Loading...
HomeMy WebLinkAbout20190049 Ver 1_CarpenterBottom_100090_MY2_2023_20240129MONITORING YEAR 2 ANNUAL REPORT FINAL J 11 1A % 4 01 � I Wit. y r,: CARPENTER BOTTOM MITIGATION SITE Gaston County, NC Catawba River Basin HUC 03050102 (03050103 Expanded Service Area) January 2024 DMS Project No. 100090 NC DEQ Contract No. 7731 DMS RFQ No. 16-007133-CT03 Date of Issue: April 24, 2017 USACE Action ID No. SAW-2018-02062 DWR Project No. 2019-0049 Data Collection Dates: January— November 2023 PREPARED FOR: if NC Department of Environmental Quality Division of Mitigation Services 1652 Mail Service Center Raleigh, NC 27699-1652 PREPARED BY: w WILDLANDS E N G I N EER I N G Wildlands Engineering, Inc. 1430 S. Mint Street, Suite 104 Charlotte, NC 28203 Phone: 704.332.7754 Fax: 704.332.3306 ktr4 WILDLANDS E N G I N E E R I N G January 19, 2024 Mr. Matthew Reid Project Manager NCDEQ— Division of Mitigation Services 5 Ravenscroft Drive, Suite 102 Asheville, NC 28801 RE: Carpenter Bottom Draft MY2 Report Review Catawba River Basin - HUC 03050102 (03050103 Expanded Service Area) Gaston County DMS Project ID No. 100090 Contract #7731 Dear Mr. Reid: Wildlands Engineering, Inc. (Wildlands) has reviewed the Division of Mitigation Services (DMS) comments from the Draft Year 2 Monitoring Report for the Carpenter Bottom Mitigation Site that were received on January 2, 2024. The report has been updated to reflect those comments. The Final MY2 Report is included. DMS' comments are listed below in bold. Wildlands' responses to DMS' comments are noted in italics. DMS Comment: WEI has actively treated Murdannia keisak on the site. The report indicates that a small population persists. Are the remaining populations site wide or limited to isolated reaches? Can you provide an update of where the species is found on site? Wildlands' response: Small patches of Murdannia keisak were located in some of the riffles along the main stem of Carpenter Branch Reach 1 between UT1 and the crossing (approx. STA 111+00 to 118+00). The plants were treated and are not a concern to the functioning and performance of the stream. DMS Comment: Game cameras were installed at the request of the IRT during the 2023 Credit Release Meeting. WEI has indicated that the cameras do not provide a level of detail that is useful due to vegetation. Does WEI plan to continue using the cameras to supplement the gauge data or discontinue use? If pictures are available from the cameras, please include them in the report to show the issue. Wildlands' response: The text of section 2.5 was expanded to describe the game camera issues in more detail. A photo log was also added to Appendix A that documents stream flow conditions which confirm the data recorded by the stream gages. The photo log also illustrates problems with vegetation obstructing the game cameras' view for much of the year. Wildlands will relocate the game cameras to attempt to document different portions of UT1 and UT2; however, it is expected that by spring, the view may be obstructed by the vegetation. DMS Comment: The IRT requested the rain data source, distance from the site and month to month rainfall graph be included in the MY2 report. Thank you for including this information, and the additional discussion regarding 2023 rainfall and how it relates to site hydrology. Wildlands' response: You are welcome. Wildlands Engineering, Inc. • phone 704-332-7754 • fax 704-332-3306 • 1430 S. Mint Street, # 104 • Charlotte, NC 28203 WILDLANDS ENGINEERING DMS Comment: Table 11: If possible, please update the rainfall summary table with end of year data for final submittal. Wildlands' response: The rainfall table (table 11) and the Monthly Rainfall Data plot were updated to include all of 2023. With a 4.7" rain event at the end of December and 7.7" of rain for the month, the annual rainfall totaled about 2" more than the normal annual rainfall. The end of year rainfall was enough to bring Gaston County to an Abnormally Dry DO status. Any impact on groundwater storage should be visible in the next monitoring year. North Carolina Home / North Carolina Map released: Thurs. January 4, 2024 Data valid. January 2, 2024 at 7 a.m. EST Intensity Nose DO (Abnormally Dry) D1 (Moderate Dro ught) D2(Severe Drought) D3(Extreme Drought) D4 (Exceptional Drought) NO Data Authors United States and Puerto Rico Author(,): Lind-yJohn r, National Dra ught Mitigation Center Pacifc Islands and Virgin Islands Author(,): Richard Heim, NOAA/NCEI National Drought Mitigation Center. 2024. U.S. Drought Monitor — North Carolina. University of Nebraska -Lincoln. Accessed 01104124 from https://droughtmonitor. unl. edu/CurrentMap/StateDroughtMonitor. ospx?Southeast DMS Comment: WEI has included Table 12a Existing Conditions Wetland Gauge Summary to provide additional pre -construction information about the site hydrology. Does WEI have a reference gauge onsite or offsite for comparison? Wildlands' response: As stated in the Mitigation Plan, a reference wetland gage was established approximately 6.7 miles from the Site within the floodplain of Howards Creek in Lincoln County (located at the closed -out Owl's Den Mitigation Site). This reference gage data was added to all the groundwater gage plots and will be included in future monitoring reports. DMS Comment: Recommend either including Figure 3 from the Mitigation Plan and/or adding the six gauges shown in Table 12a to the CCPV so reviewers can easily see the location of the existing conditions gauges compared to the locations of the current monitoring gauges. Wildlands' response: "Figure 3. Site Map (Mitigation Plan)" was added to the report after the CCPV figures. In addition, the six groundwater gages from the Mitigation Plan are included in the submitted geodatabose. DMS Comment: In stream flow: Credits are considered at risk for reaches not meeting the 30 consecutive days of flow success criteria. DMS recommends that WEI document if portions of the reaches do meet the criteria that may not be captured by the instream flow gauge. Additional gauges and/or cameras may be used to track this. Wildlands' response: As discussed in the previous comments, and in Section 2.5, the game cameras will be relocated in an attempt to capture different portions of UT1 and UT2; however, it is expected that by Wildlands Engineering, Inc. • phone 704-332-7754 • fax 704-332-3306 • 1430 S. Mint Street, # 104 • Charlotte, NC 28203 k P WILDLANDS ENGINEERING spring, the view may be obstructed by the vegetation. An additional stream gage will be installed on the main stem of Carpenter Branch Reach 1, just below the confluence of UT3, to monitor the streamflow at this location in the reach. DMS Comment: Digital Deliverable Comments - Please include spatial files for the MY2 random plot locations with final submittal. Wildlands' response: The mobile vegetation plots are included in the digital files. It is the shapefile titled VP —Mobile" and is located in the geodatabase titled "CB_AsBuilt.gdb". This shapefile includes the current and previous years' mobile plots. As requested, Wildlands has included two (2) hard copies of the final report and a full final electronic submittal of the support files on USB. A copy of our responses to DMS's comment letter has been included inside the cover of the report, as well. Please let me know if you have any questions. Sincerely, Mimi Caddell Environmental Scientist mcaddell@wildlandseng.com Wildlands Engineering, Inc. • phone 704-332-7754 • fax 704-332-3306 • 1430 S. Mint Street, # 104 • Charlotte, NC 28203 CARPENTER BOTTOM MITIGATION SITE Monitoring Year 2 Annual Report TABLE OF CONTENTS Section 1: PROJECT OVERVIEW........................................................................................................1-1 1.1 Project Quantities and Credits...................................................................................................1-1 1.2 Project Goals and Objectives.....................................................................................................1-1 1.3 Project Attributes.......................................................................................................................1-1 Section 2: Monitoring Year 2 Data Assessment................................................................................ 2-1 2.1 Vegetative Assessment.............................................................................................................. 2-1 2.2 Vegetation Areas of Concern and Management Activities........................................................2-1 2.3 Stream Assessment....................................................................................................................2-1 2.4 Stream Areas of Concern...........................................................................................................2-2 2.5 Stream Hydrology Assessment..................................................................................................2-2 2.6 Wetland Hydrology Assessment................................................................................................2-2 2.7 Monitoring Year 2 Summary......................................................................................................2-4 Section3: REFERENCES.................................................................................................................... 3-1 TARI PC, Table 1. Mitigation Assets and Components.............................................................................................1-2 Table 2: Goals, Performance Criteria, and Functional Improvements......................................................1-3 Table 3: Project Attributes.........................................................................................................................1-5 FIGURES Figure 1 Current Condition Plan View (Key) Figure la-b Current Condition Plan View Figure 3 Site Map (Mitigation Plan) APPENDICES Appendix A Visual Assessment Data Table 4a-c Visual Stream Morphology Stability Assessment Table Table 5 Vegetation Condition Assessment Table Stream Photographs Vegetation Plot Photographs Groundwater Gage Photographs Stream and Crest Gage Photographs Areas of Concern Photographs Photographs of Stream Flow Appendix B Vegetation Plot Data Table 6 Vegetation Plot Data Table 7 Vegetation Performance Standards Summary Table Appendix C Stream Geomorphology Data Cross -Section Plots Table 8a-b Baseline Stream Data Summary Table 9 Cross -Section Morphology Monitoring Summary Carpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL Appendix D Hydrology Data Table 10 Bankfull Events Table 11 Rainfall Summary Monthly Rainfall Data Table 12a Existing Conditions Wetland Gage Summary Table 12b Wetland Gage Summary Table 13 Recorded In -Stream Flow Events Summary Recorded In -Stream Flow Events Plots Groundwater Gage Plots Soil Temperature Probe Plot Groundwater Gage Installation Sheets Appendix E Project Timeline and Contact Info Table 14 Project Activity and Reporting History Table 15 Project Contact Table Appendix F Additional Documentation Wildlands' Response to IRT Comments for the MYO Report & Notice of Initial Credit Release (July 26, 2022) WCarpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL Section 1: PROJECT OVERVIEW The Carpenter Bottom Mitigation Site (Site) is located in Gaston County, NC approximately 4.1 miles south of the City of Lincolnton and just south of the Gaston County/Lincoln County border. The Site drains to Beaverdam Creek, which drains to the Catawba River. The Site is located within the South Fork Catawba River (High Shoals) WS-IV water supply watershed and is located just outside the Indian Creek Targeted Local Watershed (TLW). Table 3 presents information related to the project attributes. 1.1 Project Quantities and Credits Mitigation work within the Site included the restoration and enhancement of perennial and intermittent stream channels and the rehabilitation and re-establishment of historically altered wetlands. Table 1 below shows stream and wetland credits by reach and the total amount of credits expected at closeout. -L.2 Project Goals and Objectives The project is intended to provide numerous ecological benefits. Table 2 below describes expected outcomes to water quality and ecological processes and provides project goals and objectives. 1.3 Project Attributes The project includes the headwaters of a tributary to Beaverdam Creek and occurs on adjacent properties that have a history of agricultural use. The Site has been ditched and maintained as an active cattle and hay pasture as far back as 1950; however, a small, forested area within the proposed wetland restoration area was allowed to reforest starting around 1973. In 2014, approximately 2.4 acres were deforested to provide additional pasture. Table 3 below and Table 8 in Appendix C present additional information on pre -restoration conditions. Carpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL 1-1 1A C C G1 C O Q E O U C m N a" C O m bb a.+ C N m H O m W �C C O O m 0J Q V C C aj C a C a1 C N v vi a1 V Q vi a1 Q 'in E E ,O O v O '� E O 00 N y, O o o ti mm+ i V O w Q N N m c m O c U O V m m w O_ m V m w V .> — w N v C a) C a) C C N a C O N > O w y. C — E C N m � C 41 a) a) C > a) u o ai V 0 N O m v O E E E N N w i m i m i O_ C E w > U C N a i L u bD N c N m m C N a m m E 00 al — C N •— " c p c m 0 O O c 00 O O i �a • m N O by v O C V U CO N c u a) c' V c N Y C c m al N C a) C a) O_ C �a O_ V c c m c c p O w O_ >= p N N > .0 aj L: W O_ c N m O c m c m ca Q C ?� •� a) Q c C m a) c p_ c m u CO O N 0 O_ > C 0 M U N C V C £ m E `u E E E O E .c O E C m E v Y .� O .w p O 0 O V N N N 7 > C 7 � C V m Q v = > O_ O_ m V v •2 m v m O_ O m E m C .— v O v c 7 C C V C ` C >, 00 N V >m N c a U v v Q O o Y C v p w E E Y c E o f E E n ca u O o f -0 c a O' c 41 m al W O p � EmO tip Oc O m •O m O O ai a ual oa u-O u Q m E E a) maiCL acNic m y t> v > ai > = c u m = � t> u •N s m '� a1 v a > v o 3 �a 7 > m > m > 7 m m LL O_ D Y LL —_ m 7 > LL C C C i LL C N E Op O O O O O O •3 w O O O O O O O O O O O O V 1� Co N i m O ^ � Q0 V O Q LL N N N m N 1� 00 m m V1 m N L: Y � m i° ri 0 ooq In ti m 00 V V O a 00 7�6 n w !•' C • C m N N O 1l n 00 r^ I.rt N G a E c • C _ m m O X i W N Vf O O O O O O O 3 O ul 00 j:O Y_ .ti 00 O d m • T _ N fV al LL LL J a` LL LL 0 `Q w cc w cc cc w 2 al o i Y O E E E E E E 00 K K Y W m V N y a 0 a+ 00 O O 0)c O w O 00 m LOO 00 O O O0 0)Lo r i l0 m v Y m i m a 00 V 1� Ol m 0 Q N m m In m jJ y N au Q w Yw m LO O O mm N V W v O X 0 W O Q w f V m O V U U -O U a) C C E i m U p 0 O CO L U CO L m .� N m C — V M GJ t •O al O_ a O_ a O_ u � � v ai V U U cC Y N N m m V Q � _ C Cm O m Z 2� c -0 m c v Ln `m n m G m In N 00 O U m Qo V v m E ti ^ m 00 m m 3C" o cn ni J c0 4� 0) O L °1 t m O m E o _ m N U -0 O O 0) C m m v m t H � w � C O O 7 V w f0 C _ •p p N K O OV Y a1 C co O Q L 'p 00 oo m c 0 'r 0 \ z > 3 c v 16 ° E N v E E a) 0 3 E° U U O N Aa1 U L V Z f`o N a1 C oZS Yo L E fo Y _ y O Y a) Q o Y C } pp V Q 7 Y L > C N E - O L C C m o on 3 a, N E C N a1 c c p } L p Y u 'O C N O Q a) L C +' V of y1 <D C -0N sw +' r w76 •� -o Y p_} C m O .3 '� Q 76 m E ` E c G _ `° N i a 3 o m 7 of CL oa o N D N 7 oii 3 � a o fo •� -o N co r, ccc 'O -o a1 -O D 7 '> p f° D -fop -o U p c a)O .Y N Y 'y aj E E C u Vf C .� a1 fV •o > iy rA C V o E v E Y a1 O a1 w a L O a1 o ^ n o a L O HIt v � v Q. w n n Y N Y V O 0 'p E c o" m o v w U L N 7 N O w E N Vf N to om Y <D N 0a — Y p• C >, C N O v —m -o O C ro ro m O- -o DO ap.+ '� C C E f0 L ap.+ 7 m O fC0 n m E v p w o � E> c E _ v — w 3 v Y '� c '� to to a1 C E C O Y ` •X V W .0 o c -o N u > f S tY/1 °1 u p N 'O c c N o o c 5 ar 'p O Q yam., -op C E c O — E s ry fCo L c E Y v cc 7 a v a p E aj o C_ m o C O oO CL 'O w E V U c v .4 v Y c ,p v .o p f c Q -o •� 7 O C 7 O V V N f 'O a1 OC -o 7 a1 v L a1 v Y p C L a1 f0 E C OC U OC m Q .Y Lo yaj , v v o C o C 'O E o 'O W YO O p W v f Y C j o v -o E o Ln L V Y f0 Op C O C O .> to to }�+ C Y ` m O `^ V ` �n E aj Y u N Q o U Q ` 0 Y C f0 mV V ` C u t O O E` f6 7 O E O v c c cyi C E +' -o r m a1 o. ` p O. C O v CL Y O C > y V -o 0 N w L Otw 3 C .V p W E C Y OC O Y O 4t V C Y m 7 o N 7 a1 a1 w a1 to ,o Q a1 L -O N ar yj U -o E + L r= C E p Q s> O x c E w > fa C m 0 .Y y 7 o N a1 Y L c _ fa o N aj Ou E a1 O a1 -p a1 o C a1 C a o yL,, oc O°= u v 3 v U E E u U o E c ` L ` m > o c v w a1 C C O O t� C `Uo E O C Y s o p 7 o 3 E V L Xu w w — fS0 N Q E bA O V H e1 C C O C N a' 'O = 'O c ry D C7 m o + m v Q a00 11 O C v f/1 L }; } m O (7 O N CO t' N O Cv N O- O � -Q N O = N} N -E N 11 11 Y T r4 D m N E �+ m V N +' V -o ` M N fV }c al fV m } Cp O V fY N Y 7 Y C > a+ C O C v Q > O c -O c y N > K C al y > N z T` Y V a1 ^y O a1 N yvOi Co C CO O a) Vl V N a --I 'Q } O C c� T 7 7 m a1 V y w �... N y} O N 00 3 O Y u O ar O C E `~ U' } tw } N a1 } m O O Y V E Q C U fa LL m N V > C N a1 C C CO CO al w yN., v O -O O C C Q O C Q a1 -o O N a1 a1 } O o w s O O C a1 u m 3 Q v aj C�a v +°1 E 0 3 �'o a>i v= o •c C 3 T-o s0 Ij j N O N N N 'O a1 > Y N r m m <D .0 N C —c N c E C N V V O_ yt,, N v) N S O V1 •Y C CO E T Y N a7 vNi N } fa O C O aj •7 •3 7 N o f/1Qj N 'O o t " a+ (7 C C -O CO fC0 = 7 to •C C C > 3 a) to 'Q -O 7 Y 7 C u N a1 a) O °' o'A N v o o 3 m } v v v t Q a) E c c� v rv- 3 c °1cm v s` E y N O —(D C w V 7 _O y L N <D E N E a1 C O. -O } __ >, Y O 7 a1 O L 7 Y O O E CO C <D a1 C �Oif 3 V C N N ai y C >, c ` ry c N n s v Q v -o N v v > N `fa Q y y -O N N a1 Cn N O N fa a7 > y 3 O c N COO N m •a/ O C C N w K rfiL N s fa O t O y N E O v Q �' ID —o N g y O V P '3 Q 7 w O �:% N O w N V N > O N E C C _ N C N N c O E c� v i v o v v cvi ti> w m> v Y ayi c v c 7 u> °1 ry 3 c o v om o f } w u �7 CL N E > O 'a.+ aoi y N to Y O E C a1 a0.+ C V al 7 ti 'O 7 N U E V v U} f0 > O .� Q O al �- ey y f0 O N N O C j CO C_ N C_ �O m -o m N > a1 y y C L O a o 2 v c o v E c 3 c} LL LL O 0 0 7 •� E m LL on n s y_ 3 s Q u -c a v c `^ c m E c- CL -O -O oO O. °' _ 0 E -O .Y ' jo Q -o T -o O a1 O C 7 ^ o L -o O V u 3 c c ry O C to 7 V C O1 .y C G C O '' C CO 'O C 'O N .V a 7 y n 3 .0 y ro c J v 7 0 yif w v v c 7 cr CO y C to C m ,� O C C O w E O m y Q LL ? v .� ` y �C 2 N O Q w fa fl. 3 fa ) -O 7 O Y C m Q o y N Y_ O m y O Y J E O. O O N CO 'i N y •O. u O. C 3 -0 N •ry O C C O O 7 O .V -O -Q •� V O. Y a1 CL 7 O OC 'O 0 ' cTi O Q O y � •� Q E LL a1 CL N O N - O > N C r fa O _C O 7 t Y Q N CO a1 7 Q <D E V C -o E S Q V w CO O 'O y L CO V c 7 aj C O N N 0 O a1 a1 Y r N -O w m L v _Q L N N y m O •` -Q C a1 ` V a) Q N C O d tyA c a) a7 Q Y -o y CL Q •y O Y > y •N V v^ a1 C O E ro O N O. N Y T O o L C N v c 3 s= Y E fa O CL N Q E a/ y-o •O W N 7 a) •� W V C tyA -O L Y O y 3 c m E c o N w v v E v O C LL -o oc v K 7 � O N CO C C <D C •m -o C C O O > _O y Y N 7 T' m 3 0 ° c >, c y c o f s n o O v " o° E v bo 3 0 o ro v v •2 v v c- m c v c c7 au Q` °n v •y 'O v O u Q> 'Q y m E j E ,° C y w C t 7 O V y C t N O 'O v i O u O O 3 c N C Y v CL Y w O aui c v N C- oc 3 v V) N C � O r+ m tuD m o N a�0 ar � � N U O O )0 W O O Z v aJ O 'L y o +0 ai. Q V O H U 0 2 V v > j Ln m •C N a vi v— O 0 V U _ O � O � L N \ � C N C > w O O = O tw oo oo o m m o o u o G w C O L 7 u ¢ U Q) O O 0 o ON cCo O Z •+-' Z Z Z � O 7 V i C > n a O 0 c N V) o0 m m a U - u 0 N c-I 7¢ 7 O O u U V 7 0 v) W n Y - V m u c n V C - O O m L v N c 7 W v C)oLrl v > U N • NO C N U- V c-I .--I V o 3 o "' o m — -a � u m V) m Om D M L Lr) lD • C7 M • U O n O • s lo N Q IQ s u � m v _ j ¢ ¢ ¢ • m m t m c i>n >• O>>>> Z Z Z O U a) G • ¢ n U oo O O O \ n Y O Y L V -o a) c0 F+ C V w Q• E .) E N w CO A. a) T • O • m c0 >, D_ C > ai �n �n �n �n O O O OO C 1-4 V V al d O N Y \ >� V U\ U}}}> Z Z Z Uy 0 N > u f6 U O V a oc a E O Y � o O m v1 a) a a0+ O C O V) O 4 _ ¢ C 'a+ a) O E 1 O0 M W O u U — 2 ¢ O O O >, c0 u a0 a M o M o CO o O- b 0 0 0 c a a ¢ O L O c O C O C O N E �' N ^ (p -O a) V - O - O vi m U1 VI u ¢ a1 U a c w o W w vI m u — m a) a) aj � a] m w U 41 •- CL Y Y 4) O a Y oa v °° v a) E V v E m E E a c a u 7 c m C C v w a m v C C7 a s 0 >> a O. v L (0 i �' ry L i U U C -p 4) - V) v) > W a) N a) N v of i a) C O LL Z ¢ s a) 'p o� a) m io c a) a N o— Id t'i = v) a a. V to O O O c O O '� m LL Y a a O - 0 > a O °C y) y) c v T 3: o .L v E O E O E O m a` a` a a a` a> a 0 0 3: �i w, u LL w 0 O O O l Q N U h a C O Ok. W ti O � c a, 0 E o a N � -C O N N N -Cl O Q O = C O N zi O C • O OU U h N O U N vi E O ate. H � v o � C � � O v N O N Z 00QU O ti U O 'O In n O O c C C O C j O � > > N W C N C C O O U U o O M Ln E N O ,Z3 U C C C Q O ti N N O M U In a, QU aU. h G � O o E O U N O N U C N C 01 O o G O o N E -O C O Qu O Q a QU Ln C ._ E v C -0 O Z o c v YN 3 y Q Ln } Z N N vv 0 0 C ry W O 0 -0 en c,6 .s LL E d - 0 0 m o (0 .S f0 v ry 0 3 y Q o N O °p o >j a 8 0 -O ou C,6 .O W C 0 S Y Q J mo c-8 a, 3 Y ¢ �o 0 Q T T C O Z 0 0 a 0 0 0 v Y N Y C c0 c-1 •(0 0 3 16 o N 00 '6 Z 3 oc a v o m MOM co c a) Y° o z 3 \ o 0 m— y c° z v o 0 00 Et -0 co .s CQ C °o '6 C a -I o L L 'c N 0 a0+ N 3 y Q \ C lD o m 0 0 0} C Z 0 00 O a � > 0 O O V N 6 ° o N > ° 2 > a° O O V N 6 ° o N 6 N 6 0 Y > ° 2 > a° o v C — o z v (6 3 � 7 l7 Q z on C,6 s Q Q -0Q Q O O 4 o O Q c O Z -0 z § ° o (D > O v co_ E o v -o ° o _°o C -0 0 z > 00 L O O N 4) •Y 12 \c 0 \ N C O N-0 0 a0 tto N m c z 3 > ., 'M o 0 o -a a = 0 > coen W C -° Q -0 a) a ° = E v 0 Q Y Q en c °) 'm ° c m m o o O 3 Q \ m 0 — v Q V -O Z y 'O O ° Z — 4) C) ° >, — > C 0 V a— v m 0 0 0 tw 0 a (7 0 (7 > 0 T 2 C )p ° O L C � 0 L c0 _ Up v _ M v 2- c Q E ° c Q E N Q. "'� N O_ � '^ N (0 •> cmc C vC V C v N (0 •L E v yV+ E N Q N c0 C fl- O \ N V N c0 C fl- 0 \ -° v V N y i) C 4 C > aO, y 4 C v C> Y fi Q (0 N N O C v (` Q (0 a) N O� N a c `J o. o t ° oA a v a Yo 0 tm N 0 w Un N M Ul N N N 000 'O O m O Qj 000 -O O O O Q• C 2 N O O Q• C = N O Y Q. •- V Y T N c0 •_ V 'Q T N in 0 0 lO CL; L OC i O VolL 0 V) L K Section 2: Monitoring Year 2 Data Assessment Annual monitoring and site visits were conducted during Monitoring Year 2 (MY2) to assess the condition of the project. The vegetation, stream, and hydrologic success criteria for the Site follow the approved success criteria presented in the Mitigation Plan (Wildlands, 2020), the performance criteria are located in Section 1.2 Tables 3a-b: Goals, Performance Criteria, and Functional Improvements. Methodology for annual monitoring is presented in the MYO Annual Report (Wildlands, 2022). 2.1 Vegetative Assessment The vegetative survey was completed in August 2023. Vegetation monitoring resulted in a stem density range of 364 to 810 planted stems per acre. All thirteen vegetation plots are meeting the interim requirement of 320 stems per acre required at MY3. As requested by the NC Interagency Review Team (IRT) as part of their comments from the MYO Baseline Report (Wildlands, 2022), some of the wetland rehabilitation area was captured by the new location for mobile vegetation plot 1. The wetland rehabilitation areas will continue to be captured by some mobile plots in future monitoring years as well. Herbaceous vegetation is also abundant across the Site and includes native pollinator species indicating a healthy riparian habitat. The riparian habitat is helping to reduce nutrient runoff from the agricultural fields outside the easement and stabilize the stream banks. Refer to Appendix A for Vegetation Plot Photographs and the Vegetation Condition Assessment Table and Appendix B for Vegetation Plot Data. 2.2 Vegetation Areas of Concern and Management Activities The vegetation assessment indicated that the surviving stems are at a density above the MY3 interim criteria. The visual assessment across the Site found that the herbaceous cover is also well established throughout the floodplain. A Site walk was conducted in November 2023 to assess the easement boundary. No new issues of encroachment were found, and all easement signs/markings were intact. Two areas of encroachment were documented earlier in the year but both areas appear resolved. The northern encroachment is along the boundary just east of VP1; this area was mowed early in the year. An additional sign was installed, and no more mowing was observed in November 2023. The second area is located along the boundary just east of GWG 8. This area showed evidence of ATV encroachment cutting through the corner. The boundary was blocked off with logs and debris and this path is no longer being used by ATV traffic. Both areas are shown as resolved in the Areas of Concern Photographs in Appencix A and in Figure 1. There are few areas where invasive species are a problem on the Site. The small populations of Asian spiderwort (Murdannia keisak) do not appear to be negatively impacting the stream or restricting flow. Small areas of hardy orange (Citrus trifoliata), Chinese privet (Ligustrum sinense), Japanese Honeysuckle (Lonicera japonica) and multiflora rose (Rosa multiflora) were scattered across the Site. These species were all treated with herbicides throughout the year in an effort to keep their presence to a minimum. There is one area of C. trifoliata which continues in the northwest portion of the project that is 0.16 acres in size; at 1% of the Site's acreage, it is only a minor concern. Additional chemical treatments may be needed in the following years to keep resprouts and new populations under control. Ninety-nine percent of the Site is free of invasive species and shows strong vegetative growth. Wildlands will continue to monitor for the reemergence of any invasive populations which threaten the success of the project. 2.3 Stream Assessment Morphological surveys were conducted in July 2023. All streams within the Site are stable and functioning as designed. All 14 cross -sections at the Site show little to no change in the bankfull areas WCarpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL 2-1 and the width -to -depth ratios, the entrenchment ratios (ERs) are above 2.2, and the bank height ratios (BHRs) are less than 1.2 (0.8-1.0). Refer to Appendix A for the Visual Stream Morphology Stability Assessment Table and Stream Photographs and Appendix C for Stream Geomorphology Data. 2.4 Stream Areas of Concern A site assessment last conducted in November 2023 found that there were no stream areas of concern across the project. The banks all appear stable and are well covered by established vegetation. 2.5 Stream Hydrology Assessment This year, bankfull events were recorded on UT1, UT2, and Carpenter Branch Reach 1. UT3 did not record a bankfull event for the second year in a row and there were no visual indicators of bankfull events occurring on this reach. Although UT3 hasn't had a bankfull event yet, it is still expected that the hydrologic success criteria for bankfull events will be met for all streams. During a site walk in January 2023, Wildlands staff found evidence of out -of -bank flow over much of the Site. In addition, the presence of baseflow must be documented on intermittent or low flow reaches (Carpenter Branch Reach 1, UT1, UT2, and UT3) for a minimum of 30 consecutive days during a normal precipitation year. UT2 and UT3 maintained baseflow for 208 and 131 consecutive days, respectively; however, Carpenter Branch Reach 1 and UT1 did not meet the minimum requirement with 8 and 3 days, respectively. Although Carpenter Branch did not meet this year, it is not a concern at this time. The thalweg at the head of riffle is surveyed each year. Slight variations in the thalweg elevations at the head of riffle can cause discrepancies in the recorded number of days of consecutive flow. The head of riffle elevation will be verified again next year. Game cameras were installed in MY2 to photograph the flow along UT1 and UT2 at the stream gage locations. However, the photos provided by these cameras simply confirmed data collected by the stream gages which was also verified during site visits. Most of the time, the game camera's view is obscured by herbaceous vegetation, causing photos to be unusable for stream flow documentation. Refer to Appendix A for the stream flow photo log containing game camera documentation of flow (photos 1, 2, 6, and 7) and examples of views obstructed by vegetation (photos 3 and 8). Other photos documented during site visits, photo point monitoring, and cross-section surveys also confirm the data recorded by the stream gages (photos 4, 5, 9, and 10). In MY3, Wildlands will relocate the game cameras to document different portions of UT1 and UT2; however, it is expected that by spring, the view may be obstructed by the vegetation. An additional stream gage will be installed on the main stem of Carpenter Branch Reach 1, just below the confluence of UT3, to monitor the streamflow at this location in the reach. It is expected that baseflow duration will increase as rainfall restores groundwater levels. Rainfall is discussed in more detail in the subsequent section. Photologs are included Appendix A, and hydrology data is presented in Appendix D. 2.6 Wetland Hydrology Assessment Eleven groundwater gages (GWG) were installed during baseline monitoring to record the groundwater level across the Site. Because gages 9 and 10 did not mee the criteria during MY1, two additional gages (12 and 13) were installed in January 2023 to assess different portions of the wetland area. Out of the thirteen gages, ten met the success criteria this year (GWG1, 2, 3, 4, 5, 6, 7, 10, 11, and 12) for 35-96 consecutive days of the growing season. Three gages (GWG 8, 9, and 13) did not meet the success criteria this year with 6, 22, and 21 consecutive days of the growing season, respectively. The hydrology of gage 9 improved since MY1, although gage 8 did not improve. Gages 9 and 13 had groundwater levels consistently within 12-inches of the ground surface in the weeks leading up to the start of the Site's WCarpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL 2-2 established growing season; both gages would have met if the growing season were extended to March 1. The soil temperature plot would support this adjustment as the soil temperature only drops below 40F briefly in January. The normal and daily rainfall is determined from the Lincolnton 4 W precipitation gage, which is approximately 5 miles from the Site (NCSU, 2023; NOAA Regional Climate Centers, 2023). The rain data appears to be representative of the conditions on the Site as the larger rainfall events correspond stream level rises recorded by the stream probes. A reference wetland was identified approximately 6.7 miles NW of the Site. This reference wetland area is a mature Piedmont Bottomland Forest that is located within the floodplain of Howards Creek in Lincoln County. This reference groundwater data is included on all of the groundwater gage plots. It is expected that all gages will meet the criteria over time as groundwater continues to recharge across the site. However, rainfall has been sporadic. While annual total rainfall in 2022 was normal, few late - winter rains resulted in the 30-day rolling precipitation total being below the 30% of normal threshold at the start of the 2023 growing season, as shown on the groundwater gage plots in Appendix D. Therefore, the groundwater surface was already starting to drop on March 15 across portions of the Site. The effects of the lower groundwater table can be seen in the plot for Gage 8. While the summer rainfall was at or above the normal rainfall each month, 41% of the rainfall occurred during three rain events where more than 2-inches fell (one in each month of April, May, and June). These flashy events do not help recharge the groundwater as most will drain as surface runoff. As a result, and in combination with minimal rainfall in the Fall, the 30-day rainfall amount dropped below the 30% of normal threshold on October 12. Much of the state was in a drought, with Gaston County being in a Severe drought, at the end of the growing season (National Drought Mitigation Center, 2023). Groundwater recharge is expected to occur in the winter, but any winter rain will have to first overcome this water storage deficit. It is likely that the effect of this drought could be observed during 2024 (MY3) in both the stream and groundwater gages. With a 4.7" rain event at the end of December and 7.7" of rain for the month, the annual rainfall ended up being about 2" more than the normal annual rainfall. The rain was enough to bring Gaston County to an Abnormally Dry DO status. Any impact on groundwater storage should be visible in the next monitoring year. North Carolina Home / North C—lin, Map released: Thurs. November 16, 2023 Data valid! November 14, 2023 at 7 a.m. EST Intensity None DO (Ahnorri Dry) D1 (Moderate Drought) Dz (severe Drought) D3 (Extreme Droughq Dal (Exceptional Drought) No Data _ Authors United States and Puerto Rico Author(s): Brad Rippey, U.S. Department of Agriculture Pacific Islands and Virgin Islands Author(s). Denise Gutzmer, National Drought Mitigation Center Annual inspections of the bentonite seals around the groundwater gages are a regular part of Wildlands' protocol and bentonite was added as needed this year. Refer to Appendix D Table 11 for the rainfall WCarpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL 2-3 summary table, and Table 12 for the wetland hydrology data. Table 12a shows the hydroperiods for the wetland gages during the existing conditions; the Figure 3 Site Map from the Mitigation Plan is included after the CCPV figures to show the original locations of the groundwater gages. 2.7 Monitoring Year 2 Summary All 13 vegetation plots are exceeding the MY3 interim requirement of 320 planted stems per acre. All streams across the Site are stable and the cross sections show little dimensional change since the as - built survey. UT1, UT2, and Carpenter Branch Reach 1 all exhibited at least one bankfull event and are on track to meet the bankfull hydrologic criteria. Only UT3 has yet to record any bankfull events. UT2 and UT3 both met the baseflow criteria; Carpenter Branch Reach 1 met during MY1, and UT1 has yet to meet the criteria. Two new groundwater gages were installed this year. Ten of the thirteen groundwater gages met or exceeded the hydrologic success criteria. Small pockets of invasive species were treated this year and will continue to be monitored and treated as needed. Overall, the Site is on track to meet its goals and is preventing excess nutrients and sediment from entering the Catawba River tributaries. Summary information and data related to the performance of various project and monitoring elements can be found in the tables and figures in the report appendices. All raw data supporting the tables and figures in the appendices are available from DMS upon request. Carpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL 2-4 Section 3: REFERENCES Doll, B.A., Grabow, G.L., Hall, K.A., Halley, J., Harman, W.A., Jennings, G.D., and Wise, D.E. 2003. Stream Restoration: A Natural Channel Design Handbook. NC Stream Restoration Institute, NC State University. Harrelson, C.C., Rawlins, C.L., Potyondy, J.P. 1994. Stream Channel Reference Sites: An Illustrated Guide to Field Technique. Gen. Tech. Rep. RM-245. Fort Collins, CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Forest and Range Experiment Station. 61 p. National Drought Mitigation Center. 2023. U.S. Drought Monitor — North Carolina. University of Nebraska -Lincoln. Accessed 11/20/23 from https://droughtmonitor.unl.edu/CurrentMap/StateDroughtMonitor.aspx?Southeast North Carolina Division of Mitigation Services (NC DMS). 2007. Catawba River Basin Restoration Priorities. Raleigh, NC. NC DIMS. 2017. DIMS Annual Monitoring Report Format, Data Requirements, and Content Guidance. June 2017, Raleigh, NC. NC DIMS. 2020. Vegetation Data Entry Tool and Vegetation Plot Data Table. Raleigh, NC. https://ncdms.shinyapps.io/Veg Table Tool/ North Carolina Division of Water Quality (NC DWQ). 2010. Catawba River Basinwide Water Quality Plan. NC Division of Environmental Quality (NC DEQ). 2015. Surface Water Classifications. https://deg.nc.gov/about/divisions/water-resources/water-planning/classification- standards/classifications. NC Interagency Review Team (NC IRT). 2016. Wilmington District Stream and Wetland Compensatory Mitigation Update; October 24, 2016. Accessed at: https://saw- reg.usace.army.mil/PN/2016/Wilmington-District-Mitigation-Update.pdf NC State University (NCSU). 2023. Cardinal: Station Scout for 314996 — Lincolnton 4 W. North Carolina State Climate Office. Accessed 11/02/2023 from https://products.climate.ncsu.edu/cardinal/scout/?station=314996. NOAA Regional Climate Centers, ACIS. 2023. AgACIS for Lincoln County: WETS product for Lincolnton 4 W. Accessed 11/01/2023 from https://agacis.rcc-acis.org/?fips=37109. Rosgen, D.L. 1994. A Classification of Natural Rivers. Catena 22:169-199. Rosgen, D.L. 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books. Simon, A. 1989. A model of channel response in disturbed alluvial channels. Earth Surface Processes and Landforms 14(1):11-26. United States Army Corps of Engineers (USACE). 2003. Stream Mitigation Guidelines. USACE, NCDENR- DWQ, USEPA, NCWRC. USACE. 2005. Technical Standard for Water -Table Monitoring of Potential Wetland Sites. ERDC TN- W RAP-05-2. Wildlands Engineering, Inc. (Wildlands). 2020. Carpenter Bottom Mitigation Site: Mitigation Plan. DMS, Raleigh, NC. WCarpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL 3-1 Wildlands. 2022. Carpenter Bottom Mitigation Site: Monitoring Year 0 Annual Report — Final. DMS, Raleigh, NC. Carpenter Bottom Mitigation Site Monitoring Year 2 Annual Report - FINAL 3-2 FIGURES Figure 1. Current itton Plan View'Key, W I L D L A N D S 0 250 500 Feet I}�Jj Carpenterer Bottom Mitigation Site vvv ENGINEERING I I I I I DMS Project Na. 100090 Envlronmearal Monitoring Year 2 - 2023 Quality Gaston County, NC Figure 1a, Current Condition Plan View W I L D L A N D S 0 100 200 Feet Carpenter Bottom Mitigation Site ENGINEERING c , I DMS Project No. 100090 Eaviroamearal Monitoring Year 2 - 2023 Quality Gaston County, NC r... I Conservation Easement 0 Project Parcels ® Existing Wetlands Internal Crossing ] Structures Restoration Enhancement III No Credit -- As -Built Alignment Deviation BMP — Non -Project Streams x — Fence ---- Top of Bank — Cross Sections (XS) Topographic Contours (2') 0 Photo Points (PP) 0 Reach Breaks Stream Gage (SG) Crest Gage (CG) Vegetation Plot Conditions - MY2 Permanent (VP) & Mobile Vegetation Plots (MP) 0 Criteria Met ft.,WILDLANDS ENGINEERING Environmental Quality MP4 _40 40 r- Figure 1b. Current Condition Plan View 0 100 200 Feet Carpenter Bottom Mitigation Site I I I DMS Project No. 100090 Monitoring Year 2 - 2023 Gaston County, NC Figure 3. Site Map (Mitigation Plan) W 1 L, D L. A N D S 0 100 200 Feet Carpenter Bottom Mitigation Site ENGINEERING I I I I I Catawba River Basin 03050102 (03050103 Expanded Service Area) Gaston County, NC APPENDIX A. Visual Assessment Data Table 4a. Visual Stream Morphology Stability Assessment Table Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 Carpenter Branch Reach 1 Date Last Assessed:11/14/2023 Number Tota I Amount of Major Channel Category Stable . ' Number in Unstable 11 Performing As -built Footage d1i as Intended Assessed Stream Length % Stable, Performing as Intended 2,243 Assessed Bank Length 4,486 Surface Scour/ Bank lacking vegetative cover resulting simply from Bare Bank poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are Bank Toe Erosion modest, appear sustainable and are providing 0 100% habitat. Fluvial and geotechnical - rotational, slumping, Bank Failure 0 100% calving, or collapse. Tota Is: 0 100% Grade control structures exhibiting maintenance of Grade Control 31 31 100% grade across the sill. Structure Bank erosion within the structures extent of Bank Protection 45 45 100% influence does not exceed 15%. UT1 Date Last Assessed: 11/14/2023 Number Tota I Amount of Major Channel Category Stable, Number in unstable 11 Performing As -built Footage as Intended Assessed Stream Length % Stable, Performing as Intended 175 Assessed Bank Length 350 Surface Scour/ Bank lacking vegetative cover resulting simply from Bare Bank poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are Bank Toe Erosion 0 100% modest, appear sustainable and are providing habitat. Fluvial and geotechnical - rotational, slumping, Bank Failure 0 100% calving, or collapse. Tota Is: 0 100% Grade control structures exhibiting maintenance of Grade Control 6 6 100% grade across the sill. Structure Bank erosion within the structures extent of Bank Protection 6 6 100% influence does not exceed 15%. Table 4b. Visual Stream Morphology Stability Assessment Table Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 UT2 Date Last Assessed: 11/14/2023 Number Tota I Amount of Major Channel Category "UTet7ir Stable, Number in Unstable 11 Performing As -built Footage d1i as Intended Assessed Stream Length % Stable, Performing as Intended 178 Assessed Bank Length 356 Surface Scour/ Bank lacking vegetative cover resulting simply from Bare Bank poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are Bank Toe Erosion modest, appear sustainable and are providing 0 100% habitat. Fluvial and geotechnical - rotational, slumping, Bank Failure 0 100% calving, or collapse. Tota Is: 0 100% Grade control structures exhibiting maintenance of Grade Control 4 4 100% grade across the sill. Structure Bank erosion within the structures extent of Bank Protection 5 5 100% influence does not exceed 15%. UT3 Date Last Assessed: 11/14/2023 Number Tota I Amount of Major Channel Category Stable, Number in unstable 11 Performing As -built Footage as Intended Assessed Stream Length % Stable, Performing as Intended 385 Assessed Bank Length 770 Surface Scour/ Bank lacking vegetative cover resulting simply from Bare Bank poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are Bank Toe Erosion 0 100% modest, appear sustainable and are providing habitat. Fluvial and geotechnical - rotational, slumping, Bank Failure 0 100% calving, or collapse. Tota Is: 0 100% Grade control structures exhibiting maintenance of Grade Control 9 9 100% grade across the sill. Structure Bank erosion within the structures extent of Bank Protection 12 12 100% influence does not exceed 15%. Table 4c. Visual Stream Morphology Stability Assessment Table Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 UT4 Date Last Assessed: 11/14/2023 Number Tota I Amount of Major Channel Category "WTtWric Stable, Number in Unstable 11 Performing As -built Footage d1i as Intended Assessed Stream Length % Stable, Performing as Intended 36 Assessed Bank Length 72 Surface Scour/ Bank lacking vegetative cover resulting simply from Bare Bank poor growth and/or surface scour. 0 100% Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are Bank Toe Erosion modest, appear sustainable and are providing 0 100% habitat. Fluvial and geotechnical - rotational, slumping, Bank Failure 0 100% calving, or collapse. Totals: 0 100% Grade control structures exhibiting maintenance of Grade Control 1 1 100% grade across the sill. Structure Bank erosion within the structures extent of Bank Protection 0 0 N/A influence does not exceed 15%. Table 5. Vegetation Condition Assessment Table Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 Date Last Assessed: 11/14/2023 Planted Acreage 15.94 regetation WCatego ]I Mapping Definitions Threshold (ac) Combined Acreage % of Planted Acreage Bare Areas Very limited cover of both woody and herbaceous material. 0.10 0 0% Low Stem Density Woody stem densities clearly below target levels based on current MY stem count 0.10 0 0% Areas criteria. Total 0 0% Areas of Poor Growth Planted areas where average height is not meeting current MY Performance 0.10 0 0% Rates Standard. Cumulative Total 0.0 0% Easement Acreage 18.00 Invasives may occur outside of planted areas and within the easement and will Invasive Areas of therefore be calculated against the total easement acreage. Include species with Concern the potential to directly outcompete native, young, woody stems in the short-term 0.10 0.16 1% or community structure for existing communities. Invasive species included in summation above should be identified in report summary. Encroachment may be point, line, or polygon. Encroachment to be mapped consists Easement of any violation of restrictions specified in the conservation easement. Common 0 Encroachments Noted Encroachment Areas encroachments are mowing, cattle access, vehicular access. Encroachment has no none / 0 ac threshold value as will need to be addressed regardless of impact area. STREAM PHOTOGRAPHS PHOTO POINT 1- Carpenter Bottom R1- upstream PHOTO POINT 1- Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) PHOTO POINT 2 - Carpenter Bottom R1- upstream PHOTO POINT 2 - Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) PHOTO POINT 3 - Carpenter Bottom R1- upstream PHOTO POINT 3 - Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) WCarpenter Bottom Mitigation Site Appendix A -Visual Assessment Data —Stream Photographs PHOTO POINT 3 - Carpenter Bottom R1- Floodplain Pool (03/06/2023) 1 PHOTO POINT 4 - Carpenter Bottom R1- upstream PHOTO POINT 4 - Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) PHOTO POINT 4A - Carpenter Bottom R1- upstream PHOTO POINT 4A - Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) WCarpenter Bottom Mitigation Site Appendix A -Visual Assessment Data —Stream Photographs PHOTO POINT 5 - Carpenter Bottom R1- upstream PHOTO POINT 5 - Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) PHOTO POINT 6 - Carpenter Bottom R1- upstream PHOTO POINT 6 - Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) PHOTO POINT 7 - Carpenter Bottom R1- upstream PHOTO POINT 7 - Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) Carpenter Bottom Mitigation Site Appendix A - Visual Assessment Data — Stream Photographs PHOTO POINT 8 - Carpenter Bottom R1- upstream PHOTO POINT 8 - Carpenter Bottom R1- downstream (03/06/2023) (03/06/2023) PHOTO POINT 9 - UT1- upstream (03/06/2023) 1 PHOTO POINT 9 - UT1- downstream (03/06/2023) 1 PHOTO POINT 9A - UT1- upstream (03/06/2023) I PHOTO POINT 9A - UT1- downstream (03/06/2023) I WCarpenter Bottom Mitigation Site Appendix A -Visual Assessment Data —Stream Photographs PHOTO POINT 10 - UT2 - upstream (03/06/2023) 1 PHOTO POINT 10 - UT2 - downstream (03/06/2023) 1 PHOTO POINT 11- UT3 - upstream (03/06/2023) 1 PHOTO POINT 11- UT3 - downstream (03/06/2023) 1 PHOTO POINT 12 - UT4 - upstream (03/06/2023) I PHOTO POINT 12 - UT4 - downstream - (03/06/2023) I Carpenter Bottom Mitigation Site Appendix A - Visual Assessment Data — Stream Photographs VEGETATION PLOT PHOTOGRAPHS PERMANENT VEG PLOT 1 (8/17/2023) 1 PERMANENT VEG PLOT 2 (8/17/2023) 1 PERMANENT VEG PLOT 3 (8/17/2023) 1 PERMANENT VEG PLOT 4 (8/17/2023) 1 MJJNW,7!jl �.. PERMANENT VEG PLOT 5 (8/17/2023) I PERMANENT VEG PLOT 6 (8/17/2023) WCarpenter Bottom Mitigation Site Appendix A - Visual Assessment Data - Vegetation Plot Photographs PERMANENT VEG PLOT 7 (8/17/2023) 1 PERMANENT VEG PLOT 8 (8/17/2023) 1 PERMANENT VEG PLOT 9 (8/17/2023) 1 MOBILE VEG PLOT 1 (8/17/2023) I MOBILE VEG PLOT 2 (8/17/2023) WCarpenter Bottom Mitigation Site Appendix A - Visual Assessment Data - Vegetation Plot Photographs WCarpenter Bottom Mitigation Site Appendix A - Visual Assessment Data - Vegetation Plot Photographs GROUNDWATER GAGE PHOTOGRAPHS GROUNDWATER GAGE 1 (7/3/2023) 1 GROUNDWATER GAGE 2 (7/3/2023) 1 GROUNDWATER GAGE 3 (7/3/2023) 1 GROUNDWATER GAGE 4 (7/3/2023) 1 GROUNDWATER GAGE 5 (7/3/2023) 1 GROUNDWATER GAGE 6 (7/3/2023) 1 WCarpenter Bottom Mitigation Site Appendix A - Visual Assessment Data - Groundwater Gage Photographs t �. I I 3 1i Af le, i Y 1 GROUNDWATER GAGE 13 (7/3/2023) I WCarpenter Bottom Mitigation Site Appendix A - Visual Assessment Data - Groundwater Gage Photographs STREAM AND CREST GAGE PHOTOGRAPHS STREAM GAGE 1 (7/3/2023) 1 STREAM GAGE 2 (11/14/2023) 1 STREAM GAGE 3 (7/3/2023) 1 STREAM GAGE 4 (7/3/2023) 1 CREST GAGE 5 (11/14/2023) 1 Carpenter Bottom Mitigation Site Appendix A - Visual Assessment Data - Stream Gage Photographs AREAS OF CONCERN PHOTOGRAPHS WCarpenter Bottom Mitigation Site Appendix A - Visual Assessment Data — Areas of Concern Photographs PHOTOGRAPHS OF STREAM FLOW Photo 1— UT1— High flow, above thalweg but below bankfull (7PM) (03/03/2023) MIT r Ate. zi N J c 040. Photo 2 — UT1— High flow (6PM) just prior to the bankfull event (3AM the following morning) (04/27/2023) Photo 3 — UT1— Typical blocked view (10PM) (07/02/2023) Photo 4 — UT1— No flow. This photo was taken during a site visit and confirms the water level data shown in the Recorded in - Stream Flow Events Plot (11/14/2023) Photo 5 — UT1— Cross-section photo confirming no flow over the riffle (07/03/2023) I WCarpenter Bottom Mitigation Site Appendix A -Visual Assessment Data —Game Camera Photographs of Stream Flow Photo 6 — UT2 — High flow, above thalweg but below bankfull Photo 7 — UT2 — Bankfull event (3AM) (04/28/2023) (3PM) (06/20/2023) Photo 8 — UT2 — Typical blocked view (12AM) (08/23/2023) Photo 9 — UT2 — No flow. This photo was taken during a site visit and confirms the water level data shown in the Recorded in - Stream Flow Events Plot (11/14/2023) Photo 10 — UT2 — Photo point 10 confirming flow (03/06/2023) I WCarpenter Bottom Mitigation Site Appendix A -Visual Assessment Data —Game Camera Photographs of Stream Flow APPENDIX B. Vegetation Plot Data �III�■I�I�■��■I�IIIII�IIII�II �III�I�I�O�■I;IIIII�IIII�II 111■I■I■1■9111111■IIII■II ■oa�a�'���annn�nn�n !!! o o ON o o ))§o 0 <<0< E ! !=e { §o \\\\\\}/}\��/}}\\20 z z w mm F T `m E E V) VI m m C V) V m m E O W a O m W W > w a a a d 0 0 0 0 a a a a a ro n ro a a a a a m a � m a a a x x x s x > m = N N ry = ry ry = a m m o= m ry a a a a a a a a N V1 00 V V 1p � iD ill iD ill iD ill � � � 00 � iD ifl � 00 V V V N V1 a VI a VI a VI a N a a a a c c c c e e e o w LL N LL N N p_ V1 m N A V1 i[ ML W ]C 00 A E O m O a O a U` m U = a a a a C E 00 V V V O �0 E O V O � O iD E O V V V O iD E o0 O� C lD VI N N VI Q1 a c 16 o 0 0 o 0 0 o o 0 0 o 0 0 a a a a a a n n n a a a - LL H LL N N Q N fl. H O O O a O a O a o ... o_ m m = M N = m N N = N N N;= m N N>= 7 7 7 7 7 IT a a a a a a a a a a a VI a N a N a VI a VI U! m U! U! m m U! m U! m U! m N m N m N m N m N m N m N m N m N m N m N m N m N N m m N m N m N m N m N m N m N m N m N m N m O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O APPENDIX C. Stream Geomorphology Data m C O .m pp O M 00, N .Y p V O N 0 E N � a C ° O m C o z > N O N N d Y N Q c u u o 2 Ln M M M �•' + � C o 0 gl 3 I � oLn + ,� } IN'i N c-I ik �.Y } s on V mO- w O - OJ 0' O m L V ti N 0 m D c N m L w f0 W W L m Q L O cij o L Gl } C O O -O m -O 7� I C cij m t m O N N m X m m v \ O a � ,� x �3 E E 3>� 3 �� m u o v 3 m m co m m a m U c ti ti o r o c O ^ m .v V n r r r d n n r r r N '^ (11) OO!Ienal3 O u OJ C 0 O O M pp of N O O N O N a0 E 2 N c ° ° y p o z > } m U pp G1 a 'o N A N d Y N Q Ln c u u o 2 a v Q 0 Q 0 0 v Q 0 o m } � c 0 m m I I Y � w C NO N Y m O e-I m N n N O N ti W o 0 0 r � n n n n n n n r r (11) uoi}enal3 r K rT e *a t x � .1 h 64 O c v Ow s"�v o > w A t \ Fot ja6evr �w+aR�r i gc ei s _ on V O C N s — — SoO O •ia OJ O N V i N v E O O O L w t OJ OJ i f0 Q L �� Q O m ut C ^OJ O_ O_ .0 OJ L i' -O L C O -O OJ , O -O -O U C O m U O +0+ O 2 O N N p� a0 m y -o -0 3 m a aj x 3 E E 3r 3 v° r N p Qj 3 u _ �v I, to O O to ID(71 O O U m m caj p m i •v LL V n d N V O u OJ C 0 O O M pp of N '"' O O N N 2 O a0 E 2 N � 0 O N } m U pp V i O N A a '2 IA N Ln Y N Q Ln c u u o 2 mmNi LCN3n m J N c V 7 Nx O NO - U O- cjm iv� n O a lo t 3) uiea3 m C O pp 0 N aO E 2 N V m N CAO N d 0 N Q Ln c u u o 2 Ln -t. n m N .� C n 131 3 Ln ei s on V mO- O - 0' Ui O m m L V n c m D bA i mi m m E O C L w m W m C Y m O_ O_ .0 m -O L Gl c O -O m -O 7� m O L C Y m L N N X \ O aj m aj -o -o m a NU ar m aj x 3 E E 3 3 N U � N m y D co io m io N U Y c�-I c-I c-I N c-I pl N C � m i m } W d cA N V O u V M n d � O � e-I � O N N m O W N N O .-i I� O O r r r Ot O r 0a O n (3}) uoi�enal3 I� V7 n V7 V7 n OJ 0 O Y f0 CO � M S= � M C 3 0 � v 0 0 c\-I \ W °t } Pi s O � V � � S w C N � OJ 7 O bA w N L f0 W a m Q1 ut C Y N O_ O- .0 OJ -6 G1 } O C 2 N O x \ 6 a cli v m u o v 3 O N c-I V1 m n co N 0 U Y C c c N c �- 6 i O O m N .v V 10 t^O 10 10 10 1MD 1N0 W d n r r r n n to CA ^ (11) UO!Ienal3 O u OJ N O .O O M pp o N '"' O O N N 2 O aO E 2 N o O N O o z } } m U pp N A O 'o A N L Y N Q v) c u u o 2 0 v Q c 0 a 0 O v a 0 o a } � c 0 m w m I I w � c M O m Y m Q1 O N m N n } O N N � W O r-I 0 O r r r (}}) r uoiIenal3 n r OJ N O .O O M pp o N O O N O N 0 2 N a c ° ° y O o z > } m U pp N A a 'o A N L Y N Q N C u u o 2 y � � L 3 M1M1II � 0 e tC ivy !� s on V _ _ O C s v O O _ a N N O i N V _ N 7 i N bA O •� O L w t N OJ L -O O -O -O U C O C O -O W m U O cli a3 O OJ N � o v m v o 0 3 m cli v° r� o ° 3 O N 7 O n n N O to N ^ W m U o- o Ln a o v � p c m i •v V LL d In N V O u 0 v I I I I I I I a � o � o I I I I I I a o } o � m I I I I w m I I ' Y � n O mom' m I c-i ti ti I I I I m N I I I I I I I \ � } � o N N � m � I I I I I I I o ti o > � r r n r (3}) uoi�enal3 n r cli .. . . ^ *: «\ \ y ƒ § ƒ } £ OJ Ln Y f0 CO V M r } O O d _ 00 O � a c-i N O m W N O Q1 O oo 0 u) n r 1) r u) r (11) UO!Ienal3 u) r u) r OJ N O •Ip U M pp o N Y O p V U N O 2 N a c ° ° y O o z > } m U pp N A a 'o {A � CL Y N Q N C u u o 2 a v Q v 0 Q 0 0 v Q 0 o m } � m N w m 3 � c O O N yam. m c-i m N n } O N W o 0 0 r � n r r (31) r uoiIenal3 r r O " o cij it � Fah f � � 9 !� s V !0 c s O O O N � V N v v i a v o 2 c •aj c m� o v v w L ut C N O_ o_ OJ L i' -6 G1 C O -6 -O -O U C O v o a m i U C Y O L O 'Z N o Gl c N -o v m v -o -0 3 m cij x 3 E E 3� 3 v° u o v 3 O m N ^! Cj I, lo� N O f0 U Ln vi .--i v c � p m i •v w V In d N V O u cli Ln , : ®ao ! — \G% } ±�® r,4 r >^ § � \ o ^ )cy - cij clj - ® y[\2 waj 7 o § })\\x _ [ m / , § / E $ ± § / \ u 3 // \ a § m c - - - - 2 f / In ) d G_m 6 OJ N O •Cp U M pp o N Y O p V U N O 2 N a c ° ° y O o z > } m U pp N A a 'o {A � d Y N Q v) c u u o 2 0 v Q c 0 a 0 0 v Q 0 o a r � c 0 m w w m I I 3 Y c � 0 m Y m Q1 ti O N N � W �n o ti 0 0 r � �n �n �n Ot a 00 v n n r n (3}) uoi�enal3 n r 07, i a: y 3 TA� o s l �.° N s V !0 c s O to O N ai V N v v i a v o 2 c •c m� o v aw L ut C N O_ O- OJ G1 C O -O -O U C C v o m i -6 U C O O O O N Gl c N -o v m v -o -0 3 m cli v° u o 3 N w Ol to w NN M n O p `.--i m ar o o Ln v U cai p m i •v w V In d N V O u aJ N c 0 O O M pp CF) N � O N a � 0 O N } m U pp N A O '2 IA N IL Y In Q In c u u o 2 0 v Q v c 0 a 0 v o I o a } � c 0 m m i i w w CT) 0 m Y m N O N m N � N } O N N � W O c-I O m r r r (31) r uoiIenal3 � p F � r rv,,% c t �f c t J 3 _. oo aj i IIr O Cc O '� N aj _ O N N ut •� a] N aJ bA C O . N t t O O N w O Q aJ - , ut ut C aJ Q o_ aJ L �' -o C O -O w -O -O -o U C O ° t c aJ m t o c m m m aj m x 6 0 3 m w _ ar m r E X 3 E E 3 3 as o o aj 3 M 7 m I� m lD CO m N o O O U N Ln n .--� N c � m i N LL V In d N V O u OJ N O •yp O M pp m N Y o p V N 2 O aO N � c ° o y O o z > } m U pp V i O r Gl ar N A N d Y N Q c u u o 2 0 v I I I I I I a w c o -a o I I I I I I i v a O I I I I I I o } C o � m Y I I w m I I Y � O N O `7 I I I I m N I I I I I m n N � p N N � W � I I I I I I I o ti o } � r r r r r r r r (}}) uoi�enal3 r r og- � � o 4 � 5 � rEWN *10 i O CE s _ O O '� N � _ O N N ut •� O f0 C m N D N bA C O . OJ t t O O N w O Q N Q D- E in O -6 — -6 -O u C °J o c m m e U O +0+ O OJ N N O X \ 6 c N -o v m v -o -0 3 m r cij x 3 E E 3� 3 v o r m v v w t m io o N io `n 1O m o p c� Ln Co o .--i of o ti Nil vi .ti ccij p m i ,v LL V to d N V O u Table 8a. Baseline Stream Data Summary Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 Parameter MONITORING CONDITIONSDESIGN • Carpenter Branch R1 Riffle Only Min I Max n Min I Max Min Max n Bankfull Width (ft) 10.2 1 7.5 9.2 12.2 6 Floodprone Width (ft) 14.2 1 17.0 1 26.0 44.4 68.1 6 Bankfull Mean Depth 0.7 1 0.6 0.5 0.8 6 Bankfull Max Depth 1.2 1 0.7 1 0.9 0.9 1.2 6 Bankfull Cross Sectional Area (ftz) 7.0 1 4.4 5.3 8.2 6 Width/Depth Ratio 14.9 1 12.5 14.4 22.7 6 Entrenchment Ratio 1.4 1 2.2 3.5 4.6 5.6 6 Bank Height Ratio 3.4 1 1 1.0 1.1 1.0 1 1.0 6 Max part size (mm) mobilized at bankfull 37 / 90 32 / 81 46 61 6 Rosgen Classification G4 C4 C4 Bankfull Discharge (cfs) 14.0 14.0 14.0 Sinuosity 1.1 1.2 1.2 Water Surface Slope (ft/ft)z 0.0130 0.0120 0.0109 Other -- -- -- Parameter UT1 Riffle Only Min I Max n Min I Max Min Max n Bankfull Width (ft) 3.1 1 5.0 8.0 1 Floodprone Width (ft) 4.2 1 11.0 1 18.0 55.5 1 Bankfull Mean Depth 0.6 1 0.4 0.3 1 Bankfull Max Depth 0.8 1 0.5 1 0.6 0.6 1 Bankfull Cross Sectional Area (ftz) 1.8 1 1.9 2.3 1 Width/Depth Ratio 5.2 1 12.5 27.6 1 Entrenchment Ratio 1.4 1 2.2 3.5 6.9 1 Bank Height Ratio 6.1 1 1.0 1.1 1.0 1 Max part size (mm) mobilized at bankfull -- -- 41 1 Rosgen Classification G4/5 C4 C4 Bankfull Discharge (cfs) 6.8 6.0 6.0 Sinuosity 1.1 1.3 1.2 Water Surface Slope (ft/ft)z 0.0258 0.0200 0.0153 Other -- -- -- 1. ER for the baseline/monitoring parameters are based on the width of the cross-section, in lieu of assuming the width across the floodplain. 2. Channel slope is calculated from the surface of the channel bed rather than water surface. ( --- ): Data was not provided, N/A: Not Applicable Table 8b. Baseline Stream Data Summary Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 Parameter CONDITIONS UT3 MONITORING Riffle Only Min I Max n Min I Max Min I Max n Bankfull Width (ft) 9.5 1 6.0 8.4 1 Floodprone Width (ft) N/A 1 13.0 1 21.0 52.6 1 Bankfull Mean Depth 0.3 1 0.5 0.6 1 Bankfull Max Depth 0.7 1 0.6 1 0.8 0.9 1 Bankfull Cross Sectional Area (ftz) 2.8 1 2.9 5.1 1 Width/Depth Ratio 31.9 1 12.0 14.0 1 Entrenchment Ratio N/A 1 2.2 3.5 6.2 1 Bank Height Ratio 1.3 1 1.0 1.1 1.0 1 Max part size (mm) mobilized at bankfull -- -- 48 1 Rosgen Classification G4/5 C4b C4b Bankfull Discharge (cfs) 6.2 8.0 8.0 Sinuosity 1.0 1.2 1.1 Water Surface Slope (ft/ft)z 0.0260 0.0230 0.0237 Other --- --- 1. ER for the baseline/monitoring parameters are based on the width of the cross-section, in lieu of assuming the width across the floodplain. 2. Channel slope is calculated from the surface of the channel bed rather than water surface. ( --- ): Data was not provided, N/A: Not Applicable Y Y Y O a° O a° ce Y Y Y Q C O_ 00 C O_ N O O 1T r W C m r r r co r r r r r r r r r r r Y Y Y ti N N O S r r r r r r � C r r O O O O m �IN m N r r r r r r r r YOl r O 0 r 01 Tm r N Y �O r O C r �O r N T Y m r N r vl I� n Y n Y n Y n Y N N N N EC EC O y O ' N �° C O .� C O •�'i N N m a v�i vNi y� I� r O��11 ri r r r r ri �O N 1O r 0 `i r �O r ti ri N y r O r r ,,, y r 0 r r O a O V O V 2 Y N O C N ri m 1 y O O N y O m O Ol N y 0 ri C r r `� r r r r O l0 r `i l0 r l0 r ri V N r ri r r ri I� V r r r In n n n n n n n n �n n n n n Y Y Y Y O a° O a° O a° Y Y Y Y .-I C O_ u1 C O Ot C O M O 77 Y O O O h m m r r r r r r r r r n n n n n n n n n x4 o o x > > > > > > > > - - -_ -_ ca -_ -_ -_ -_ m m 3 0 o m m 3 0 o m m 3 0 o m m 3 0 o ¢¢ ~ m ¢¢m ~ m i Q m Q m ~ m m Q m Q m ~ m 0 0 O 0 c 0 0 O 0 c 0 o O 0 c 0 0 O m m V m m lw m V m m lw m V m w m lw0 m V m x _, O — m .0 s m Z m OF x _, O > — m .0 m m Z m OF x _, O > — m .0 m m Z m OF x _, O > — m .0 m m Z m OF APPENDIX D. Hydrology Data O GJ i W 3 Y O M m O r-I _N M H M N O N N R GJ } tw C O C O 2 a N O rIL P. } n N O �D } �D N O rIL } Ln N O rIL C} C N O rIL } m m m m m M N N N N N N O O O O O 00 :1- 00 O :1- 00 N N O N Z O N G O O O O O N N N N N N N N O O O N O O O .--i Z Z O O O Z r-I t U R t � U 'n kn kn M U w L m 0) C GJ O_ R CJ N � N M� E O E dA O N 3 +' p N CA O N O O f6 f0 p Z } CO U tw a cn c O H U a N O n } n N O �D } �D N O rIL } Ln N O rIL C} C N O rIL } M N Or'L 00 l0 l0 m N 00 O O N L Ol N � N N O O 00 00 I� N LO M m N m N LO Ol _ GJ GJ R O 0 a+ C a+ C ~ U U CL 0) 0) R a a E a o m Z R 3 C W W a � � v V) v t E O E Ln a v 4r� E X O Q Q ro uu O J N c O CD U T L N � L O O +J ul O umS 5 v E v v 0 v E a, 0 z v v v � V O v U O Y O n E 0J Q U1 LO N w Q E O a O L o m L � Q u C Q (0 W C s m i N � O 7 �i 7 c ra 00 Il to L m N (ui) uoi;e;idi:)aad N N L E O w M T N (0 E X O Q Q m N V 0 0 0 m v 0 N m O .6 C D f6 2� (A � C O Ln :a O C M O W C) N V }' C)N OA O +� E ev L W O Z } CO U to fd L N O N N L rl � O 4J a)O Q N C O H V N CUD m C N U N � a ,1 " o o = o o o W c 1O o 1D o 00 n Q O 0) Ol 00) 01 N Lli O ++ C m f m i 2 U m m m m m fu m m m N b N N M � N 7 �' U W � C O U X m ti0 Cb m c-I N M Ln l0 C7 0 m 0 v en m en 0 N m M O m (10 m N v C m E 0 v a C O .m H w N m M Ln N c-I O Ln \ m O C O m v N uo O o Table 12b. Wetland Gage Summary Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 Max. Consecutive Hydroperiod (Percentage) Gage MY1 (2022) MY2 (2023) MY3 (2024) MY5 (2025) MY5 (2026) MY6 (2027) MY7 (2028) 107 Days 245 Days Reference1 (43.7%) (100.0%) 1 59 Days 96 Days (24.1%) (39.2%) 45 Days 53 Days 2 (18.4%) (21.6%) 34 Days 38 Days 3 (13.9%) (15.5%) 48 Days 59 Days 4 (19.6%) (24.1%) 45 Days 54 Days 5 (18.4%) (22.0%) 14 Days 35 Days 6 (5.7%) (14.3%) 48 Days 71 Days 7 (19.6%) (29.0%) 8 Days 6 Days 8 (3.3%) (2.4%) 15 Days 22 Days 9 (6.1%) (9.0%) 42 Days 55 Days 10 (17.1%) (22.4%) 51 Days 71 Days 11 (20.8%) (29.0%) 12 N/AZ 5 Days 3 (14.3%) 13 N/AZ 2 1 Days (8 6%) Performance Standard: 30 Days (12%) WETS Station: LINCOLNTON 4W (37109) <http://agacis.rcc-acis.org/?fips=37109> Growing Season: 03/15 to 11/14 (245 Days) 1 Reference well is located approximately 6.7 miles NW of the Site z Wells 12 and 13 installed during MY2 (01/2023) 3 O LL E O ca N ++ O N co O M OA (14 0 N 41 O ' E rl N L O v +, O f0 0 CO U Op CM a1 O O O 4J v a Qco O H U 0 N O n n N O l0 t0 'L N 'i l0 U NO y�j N LM U � C� C 40 C 0) C0) C � N O t4 0 O H m 0 �+ N N c�i � M U X O T fo a fo fo o co 0 00 0 N N >. 00 00 cr) cr) O N 0 rm-I O voo V' T coo MOMM OMM 0 �..� m fV O m N -q ry) r-I Oo C� C rr-I N rr-I t U fu N N l� s m v Ci--I U CV (y) a v D D D c U 3 0 0 N T � N 0) O u v � C e-I o t u O = m 0 v U N u'^ u U 0 U �n � m U (ul) uollelldl:)aJd N O V M N n n n N (4) uollena13 (ul) uollelldl:)aJd N O M N O (4) uol;ena13 (ul) uolle31dl:)aJd N O n n n n (4) uol;ena13 (ul) uollelldl:)aJd N O tD V1 � M n n n n (4) uollena13 m U (ul) uol;elldl:)aJd N O zdl N C D Ln V V VLn r, n n n (:}) uol4enal3 (ul) uol;e;ldl:)aad N to M O I I £ZOZ/bL/LL uoseaS SuimoJE) }o pu3 I I I I I P'� IQ� I� V I Q� Y 3 c 3 en N ,O^ N V I � N V7 C a o r Ad fC � O �C � � I c Im v I v Q N rr L � ' �Y I 7 V V H I I C O V �I X � Iy] I ID 0) P I £ZOZ/SL/£ uoseaS BuimoJE) }o lwels J I I I I O O O O O O N c c N M NO UOIIB-13 .c v U `w a L O n 06 L O m C LOf1 l00 0 (ul) uol;e;ldl:)aad N c Ol D M O 11 low i� r ■ �I I I� I� �I III O O O O O O N c c N M NO UOIIB-13 .c v U `w a L O n 06 m � LOf1 lO0 0 a) Y V) 0 a N 0 N ++ N E O O m +�+ N f+ O Z g LJJ co U an ?> N C OC 'a O 'O O aJ a- O Q c O ai u o 2 3 (ul) uol;e;ldl:)aad N c Ol to M O I I £ZOZ/bL/LL uoseaS SuimoJE) 10 pu3 I I I I I M � N I I fC � I N 3 � c I en 3 N ,O ^ N IV � N +� � IV1 C � O r a+ � � O �C ccO C O Y O m L v Y Q � L � > .Y V a1 IO CV C I 00 m M I £ZOZ/SL/£ uoseaS Buim0JE) 10 vels I I I I I O O O O O O N c c N M NO UOIIB-13 .c v U `w a L O n 06 L O m C LOf1 l00 0 a) Y V) O a N 0 N ++ N E O O m +�+ N f+ O Z g LJJ co U an ?> N C OC 'a O 'O O aJ a- C Q c O ai u o 2 3 (ul) uol;e;ldl:)aad N to M O I I £ZOZ/bL/LL uoseaS SuimoJE) }o pu3 I I I I I IQ� I� V I Q� 3 � c I en 3 N ,O^ N V I � N V7 � C � � r fC � O �C � � I Y m L v Y C Q fC � � > I V a1 IO CV C I 0) L Ln I £ZOZ/SL/£ uoseaS BuimoJE) }o lWelS I I I I I I O O O O O O N c — N M (ul) UORB 13 O O O v .c v U `w a L O n co L O m Ma Y cli V) O Y WD 1+ 2 v C: c v Q v v .c (ul) uol;e;ldl:)aad v w a c-I 01 lD M O L O n L I m m I u O FU 0 a U UJ a` £ZOZ/bL/LL u0seas SuimoJ9 10 pu3 I I 0 z 0 z I m I? 0 m I O 1)I I C UJ I LA v J 00 Q Ul m U 2 I� V IL C Q� Y ccm G t O 3 M I Q O N cu N I m 16 0 fC � O O O w w C J � W Y O m L ' v IY C L � I cry 2 Y 7 I 0 W I m f0 cu U X Ip Q C N N V lf1 I K £ZOZ/sL/£ u0seas Buim0Jg 10 lJels cu I c� C J I m I I LL c 0 m �a U UJ a` O O O O O O O O f0 0 a) Y V) O a bll01 N N ++ O N t b,D O M 0 N N f+ O Z U LJJ O] ?> N C OC 'a O O o aJ a- C Q c O ai u o 2 3 (ul) uol;e;ldl:)aad N to M O I I £ZOZ/bL/LL uoseaS SuimoJE) }o pu3 I I I I I IQ� I� V I Q� 3 � c I 3en ON 72 V � N +� � IV1 C N O r �o o E cC O Y O Co L v Y C Q � L � CJ > J V V I V IO X Ln m I I £ZOZ/SL/£ uoseaS BuimoJE) }o lwels I I I I I O O O O O O N c c N m NO UOIIB-13 .c v U `w a L O n 06 L O m C LOf1 l00 0 a) Y V) O O M a °p rn N c 00 N O m CO U an cli ?> N C OC 'a O 'O O aJ a- C Q c O ai u o 2 3 (ul) uol;e;ldl:)aad N to M O I I £ZOZ/bL/LL uoseaS SuimoJE) }o pu3 I I I I I Ir I� V IQ� I 3 M N ,O^ N V I � N V7 � C � � r bA fC s � O �C � � I Y O m v IY Q C � CJ > I V a1 O V I CD X I n I £ZOZ/SL/£ uoseaS BuimoJE) }o lWelS i I I I I I O O O O O O N c c N M NO UOIIB-13 .c v U `w a L O n 06 L O m C LOf1 l00 0 (ul) uol;e;ldl:)aad N c Ol D M O 7 ,I�r} _OF I J �I I� �I I III O O O O O O N c c N M M) uORB-13 v .c v U `w a L O n 06 m C LOf1 lO0 0 (ul) uol;e;ldhaad N c Ol lD M O I I £ZOZA71/11 uoseaS SuimoJE) 10 pu3 I I I I I I CTI U Q� I I I� V I Q� 3 � c I en 3 N ,O^ N V I � N +� � IV1 C � O r bA �o cco C O Y O m L v Y C Q � L � CJ > Y J V V I V IO CD X E N I £ZOZ/SL/£ uoseaS Buim0JE) }o lwels I I I I I I I O O O O O O N c c N M M) UORB 13 v .c v U `w a L O n 06 L O m C LOf1 l00 0 }J Cli V) O a 0 N N ++ N E O O m +�+ W ate+ O Z w Co V ?> S C - 'a O 'O - 4J a- O Q c a+ � O v u 0 2 3 (ul) uol;e;ldl:)aad N to M O I S I I £ZOZ/bL/LL uoseaS SuimoJE) }o pu3 I I I I I I l"I IQ� I� IV Q� }r Y O M I 3 O �O N I y N V7 � U1 I � Y O pp a+ C � O r+ Cam, C O O Y O Co L v y v Q � � ' .Y I V U1 IO CV C Ln Ln I I £ZOZ/SL/£ uoseaS BuimoJE) }o lWelS i I I I I I O O O O O O N c c N M NO UOIIB-13 � LOf1 O a) Y V) O O en a °p rn N c 00 N O � O ` O �0 N ' Z W m O CO U an Cli 3 S C Cc' O 'O - aJ a- O Q c a+ O ai u o 2 3 (ul) uol;e;ldl:)aad N to M O I I £ZOZ/bL/LL uoseaS SuimoJE) }o pu3 I I I I I I l"� l"I IQ� I� IV Q� Y 3 I� O M 3 N O O N I� N N V1 � al � Y O pp a+ C � O r+ Cam, C � I O Y O Co L Iv y v Q � � ' I V a1 IO V X I n I £ZOZ/SL/£ uoseaS BuimoJE) }o 1pels I I I I I O O O O O O N c c N M NO UOIIB-13 .c v U `w a L O n 06 L O m � LOf1 l00 0 (ul) uol;e;ldl:)aad N c Ol D M O I Ed 1.1 1 v .c v U `w a L O n 06 m LL O a U UJ O a O O O O O O O O C f0 0 NO UOIIB-13 I (ul) uol;e;ldl:)aad N c Ol D M O NEI v .c v U `w a L O n 06 m ai LL C �a U UJ c a O O O O O O O O C f0 0 NO UOIIB-13 I o z a § 2 : CT) a / / / C [ \ m / Z e \ 2 0 2 « \ 7 { E 3/ ' © _ 4 \ \ (A u / 0 0 2 R EmyGyl uaeas AAeegPq § ¥ E / S / (j)emeadma aa(] mN po da 2n Inr unr Ga A ,e a qR 4 Uef % MONITORING GAUGE INSTALLATION DATA SHEET Proiect Name. K e%r Owe Proiect Location. Purpose of Gauae. Water Table Monitoring Gauge Description: Game ID. Serial Number. Total Well Casino Length (A): Well Casing Height Above Ground (B): Distance From Eve Bolt To Probe Sensor Material. Type of Measurement Type of Logger. Notes: Soil Profile Descriotion at Location of Well: • rmr-s����s�*� . • G MYnO TA UARM [fY�i •:3R.SI�ItL OW, rjnl ii�r■�r� " U Mrv�Swallf?a� 0 Proiect Name: Proiect Location. Purpose of Gauge. Gauge Description: Gauge ID: Serial Number: Total Well Casing Length fAl: Well Casln Height Above Ground �,B) Distance From Eye Bo4 To Probe S6nsor miftw* Type of Measurement: Tvpe of Logger. Gauge Location. tr a Y - G , L� cG Water Table Monitoring S/ 2" PVC Well Soil Profile Description at Location of Well: hnnfh D� a ein l f nln P-1 Twvb— NM.. r mr►rl����r��Q*• ff RROWRWAA 7 rim-3YAM0,11 w4w. M W W-ONWACM, �� WA _n 019MI- � • t r' q�$, 40 • APPENDIX E. Project Timeline and Contact Info Table 14. Project Activity and Reporting History Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 Activity or Deliverable -A Project Instituted Mata Collection C ` ompelLeliverable N/A Task Completion o Submissio October 9, 2018 Mitigation Plan Approved December 2020 December 2020 Construction (Grading) Completed N/A July 2021 As -Built Survey Completed August -September 2021 September 2021 Planting Completed N/A February 2022 Baseline Monitoring Document (Year 0) Stream Survey August -September 2021 April 2022 lVegetation Survey February 2022 Invasive Treatment July, November 2022 Year 1 Monitoring Istream Survey August 2022 November 2022 Vegetation Survey Invasive Treatment January - August 2023 Year 2 Monitoring Stream Survey July 2023 November 2023 Vegetation Survey August 2023 Year 3 Monitoring Stream Survey Vegetation Survey Year 4 Monitoring Year 5 Monitoring Stream Survey Vegetation Survey Year 6 Monitoring Year 7 Monitoring Stream Survey Vegetation Survey Table 15. Project Contact Table Carpenter Bottom Mitigation Site DMS Project No. 100090 Monitoring Year 2 - 2023 Designer Wildlands Engineering, Inc. Eric Neuhaus, PE 167-B Haywood Rd Asheville, NC 28806 828.774.5547 Construction Contractor Wildlands Construction, Inc. 1430 S. Mint St., Suite 104 Charlotte, NC 28203 Planting Contractor Bruton Natural Systems, Inc. PO Box 1197 Fremont, NC 27830 Seeding Contractor Canady's Landscape & Erosion Control, LLC. Nursery Stock Supplies Bruton Natural Systems, Inc. Herbaceous Plugs Wetland Plants, Inc. Monitoring Performers Wildlands Engineering, Inc. Monitoring, POC Mimi Caddell 828.774.5547 x107 APPENDIX F. Additional Documentation WILDLANDS ENGINEERING July 26, 2022 ATTN: Ms. Kim Isenhour Mitigation Project Manager, Regulatory Division U.S. Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403-1343 RE: Carpenter Bottom Mitigation Site - MYO Report Comments Catawba River Basin — CU# 03040101, Gaston County USACE Action ID No. SAW-2018-02062 NCDWR Project No. 20190049 DMS Project ID No. 100090, Contract # 7731 Dear Ms. Kim Isenhour, Thank you for your comments in the email dated July 7, 2022 referencing the Carpenter Bottom Mitigation Site Monitoring Year 0 (MYO) Report. Wildlands Engineering, Inc. (Wildlands) has reviewed these comments and our responses are noted below. Kim Isenhour, USACE: 1. How deep are the floodplain pools where the relic channel meander features were located? On recent site visits, we've noted several instances of floodplain pools being left as open water in areas where the mitigation plans calls for planted buffers. The majority of these pools have been deep enough that they will not dry seasonally and allow for herbaceous or woody vegetation establishment. Wildlands Response: At the location of the relic channel meander features, the floodplain pool is around 1.5' deep. The floodplain pools were designed with a max depth of 2.0' and were intended to draw down seasonally. Vegetation growth will be monitored in floodplain pools and reported on in the MY1 report. Kim Isenhour, USACE response (July 28, 2022): These features should be no more than 18-inches deep and should dry seasonally (ideally toward the end of spring), not draw down. The idea is that the pools will have dry periods that prevent predator species from surviving. The size of constructed ephemeral pools should be limited to prevent the formation of gaps within the tree canopy and minimize the risk of invasive plant colonization. You should also take into account the target vegetation community for the project. For example, ephemeral pools may develop herbaceous vegetative growth that may persist for a long period rather than the targeted forested community. Wildlands Response: The condition of the floodplain pools is discussed in more detail in section 2.6 — Wetland Hydrology Assessment of the MY1 report. Two of the four floodplain pools were existing wetland areas protected during construction, so their hydrologic functionality and their vegetation communities are assumed to be comparable to the existing conditions. When the Site was assessed on September 1, 2022, three of the pools had dried up completely and only the most upstream pool had a small area of standing water approximately 0.5 feet deep. The targeted forested community can still develop an enclosed canopy over and around these floodplain pools as they are only 27-feet wide. Consequently, these four pools are not a concern for the success and functionality of the completed project. See the MY1 report for photo documentation of the floodplain pools. 2. In future monitoring years, please capture some of the wetland rehabilitation areas with mobile veg plots. Wildlands Response: Mobile veg plots will be positioned to capture wetland rehabilitation areas starting in MY2 as mobile vegetation plots are typically stationary between MYO and MY1. 3. Thank you for including the soil profile descriptions at each groundwater gauge. It would have been helpful to include a table with the pre -construction gauge data. Wildlands Response: A summary table of pre -construction gage data will be included in future as -built monitoring reports. 4. Pebble counts were included in the data. Do you plan to keep this as a performance standard through monitoring? Wildlands Response: Pebble counts were included in the MYO report as part of the baseline data collection as described in the Mitigation Plan. However, pebble counts will not be collected for the MY1-MY7 reports, unless requested by the IRT or deemed necessary based on best professional judgement. This is documented in Section 3.3 (Stream Assessment) of the MYO report. 5. Photo Point 12, outside the easement, appears to be a source of offsite sediment/nutrients. Wildlands Response: Sediment in photo point 12 is from recent fencing work at the Site. Upstream of UT4 is wooded and stable. Erin Davis, NCDWR: 1. DWR would like to reiterate DMS' comments/questions on the high riffles and gauge ben tonite seals. WEI's responses were fine, but please closely observe these areas during MY1 and address as needed. Wildlands Response: These items/concerns will be noted in future monitoring reports. 2. What are the max. depths of the floodplain pools? (may include response in MY1 report) Wildlands Response: The floodplain pools were designed with a max depth of 2.0' and were intended to draw down seasonally. Vegetation growth will be monitored in floodplain pools and reported on in the MY1 report. DWR appreciated that invasives were inventoried and treated pre -construction. And we were glad to see woody debris was added to the floodplain pools. DWR is ok with the proposed credit release. No site visit requested. Wildlands Response: Thank you for your comments. Todd Bowers, USEPA: 1. All 13 vegetation plots met the interim success criteria and are on track to meet the final success criteria required for MY7, and no species dominance per plot was greater than 50%. Morphological WILDLANDS ENGINEERING surveys conducted throughout the Site show all streams as stable and functioning as designed. Eleven groundwater wells were established at baseline conditions to monitor wetland hydrology within both wetland re-establishment and rehabilitation areas. Wetland hydrologic data will be collected and reported during MY1. No adaptive management plan needed at this time. No issues of conservation easement encroachment. Wildlands Response: Thank you, we acknowledge the comments. 2. Table 2a: I recommend adding a visual confirmation that the objective of excluding livestock from the conservation easement is being met. Visual confirmation can include no sign of hoof shear or cattle excrement within the project boundaries. Trampled streams and vegetation, broken fence, destroyed banks from hooves and excrement would be positive indications of that objective not meeting standards. Wildlands Response: A visual confirmation of cattle exclusion will be added to Table 2A in the MY1 report. Overall, I am very satisfied with the report and the work that Wildlands has completed at the site. Having not been able to visit this location, I really appreciated the detailed ground -level stream and veg plot photos to illustrate the amount of work implemented. I recommend the appropriate credit release (Milestone 2) for warm stream and riparian wetland mitigation units for this monitoring milestone. I have no other substantial comments at this time. Wildlands Response: Thank you, we acknowledge the comments. As requested, Wildlands has addressed these comments and the updates are included in the MY1 Report. A copy of this comment/response letter will be included in the Appendix of the MY1 Report. If you have any questions, please feel free to contact me. Thank you! Sincerely, Eric Neuhaus Senior Environmental Scientist ksuggs@wildlandseng.com