the North Carolina Division of Water Resources. In the event of considering financial enforcement, we request that the Division take this factor into account when proceeding with enforcement. Sincerely, Dale Norman Lake Norman Woods HOA CC: Todd Robinson, Envirolink, Inc. Josh Powers, Envirolink, Inc. JUSTIFICATION FOR REMISSION REQUEST Case Number: LV-2023-0237 County: Catawba Assessed Party: Lake Norman Woods Homeowners Association Permit No.: NCO071528 Amount Assessed: $3,070.53 Please use this form when requesting remission of this civil penalty. You must also complete the "Request For Remission, Waiver of Right to an Administrative Hearing, and Stipulation of Facts" form to request remission of this civil penalty. You should attach any documents that you believe support your request and are necessary for the Director to consider in evaluating your request for remission. Please be aware that a request for remission is limited to consideration of the five factors listed below as they may relate to the reasonableness of the amount of the civil penalty assessed. Requesting remission is not the proper procedure for contesting whether the violation(s) occurred or the accuracy of any of the factual statements contained in the civil penalty assessment document. Pursuant to N.C.G.S. § 143B-282.1(c), remission of a civil penalty may be granted only when one or more of the following five factors apply. Please check each factor that you believe applies to your case and provide a detailed explanation, including copies of supporting documents, as to why the factor applies (attach additional pages as needed). (a) one or more of the civil penalty assessment factors in N.C.G.S. 143B-282.1(b) were wrongfully applied to the detriment of the petitioner (the assessment factors are listed in the civil penalty assessment document); (b) the violator promptly abated continuing environmental damage resulting from the violation (Le., explain the steps that you took to correct the violation and prevent future occurrences); X (c) the violation was inadvertent or a result of an accident (i.e., explain why the violation was unavoidable or something you could not prevent or prepare for); (d) the violator had not been assessed civil penalties for any previous violations; X (e) payment of the civil penalty will prevent payment for the remaining necessary remedial actions (i.e., explain how payment of the civil penalty will prevent you from performing the activities necessary to achieve compliance). EXPLANATION: The NH3N exceedances were caused by various complications with WWTP's air system that had adversely affected the plant's operations at the time that these violations occurred. Reconstruction of the air head at the WWTP are scheduled to begin during October 2023, and are in the early stages of execution. The strategy is to replace the air head on WWTP with new galvanized header and stainless steel drops, replace the existing return piping to the head of the plant with new schedule 80 PVC, and empty and clean the plant and re -seed with 3,300 gallons of new sludge. As an interim solution, operators increased the air flow output and blower RPMs to allow for greater turnover in the tanks, in addition to brushing down the walls of the aeration basin, and agitating the bottom of the basin to bring settled solids from the anoxic zone back up to the aeration basin for treatment. This has proven to be highly successful for lowering ammonia nitrogen levels, of which no further exceedances have occurred since June 2023. Please see the construction Schedule and Total Cost of Travel, Labor, and Materials for Replacement of the Air Header at the Lake Norman Woods WWTP. As a small community association, it is very expensive for us to make such repairs. We greatly appreciate the Division taking this factor into account during review. -Replace air head on WWTP including new galvanized header and stainless steel drops - $17,495.79 -Replace existing return piping with new schedule 80 PVC to head of plant - $2,675.00 -Pump out existing sludge and replenish with 6,600 — 9,900 gallons of new sludge — (estimated) $15,000.00 TOTAL: $35,170.79 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY COUNTY OF CATAWBA IN THE MATTER OF ASSESSMENT ) WAIVER OF RIGHT TO AN OF CIVIL PENALTIES AGAINST ) ADMINISTRATIVE HEARING AND STIPULATION OF FACTS Lake Norman Woods Homeowners Association ) Lake Norman Woods WWTP ) PERMIT NO. NCO071528 ) CASE NO. LV-2023-0237 Having been assessed civil penalties totaling $3,070.53 for violation(s) as set forth in the assessment document of the Division of Water Resources dated September 13, 2023, the undersigned, desiring to seek remission of the civil penalty, does hereby waive the right to an administrative hearing in the above -stated matter and does stipulate that the facts are as alleged in the assessment document. The undersigned further understands that all evidence presented in support of remission of this civil penalty must be submitted to the Director of the Division of Water Resources within thirty (30) days of receipt of the notice of assessment. No new evidence in support of a remission request will be allowed after (30) days from the receipt of the notice of assessment. This the 9th day of October 20 23 �Ce� /(/d2�Yl,CLNv SIGNATURE ADDRESS ke Norman Woods HOA PO Box 321 Sherrills Ford, NC 28673 TELEPHONE 336 972-3212 ATTACHMENT A Lake Norman Woods Homeowners Association CASE NUMBER: LV-2023-0237 PERMIT: NCO071528 REGION: Mooresville FACILITY: Lake Norman Woods WWTP COUNTY: Catawba LIMIT VIOLATION(S) SAMPLE LOCATION: Outfall 001 - Effluent Violation Report Unit of Limit Calculated % Over Violation Penalty Date MonthNr Parameter Frequency Measure Value Value Limit Type Amount 6/1/2023 6-2023 Nitrogen, Ammonia; Weekly mg/I 20 30.46 52.3 Daily $375.00 Total (as N) - Maximum Concentration Exceeded 6/8/2023 6-2023 Nitrogen, Ammonia Weekly mg/I 20 33.6 68.0 Daily $375.00 Total (as N) - Maximum Concentration Exceeded 6/15/2023 6-2023 Nitrogen, Ammonia Weekly mg/I 20 35.06 75.3 Daily $375.00 Total (as N) - Maximum Concentration Exceeded 6/22/2023 6-2023 Nitrogen, Ammonia Weekly mg/I 20 32.93 64.7 Daily $375.00 Total (as N) - Maximum Concentration Exceeded 6/27/2023 6-2023 Nitrogen, Ammonia Weekly mg/I 20 21.17 5.8 Daily $325.00 Total (as N) - Maximum Concentration Exceeded 6/30/2023 6-2023 Nitrogen, Ammonia Weekly mg/I 4 30.64 666.1 Monthly $1,062.50 Total (as N) - Average Concentration Exceeded