Loading...
HomeMy WebLinkAbout19950693 Ver 2_401 Application_20150930North Carolina Division of Water Resources 401 & Buffer Permitting Unit 512 North Salisbury Street Raleigh, NC 27604 04ARCAD1S1f'b'-uLftt `y Subject: Preconstruction Notification — Baxter Healthcare Corporation, Marion, NC. Action ID: 2015 -00065 Our ref: ATLBAXNC.EN01 Date: September 25, 2015 PAW Dear Sir /Madam: Attached are four copies of a preconstruction notification for Nationwide Permit 7, Outfall Structures and Associated Intake Structures and check # for $240 to cover application fees. The site is located at the Baxter Healthcare Corporation site in Marion, NC. A preliminary jurisdictional determination was issued by the US Army Corps of Engineers for the site on July 27, 2015. Work at the site consists of upgrading an existing wastewater treatment facility. Portions of the existing facility will be demolished and new structures constructed. A new discharge pipe and outlet structure will be installed on the north bank of the North Fork Catawba River. The existing discharge pipe will be abandoned in place and plugged. The existing 48" culvert under the access road will be replaced with a 60" concrete pipe, headwall and riprap outlet protections. The new pipe will be buried 1 foot in the substrate. The attached information provides more detail of the scope of work. Approval from the US Army Corps of Engineers is also required and will be requested under a separated request. If you have any questions or concerns, please contact me either by phone or by email. Sincerely, ARCADIS US Robert Lepsic, PWS Senior Scientist Email: robert.lepsic @arcadis - us.com Direct line: 919 - 415 -227 SEP 3 0 2015 .g DENR WATER RESOURCES 401 & BUFFER PERMITTING 01001 37677155 NCDENR DIVISION OF WATER RESOURCES 6192465 09/18/15 Vchr Invoice PO Invoice Gross Discount Net Number Number Number Date Amount Amount Amount 2326578 401 PERMIT1 5 09/16/15 240.00 240.00 TOTALS 240.00 - -- REMOVE DOCUMENT ALONG THIS PERFORATION- 240.00 1111 BANK OF AMERICA ** Li ".!l 11,111111111111 CONTROLLED DISBURSEMENT ACCOUNT NORTHBROOK IL BAXTER HEALTHCARE CORPORATION �0- 2328/�1s ONE BAXTE'R,,PKWY DE�E'R'FIELD' ''60'015. Date Check No Net Amount (224)9482000 09/18/15 06192465 $**** ***240.00 VOID AFTER SIX MONTHS '� •i • �:. PUi * 'TWO HUNDRED' FORTY AND 00/160 DOLLARS To NCDENR DIVISION OF WATER RESOURCES The 1617 MAIL SERVICE CTR Order RALEIGH NC 27699 Of _ -_ Chlef, Financial Officer reaNm o�monback 06192465 BAXTER HEALTHCARE CORPORATION ONE BAXTER PKWY DEERFIELD IL 60015 (224)9482000 00000036 1 SP 0500 2 NCDENR DIVISION OF WATER RESOURCES 1617 MAIL SERVICE CTR RALEIGH NC 27699 010011104M NBSBHC7 -2 3191904 B 8 J, Ba CO'o ot WA O�TF9�G O,kY Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: Q Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 7 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? I Q Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit: because written approval is not required? 401 Certification: ❑ Yes ❑X No ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank ❑ Yes ❑X No or in -lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes ❑X No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Baxter Healthcare Corporation, Wastewater Treatment Plant Improvements 2b. County: McDowell 2c. Nearest municipality / town: Marion 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: I N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Baxter Healthcare Corporation 3b. Deed Book and Page No. 329/630 3c. Responsible Party (for LLC if Alan Weiler, Plant Manager applicable): 3d. Street address: 65 Pitts Station Road 3e. City, state, zip: Marion, NC 28752 3f. Telephone no.: 828 - 756 -6530 3g. Fax no.: 828- 756 -4821 3h. Email address: alen.weiler @baxter.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑X Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consult; 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: ant Information (if applicable) Robert Lepsic ARCADIS G &M of NC Inc 801 Corporate Center Drive, Suite 300 Raleigh NC 27607 919 -415 -2278 919- 854 -5448 robert.lepsic @arcadis - us.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1 171700126528 1 b. Site coordinates (in decimal degrees): I Latitude: 38.836951 Longitude: -81.999157 1 c. Property size: 127.26 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: North Fork Catawba River 11- 24- (2.5)b 2b. Water Quality Classification of nearest receiving water: B and Tr 2c. River basin: Catawba HUC 03050101 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently comprised of a waste water treatment plant, maintained land, forested areas and two perennial streams. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 4,413 3d. Explain the purpose of the proposed project: The project will upgrade and increase the treatment capacity of an aging, existing waste water treatment plant to increase the useful life of the facility an additional 20 years. 3e. Describe the overall project in detail, including the type of equipment to be used: the existing wastewater treatment plant will be upgraded. This will include the construction of new facilities and the abandonment/demoldion of old structures. Approximately 10 acres of forest will be ;feared for the construction of the new facility A new discharge pipe and outlet structure will be installed on the north bank of the North Fork Catawba River. This structure will replace the old structure .hat is located approximately 550 feet downstream. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the ❑X Yes ❑ No ❑ Unknown Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type 0 Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: ARCADIS G&M of NC Inc. Name (if known): Robert Lepsic Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. July 28, 2015. See attached. 5. Project History 5a. Have permits or certifications been requested or obtained for I ❑ Yes ❑X No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3of10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑X Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary (T) W1 Choose one Choose one Yes /No - W2 Choose one Choose one Yes /No - W3 Choose one Choose one Yes /No - W4 Choose one Choose one Yes /No - W5 Choose one Choose one Yes /No - W6 Choose one Choose one Yes /No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Type In (Other) North Fork Catawba Rivr PER DWQ 40 6.75 S2 P Culvert UT to NF Catawba River PER DWQ 6 24.58 S3 Choose one - S4 - Choose one - S5 Choose one - S6 Choose one - jl 3h. Total stream and tributary impacts 31.33 3i. Comments: A new outlet structure for an 18" pipe will be installed on the bank of North Fork Catawba River. The invert of the pipe will be 1,461.5 ms], 2.9 feet above the normal water surface of the river. The structure will impact 6.75 linear feet of stream bank. The existing 48" corrugated metal pipe culvert under the access road will be replaced with a 60" reinforced concrete pipe and headwalls. The culvert will be buried one foot. A 22 foot rip rap apron will be installed at the outlet of the new culvert. An existing 4 foot concrete apron will be removed. See attached plans. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts 0 Yes 0 No If yes, permit ID no: If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 5j. Size of pond watershed (acres): 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody 6. Buffer Impacts (for DWQ) impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or impacts type Temporary (T) 6a. Project is in which protected basin? 0 Neuse E] Tar - Pamlico Catawba E] Randleman []Other: O1 I I Choose one Choose O2 I I Choose one I Choose 03 Choose one I Choose I 04 Choose one I Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e, Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded I Filled I Excavated Flooded � Filled Excavated P1 Choose one P2 I Choose one 5f. Total: I I I I I I 5g. Comments: I 5h. Is a dam high hazard permit required? 0 Yes 0 No If yes, permit ID no: +j 5i. Expected pond surface area (acres): I 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? 0 Neuse E] Tar - Pamlico Catawba E] Randleman []Other: 6b. 6c. Buffer Impact Reason for impact 6d. 6e. 6f. Stream name Buffer Zone 1 6g. Zone 2 number — Permanent (P) or mitigation impact impact Temporary (T) required? (square (square feet) feet) 131 I I I Yes /No J B2 I I Yes/No B3 I I I Yes /No I B4 I I I Yes /No B5 I I I Yes /No B6 I I I Yes /No I I 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Even though there are no NCDWR buffer rules for the area, the project was designed to stay outside of 25 foot trout buffer from the top of stream bank except for the pipe outlet structure and culvert replacement. The length of the driveway culvert being replaced was kept to the minimum required. Demolition of the portions of the existing wastewater treatment plant will allow more water to infiltrate in those areas. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. No tree clearing or building demolition will occur between May 15 and August 15 to avoid potential impacts to the northern long -eared bat. An erosion and sediment control plan will be prepared and implemented during construction. The stream will be dewatered during the driveway culvert replacement to prevent sediment from being released to downstream waters. The new culvert will be buried and the existing concrete apron removed from the stream bed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes ❑X No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. I ❑ Yes 4b. Stream mitigation requested: I linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan Quantity: Quantity: 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes QX No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: ❑ Yes ❑X No ❑ Yes ❑ No 20% 0 Yes ❑ No 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Proposed erosion and sediment controls will include silt fence, construction entrance/exits, tree protection fencing, slope stabilization, inlet and outlet protection, grass lined channels, and temporary and permanent seeding Per NCDENR requirements, specifications will require ground stabilization in 7 days on disturbed perimeter areas and slopes greater than 3:1. Any remaining disturbed areas left exposed for a period greater than 14 days shall be stabilized. 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 3b. Which of the following locally - implemented stormwater management programs apply (check all that apply): 3c. Has the approved Stormwater Management Plan with proof of approval been attached? 4. DWQ Stormwater Program Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): 4b. Has the approved Stormwater Management Plan with proof of approval been attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? 5b. Have all of the 401 Unit submittal requirements been met? INCDENR McDowell County, NC ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: ❑ Yes ❑X No ❑Coastal counties ❑HQW ❑ORW ❑Session Law 2006 -246 []Other: ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑X No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes letter.) ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after - the -fact permit application? ❑Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in I ❑ Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. All work will occur on Baxter property. The waste water treatment plant is solely for water generated from the Baxter plant. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater, both sanitary and industrial, generated af the Baxter facility is treated through an existing biological treatment plant and discharged through an outfall permitted under NPDES Permit No. NC0006564. The existing facility will continue operation until the new facility is brought online at the end of this construction project. The new facility will have an approximate average volumetric capacity of 1,000,000 gallons per day. An application for the new wastewater treatment plant discharge will be submitted to NC DENR for approval concurrently with this application. The existing wastewater treatment plant has sufficient capacity to accept wastewater generated from this project. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS and NCNHP data. See attached correspondence with USFWS. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? I ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? See attached report ER -15 -1141. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? I Q Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: An exemption has been requested from McDowell County. 8c. What source(s) did you use to make the floodplain determination? FIRM 3710171700J and www.ncfloofmaps.com ( http:// fris.nc.gov /fris /index.aspx ?FIPS= 111 &ST =NC &user = General %20Public) ,r Applicant/Agent's Printed Name 1. Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 L 1 SND. ® ABANDON/OEMOLISH F100 YEAR FLOODWAY } K i b i YY 11 T� �A PAP .-\ �-: �. ., 11 11 11 ..� � •� �. 1� .. ► �`�.`�i' Y I. IV om r- 6 -n l) 1- 4m-q =D = -n m z = a r- -n n mm as U) o 0 O � z m N z N m �ClH m � = N cl) C) z �Zv D -4 =0 N m v �m� m m Z z O Sao c r SHEET 1 OF 1 838.80 W1 (FT.) H2 CS /RCP H1 B" O.C.(TYP.) REFER TO CHART FOR BAR SIZE ELEVATION W2 (FT.) / D \ PLAN NOTES: 0 1 , e„ THIS PRECAST ENOWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.33, 838.39, 838.51, 838.57, 838.83 AND 838.89. INSTALL PRECAST ENDWALLS WITH WINGS AND PAY FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. USE 4000 PSI CONCRETE. PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A815 FOR GRADE 80 AND WELDED WIRE FABRIC CONFORMING TO ASTM A185 WITH 2" MIN. CLEARANCE. PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1928.704. PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY CONTRACTOR ALL ELEMENTS PRECAST TO MEET ASTM C913. WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1 ". NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS AT 8" CTS.THE CONTRACTOR WILL HAVE THE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. ENDWALL DIMENSIONS FT. MINIMUM MIN. /MAX. o I I H2 ' H1 I 1' -0" _ ro 8r. J V e" O.C.(TYP.) L REFER TO CHART FOR BAR SIZE BAR SIDE THIS PRECAST ENOWALL MAY BE USED FOR THE FOLLOWING STANDARDS: 838.01, 838.11, 838.21, 838.27, 838.33, 838.39, 838.51, 838.57, 838.83 AND 838.89. INSTALL PRECAST ENDWALLS WITH WINGS AND PAY FOR IN ACCORDANCE WITH SPECIFICATION SECTION 838. USE 4000 PSI CONCRETE. PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A815 FOR GRADE 80 AND WELDED WIRE FABRIC CONFORMING TO ASTM A185 WITH 2" MIN. CLEARANCE. PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1928.704. PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY CONTRACTOR ALL ELEMENTS PRECAST TO MEET ASTM C913. WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1 ". NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS AT 8" CTS.THE CONTRACTOR WILL HAVE THE OPTION TO INCREASE THIS BAR SIZE AS NEEDED. ENDWALL DIMENSIONS FT. MINIMUM MIN. /MAX. MIN. /MAX. MIN. /MAX. MIN. /MAX. MIN. /MAX. PIPE DIA. BAR SIZE Hi(FT.) H2(FT.) D (FT.) W1 W2 1.0 #5 @ 8" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.5016.00 1.25 #5 @ 8" 1.25/2.00 3.00/3.75 1.25/2.00 3.50/3.75 6.50/6.75 1.50 #5 @ 8" 1.25/2.00 3.00/4.25 1.5012.50 3.50/3.75 6.50/6.75 2.0 #5 @ B" 1.50/2.50 4.00/4.75 1.75/2.50 4.00/4.25 7.50/8.25 2.5 #5 @ 8" 2.50/3.50 4.00/6.00 2.00/3.00 4.50/5.50 10.00/11.50 3.0 #5 @ S" 3.00/3.50 5.0016.00 2.7513.50 5.25/5.75 11.50111.75 3.5 #5 @ B" 3.25/4.50 6.00/6.75 3.25/3.50 6.00/6.75 12.00/13.25 4.0 #5 @ 8" 3.50/4.50 6.50/7.00 3.25/3.50 6.50/6.75 13.00/13.25 4.5 #5 @ 8" 4.00 15.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50115.75 5.0 #5 @ 8" 4.5015.00 7.00/8.50 3.25/4.00 7.25/9.25 13.75/15.75 5.5 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.25/9.25 14.00/15.75 6.0 #5 @ 8" 4.50/5.00 7.50/8.50 3.25/4.00 7.75/9.25 14.75116.75 z ov H Q Q LLJaHZ oomm W LL = F- 0 0 0 H H O�LL0J Z 0 cl) N H a 0O Y O J N LL o 03� N Z Q W a o W a O ~ N Q cc cc Q Z F 0 N co w V z Z W y IL O LL SHEET 1 OF 1 838.80 �kil■ North Carolina Department of Cultural Resources State Historic Preservation Office Ramona M. Banos, Administrator Governor Pat McCrory Office of Archives and History Secretary Susan Klutta Deputy Secretary Kevin Cherry September 1, 2015 Dawn Reid Archaeological Consultants of the Carolinas, Inc. 121 East First Street Clayton, NC 27520 Re: Baxter Healthcare Corporation Water Treatment Plant Rehabilitation, McDowell County, ER 15 -1144 Dear Ms. Reid: Thank you for your letter of August 3, 2015, transmitting the archaeological survey report by James Stewart for the above project. During the course of the survey, no sites were located within the project area. Mr. Stewart has recommended that no further archaeological investigation be conducted in connection with this project. We concur with this recommendation since the project will not involve significant archaeological resources. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill- Earley, environmental review coordinator, at 919- 807 -6579 or environmental .reviewO,ncdcr.Lyov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, W (1� ✓ M. Bartos cc: Robert Lepsic, Arcadis Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address- 4617 Mail Service Center, Raleigh NC 27699 -4617 Telephone /Fax: (919) 807 - 6570/807 -6599 United States Department of the Interior FISH AND WILDLIFE SERVICE Asheville Field Office 160 Zillicoa Street Asheville, North Carolina 28801 June 30, 2015 Mr. Robert Lepsic Arcadis G &M of NC, Inc. 801 Corporate Center Drive, Suite 300 Raleigh, North Carolina 27607 Dear Mr. Lepsic: Subject: Federally Listed Species Assessment for the Proposed Baxter Healthcare Corporation Water Treatment Plant Improvement Project, Adjacent to US Highway 221, North of Marion, McDowell County, North Carolina On June 2, 2015, we received (via e-mail) a copy of the project plans and a letter from you requesting our review and comments on the subject project. We have reviewed the information presented and are providing the following information to you in accordance with the provisions of the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661- 667e), and section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 -1543) (Act). According to the information presented, Baxter Healthcare Corporation is proposing construction activities to improve the water treatment plant located at their facility in Marion, North Carolina. The project area consists of maintained/disturbed land, industrial development, and an area of mature hardwood forest. The North Fork Catawba River flows along the southern boundary of the project site. Improvements to the water treatment plant will include clearing vegetation for the construction of new structures, rehabilitation of some existing structures, demolition some of existing structures, and constructing a new outfall in the North Fork Catawba River. A 404/401 permit will be required for the construction of the project. Endangered Species. We believe there is suitable habitat within the project area for the northern long -eared bat (Myotis septentrionalis) which is currently federally listed as a threatened species. During the summer, northern long -eared bats typically roost singly or in colonies in a wide - variety of forested habitats, underneath bark or in cavities /crevices of both live trees and snags. Northern long - eared bats have also been documented roosting in man -made structures (i.e., buildings, barns, etc.) during the summer. Northern long -eared bats predominately winter in hibernacula that include caves and abandoned mine portals. It should be noted that the general habitat types described above may not be all- inclusive, and additional habitat types may be identified as new information is obtained. Because there is suitable summer roosting habitat on the site for northern long -eared bats, we recommend that no tree clearing /cutting or building demolition occur between May 15 and August 15 to minimize potential impacts to this species. If you will be implementing the aforementioned tree cutting and demolition restriction, our concurrence with a "not likely to adversely affect" determination can be assumed from this letter and further consultation on the northern long -eared bat is not necessary as long as circumstances remain the same. If the tree clearing/building demolition moratorium cannot be implemented into the project plans, additional consultation with this office will be necessary. Further consultation may require habitat assessments, species surveys, and/or building assessments to ensure that impacts to northern long -eared bats will be avoided. In accordance with the Act, it is the responsibility of the appropriate federal agency or its designated representative to review its activities or programs and to identify any such activities or programs that may affect endangered or threatened species or their habitats. If it is determined that the proposed activity may adversely affect any species federally listed as endangered or threatened, formal consultation with this office must be initiated. We are concerned that storm water runoff and the removal of riparian buffers at the proposed site. Therefore, we recommend the following measures be implemented into the project plans in order to avoid potential adverse effects to water quality: Use low- impact - development techniques,' such as reduced road widths, grassed swales in place of curb and gutter, rain gardens, and wetland retention areas, for retaining and treating storm water runoff rather than the more traditional measures, such as large retention ponds, etc. These designs often cost less to install and significantly reduce environmental impacts from residential development. Design and construct storm water outlets from the parking area to drain from the parking lot through a vegetated area prior to reaching any natural stream or wetland area. Detention structures should be designed to allow for the slow discharge of storm water, attenuating the potential adverse effects of storm -water surges; thermal spikes; and sediment, nutrient, and chemical discharges. Also, because the purpose of storm- water - control measures is to protect streams and wetlands, no storm- water - control measures or best management practices should be installed within any stream (perennial or intermittent) or wetland. 2. Consider the use of pervious materials (i.e., pervious concrete, interlocking/open paving blocks, etc.) for the construction of the road and parking area. Pervious surfaces minimize changes to the hydrology of the watershed and can be used to facilitate groundwater recharge. Pervious materials are also less likely to absorb and store heat and allow the cooler soil below to cool the pavement. Additionally, pervious concrete requires less maintenance and is less susceptible to freeze /thaw cracking due to large voids within the concrete. 3. Preserve and/or restore forested riparian buffers (a minimum 50 feet wide along intermittent streams and 100 feet wide along perennial streams [or the full extent of the 100 -year floodplain, whichever is greater]) should be created and/or maintained along all aquatic areas. Within the watersheds of streams supporting endangered aquatic species, we recommend undisturbed, forested buffers that are naturally vegetated with trees, 'We recommend visiting the Environmental Protection Agency's Web site ( http : / /www.epa.govlowowlnpsllidl)for additional information and fact sheets regarding the implementation of low- impact - development techniques. shrubs, and herbaceous vegetation and extend a minimum of 200 feet from the banks of all perennial streams and a minimum of 100 feet from the banks of all intermittent streams, or the full extent of the 100 -year floodplain, whichever is greater.) Impervious surfaces, ditches, pipes, roads, utility lines (sewer, water, gas, transmission, etc.), and other infrastructures that require maintained, cleared rights -of -way and/or compromise the functions and values of the forested buffers should not occur within these riparian areas. We appreciate the opportunity to comment on this project. Our mission is to conserve, protect, and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American people. By working with you and giving you the appropriate information early in the planning process, we hope to accomplish this goal. If we can be of assistance or if you have any questions, please do not hesitate to contact Mr. Bryan Tompkins of our staff at 828/258 -3939, Ext. 240. In any future correspondence concerning this project, please reference our Log Number 4 -2 -15 -343. Sincerely, - - original signed - - Janet Mizzi Field Supervisor From: Leslie. Andrea J To: Leosic. Robert Cc: Kina. Melissa Subject: Baxter Healthcare Water Treatment Plant Rehabilitation Date: Thursday, August 13, 2015 3:26:38 PM Attachments: imaae001.ona Mr. Lepsic, I received your July 14, 2015 letter requesting NC Wildlife Resources Commission input on the Baxter Healthcare Treatment Plant Rehabilitation project regarding trout buffer rules and construction moratoria. The project should not affect wild trout and activities do not need to be avoided during the trout spawning moratorium. Trout buffer rules are enforced by the NC DENR's Land Quality Section. I suggest speaking with Melissa King in the Asheville office, who is cced here. Andrea Andrea Leslie Mountain Habitat Conservation Coordinator 20830 Great Smoky Mountain Expressway Waynesville, NC 28786 828 - 400 -4223 www.ncwildlife.org Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N C Public Records Law and may be disclosed to third Parties.