HomeMy WebLinkAboutSW6220804_Annual Certificate of Completion (2024)_20240129 CERTIFICATE OF COMPLETION
Post-Construction Stormwater Annual Permit Certification
This certifies that Joe Ervin has completed the Annual Permit Certification for Post-Construction Stormwater Permit SW6220804, Rebekah Evans 230kV
POD, located in Fayetteville,Cumberland County,on January 29,2024 in accordance with G.S. 143-214.7(b4). Please keep a copy of this certificate for
your records.The electronic record will be stored in the Department of Environmental Quality's digital repository permit file.
The Annual Permit Certification must be completed each year on or before the day of permit issuance, March 1. Failure to do so is a violation of your
permitting conditions and is subject to enforcement action per G.S. 143-215.6.
Jim Farkas
State Stormwater Engineer
Division of Energy, Mineral,and Land Resources