HomeMy WebLinkAboutNCC240219_ESC Approval Submitted_20240129 dL+YNLq.
ROY COOPER
Governor -_
1 .,�
ELIZABETH S. BISER :ka
ew..d7
WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA
lnterlm Director Environmental Quality
January 19, 2024
LETTER OF APPROVAL WITH MODIFICATIONS
Journey Investments Group, LLC
Attention: John Cambert, Coo
6549 Morehead Road
Harrisburg,North Carolina 28075
RE: Project Name: The Flats at Gibson Village
Project ID: CABAR-2024-015
Acres Approved: 1.51
County: Cabarrus
City: Concord
Location: Railroad Drive NW
River Basin: Yadkin Pee Dee
Stream Classification: Other
Submitted By: Woodbine Design, P.C.
Date Received by LQS: January 5, 2024
Plan Type: Revised
Dear Mr. Cambert:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019. all new construction activities are required to complete and submit an electronic
Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete,you will receive a link
with payment instructions for the S120 annual permit fee. After the fee is processed, you will receive the
COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at dea.nc.aov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 1 5A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on
file at the job site:
North Carolina Department of Environmental Quality Division of Energy-Mineral,and Land Resources
Mooresville Regional Office 610 East Center Avenue Suite 301 \Iroresalle,Nonh Carolina:gl 13
roar 704.663-169g
Letter of Approval with Modifications
Journey Investments Group, LLC
January 19, 2024
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office of
the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
i It pa \-.06(
athryn S. Peterson
Assistant Regional Engineer
Land Quality Section
KSP
Enclosure: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
c: Woodbine Design, P.C.
Attention: Peyton Woody
20816 North Main Street, Suite 204
Cornelius, North Carolina 28031
North Carolina Department of Environmental Quality Division.1'1 nern \hncr 1,and Land Resources
Mooresville Regional Office 610 Cast Center Avenue Suite 301 \Luxesulle Non!'Carolina 28115
�.+r 704-663-1699
Letter of Approval with Modifications
Journey Investments Group, LLC
January 19, 2024
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: The Flats at Gibson Village
Project ID: CABAR-2024-015
County: Cabarrus
Reviewed by: Kathryn S. Peterson
1. Revise the Registered Agent information located in Part B 2(a) of the Financial
Responsibility/Ownership Form to reflect what is listed on the Secretary of State website. Send in a
copy of the Financial Responsibility/Ownership form with this field filled out.
2. The proposed skimmer basin must remain until all areas draining towards it are stabilized. Diversion
ditches shall be adjusted daily as the site grading progresses to ensure positive drainage to the
sediment basin.
3. Inlet A 1.1 must be blocked, and offsite flow shall remain diverted to the 18 inch bypass until the site
is stabilized and the skimmer basin is removed.
4. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take
those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
4onh Carolina Department or Environmental Quality Division of Energy Mineral and Land Resources
Mooresville Regional Office MO East Center Avenue,Suite 301 looressd]e.North Carolina 2g115
'u4-663-1699
E
I 14 7 I I J II 111- II II I•
I I 1 40011
1 I
1 ' - I 11
_yolud mtI,� III 1+I I I
II 11E11111 1 11041I
-.y 1 a r pL 1 _- 1
liii I10 I 14 - n4 III - 111 II II IIIIIII _1 ■ 1 II 1 11 a I
,.1_ ._. __I I- — 1 1-►.J U I .i • li _ Em- 11I - �1 - - -I
1 11 � Hill• •I (T-r _ -11l1.55? Al A r II Ai- II 1 ITT
H :1 I Ill.
T P II ]II irh ' if 1 1 1T I-� r r 4 Fr 1 - a �
I_ �: . I L (iN I_ - II J I II 1111 -I III I 11 i'a
I _LI
-
- - _� I I 1,1 _ I 1 I
II III II i
1 - - - n i, .« ' - m - -
1 I I I I II I III I I
1 . I 11 I I * T I �•
I
I I
I
I II
1
- 1 1
1
1
111
1
I -
1 1
i - - - - — - - - -- —