Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
October 2, 2023 Ver 4.3
Initial Review
Has this project met the requirements for acceptance in to the review process?
Yes No
Is this project a public transportation project?*
Yes No
Change only If needed.
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or involve the distribution or transmission of energy or
fuel, including natural gas, diesel, petroleum, or electricity?
Yes No
BIMS # Assigned
Version# *
20240173
1
Is a payment required for this project?*
No payment required
What amount is owed?*
Fee received
$240.00 $570.00
Fee needed - send electronic notification
$323.00 $767.00
Reviewing Office*
Select Project Reviewer*
Mooresville Regional Office - (704) 663-1699
Andrew Pitner:andrew.pitner
Information for Initial Review
la. Name of project:
Coddle Creek Road (McKenzie Bluffs)
1a. Who is the Primary Contact? *
Jennifer Robertson
1b. Primary Contact Email: * 1c. Primary Contact Phone:*
jobertson@atlasenvi.com (828)712-9205
Date Submitted
1/24/2024
Nearest Body of Water
Rocky River
Basin
Yadkin-PeeDee
Water Classification
C
Site Coordinates
Latitude:
Longitude:
35.553421'
-80.778788°
A. Processing Information
Is this project connected with ARPA funding?
Yes No
County (or Counties) where the project is located:
Iredell
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
O
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?*
Yes
No
1b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
29 - Residential Developments
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application? *
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
Nicholus E Johnston and John N & Samantha Johnston
2b. Deed book and page no.:
2576/26 and 1693/962
2c. Contact Person:
Nicholus Johnston and John & Samantha Johnston
2d.Address
Street Address
2060 Cannon Farm Road
Address Line 2
City
China Grove
Postal / Zip Code
28023
401 Water Quality Certification - Express
Riparian Buffer Authorization
State / Province / Region
North Carolina
Country
United States
Yes No
Yes No
2e. Telephone Number: 2f. Fax Number:
(919)901-8299 (000)000-0000
2g. Email Address:*
tdoupona@wedgse.com
3. Applicant Information (if different from owner)
3a. Name:
Todd Doupona
3b. Business Name:
Weeks Development Group
3c.Address
Street Address
8307 Hampton Fare Lane
Address Line 2
City
State / Province / Region
Waxhaw
North Carolina
Postal / Zip Code
Country
28173
United States
3d. Telephone Number:
3e. Fax Number:
(919)901-8299
(000)000-0000
3f. Email Address:
tdoupona@wedgse.com
4. Agent/Consultant (if applicable)
4a. Name:
Jennifer Robertson
4b. Business Name:
Atlas Environmental, Inc.
4c.Address
Street Address
338 S. Sharon Amity Road
Address Line 2
#411
City
State / Province / Region
Charlotte
North Carolina
Postal / Zip Code
Country
28211
United States
4d. Telephone Number:
4e. Fax Number:
(828)712-9205
(000)000-0000
4f. Email Address:
jrobertson@atlasenvi.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
McKenzie Bluffs
1c. Nearest municipality / town:
Mooresville
2. Project Identification
2a. Property Identification Number
4676009552,4676104092
2b. Property size:
16.08
M
2c. Project Address
Street Address
1496 Coddle Creek Hwy
Address Line 2
city
Mooresville
Postal / Zip Code
28115
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Rocky River
3b. Water Resources Classification of nearest receiving water:
C
3c. What river basin(s) is your project located in?"
Yadkin-PeeDee
3d. Please provide the 12-digit HUC in which the project is located.
030401050102
4. Project Description and History
State / Province / Region
North Carolina
Country
United States
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The project site consists of two privately owned parcels. The parcels are mostly forested with a small, cleared area in the central East portion of the project site. Surrounding land use
includes residential subdivisions, a school, single family parcels, an existing sewer line, and mixed development currently under construction.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?'�
Yes No Unknown
4f. List the total estimated acreage of all existing wetlands on the property:
0.242 acre
4g. List the total estimated linear feet of all existing streams on the property:
453 linear feet
4h. Explain the purpose of the proposed project:
The purpose of this project is for the construction of a residential development. There will be 41 single family lots, infrastructure roads and utilities, and one SCM. The project will be served
by municipal sewer and water. There is an existing sewer manhole located at the adjacent subdivision. This manhole will be accessed for a tie in. Municipal water is existing along Coddle
Creek Highway. The project will provide opportunities for residents of Mooresville or people relocating to Mooresville to purchase homes.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:"
No indirect impacts should occur since there are existing municipal utilities accessible at the project site. The only impacts requested are for one road crossing to access the project site.
The stream to be impacted parallels Coddle Creek Hwy so this one road crossing is unavoidable. Typical construction equipment will include track hoes, bull dozers, skid steers, motor
graders, dump trucks, and sheepsfoot roller. The site will be mass graded to created building pads for the home builder.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?"
Yes No Q Unknown
Comments:
Delineations were completed on September 13 and October 23, 2023
5b. If the Corps made a jurisdictional determination, what type of determination was made?"
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
SAW-2024-00022
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Austin Baggarley and Matthew Menzel
Agency/Consultant Company:
Other:
Atlas Environmental, Inc.
Trevor Casey and Luke Diaz
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
January 16, 2024
6. Future Project Plans
6a. Is this a phased project?*
Yes
No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
No
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
3. Stream Impacts
3a. Reason for impact (?)
3b.lmpact type "
3c. Type of impact'" �3�name*
��3e.
Stream Type *
3f. Type of
3g. S. width
3h. Impact
❑
(?)
Jurisdiction*
length*
g1
Access road
Permanent
Culvert
CH 200
Intermittent
Both
89
Averege (feet)
(linear feet)
S2
Pump Around
Temporary
Dewatering
CH 200
Intermittent
Both
20
Averege (feet)
(linear feet)
S3
Pump Around
Temporary
Dewatering
CH 200
Intermittent
Both
20
Averege (feet)
(linear feet)
3i. Total jurisdictional ditch impact in square feet:
0
31. Total permanent stream impacts:
89
3i. Total stream and ditch impacts:
129
3j. Comments:
Permanent stream impacts = 0.006 acre
Temporary stream impacts = 0.002 acre
E. Impact Justification and Mitigation
1. Avoidance and Minimization
31. Total temporary stream impacts:
40
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Impacts are limited to one intermittent stream unavoidable due to gaining access to the site. No impacts are proposed to wetlands. Over 80 % of the
streams on site will be avoided and preserved. The area where all surface waters are located is within the common open space.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The civil engineers have designed the road crossing to include headwalls at both the upstream and downstream ends of the culvert. The culvert will be
buried either 20 % or a foot depending on the size to allow for aquatic life movement.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Surface water impacts are limited to one intermittent stream of less than 0.02 acre therefore USACE mitigation is not required. DWR does not require mitigation for intermittent stream
impacts.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
If no, explain why:
The receiving water is Rocky River which is classified as a Class C water. See the enclosed stream classification map.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?'
Yes No
u
O
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
Local Government Stormwater Programs
Phase II NSW USMP Water Supply
Please identify which local government stormwater program you are using.
Town of Mooresville
Comments:
One SCM is planned to treat all stormwater within the project area.
G. Supplementary Information
1. Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
This is a single and complete residential subdivision with one phase. Existing municipal water and sewer will be tapped to serve the lots. A mixed -use
development that did not require any impacts to waters is currently under construction in the vicinity which will serve the residents of McKenzie Bluffs.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?
Yes No N/A
4b. Describe, in detail, the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a
treatment plant, list the capacity available at that plant.
Town of Mooresville municipal sewer will serve the project. The Town's sewer plant has adequate capacity to serve these 41 single family lots.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?
Yes No
5c. If yes, indicate the USFWS Field Office you have contacted.
Asheville
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
5h. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
IPaC and NC NHP databases; field surveys and report; FWS coordination; see enclosed FWS email response
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?
NOAA Essential Fish Habitat Mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?"
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?"
NC HPO database search, field surveys, report of findings, SHPO coordination, see enclosed comment letter from SHPO
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?"
Yes No
8c. What source(s) did you use to make the floodplain determination?
FEMA NFHL data layer
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
PCN Attachments Compressed.pdf 12.15MB
File must be PDF or KMZ
Comments
Signature
By checking the box and signing below, I certify that:
• The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction' subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Jennifer Robertson
Signature
C'%iww�t ,�,�tlJar
Date
1/24/2024
O