Loading...
HomeMy WebLinkAbout_External_ SAW-2020-01905 Hackeny Site_2500 Olive Chapel Road Provisional PermitBaker, Caroline D From: Capito, Rachel A CIV USARMY CESAW (USA) < Rachel.A.Capito@usace.army.mil > Sent: Thursday, January 4, 2024 5:10 PM To: dshirley@sandec.com; chris.raughley@pultegroup.com Cc: Thomas, Zachary T; Myers, Joseph M; Morales, Kristina Subject: [External] SAW-2020-01905 Hackeny Site/2500 Olive Chapel Road Provisional Permit CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear APPLICANT, This correspondence is in response to a Pre -Construction Notification (PCN) received on January 21, 2023, and considered complete on December 7, 2023. In submitting the PCN, you requested verification that the proposed project is authorized by a Department of the Army (DA) Nationwide Permit (NWP). The work affecting waters of the United States is part of an overall project known as the Hackney Site/2500 Olive Chapel Road. The activities in waters of the United States include the rehabilitation of an onsite dam including stream, wetland and open water impacts associated with the reconstruction of the dam and riprap spillway. The project involves the permanent discharge of fill material into 0.079 acre of wetland and 25 linear feet of stream impacts. An additional 0.043 acre of wetland, 75 linear feet of stream and 0.8 acre of temporary open water impacts for access and dam rehabilitation.. The project is located Apex, in Wake County, North Carolina. This letter is a provisional notification that your proposed project has been reviewed under NWP 3. In accordance with 40 CFR Part 121 (401 Rule), the Corps cannot take final action on the NWP verification request until the procedures outlined in the 401 Rule for an individual Water Quality Certificate (WQC) have been completed. Specifically, a Department of the Army (DA) permit or verification cannot be issued until a Section 401 WQC has been either issued, waived, or denied, and the neighboring jurisdiction review process described in 40 CFR 121 has been successfully completed. Conditions of the Individual Section 401 WQC will generally become conditions of any final NWP verification letter. Should state action on the required WQC approve a project different from that shown on the current application, a modification to the PCN will be required. You should notify our office of any such changes as substantial changes may require further evaluation. As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal law and subject you to further enforcement action. Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine Fisheries) does not preclude the requirement for obtaining DA authorization (e.g., an NWP verification letter) prior to commencing the work. In all future correspondence, please refer to file number SAW-2020-01905. This correspondence has also been copied to State and/or Federal agencies for their information. If you have any questions, please contact Rachel Capito at (919)- 440-1823, or by email at Rachel.A.Capito@usace.army.mil Sincerely, Rachel Capito Raleigh Regulatory Field Office Rachel Capito Regulatory Project Manager Wilmington District U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 919.440.1823 We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey.