Loading...
HomeMy WebLinkAboutWQ0044093_Other Correspondence_20240129 FY January 26, 2024 N.C. Department of Environmental Quality RECEIVED Division of Water Resources jAN Central Office 2 9 2024 512 N. Salisbury Street, Suite 925 Raleigh, NC 27604 NCDEQ/DWR/NPDES Re: Guilford/Randolph Megasite City of Greensboro Megasite Water and Sewer Improvements Phase II 15A NCAC 02T .0105—Variance/Alternative Design Request Application HDR Project Number 10328292 On behalf of Toyota,enclosed please find the following variance application and supporting documents for the City of Greensboro Megasite Water and Sewer Improvements Phase II Project for your review and approval: 1. One original of the Variance/Alternative Design Request Application 2. $600 Application Fee 3. Plan sheet 4. Sewer Fast Track WQ0044093 We are requesting a variance due to the design conditions and install conditions changed and we do not have the cover NCDEQ requires over PVC pipe. NCAC 02T.305(g)(4)Requesting coverage under a stream for gravity sewer main.We have a 24"gravity main under a stream with just over a foot of cover and is encased in concrete.The pipe is C-900 DR-18,we are requesting to leave the pipe as is and finish the stabilization for maintenance corridor per City of Greensboro detail(attached).Our survey and actual conditions changed between time of design and time of construction.Approximately 1,500 LF up stream there is a force main discharging into a manhole and there will be 2 other force main discharges added to the same manhole in the future.The pipe being C-900 PVC will be better at handling the corrosive gases. The pipe being encase in concrete will protect the pipe.The MDC discuss sewers in relation to streams and other water bodies.One foot of cover where the sewer is located in rock. Will the pipe being encased in concrete satisfy this requirement. Should you have any questions or need additional information,please do not hesitate to contact me. Sincerely, HDR Engineer' the Carolinas Matthew W Watt PE Water/Wastewater Engineer hdrinc.com 440 S Church Street,Suites 800,900& 1000 Winston Salem,NC 27101-4015 336-955-8259 0 0 0 . 20 ' PERM. I EASMENT (MIN.)0 F 10 ' I w TOP OF BANK J Q E ,- 0- ,. 0 �ilpp ♦y, Jigq � 000`'', v � 9 .0-40oro0ODign 0�0{°0 0010 ,so ,e ' . :: lO�° ac° o�!/r0�"o!9 $o��'#oelw.• _ = - - _ r:a._o�r ooO.° s�o °-.>�i0o...o�°9°ioK�°o cam•__ - - •: .,o°C O:O0P�io©,0 <.0040 °80.7� 2,0•6 :•-::,:_- -;'-' ,-- STREAM '-- `' °' 0-1�_oa o • • Xo rO-QicI .'_1..' 1Oq U. oY9i90r al ,..r FL OW . r° a � 19s 044;- : o oo p�o416o o{ Yir°il =• = • - ='•' c.• O go ° e gor°e°i1asi.� 0�-oS,.- : '--' ..omie , = :- -. TOB .,oa. oo00,0�0°�0r .`oOoO o,00a go=`•. �s000 o°o;°oo� �O IO00000 oo jo°4`. ,......Q► AN .- n tent:-i I I NATURAL GROUND Q RIP-RAP c---- CROSSING7 TYPICAL PIPE SYNTHETIC FILTER FABRIC PLAN TOP OF BANK RIP RAP SHALL NOT DRAINAGE DITCH EXTEND ABOVE NORMAL OR SMALL STREAM HIGH WATER MARK `°o o °o° % OF °+''° •• ..° O O °°l0 O�O •!boo o°� NV' SYNTHETIC FILTER �. 000 ogo�o -` = ,.? `-`-_e.oy o°ii� FABRIC (AS PER EX CREEK TS o•ao ♦o°ooe°514°ao0�°1�o9 `0Oo0oeX�o.a°°ao+OoefiO� 3.1 NCDOT SPEC `1056, l 0,o� �I41 7a°"oti9coxgio4 1-401 0! .1°1' TYPE-2) CROSSING PIPE 18" CLASS I RIP-RAP 0 L 6 SECTION A-A . in NOTES: 0 N m 1) PERMANENT CROSSING FOR VEHICLE MAINTENANCE EQUIPMENT. c 2) CLASS I RIP-RAP TO BE LAID MIN. 18 INCHES THICK OVER ENTIRE AREA OF DISTURBANCE (AS DIRECTED BY ENGINEER) . 0 = 3) CLASS II RIP-RAP USED IN LARGER STREAMS (AS DIRECTED BY ENGINEER) . 0 1 4) AS PROJECT IS STABILIZED PLACE SYNTHETIC FILTER FABRIC 6 SPREAD ALL EXISTING EROSION STONE INTO PERMANENT LINER AS SHOWN. ADD STONE AS NEEDED. . 5) ANY REQUIRED ARMORING ABOVE NORMAL HIGH WATER MARK SHALL CONSIST OF = MATTING OR APPROVED VEGETATIVE COVER. C I T Y OF GREENSBORO i+ STANDARD PERMANENT CREEK STABILIZATION STD. NO. REV. . 01-91 06-05 W WITH MAINTENANCE CROSSING 214 03-97 ••PROTECTED rATffg State of North Carolina DWR Department of Environment and Natural Resources Division of Water Resources ISA NCAC 02T.0105—VARIANCE/ALTERNATIVE DESIGN REQUEST Division of Water Resources VADC 10-23&SUPPORTING DOCUMENTATION Application Number: (if applicable,to be completed by DWR) I. APPLICANT INFORMATION: 1. Applicant's name:Toyota 2. Applicant type: ❑ Individual ®Corporation ❑General Partnership ❑ Privately-Owned Public Utility ❑ Federal ❑State ❑ Municipal ❑County 3. Signature authority's name:Kevin Kerwin per 15A NCAC 02T.0106(b) Title: 4. Applicant's mailing address:5938 Julian Airport Road City:Liberty State:NC Zip:27298- 5. Applicant's contact information: Phone number:(734)223-8318 Email Address:kevin.kerwinAtoyota.com RECEIVED II. PROJECT INFORMATION: JAN 2 9 2024 1. Project name:City of Greensboro Megasite Water and Sewer Improvements Phase II 2. Project status:❑ Proposed ® Existing(if existing,Permit Number: WQ0044350) NCDEQ/DWR/NPDES III. CONSULTANT INFORMATION: 1. Professional Engineer:Matthew Watt License Number:037518 Firm:HDR Engineering,Inc.of the Carolina's Mailing address: 100 N Main Street Suite 1500 City:Winston-Salem State:NC Zip:27101-7056 Phone number:(336)995-7056 Email Address:matthew.wattAhdrinc.com IV. VARIANCE REQUEST: 1. Provide a detailed list of specific criteria that a variance request is submitted for: (e.g., NCAC 027.0305(f)-Separation,MDC for Pump Stations/Force Mains 3.04(A)(1)(b)—Discharge Piping Velocity,etc) NCAC 02T.305(g)(4)Requesting coverage under a stream for gravity sewer main. We have a 24"gravity main under a stream with just over a foot of cover and is encased on the top and sides in a mimimum of 6"concrete. The pipe is C-900 DR-18,we are requesting to leave the pipe as is and finish the stabilization for maintenance corridor per City of Greensboro detail (attached).Our survey and actual conditions changed between time of design and time of construction. Approximately 1,500 LF up stream there is a force main discharging into a manhole and there will be 2 other force main discharges added to the same manhole in the future.The pipe being C-900 PVC will be better at handling the corrosive gases. FORM: VADC 10-23 Page 1 of 2 ••PROTECTED 1'AM-fk Applicant's Certification per 15A NCAC 02T.0106(b): Kevin A. Kerwin, Engineering Manager - Environmental attest that this request for (Signature Authority's name&title from Request Item 1.3.) City of Greensboro Megasite Water and Sewer Improvements Phase II (Project name from Request Item 11.1.) has been reviewed by me and is accurate and complete to the best of my knowledge. I also understand that if all required parts of this request package are not completed and that if all required supporting information and attachments are not included,this request package will be returned to me as incomplete. I understand that by certifying this variance request, I shall adhere to the requirements of the variance approval should it be approved and all permit conditions should the permit be approved. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation,or certification in any request package shall be guilty of a Class 2 misdemeanor,which may include a fine not to exceed $10,000 as well as civil penalties up to$25,000 per violation. l /ó'Signature: Date: L( Professional Engineer's Certification: w/ . ' I, I li(,..) W ti*-- attest that this request for (Professional Engineer's name from Request/ Item 111.1.) L ,�J/ e.tt 07L G re L'1,5 ro 44_AL G(l,TG� SST,L„��n.,. ,-d T. V 1�1,_/L (Project name from Request Item 11.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations,and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design,in accordance with 15A NCAC 02T.0105(n)will provide; equal or better treatment of the waste; equal or better protection of the waters of the state;and no increased potential for nuisance conditions from noise,odor,or vermin. I further attest as been prepared in accordance with this request package and its instructions,as well as all applicable regulations and statutes. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation,or certification in any request package shall be guilty of a Class 2 misdemeanor,which may include a fine not to exceed $10,000,as well as civil penalties up to$25,000 per violation. North Carolina Professional Engineer's seal,signature,and date: VI R O/.gi, øO3758. , : E 1 1 -14--20 4 iOd/ir✓ i 1,,\1 FORM: VADC 10-23 Page 2 of 2 4' R S . ,� ROY COOPER Governor ti , ELIZABETH S.BISER , </ Secretary RICHARD E.ROGERS,JR. NORTH CAROLINA Director Environmental Quality February 6, 2023 Mr. Kevin Kerwin, Manager Toyota Battery Manufacturing, Inc. 5938 Julian Airport Road Liberty, NC 27298 Subject: Permit No. WQ0044093 Toyota Battery Manufacturing, Inc. Toyota 802 Lift Station Wastewater Collection System Extension Permit Randolph County Dear Mr. Kerwin: In accordance with your application received January 27, 2023, we are forwarding herewith Permit No. WQ0044093 dated February 6, 2023 to Toyota Battery Manufacturing, Inc., (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 02T.0403 or any individual system-wide collection system permit issued to the Permittee. Condition 11.7: Upon completion of construction and prior to operation of these permitted facilities,the completed Engineering Certification form with checklist attached to this permit shall be submitted with the required supporting documents to the address provided on the form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations,or the Minimum Design Criteria. [15A NCAC 02T.0116] It shall be responsibility of the Permittee to ensure that the as-constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to the licensing board. D ?), NorthWinston CarolinaSalem DepartRegional mentOf ofce Envi i ro450nmental WestH QanesualityMi III Division of Water Resources fi Road,Suite 300 I Winston Salem,North Carolina 27105 ,r ,> oeo.roea i m 411milmental aue� f" 336.T76.9800 Toyota Battery Manufacturing, Inc. Permit No.WQ0044093 If any parts, requirements,or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made,this permit shall be final and binding. If you need additional information concerning this matter, please contact Jenny Graznak at (336) 776- 9695 or via e-mail at ienny.graznak@ncdenr.gov. Sincerely, 1-DocuSigned by: Seftukit �0D2D3CE3F1B7456... for Richard E. Rogers,Jr. Director, Division of Water Resources by Jennifer F. Graznak,Assistant Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ cc: Matthew Watt, PE (matthew.watt@hdrinc.com) Wendy Messer(wendy.humphrey-messer@greensboro-nc.gov) Page 2 of 7 NORTH CAROLINA Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Toyota Battery Manufacturing, Inc. Randolph County for the construction and operation of approximately 2,800 linear feet of 24-inch gravity sewer; a 600— gallon per minute pump station with duplex pumps, on-site audible and visual high water alarms, telemetry and a permanent generator with automatic transfer switch; as well as approximately 750 linear feet of 8-inch force main and 6,150 linear feet of 10-inch force main to serve a battery manufacturing facility as part of the Toyota 802 Lift Station project, and the discharge of"0" gallons per day of collected industrial wastewater (flow previously allocated in Permit Number WQ0040844) into the City of Greensboro's existing sewerage system, pursuant to the application received January 27, 2023 and in conformity with 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. —DocuSigned by: .)tiAk- `—OD2D3CE3F1 B7456... for Richard E. Rogers,Jr. Director, Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0044093 Permit Issued: February 6,2023 Page 3 of 7 SUPPLEMENT TO PERMIT COVER SHEET Toyota Battery Manufacturing, Inc., is hereby authorized to: Construct,and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the City of Greensboro T.Z. Osborne Wastewater Treatment Facility in accordance with Permit Number NC0047384. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina-licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as-constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. SPECIAL CONDITIONS 1. This permit shall become voidable unless the agreement between Toyota Battery Manufacturing, Inc., and the City of Greensboro for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(g)] 2. Each pump station shall be clearly and conspicuously posted using a weatherproof sign with a pump station identifying name/number, 24-Hour Emergency telephone number, and name of the owner/operator of the sewer system/pump station and instructions to call the number in the event of alarm activation or other emergency. Simplex pump stations or vacuum sewer pits serving a single- family residence may have a placard or sticker on the control panel in lieu of a sign. [15A NCAC 02T .0305(h)(2)] II. STANDARD CONDITIONS 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection or there is a name change of the Permittee, a formalpermit request facilities to change ownership, ggq shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0116; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 02T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.0110] 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T.0110] Page 4 of 7 l 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system-wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 02T .0403. If an individual permit is not required,the following performance criteria shall be met: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day(i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High-priority sewer lines shall be inspected at least once per every six-months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease-related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs(a)through (i)of this Rule for a minimum of three years with exception of the map,which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Winston-Salem Regional Office,telephone number (336) 776-9800, as soon as possible, but in no case more than 24 hours,following the occurrence or first knowledge of the occurrence of either of the following: Page 5 of 7 a. Any process unit failure,due to known or unknown reasons,that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any SSO and/or spill over 1,000 gallons; or c. Any SSO and/or spill, regardless of volume,that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current Division approved form) within five days following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO(or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143-215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form with checklist attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings(plan & profile views of sewer lines&force mains) of the wastewater collection system extension. Final record drawings should be clear on the plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing,velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes,shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings, on the certification in the space provided, or in written summary form. Page 6of7 Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including but not limited to pipe length changes of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested modifications or variances to the Minimum Design Criteria will be reviewed on a case-by- case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After- construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case-by-case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the individual permit and construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 02T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes§143-215.6A through §143- 215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to the licensing board. [15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions,the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations,or ordinances that may be imposed by the Division any other Federal,State,or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 7 CERTIFICATION CHECKLIST To be completed by the certifying engineer prior to operation of the permitted sewers, per 15A NCAC 02T.0116. Certifying Engineer: Certification Review Date: Project: Toyota 802 Lift Station Permit No. WQ0044093 Project County: Randolph County 1) Has permittee information changed since the permit was issued (or last modified): change of mailing address, change of ownership, transfer from developer to HOA/POA, etc. Yes n No • If yes, please provide either a change of ownership form or new contact information. Note that transfer of permits from the developer to the HOA/POA must occur with the first certification. 2) Have the as-built drawings have been signed, sealed, and dated by an N.C. PE? Yes n No 3) Final Engineering certification? Yes No • If Partial Engineering certification, provide detailed narrative including what is being certified in the current phase,what was previously certified (if applicable), and what is left to be certified. 4) Adequate information related to sewer lines: Yes No N/A • Three feet minimum cover has been provided for all sewers unless ferrous pipe was installed. • Minimum diameters for gravity sewers are 8-inches for public lines and 6-inches for private lines. • Manholes have been installed: At the end of each line, at all changes in grade, size, or alignment, at all intersections, and at distances not greater than 425 feet; minimum diameter shall be 4 feet (48-inches). 5) Adequate information related to pump stations: Yes I I No N/A • Ensure power reliability option was selected per 15A NCAC 02T.0305(h). 6) Was project construction completed in accordance with all of the following: Yes No I N/A • 15A NCAC 02T, Minimum Design Criteria (MDC) for the permitting of Gravity Sewers (latest version), and MDC for the Permitting of Pump Stations and Force Mains (latest version)? If not, a variance approval is required in accordance with 15A NCAC 02T.0105(b), prior to certification and operation. • Contact the Central Office to discuss the variance to determine a course of action. • Applicant must submit two copies of the variance request form, plans, specifications, calculations, and any other pertinent information to the Central Office (one hard copy, one digital copy). • The central office will review the variance request, and if approvable, specific language regarding the variance will be incorporated into the permit, either via a special condition or a supplementary letter. A copy of the reissued permit with variance language or the variance letter must be maintained with the original documents. 7) Does the project contains high priority lines (15A NCAC 02T .0402(2))? Yes No • If yes, ensure that the permit already contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5). If the permit does not include this language,the Fast Track reviewer will reissue the permit with the appropriate language. 8) Are Permit modifications are required for any changes resulting in non-compliance with this permit(including but not limited to pipe length changes of 10%or greater, change in flow, pump station design capacity design change of 5%or greater, and/or change in the number/type of connections)? Yes n No • If yes, a permit modification request must be submitted to the appropriate Regional Office, and a modified permit with revised certification must be issued prior to certification and operation. NC DWR—Water Quality Regional Operations Section 450 West Hanes Mill Road,Suite 300,Winston-Salem, NC 27105 Winston-Salem Regional Office Phone: (336)776-9800 FAX: (336) 776-9798 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: Toyota Battery Manufacturing, Inc. PERMIT#: WQ0044093 PROJECT: Toyota 802 Lift Station ISSUE DATE: February 6, 2023 COUNTY: Randolph County This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor,Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I,the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name,Title Signature Date ENGINEER'S CERTIFICATION I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ([] periodically, ❑ weekly, full time) the construction of the project referenced above for the above Permittee, and hereby state that,to the best of my abilities, due care and diligence was used in the observation of the following construction: approximately 2,800 linear feet of 24-inch gravity sewer; a 600—gallon per minute pump station with duplex pumps, on-site audible and visual high water alarms, telemetry and a permanent generator with automatic transfer switch; as well as approximately 750 linear feet of 8-inch force main and 6,150 linear feet of 10-inch force main to serve a battery manufacturing facility as part of the Toyota 802 Lift Station project, and the discharge of "0" gallons per day of collected industrial wastewater (flow previously allocated in Permit Number WQ0040844)into the City of Greensboro's existing sewerage system,pursuant to the application received January 27, 2023; such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast- TrackPPP g Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: ❑ Final ❑ Partial (include description) Certification Comments/Qualifiers (attach if necessary): NC DWR—Water Quality Regional Operations Section 450 West Hanes Mill Road,Suite 300,Winston-Salem, NC 27105 Winston-Salem Regional Office Phone:(336)776-9800 FAX: (336)776-9798