Loading...
HomeMy WebLinkAboutSummary of Comments on 20201095 Ver 1_DoubleRock_Buffer_As_BuiltSummary of Comments on 20201095 Ver 1_DoubleRock_Buffer_MY0_Report_20230901 Page: 5 Author: bhartshorn Subject: Sticky Note Date: 12/18/2023 9:49:48 AM Reference the Stream mitigation project in introduction as well. Author: bhartshorn Subject: Sticky Note Date: 12/18/2023 9:49:58 AM Mention the DWR As Built Site walkthrough and the results. Page: 6 Author: bhartshorn Subject: Sticky Note Date: 12/18/2023 9:43:14 AM When were restoration activities completed? Add that information is Section 3.0 Page: 7 Author: bhartshorn Subject: Sticky Note Date: 12/14/2023 4:35:26 PM This does not seem like a slight reduction. Explain why there is a 50,426 reduced credit difference from the approved Plan. Page: 13 Author: bhartshorn Subject: Sticky Note Date: 12/18/2023 9:46:56 AM Provide descriptions on stream restoration work and status of the USACE as built report in Section 3.0 as well and include that in Table 2. Project Activity and Reporting History Page: 19 Author: bhartshorn Subject: Sticky Note Date: 12/14/2023 4:23:43 PM Are any of these plots being shared with USACE stream performance? If so indicate which ones.