HomeMy WebLinkAboutNCC240245_Site Plan or Location Map_20240129 V SODDING
�C' DATE PAGE DATE: PAGE:
. PATTERN.BUTIHRS sins,
nanny AnAssi EA.°THE, so
PNEP "�� A"SELFINSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS _ —uw son In:srysoseso
0'MIN _ /SILT FENCE /
113A-561"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN
C "., M •• axos.wo Tn Nx xsoscas. EXCEL SPREADSHEET '` rIIIIII /I'
AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND General Erosion Control Notes L. HIM •
/ I t
MIMI ce.cxso p00evr v. SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A NCAC O4B. •
a0 /y`y
E,g ONtBE`I60� 0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING 1.Only the areas shown shall be disturbed.
{ • • •
00
OPe' se-�1 "a EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND 2IXIPPECT .All disturbed areas shell be grassed and •
•
Q' �
\ 1Sv SITE o SEDIMENTATION CONTROL PLAN OR BY COMPLETING,DATING AND SIGNING AN INSPECTION mulched as soon as possible and maintained THE WASHED •
�`G / •� � •w7p
pOt' REPORT THAT LISTS EACH MEASURE,PRACTICE OR DEVICE SHOWN ON THE APPROVED until pemaneM rover s established. QJ ':.'�'� .on
/� cntNE g�p rc EROSION AND SEDIMENTATION CONTROL PLAN.' HARDWARE CLOTH FaorvrvlEw +. ��� � �•
Q
" Persu ant to G.S.113A(3), provisions for permanent ground cover sufficient to restain //. t�ti
aR
e u erosion FENCE
N ��4. s
�F a-m f III must be accomplished for all disturbed areas within 14 working days or 90 calendar days `,••- v1 y�`°ii°i �_
3 aNORs� ull !U IIH11G (whichever is shorter) following completion of construction. FILTER OF $� _952 B[...-
2' CLOTH NDH R WARE ,' Mn. '�4}'r `.,:::`fj �::: .y"
R pfiiii d
N� To 60ESTABLISHED-in 2, 'GROUND NOTES: INTO SOLID AND HARDWARE / i1 tic
344, wT".xasat. TactLOutoO11sP6LXES9�a Hicx lr rl. EM°are �m�p 6�+ 1.Hand ne cloth antl gravel shoultl overlay rho siftfence at least l2 za curse Aooregele yn LT
'�swxrsAPPEARANCE OF GOOD SOD S°sg Scher.
2.Stone ougete should be placed on low elevation areas of sift fence Construction: Maintenance:
and based on field conditions.
N V TV 0 PO 1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-in inspect at least once a week and alter each 1 inch or
II n \\�\ MAINTENANCE: properly grade it. t tillanyrequirerepairs immediately.
OHO FWNAtE (I (II I )I I III 1,
I um,wxx°x.. BURY WIRE FENCE AND
HARDWARE CLOTH `"Rv F 1.Per NCG-01,inspect outlet at lest once a week and after each 1 inch en 2.Flace• nthe and
Ito the specific de and dimensions shown On the lens,end 2.Maintain the
;make d distal
VICINITYMAP fi.\i IIIl I II Iifi II arER FAaRIC IN rRENCN greater rainfall event Complete any required repairs lmmetllately. grave peel grade p grovel pad iris condition to prevent mud or sediment
/ 4 1 {I II u 2 Freshen stone when sediment accumulation exceeds 6'nches. smooth t from leaving the construction site.This may require periodic
N.T.S. _ 3 Provide drainage to carry water to a stability
trap or other suitable outlet topmresseg with 2inch stone
arora max. 3 Keep mesh free of debris to provide adequate flow. 4 Use geotext le fabrics'n order to improve stability of the foundation in locations 3 Immediately remove all objectionable materials spilled,washed or
• .c am sECT ON VIEW 4,Remove sedistone
as
when half of stone outlet s covered. subject to seepage or high water table tracked onto publ c roadways.
^Y �3"�'ls+- *x °E'"E°OO�"car WC£n ental.jpeg 5.Raplacestone as nestled to facilitate tle watering.
"cx9Ow xoaom„x°un,< �ry'�'
I SILT FENCE OUTLET CONSTRUCTION ENTRANCE/EXIT
CONSTRUCTION SCHEDULE \ I l� _,_ _ _
L Obtain all necessary semris and plan alp vats. on and Sediment Connol(ESSC)nemr and a Certificate of Coverage I — i i i
plan m muse be obtained berme any land disturbing b x.Erosion
accessible
occur.A coon In the iOn. mil ache COC and a hard copy o[the 1 I ) / i i//i /
p b p preferably permits box and accessible during inspection. '—
2.Install g - knees reinforced silt fence
I d I I iii
3.Finish clearing d grubbing Y necessary on the lots as they are d. / \ r0---_..5----?-------- / i i i
4 B gin 1 grading d i i� i \ DATE: —a M care Fence\r—Filter Fabric PAGE:
5,Begin or continue with house construction activities. / /i� / 3 fence ,
6,Finish all rough grading and house construction. / \ I /ice/ ���� I I °Ba 6Max Extra strength jabot without fenc
e Wire Fence Ba kfill trench
J.wall err walks a /��/ 5 end Compact
g.Begin finegrading fl i// i i Cr 1 Steel Poet thoroughly
9.Fival dstabilizingf I I R will involve h installation of sod on the lot The silt fence will /i/ i i t 7
remain'a g theBI ddd stabilized date hold. / \ i% /i�� I
10 The con shall J If' f M1 d sedimentation I az and complete the following /i // / ` to zn Upsbpe
combined If f found theDEMLR b j /i i Plastic or Y d" —'
http:/ deg g b 4 - gY - d d s/ P&M pd nsirmfon Program / \ \ \ ///%/ // /---
Twelve I ) I I Wire ties �'kbn
hs f I f hallb k pt eM '1 bl f all I mmendedaj
y bete t»' b Ref G.S.113A 54.1 into hG113A 575m 15A NCAC OOA0101 thro M115A i %�/
NCAC 04E OSOOG IP 'NCG OIOWONPDESf C Activities. \ \ \ /// / . ' /. /// I
i/
A:
Selfinsp e a sedimentation control be perforated least m calendar days and I� V\/\/
withing h f very vent of greater Man h. y needed reparrs shall be made immediately to maintain measures as / /�/ /�%i/ {H r,cog treiwn /
// mwnaa'rorvam
1 X/y\
designed.AIIESC shall bemainaniedaz fled'thesw<eondemrls°nthns tan AmingaugeshallbemaWled \\ \ i
at Me project ^g p \ 7 DAy GROUND COVER 0/ a� rerFabar the
tt A I
12 Inspection and final acceptance letters When the project is complete the petmidees shall contact DEMLR to close out the E&SC \ / / OO^8'fYLbO^
Plan.After DEMLR toreros the perm.°of the project close out,via inspection report,the permiuce shall visit \ IN DI CH WI,ERE PIPES -i 0 0% I '' °°nam,<i"°=°elmem bars°rotamntlartl etreneth on°xtn°"°rim"sy^'"°"°filterkbnm. CROSS SECTION VIEW
"deq.ncgov/NCAOP'toaobmit an electronic Notice of termitmtion(o-NOT).A$100 annual general permit tee will be charged ) HAV BEEN INSTALLED /%�/ a elevvoorr.IHlgherren<ea
nirm the a-Nor Has been tried one // n alma
/ 'a1'�e \ �:�:;uretr;s efiltercoot unye a support�e Wen ereetm,m lo.a o w1; ec.
rmupuraN the upalope side of the posts.Extend the wIre
en fah.
4.oher• the fence Peat Wre to e bottom...no,Fasten orroepvreotiers Dula beveemi falvdc by wire mesh fasten.nimum g0 nil imnalle mango.a hP°CI°r greatment ranlnces at llMkea yrequ red once a Pend mmatl ster each t
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION
/�% /// /� \ / ep,acTsts S. wiremeshemeumum Ne she.Supportss ma he tlnven :inr bile ofasetlin,entfence toll e.mar,tle y
supp
seareneonrde deposits
necessary
mvr0
Gravel Const on Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site. \ i/ 1 ►� / strength mterfabrouMe whnsmm ininirnurn opmt spacing aces not require awire mein suppmfenm.Securely a. provide eaequem
This may ruetl'odic[o dressin with stone.After each rainfall,ins used sediment and clean it out 0 /i ��'� filter rY
require pen p gwr pen any so-ucmre use p necessary.
/ // / �1,� / reedy m poem.Wire or plastic zip ties mould have a minimum of W pound tensile reduce
Immediately remove all objectionable materials spilled,washed,or tracked onto public roadways. /�/ remavoM undermining the lens tluargn the
/ •i• IVEWAY �mmey4 inch.....,,,,,mrnea deep smog the PnPnaea true Hobe pinta aria
Silt Fenm-Sediment fences should be inspected at least onceaweek and after each rainfall event Any regain should be made immediately. %�/
Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that moos up against me rend should be removed and disposed PIP IN DITCH • 12 long the bottom am side erne trench. SWIM conmb rig
of properly to insure that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence �// ffi/ C hencFwaFa along
over De alter labile and compact.Thorough compaction al Me becktlll is drainage athre all aaabeen pmpedyembJlzed sediment
at tall limes.Take care to not undermine the fence during clean.operations. /�% a MINN to silt...D....a
10.Do not men CM Mb.to exiagtrees.
Soddng-The sod should be properly mainminedminsure that the grass rake holds in the areas being secured.The sod should be warmed as necessary ��/ CONSTRUCTION \ CONSTRUCTION
adequate moisnue in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could iMibit adequate / ..\NGEnviru....Men
growth maintain
stabilization of the root bed.The sot should be limed aria fertilized as per mil type recommendations and type of grass recommendations when / ENTRANCE N.
LIMITS SILT FENCE
and if possible. /iFt
I
Grassing and Mulching-The area to receive grassing and mulching should Cr properly fertilized and limed as necessary as an initial step in soil preparation. /i/ i i
Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be repaired, % i/
CO/
and reseeded as soon as possible. - of year does not n.the establishment f then should be used until Me / DATE: PAGE
p Y Pe P B< temporary -g /i
Bowing season pennimth f permanent Boss /i 1 M e
/i I
MI �I Ass to he 1. Other materials providing
have been Berms DsI b shall beinspected weekly8 maMrht,each d shall
hRprod d 'till Mal they - designed and that Mere �,, 3872 GA VEY RO / �— - Iti I� rap rim
Asa FLOW
ffi
name been no breaches h berm.B shallnot exceed is in height,and aha lbe placed- - - M1 - ..lea. i/ / I— obstrtwd for
Once the house construe- -completed d[M1e lot isready to receive sod,then Me berm shall be d d m d- he graded lot area i I I I Lot Pla� / ,z• 'I _.q '' hh Mil �II.IIg - w - ryvuln compost
and covered immediately M1 d.All propercare shall be taken to mime that the berm installed d h applicable detail with the berm material
compacted sufficiently insure thatthe berm remains in place during the course of the lion activities. I I I UGrr \ aECDON tees SECTION ankea (1 edeoonyaemmr
a.a minimum of 10 feet ey
General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The budder will insure that the / graded noutetlbe located et theedge the
construction ' any particular lot do not adversely affect any of the installed erosion control measures.DM comtmnion dictates,measures will be relocatedland
on the lot to insure thatthe potential for sedimentation mnoffis eliminated as much as possible.Sill fences and gravel conauu°tlon entrances will be maintained as suggested / I \ ° ahlet)shoultl be mmea.The ends of esgthMy upss.to
in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. I o tiro g around a antl e
/ "io g0% RO aMy.. end srem go
23
Theati lvenIcally plumb,through the center of the silt
Inch x 2 Inch cross section.ould be driven
GROUND STABILIZATION L I J (`�� �`O� , \ 9 Wood Mulch a°Mmum intsval
gtlamaxlmorn interval �neapla dma°,ech
et or Ma
�m �. .m , . aheaM m� �w.cu,reENTRENCH .ren<him in Esocks/wadero no nv reon p
SITE AREA STABILIZATION '` mgroan s. the event possible°e.eMcoW
Swathe
old
runoff evens
EXCEPTIONS "`"oy, w uNTRENCHEDIrvsruunON
DESCRIPTIONTIME FRAME I I / /� / / 1 sot.,w,°,m.=°1.°,r,�..,,,s,..,1_.
PERIMETER DIKES, 7 DAYS NONE ••_ ossr°,�, /\ SxeBnRlc uIBw
n.the silt
SWALES,DITCHES& a p'Wo."� ... -- \ ' sine et leazleeek atter
SLOPES I, '� I / I I Mulch or Compost cuaoomsacx u.uaow antes T<h 1 inch or greeter rainfall.c memam an debris.
ove
HIGH QUALITY 7DAVS NONE llR Igl II%III .,,.re, rroro I / / \ \ tiro umremnm sow z. rv+ame mu rclogged or
WATER ZONES 71 Ili II / rota Toacte °iYm^teni°' naa^m pm"m Nso"m paa"m, our"m, accumulated needed to sediment.anyabn
(HQW) ➢°I j LW.l` .w.. I CONSTRUCTION / I fib/ SheetF e_ Pref panning becomes exoessive..sin
SLOPES STEEPER 7DAVS IF SLOPES ARE IO' II"'� II�IR "• ""m""`"w'"b l I ens tnnneax, nes., nee., 'Zr pas. Isa^m, iergemeimeter or a different aplaaureaab
III II—III' \ \ w
THAN 3:1 OR LESS IN LENGTH L II-n'I-IKII= a.m.+.wno...... ,�, I LIMITS / 1 won are m am a.man rat ram resmum zer arum t°tmum age.
_ / 91noeemd uand the area e i land
istuManceAND ARE NOT ".�.,„.,„.,..,, I / / / \ \ roam p measure has been permanently°mbaaea.
STEEPER THAN 2:1,
14 DAYS ARE 'r / / I ,\� \ \\ SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION
ALLOWED ^""^0 \ J
I \ L _SLOPE�ER R 14 DAYS SLO7 DAYS PES GREAT ER I\ d 4/ m`� �� / / / /� \THAN 50'IN LENGTH �� " =.11:1�gf I \
Ikil=lFll�,� III / I I \
ALL OTHER AREAS 14 DAYS NONE(EXCEPT FOR II.II�—II¶II 1 I /
WITH SLOPES PERIMETERS AND II—=II I�•_ _._.' _I I I // 1 / I I \
FLATTER THAN 4:1 HQW ZONES) %— CO /
/ /
DATE: PAGE: 1� 1II J / / / / I / \ /IIIII—
1 (/ / / I/ / I / \ PAGE 1 of 2
it ifs I .11.
00 7 G 'a ✓t rt `� t�`� / I/ A LOT EROSION CONTROL PLAN
t HOUS t 1L H kk .HODS HOU G HOUS% %HOU Roos Hou / / / // I TOTAL DISTURBED ACREAGE:2.50 ACRES
EOr^^*^ ^—r� � D Ta��r / / / I 7 / /I FOR
N°tea: / / / / / /' 3872 GAI N EY ROAD
LEGEND ,.If needed,Tree Protection fencing should be Installed along the buffer zone,wetland i
/
boundary oary and/or around preceded trees,providing a radius of at least 1.25 feet for eacM1 / / / I
DIRECTIONFLOVV `r inch Ofimnkd/or diameter.
around
SILT FENCE 2.Install Silt Fenceon the low elevation sides of each lot Install Silt Fence Outlets shown on
DIVERSION BITCH —rD'TC schematic/diagram and field adjusted,if necessary,for placement at low points.If lots are / \ / / FOR
1 contiguous and have different land owners or builders,each lot should have individual Silt /
SILT aTFENCELTSVOES ... Fences / KI MAS H HOMES L LC.
3.Install system.Silt Fence ponsi 10 feet of properly line to ensure there is no conflict with `\
CONSmucDON ENT.... septic system.It is the responsibility of the builder to ensure the installation of sediment / I
/ / / ` I /
control measures does not impact the septic system and repair area(s). /
°. ttaeoiontie°nao-°°"°nVrossee/Exitiat°batnat°Iledperint / \ / / GRAYS CREEK TOWNSHIP CUMBERLAND COUNTY,N.C.
/
5.Waste bins and other areas decimated for managing building material waste shall be at
least 50 feet away from storm drain inlets°rtlreinage ditcM1es unlesSttcan be shown that / / / \ / I / SCALE:1"=60' JANUARY 2024
no other alternative exists.If this separation cannot be achieved,these areas must be
contained behind Sat Fence. GRAPHIC SCALE
6. eta downstream of diaturoaneea should be protected;streets should be swept when
sediment from the construction Fence
activity is present. / I / 0 3D 6D ,2D 240
7.Details for Silt Fence,Silt Fence Outlets,Construction Enhances and other measures are
provided on additional sheets.Erosion and sediment control details are not drawn to
/
L_ stele. TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES l ENGINEERS
NOTE-DIVERSION DITCHES AND WATTLES WILL NOT BE UTILIZED IN ROADSIDE DITCHES / / I / PLANNERS iviatj
N FEET I
IMMI
1 inch = 60 ft.
I
/ I I SURVEYORS MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.