Loading...
HomeMy WebLinkAbout20180784 Ver 1_ArabiaBay_100061_MY4_2023_20240126 FINAL MONITORING REPORT (MY4) ARABIA BAY WETLAND MITIGATION SITE Hoke County, North Carolina DMS Project ID No. 100061 Full Delivery Contract No. 7529 USACE Action ID No. SAW-2018-01151 DWR Project No. 2018-0784 RFP No. 16-007332 Cape Fear River Basin Cataloging Unit 03030004 Data Collection: January - November 2023 Submission: January 2024 Prepared for: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 1652 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1652 Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 Fx: (919) 755-9492 1101 Haynes St., Suite 211 • Raleigh, NC 27604 • www.restorationsystems.com • Ph 919.755.9490 • Fx 919.755.9492 Response to Monitoring Year 4 (2023) DMS Comments Arabia Bay Wetland Mitigation Site (DMS #100061) Cape Fear River Basin 03030004, Hoke County Contract No. 7529 Comments Received (Black Text) & Responses (Blue Text) Report & Field Visit: 1. Encroachment of approximately 300 sq. ft was observed during site visit. The encroachment was near the southeast conservation easement boundary line, next to the driveway going to the turkey coops. Please indicate what corrective action will be taken. Overall, the vegetation looked great. The encroachment area has been added to the report, CCPV, and digital submittal. The landowner was contacted and a discussion was had that noted no mowing and/or cutting of vegetation in the easement is allowed. Also, additional easement markings and horse tape will be added to this area to prevent future encroachments. Lastly, the area will be replanted with container trees from the approved mitigation plan to account for any loss of woody stems. Digital Comments: 1. The submission is complete. Thank you. The digital submission was updated to include the encroachment area observed during the DMS monitoring site visit. MY4 Monitoring Report (Project No. 100061) Executive Summary Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Arabia Bay Year 4, 2023 Monitoring Summary Wetlands • None of the 14 groundwater gauges met success criteria during the Year 4 (2023) monitoring period (Appendix C). A detailed analysis is provided in Section 2.1. • Terracell outlet structure and ditch plugs are in place and functioning as designed. • A wetland reference gauge was installed July 20, 2023 and is described in Section 2.1. Year Soil Temperatures/ Date Bud Burst Documented* Monitoring Period Used for Determining Success 10 Percent of Monitoring Period 2020 (Year 1) March 2, 2020 March 2-November 12 (256 days) 26 days 2021 (Year 2) March 1, 2021 March 1-November 12 (257 days) 26 days 2022 (Year 3) March 1, 2022 March 1-November 12 (257 days) 26 days 2023 (Year 4) March 1, 2023 March 1-November 12 (257 days) 26 days *Based on data collected from a soil temperature data logger located on the Site. Summary of Monitoring Period/Hydrology Success Criteria by Year Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) 1 Yes - 85 days (33.2%) Yes - 77 Days (28%) No – 0 Days (0%) No – 0 Days (0%) 2 Yes - 72 days (28.1%) Yes - 75 Days (27%) No – 0 Days (0%) No – 0 Days (0%) 3 Yes - 72 days (28.1%) Yes -76 Days (28%) No – 0 Days (0%) No – 0 Days (0%) 4 Yes - 93 days (36.3%) Yes - 79 Days (29%) No – 0 Days (0%) No – 0 Days (0%) 5 Yes - 95 days (37.1%) Yes - 82 Days (30%) No – 0 Days (0%) No – 0 Days (0%) 6 Yes - 36 days (14.1%) Yes - 75 Days (27%) No – 1 Day (0.5%) No – 1 Day (0.5%) 7 Yes - 77 days (30.1%) Yes - 75 Days (27%) No – 1 Day (0.5%) No – 1 Day (0.5%) 8 Yes - 85 days (33.2%) Yes - 79 Days (29%) No – 1 Day (0.5%) No – 1 Day (0.5%) 9 Yes - 94 days (36.7%) Yes - 81 Days (29%) No – 2 Days (0.8%) No – 2 Days (0.8%) 10 Yes - 69 days (27.0%) Yes - 74 Days (27%) No – 0 Days (0%) No – 0 Days (0%) 11 Yes - 28 days (10.9%) Yes - 52 Days (19%) No – 0 Days (0%) No – 0 Days (0%) 12 Yes - 61 days (23.8%) Yes - 74 Days (27%) No – 1 Day (0.5%) No – 3 Days (1.2%) 13 Yes - 34 days (13.3%) Yes - 69 Days (25%) No – 0 Days (0%) No – 0 Days (0%) 14 Yes - 31 days (12.1%) Yes - 62 Days (22%) No – 0 Days (0%) No – 0 Days (0%) MY4 Monitoring Report (Project No. 100061) Executive Summary Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Vegetation • In accordance with the monitoring schedule, vegetation plot monitoring was not performed in Year 4 (2023). Visual assessment indicates that vegetation on the Site remains vigorous, and no vegetation areas of concern were observed during Year 4 (2023) (Table 5, Appendix B). General Notes • One encroachment area totaling 0.01 acres was observed from grass mowing adjacent to the easement. This area will be replanted with gallon containerized species from the approved Site Mitigation Plan. Additional easement markings and horse tape will be added along the easement boundary to improve visibility. A conversation was had with the landowner to ensure encroachment ceases. • No evidence of nuisance animal activity (i.e., heavy deer browsing) was observed. Site Permitting/Monitoring Activity and Reporting History Activity or Deliverable Data Collection Complete Completion or Delivery Technical Proposal (RFP No. 16-007332) February 8, 2018 February 8, 2018 Institution Date (NCDMS Contract No. 7529) -- April 4, 2018 Mitigation Plan October 2018 April 30th, 2019 Construction Plans -- November 2018 Earthwork Completion -- August 13th, 2019 Planting -- January 24, 2020 As-Built Survey February 2020 March 2020 As-Built Monitoring Report February 2020 March 2020 MY1 Monitoring Report November 2020 December 2020 MY2 Monitoring Report November 2021 December 2021 MY3 Monitoring Report November 2022 December 2022 MY4 Monitoring Report November 2023 January 2024 Site Maintenance Report (2023) Invasive Species Work Maintenance work 05/23/2023 Chinaberry, Sweetgum, Mimosa, Callery Pear, and Pines 10/12/2023 Chinaberry, Privet, Mimosa, and Callery Pear None FINAL MONITORING REPORT (MY4) ARABIA BAY WETLAND MITIGATION SITE Hoke County, North Carolina DMS Project ID No. 100061 Full Delivery Contract No. 7529 USACE Action ID No. SAW-2018-01151 DWR Project No. 2018-0784 RFP No. 16-007332 Cape Fear River Basin Cataloging Unit 03030004 Data Collection: January - November 2023 Submission: January 2024 Prepared for: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 1652 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1652 Prepared by: And Restoration Systems, LLC Axiom Environmental, Inc. 1101 Haynes Street, Suite 211 218 Snow Avenue Raleigh, North Carolina 27604 Raleigh, North Carolina 27603 Contact: Ray Holz Contact: Grant Lewis 919-755-9490 (phone) 919-215-1693 (phone) 919-755-9492 (fax) MY4 Monitoring Report (Project No. 100061) Table of Contents page i Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 TABLE OF CONTENTS 1.0 PROJECT SUMMARY ....................................................................................................................... 1 1.1 PROJECT GOALS & OBJECTIVES .................................................................................................................. 1 1.2 PROJECT BACKGROUND ............................................................................................................................ 1 1.3 PROJECT COMPONENTS AND STRUCTURE .................................................................................................... 2 1.4 SUCCESS CRITERIA ................................................................................................................................... 3 2.0 METHODS ...................................................................................................................................... 3 2.1 MONITORING ......................................................................................................................................... 4 3.0 REFERENCES ................................................................................................................................... 6 APPENDICES Appendix A. Background Tables Figure 1. Project Location Table 1. Project Components and Mitigation Units Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Attributes Table Appendix B. Visual Assessment Data Figure 2. Current Conditions Plan View Table 5. Vegetation Condition Assessment Photo Log Appendix C. Vegetation Data Table 6. Planted Bare Root Woody Vegetation Appendix D. Hydrology Data Table 7. Groundwater Hydrology Data Groundwater Gauge Graphs Soil Temperature Graph Figure D1. 30-70th Percentile Graph for Rainfall Reference Gauge Soil Profile Description MY4 Monitoring Report (Project No. 100061) page 1 Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 1.0 PROJECT SUMMARY Restoration Systems, LLC (RS) has established the North Carolina Division of Mitigation Services (NCDMS) Arabia Bay Wetland Restoration Site (Site). 1.1 Project Goals & Objectives Project goals were based on the Cape Fear River Basin Restoration Priorities (CFRBRP) report (NCEEP 2009). Goals are addressed by project objectives as follows: 1. CFRBRP Goal – Reduce and control sediment inputs Site-specific objective – Cessation of row crop production and conversion of a ditched Carolina Bay to a depressional wetland, removal of agricultural sediment outputs from the Site, and control of sediments within the Site. 2. CFRBRP Goal – Reduce and manage nutrient inputs Site-specific objective – Cessation of row crop production may result in a direct reduction of 160 pounds of nitrogen and 280 pounds of phosphorus per year (based on the nutrient model) from the elimination of agricultural nutrient inputs/fertilizer application at the Site. Site-specific mitigation goals and objectives have been developed through the North Carolina Wetland Assessment Method (NC WAM) analyses of preconstruction and reference wetland systems (NC WFAT 2010) as outlined in the following table. 1.2 Project Background The Site is situated in a Carolina Bay that was historically cleared, drained, and farmed. In the NC Geological Survey 1956 aerial photograph for Hoke County, the Site was in agricultural production, indicating the area was cleared before 1956. The bay is an isolated depression surrounded by sand rims along the northwest and southeast margins. Land use adjacent to the bay includes rural residential properties, timber tracts, and additional row crops. Before construction, the Site land use was characterized entirely by agricultural row crops. Herbaceous vegetation and a few shrubby species grew along Site ditches, which were regularly maintained by bush hogging and herbicide application. Wetland Targeted Functions, Goals, and Objectives Targeted Functions Goals Objectives (1) HYDROLOGY (2) Surface Storage & Retention • Minimize downstream flooding to the maximum extent possible. • Filled agriculture ditches to restore jurisdictional hydrology • Planted native woody vegetation • Ceased row crop production within the easement • Plowed soils (6-8 inches) to reduce surface compaction and increase surface roughness • Protected the Site with a perpetual conservation easement (2) Sub-surface Storage & Retention MY4 Monitoring Report (Project No. 100061) page 2 Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Wetland Targeted Functions, Goals, and Objectives (continued) (1) WATER QUALITY (2) Pollution Change • Remove direct nutrient, sediment, and pollutant inputs from the Site. • Removed agricultural land uses and agricultural inputs from the Site • Filled the ditch network to restore ground and surface hydrology within the Site • Planted woody vegetation • Restored jurisdictional wetlands (1) HABITAT (2) Physical Structure • Improve wildlife habitat within and adjacent to the Site. • Planted woody vegetation to provide organic matter and shade • Filled ditches to provide groundwater hydrology and plant woody native vegetation • Protected the Site with a perpetual conservation easement • Restored jurisdictional wetlands (2) Landscape Patch Structure (2) Vegetation Composition The 1956 NC Geological Survey aerial photograph and 1974 aerial photograph included in the Hoke and Cumberland Counties Soil Survey show a historic ditch that was not present before Site restoration (USDA 1984). The ditch was located in the middle of the field and ran from the southeast to the northwest, connecting to the westernmost primary ditch. The historical ditch appeared to be a secondary ditch that was not necessary for agricultural production and was therefore filled in during the 1980s. A field investigation was performed using hand tools to locate the historic ditch location and determine if the subsurface clay layer was intact. Based on the field investigation, it appears the clay layer within the footprint of the historic ditch is intact. A Detailed Restoration Plan was prepared for the Site that outlined backfilling agricultural ditches and planting native forest vegetation. In addition, an outlet structure was designed as an emergency spillway if the bay filled during significant storm events. The detailed plan was approved by the NCDMS and Interagency Review Team (IRT) and implemented during the summer of 2019. 1.3 Project Components and Structure Proposed Site restoration activities generated 16.0 Non-riparian Wetland Mitigation Units (WMUs) resulting from 16.1 acres of non-riparian wetland restoration. Additional activities that occurred at the Site included the following: • Moving the access road off the Carolina bay bed and onto the adjacent sand rim. The road was built according to the construction plans at an average elevation of 223 feet, • Installation of an overflow drop structure to release water from the Carolina bay during significant storm events (at a water depth of approximately 2.5 feet in the Carolina bay bottom), • Excavation of shallow, elliptical depressions to form hummocks and pools for habitat variation across the Site, • Plant 16.1 acres of the Site with 10,300 stems (planted species and densities by zone are included in Table 6 [Appendix C]). • A permanent seed mix was applied across the Site. MY4 Monitoring Report (Project No. 100061) page 3 Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Site design was completed in November 2018. Construction started on August 5, 2019, and ended with a final walkthrough on August 22, 2019. The Site was planted on January 24, 2020, and visited by IRT members in May 2020. Completed project activities, reporting history, completion dates, project contacts, and background information are summarized in Tables 1-4 (Appendix A). 1.4 Success Criteria Project success criteria were established per the October 24, 2016, NC Interagency Review Team Wilmington District Stream and Wetland Compensatory Mitigation Update. Monitoring and success criteria relate to project goals and objectives. Several goals and objectives are assumed to be functionally elevated by restoration activities without direct measurement from a mitigation perspective. Other goals and objectives will be considered successful upon achieving success criteria. The following table summarizes Site success criteria. Success Criteria Wetland Hydrology • Saturation or inundation within the upper 12 inches of the soil surface for, at a minimum, 10 percent of the growing season, during average climatic condition based on the Wilmington District Stream and Wetland Compensatory Mitigation Update (USACE 2016), Table 1, for a Typic Paleaquult (Rains). Vegetation • Within planted portions of the Site, a minimum of 320 stems per acre must be present at year 3; a minimum of 260 stems per acre must be present at year 5; and a minimum of 210 stems per acre must be present at year 7. • Trees must average 7 feet in height at year 5, and 10 feet in height at year 7 in each plot. • Planted and volunteer stems are counted, provided they are included in the approved planting list for the Site; natural recruits not on the planting list may be considered by the IRT on a case-by-case basis. • Any single species can only account for 50% of the required stems within any vegetation plot. o Ephemeral pool "habitat areas" are a normal component of Carolina bays. Areas of freshwater marsh are expected to be comprised of herbaceous emergent vegetation and not forested woody vegetation. Ephemeral pool "habitat areas" are expected to encompass approximately 20% of the bay area and should not be held to the above vegetative success criteria. 2.0 METHODS Monitoring requirements and success criteria outlined in this plan follow the October 24, 2016, NC Interagency Review Team Wilmington District Stream and Wetland Compensatory Mitigation Update. Monitoring will be conducted by Axiom Environmental, Inc. Annual monitoring reports of the data collected will be submitted to the NCDMS by Restoration Systems no later than December 31 of each monitoring year data is collected. The monitoring schedule is summarized in the following table. MY4 Monitoring Report (Project No. 100061) page 4 Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Monitoring Schedule Resource Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Wetlands X X X X X X X Vegetation X X X X X Visual Assessment X X X X X X X Report Submittal X X X X X X X 2.1 Monitoring The monitoring parameters are summarized in the following table. Monitoring Summary Wetland Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Wetland Restoration Groundwater gauges As-built, Years 1, 2, 3, 4, 5, 6, and 7 throughout the year with the growing season defined as March 2-November 12 14 gauges spread throughout restored wetlands Soil temperature* at the beginning of each monitoring period to verify the start of the growing season, groundwater and rain data for each monitoring period Visual Assessment As-built, Years 1, 2, 3, 5, and 7 Terracell outlet structure and ditch plugs Visually inspect features to ensure they are performing as designed and retaining hydrological inputs Vegetation Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Vegetation establishment and vigor Permanent vegetation plots 0.0247 acre (100 square meters) in size; CVS-EEP Protocol for Recording Vegetation, Version 4.2 (Lee et al. 2008) As-built, Years 1, 2, 3, 5, and 7 14 plots spread across the Site Species, height, planted vs. volunteer, stems/acre Annual random vegetation plots, 0.0247 acre (100 square meters) in size As needed As needed Species *Soil Temperature will be measured with a continuous recording soil probe. Temperatures will be measured from February to the end of April in each monitoring year. MY4 Monitoring Report (Project No. 100061) page 5 Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Wetland Summary Summary of Monitoring Period/Hydrology Success Criteria by Year *Based on data collected from a soil temperature data logger located on the Site. None of the 14 groundwater gauges met success criteria during the Year 4 (2023) monitoring period (Appendix D). Except for several significant but sporadic rain events, rainfall amounts remained low through March, April, and May (Figure D1, Appendix D). Under normal rainfall conditions, the water table is expected to be elevated during these months before dropping off for the dry season. Due to this unseasonable dryness, all portions of the Site remained visibly dry throughout the year. A visual assessment of the terracell outlet and ditch plugs found that all features are intact and performing as designed. There is no indication that these features are failing to retain hydrological inputs. A reference gauge was installed on July 20, 2023. The reference location is ~1.75-miles west of the Site and was selected in a similarly sized Carolina Bay within the same mapped soil series, McColl loam, as the Site (Figure 1, Appendix A). Also, a review of historic imagery and discussions with the landowner indicated the area has not been ditched. The vegetation is currently a successional Nonriverine Wet Hardwood Forest, as the area was timbered between 2004-2005. A detailed soil profile description was recorded at the time of the gauge installation (Appendix D). Reference gauge data indicate that the reference wetland remained dry July through November. The gauge will continue to be monitored for the remainder of the monitoring period, and data will be compared with Site hydrology. Vegetation Summary In accordance with the monitoring schedule, vegetation plot monitoring was not performed in Year 4 (2023). Visual assessment indicates that vegetation on the Site remains vigorous, and no vegetation areas of concern were observed during Year 4 (2023) (Table 5, Appendix B). Year Soil Temperatures/Date Bud Burst Documented* Monitoring Period Used for Determining Success 10 Percent of Monitoring Period 2020 (Year 1) March 2, 2020 March 2-November 12 (256 days) 26 days 2021 (Year 2) March 1, 2021 March 1-November 12 (257 days) 26 days 2022 (Year 3) March 1, 2022 March 1-November 12 (257 days) 26 days 2023 (Year 4) March 1, 2023 March 1-November 12 (257 days) 26 days MY4 Monitoring Report (Project No. 100061) page 6 Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 3.0 REFERENCES Lee, M.T., R.K. Peet, SD. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation. Version 4.2. North Carolina Department of Environment and Natural Resources, Ecosystem Enhancement Program. Raleigh, North Carolina. North Carolina Ecosystem Enhancement Program (NCEEP). 2009. Cape Fear River Basin Restoration Priorities 2009 (online). Available: http://portal.ncdenr.org/c/document_library/get_file?uuid=864e82e8-725c-415e-8ed9- c72dfcb55012&groupId=60329 North Carolina Wetland Functional Assessment Team. (NC WFAT 2010). NC Wetland Assessment Method (NC WAM) User Manual. Version 4.1. Schafale, M.P. and A.S. Weakley. 1990. Classification of the Natural Communities of North Carolina: Third Approximation. North Carolina Natural Heritage Program, Division of Parks and Recreation, North Carolina Department of Environment, Health, and Natural Resources. Raleigh, North Carolina. United States Department of Agriculture (USDA). 1984. Soil Survey of Cumberland and Hoke Counties, North Carolina. United States Department of Agriculture, Soil Conservation Service. United States Department of Agriculture (USDA). 2017. Web Soil Survey (online). Available: https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm [May 8, 2018]. United States Department of Agriculture. MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Appendix A Background Tables and Map Figure 1. Project Location Table 1. Project Components and Mitigation Units Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Attributes Table Copyr ight :© 2013 Na tion al G eo gr aphic So ciet y, i-c ubed FIGU R E Dra wn b y: Da te: Sca le : Pro jec t N o.: KRJ DEC 2023 1:20,000 18-016 Tit le: Pro jec t: Pre pa red fo r: Hoke County, N C ARA BIA B AYWETLANDMITIGATION SITE SITE LOCATION 1 ³ Copyr ight :© 2013 Na tion al G eo gr aphic Societ y, i-cube d Copyr ight :© 2013 Na tion al G eo gr aphic Societ y, i-cube d Dir ect ion s to the Si te fro m Ra leig h:- Ta ke I-40 E o ut of Ra lei gh ; tr av el ~3 0 m il es- Ta ke ex it 32 8A to m erg e on to I -95 S ; tr av el ~4 0 m il es- Ta ke ex it 41 for N C-5 9 t ow ar ds Ho pe M ills an d P ar kto n- Tu rn rig ht on to NC -5 9 N , a nd af ter 0.7 m ile s, tur n l eft on to Sh ipm an R d- Af ter 1 m il e, t urn ri gh t o nto U S-3 01 S; tra ve l 2 .4 mil es- Tu rn rig ht on to NC -7 1 S ; t rav el 2.7 m ile s- Tu rn rig ht on to 3r d S t a nd co nti nu e s tra igh t o nt o B ar low R d a nd C has on R oa d; app ro x. 5.5 m iles- Tu rn le ft o n Ar ab ia R d ; tr ave l a pp rox . 3 m ile s- T he S ite is loc ate d on the ri gh t, d ow n a g rav el dri ve wa y.- S ite L atit ud e, Lon gi tud e 34.95 70, -7 9.1 37 9 (W G S8 4) US GS 7.5 Min ute Top og raph ic Ma p (R ae ford an d Pa rkton , N C Quad s) Ra eford ¬«20 Lege nd Ara bia Ba y E a se m en t = 16 .1 a c. NC DO T Ro a d s R o c k f i s h Creek ArabiaRoad Pate Road LASandyRoad ¬«20 Arabia Road R o c k f i s h R o a d R e d S p r i n g s R o a d £¤401 R efe ren ce Gau g e Lo ca tio n MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Table 1. Project Components and Mitigation Credits Arabia Bay Restoration Site Reach ID Wetland Type Existing Acreage Restoration Acreage Restoration Level Restoration or Restoration Equivalent Mitigation Ratio Mitigation Credits Wetland Restoration Non-riparian -- 16.000 Restoration 16.000 1:1 16.000 Length & Area Summations by Mitigation Category Restoration Level Non-riparian Wetland (acreage) Restoration 16.000 Overall Assets Summary Asset Category Overall Credits Non-riparian Wetland 16.000 Table 2. Project Activity and Reporting History Arabia Bay Restoration Site Activity or Deliverable Data Collection Complete Completion or Delivery Technical Proposal (RFP No. 16-007332) February 8, 2018 February 8, 2018 Institution Date (NCDMS Contract No. 7529) -- April 4, 2018 Mitigation Plan October 2018 April 30th, 2019 Construction Plans -- November 2018 Earthwork Completion -- August 13th, 2019 Planting -- January 24, 2020 As-Built Survey February 2020 March 2020 As-Built Monitoring Report February 2020 March 2020 MY1 Monitoring Report November 2020 December 2020 MY2 Monitoring Report November 2021 December 2021 MY3 Monitoring Report November 2022 December 2022 MY4 Monitoring Report November 2023 January 2024 MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Table 3. Project Contacts Table Arabia Bay Restoration Site Full Delivery Provider Restoration Systems 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Worth Creech 919-755-9490 Construction Contractor Land Mechanic Designs 780 Landmark Road Willow Spring, NC 27592 Lloyd Glover 919-639-6132 Designer Axiom Environmental, Inc. 218 Snow Avenue Raleigh, NC 27603 Grant Lewis 919-215-1693 Planting Contractor Restoration Systems 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Worth Creech 919-755-9490 Construction Plans and Sediment and Erosion Control Plans Sungate Design Group, PA 915 Jones Franklin Road Raleigh, NC 27606 Joshua G. Dalton, PE 919-859-2243 As-built Surveyor K2 Design Group 5688 US Highway 70 East Goldsboro, NC 27534 John Rudolph 919-751-0075 Baseline & Monitoring Data Collection Axiom Environmental, Inc. 218 Snow Avenue Raleigh, NC 27603 Grant Lewis 919-215-1693 MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Table 4. Project Attribute Table Arabia Bay Restoration Site Project Information Project Name Arabia Bay Restoration Site Project County Hoke County, North Carolina Project Area (acres) 16.1 Project Coordinates (latitude & latitude) 34.9570ºN, 79.1379ºW Planted Area (acres) 16.1 Project Watershed Summary Information Physiographic Province Piedmont Project River Basin Cape Fear USGS HUC for Project (14-digit) 03030004150011 NCDWR Sub-basin for Project 03-06-15 Project Drainage Area (acres) NA Percentage of Project Drainage Area that is Impervious <5% CGIA Land Use Classification Cultivated Wetland Summary Information Parameters Wetlands Wetland acreage 16.1 acres drained Wetland Type Non-riparian Mapped Soil Series McColl Drainage Class Poorly drained Hydric Soil Status Hydric Source of Hydrology Precipitation, groundwater Hydrologic Impairment Ditched and drained Native Vegetation Community Bay Forest/Small Depression Pocosin % Composition of Exotic Invasive Vegetation 0% Restoration Method Hydrologic, vegetative Enhancement Method NA Regulatory Considerations Regulation Applicable? Resolved? Supporting Documentation* Waters of the United States-Section 401 Yes Yes Approved JD (App D Mitigation Plan) Waters of the United States-Section 404 Yes Yes Approved JD (App D Mitigation Plan) Endangered Species Act Yes Yes CE Document (App E Mitigation Plan) Historic Preservation Act Yes Yes CE Document (App E Mitigation Plan) Coastal Zone Management Act No -- CE Document (App E Mitigation Plan) FEMA Floodplain Compliance No -- CE Document (App E Mitigation Plan) Essential Fisheries Habitat No -- CE Document (App E Mitigation Plan) *Included in the Detailed Mitigation Plan MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Appendix B Visual Assessment Data Figure 2. Current Conditions Plan View Table 5. Vegetation Condition Assessment Photo Log &3 !( !( !( !( !( !( !( !( !( !( !( !( !( !( 9 8 7 6 5 4 3 2 1 14 13 12 11 10 3 2 5 9 8 1 6 4 7 11 14 13 10 12 NCCG IA, NC 9 11 Boar d FIGU R E Dra wn b y: Da te: Sca le : Pro jec t N o.: KRJ JA N 2024 1:1200 18-016 Tit le: Pro jec t: Pre pa red fo r: Hoke County, N C ARABI A BAYWETLANDMITIGATIONSITE CUR RE NTCONDITIONSPLAN VIEW 2 ³ Le g en d Ar abia Bay Easement = 16.1 ac Wet land Rest oration = 16.1 ac Habitat Pool s = 1.6 ac CVS Plots M eet ing Success Cri teria Dur ing Year 3 CVS Plots Not Meeti ng Success Cr it er ia Dur ing Year 3 !(Groundwater Gauges Not Meeti ng Success Cr it er ia &3 Rai n Gauge/Soi l Tem per ature Logger MY4 (2023) Encroachm ent 0 300 600150Feet Table 5 Vegetation Condition Assessment Arabia Bay Planted Acreage1 16.1 1. Bare Areas None 0.1 acres none 0 0.00 0.0% 2. Low Stem Density Areas None 0.1 acres none 0 0.00 0.0% 2B. Low Planted Stem Density Areas None 0.1 acres none 0 0.00 0.0% 0 0.00 0.0% 3. Areas of Poor Growth Rates or Vigor None 0.25 acres none 0 0.00 0.0% 0 0.00 0.0% Easement Acreage2 16.1 4. Invasive Areas of Concern4 None 1000 SF none 0 0.00 0.0% 5. Easement Encroachment Areas3 Small area of encroachment along the eastern easement boundary none Yellow Hatching 1 0.01 0.0% CCPV Depiction Number of Polygons Combined Acreage % of Easement Acreage Vegetation Category Definitions Mapping Threshold % of Planted Acreage Total Cumulative Total Vegetation Category Definitions Number of Polygons Mapping Threshold CCPV Depiction Combined Acreage 1 = Enter the planted acreage within the easement. This number is calculated as the easement acreage minus any existing mature tree stands that were not s ubject to supplemental planting of the understory, the channel acreage, crossings or any other elements not directly planted as part of the project effort. 2 = The acreage within the easement boundaries. 3 = Encroachment may occur within or outside of planted areas and will therefore be calculated against the overall easement acreage. In the event a polygon is cataloged into items 1, 2 or 3 in the table and is the result of encroachment, the associated acreage should be tallied in the relevant item (i.e., item 1,2 or 3) as well as a parallel tally in item 5. 4 = Invasives may occur in or out of planted areas, but still within the easement and will therefore be calculated against the overall easement acreage. Invasives of concern/interest are listed below. The list of high concern spcies are those with the potential to directly outcompete native, young, woody stems in the short-term (e.g. monitoring period or shortly thereafter) or affect the community structure for existing, more established tree/shrub stands over timeframes that are slightly longer (e.g. 1-2 decades). The low/moderate concern group are those species that generally do not have this capacity over the timeframes discussed and therefore are not expected to be mapped with regularity, but can be mapped, if in the judgement of the observer their coverage, density or distribution is suppressing the viability,density, or growth of planted woody stems. Decisions as to whether remediation will be needed are based on the integration of risk factors by DMS such as species present, their coverage, distribution relative to native biomass, and the practicality of treatment. For example, even modest amounts of Kudzu or Japanese Knotweed early in the projects history will warrant control, but potentially large coverages of Microstegium in the herb layer will not likley trigger control because of the limited capacities to impact tree/shrub layers within the timeframes discussed and the potential impacts of treating extensive amounts of ground cover. Those species with the "watch list" designator in gray shade are of interest as well, but have yet to be observed across the state with any frequency. Those in red italics are of particular interest given their extreme risk/threat level for mapping as points where isolated specimens are found, particularly ealry in a projects monitoring history. However, areas of discreet, dense patches will of course be mapped as polygons. The symbology scheme below was one that was found to be helpful for symbolzing invasives polygons, particulalry for situations where the conditon for an area is somewhere between isolated specimens and dense, discreet patches. In any case, the point or polygon/area feature can be symbolized to describe things like high or low concern and species can be listed as a map inset, in legend items if the number of species are limited or in the narrative Photo 1: Looking southeast across site MY4 (2023) Monitoring Report (Project No. 100061) Appendices Arabia Bay Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 2: Looking northwest across the site Arabia Bay MY-04 (2023) Photo Log Photo 3: Mowing along well-marked easement boundary (no encroachment) Photo 4: Quercus michauxii Arabia Bay MY-04 (2023) Photo Log MY4 (2023) Monitoring Report (Project No. 100061) Appendices Arabia Bay Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 5: Easement boundary, looking northwest Photo 6: Easement boundary, looking west Arabia Bay MY-04 (2023) Photo Log MY4 (2023) Monitoring Report (Project No. 100061) Appendices Arabia Bay Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 7: Plot 5, looking north Photo 8: From Plot 2, looking north Arabia Bay MY-04 (2023) Photo Log MY4 (2023) Monitoring Report (Project No. 100061) Appendices Arabia Bay Stream and Wetland Mitigation Site Restoration Systems, LLC Arabia Bay MY-04 (2023) Photo Log Photo 9: Bud burst on Prunus serotina (Taken 2/28/23) Photo 10: Bud burst on Quercus sp. (Taken 2/28/23) MY4 (2023) Monitoring Report (Project No. 100061) Appendices Arabia Bay Stream and Wetland Mitigation Site Restoration Systems, LLC MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Appendix C Vegetation Data Table 6. Planted Bare Root Woody Vegetation MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Table 6. Planted Bare Root Woody Vegetation Arabia Bay Restoration Site Nonriverine Wet Hardwood Forest Species Quantity Percentage Cephalanthus occidentalis 100 1% Fraxinus pennsylvanica 600 6% Magnolia virginiana 1,000 10% Nyssa sylvatica v sylvatica 1,000 10% Quercus bicolor 600 6% Quercus laurifolia 1,000 10% Quercus michauxii 600 6% Quercus nigra 1,000 10% Quercus pagoda 600 6% Taxodium distichum 800 8% 7,300 71% Cypress Savanna (Habitat Pools) Species Quantity Percentage Nyssa sylvatica v biflora 1,000 10% Taxodium ascendens 2,000 19% 3,000 29% Totals = 10,300 MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Appendix D Hydrology Data Table 6. Groundwater Hydrology Data Groundwater Gauge Graphs Soil Temperature Graph Figure D1. 30-70th Percentile Graph for Rainfall Reference Gauge Soil Profile Description MY4 Monitoring Report (Project No. 100061) Appendices Arabia Bay Wetland Restoration Site Restoration Systems, LLC Hoke County, North Carolina January 2024 Table 6. Groundwater Hydrology Data Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) 1 Yes - 85 days (33.2%) Yes - 77 Days (28%) No – 0 Days (0%) No – 0 Days (0%) 2 Yes - 72 days (28.1%) Yes - 75 Days (27%) No – 0 Days (0%) No – 0 Days (0%) 3 Yes - 72 days (28.1%) Yes -76 Days (28%) No – 0 Days (0%) No – 0 Days (0%) 4 Yes - 93 days (36.3%) Yes - 79 Days (29%) No – 0 Days (0%) No – 0 Days (0%) 5 Yes - 95 days (37.1%) Yes - 82 Days (30%) No – 0 Days (0%) No – 0 Days (0%) 6 Yes - 36 days (14.1%) Yes - 75 Days (27%) No – 1 Day (0.5%) No – 1 Day (0.5%) 7 Yes - 77 days (30.1%) Yes - 75 Days (27%) No – 1 Day (0.5%) No – 1 Day (0.5%) 8 Yes - 85 days (33.2%) Yes - 79 Days (29%) No – 1 Day (0.5%) No – 1 Day (0.5%) 9 Yes - 94 days (36.7%) Yes - 81 Days (29%) No – 2 Days (0.8%) No – 2 Days (0.8%) 10 Yes - 69 days (27.0%) Yes - 74 Days (27%) No – 0 Days (0%) No – 0 Days (0%) 11 Yes - 28 days (10.9%) Yes - 52 Days (19%) No – 0 Days (0%) No – 0 Days (0%) 12 Yes - 61 days (23.8%) Yes - 74 Days (27%) No – 1 Day (0.5%) No – 3 Days (1.2%) 13 Yes - 34 days (13.3%) Yes - 69 Days (25%) No – 0 Days (0%) No – 0 Days (0%) 14 Yes - 31 days (12.1%) Yes - 62 Days (22%) No – 0 Days (0%) No – 0 Days (0%) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 1 Year  4 (2023 Data) End Growing Season November 12 Start Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 2 Year  4 (2023 Data) End Growing Season November 12 Start Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 3 Year  4 (2023 Data) End Growing Season  November 12 Start Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 4 Year  4 (2023 Data) End Growing Season November 12 Start Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 5 Year  4 (2023 Data) End Growing Season Start Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 6 Year  4 (2023 Data) End Growing Season November 12 Start Growing Season March 1 1 Day 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 7 Year  4 (2023 Data) Start Growing Season March 1 End Growing Season November 12 1 Day 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 8 Year  4 (2023 Data) End Growing Season  November 12 Start Growing Season March 1 1 Day 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 9 Year  4 (2023 Data) End Growing SeasonStart Growing Season March 1 2 Days 1 Day Shuttle malfunction 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 10 Year  4 (2023 Data) End Growing Season November 12 Start Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 11 Year  4 (2023 Data) End Growing SeasonStart Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 12 Year  4 (2023 Data) Start Growing Season March 1 End Growing Season November 12 3 Days 2 Days 1 Day 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 13 Year  4 (2023 Data) End Growing Season November 12 Start Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Gauge 14 Year  4 (2023 Data) End Growing Season November 12 Start Growing Season March 1 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 14 16 18 20 22 24 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l   Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Arabia Bay Groundwater Reference Year  4 (2023 Data) End Growing Season November 12 Start Growing Season March 1 Reference gauge installed 7/20/23 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Te m p e r a t u r e  (D e g r e e s  Fa h r e n h e i t ) Arabia Bay Soil Temperature  Data Year  4 (2023)  March 15: 47.05°F March 1: 60.57°F 0 1 2 3 4 5 6 7 8 Ra i n f a l l A m o u n t i n I n c h e s Figure D1: Arabia Bay 30-70 Percentile Graph for Rainfall Current year data from onsite rain gauge 30-70th percentile data from WETS Station: Fayetteville, NC 2020 2021 2022 2023 30th Percentile 70th Percentile SOIL PROFILE DESCRIPTION FORM PROFILE ID:____________ NAME: _____________________________________ DATE:____________________________________ PROJECT NUMBER/NAME: __________________________________________________________________________________ LOCATION: _______________________________________________________________________________________________ WEATHER: ________________________________________________________________________________________________ LANDSCAPE POSITION: ________________________________ SLOPE (%): _______________________________________ VEGETATION/CROP: _______________________________________________________________________________________ SOIL MAP UNIT: __________________________ HYDRIC SOIL FIELD INDICATOR:________________________________ DEPTH TO WATER: _____________________________ DEPTH TO SHWT: _______________________________ DEPTH (inches) MATRIX REDOXIMORHPIC FEATURES TEXTURE COLOR % TYPE1/LOCATION2 COLOR % 0-6 10YR 2/1 100 SL 6-13 10YR 5/1 60 D/M 10YR 3/1 40 C 13-20 10YR 5/1 85 D/M 10YR 3/1 15 C 20-29+ 10YR 4/6 SCL 1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. 2Location: PL=Pore Lining, M=Matrix. NOTES: Photo 1 A. Baldwin July 20, 2023 Arabia Bay – Reference 2190 Arabia Rd, Raeford, NC (34.959864, -79.169201) Cloudy 72° Carolina Bay 0 Successional forest (pines, red maple, sweet gum, holly, blueberry, smilax) Mc - McColl F3 – Depleted Matrix N/A ~6-inches Timbered b/w 2003-2005, water marks on trees Arabia Reference