Loading...
HomeMy WebLinkAbout20150705 Ver 2_More Info Letter_20151001North Carolina Department of Environmental Quality Pat McCrory Donald R. van der Vaart Governor Secretary October 1, 2015 DWQ # 15- 0705v2 Alamance County CERTIFIED MAIL #7015 0640 0005 6272 4584 RETURN RECEIPT REQUESTED Conergy Projects Inc Attn: Mr. Steve Crivelli 3947 Lennane Dr Sacramento CA 95834 Subject: REQUEST FOR ADDITIONAL INFORMATION Minnie Solar Farm Dear Mr. Crivelli: On September 9, 2015, the Division of Water Resources — Water Quality Programs (Division) received your application dated September 4, 2015, requesting a 401 Water Quality Certification and Buffer Authorization from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on- hold until all of the following information is received: 1. Please provide an owner authorization letter delegating authority to Conergy Projects Inc. to apply for permits on property owned by Mr. Graydon Issacs. [15A NCAC 02H .0506(f)] 2. It appears that the buffer for the portion of stream between the pond and the road has not been shown on the plans that were submitted with your application. Please show all impacts on the site plan and clearly label impacts. The Division recommends highlighting by hatching or shading all impacts areas for temporary impact areas and permanent impact areas. Please verify that the PCN form has accounted for all impacts. [15A NCAC 02B .0267(8)(b)(iv)] 3. Please show all fill slopes, disturbed areas, and erosion control measures for the access road. It is unclear from the plans that were submitted whether the road area shown includes all disturbed areas for the purpose of construction. [15A NCAC 02B .0267(8)(b)(iv)] 4. Per the Jordan Riparian Buffer Rule, you must show that this site meets diffuse flow requirements. [15A NCAC 02B .0267(5)] Winston -Salem Regional Office Location: 450 W. Hanes Mill Rd, Winston Salem NC 27105 Phone: 336 - 776 -98001 FAX: 336 - 776 -97971 Customer Service: 1- 877 - 623 -6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer Conergy Projects Inc. DWQ# 15- 0705v2 Request for Additional Information Page 2 of 2 Pursuant to Title 15A NCAC 02H .0502(e) and.0267, the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending two copies of all of the above requested information to the Wetlands, Buffers, Stormwater — Compliance and Permitting (Webscape) Unit, 1617 Mail Service Center, Raleigh, NC 27699 -1650. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Please contact me at 336- 776 -9693 or Sue. Homewood @ncdenr.gov if you have any questions or concerns. Sincerely, Sue Homewood Winston -Salem Regional Office cc: Brad Luckey, Pilot Environmental Inc. (via email) David Bailey, USACE Raleigh Regulatory Field Office (via email) DWR WSRO 401 files DWR 401 & Buffer Permitting Unit